Cost So Far
$88.9M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$74.6M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2045
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
72 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
59 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SD007
C-5 POSITION 65 WASHRACK (SWMU-10/SWMU-26)
Surface Disposal Area
Cost
$1.62M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2019
This site is under ongoing monitoring until Sep 2032
Contaminated Areas
Groundwater: Medium Risk
Montoring data indicates the potential groundwater plume moving away from the source however the lastest round of sampling shows that there is a source (B84) upgrade from the site which is contributing to the plume. The state considers all groundwater to be potentially useable for drinking water, but currently gets drinking water from surface water upstream of the plant.
Contaminants: Toluene 7.0 ug/L Ethyl benzene 20.0 ug/L Tetrachloroethylene 20.0 ug/L Trichloroethylene (TCE) 21.0 ug/L 1,2-Dichloroethylene (cis) 39.0 ug/L Benzene 80.0 ug/L Xylene (Mixed) 670.0 ug/L
Soil: Low Risk
Analytical data indicates that contamination may be present at a point of exposure. On Site workers could have access to contaminated soil.
Contaminants: Xylene (Mixed) 5.3e-06 mg/kg
Site ID: ML930
SOUTHERN GUN BUTT
Medium/Large Caliber
Cost
$10K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2017
Contaminated Areas
Soil: Low Risk
Contaminants: Antimony and compounds 0.0012 mg/kg Lead 0.117 mg/kg Copper and compounds 0.527 mg/kg Zinc 0.916 mg/kg Iron 454.0 mg/kg
Site ID: SS020
SWMU 6 AREA EAST OF B-30 PAINT SPILL AREA
Spill Site Area
Cost
$125K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2017
Site ID: ZZ668
SWMU 42 BLDG 26, BLDG, FLOOR, DRAINS, UNDERGROUND
Unknown Site Type
Cost
$2.64M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2018
Site ID: SS021
SWMU 7 AREA WEST OF B-78 HYDRAULIC FLUID
Spill Site Area
Cost
$189K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2017
Site ID: RW540
SWMU 73 - B-79 FLOOR, DRAINS, UNDERGROUND PIPING
Washrack
Cost
$2.85M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2020
Site ID: CG037
SWMU 77 CONTAMINATION IN BACKGROUND WELLS AT B-10
Contaminated Ground Water
Cost
$2.91M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2018
This site is under ongoing monitoring until Jul 2075
Site ID: DC100
SWMU 37 BUILDING B-84 PARTS CLEANER SUMP
Chemical Disposal
Cost
$2.92M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2018
Site ID: TU951
SWMU 90 B-30 LEAKING DIESEL UNDERGROUND STORAGE TANKS (AOC 4)
Underground Storage Tanks
Cost
$163K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Site ID: WP006
B-10 AERATION BASIN (SWMU-4)
Disposal Pit and Dry Well
Cost
$1.99M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2008
This site is under ongoing monitoring until Sep 2035
Contaminated Areas
Groundwater: Medium Risk
Monitoring data indicates presence of a groundwater plume moving away from the source. An ICM - Boundary Control System for the B10 Area has been installed and began operation Jan 99. The state considers all groundwater to be potentially useable for drinking water, but currently gets drinking water from surface water upstream of the plant.
Contaminants: Tetrachloroethylene 5.0 ug/L Benzene 5.0 ug/L 1,1,1-Trichloroethane 5.0 ug/L 1,2-Dichloropropane 5.0 ug/L Chlorobenzene 7.7 ug/L Chloroform 8.3 ug/L 1,4-Dichlorobenzene 8.5 ug/L 1,1-Dichloroethylene 8.8 ug/L 1,2-Dichlorobenzene 31.0 ug/L Vinyl Chloride 44.0 ug/L Pentachlorophenol 50.0 ug/L 1,1-Dichloroethane 77.0 ug/L Trichloroethylene (TCE) 21000.0 ug/L
Soil: Low Risk
Analytical data indicates contamination is moving toward a point of exposure. On Site workers could have access to contaminated soil. Site is not restricted.
Contaminants: Chloroform 6.0e-06 mg/kg Tetrachloroethylene 7.0e-06 mg/kg 1,1-Dichloroethylene 7.0e-06 mg/kg Vinyl Chloride 8.0e-06 mg/kg 1,1-Dichloroethane 8.0e-06 mg/kg Toluene 6.500000000000001e-05 mg/kg Trichloroethylene (TCE) 0.0012 mg/kg
Surface Water: Low Risk
Analytical data indicates movement of contamination. Surface water eventually empties into a lake which has been classifed as recreational , but is no longer in use.
Contaminants: Trichloroethylene (TCE) 38.0 ug/L
Surface Water (Fresh): Low Risk
Analytical data indicates movement of contamination. Surface water eventually empties into a lake which has been classifed as recreational , but is no longer in use.
Contaminants: Trichloroethylene (TCE) 38.0 ug/L
Site ID: WT028
SWMU 31 B-10 WWTP AND UNDERDRAIN SYSTEM
Waste Treatment Plant
Cost
$2.18M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2035
Site ID: ZZ660
SWMU 51 - B-31 SCRAP METAL TRUCK PARKING/HOPPER
Unknown Site Type
Cost
$279K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2017
Site ID: ZZ667
SWMU 41 BLDG B-1 FLOORS, DRAINS, UNDERGROUD PIPING
Unknown Site Type
Cost
$2.69M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2018
Site ID: WT017
SWMU 2 B-10 EFFLUENT PUMP AT WWTP
Waste Treatment Plant
Cost
$82K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2018
Site ID: ZZ664
SWMU 67 - B-65 PAINT CAN CRUSHER AREA
Unknown Site Type
Cost
$21K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2018
Site ID: TA036
SWMU 75 ABOVE GROUND STORAGE TANKS AT B-52
Above Ground Storage Tank
Cost
$114K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2016
Site ID: ID031
SWMU 43 B-4 BLDG FLOORS,DRAINS,UNDERGROUND PIPING
Industrial Discharge
Cost
$2.78M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2018
Site ID: SA025
SWMU 21 FORMER B-10 STORAGE AREA (FRMR HW PAD)
Storage Area
Cost
$1.41M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
Site ID: SS041
SWMU 102 B-52 DIESEL FUEL SPILL
Spill Site Area
Cost
$162K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2017
Site ID: SS027
SWMU 27 TCE CONTAMINATION SOIL AT B-31 CUTTING OIL
Spill Site Area
Cost
$59K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: WT018
SWMU-## B-10 FORMER WWTP RECIRCULATION PIT (SUMP)
Waste Treatment Plant
Cost
$473K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2020
This site is under ongoing monitoring until May 2020
Site ID: DC1
Duplicate Site Within Same Program
Cost
Unknown
Site ID: CG704
SWMU 65 T-566 HAZARDOUS WASTE COLLECTION SITE
Contaminated Ground Water
Cost
$3.74M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2020
Site ID: ID022
SWMU 8 B-78 LEAKING PUMP
Industrial Discharge
Cost
$21K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2017
Site ID: ID035
SWMU 72 B-91 BLDG FLOORS,DRAINS,UNDERGRD PIPING
Industrial Discharge
Cost
$2.42M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2018
Site ID: LF003
SITE 03 PAST LANDFILL@ B-90 (SWMU-29)
Landfill
Cost
$1.74M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 1992
This site is under ongoing monitoring until Sep 2099
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: LF002
DEACTIVATED LANDFILL (SWMU-30)
Landfill
Cost
$1.77M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2006
This site is under ongoing monitoring until Sep 2099
Contaminated Areas
Groundwater: Medium Risk
Monitoring data indicates presence of a groundwater plume moving away from the source. An ICM - Boundary Control System for the B4 area has been installed and began operation. The state considers all groundwater to be potentially useable for drinking water, but currently gets drinking water from surface water upstream of the plant.
Contaminants: Toluene 1.36 ug/L Carbon tetrachloride 2.0 ug/L Benzene 3.7 ug/L 1,1,1-Trichloroethane 5.0 ug/L Chloroform 5.7 ug/L 1,1-Dichloroethylene 8.6 ug/L Tetrachloroethylene 11.0 ug/L 1,1,2-Trichloroethane 15.0 ug/L 1,1-Dichloroethane 19.0 ug/L Vinyl Chloride 100.0 ug/L 1,2-Dichloroethylene (trans) 30000.0 ug/L Trichloroethylene (TCE) 330000.0 ug/L
Soil: Low Risk
Contamination has moved form source. Access is limited.
Contaminants: Toluene 0.00035 mg/kg Ethyl benzene 0.00054 mg/kg Benzene 0.0007 mg/kg Trichloroethylene (TCE) 0.005200000000000001 mg/kg
Site ID: OT015
BLDG 58 WING SEAL FACILITY (SWMU-28)
Spill Site Area
Cost
$149K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2009
Contaminated Areas
Groundwater: Medium Risk
Previous investigations have identified groundwater contamination below and downgradient of Bldg B-58. TCE at a level of 340 ppb has been detected off site and is about 200 feet downgradient across from Bldg B-58. An ICM - Boundary Control System for the The state considers all groundwater to be potentially useable for drinking water, but currently gets drinking water from surface water upstream of the plant. Offsite groundwater contamination identified at 300 ppb.
Contaminants: Toluene 1.36 ug/L Carbon tetrachloride 2.0 ug/L Benzene 3.7 ug/L 1,1,1-Trichloroethane 5.0 ug/L Chloroform 5.7 ug/L 1,1-Dichloroethylene 8.6 ug/L Tetrachloroethylene 11.0 ug/L 1,1,2-Trichloroethane 15.0 ug/L 1,1-Dichloroethane 19.0 ug/L Vinyl Chloride 100.0 ug/L 1,2-Dichloroethylene (trans) 30000.0 ug/L Trichloroethylene (TCE) 330000.0 ug/L
Soil: Low Risk
Contamination has moved form source. Access is limited.
Contaminants: Tetrachloroethylene 9.0e-06 mg/kg 1,2-Dichloroethylene (Total) 1.1e-05 mg/kg Ethyl benzene 1.2e-05 mg/kg Trichloroethylene (TCE) 2.1000000000000002e-05 mg/kg Chloroethane 5.0e-05 mg/kg
Site ID: CG705
SWMU 91 B-102 PLUME (WELL #ITS-10)
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Jul 2017
Site ID: DD026
SWMU 23 B-68 DRAIN PIPE SITE
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Aug 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: ID032
SWMU 44 B-77 BLDG FLOORS,DRAINS,UNDERGRD PIPING
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Oct 2009
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: ID033
SWMU 54 B-7 BLDG FLOORS,DRAINS,UNDERGRD PIPING
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Aug 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: PL042
SWMU 3-09 AREA OUTSIDE B-23 FUEL TEST FAC & TANK
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Oct 2017
Site ID: RS581
SWMU 60 B-31 SPILLWAY, RETENTION POND, AND DRAINAG
Surface Runoff
Cost
Unknown
Final Cleanup Action
Jul 2018
Site ID: RS582
SWMU 92 - B-10 SEDIMENTATION POND
Surface Runoff
Cost
Unknown
Final Cleanup Action
Apr 2018
Site ID: CG703
SWMU 96 RAG COLLECTION SITE B-86/T-566
Contaminated Ground Water
Cost
$1.22M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2018
Site ID: SA667
SWMU 35 - B-57 CHEMICAL STORAGE AREA
Storage Area
Cost
$2.87M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2020
Site ID: SD005
RETENTION BASIN #2 (SWMU-20)
Surface Disposal Area
Cost
$6.38M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2006
This site is under ongoing monitoring until Sep 2075
Contaminated Areas
Groundwater: Medium Risk
Monitoring data indicates presence of a groundwater plume moving away from the source. An ICM - Boundary Control System for the B4 Area has been installed and began operation. The state considers all groundwater to be potentially usable.
Contaminants: Toluene 1.36 ug/L Carbon tetrachloride 2.0 ug/L Benzene 3.7 ug/L 1,1,1-Trichloroethane 5.0 ug/L Chloroform 5.7 ug/L 1,1-Dichloroethylene 8.6 ug/L Tetrachloroethylene 11.0 ug/L 1,1,2-Trichloroethane 15.0 ug/L 1,1-Dichloroethane 19.0 ug/L Vinyl Chloride 100.0 ug/L 1,2-Dichloroethylene (trans) 30000.0 ug/L Trichloroethylene (TCE) 330000.0 ug/L
Sediment (Fresh): Low Risk
Analytical data indicates movement of contamination. Tributary discharges into Rottenwood Creek that runs through a College Campus.
Contaminants: Tetrachloroethylene 1.5e-05 mg/kg 1,2-Dichloroethylene (cis) 0.00013000000000000002 mg/kg Trichloroethylene (TCE) 0.0040999999999999995 mg/kg
Sediment (Human): Low Risk
Analytical data indicates movement of contamination. Tributary discharges into Rottenwood Creek that runs through a College Campus.
Contaminants: Tetrachloroethylene 1.5e-05 mg/kg 1,2-Dichloroethylene (cis) 0.00013000000000000002 mg/kg Trichloroethylene (TCE) 0.0040999999999999995 mg/kg
Site ID: SI019
SWMU 5 B-90 SEPTIC TANK DRAIN FIELD
Surface Impoundment/Lagoon
Cost
$1.36M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS009
B76 - TCE SPILL (SWMU-19)
Spill Site Area
Cost
$15M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2008
This site is under ongoing monitoring until Sep 2075
Contaminated Areas
Groundwater: Medium Risk
Montoring data indicates the presence of a groundwater plume. TCE at a level of 340 ppb has been detected off site . An ICM - Boundary Control System for the B4 Area has been installed and began operation. The state considers all groundwater to be potentially useable for drinking water, but currently gets drinking water from surface water upstream of the plant. Offsite groundwater contamination identified at 300 ppb.
Contaminants: Toluene 1.36 ug/L Carbon tetrachloride 2.0 ug/L Benzene 3.7 ug/L 1,1,1-Trichloroethane 5.0 ug/L Chloroform 5.7 ug/L 1,1-Dichloroethylene 8.6 ug/L Tetrachloroethylene 11.0 ug/L 1,1,2-Trichloroethane 15.0 ug/L 1,1-Dichloroethane 19.0 ug/L Vinyl Chloride 100.0 ug/L 1,2-Dichloroethylene (trans) 30000.0 ug/L Trichloroethylene (TCE) 330000.0 ug/L
Soil: Medium Risk
Contamination has moved from the source. Potential Access by personnel working in the area.
Contaminants: Trichloroethylene (TCE) 0.006200000000000001 mg/kg
Site ID: SS039
SWMU 98 FLIGHTLINE FUEL FARM SPILL SITE
Spill Site Area
Cost
$776K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2020
Site ID: SS023
SWMU 11 B-31 CUTTING OIL SPILL SITE
Spill Site Area
Cost
$114K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2017
Site ID: SS040
SWMU 97 B-102 HYDRAULIC OIL SPILL SITE
Spill Site Area
Cost
$189K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
Site ID: SS043
SWMU 4-09 CRACKED FLOOR FORMER T-558 NOSE HANGER
Spill Site Area
Cost
$114K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Site ID: SS010
SITE 10 JP-5 FUEL SP NO. 2 (SWMU-9)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1999
Contaminated Areas
Soil: Low Risk
Analytical data indicates contamination could move toward a point of exposure. On Site workers could have access to contaminated soil. Site is not restricted.
Contaminants: Toluene 4.43e-06 mg/kg Tetrachloroethylene 2.1000000000000002e-05 mg/kg Methyl Ethyl Ketone 3.85e-05 mg/kg Bis(2-Ethylhexyl)Phthalate 0.0006500000000000001 mg/kg
Site ID: SS011
SITE 11 JP-5 FUEL SP NO. 1 (SWMU-9)
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1992
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS723
SWMU 52 B-96 TROUGH, RETENTION POND, DRAINAGEWAY
Spill Site Area
Cost
$44K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2018
Site ID: SS724
SWMU 89 B-80 FUEL SPILL AREA
Spill Site Area
Cost
$59K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2017
Site ID: RW541
SWMU 18 - C-130 WASHRACK TCE LEAKS
Washrack
Cost
Unknown
Final Cleanup Action
Dec 2017
Site ID: SA666
SWMU 38 - B-3 PAINT MIX AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 2018
Site ID: SA668
SWMU 16 BUILDING T-559
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2018
Site ID: SA669
SWMU 24 - T-706 STORAGE AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 2017
Site ID: SA670
SWMU 13 B-96 DRUM STORAGE RACKS
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 2017
Site ID: SI024
SWMU 12 RETENTION BASIN NO. 1
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Jul 2018
Site ID: TA636
SWMU 25 GUN BUTT/OFF-SPEC FUEL TANK AREA
Above Ground Storage Tank
Cost
$1.39M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2018
This site is under ongoing monitoring until Sep 2030
Site ID: TA639
SWMU 14 B-80 FUEL OIL TANK AOC 12
Above Ground Storage Tank
Cost
$82K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
Site ID: TT509
SWMU 17 - B-99 UNDERGROUND STORAGE TANKS FARM
Underground Tank Farm
Cost
$5.51M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
Site ID: TU016
SWMU 1 B-64 LEAKING VAULT SITE
Underground Storage Tanks
Cost
$283K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2018
This site is under ongoing monitoring until Aug 2018
Site ID: WP001
B90 SURFACE IMPOUNDMENT (SWMU-3)
Disposal Pit and Dry Well
Cost
$1.74M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2008
This site is under ongoing monitoring until Sep 2099
Contaminated Areas
Groundwater: Medium Risk
Monitoring data indicates presence of a groundwater plume moving away from the source. An ICM - Boundary Control System for the B90 Area has been installed and began operation Jan 99. The state considers all groundwater to be potentially useable for drinking water, but currently gets drinking water from surface water upstream of the plant.
Contaminants: Chloroform 3.0 ug/L Benzene 5.1 ug/L Naphthalene 11.0 ug/L Chlorobenzene 18.0 ug/L 1,4-Dibromobenzene 19.0 ug/L Vinyl Chloride 34.0 ug/L 1,2-Dichloropropane 48.0 ug/L Pentachlorophenol 120.0 ug/L 1,1,1-Trichloroethane 150.0 ug/L 1,2-Dichlorobenzene 150.0 ug/L 1,1-Dichloroethane 390.0 ug/L 1,1-Dichloroethylene 480.0 ug/L Trichloroethylene (TCE) 530.0 ug/L
Surface Water: Medium Risk
Analytical data indicates movement of contamination toward a point of exposure. Surface water eventually empties into a man-made lake which has been classifed as recreational , but is no longer in use.
Contaminants: Trichloroethylene (TCE) 130.0 ug/L
Surface Water (Fresh): Medium Risk
Analytical data indicates movement of contamination toward a point of exposure. Surface water eventually empties into a man-made lake which has been classifed as recreational , but is no longer in use.
Contaminants: Trichloroethylene (TCE) 130.0 ug/L
13 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: TA637
SWMU 34 FORMER AVIATION FUEL TANK FARM (AOC 5A2)
Above Ground Storage Tank
Cost
$437K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2015
This site is under ongoing monitoring until Sep 2075
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Naphthalene 9.1 mg/kg 2-Methylnaphthalene 14.0 mg/kg Ethylbenzene 21.0 mg/kg Xylene (Mixed) 54.0 mg/kg
Site ID: SS015
B-104 GAS PUMP STATION (SWMU-81)
Spill Site Area
Cost
$76K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2002
Contaminated Areas
Groundwater: Medium Risk
The GW investigation which is part of the C-5 Wash Rack SRFI indicates that PCE, TCE, VC & DCE are coming from another source upgrade from the B-104. The B-104 is a UST that has benn removed and the soil cleaned up before the upgraded tank was replaced. The state considers all groundwater to be potentially useable for drinking water, but currently gets drinking water from surface water upstream of the plant.
Contaminants: Tetrachloroethylene 2.0 ug/L Vinyl Chloride 2.0 ug/L Toluene 6.0 ug/L Benzene 6.0 ug/L Trichloroethylene (TCE) 24.0 ug/L Xylene (Mixed) 84.0 ug/L Ethyl benzene 93.0 ug/L 1,2-Dichloroethylene (cis) 99.0 ug/L
Soil: Low Risk
Contamination is NOT moving toward a point of exposure. On Site workers could have access to contaminated soil. Site is not restricted.
Contaminants: Ethyl benzene 0.00027 mg/kg Benzene 0.00048 mg/kg Toluene 0.0006 mg/kg Xylene (Mixed) 0.0007 mg/kg
Site ID: PL034
SWMU 62 B-70 PIT UNDER RAILROAD TRACKS
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Aug 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS013
POSITION 58 FUEL/DEFUEL STATION
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 1997
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS012
SODIUM DICHROMATE SPILL (SWMU-22)
Spill Site Area
Cost
$59K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 1999
Contaminated Areas
Soil: Low Risk
Contaminants: Chromium 0.0 mg/kg
Site ID: TU029
SWMU 32 B-90 OLD LUNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
$59K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: WP004
SITE 04 SANIT WWTP SLUDGE (SWMU-78)
Disposal Pit and Dry Well
Cost
$23K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 1992
This site is under ongoing monitoring until Mar 2018
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS014
POSITION 19 FUEL/DEFUEL STATION (SWMU-83)
Spill Site Area
Cost
$3.3M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 1992
This site is under ongoing monitoring until Sep 2075
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OT008
SITE 08 BLDG B-96 (SWMU-15)
Surface Disposal Area
Cost
$59K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 1992
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SA030
SWMU 40 T-705 IWWTP CHEMICAL STORAGE
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OT013
C-130 FUELING POS 21-26
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Dec 1999
Contaminated Areas
Soil: Low Risk
Contaminated soil has been removed. Flightline workers can not have access to contaminated soils.
Contaminants: Ethyl benzene 0.0 mg/kg Toluene 0.0 mg/kg Benzene 0.0 mg/kg
Site ID: CG038
SWMU 93 CONTAMINATION AT WELL #ITS-9
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Aug 2013
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: ZZ666
SWMU 50 B-31 BERMED METAL CUTTINGS STORAGE AREA
Unknown Site Type
Cost
$59K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2013
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Methylene Chloride 0.005200000000000001 mg/kg Carbon Disulfide 0.0096 mg/kg Acetone 0.041 mg/kg Beryllium and compounds 2.0 mg/kg Cadmium and compounds 5.8 mg/kg Arsenic 13.0 mg/kg Lead 37.0 mg/kg Barium 120.0 mg/kg Chromium 160.0 mg/kg
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »