Cost So Far
$68.1M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$5.46M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2016
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
35 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions, fences, warning signs. see more » concrete berm around the controlled area. a deed restriction is documented in the parcel deed. a fence around controlled area, with or without gate. gate(s) and/or door(s) must be locked to prevent access and exposure to contaminants. a warning sign is in place surrounding the area a barrier, including but not limited to a paved surface or landfill cap, must be maintained in order to prevent exposure to contaminants, including vapor intrusion into an enclosed structure. notice to federal or state regulators, property owners, etc. before changes in land use or ownership. prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits any use other than industrial in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. no recreational use, including camping and overnight stays, are permitted in the area. prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. « see less
1 Active Site
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SITE 00033
BARBERS POINT NAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2014
Contaminated Areas
Soil: Low Risk
Contaminants: Aroclor 17.0 ppb
34 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: SITE 00018
BARBERS POINT NAS
Firing Range
Cost
$258K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2005
This site is under ongoing monitoring until Dec 2045
Contaminated Areas
Soil: Medium Risk
Contaminants: Lead 3930.0 ppb
Site ID: SITE 00002
BARBERS POINT NAS
Surface Impoundment/Lagoon
Cost
$416K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2007
This site is under ongoing monitoring until Apr 2023
Contaminated Areas
Sediment (Marine): Medium Risk
Contaminants: Carbon disulfide 0.03 ppb Methylene chloride 0.12 ppb Nitrate 0.25 ppb Acetone 0.65 ppb Fluoranthene 1.6 ppb Benzo[a]pyrene 1.6 ppb Benzo[b]fluoranthene 1.8 ppb Benz(a)anthracene 1.8 ppb Chrysene 1.9 ppb Benzo[k]fluoranthene 2.2 ppb Selenium 2.8 ppb Pyrene 3.0 ppb Antimony and compounds 3.1 ppb Cadmium and compounds 9.2 ppb Bis(2-ethylhexyl)phthalate (DEHP) 18.0 ppb Tin and compounds 28.4 ppb Manganese and compounds 157.0 ppb Zinc 571.0 ppb Aluminum 3716.0 ppb
Surface Water (Marine): Medium Risk
Contaminants: Dimethyl phthalate 100.0 ppb Nitrate 170.0 ppb Carbon disulfide 300.0 ppb Diethyl phthalate 300.0 ppb Mercury 530.0 ppb Nickel and compounds 2900.0 ppb Copper and compounds 3000.0 ppb Arsenic (cancer) 3500.0 ppb Manganese and compounds 5000.0 ppb Cyanide (free) 6000.0 ppb Benzoic acid 6000.0 ppb Acetone 6000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 10000.0 ppb Zinc 20200.0 ppb Iron 40900.0 ppb Formaldehyde 110000.0 ppb
Groundwater: Low Risk
Contaminants: Beryllium and compounds 220.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 3000.0 ppb Arsenic (cancer) 5800.0 ppb
Sediment (Human): Low Risk
Contaminants: Benzo[a]pyrene 1.6 ppb Benzo[b]fluoranthene 1.8 ppb Benz(a)anthracene 1.8 ppb Selenium 2.8 ppb Cadmium and compounds 9.2 ppb Bis(2-ethylhexyl)phthalate (DEHP) 18.0 ppb Zinc 571.0 ppb
Surface Water (Human): Low Risk
Contaminants: Arsenic (cancer) 3400.0 ppb Thallium 6700.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 10000.0 ppb
Site ID: SITE 00005
BARBERS POINT NAS
Soil Contamination After Tank Removal
Cost
Unknown
Final Cleanup Action
Apr 1999
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo[a]pyrene 0.16 ppb Dichloroethylene, 1,1- 0.46 ppb
Site ID: SITE 00022
BARBERS POINT NAS
Building Demolition/Debris Removal
Cost
Unknown
Final Cleanup Action
Oct 2001
Site ID: SITE 00020
BARBERS POINT NAS
Contaminated Ground Water
Cost
$247K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2003
This site is under ongoing monitoring until Dec 2045
Contaminated Areas
Soil: High Risk
Contaminants: Polychlorinated biphenyls (PCBs) 270.0 ppb
Site ID: SITE 00006
BARBERS POINT NAS
Disposal Pit and Dry Well
Cost
$285K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: High Risk
Contaminants: Benzo(a)Pyrene 0.15 ppb Arsenic 41.0 ppb Lead 679.0 ppb Manganese and compounds 4260.0 ppb
Site ID: SITE 00007
BARBERS POINT NAS
Disposal Pit and Dry Well
Cost
$206K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 1480.0 ppb
Site ID: SITE 00017
BARBERS POINT NAS
Surface Disposal Area
Cost
$29K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Beryllium and compounds 240.0 ppb Demeton 320.0 ppb Diazinon 1100.0 ppb Antimony and compounds 5100.0 ppb 2,6-Dimethylphenol 8000.0 ppb Cadmium and compounds 17500.0 ppb 4-Methylphenol 33000.0 ppb Naphthalene 37000.0 ppb Lead 76400.0 ppb Benzene 79000.0 ppb Vanadium 99400.0 ppb Toluene 170000.0 ppb Arsenic (cancer) 207000.0 ppb Manganese and compounds 635000.0 ppb Xylene (mixed) 650000.0 ppb Aluminum 2940000.0 ppb
Soil: Medium Risk
Contaminants: Arsenic (cancer) 23.6 ppb Chromium VI and compounds 32.8 ppb Lead 475.0 ppb
Site ID: SITE 00003
BARBERS POINT NAS
Landfill
Cost
Unknown
Final Cleanup Action
Nov 2008
Contaminated Areas
Soil: Medium Risk
Contaminants: Beryllium and compounds 0.19 ppb Heptachlor epoxide 0.21 ppb Endosulfan I 7.9 ppb Arsenic (cancer) 50.4 ppb Chlordane 78.0 ppb Nickel and compounds 119.0 ppb Vanadium 145.0 ppb Chromium VI and compounds 163.0 ppb Barium and compounds 267.0 ppb Zinc 411.0 ppb Copper and compounds 536.0 ppb DDE,4,4- 630.0 ppb Manganese and compounds 1160.0 ppb DDD,4,4- 1500.0 ppb DDT 4300.0 ppb
Groundwater: Low Risk
Contaminants: Chlordane 70.0 ppb Beryllium and compounds 250.0 ppb Atrazine 900.0 ppb Benzene 1000.0 ppb Arsenic (cancer) 3100.0 ppb Thallium 3200.0 ppb Selenium 5000.0 ppb Ethyl acetate 6000.0 ppb Vanadium 40000.0 ppb Barium and compounds 100000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 140000.0 ppb
Site ID: SITE 00008
BARBERS POINT NAS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Aug 1999
Contaminated Areas
Soil: Medium Risk
Contaminants: Benzo[a]pyrene 1.1 ppb Antimony and compounds 11.9 ppb Arsenic (cancer) 18.4 ppb Vanadium 92.8 ppb Zinc 385.0 ppb Barium and compounds 1007.0 ppb Lead 2171.0 ppb
Site ID: SITE 00009
BARBERS POINT NAS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Apr 1999
Contaminated Areas
Groundwater: Low Risk
Contaminants: Indeno[1,2,3-cd]pyrene 500.0 ppb Benz(a)anthracene 800.0 ppb Benzo[a]pyrene 900.0 ppb Beryllium and compounds 1500.0 ppb Benzo[b]fluoranthene 3000.0 ppb Thallium 3800.0 ppb Benzene 6000.0 ppb Arsenic (cancer) 22600.0 ppb N-Nitrosodiphenylamine 31000.0 ppb N-Nitroso di-n-propylamine 36000.0 ppb Cadmium and compounds 50500.0 ppb Lead 98500.0 ppb 2-Methyl-4-chlorophenoxyacetic acid 120000.0 ppb 2-(2-Methyl-4-chlorophenoxy) propionic acid 202000.0 ppb Fluorene 580000.0 ppb Acetone 1300000.0 ppb Manganese 1500000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 1800000.0 ppb 4-Methylphenol 2300000.0 ppb 1,2-Dichloroethylene (mixture) 3500000.0 ppb Naphthalene 4500000.0 ppb Trichloroethylene (TCE) 7500000.0 ppb
Soil: Low Risk
Contaminants: Vinyl chloride 4.9 ppb Benzene 17.0 ppb N-Nitrosodiphenylamine 21.0 ppb 1,1,2,2-Tetrachloroethane 23.0 ppb Methylene chloride 24.0 ppb Mercury and compounds (inorganic) 37.9 ppb Antimony and compounds 68.7 ppb 4-Chloroaniline 88.0 ppb Tetrachloroethylene (PCE) 220.0 ppb Silver and compounds 411.0 ppb Cadmium and compounds 411.0 ppb Toluene 710.0 ppb Trichloroethylene (TCE) 3400.0 ppb 1,1-Dichloroethylene 3600.0 ppb Lead 17200.0 ppb
Site ID: SITE 00010
BARBERS POINT NAS
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Aug 1999
Contaminated Areas
Soil: Medium Risk
Contaminants: Benzo[a]pyrene 0.07 ppb Polychlorinated biphenyls (PCBs) 0.08 ppb Lead 856.0 ppb
Site ID: SITE 00011
BARBERS POINT NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Apr 1999
Contaminated Areas
Soil: Medium Risk
Contaminants: Dieldrin 0.4 ppb Chlordane 0.65 ppb Heptachlor epoxide 0.66 ppb Beryllium and compounds 2.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 36.0 ppb Vanadium 118.0 ppb Chromium VI and compounds 155.0 ppb Manganese 1974.0 ppb
Site ID: SITE 00012
BARBERS POINT NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Apr 1999
Contaminated Areas
Soil: Medium Risk
Contaminants: Carbazole 0.5 ppb Indeno[1,2,3-cd]pyrene 0.66 ppb Benzo[a]pyrene 0.92 ppb Benz(a)anthracene 1.3 ppb Benzo[b]fluoranthene 1.4 ppb Mercury and compounds (inorganic) 2.0 ppb Arsenic (cancer) 20.7 ppb Barium and compounds 190.0 ppb Vanadium 197.0 ppb Chromium VI and compounds 230.0 ppb Lead 295.0 ppb Zinc 1170.0 ppb Manganese 2040.0 ppb Copper and compounds 2940.0 ppb
Site ID: SITE 00014
BARBERS POINT NAS
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Apr 2002
Contaminated Areas
Soil: Medium Risk
Contaminants: Benzo[a]pyrene 0.08 ppb Polychlorinated biphenyls (PCBs) 0.72 ppb Mercury and compounds (methyl) 1.8 ppb Cadmium and compounds 3.5 ppb Antimony and compounds 4.7 ppb Arsenic (cancer) 7.0 ppb Zinc 365.0 ppb Manganese 1400.0 ppb
Site ID: SITE 00016
BARBERS POINT NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Feb 1995
Site ID: SITE 00019
BARBERS POINT NAS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
May 1999
This site is under ongoing monitoring until Mar 2006
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Beryllium and compounds 110.0 ppb Atrazine 1300.0 ppb Arsenic (cancer) 5400.0 ppb Thallium 7000.0 ppb Bis(2-ethylhexyl)phthalate 14000.0 ppb Manganese 489000.0 ppb
Site ID: SITE 00023
BARBERS POINT NAS
Storage Area
Cost
Unknown
Final Cleanup Action
Jan 2004
Contaminated Areas
Soil: Medium Risk
Contaminants: Benzo(a)Pyrene 2.0 ppb Benz(a)Anthracene 2.0 ppb Aroclor 1254 8.0 ppb Cadmium and compounds 52.4 ppb Lead 411.0 ppb Arsenic 1290.0 ppb Manganese and compounds 2120.0 ppb Iron 78400.0 ppb
Site ID: SITE 00026
BARBERS POINT NAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2006
Contaminated Areas
Soil: Low Risk
Contaminants: Chromium 270.0 ppb Manganese and compounds 4280.0 ppb Iron 113000.0 ppb
Site ID: SITE 00028
BARBERS POINT NAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2006
Contaminated Areas
Soil: Low Risk
Contaminants: Manganese and compounds 2510.0 ppb Iron 86300.0 ppb
Site ID: SITE 00029
BARBERS POINT NAS
Contaminated Fill
Cost
Unknown
Final Cleanup Action
Jun 2009
Contaminated Areas
Soil: Medium Risk
Contaminants: Arsenic 23.2 ppb
Site ID: SITE 00030
BARBERS POINT NAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2006
Contaminated Areas
Soil: Low Risk
Contaminants: Chromium 275.0 ppb Manganese and compounds 2600.0 ppb Iron 101000.0 ppb
Site ID: SITE 00031
BARBERS POINT NAS
Contaminated Fill
Cost
Unknown
Final Cleanup Action
Oct 2008
Contaminated Areas
Soil: Medium Risk
Contaminants: Arsenic 19.2 ppb
Site ID: UST 000001
BARBERS POINT NAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1994
This site is under ongoing monitoring until Aug 2011
Site ID: UST 000002
BARBERS POINT NAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: UST 000006
BARBERS POINT NAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 1999
This site is under ongoing monitoring until Dec 2009
Site ID: UST 000008
BARBERS POINT NAS
Underground Storage Tanks
Cost
$406K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2004
This site is under ongoing monitoring until Jun 2022
Contaminated Areas
Groundwater: Low Risk
Contaminants: Ethyl benzene 183000.0 ppb Benzene 1690000.0 ppb Toluene 2410000.0 ppb Xylene (Mixed) 3360000.0 ppb
Site ID: SITE 00004
BARBERS POINT NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Feb 1987
Site ID: SITE 00015
BARBERS POINT NAS
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Apr 2001
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Beryllium and compounds 270.0 ppb Thallium 3800.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 5000.0 ppb Lead 12800.0 ppb Arsenic (cancer) 22600.0 ppb 4-Methylphenol 1000000.0 ppb Manganese 1500000.0 ppb
Soil: Medium Risk
Contaminants: Dibenz[ah]anthracene 0.34 ppb Indeno[1,2,3-cd]pyrene 1.0 ppb Mercury and compounds (inorganic) 1.28 ppb Benzo[a]pyrene 2.0 ppb Benz(a)anthracene 2.9 ppb Benzo[b]fluoranthene 3.0 ppb Cadmium and compounds 44.4 ppb Arsenic (cancer) 66.6 ppb Vanadium 109.0 ppb Nickel and compounds 110.1 ppb Silver and compounds 130.0 ppb Chromium VI and compounds 246.0 ppb Zinc 747.0 ppb Lead 1830.0 ppb
Site ID: UST 000007
BARBERS POINT NAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1999
Contaminated Areas
Groundwater: Low Risk
Contaminants: Fluoranthene 10.0 ppb Benzo[a]pyrene 10.0 ppb Acenaphthene 10.0 ppb Naphthalene 10.0 ppb
Site ID: SITE 00001
BARBERS POINT NAS
Disposal Pit and Dry Well
Cost
$91K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2003
This site is under ongoing monitoring until Dec 2045
Contaminated Areas
Soil: High Risk
Contaminants: Arochlor 1254 3.6 ppb Dibenz[ah]anthracene 5.0 ppb Arochlor 1260 11.0 ppb Antimony and compounds 12.3 ppb Indeno[1,2,3-cd]pyrene 18.0 ppb Arsenic (cancer) 23.5 ppb Benzo[a]pyrene 41.0 ppb Benzo[b]fluoranthene 67.0 ppb Benz(a)anthracene 68.0 ppb Chrysene 77.0 ppb Cadmium and compounds 86.3 ppb Manganese 318.0 ppb Chromium VI and compounds 487.0 ppb Lead 5980.0 ppb
Groundwater: Medium Risk
Contaminants: Arsenic (cancer) 3200.0 ppb Antimony and compounds 7000.0 ppb Lead 12600.0 ppb Hexachloroethane 31000.0 ppb
Surface Water (Human): Medium Risk
Contaminants: Arsenic (cancer) 4000.0 ppb Lead 5000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 10000.0 ppb Thallium 10000.0 ppb Barium and compounds 10000.0 ppb Selenium 49000.0 ppb Methylene chloride 121000.0 ppb
Sediment (Fresh): Low Risk
Contaminants: Mercury and compounds (inorganic) 2.3 ppb Selenium 6.3 ppb Methylene chloride 58.0 ppb Cadmium and compounds 131.0 ppb Nickel and compounds 133.0 ppb Chromium VI and compounds 825.0 ppb Copper and compounds 895.0 ppb Zinc 1360.0 ppb Polychlorinated biphenyls (PCBs) 2000.0 ppb Fluorene 2500.0 ppb Dibenz[ah]anthracene 2800.0 ppb Butyl benzyl phthalate 3000.0 ppb Acenaphthene 3100.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 3900.0 ppb Lead 6890.0 ppb Anthracene 6900.0 ppb Benzo[k]fluoranthene 10000.0 ppb Indeno[1,2,3-cd]pyrene 12000.0 ppb Benz(a)anthracene 14000.0 ppb Chrysene 15000.0 ppb Benzo[b]fluoranthene 16000.0 ppb Benzo[a]pyrene 16000.0 ppb Phenanthrene 27000.0 ppb Pyrene 28000.0 ppb Fluoranthene 32000.0 ppb
Surface Water (Fresh): Low Risk
Contaminants: Antimony and compounds 13000.0 ppb Lead 14000.0 ppb Vanadium 20000.0 ppb Cadmium and compounds 34000.0 ppb Barium and compounds 150000.0 ppb
Site ID: SITE 00013
BARBERS POINT NAS
Fire/Crash Training Area
Cost
$46K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 1999
This site is under ongoing monitoring until Dec 2045
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Beryllium and compounds 320.0 ppb Arsenic (cancer) 10200.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 11000.0 ppb Thallium 15600.0 ppb
Soil: Medium Risk
Contaminants: Benzo[a]pyrene 0.1 ppb Polychlorinated biphenyls (PCBs) 0.89 ppb Benzene 4.1 ppb 1,1-Dichloroethylene 6.3 ppb Arsenic (cancer) 7.3 ppb Bis(2-ethylhexyl)phthalate (DEHP) 280.0 ppb Manganese 473.0 ppb Lead 894.0 ppb
Site ID: SITE 00027
BARBERS POINT NAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Oct 2006
Contaminated Areas
Soil: High Risk
Contaminants: Heptachlor Epoxide 0.18 ppb Arsenic 168.0 ppb
Site ID: SITE 00040
BARBERS POINT NAS
Landfill
Cost
$4.16M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2008
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: Low Risk
Contaminants: Antimony and compounds 210.0 ppb Arsenic 5500.0 ppb Selenium 7400.0 ppb Iron 444000.0 ppb
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »