Cost So Far
$117M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$128M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2046
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
145 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: fences, barriers. see more » a barrier, including but not limited to a paved surface or landfill cap, must be maintained in order to prevent exposure to contaminants, including vapor intrusion into an enclosed structure. incorporation of lucs into a base master plan state or local permits required for construction, development, excavation, well drilling, etc. the agencies issuing the permits should be notified of areas impacted by lucs. notice to federal or state regulators, property owners, etc. before changes in land use or ownership. notices other than in deed, e.g., newspaper advertisements. a fence around controlled area, with or without gate. annual written certification of compliance with lucs prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. groundwater use restricted. a landfill cover at the site prevents exposure to contaminated soil and reduces infiltration of groundwater. this cover will be inspected and maintained. « see less
22 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SITE 00031
PEARL HARBOR NS
Spill Site Area
Cost
$12.7M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2017
Contaminated Areas
Soil: High Risk
Contaminants: Chloroform 390.0 ppb Trichloroethylene (TCE) 790.0 ppb Xylene 2075.0 ppb Tetrachloroethylene (PCE) 20000.0 ppb
Site ID: SITE 00019
PEARL HARBOR NS
Contaminated Sediments
Cost
$60.5M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2023
This site is under ongoing monitoring until Jan 2061
Contaminated Areas
Sediment (Human): High Risk
Contaminants: Mercury 0.38 ppb PCB 1.1 ppb Cadmium and compounds 1.2 ppb Silver and compounds 2.0 ppb Chromium VI and compounds 25.0 ppb Lead 51.0 ppb Copper and compounds 52.0 ppb Zinc 98.0 ppb
Sediment (Marine): High Risk
Contaminants: Mercury 0.38 ppb PCBs 1.1 ppb Cadmium and compounds 1.2 ppb Silver and compounds 2.0 ppb Chromium VI and compounds 25.0 ppb Lead 51.0 ppb Copper and compounds 52.0 ppb Zinc 98.0 ppb
Site ID: UXO H00103
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
$787K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2019
This site is under ongoing monitoring until Apr 2051
Contaminated Areas
Soil: High Risk
Contaminants: Dibenz[ah]anthracene 24.0 ppb Benzo(a)Pyrene 120.0 ppb Arsenic 338.0 ppb Lead 31400.0 ppb
Groundwater: Low Risk
Contaminants: Copper and compounds 4700.0 ppb
Sediment (Human): Low Risk
Contaminants: Arsenic 12.5 ppb
Sediment (Fresh): Risk Not Evaluated
Site ID: UXO H00106
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
$356K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2019
This site is under ongoing monitoring until Apr 2051
Contaminated Areas
Sediment (Fresh): High Risk
Contaminants: Arsenic 12.5 ppb Barium 46.6 ppb Copper and compounds 53.8 ppb Zinc 89.6 ppb Lead 136.0 ppb
Soil: Medium Risk
Contaminants: Benzo(a)Pyrene 12.0 ppb Dibenz[ah]anthracene 27.0 ppb Lead 413.0 ppb
Groundwater: Low Risk
Contaminants: Cadmium and compounds 510.0 ppb Copper and compounds 20000.0 ppb Barium 24000.0 ppb Zinc 80000.0 ppb
Sediment (Human): Low Risk
Contaminants: Cadmium and compounds 0.54 ppb Antimony and compounds 0.79 ppb Arsenic 12.5 ppb Barium 46.6 ppb Copper and compounds 53.8 ppb Zinc 89.6 ppb Lead 136.0 ppb
Site ID: UXO 000002
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
$8.38M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2024
This site is under ongoing monitoring until Apr 2053
Site ID: SITE H0080
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Apr 2017
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo(a)Pyrene 25.0 ppb Fluoranthene 2500.0 ppb
Groundwater: Risk Not Evaluated
Site ID: SITE H0039
PEARL HARBOR NS
Underground Storage Tanks
Cost
$7.98M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2021
Contaminated Areas
Groundwater: Low Risk
Contaminants: Toluene 100.0 ppb Benzene 200.0 ppb
Soil: Low Risk
Contaminants: Lead 780.0 ppb
Site ID: UST 000002
PEARL HARBOR NS
Underground Storage Tanks
Cost
$210K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2017
This site is under ongoing monitoring until Nov 2021
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 4910.0 ppb
Site ID: SITE 00059
PEARL HARBOR NS
Underground Storage Tanks
Cost
$2.64M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2018
This site is under ongoing monitoring until Sep 2047
Contaminated Areas
Groundwater: Low Risk
Contaminants: Vinyl Chloride 369000.0 ppb
Site ID: SITE H0009
PEARL HARBOR NS
Spill Site Area
Cost
$1.75M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2009
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Naphthalene 1200000.0 ppb Benzene 6800000.0 ppb
Site ID: SITE 00008
PEARL HARBOR NS
Landfill
Cost
$3.63M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 1997
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: High Risk
Contaminants: Dibenz[ah]anthracene 0.21 ppb Benzo[a]pyrene 0.32 ppb Beryllium and compounds 2.3 ppb Aroclor 16.0 ppb Arsenic (noncancer) 241.0 ppb Chromium VI and compounds 283.0 ppb Antimony and compounds 466.0 ppb Lead 3900.0 ppb Copper and compounds 8930.0 ppb
Sediment (Marine): High Risk
Contaminants: Aroclor 0.53 ppb Mercury 1.0 ppb Antimony and compounds 5.7 ppb Nickel and compounds 52.7 ppb Copper and compounds 98.4 ppb Lead 136.0 ppb Zinc 211.0 ppb
Groundwater: Medium Risk
Contaminants: Copper and compounds 31800.0 ppb Arsenic (cancer) 54200.0 ppb Lead 72800.0 ppb
Site ID: SITE H0078
PEARL HARBOR NS
Contaminated Fill
Cost
$1.66M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2012
This site is under ongoing monitoring until Jun 2046
Contaminated Areas
Soil: Low Risk
Contaminants: Dieldrin 0.18 ppb Benzo(a)Pyrene 1.1 ppb Barium 1900.0 ppb Lead 11000.0 ppb
Site ID: SITE 00055
PEARL HARBOR NS
Oil/Water Separator
Cost
$2.95M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: High Risk
Contaminants: Mercury (Inorganic) 120.0 ppb Arsenic 120.0 ppb Beryllium and compounds 210.0 ppb Lead 640.0 ppb Iron 130000.0 ppb
Groundwater: Medium Risk
Contaminants: Mercury (Inorganic) 30.0 ppb Silver and compounds 2700.0 ppb Copper and compounds 5100.0 ppb
Site ID: SITE HP026
PEARL HARBOR NS
Underground Tank Farm
Cost
$2.65M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2013
This site is under ongoing monitoring until Mar 2024
Contaminated Areas
Groundwater: Low Risk
Contaminants: Lead 8700.0 ppb Xylene (Mixed) 30770.0 ppb 1,2-Dichlorobenzene 82000.0 ppb Benzene 211000.0 ppb Ethyl benzene 230000.0 ppb
Sediment (Human): Low Risk
Contaminants: Lead 10.0 ppb
Soil: Low Risk
Contaminants: Toluene 0.002 ppb Lead 872.0 ppb
Surface Water (Human): Low Risk
Contaminants: Lead 90800.0 ppb
Site ID: SITE H0005
PEARL HARBOR NS
Landfill
Cost
$5.14M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2006
This site is under ongoing monitoring until Jul 2069
Contaminated Areas
Soil: High Risk
Contaminants: Arsenic 1190.0 ppb 1,1,1,2-Tetrachloroethane 2300.0 ppb
Groundwater: Medium Risk
Contaminants: Vinyl Chloride 13700000.0 ppb
Surface Water (Human): Low Risk
Contaminants: Diethyl Phthalate 5000.0 ppb
Surface Water (Marine): Risk Not Evaluated
Site ID: SITE H0015
PEARL HARBOR NS
Spill Site Area
Cost
$1.94M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2009
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Naphthalene 248000.0 ppb
Site ID: SITE H0016
PEARL HARBOR NS
Spill Site Area
Cost
$1.22M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2007
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Naphthalene 1078000.0 ppb Ethyl benzene 2413000.0 ppb Xylenes (isomers and mixtures) 5697000.0 ppb Benzene 5822000.0 ppb
Site ID: SITE H0064
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
$444K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2011
This site is under ongoing monitoring until Sep 2020
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Naphthalene 540000.0 ppb Ethyl benzene 1900000.0 ppb o-Xylene 2400000.0 ppb m-Xylene 5600000.0 ppb Toluene 5800000.0 ppb Benzene 6100000.0 ppb
Site ID: SITE HP006
PEARL HARBOR NS
Spill Site Area
Cost
$1.91M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2015
This site is under ongoing monitoring until Aug 2033
Contaminated Areas
Groundwater: Low Risk
Contaminants: Ethyl benzene 250000.0 ppb Toluene 1200000.0 ppb Benzene 4000000.0 ppb
Soil: Low Risk
Contaminants: Benzene 1.2 ppb 2-Methylnaphthalene 4.1 ppb Ethyl benzene 8.9 ppb
Site ID: SITE H0013
PEARL HARBOR NS
Spill Site Area
Cost
$7.21M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2007
Contaminated Areas
Groundwater: High Risk
Contaminants: Lead 28000.0 ppb Naphthalene 460000.0 ppb Ethyl benzene 1900000.0 ppb Toluene 5800000.0 ppb Benzene 6100000.0 ppb Xylenes (isomers and mixtures) 8000000.0 ppb
Soil: Medium Risk
Contaminants: Ethyl benzene 34.0 ppb Xylenes (isomers and mixtures) 140.0 ppb Toluene 140.0 ppb Benzene 320.0 ppb
Sediment (Fresh): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Sediment (Marine): Risk Not Evaluated
Surface Water (Fresh): Risk Not Evaluated
Surface Water (Human): Risk Not Evaluated
Surface Water (Marine): Risk Not Evaluated
Site ID: SITE HP016
PEARL HARBOR NS
Spill Site Area
Cost
$269K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2013
This site is under ongoing monitoring until Jun 2024
Contaminated Areas
Groundwater: Low Risk
Contaminants: Lead 1300.0 ppb 2-Methylnaphthalene 44000.0 ppb Ethyl benzene 510000.0 ppb Xylene (Mixed) 560000.0 ppb Benzene 750000.0 ppb
Soil: Low Risk
Contaminants: 2-Methylnaphthalene 25.0 ppb Lead 115.0 ppb
Site ID: SITE HP007
PEARL HARBOR NS
Spill Site Area
Cost
$2.05M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2013
This site is under ongoing monitoring until Jul 2034
Contaminated Areas
Soil: Low Risk
Contaminants: Benzene 0.32 ppb Naphthalene 5.58 ppb Lead 11.1 ppb 2-Methylnaphthalene 12.0 ppb Ethyl benzene 20.0 ppb 1,3,5-Trimethylbenzene 40.0 ppb o-Xylene 49.0 ppb 1,2,4-Trimethylbenzene 61.0 ppb Xylene (Mixed) 160.0 ppb
123 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: UXO H00117
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: SITE 00005
PEARL HARBOR NS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 1983
Contaminated Areas
Soil: Risk Not Evaluated
Site ID: SITE 00006
PEARL HARBOR NS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 1983
Site ID: SITE 00032
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1991
Site ID: SITE 00035
PEARL HARBOR NS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Jul 2006
This site is under ongoing monitoring until Jun 2039
Contaminated Areas
Sediment (Human): High Risk
Contaminants: Arsenic (noncancer) 11.0 ppb Antimony and compounds 19.7 ppb Chromium (III) 121.0 ppb Vanadium 121.0 ppb Nickel and compounds 128.0 ppb Lead 309.0 ppb Fluoranthene 1400.0 ppb Pyrene 4000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 4100.0 ppb Aluminum 21600.0 ppb
Sediment (Marine): High Risk
Contaminants: Cadmium and compounds 1.7 ppb Arsenic (noncancer) 11.0 ppb Antimony and compounds 19.7 ppb Chromium (III) 121.0 ppb Nickel and compounds 128.0 ppb Copper and compounds 223.0 ppb Lead 309.0 ppb Fluoranthene 1400.0 ppb Zinc 1810.0 ppb Pyrene 4000.0 ppb
Groundwater: Low Risk
Contaminants: Lead 10.0 ppb Nickel and compounds 10.0 ppb Antimony and compounds 10.0 ppb Silver cyanide 20.0 ppb Xylene (mixed) 1000.0 ppb Acenaphthene 10000.0 ppb Fluoranthene 11000.0 ppb Pyrene 16000.0 ppb
Site ID: SITE 00054
PEARL HARBOR NS
Storm Drain
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Soil: High Risk
Contaminants: Benzo(a)Pyrene 0.19 ppb Arsenic 23.0 ppb Chromium 250.0 ppb Iron 120000.0 ppb
Groundwater: Low Risk
Contaminants: Copper and compounds 3600.0 ppb
Site ID: SITE 00056
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Soil: High Risk
Contaminants: Arsenic 16.0 ppb Lead 620.0 ppb Iron 53000.0 ppb
Groundwater: Medium Risk
Contaminants: Copper and compounds 9400.0 ppb Aluminum 450000.0 ppb
Site ID: SITE 00057
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Soil: High Risk
Contaminants: Arsenic 20.0 ppb Chromium 280.0 ppb Lead 1400.0 ppb Iron 150000.0 ppb
Groundwater: Low Risk
Contaminants: Copper and compounds 3000.0 ppb
Site ID: SITE 00060
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2012
Contaminated Areas
Soil: Medium Risk
Contaminants: Ethenylbenzene 1.7 ppb Dimethylbenzene 70.0 ppb Arsenic 117.0 ppb Nickel (Soluble Salts) 253.0 ppb
Groundwater: Low Risk
Contaminants: Acetone 22.0 ppb
Site ID: SITE H0001
PEARL HARBOR NS
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Dec 2008
Contaminated Areas
Soil: Low Risk
Contaminants: PCBs 1.4 ppb Aroclor-1221 57.6 ppb
Site ID: SITE H0002
PEARL HARBOR NS
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Jul 2006
Site ID: SITE H0003
PEARL HARBOR NS
Chemical Disposal
Cost
Unknown
Final Cleanup Action
Jul 2006
Site ID: SITE H0007
PEARL HARBOR NS
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Sep 1999
Contaminated Areas
Soil: High Risk
Contaminants: Arsenic 162.0 ppb
Site ID: SITE H0010
PEARL HARBOR NS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jun 2008
Contaminated Areas
Soil: Medium Risk
Contaminants: Arsenic 42.0 ppb Lead 810.0 ppb
Site ID: SITE H0011
PEARL HARBOR NS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jun 2011
Contaminated Areas
Soil: Low Risk
Contaminants: PCBs 0.91 ppb
Site ID: SITE H0012
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 2006
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Naphthalene 930000.0 ppb
Site ID: SITE H0014
PEARL HARBOR NS
Washrack
Cost
Unknown
Final Cleanup Action
Jul 2006
Site ID: SITE H0018
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 2009
Contaminated Areas
Groundwater: Low Risk
Contaminants: tert-Butylbenzene 3460.0 ppb Copper and compounds 3500.0 ppb
Site ID: SITE H0019
PEARL HARBOR NS
Washrack
Cost
Unknown
Final Cleanup Action
Jul 2006
Site ID: SITE H0021
PEARL HARBOR NS
Storm Drain
Cost
Unknown
Final Cleanup Action
Aug 2006
Site ID: SITE H0022
PEARL HARBOR NS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 2006
Site ID: SITE 00045
PEARL HARBOR NS
Oil/Water Separator
Cost
$55K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2002
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Sediment (Human): High Risk
Contaminants: Mercury and compounds (inorganic) 0.33 ppb Cadmium and compounds 1.7 ppb Antimony and compounds 19.7 ppb Nickel and compounds 128.0 ppb Copper and compounds 223.0 ppb Lead 309.0 ppb Fluoranthene 1400.0 ppb Zinc phosphide 1810.0 ppb Pyrene 4000.0 ppb
Site ID: SITE 00038
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1990
Site ID: SITE 00050
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 1995
Contaminated Areas
Sediment (Marine): High Risk
Contaminants: Mercury 0.33 ppb Beryllium and compounds 0.86 ppb Cadmium and compounds 1.7 ppb Arsenic (cancer) 11.0 ppb Antimony and compounds 19.7 ppb Vanadium 121.0 ppb Nickel and compounds 128.0 ppb Barium and compounds 168.0 ppb Copper and compounds 223.0 ppb Lead 309.0 ppb Fluoranthene 1400.0 ppb Zinc 1810.0 ppb Pyrene 4000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 4100.0 ppb 4-Nitrophenol 8500.0 ppb Aluminum 21600.0 ppb
Site ID: SITE 00053
PEARL HARBOR NS
Storm Drain
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Soil: High Risk
Contaminants: Arsenic 25.0 ppb Chromium 270.0 ppb Lead 1000.0 ppb Iron 140000.0 ppb
Groundwater: Low Risk
Contaminants: Copper and compounds 5200.0 ppb
Site ID: SITE 00058
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Aug 2011
Contaminated Areas
Surface Water (Human): Medium Risk
Contaminants: Arsenic 1300.0 ppb Lead 1725000.0 ppb Copper and compounds 4961000.0 ppb
Site ID: SITE H0023
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 2012
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzo(a)Pyrene 7000.0 ppb Fluoranthene 23000.0 ppb
Soil: Low Risk
Contaminants: Toluene 0.0013 ppb Benzo(a)Pyrene 0.014 ppb Ethyl benzene 0.068 ppb Fluoranthene 1.0 ppb
Site ID: SITE H0028
PEARL HARBOR NS
Storm Drain
Cost
Unknown
Final Cleanup Action
Mar 2007
Contaminated Areas
Soil: Medium Risk
Contaminants: Benzo(a)Pyrene 30.0 ppb Lead 1870.0 ppb
Sediment (Marine): Medium Risk
Contaminants: PCBs 0.034 ppb Chrysene 1.3 ppb Lead 487.0 ppb
Site ID: SITE H0030
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Apr 2008
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzo(a)Pyrene 3600.0 ppb
Soil: Low Risk
Contaminants: Benzo(a)Pyrene 9.0 ppb
Site ID: SITE H0032
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: SITE H0033
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: SITE H0035
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 2009
Contaminated Areas
Sediment (Marine): Medium Risk
Contaminants: Benzo(a)Pyrene 0.044 ppb
Site ID: SITE H0038
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2011
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzo(a)Pyrene 270.0 ppb
Site ID: SITE H0040
PEARL HARBOR NS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Dec 2008
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 50800.0 ppb
Site ID: SITE H0042
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jul 2010
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 284.0 ppb
Site ID: SITE H0043
PEARL HARBOR NS
Leach Field
Cost
Unknown
Final Cleanup Action
Feb 2001
Site ID: SITE H0047
PEARL HARBOR NS
Landfill
Cost
Unknown
Final Cleanup Action
Jul 2006
Site ID: SITE H0048
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 2010
Site ID: SITE H0049
PEARL HARBOR NS
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Mar 2006
Site ID: SITE H0050
PEARL HARBOR NS
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Jun 2008
Contaminated Areas
Soil: Low Risk
Contaminants: Nickel (Soluble Salts) 327.0 ppb
Site ID: SITE H0052
PEARL HARBOR NS
Landfill
Cost
Unknown
Final Cleanup Action
Jul 2006
Site ID: SITE H0054
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 1997
Site ID: SITE H0055
PEARL HARBOR NS
Landfill
Cost
Unknown
Final Cleanup Action
Aug 1999
Site ID: SITE H0056
PEARL HARBOR NS
Landfill
Cost
Unknown
Final Cleanup Action
Aug 1999
Site ID: SITE H0057
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Nov 2000
Site ID: SITE H0059
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Aug 2008
Contaminated Areas
Groundwater: Low Risk
Contaminants: Tetrachloroethylene 2000.0 ppb
Site ID: SITE H0072
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: SITE HP020
PEARL HARBOR NS
Spill Site Area
Cost
$271K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2009
This site is under ongoing monitoring until Mar 2045
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Indeno(1,2,3-cd)Pyrene 70.0 ppb 1,2-Dichloroethene 240.0 ppb Benzo(b)Fluoranthene 620.0 ppb Naphthalene 120400.0 ppb
Site ID: SITE HP023
PEARL HARBOR NS
Spill Site Area
Cost
$5,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2013
This site is under ongoing monitoring until Apr 2018
Contaminated Areas
Groundwater: Low Risk
Contaminants: Ethyl benzene 1700.0 ppb Xylene (Mixed) 3500.0 ppb Lead 5400.0 ppb 2-Methylnaphthalene 12000.0 ppb
Soil: Low Risk
Contaminants: Benzene 0.0052 ppb Ethyl benzene 2.4 ppb 2-Methylnaphthalene 3.7 ppb Lead 5.5 ppb
Site ID: SITE H0075
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 2010
Site ID: SITE H0076
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2011
Contaminated Areas
Groundwater: Low Risk
Contaminants: Lead 20000.0 ppb Xylene (Mixed) 120000.0 ppb Ethyl benzene 620000.0 ppb Benzene 620000.0 ppb
Site ID: SITE H0101
PEARL HARBOR NS
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: SITE H0103
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Feb 2014
Contaminated Areas
Soil: Low Risk
Contaminants: Acenaphthene 0.0509 ppb Chrysene 0.619 ppb Benzo(a)Pyrene 0.626 ppb Benzo(b)Fluoranthene 0.865 ppb Anthracene 0.907 ppb Pyrene 0.968 ppb Fluoranthene 1.45 ppb
Groundwater: Risk Not Evaluated
Site ID: SITE H0104
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Feb 2014
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo(b)Fluoranthene 0.0106 ppb Benzo(a)Pyrene 0.0207 ppb Chrysene 0.0282 ppb Pyrene 0.0411 ppb Fluoranthene 0.0427 ppb
Groundwater: Risk Not Evaluated
Site ID: SITE H0105
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Sep 2014
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo(a)Pyrene 0.0207 ppb Fluoranthene 0.0427 ppb
Site ID: SITE H0106
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Feb 2014
Contaminated Areas
Soil: Low Risk
Contaminants: Benzene 0.01 ppb
Groundwater: Risk Not Evaluated
Site ID: SITE HP005
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP008
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 2009
This site is under ongoing monitoring until Mar 2012
Contaminated Areas
Soil: Low Risk
Contaminants: Toluene 0.007 ppb Lead 7.2 ppb
Site ID: SITE HP010
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP011
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP012
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP013
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP014
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2009
This site is under ongoing monitoring until Mar 2012
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Ethylene Dibromide 230.0 ppb 1,2-Dichlorobenzene 1800.0 ppb Lead 10000.0 ppb Ethenylbenzene 16000.0 ppb Xylene (Mixed) 38000.0 ppb Benzene 40000.0 ppb Toluene 81000.0 ppb
Site ID: SITE HP018
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP019
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP021
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SITE HP022
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 2009
This site is under ongoing monitoring until Mar 2012
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Ethyl benzene 1320000.0 ppb Xylene (Mixed) 3990000.0 ppb Benzene 4290000.0 ppb Toluene 4640000.0 ppb
Site ID: SITE HP025
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 1991
This site is under ongoing monitoring until Mar 2012
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzene 3730000.0 ppb
Site ID: SITE HP009
PEARL HARBOR NS
Spill Site Area
Cost
$5,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2013
This site is under ongoing monitoring until Apr 2018
Contaminated Areas
Groundwater: Low Risk
Contaminants: Lead 7700.0 ppb Naphthalene 120000.0 ppb 2-Methylnaphthalene 250000.0 ppb
Sediment (Human): Low Risk
Contaminants: 2-Methylnaphthalene 3.5 ppb
Soil: Low Risk
Contaminants: Lead 23.3 ppb
Site ID: SITE HP101
PEARL HARBOR NS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Nov 2009
Site ID: SITE HP102
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 2008
This site is under ongoing monitoring until Mar 2012
Contaminated Areas
Groundwater: Low Risk
Contaminants: Toluene 520.0 ppb Benzene 820.0 ppb Ethyl benzene 1800.0 ppb Xylene (Mixed) 3900.0 ppb
Soil: Low Risk
Contaminants: Toluene 2.2 ppb Xylene (Mixed) 5.7 ppb Lead 21.5 ppb
Site ID: SITE HP103
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 2008
This site is under ongoing monitoring until Mar 2012
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Naphthalene 17.0 ppb Benzene 800.0 ppb Ethyl benzene 4200.0 ppb Xylene (Mixed) 11000.0 ppb
Site ID: SITE HP105
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Feb 1999
Site ID: SITE HP106
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Dec 2001
Site ID: SITE HP107
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Feb 1999
Site ID: SWMU 00003
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1995
Contaminated Areas
Soil: High Risk
Contaminants: Beryllium and compounds 4.3 ppb Arsenic (cancer) 60.0 ppb
Groundwater: Low Risk
Contaminants: Barium and compounds 222000.0 ppb
Site ID: SWMU 00004
PEARL HARBOR NS
Storm Drain
Cost
Unknown
Final Cleanup Action
Apr 2012
Contaminated Areas
Soil: Medium Risk
Contaminants: Lead 2490.0 ppb
Groundwater: Low Risk
Contaminants: Lead 2600.0 ppb
Site ID: SWMU 00006
PEARL HARBOR NS
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Sep 2007
Contaminated Areas
Sediment (Human): High Risk
Contaminants: Toluene 23.0 ppb Fluorene 220.0 ppb Acetone 250.0 ppb Acenaphthene 310.0 ppb Carbazole 310.0 ppb Dibenz[ah]anthracene 940.0 ppb Methylene chloride 990.0 ppb Indeno[1,2,3-cd]pyrene 2100.0 ppb Phenanthrene 8800.0 ppb Chrysene 9300.0 ppb Fluoranthene 14000.0 ppb Pyrene 15000.0 ppb
Sediment (Marine): High Risk
Contaminants: Toluene 23.0 ppb Fluorene 220.0 ppb Acetone 250.0 ppb Acenaphthene 310.0 ppb Carbazole 310.0 ppb Dibenz[ah]anthracene 940.0 ppb Methylene chloride 990.0 ppb Indeno[1,2,3-cd]pyrene 2100.0 ppb Phenanthrene 8800.0 ppb Chrysene 9300.0 ppb Fluoranthene 14000.0 ppb Pyrene 15000.0 ppb
Groundwater: Low Risk
Contaminants: Benzene 56000.0 ppb Methylene chloride 80000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 140000.0 ppb
Soil: Low Risk
Contaminants: Phenanthrene 3.5 ppb Methylnaphthalene,2 11.0 ppb
Site ID: UST 000001
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 2005
Contaminated Areas
Groundwater: Low Risk
Contaminants: Ethylbenzene 500.0 ppb Toluene 500.0 ppb Benzene 500.0 ppb Xylene (mixed) 1000.0 ppb
Soil: Low Risk
Contaminants: Ethylbenzene 0.04 ppb Toluene 0.04 ppb Benzene 0.04 ppb Xylene (mixed) 0.07 ppb
Site ID: UST 000004
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2011
Site ID: UXO H00102
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Jul 2010
Contaminated Areas
Groundwater: Low Risk
Contaminants: Lead 2500.0 ppb Copper and compounds 6500.0 ppb Zinc 22000.0 ppb
Soil: Low Risk
Contaminants: Lead 36.3 ppb Arsenic 59.8 ppb Zinc 351.0 ppb
Site ID: UXO H00104
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Jul 2010
Contaminated Areas
Groundwater: Low Risk
Contaminants: Lead 2800.0 ppb Copper and compounds 6400.0 ppb Barium 40000.0 ppb Zinc 55000.0 ppb
Soil: Low Risk
Contaminants: Arsenic 2.1 ppb Lead 4.2 ppb Copper and compounds 27.2 ppb Zinc 53.7 ppb Barium 59.8 ppb
Site ID: UXO H00105
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Jul 2010
Contaminated Areas
Groundwater: Low Risk
Contaminants: Lead 6100.0 ppb Arsenic 27000.0 ppb Zinc 100000.0 ppb
Soil: Low Risk
Contaminants: Zinc 54.8 ppb
Site ID: UXO H00107
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: UXO H00108
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: UXO H00110
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: UXO H00111
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: SITE 00009
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
$97K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2015
This site is under ongoing monitoring until Aug 2045
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo(a)Pyrene 0.32 ppb Lead 581.0 ppb
Site ID: UXO H00115
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: UXO H00116
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: SITE HP015
PEARL HARBOR NS
Spill Site Area
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2013
This site is under ongoing monitoring until Apr 2018
Contaminated Areas
Groundwater: Low Risk
Contaminants: 2-Methylnaphthalene 85.0 ppb Naphthalene 480.0 ppb Lead 990.0 ppb
Site ID: SITE 00007
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1987
Site ID: SITE 00051
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Jul 2007
Contaminated Areas
Groundwater: High Risk
Contaminants: Methylene Chloride 11500.0 ppb Lead 110000.0 ppb
Soil: High Risk
Contaminants: Ethyl benzene 1.8 ppb Lead 12100.0 ppb
Site ID: SITE H0026
PEARL HARBOR NS
Storm Drain
Cost
Unknown
Final Cleanup Action
Apr 2002
Site ID: SITE H0053
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Dec 1999
Site ID: SITE H0079
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Feb 2015
Contaminated Areas
Soil: Low Risk
Contaminants: Arsenic 908.0 ppb Lead 1430.0 ppb
Site ID: SITE HP024
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: UST 000003
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jul 2013
Contaminated Areas
Soil: Low Risk
Contaminants: Chlordane 9.0 ppb
Site ID: UXO H00113
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: SITE H0074
PEARL HARBOR NS
Underground Storage Tanks
Cost
$23K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2014
This site is under ongoing monitoring until Apr 2017
Contaminated Areas
Groundwater: Low Risk
Contaminants: Naphthalene 3300.0 ppb 2-Methylnaphthalene 63000.0 ppb
Soil: Low Risk
Contaminants: 2-Methylnaphthalene 92.0 ppb
Site ID: SITE H0061
PEARL HARBOR NS
Contaminated Ground Water
Cost
$1.22M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2010
This site is under ongoing monitoring until Apr 2045
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Vinyl Chloride 506000.0 ppb Trichloroethylene (TCE) 2742000.0 ppb
Site ID: UXO H00114
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: SITE 00052
PEARL HARBOR NS
Spill Site Area
Cost
$97K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Aug 2045
Contaminated Areas
Soil: High Risk
Contaminants: Aroclor 347.0 ppb
Site ID: SITE H0004
PEARL HARBOR NS
Landfill
Cost
$1.62M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2006
This site is under ongoing monitoring until Apr 2045
Contaminated Areas
Soil: Medium Risk
Contaminants: TCDD 0.00352 ppb Polychlorinated Biphenyls 4.73 ppb Lead 1420.0 ppb
Site ID: SITE H0006
PEARL HARBOR NS
Landfill
Cost
$1.32M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2010
This site is under ongoing monitoring until Apr 2045
Contaminated Areas
Soil: Low Risk
Contaminants: Benzo(a)Pyrene 92.0 ppb
Site ID: SITE H0037
PEARL HARBOR NS
Underground Storage Tanks
Cost
$62K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2013
This site is under ongoing monitoring until May 2019
Contaminated Areas
Groundwater: Low Risk
Contaminants: Toluene 360.0 ppb
Soil: Low Risk
Contaminants: Naphthalene 23.0 ppb 2-Methylnaphthalene 66.0 ppb
Site ID: SITE H0077
PEARL HARBOR NS
Underground Storage Tanks
Cost
$5,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2013
This site is under ongoing monitoring until Apr 2018
Contaminated Areas
Soil: Low Risk
Contaminants: Xylene (Mixed) 0.4 ppb Naphthalene 2.7 ppb
Site ID: UXO H00109
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Site ID: SITE H0044
PEARL HARBOR NS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2010
Site ID: SITE H0107
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Feb 2014
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzene 100.0 ppb
Soil: Low Risk
Contaminants: Benzene 0.1 ppb
Site ID: SITE HP108
PEARL HARBOR NS
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Feb 1999
Site ID: UXO 00001
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
$1.15M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2004
This site is under ongoing monitoring until May 2045
Site ID: SITE H0031
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 2012
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzene 960.0 ppb Toluene 2600.0 ppb Xylene (Mixed) 4200.0 ppb Ethyl benzene 5100.0 ppb
Site ID: SITE H0073
PEARL HARBOR NS
Underground Storage Tanks
Cost
$116K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2013
This site is under ongoing monitoring until Nov 2018
Contaminated Areas
Groundwater: Low Risk
Contaminants: Ethyl benzene 1200.0 ppb Acenaphthene 1300.0 ppb Benzene 4300.0 ppb Xylene (Mixed) 8200.0 ppb Toluene 18000.0 ppb Naphthalene 47000.0 ppb
Site ID: SITE H0036
PEARL HARBOR NS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Feb 2010
Contaminated Areas
Groundwater: Low Risk
Contaminants: Benzene 16000.0 ppb Ethyl benzene 21000.0 ppb Xylene (Mixed) 60000.0 ppb
Site ID: SITE H0102
PEARL HARBOR NS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Feb 2014
Contaminated Areas
Soil: Low Risk
Contaminants: Carbon Disulfide 0.000166 ppb Mercury and compounds 0.097 ppb Arsenic 7.85 ppb Chromium 12.2 ppb Barium 19.6 ppb Manganese and compounds 82.5 ppb Aluminum 3440.0 ppb
Groundwater: Risk Not Evaluated
Surface Water (Human): Risk Not Evaluated
Site ID: SITE H0017
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: SITE H0034
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 1999
Site ID: SITE H0045
PEARL HARBOR NS
Storm Drain
Cost
Unknown
Final Cleanup Action
Jul 2008
Contaminated Areas
Groundwater: Low Risk
Contaminants: Toluene 2300000.0 ppb
Site ID: SITE H0058
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 1997
Site ID: SITE HP017
PEARL HARBOR NS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: UXO H00101
PEARL HARBOR NS
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Jul 2010
Contaminated Areas
Groundwater: Low Risk
Contaminants: Arsenic 31000.0 ppb
Soil: Risk Not Evaluated
Site ID: UXO H00112
PEARL HARBOR NS
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2007
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »