Cost So Far
$16.6M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$2.14M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2020
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
18 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
5 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: FTMP-06
OLD INCINERATOR ASH DUMPSITE
Surface Disposal Area
Cost
$352K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Contaminated Areas
Soil: High Risk
ASH AND DEBRIS WERE EVIDENT AT THE GROUND SURFACE. The excavation was backfilled, landscaped and presently has well maintained grass. THE ASH DISPOSAL AREA IS IN AN AREA THAT IS TO BECOME PART OF THE GOLF COURSE.
Contaminants: Arsenic 16.6 mg/kg Chromium 72.199997 mg/kg Barium 1560.0 mg/kg Lead 4630.0 mg/kg
Groundwater: Medium Risk
LEAD CONCENTRATIONS DOWNGRADIENT OF THE DISPOSAL SITE WERE FOUND TO BE ABOVE THE MAXIMUM CONTAMINANT LEVEL. ALL RESIDENCES DOWNGRADIENT OF THE SITE ARE SUPPLIED BY A MUNICIPAL SYSTEM.
Contaminants: Beryllium and compounds 6.699998 ug/L Antimony and compounds 9.0 ug/L Lead 60.0 ug/L Chromium 114.0 ug/L Nickel (Soluble Salts) 189.0 ug/L
Site ID: FTMP-13
BLDG 209/302 DRY CLEANING FACILITIE
Contaminated Ground Water
Cost
$1.05M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2020
This site is under ongoing monitoring until Oct 2050
Contaminated Areas
Groundwater: Low Risk
There is the potential that the contamination may be migrating and the RI will further evaluate. no one is currently using the water and there is very little potential that this will change.
Contaminants: PCE 3.0 ug/L
Site ID: FTMP-004-R-01
TRAP AND SKEET RANGE
Small Arms Range
Cost
$2,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2016
Site ID: FTMP-14
BURIAL SITE/CREMATORY
Burn Area
Cost
$622K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Site ID: FTMP-10
VET. CLINIC/OLD PX GAS STATION
Underground Storage Tanks
Cost
$111K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1999
13 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: FTMP-001-R-01
ATLANTA NG RIFLE RANGE
Firing Range
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: FTMP-002-R-01
ATLANTA NG TARGET RANGE
Firing Range
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: FTMP-003-R-01
WACO TARGET RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: FTMP-01
BLDG 363 PAINT SHOP
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Apr 1988
Site ID: FTMP-02
BLDG 41 - UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 1992
Site ID: FTMP-03
BLDG 346 WASTE OIL TANK
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Jun 1993
Site ID: FTMP-04
BLDG 346 O/W SEPARATOR
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Apr 1988
Site ID: FTMP-05
BLDG 370 O/W SEPARATOR
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Apr 1988
Site ID: FTMP-07
BLDG 357 DEH MAINTENANCE
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
Apr 1988
Site ID: FTMP-11
COMMISSARY PARKING LOT
Contaminated Fill
Cost
Unknown
Final Cleanup Action
Sep 1996
Site ID: FTMP-16
PESTICIDE FACILITY 1
Pesticide Shop
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2014
Site ID: FTMP-09
BUILDING 143 PX STATION
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1999
Site ID: FTMP-08
BLDG 370 WASTE OIL TANK
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1994
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »