Back to Map
NAVY INSTALLATION ID: HI917002432600

BARBERS POINT NAS

kapolei, Hawaii

Cost So Far

$68.1M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$5.46M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Completion Date

2016

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

35 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions, fences, warning signs. see more » concrete berm around the controlled area. a deed restriction is documented in the parcel deed. a fence around controlled area, with or without gate. gate(s) and/or door(s) must be locked to prevent access and exposure to contaminants. a warning sign is in place surrounding the area a barrier, including but not limited to a paved surface or landfill cap, must be maintained in order to prevent exposure to contaminants, including vapor intrusion into an enclosed structure. notice to federal or state regulators, property owners, etc. before changes in land use or ownership. prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits any use other than industrial in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. no recreational use, including camping and overnight stays, are permitted in the area. prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. « see less

1 Active Site

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00033

BARBERS POINT NAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2014

Contaminated Areas

Soil: Low Risk

Contaminants: Aroclor 17.0 ppb

See more details...

34 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00018

BARBERS POINT NAS

Firing Range

Cost

$258K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2005

This site is under ongoing monitoring until Dec 2045

Contaminated Areas

Soil: Medium Risk

Contaminants: Lead 3930.0 ppb

See more details...

Site ID: SITE 00002

BARBERS POINT NAS

Surface Impoundment/Lagoon

Cost

$416K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2007

This site is under ongoing monitoring until Apr 2023

Contaminated Areas

Sediment (Marine): Medium Risk

Contaminants: Carbon disulfide 0.03 ppb Methylene chloride 0.12 ppb Nitrate 0.25 ppb Acetone 0.65 ppb Fluoranthene 1.6 ppb Benzo[a]pyrene 1.6 ppb Benzo[b]fluoranthene 1.8 ppb Benz(a)anthracene 1.8 ppb Chrysene 1.9 ppb Benzo[k]fluoranthene 2.2 ppb Selenium 2.8 ppb Pyrene 3.0 ppb Antimony and compounds 3.1 ppb Cadmium and compounds 9.2 ppb Bis(2-ethylhexyl)phthalate (DEHP) 18.0 ppb Tin and compounds 28.4 ppb Manganese and compounds 157.0 ppb Zinc 571.0 ppb Aluminum 3716.0 ppb

Surface Water (Marine): Medium Risk

Contaminants: Dimethyl phthalate 100.0 ppb Nitrate 170.0 ppb Carbon disulfide 300.0 ppb Diethyl phthalate 300.0 ppb Mercury 530.0 ppb Nickel and compounds 2900.0 ppb Copper and compounds 3000.0 ppb Arsenic (cancer) 3500.0 ppb Manganese and compounds 5000.0 ppb Cyanide (free) 6000.0 ppb Benzoic acid 6000.0 ppb Acetone 6000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 10000.0 ppb Zinc 20200.0 ppb Iron 40900.0 ppb Formaldehyde 110000.0 ppb

Groundwater: Low Risk

Contaminants: Beryllium and compounds 220.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 3000.0 ppb Arsenic (cancer) 5800.0 ppb

Sediment (Human): Low Risk

Contaminants: Benzo[a]pyrene 1.6 ppb Benzo[b]fluoranthene 1.8 ppb Benz(a)anthracene 1.8 ppb Selenium 2.8 ppb Cadmium and compounds 9.2 ppb Bis(2-ethylhexyl)phthalate (DEHP) 18.0 ppb Zinc 571.0 ppb

Surface Water (Human): Low Risk

Contaminants: Arsenic (cancer) 3400.0 ppb Thallium 6700.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 10000.0 ppb

See more details...

Site ID: SITE 00005

BARBERS POINT NAS

Soil Contamination After Tank Removal

Cost

Unknown

Final Cleanup Action

Apr 1999

Contaminated Areas

Soil: Low Risk

Contaminants: Benzo[a]pyrene 0.16 ppb Dichloroethylene, 1,1- 0.46 ppb

See more details...

Site ID: SITE 00022

BARBERS POINT NAS

Building Demolition/Debris Removal

Cost

Unknown

Final Cleanup Action

Oct 2001

Site ID: SITE 00020

BARBERS POINT NAS

Contaminated Ground Water

Cost

$247K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2003

This site is under ongoing monitoring until Dec 2045

Contaminated Areas

Soil: High Risk

Contaminants: Polychlorinated biphenyls (PCBs) 270.0 ppb

See more details...

Site ID: SITE 00006

BARBERS POINT NAS

Disposal Pit and Dry Well

Cost

$285K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2005

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Soil: High Risk

Contaminants: Benzo(a)Pyrene 0.15 ppb Arsenic 41.0 ppb Lead 679.0 ppb Manganese and compounds 4260.0 ppb

See more details...

Site ID: SITE 00007

BARBERS POINT NAS

Disposal Pit and Dry Well

Cost

$206K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2005

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 1480.0 ppb

See more details...

Site ID: SITE 00017

BARBERS POINT NAS

Surface Disposal Area

Cost

$29K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Beryllium and compounds 240.0 ppb Demeton 320.0 ppb Diazinon 1100.0 ppb Antimony and compounds 5100.0 ppb 2,6-Dimethylphenol 8000.0 ppb Cadmium and compounds 17500.0 ppb 4-Methylphenol 33000.0 ppb Naphthalene 37000.0 ppb Lead 76400.0 ppb Benzene 79000.0 ppb Vanadium 99400.0 ppb Toluene 170000.0 ppb Arsenic (cancer) 207000.0 ppb Manganese and compounds 635000.0 ppb Xylene (mixed) 650000.0 ppb Aluminum 2940000.0 ppb

Soil: Medium Risk

Contaminants: Arsenic (cancer) 23.6 ppb Chromium VI and compounds 32.8 ppb Lead 475.0 ppb

See more details...

Site ID: SITE 00003

BARBERS POINT NAS

Landfill

Cost

Unknown

Final Cleanup Action

Nov 2008

Contaminated Areas

Soil: Medium Risk

Contaminants: Beryllium and compounds 0.19 ppb Heptachlor epoxide 0.21 ppb Endosulfan I 7.9 ppb Arsenic (cancer) 50.4 ppb Chlordane 78.0 ppb Nickel and compounds 119.0 ppb Vanadium 145.0 ppb Chromium VI and compounds 163.0 ppb Barium and compounds 267.0 ppb Zinc 411.0 ppb Copper and compounds 536.0 ppb DDE,4,4- 630.0 ppb Manganese and compounds 1160.0 ppb DDD,4,4- 1500.0 ppb DDT 4300.0 ppb

Groundwater: Low Risk

Contaminants: Chlordane 70.0 ppb Beryllium and compounds 250.0 ppb Atrazine 900.0 ppb Benzene 1000.0 ppb Arsenic (cancer) 3100.0 ppb Thallium 3200.0 ppb Selenium 5000.0 ppb Ethyl acetate 6000.0 ppb Vanadium 40000.0 ppb Barium and compounds 100000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 140000.0 ppb

See more details...

Site ID: SITE 00008

BARBERS POINT NAS

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Aug 1999

Contaminated Areas

Soil: Medium Risk

Contaminants: Benzo[a]pyrene 1.1 ppb Antimony and compounds 11.9 ppb Arsenic (cancer) 18.4 ppb Vanadium 92.8 ppb Zinc 385.0 ppb Barium and compounds 1007.0 ppb Lead 2171.0 ppb

See more details...

Site ID: SITE 00009

BARBERS POINT NAS

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Apr 1999

Contaminated Areas

Groundwater: Low Risk

Contaminants: Indeno[1,2,3-cd]pyrene 500.0 ppb Benz(a)anthracene 800.0 ppb Benzo[a]pyrene 900.0 ppb Beryllium and compounds 1500.0 ppb Benzo[b]fluoranthene 3000.0 ppb Thallium 3800.0 ppb Benzene 6000.0 ppb Arsenic (cancer) 22600.0 ppb N-Nitrosodiphenylamine 31000.0 ppb N-Nitroso di-n-propylamine 36000.0 ppb Cadmium and compounds 50500.0 ppb Lead 98500.0 ppb 2-Methyl-4-chlorophenoxyacetic acid 120000.0 ppb 2-(2-Methyl-4-chlorophenoxy) propionic acid 202000.0 ppb Fluorene 580000.0 ppb Acetone 1300000.0 ppb Manganese 1500000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 1800000.0 ppb 4-Methylphenol 2300000.0 ppb 1,2-Dichloroethylene (mixture) 3500000.0 ppb Naphthalene 4500000.0 ppb Trichloroethylene (TCE) 7500000.0 ppb

Soil: Low Risk

Contaminants: Vinyl chloride 4.9 ppb Benzene 17.0 ppb N-Nitrosodiphenylamine 21.0 ppb 1,1,2,2-Tetrachloroethane 23.0 ppb Methylene chloride 24.0 ppb Mercury and compounds (inorganic) 37.9 ppb Antimony and compounds 68.7 ppb 4-Chloroaniline 88.0 ppb Tetrachloroethylene (PCE) 220.0 ppb Silver and compounds 411.0 ppb Cadmium and compounds 411.0 ppb Toluene 710.0 ppb Trichloroethylene (TCE) 3400.0 ppb 1,1-Dichloroethylene 3600.0 ppb Lead 17200.0 ppb

See more details...

Site ID: SITE 00010

BARBERS POINT NAS

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Aug 1999

Contaminated Areas

Soil: Medium Risk

Contaminants: Benzo[a]pyrene 0.07 ppb Polychlorinated biphenyls (PCBs) 0.08 ppb Lead 856.0 ppb

See more details...

Site ID: SITE 00011

BARBERS POINT NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1999

Contaminated Areas

Soil: Medium Risk

Contaminants: Dieldrin 0.4 ppb Chlordane 0.65 ppb Heptachlor epoxide 0.66 ppb Beryllium and compounds 2.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 36.0 ppb Vanadium 118.0 ppb Chromium VI and compounds 155.0 ppb Manganese 1974.0 ppb

See more details...

Site ID: SITE 00012

BARBERS POINT NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1999

Contaminated Areas

Soil: Medium Risk

Contaminants: Carbazole 0.5 ppb Indeno[1,2,3-cd]pyrene 0.66 ppb Benzo[a]pyrene 0.92 ppb Benz(a)anthracene 1.3 ppb Benzo[b]fluoranthene 1.4 ppb Mercury and compounds (inorganic) 2.0 ppb Arsenic (cancer) 20.7 ppb Barium and compounds 190.0 ppb Vanadium 197.0 ppb Chromium VI and compounds 230.0 ppb Lead 295.0 ppb Zinc 1170.0 ppb Manganese 2040.0 ppb Copper and compounds 2940.0 ppb

See more details...

Site ID: SITE 00014

BARBERS POINT NAS

Waste Treatment Plant

Cost

Unknown

Final Cleanup Action

Apr 2002

Contaminated Areas

Soil: Medium Risk

Contaminants: Benzo[a]pyrene 0.08 ppb Polychlorinated biphenyls (PCBs) 0.72 ppb Mercury and compounds (methyl) 1.8 ppb Cadmium and compounds 3.5 ppb Antimony and compounds 4.7 ppb Arsenic (cancer) 7.0 ppb Zinc 365.0 ppb Manganese 1400.0 ppb

See more details...

Site ID: SITE 00016

BARBERS POINT NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Feb 1995

Site ID: SITE 00019

BARBERS POINT NAS

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

May 1999

This site is under ongoing monitoring until Mar 2006

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Beryllium and compounds 110.0 ppb Atrazine 1300.0 ppb Arsenic (cancer) 5400.0 ppb Thallium 7000.0 ppb Bis(2-ethylhexyl)phthalate 14000.0 ppb Manganese 489000.0 ppb

See more details...

Site ID: SITE 00023

BARBERS POINT NAS

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 2004

Contaminated Areas

Soil: Medium Risk

Contaminants: Benzo(a)Pyrene 2.0 ppb Benz(a)Anthracene 2.0 ppb Aroclor 1254 8.0 ppb Cadmium and compounds 52.4 ppb Lead 411.0 ppb Arsenic 1290.0 ppb Manganese and compounds 2120.0 ppb Iron 78400.0 ppb

See more details...

Site ID: SITE 00026

BARBERS POINT NAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2006

Contaminated Areas

Soil: Low Risk

Contaminants: Chromium 270.0 ppb Manganese and compounds 4280.0 ppb Iron 113000.0 ppb

See more details...

Site ID: SITE 00028

BARBERS POINT NAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2006

Contaminated Areas

Soil: Low Risk

Contaminants: Manganese and compounds 2510.0 ppb Iron 86300.0 ppb

See more details...

Site ID: SITE 00029

BARBERS POINT NAS

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Jun 2009

Contaminated Areas

Soil: Medium Risk

Contaminants: Arsenic 23.2 ppb

See more details...

Site ID: SITE 00030

BARBERS POINT NAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2006

Contaminated Areas

Soil: Low Risk

Contaminants: Chromium 275.0 ppb Manganese and compounds 2600.0 ppb Iron 101000.0 ppb

See more details...

Site ID: SITE 00031

BARBERS POINT NAS

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Oct 2008

Contaminated Areas

Soil: Medium Risk

Contaminants: Arsenic 19.2 ppb

See more details...

Site ID: UST 000001

BARBERS POINT NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1994

This site is under ongoing monitoring until Aug 2011

Site ID: UST 000002

BARBERS POINT NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 1998

Site ID: UST 000006

BARBERS POINT NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1999

This site is under ongoing monitoring until Dec 2009

Site ID: UST 000008

BARBERS POINT NAS

Underground Storage Tanks

Cost

$406K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Feb 2004

This site is under ongoing monitoring until Jun 2022

Contaminated Areas

Groundwater: Low Risk

Contaminants: Ethyl benzene 183000.0 ppb Benzene 1690000.0 ppb Toluene 2410000.0 ppb Xylene (Mixed) 3360000.0 ppb

See more details...

Site ID: SITE 00004

BARBERS POINT NAS

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Feb 1987

Site ID: SITE 00015

BARBERS POINT NAS

Drainage Ditch

Cost

Unknown

Final Cleanup Action

Apr 2001

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Beryllium and compounds 270.0 ppb Thallium 3800.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 5000.0 ppb Lead 12800.0 ppb Arsenic (cancer) 22600.0 ppb 4-Methylphenol 1000000.0 ppb Manganese 1500000.0 ppb

Soil: Medium Risk

Contaminants: Dibenz[ah]anthracene 0.34 ppb Indeno[1,2,3-cd]pyrene 1.0 ppb Mercury and compounds (inorganic) 1.28 ppb Benzo[a]pyrene 2.0 ppb Benz(a)anthracene 2.9 ppb Benzo[b]fluoranthene 3.0 ppb Cadmium and compounds 44.4 ppb Arsenic (cancer) 66.6 ppb Vanadium 109.0 ppb Nickel and compounds 110.1 ppb Silver and compounds 130.0 ppb Chromium VI and compounds 246.0 ppb Zinc 747.0 ppb Lead 1830.0 ppb

See more details...

Site ID: UST 000007

BARBERS POINT NAS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1999

Contaminated Areas

Groundwater: Low Risk

Contaminants: Fluoranthene 10.0 ppb Benzo[a]pyrene 10.0 ppb Acenaphthene 10.0 ppb Naphthalene 10.0 ppb

See more details...

Site ID: SITE 00001

BARBERS POINT NAS

Disposal Pit and Dry Well

Cost

$91K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2003

This site is under ongoing monitoring until Dec 2045

Contaminated Areas

Soil: High Risk

Contaminants: Arochlor 1254 3.6 ppb Dibenz[ah]anthracene 5.0 ppb Arochlor 1260 11.0 ppb Antimony and compounds 12.3 ppb Indeno[1,2,3-cd]pyrene 18.0 ppb Arsenic (cancer) 23.5 ppb Benzo[a]pyrene 41.0 ppb Benzo[b]fluoranthene 67.0 ppb Benz(a)anthracene 68.0 ppb Chrysene 77.0 ppb Cadmium and compounds 86.3 ppb Manganese 318.0 ppb Chromium VI and compounds 487.0 ppb Lead 5980.0 ppb

Groundwater: Medium Risk

Contaminants: Arsenic (cancer) 3200.0 ppb Antimony and compounds 7000.0 ppb Lead 12600.0 ppb Hexachloroethane 31000.0 ppb

Surface Water (Human): Medium Risk

Contaminants: Arsenic (cancer) 4000.0 ppb Lead 5000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 10000.0 ppb Thallium 10000.0 ppb Barium and compounds 10000.0 ppb Selenium 49000.0 ppb Methylene chloride 121000.0 ppb

Sediment (Fresh): Low Risk

Contaminants: Mercury and compounds (inorganic) 2.3 ppb Selenium 6.3 ppb Methylene chloride 58.0 ppb Cadmium and compounds 131.0 ppb Nickel and compounds 133.0 ppb Chromium VI and compounds 825.0 ppb Copper and compounds 895.0 ppb Zinc 1360.0 ppb Polychlorinated biphenyls (PCBs) 2000.0 ppb Fluorene 2500.0 ppb Dibenz[ah]anthracene 2800.0 ppb Butyl benzyl phthalate 3000.0 ppb Acenaphthene 3100.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 3900.0 ppb Lead 6890.0 ppb Anthracene 6900.0 ppb Benzo[k]fluoranthene 10000.0 ppb Indeno[1,2,3-cd]pyrene 12000.0 ppb Benz(a)anthracene 14000.0 ppb Chrysene 15000.0 ppb Benzo[b]fluoranthene 16000.0 ppb Benzo[a]pyrene 16000.0 ppb Phenanthrene 27000.0 ppb Pyrene 28000.0 ppb Fluoranthene 32000.0 ppb

Surface Water (Fresh): Low Risk

Contaminants: Antimony and compounds 13000.0 ppb Lead 14000.0 ppb Vanadium 20000.0 ppb Cadmium and compounds 34000.0 ppb Barium and compounds 150000.0 ppb

See more details...

Site ID: SITE 00013

BARBERS POINT NAS

Fire/Crash Training Area

Cost

$46K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 1999

This site is under ongoing monitoring until Dec 2045

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Beryllium and compounds 320.0 ppb Arsenic (cancer) 10200.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 11000.0 ppb Thallium 15600.0 ppb

Soil: Medium Risk

Contaminants: Benzo[a]pyrene 0.1 ppb Polychlorinated biphenyls (PCBs) 0.89 ppb Benzene 4.1 ppb 1,1-Dichloroethylene 6.3 ppb Arsenic (cancer) 7.3 ppb Bis(2-ethylhexyl)phthalate (DEHP) 280.0 ppb Manganese 473.0 ppb Lead 894.0 ppb

See more details...

Site ID: SITE 00027

BARBERS POINT NAS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2005

This site is under ongoing monitoring until Oct 2006

Contaminated Areas

Soil: High Risk

Contaminants: Heptachlor Epoxide 0.18 ppb Arsenic 168.0 ppb

See more details...

Site ID: SITE 00040

BARBERS POINT NAS

Landfill

Cost

$4.16M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2008

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Groundwater: Low Risk

Contaminants: Antimony and compounds 210.0 ppb Arsenic 5500.0 ppb Selenium 7400.0 ppb Iron 444000.0 ppb

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »