Cost So Far
$1.49M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$0
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2017
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
6 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
3 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: CC-CLAY-002-01
EASTERN BOUNDARY TCE PLUME
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Oct 2016
Contaminated Areas
Groundwater: Medium Risk
Plume extends off of property boundary.
Contaminants: Trichloroethylene (TCE) 6600.0 ug/L
Site ID: CC-CLAY-001-01
NEW JFHQ/OLD BULK FUEL FARM SITE
Above Ground Storage Tank
Cost
$10K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
Contaminated Areas
Groundwater: Low Risk
Currently capped by liner material or asphalt. Not a drinking water source and only monitoring wells in area.
Contaminants: Benzene 42.0 ug/L
Site ID: GAC95-001-R-01
NDNODS ROME NG ARM. RANGE CMPLX CLO
Site Funded Under Another Program
Cost
Unknown
Final Cleanup Action
Jan 2027
3 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: GAC95-002-R-01
NDNODS ROME NG ARMORY RANGE COM. TD
Small Arms Range
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: GAHQ-001-R-01
NDNODS AVONDALE RIFLE RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: GAHQ-002-R-01
NDNODS CAMP NORTHEN TARGET RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Sep 2012
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »