Cost So Far
$147M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$71.4M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2025
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
Hazardous Area
785 acres
142 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
34 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SVAD-009-R-01
OLD BURNING GROUNDS GROUP
Open Burn
Cost
$20.2M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2025
This site is under ongoing monitoring until Jun 2054
Site ID: SVAD-178
ORDNANCE SCHOOL LAKE OUTFALLS
Industrial Discharge
Cost
$247K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2047
Contaminated Areas
Sediment (Fresh): High Risk
Contaminants have been found in sediment in the lake edge where the storm sewers flow into the lake. Lake is connected to the Mississippi. Aquatic animals and plants are likely to be exposed to the sediments especially bottom feeders such as fish and ducks.
Contaminants: Endrin 0.07 mg/kg 4,4-DDT 1.4 mg/kg Benzo(a)Anthracene 1.7 mg/kg PCBs 3.3 mg/kg
Sediment (Human): Medium Risk
Area accessable by individuals with depot recreation privilages and will be open to public use once the land transfers to Fish and Wildlife Service. Sediments are at lakes edge where fisherman could be exposed by sitting or steping in sediments.
Contaminants: 4,4-DDT 1.4 mg/kg
Site ID: SVAD-020
ABANDONED LANDFILL
Landfill
Cost
$1.71M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2048
Contaminated Areas
Groundwater: High Risk
SITE ON BANKS OF APPLE RIVER LEACHING INTO RIVER. SITE IS A THREAT TO DOWN GRADIENT AQUIFER AND ADJACENT SURFACE WATER THAT IS TRIB OF MISSISSIPPI BOTH GROUND WATER AND SURFACE WATER ARE USED DOWNSTREAM FOR HUMAN CONSUMPTION SITE HAS UNRESTRICTIED ACCESS TO VISITORS AND EMPLOYEES
Contaminants: Arsenic 13.6 ug/L Manganese and compounds 3080.0 ug/L
Sediment (Human): Medium Risk
SEE GW RATIONALE
Contaminants: Nickel (Soluble Salts) 24.799999 mg/kg Lead 35.799999 mg/kg Copper and compounds 40.0 mg/kg Zinc 143.0 mg/kg
Surface Water (Human): Low Risk
SEE GW RATIONALE
Contaminants: Lead 7.699999 ug/L Copper and compounds 33.299999 ug/L Zinc 38.599998 ug/L
Site ID: SVAD-033
ARTILLERY TUNNEL TEST SITE (MOUNDS)
Burn Area
Cost
$797K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Contaminated Areas
Soil: High Risk
SEE RATIONALE FOR SITE 15. SITES ARE ADJACENT AND WILL BE ADDRESSED TOGETHER LEAD LEVEL VERIFIED IN DAMES AND MOORE/AEC RI REPORT PER JOHN CLARKE AND PETE RISSELL SEE RATIONALE FOR SITE 15
Contaminants: Chromium 66.800003 mg/kg Manganese and compounds 686.0 mg/kg Zinc 18000.0 mg/kg Copper and compounds 48000.0 mg/kg Lead 110000.0 mg/kg
Site ID: SVAD-073
STABLES LANDFILL (DUMP)
Landfill
Cost
$67K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Contaminated Areas
Soil: High Risk
SE GW RATIONALE. SITE HAS UNCONTROLLED ACCESS TO EMPLOYEES AND VISITORS SEE GW RATIONALE
Contaminants: Cadmium and compounds 14.199999 mg/kg Chromium 187.0 mg/kg Manganese and compounds 1300.0 mg/kg Lead 5800.0 mg/kg Copper and compounds 46000.0 mg/kg
Groundwater: Medium Risk
CONTAMINATION RIGHT NEXT TO APPLE RIVER BANK. SUBJECT TO FLOODING AND LEACHING FLOWS TO MISSISSIPPI. THREAT TO DOWN STREAM USERS AND DOWNGRADIENT AQUIFER HUMAN RECEPTORS OF MISSISSIPPI RIVER FORRECREATION OR CONSUMPTION
Contaminants: 1,3,5-Trinitrobenzene 0.77 ug/L Manganese and compounds 10.699999 ug/L
Sediment (Human): Medium Risk
SEE GW RATIONALE. SITE HAS UNCONTROLLEDACCESS TO EMPLOYEES AND VISITORS. SEE GW RATIONALE
Contaminants: Copper and compounds 14.899999 mg/kg Lead 21.0 mg/kg Nickel (Soluble Salts) 22.1 mg/kg Chromium 26.700001 mg/kg Zinc 71.0 mg/kg
Surface Water (Human): Medium Risk
SEE GW RATIONALE
Contaminants: Chromium 59.5 ug/L Lead 75.699997 ug/L Nickel (Soluble Salts) 82.400002 ug/L Zinc 284.0 ug/L
Site ID: SVAD-067
FIRE TRAINING WASTE OIL TANK
Fire/Crash Training Area
Cost
$856K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Contaminated Areas
Groundwater: High Risk
CONTAMINATION ON GW IS FLOWING TOWARD DEPOT POTABLE WATER WELL. AQUIFER IN DANGER. IF NOT ADDRESSED GW CONTAM WILL REACH MISSISSIPPI RIVER HUMAN RECEPTOR IN THE FORM OF EMPLOYEES USE DEPOT WATER.
Contaminants: 1,1,2,2-Tetrachloroethane 400.0 ug/L Carbon Dichloride 407.0 ug/L 1,2-Dichloroethane (EDC) 20000.0 ug/L Trichloroethylene (TCE) 30000.0 ug/L
Soil: High Risk
SEE GW RATIONALE
Contaminants: Lead 89.5 mg/kg Manganese and compounds 231.0 mg/kg Benzene 33000.0 mg/kg
Site ID: SVAD-047
CHROMIUM ORE OPEN STORAGE AREA
Storage Area
Cost
$240K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2019
Contaminated Areas
Soil: Medium Risk
Site has uncontrolled acess to chorme ore piles. chrome is present in soil and dust and is transported by wind chorme ore and dust may be absorbed by emplyees and future users of land
Contaminants: Chromium 2400.0 mg/kg
Site ID: SVAD-181
BLDGS. E601 & E607
Contaminated Buildings
Cost
$1,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2017
Contaminated Areas
Soil: Medium Risk
explosives contamination on floor of building. If future workers use the igloo migration will occur via inhalation and skin contact high concentrations of explosives on floor of building. If humans enter the building they will be exposed to explosives.
Contaminants: 2,4-Dinitrotoluene 3000.0 mg/kg 2,4,6-Trinitrotoluene 20000.0 mg/kg
Site ID: SVAD-014-R-01
UPPER FUNCTION TEST RANGE
Firing Range
Cost
$24K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2017
Site ID: SVAD-015-R-01
NEW FUNCTION TEST RANGE
Firing Range
Cost
$332K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2048
Site ID: SVAD-222
EXPLOSIVE BUILDING DECONTAMINATION
Building Demolition/Debris Removal
Cost
$50K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2019
Contaminated Areas
Soil: Medium Risk
"there is confirmed explosives of several types on the interior surfaces of these buildings. Likely in soil underneath buildings." "future owners, construction/remediation works will be exposed to contamination if the work in the building. Acute danger of explosions in these contaminated buildings"
Contaminants: Benzo(a)Pyrene 3.999 mg/kg TNT 206.0 mg/kg
Site ID: SVAD-001-R-01
90MM CASING TEST AREA
Firing Range
Cost
Unknown
Final Cleanup Action
Aug 2017
Site ID: SVAD-021-BDP
BOMB DISASSEMBLY PLANT
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2016
Contaminated Areas
Groundwater: Medium Risk
Site is not a confined MPF. Site has a Class I aquifer.
Contaminants: Arsenic 10.0 ug/L Manganese and compounds 6190.0 ug/L Iron 28600.0 ug/L
Site ID: SVAD-010-R-01
PRE-1939 OB/OD GROUNDS
Open Burn
Cost
$399K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2048
Site ID: SVAD-003-R-01
A - AREA DETONATION PIT
Open Burn
Cost
Unknown
Final Cleanup Action
Aug 2017
Site ID: SVAD-005-R-01
HAND GRENADE BURIAL SITE
Explosive Ordnance Disposal Area
Cost
$410K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2048
Site ID: SVAD-012-R-01
PROOF RANGE GROUP
Firing Range
Cost
$742K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2048
Site ID: SVAD-084
SCRAP WOOD OPEN BURN AREA
Burn Area
Cost
$62K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2018
Contaminated Areas
Soil: Low Risk
BTEX in the soil at very low levels. May migrate to GW Unknown future use. Currently employees are at burn pile infrequently
Contaminants: Benzene 0.05 mg/kg
Site ID: SVAD-087
RAILROAD TIE PILE DISPOSAL AREA
Surface Disposal Area
Cost
$2.12M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Contaminated Areas
Soil: Low Risk
degredation products from rr ties and utility poles are in the soil. Unrestricted acces to workers, reservists that use area and hunters Human contact with soil and wind born dust Employees, Army reservists, and hunters frequent the area.
Contaminants: 2-Cresol 97.0 mg/kg
Site ID: SVAD-099
BUILDING 762 CF PLANT BATTERY SH0P
Industrial Discharge
Cost
$831K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2048
Contaminated Areas
Groundwater: Low Risk
Explosives have been found in the groundwater. This aquifer is not currently used for a potable water source. If consumed by future workers an exposure pathway will be established. Humans may consume groundwater. If so exposures will occur. Currently this aquifer is not used for potable water
Contaminants: 1,3,5-Trinitrobenzene 1431.0 ug/L
Site ID: SVAD-090
H-AREA LANDFILL CELLS
Landfill
Cost
$10.6M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2024
This site is under ongoing monitoring until Jul 2053
Contaminated Areas
Groundwater: Low Risk
trace solvents found in groundwater which could migrate to potable water sources. if groundwater is consumed by humans they will become receptors. Future owners my decide to use this water source
Contaminants: Tetrachloroethylene 22.0 ug/L
Site ID: SVAD-085
NEW SMALL ARMS RANGE
Small Arms Range
Cost
$199K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
This site is under ongoing monitoring until Dec 2047
Contaminated Areas
Soil: Low Risk
Elemental lead in soil from firing of small arms. lead may be transported to human users and employees Area has limited controls. Employees and range patron can be exposed to lead.
Contaminants: Lead 230.0 mg/kg
Site ID: SVAD-223
BLDG 134, SMALL ARMS AMMO DISPOSAL
Surface Disposal Area
Cost
$2.15M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Contaminated Areas
Soil: Low Risk
it is likely the source is not moving. surface exposure is possible.
Contaminants: Lead 16266.0 mg/kg
Site ID: SVAD-126
BLDG 502 CONCRETE UNDERGROUND STORAGE TANKSS
Underground Storage Tanks
Cost
$18K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2016
Contaminated Areas
Soil: Low Risk
Nothing found at time of tank cleaning. EPAs may require further sampling which may change RRSE None at this time
Contaminants: Benzene 1.0 mg/kg
Site ID: SVAD-008-R-01
MUNDERGROUND STORAGE TANKSARD BURN AREA B
Explosive Ordnance Disposal Area
Cost
$578K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Site ID: SVAD-006-R-01
MORTAR IMPACT RANGE GROUP
Firing Range
Cost
$334K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Site ID: SVAD-045
IGLOOS MAGAZINES WAREHOUSES (A H J)
Storage Area
Cost
Unknown
Final Cleanup Action
May 2019
Contaminated Areas
Soil: Low Risk
Igloos being cleared under a non-CERCLA inspection. No receptors
Contaminants: Iron 17.0 mg/kg
Site ID: SVAD-007-R-01
MUNDERGROUND STORAGE TANKSARD BURN AREA A
Explosive Ordnance Disposal Area
Cost
$710K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Site ID: SVAD-004-R-01
BURN AREA 105
Explosive Ordnance Disposal Area
Cost
$783K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2049
Site ID: SVAD-036
INDUNDERGROUND STORAGE TANKSRIAL SEWAGE PLANT (BLDG 937)
Waste Treatment Plant
Cost
$55K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2018
Contaminated Areas
Sediment (Human): Low Risk
METALS IS DRYING BEDS NEXT TO RIVER DOWNSTREAM AQUIFER AND USERS OF THE MISSISSIPPI FOR RECREATION AND WATER SOURCE ARE THREATENED HUMAN RECEPTORS (DOWNSTREAM) THAT USE MISSISSIPPI FOR WATER SOURCE
Contaminants: Chromium 42.0 mg/kg Lead 118.0 mg/kg
Site ID: SVAD-076
APE SHOP REAR DOCK AREA
Surface Disposal Area
Cost
$340K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2016
This site is under ongoing monitoring until Dec 2048
Contaminated Areas
Soil: Low Risk
PCB and solvents in soil next to a dock that has a lot of foot traffic. Will be heavily used area in future Workers frequent area every day. Railroad traffic in area also.
Contaminants: PCBs 0.68 mg/kg Trichloroethylene (TCE) 5.5 mg/kg
Site ID: SVAD-226
J-609 OPEN BURN AREA
Open Burn
Cost
Unknown
Final Cleanup Action
Aug 2017
Site ID: SVAD-111
1934 OUTDOOR WASHOUT PLANT
Industrial Discharge
Cost
$265K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2014
This site is under ongoing monitoring until Aug 2066
Site ID: SVAD-050
DEMOLITION AREA (BOTTOMLANDS)
Explosive Ordnance Disposal Area
Cost
$24.7M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2025
This site is under ongoing monitoring until Jun 2054
108 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: SVAD-025
CF MELT POUR FACILITY SUMP
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Jun 2000
Site ID: SVAD-028
CL MELT POUR FACILITY LEACHING FIELD
Leach Field
Cost
Unknown
Final Cleanup Action
Jul 2001
Site ID: SVAD-031
GUN SITE (WWI)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: SVAD-032
OLD PISTOL RANGE
Pistol Range
Cost
Unknown
Final Cleanup Action
Sep 2014
Site ID: SVAD-037
GASOLINE SPILL (379 LITERS)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-039
MUNDERGROUND STORAGE TANKSARD OPEN STORAGE AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Jan 2008
Site ID: SVAD-040
ANTITANK MINE STRGE IGLOO EXPLSN SITE(F)
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 2001
Site ID: SVAD-041
M600 FUSE STRGE IGLOO EXPLOSION SITE(F)
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Mar 2002
Site ID: SVAD-042
STORAGE TANKS (3)(G AREA)(ASBESTOS TANKS
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 2005
Site ID: SVAD-043
NITRIC ACID STORAGE AREA (500 AREA)
Storage Area
Cost
Unknown
Final Cleanup Action
May 1995
Site ID: SVAD-044
NITRIC ACID STORAGE AREA (H AREA)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2010
Site ID: SVAD-046
SODIUM NITRATE STORAGE PITS
Storage Area
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-048
UTAH SHOCK TEST DETONATION AREA
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Dec 1999
Site ID: SVAD-049
M600 FUSE DETONATION AREA
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2001
Site ID: SVAD-051
BEDROCK WELL (BLDG 107)
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-052
BEDROCK WELL (BLDG 260)
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-053
BEDROCK WELL (BLDG 645)
Optical Shop
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-054
BEDROCK WELL (BLDG 701)
Optical Shop
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-074
BEATY HOLLOW CREEK DUMP
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Feb 2007
Site ID: SVAD-058
SHALLOW WELL (BLDG 2003)
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-059
SHALLOW WELL (BLDG 1005)
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-035
MAIN SEWAGE DISPOSAL PLANT
Waste Treatment Plant
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-061
OPEN RUBBLE DUMP
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 1999
Site ID: SVAD-086
BUILDING 128 STORAGE AREA
Storage Area
Cost
$7,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-088
H-AREA OPEN DRAINAGE DITCH
Drainage Ditch
Cost
$3,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-092
BUILDING 113 PESTICIDE STORAGE
Pesticide Shop
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-071
BURN PITS (FUNCTION TEST AREA)
Burn Area
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: SVAD-072
EXPLOSIVE MELT POUR FAC LEACH FIELD 1007
Leach Field
Cost
Unknown
Final Cleanup Action
Apr 2001
Site ID: SVAD-075
ARMY RESERVE MOTORPOOL
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1999
Site ID: SVAD-077
1917 ERA POWDER MAGAZINES
Storage Area
Cost
Unknown
Final Cleanup Action
Nov 2000
Site ID: SVAD-078
CF PLANT LAUNDRY AND LEACH FIELD
Leach Field
Cost
Unknown
Final Cleanup Action
Jul 2001
Site ID: SVAD-079
G-AREA CORRAL FUEL SPILL
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2000
Site ID: SVAD-081
BUILDING 1017 BATTERY SHOP LEACH FIELD
Leach Field
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-089
PESTICIDE BURIAL AREA
Landfill
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-091
CN PLANT SMALL ARMS STOCKPILE AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 2001
Site ID: SVAD-096
BUILDING 642 CL PLANT
Plating Shop
Cost
Unknown
Final Cleanup Action
Sep 2001
Site ID: SVAD-118
SITE 19 GW WELL MONITORING
Landfill
Cost
Unknown
Final Cleanup Action
Jun 1995
Site ID: SVAD-121
CF PLANT SEPTIC SYSTEM & LEACHFLD
Sewage Effluent Settling Ponds
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: SVAD-097
BUILDING 711 CF PLANT
Plating Shop
Cost
Unknown
Final Cleanup Action
May 2001
Site ID: SVAD-098
BUILDING 716 CF PLANT MELT POUR BLDG
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Nov 2002
Site ID: SVAD-101
K ROAD TRENCH SITE
Burn Area
Cost
Unknown
Final Cleanup Action
Apr 2002
Site ID: SVAD-068
WASTE OIL UNDERGROUND STORAGE TANK
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1990
Site ID: SVAD-103
POTENTIAL PRISON SITE SOIL SAMPLING
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Nov 1996
Site ID: SVAD-131
BLDG 137 SCRAP AREA
Storage Area
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-135
COAL STORAGE AREAS BLDGS 127 & 115
Storage Area
Cost
$7,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-104
PCB VAULTS PLANT AREA
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: SVAD-122
CL PLANT NORTH SEPTIC SYSTEM
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-124
CN PLANT SEPTIC TANK & LEACHFIELD
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
May 2001
Site ID: SVAD-129
PCB SPILL BETWEEN BLDGS 132 & 134
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: SVAD-133
BLDG 414 MAINTENANCE PITS
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-134
BLDG 120 FLAMMABLE MAT. STORAGE
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-136
BLDG 412 OLD PILOT MODEL SHOP
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-142
BLDG 628 DRILLING & BOOSTERING BLDG
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Aug 2008
Site ID: SVAD-155
BLDG 729 DRILLING & BOOSTERING BLDG
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Sep 2013
Site ID: SVAD-179
BLDG. 114 INTERNAL SPILLS
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: SVAD-128
ZINC INGOT PILES H-AREA
Storage Area
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-186
CF PLANT GENERATOR BLDG, BLDG 707
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Sep 2013
Site ID: SVAD-227
I-GATE SUBSTATION PCB
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jun 2013
Site ID: SVAD-193
SLUDGE APPLICATION AREA A-WEST ROAD
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-194
SLUDGE APPLICATION AREA B
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-224
COSMOLINE GREASE DUMP SITES
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2014
Site ID: SVAD-132
BLDG 410 WASHRACK AND BASIN
Washrack
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-002
EXPLOSIVE MELT POUR FACILITY (BLDG 1007)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Apr 2001
Site ID: SVAD-023
EXPLOSIVE MELT POUR FACILITY SUMP
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: SVAD-055
BEDROCK WELL (BLDG 1022)
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-123
CN PLANT AND CL PLANT OUTFALLS
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: SVAD-184
CL PLANT COMPRESSOR BLDG, BLDG 640
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2013
Site ID: SVAD-094
BUILDING 103 MOTOR POOL
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Apr 2000
Site ID: SVAD-001
TNT WASHOUT FACILITY (BLDG 2208)
Contaminated Buildings
Cost
$927K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2015
This site is under ongoing monitoring until Aug 2064
Site ID: SVAD-102
BUILDING 642 TILE FIELD
Leach Field
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-093
BUILDING 112 PESTICIDE MIXING PAD
Pesticide Shop
Cost
$5,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-095
BUILDING 104 FLAMMABLE STORAGE
Storage Area
Cost
$7,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-189
WATER TOWER, BLDG 904
Surface Disposal Area
Cost
$8,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-070
EXPLOSIVE WASTE INCINERATOR (BLDG 2217)
Incinerator
Cost
Unknown
Final Cleanup Action
May 1995
Site ID: SVAD-190
H AREA MATERIALS STORAGE/SCRAP YARD
Surface Disposal Area
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-010
WHITE PHOSPHOROUS BURN AREA
Burn Area
Cost
Unknown
Final Cleanup Action
Jun 2002
Site ID: SVAD-034
QUALITY CONTROL FACILITY (SAWWG)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Dec 1999
Site ID: SVAD-060
SPECIAL WEAPONS MAINTENANCE AND STORAGE
Storage Area
Cost
$7,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-130
VINCENT ROAD SEPTIC SYSTEM
Leach Field
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-183
CL PLANT EQUIPMENT STORAGE BLDG 615
Spill Site Area
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2014
This site is under ongoing monitoring until Aug 2044
Site ID: SVAD-195
SLUDGE APPLICATION AREA C
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Sep 2014
Site ID: SVAD-069
CONTAMINATED WASTE PROCESSOR (BLDG 2215)
Incinerator
Cost
Unknown
Final Cleanup Action
Sep 2013
Site ID: SVAD-012
EXPLOSIVE CONTAMINATED SCRAP BURN AREA
Burn Area
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: SVAD-056
BEDROCK WELL (BLDG 2205)
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-082
I-GATE CAFETERIA SEPTIC SYSTEM
Leach Field
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-180
WILDLIFE AREA ASPHALT DUMP
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-192
MANGANESE ORE STORAGE MOUNDS
Storage Area
Cost
$598K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2013
This site is under ongoing monitoring until Nov 2063
Site ID: SVAD-006
ACID (IRFNA) BURN AREA (DISPOSAL PIT)
Burn Area
Cost
Unknown
Final Cleanup Action
Oct 2002
Site ID: SVAD-038
WWI AMMUNITION STORAGE AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Jan 2008
Site ID: SVAD-057
SHALLOW WELL (BLDG 2213)
Storage Area
Cost
Unknown
Final Cleanup Action
Jan 1979
Site ID: SVAD-080
EMERGENCY/AUXILLARY ELEC GENERATION PLNT
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: SVAD-185
CF PLANT HEATING PLANT, BLDG 704
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 2010
Site ID: SVAD-026
CL MELT POUR FACILITY SUMP
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Jul 2001
Site ID: SVAD-011-R-01
PRE-1939 OB/OD GROUNDS - XD
Open Burn
Cost
Unknown
Final Cleanup Action
Jun 2003
Site ID: SVAD-013-R-01
PYROTECHNIC TRAINING AREA
Firing Range
Cost
Unknown
Final Cleanup Action
Jun 2003
Site ID: SVAD-003
CL MELT POUR FACILITY (BLDG 636)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
May 2001
Site ID: SVAD-004
LEAD AZIDE DEMIL FACILITY (CF AREA)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: SVAD-005
LIQUID PROPELLANT BURN AREA
Burn Area
Cost
Unknown
Final Cleanup Action
Sep 2013
Site ID: SVAD-011
TNT AND AMMONIUM NITRATE BURN AREA
Burn Area
Cost
Unknown
Final Cleanup Action
Jul 2012
Site ID: SVAD-014
MUNDERGROUND STORAGE TANKSARD BURN AREA AT OBG-155MM MUNITIONS
Burn Area
Cost
Unknown
Final Cleanup Action
Jun 2000
Site ID: SVAD-015
SMALL ARMS AMMO BURN AREA
Burn Area
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: SVAD-016
SMALL ARMS AMMO DEACTIVATION FURNACE
Incinerator
Cost
Unknown
Final Cleanup Action
Sep 2014
Site ID: SVAD-018
SODIUM EXHAUNDERGROUND STORAGE TANKS VALVE BURIAL SITE
Landfill
Cost
Unknown
Final Cleanup Action
Dec 2001
Site ID: SVAD-021
OLD LEACHING PONDS (4)
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Jun 2000
Site ID: SVAD-022
NEW LEACHING PONDS (2)
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Jun 2000
Site ID: SVAD-027
CL MELT POUR FACILITY SUMP (CLEANED)
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Aug 1993
Site ID: SVAD-024
CF MELT POUR FACILITY LEACHING FIELD
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2013
Site ID: SVAD-002-R-01
90MM CASING TEST AREA - XD
Firing Range
Cost
Unknown
Final Cleanup Action
Nov 2004
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »