Cost So Far
$97.1M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$15M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2037
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
47 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
12 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: TS001
FORMER SKEET RANGE
Trap and Skeet Range
Cost
$3.43M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2018
Contaminated Areas
Soil: High Risk
Soil pathways are complete for TS001 where lead and PAH compounds were detected at concentrations that exceeded regulatory screening levels.
Contaminants: Dibenz[ah]anthracene 0.015 mg/kg Chrysene 0.03 mg/kg Lead 41.0 mg/kg
Sediment (Marine): High Risk
Sediment pathways are complete. Lead and PAHs were detected in soil/sediment above regualtory screening levels.
Contaminants: Lead 4.6000000000000005 mg/kg
Sediment (Human): Medium Risk
Sediment pathways are complete. Lead and PAHs were detected in soil/sediment above regualtory screening levels.
Contaminants: Lead 4.6000000000000005 mg/kg
Site ID: SD043
SOUTHEAST SURFACE DISPOSAL AREA
Surface Disposal Area
Cost
$673K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2009
This site is under ongoing monitoring until May 2020
Contaminated Areas
Groundwater: Low Risk
Contaminants: Perchloroethylene (PCE) 109.0 ug/L Trichloroethylene (TCE) 130.0 ug/L
Soil: Low Risk
Contaminants: Arsenic 0.03 mg/kg Lead 0.065 mg/kg
Site ID: SS021
FORMER BX SERVICE STATION
Underground Storage Tanks
Cost
$674K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2000
This site is under ongoing monitoring until Sep 2048
Contaminated Areas
Groundwater: High Risk
Plume indicated past migration but appears confined, site will go LTM only in FY98-03. Plume will reach basewide water supply in one-five years. Receptors included local well, vegetation and service station customers and customers' children, and all users of base water.
Contaminants: Lead 110.0 ug/L Benzene 6100.0 ug/L Toluene 40000.0 ug/L
Soil: Low Risk
Potential to contaminate groundwater Potential for customer, worker and child contact with area soil.
Contaminants: Benzene 0.0001 mg/kg
Site ID: LF004
SITE 4 NORTHEAST LANDFILL
Landfill
Cost
$1.75M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2001
This site is under ongoing monitoring until Sep 2050
Contaminated Areas
Groundwater: High Risk
Evident migration from conception in 1978 is evident. Receptors identified wells are potential water sources, local wetlands, ecology and wildlife.
Contaminants: Benzene 5.5 ug/L Lead 16.0 ug/L Chlorobenzene 18.0 ug/L Methylene Chloride 21.0 ug/L Trichloroethylene (TCE) 1101.0 ug/L cis-1,2-Dichloroethylene 2400.0 ug/L
Site ID: SS039
SS-39 GOLF COURSE AREA PLUME
Spill Site Area
Cost
$1.33M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2006
This site is under ongoing monitoring until Jul 2020
Contaminated Areas
Groundwater: High Risk
Private Water Wells
Contaminants: Trichloroethylene (TCE) 500.0 ug/L
Site ID: SS024
BUILDING 785 EMS MULTIPLE SHOP (IA)
Storage Area
Cost
$2.79M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2000
This site is under ongoing monitoring until Sep 2041
Contaminated Areas
Groundwater: High Risk
Plume shows migration. Receptors include industrial area workers.
Contaminants: Methylene Chloride 1600.0 ug/L cis-1,2-Dichloroethylene 6100.0 ug/L Trichloroethylene (TCE) 11000.0 ug/L
Site ID: SS038
FLIGHTLINE AREA (APRON A/B)
Spill Site Area
Cost
$3.34M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2005
This site is under ongoing monitoring until Sep 2041
Contaminated Areas
Groundwater: High Risk
Contaminants: Trichloroethylene (TCE) 4900.0 ug/L
Site ID: LF001
SITE 1 BURMA ROAD LANDFILL
Landfill
Cost
$433K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2002
This site is under ongoing monitoring until Sep 2019
Contaminated Areas
Groundwater: Low Risk
no migration occurring receptors identified-human, wildlife, and wells as well as Mission Lake water and wildlife.
Contaminants: Benzene 480.0 ug/L
Soil: Low Risk
Sampling and analysis potential for local recreationalists and wildlife, including endangered wildlife and vegetation.
Contaminants: Benzene 0.0001 mg/kg
Site ID: FT007
FORMER FIRE TAINING AREA
Fire/Crash Training Area
Cost
$684K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2005
This site is under ongoing monitoring until Jul 2020
Contaminated Areas
Groundwater: High Risk
migration identified and has shown migration since 1988 RI and inception in seventies. receptors human, some ecological and water wells.
Contaminants: Trichloroethylene (TCE) 5.81 ug/L Xylene (Mixed) 99.0 ug/L 1,2-Dichloroethylene (cis) 750.0 ug/L
Soil: Medium Risk
Receptors include soldiers doing exercises, local wildlife, swamp.
Contaminants: Lead 0.0 mg/kg Methylene Chloride 0.0013000000000000002 mg/kg Acetone 0.0067 mg/kg Bis(2-Ethylhexyl)Phthalate 0.0088 mg/kg
Site ID: LF003
SITE 3 SOUTHWEST LANDFILL
Landfill
Cost
$1.47M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2050
Contaminated Areas
Groundwater: Medium Risk
Plume indicated past migration but appears confined-site will go LTM only FY98/99. Receptors included local well and wildlife. LF-3 upgradient of Mission Lake.
Contaminants: Arsenic 4.5 ug/L Benzene 5.0 ug/L Xylene (Mixed) 11.0 ug/L Toluene 12.0 ug/L Vinyl Chloride 16.0 ug/L Lead 124.0 ug/L Barium 9650.0 ug/L
Surface Water: Medium Risk
Migration to Mission Lake, and its wildlife is evident but confined. Receptros include park visitors, alligators, and wood storks.
Contaminants: Chlorobenzene 6.7 ug/L Acetone 14.0 ug/L Methyl Ethyl Ketone 110.0 ug/L Manganese and compounds 116.0 ug/L Mercury 140.0 ug/L Iron 1820.0 ug/L Chromium (III) 12000.0 ug/L Lead 30000.0 ug/L Barium 91000.0 ug/L
Surface Water (Fresh): Medium Risk
Migration to Mission Lake, and its wildlife is evident but confined. Receptors include fish, wood stork, alligator, children and families and park beside Mission Lake.
Contaminants: Chlorobenzene 6.7 ug/L Acetone 14.0 ug/L Methyl Ethyl Ketone 110.0 ug/L Manganese and compounds 116.0 ug/L Mercury 140.0 ug/L Iron 1820.0 ug/L Chromium (III) 12000.0 ug/L Lead 30000.0 ug/L Barium 91000.0 ug/L
Soil: Low Risk
sampling and analysis Receptors include wildlife
Contaminants: Lead 0.0 mg/kg Arsenic 0.0 mg/kg Zinc 0.0 mg/kg Barium 0.00222 mg/kg
Site ID: LF042
SOUTH GATE FILL SITE (LF-42)
Surface Disposal Area
Cost
$520K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2006
Contaminated Areas
Soil: Medium Risk
Contaminants: Dibenz[ah]anthracene 0.032 mg/kg Indeno(1,2,3-cd)Pyrene 0.052000000000000005 mg/kg Benzo(a)Pyrene 0.11 mg/kg Benzo(k)Fluoranthene 0.12 mg/kg Chrysene 0.14 mg/kg Benz(a)Anthracene 0.15 mg/kg
Site ID: SS031
VEHICLE MAINTENANCE AREA
Storage Area
Cost
$374K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2004
This site is under ongoing monitoring until Jan 2019
Contaminated Areas
Soil: Low Risk
record time lapse suff for migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
35 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: OT013
PARTS BURIAL SITE
Landfill
Cost
Unknown
Final Cleanup Action
Aug 1992
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OT017
CORROSION CONTROL FACILITY (IA)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 2000
Contaminated Areas
Groundwater: High Risk
migration evident from 1989 samples, and from initial study receptors identified-workers, wells
Contaminants: Trichloroethylene (TCE) 39000.0 ug/L cis-1,2-Dichloroethylene 67000.0 ug/L
Soil: High Risk
receptors identified-human, vegetation
Contaminants: Methylene Chloride 0.38 mg/kg Acetone 6.4 mg/kg cis-1,2-Dichloroethylene 33.0 mg/kg
Site ID: OT022
DUDLEY'S HAMMOCK (FORMER EOD AREA) OT-22
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Jan 2006
Contaminated Areas
Groundwater: Low Risk
Site indicated past potential for migration but now confined, site will go NFRAP in FY98. Past potential wildlife and well (human) receptors like hikers. Gopher tortise, wood stork, indigo snake. Water well.
Contaminants: Lead 4500.0 ug/L
Soil: Low Risk
Receptors include marsh, rare plant and wildlife, and human visitors.
Contaminants: Lead 0.0781 mg/kg
Site ID: SD016
FLTLINE STORM DRAIN OUTFALL
Storm Drain
Cost
Unknown
Final Cleanup Action
Apr 2005
This site is under ongoing monitoring until Oct 2013
Contaminated Areas
Groundwater: Medium Risk
Potential for migration. Potential for receptor intake.
Contaminants: Lead 1091.0 ug/L
Soil: Low Risk
Soil Limited receptors.
Contaminants: Lead 2.2e-05 mg/kg
Surface Water: Low Risk
Confined migration. Limited receptors.
Contaminants: Lead 1.9 ug/L
Surface Water (Fresh): Low Risk
Confined migration. Limited receptors.
Contaminants: Lead 1.9 ug/L
Site ID: SS019
GRASSY POND ANNEX
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2006
Contaminated Areas
Soil: High Risk
Campers Campers, children's play area
Contaminants: Lead 0.8 mg/kg
Groundwater: Low Risk
Potential for groundwater to feed to site lake. Area used a recreational park, but limited use.
Contaminants: Dieldrin 0.03 ug/L
Site ID: SS020
WING TIP UNDERGROUND STORAGE TANKS (IA)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2000
Contaminated Areas
Groundwater: High Risk
Groundwater plume shows signs of migration. Plume has grown over 200% since inception in 1990. Receptors include worker, and water wells. Workers intercepting GW will be exposed.
Contaminants: Benzene 8200.0 ug/L
Soil: Low Risk
High groundwater table Workers doing maintenance or repairs in area are exposed.
Contaminants: Benzene 0.0006 mg/kg
Site ID: SS023
AOC 1, AOC-23, SA023
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2003
Contaminated Areas
Soil: Low Risk
Records indicate enough time lapse for migration. Receptors include workers.
Contaminants: Lead 5.0e-06 mg/kg
Site ID: SS025
AOC 3, AOC-25, SA025 (IA)
Storage Area
Cost
Unknown
Final Cleanup Action
Feb 2001
Contaminated Areas
Soil: Low Risk
Migration appears to be evident from photos, records. Receptors include workers.
Contaminants: Lead 5.0e-06 mg/kg
Site ID: SS026
AOC 4, AOC-26, TU026
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 2003
Contaminated Areas
Soil: Low Risk
Record time lapse suff to indicate migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
Site ID: SS027
AOC 5, AOC-27, SA027
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 2000
This site is under ongoing monitoring until Mar 2003
Contaminated Areas
Soil: Low Risk
record time lapse suff for migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
Site ID: SS029
AOC 7, AOC-29, SA029
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2002
This site is under ongoing monitoring until Mar 2003
Contaminated Areas
Soil: Low Risk
record time lapse suff for migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
Site ID: SS030
SMALL TURBINE REPAIR SHOP (IA)
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 2001
Contaminated Areas
Soil: Low Risk
Historical records search indicates enough past disposal to cause plume and migration. Receptors include workers and various civilians-area is in between industrial and commercial areas.
Contaminants: Trichloroethylene (TCE) 0.00035999999999999997 mg/kg
Site ID: SS033
SHEET METAL SHOP (IA)
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 2000
Contaminated Areas
Soil: Low Risk
Historical records search indicates sufficient past disposal to create migrating plume. Site is in between industrial and commercial areas, so receptors include workers and various civilians.
Contaminants: Trichloroethylene (TCE) 0.00035999999999999997 mg/kg
Site ID: SS034
AOC 12, AOC-34, HOT PIT REFUELING AREA
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1998
Contaminated Areas
Groundwater: Low Risk
Limited site access, but high concentrations provide continuing groundwater contamination source. Limited area receptors.
Contaminants: Toluene 0.0 ug/L
Soil: Low Risk
record time lapse suff for migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
Site ID: SS036
UNNAMED CREEK DEBRIS SITE
Landfill
Cost
Unknown
Final Cleanup Action
Dec 2004
Contaminated Areas
Soil: High Risk
record time lapse suff for migration receptors include workers
Contaminants: Cadmium and compounds 0.0425 mg/kg Alachlor 0.213 mg/kg Chlordane 0.332 mg/kg Lead 0.9560000000000001 mg/kg
Site ID: ST015
U/G WASTE FUEL TANK (IA)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2000
Contaminated Areas
Groundwater: High Risk
Potential for further migration as shown by comparing 1987 sampling to 1995 results, migration is evidnent Human receptors, wells potential use.
Contaminants: Lead 33.01 ug/L Naphthalene 160.0 ug/L 1,1,1-Trichloroethane 500.0 ug/L Xylene (Mixed) 2300.0 ug/L Benzene 3500.0 ug/L Trichloroethylene (TCE) 4800.0 ug/L
Soil: Low Risk
Potential for worker exposure.
Contaminants: Lead 9.0e-06 mg/kg
Site ID: ST018
BULK FUEL STORAGE AREA (IA)
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Mar 2003
Contaminated Areas
Groundwater: High Risk
migration evidentfrom 1989 RI and previous studies. Plume has over doubled in size wells, human receptors and Oglethorpe power plant nearby.
Contaminants: Xylene (Mixed) 3400.0 ug/L Benzene 4200.0 ug/L cis-1,2-Dichloroethylene 67000.0 ug/L
Soil: Low Risk
potential for off-base migration to Oglethorpe power plant and human contact potential.
Contaminants: cis-1,2-Dichloroethylene 0.001 mg/kg
Site ID: TM001
FORMER M203 GRENADE PRACTICE RANGE
Training and Maneuver Area
Cost
Unknown
Final Cleanup Action
Sep 2012
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TM001A
FORMER M203 GRENADE PRACTICE RANGE
Training and Maneuver Area
Cost
Unknown
Final Cleanup Action
Sep 2012
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TS001A
FORMER SKEET RANGE
Trap and Skeet Range
Cost
Unknown
Final Cleanup Action
Sep 2012
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: LF041
CRASH TRAIL #2 FILL SITE, LF-41, (SWMU 43)
Landfill
Cost
Unknown
Final Cleanup Action
Dec 2004
This site is under ongoing monitoring until Jan 2006
Contaminated Areas
Soil: Low Risk
volatiles human and ecological
Contaminants: Benzo(a)Pyrene 6.7e-05 mg/kg
Site ID: OT010
SOUTH CRASH TRAIL FILL
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 1992
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS028
AOC 6, AOC-28, CB028 (IA)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Jan 2000
Contaminated Areas
Soil: Low Risk
record time lapse suff for migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
Site ID: WP014
SITE 14 LEAD SLUDGE AREA (IA)
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Oct 2000
Contaminated Areas
Groundwater: Low Risk
workers in this industrial area, area migrating to ST-18. Plume now confined, and site will go to LTM only in FY98/99. see above, local wells and vegetation also affected.
Contaminants: Lead 42.2 ug/L
Site ID: WP008
WP-08 LILY PAD POND FILL SITE
Landfill
Cost
Unknown
Final Cleanup Action
Sep 2003
This site is under ongoing monitoring until Oct 2004
Contaminated Areas
Groundwater: Low Risk
CONFINED AREA NO RECEPTORS
Contaminants: Benzene 1.0 ug/L
Site ID: SS035
AOC 13, AOC-35, SWMU 37, ENTOMOLOGY SHOP
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 2000
Contaminated Areas
Soil: Low Risk
record time lapse suff for migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
Site ID: ST012
SITE 12 NORTH POL TANK FARM
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2004
This site is under ongoing monitoring until Feb 2006
Contaminated Areas
Groundwater: Low Risk
Plume indicated past migration but appears confined. Site will go LTM only FY98-00. Recpetors include local wells, workers, Beatty Creek, and wildlife.
Contaminants: Lead 0.25 ug/L
Soil: Low Risk
Environmental Workers in fueling area.
Contaminants: Lead 0.0001 mg/kg
Site ID: FT006
SITE 6 BURMA RD FPTA
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Feb 2002
This site is under ongoing monitoring until Nov 2004
Contaminated Areas
Groundwater: Low Risk
Plume indicated past migration but now confined, site will go to LTM only FY98. Receptors include local wildlife, mission lake , and adults/children playing ball.
Contaminants: Barium 5.4 ug/L Lead 230.0 ug/L
Soil: Low Risk
Children/adults playing ball, local marsh and wildlife, and water well.
Contaminants: Chromium 0.0003 mg/kg
Site ID: LF002
SITE 2 NORTHWEST LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Sep 2004
This site is under ongoing monitoring until Oct 2005
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzene 2.0 ug/L Lead 2.0 ug/L
Soil: Low Risk
Contaminants: Benzene 5.0e-07 mg/kg
Site ID: LF005
SITE 5 DDT BURIAL SITE
Landfill
Cost
Unknown
Final Cleanup Action
Oct 1996
This site is under ongoing monitoring until Nov 1996
Contaminated Areas
Groundwater: Low Risk
limited access/migration limited
Contaminants: 4,4-DDD 0.23 ug/L
Soil: Low Risk
potential receptors include local wildlife, vegetation, including endangered species
Contaminants: 4,4-DDT 1.3e-07 mg/kg
Site ID: LF032
STONE ROAD DEBRIS SITE
Landfill
Cost
Unknown
Final Cleanup Action
Mar 2003
Contaminated Areas
Soil: Low Risk
record time lapse suff for migration receptors include workers
Contaminants: Lead 5.0e-06 mg/kg
Site ID: LF037
LF-37 - MUNITIONS AREA DEBRIS SITE - DRUMS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2004
This site is under ongoing monitoring until Sep 2005
Contaminated Areas
Groundwater: Low Risk
Contaminants: Trichloroethylene (TCE) 1.0 ug/L
Site ID: LF040
OLD HOMESTEAD DEBRIS SITE
Landfill
Cost
Unknown
Final Cleanup Action
Apr 2003
Contaminated Areas
Soil: Low Risk
Benzo(a)Pyrene
Contaminants: Benzo(a)Pyrene 6.7e-05 mg/kg
Site ID: OT009
SOUTH RUNWAY FILL SITE
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 1992
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OT011
NORTH CRASH TRAIL FILL
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 1992
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »