Back to Map
ARMY INSTALLATION ID: IL521382080300

SAVANNA DEPOT ACTIVITY

savanna, Illinois

Cost So Far

$147M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$71.4M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2025

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

Hazardous Area

785 acres

142 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

34 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SVAD-009-R-01

OLD BURNING GROUNDS GROUP

Open Burn

Cost

$20.2M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2025

This site is under ongoing monitoring until Jun 2054

Site ID: SVAD-178

ORDNANCE SCHOOL LAKE OUTFALLS

Industrial Discharge

Cost

$247K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2017

This site is under ongoing monitoring until Sep 2047

Contaminated Areas

Sediment (Fresh): High Risk

Contaminants have been found in sediment in the lake edge where the storm sewers flow into the lake. Lake is connected to the Mississippi. Aquatic animals and plants are likely to be exposed to the sediments especially bottom feeders such as fish and ducks.

Contaminants: Endrin 0.07 mg/kg 4,4-DDT 1.4 mg/kg Benzo(a)Anthracene 1.7 mg/kg PCBs 3.3 mg/kg

Sediment (Human): Medium Risk

Area accessable by individuals with depot recreation privilages and will be open to public use once the land transfers to Fish and Wildlife Service. Sediments are at lakes edge where fisherman could be exposed by sitting or steping in sediments.

Contaminants: 4,4-DDT 1.4 mg/kg

See more details...

Site ID: SVAD-020

ABANDONED LANDFILL

Landfill

Cost

$1.71M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Sep 2048

Contaminated Areas

Groundwater: High Risk

SITE ON BANKS OF APPLE RIVER LEACHING INTO RIVER. SITE IS A THREAT TO DOWN GRADIENT AQUIFER AND ADJACENT SURFACE WATER THAT IS TRIB OF MISSISSIPPI BOTH GROUND WATER AND SURFACE WATER ARE USED DOWNSTREAM FOR HUMAN CONSUMPTION SITE HAS UNRESTRICTIED ACCESS TO VISITORS AND EMPLOYEES

Contaminants: Arsenic 13.6 ug/L Manganese and compounds 3080.0 ug/L

Sediment (Human): Medium Risk

SEE GW RATIONALE

Contaminants: Nickel (Soluble Salts) 24.799999 mg/kg Lead 35.799999 mg/kg Copper and compounds 40.0 mg/kg Zinc 143.0 mg/kg

Surface Water (Human): Low Risk

SEE GW RATIONALE

Contaminants: Lead 7.699999 ug/L Copper and compounds 33.299999 ug/L Zinc 38.599998 ug/L

See more details...

Site ID: SVAD-033

ARTILLERY TUNNEL TEST SITE (MOUNDS)

Burn Area

Cost

$797K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Contaminated Areas

Soil: High Risk

SEE RATIONALE FOR SITE 15. SITES ARE ADJACENT AND WILL BE ADDRESSED TOGETHER LEAD LEVEL VERIFIED IN DAMES AND MOORE/AEC RI REPORT PER JOHN CLARKE AND PETE RISSELL SEE RATIONALE FOR SITE 15

Contaminants: Chromium 66.800003 mg/kg Manganese and compounds 686.0 mg/kg Zinc 18000.0 mg/kg Copper and compounds 48000.0 mg/kg Lead 110000.0 mg/kg

See more details...

Site ID: SVAD-073

STABLES LANDFILL (DUMP)

Landfill

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2017

Contaminated Areas

Soil: High Risk

SE GW RATIONALE. SITE HAS UNCONTROLLED ACCESS TO EMPLOYEES AND VISITORS SEE GW RATIONALE

Contaminants: Cadmium and compounds 14.199999 mg/kg Chromium 187.0 mg/kg Manganese and compounds 1300.0 mg/kg Lead 5800.0 mg/kg Copper and compounds 46000.0 mg/kg

Groundwater: Medium Risk

CONTAMINATION RIGHT NEXT TO APPLE RIVER BANK. SUBJECT TO FLOODING AND LEACHING FLOWS TO MISSISSIPPI. THREAT TO DOWN STREAM USERS AND DOWNGRADIENT AQUIFER HUMAN RECEPTORS OF MISSISSIPPI RIVER FORRECREATION OR CONSUMPTION

Contaminants: 1,3,5-Trinitrobenzene 0.77 ug/L Manganese and compounds 10.699999 ug/L

Sediment (Human): Medium Risk

SEE GW RATIONALE. SITE HAS UNCONTROLLEDACCESS TO EMPLOYEES AND VISITORS. SEE GW RATIONALE

Contaminants: Copper and compounds 14.899999 mg/kg Lead 21.0 mg/kg Nickel (Soluble Salts) 22.1 mg/kg Chromium 26.700001 mg/kg Zinc 71.0 mg/kg

Surface Water (Human): Medium Risk

SEE GW RATIONALE

Contaminants: Chromium 59.5 ug/L Lead 75.699997 ug/L Nickel (Soluble Salts) 82.400002 ug/L Zinc 284.0 ug/L

See more details...

Site ID: SVAD-067

FIRE TRAINING WASTE OIL TANK

Fire/Crash Training Area

Cost

$856K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Contaminated Areas

Groundwater: High Risk

CONTAMINATION ON GW IS FLOWING TOWARD DEPOT POTABLE WATER WELL. AQUIFER IN DANGER. IF NOT ADDRESSED GW CONTAM WILL REACH MISSISSIPPI RIVER HUMAN RECEPTOR IN THE FORM OF EMPLOYEES USE DEPOT WATER.

Contaminants: 1,1,2,2-Tetrachloroethane 400.0 ug/L Carbon Dichloride 407.0 ug/L 1,2-Dichloroethane (EDC) 20000.0 ug/L Trichloroethylene (TCE) 30000.0 ug/L

Soil: High Risk

SEE GW RATIONALE

Contaminants: Lead 89.5 mg/kg Manganese and compounds 231.0 mg/kg Benzene 33000.0 mg/kg

See more details...

Site ID: SVAD-047

CHROMIUM ORE OPEN STORAGE AREA

Storage Area

Cost

$240K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2019

Contaminated Areas

Soil: Medium Risk

Site has uncontrolled acess to chorme ore piles. chrome is present in soil and dust and is transported by wind chorme ore and dust may be absorbed by emplyees and future users of land

Contaminants: Chromium 2400.0 mg/kg

See more details...

Site ID: SVAD-181

BLDGS. E601 & E607

Contaminated Buildings

Cost

$1,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2017

Contaminated Areas

Soil: Medium Risk

explosives contamination on floor of building. If future workers use the igloo migration will occur via inhalation and skin contact high concentrations of explosives on floor of building. If humans enter the building they will be exposed to explosives.

Contaminants: 2,4-Dinitrotoluene 3000.0 mg/kg 2,4,6-Trinitrotoluene 20000.0 mg/kg

See more details...

Site ID: SVAD-014-R-01

UPPER FUNCTION TEST RANGE

Firing Range

Cost

$24K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2017

Site ID: SVAD-015-R-01

NEW FUNCTION TEST RANGE

Firing Range

Cost

$332K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Sep 2048

Site ID: SVAD-222

EXPLOSIVE BUILDING DECONTAMINATION

Building Demolition/Debris Removal

Cost

$50K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2019

Contaminated Areas

Soil: Medium Risk

"there is confirmed explosives of several types on the interior surfaces of these buildings. Likely in soil underneath buildings." "future owners, construction/remediation works will be exposed to contamination if the work in the building. Acute danger of explosions in these contaminated buildings"

Contaminants: Benzo(a)Pyrene 3.999 mg/kg TNT 206.0 mg/kg

See more details...

Site ID: SVAD-001-R-01

90MM CASING TEST AREA

Firing Range

Cost

Unknown

Final Cleanup Action

Aug 2017

Site ID: SVAD-021-BDP

BOMB DISASSEMBLY PLANT

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2016

Contaminated Areas

Groundwater: Medium Risk

Site is not a confined MPF. Site has a Class I aquifer.

Contaminants: Arsenic 10.0 ug/L Manganese and compounds 6190.0 ug/L Iron 28600.0 ug/L

See more details...

Site ID: SVAD-010-R-01

PRE-1939 OB/OD GROUNDS

Open Burn

Cost

$399K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Sep 2048

Site ID: SVAD-003-R-01

A - AREA DETONATION PIT

Open Burn

Cost

Unknown

Final Cleanup Action

Aug 2017

Site ID: SVAD-005-R-01

HAND GRENADE BURIAL SITE

Explosive Ordnance Disposal Area

Cost

$410K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Sep 2048

Site ID: SVAD-012-R-01

PROOF RANGE GROUP

Firing Range

Cost

$742K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Sep 2048

Site ID: SVAD-084

SCRAP WOOD OPEN BURN AREA

Burn Area

Cost

$62K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2018

Contaminated Areas

Soil: Low Risk

BTEX in the soil at very low levels. May migrate to GW Unknown future use. Currently employees are at burn pile infrequently

Contaminants: Benzene 0.05 mg/kg

See more details...

Site ID: SVAD-087

RAILROAD TIE PILE DISPOSAL AREA

Surface Disposal Area

Cost

$2.12M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Contaminated Areas

Soil: Low Risk

degredation products from rr ties and utility poles are in the soil. Unrestricted acces to workers, reservists that use area and hunters Human contact with soil and wind born dust Employees, Army reservists, and hunters frequent the area.

Contaminants: 2-Cresol 97.0 mg/kg

See more details...

Site ID: SVAD-099

BUILDING 762 CF PLANT BATTERY SH0P

Industrial Discharge

Cost

$831K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Sep 2048

Contaminated Areas

Groundwater: Low Risk

Explosives have been found in the groundwater. This aquifer is not currently used for a potable water source. If consumed by future workers an exposure pathway will be established. Humans may consume groundwater. If so exposures will occur. Currently this aquifer is not used for potable water

Contaminants: 1,3,5-Trinitrobenzene 1431.0 ug/L

See more details...

Site ID: SVAD-090

H-AREA LANDFILL CELLS

Landfill

Cost

$10.6M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2024

This site is under ongoing monitoring until Jul 2053

Contaminated Areas

Groundwater: Low Risk

trace solvents found in groundwater which could migrate to potable water sources. if groundwater is consumed by humans they will become receptors. Future owners my decide to use this water source

Contaminants: Tetrachloroethylene 22.0 ug/L

See more details...

Site ID: SVAD-085

NEW SMALL ARMS RANGE

Small Arms Range

Cost

$199K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2017

This site is under ongoing monitoring until Dec 2047

Contaminated Areas

Soil: Low Risk

Elemental lead in soil from firing of small arms. lead may be transported to human users and employees Area has limited controls. Employees and range patron can be exposed to lead.

Contaminants: Lead 230.0 mg/kg

See more details...

Site ID: SVAD-223

BLDG 134, SMALL ARMS AMMO DISPOSAL

Surface Disposal Area

Cost

$2.15M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Contaminated Areas

Soil: Low Risk

it is likely the source is not moving. surface exposure is possible.

Contaminants: Lead 16266.0 mg/kg

See more details...

Site ID: SVAD-126

BLDG 502 CONCRETE UNDERGROUND STORAGE TANKSS

Underground Storage Tanks

Cost

$18K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2016

Contaminated Areas

Soil: Low Risk

Nothing found at time of tank cleaning. EPAs may require further sampling which may change RRSE None at this time

Contaminants: Benzene 1.0 mg/kg

See more details...

Site ID: SVAD-008-R-01

MUNDERGROUND STORAGE TANKSARD BURN AREA B

Explosive Ordnance Disposal Area

Cost

$578K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Site ID: SVAD-006-R-01

MORTAR IMPACT RANGE GROUP

Firing Range

Cost

$334K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Site ID: SVAD-045

IGLOOS MAGAZINES WAREHOUSES (A H J)

Storage Area

Cost

Unknown

Final Cleanup Action

May 2019

Contaminated Areas

Soil: Low Risk

Igloos being cleared under a non-CERCLA inspection. No receptors

Contaminants: Iron 17.0 mg/kg

See more details...

Site ID: SVAD-007-R-01

MUNDERGROUND STORAGE TANKSARD BURN AREA A

Explosive Ordnance Disposal Area

Cost

$710K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Site ID: SVAD-004-R-01

BURN AREA 105

Explosive Ordnance Disposal Area

Cost

$783K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2019

This site is under ongoing monitoring until Sep 2049

Site ID: SVAD-036

INDUNDERGROUND STORAGE TANKSRIAL SEWAGE PLANT (BLDG 937)

Waste Treatment Plant

Cost

$55K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2018

Contaminated Areas

Sediment (Human): Low Risk

METALS IS DRYING BEDS NEXT TO RIVER DOWNSTREAM AQUIFER AND USERS OF THE MISSISSIPPI FOR RECREATION AND WATER SOURCE ARE THREATENED HUMAN RECEPTORS (DOWNSTREAM) THAT USE MISSISSIPPI FOR WATER SOURCE

Contaminants: Chromium 42.0 mg/kg Lead 118.0 mg/kg

See more details...

Site ID: SVAD-076

APE SHOP REAR DOCK AREA

Surface Disposal Area

Cost

$340K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2016

This site is under ongoing monitoring until Dec 2048

Contaminated Areas

Soil: Low Risk

PCB and solvents in soil next to a dock that has a lot of foot traffic. Will be heavily used area in future Workers frequent area every day. Railroad traffic in area also.

Contaminants: PCBs 0.68 mg/kg Trichloroethylene (TCE) 5.5 mg/kg

See more details...

Site ID: SVAD-226

J-609 OPEN BURN AREA

Open Burn

Cost

Unknown

Final Cleanup Action

Aug 2017

Site ID: SVAD-111

1934 OUTDOOR WASHOUT PLANT

Industrial Discharge

Cost

$265K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2014

This site is under ongoing monitoring until Aug 2066

Site ID: SVAD-050

DEMOLITION AREA (BOTTOMLANDS)

Explosive Ordnance Disposal Area

Cost

$24.7M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2025

This site is under ongoing monitoring until Jun 2054

108 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SVAD-025

CF MELT POUR FACILITY SUMP

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Jun 2000

Site ID: SVAD-028

CL MELT POUR FACILITY LEACHING FIELD

Leach Field

Cost

Unknown

Final Cleanup Action

Jul 2001

Site ID: SVAD-031

GUN SITE (WWI)

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Sep 2002

Site ID: SVAD-032

OLD PISTOL RANGE

Pistol Range

Cost

Unknown

Final Cleanup Action

Sep 2014

Site ID: SVAD-037

GASOLINE SPILL (379 LITERS)

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-039

MUNDERGROUND STORAGE TANKSARD OPEN STORAGE AREA

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: SVAD-040

ANTITANK MINE STRGE IGLOO EXPLSN SITE(F)

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Jul 2001

Site ID: SVAD-041

M600 FUSE STRGE IGLOO EXPLOSION SITE(F)

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Mar 2002

Site ID: SVAD-042

STORAGE TANKS (3)(G AREA)(ASBESTOS TANKS

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 2005

Site ID: SVAD-043

NITRIC ACID STORAGE AREA (500 AREA)

Storage Area

Cost

Unknown

Final Cleanup Action

May 1995

Site ID: SVAD-044

NITRIC ACID STORAGE AREA (H AREA)

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2010

Site ID: SVAD-046

SODIUM NITRATE STORAGE PITS

Storage Area

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-048

UTAH SHOCK TEST DETONATION AREA

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Dec 1999

Site ID: SVAD-049

M600 FUSE DETONATION AREA

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Site ID: SVAD-051

BEDROCK WELL (BLDG 107)

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-052

BEDROCK WELL (BLDG 260)

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-053

BEDROCK WELL (BLDG 645)

Optical Shop

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-054

BEDROCK WELL (BLDG 701)

Optical Shop

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-074

BEATY HOLLOW CREEK DUMP

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Feb 2007

Site ID: SVAD-058

SHALLOW WELL (BLDG 2003)

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-059

SHALLOW WELL (BLDG 1005)

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-035

MAIN SEWAGE DISPOSAL PLANT

Waste Treatment Plant

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-061

OPEN RUBBLE DUMP

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Jul 1999

Site ID: SVAD-086

BUILDING 128 STORAGE AREA

Storage Area

Cost

$7,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-088

H-AREA OPEN DRAINAGE DITCH

Drainage Ditch

Cost

$3,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-092

BUILDING 113 PESTICIDE STORAGE

Pesticide Shop

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-071

BURN PITS (FUNCTION TEST AREA)

Burn Area

Cost

Unknown

Final Cleanup Action

Sep 2002

Site ID: SVAD-072

EXPLOSIVE MELT POUR FAC LEACH FIELD 1007

Leach Field

Cost

Unknown

Final Cleanup Action

Apr 2001

Site ID: SVAD-075

ARMY RESERVE MOTORPOOL

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1999

Site ID: SVAD-077

1917 ERA POWDER MAGAZINES

Storage Area

Cost

Unknown

Final Cleanup Action

Nov 2000

Site ID: SVAD-078

CF PLANT LAUNDRY AND LEACH FIELD

Leach Field

Cost

Unknown

Final Cleanup Action

Jul 2001

Site ID: SVAD-079

G-AREA CORRAL FUEL SPILL

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: SVAD-081

BUILDING 1017 BATTERY SHOP LEACH FIELD

Leach Field

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-089

PESTICIDE BURIAL AREA

Landfill

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-091

CN PLANT SMALL ARMS STOCKPILE AREA

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 2001

Site ID: SVAD-096

BUILDING 642 CL PLANT

Plating Shop

Cost

Unknown

Final Cleanup Action

Sep 2001

Site ID: SVAD-118

SITE 19 GW WELL MONITORING

Landfill

Cost

Unknown

Final Cleanup Action

Jun 1995

Site ID: SVAD-121

CF PLANT SEPTIC SYSTEM & LEACHFLD

Sewage Effluent Settling Ponds

Cost

Unknown

Final Cleanup Action

Jan 2000

Site ID: SVAD-097

BUILDING 711 CF PLANT

Plating Shop

Cost

Unknown

Final Cleanup Action

May 2001

Site ID: SVAD-098

BUILDING 716 CF PLANT MELT POUR BLDG

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Nov 2002

Site ID: SVAD-101

K ROAD TRENCH SITE

Burn Area

Cost

Unknown

Final Cleanup Action

Apr 2002

Site ID: SVAD-068

WASTE OIL UNDERGROUND STORAGE TANK

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: SVAD-103

POTENTIAL PRISON SITE SOIL SAMPLING

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Nov 1996

Site ID: SVAD-131

BLDG 137 SCRAP AREA

Storage Area

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-135

COAL STORAGE AREAS BLDGS 127 & 115

Storage Area

Cost

$7,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-104

PCB VAULTS PLANT AREA

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: SVAD-122

CL PLANT NORTH SEPTIC SYSTEM

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-124

CN PLANT SEPTIC TANK & LEACHFIELD

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

May 2001

Site ID: SVAD-129

PCB SPILL BETWEEN BLDGS 132 & 134

Spill Site Area

Cost

Unknown

Final Cleanup Action

Oct 2010

Site ID: SVAD-133

BLDG 414 MAINTENANCE PITS

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-134

BLDG 120 FLAMMABLE MAT. STORAGE

Storage Area

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-136

BLDG 412 OLD PILOT MODEL SHOP

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-142

BLDG 628 DRILLING & BOOSTERING BLDG

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Aug 2008

Site ID: SVAD-155

BLDG 729 DRILLING & BOOSTERING BLDG

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Sep 2013

Site ID: SVAD-179

BLDG. 114 INTERNAL SPILLS

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: SVAD-128

ZINC INGOT PILES H-AREA

Storage Area

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-186

CF PLANT GENERATOR BLDG, BLDG 707

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Sep 2013

Site ID: SVAD-227

I-GATE SUBSTATION PCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jun 2013

Site ID: SVAD-193

SLUDGE APPLICATION AREA A-WEST ROAD

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-194

SLUDGE APPLICATION AREA B

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-224

COSMOLINE GREASE DUMP SITES

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 2014

Site ID: SVAD-132

BLDG 410 WASHRACK AND BASIN

Washrack

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-002

EXPLOSIVE MELT POUR FACILITY (BLDG 1007)

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Apr 2001

Site ID: SVAD-023

EXPLOSIVE MELT POUR FACILITY SUMP

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 2002

Site ID: SVAD-055

BEDROCK WELL (BLDG 1022)

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-123

CN PLANT AND CL PLANT OUTFALLS

Industrial Discharge

Cost

Unknown

Final Cleanup Action

Apr 1999

Site ID: SVAD-184

CL PLANT COMPRESSOR BLDG, BLDG 640

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2013

Site ID: SVAD-094

BUILDING 103 MOTOR POOL

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Apr 2000

Site ID: SVAD-001

TNT WASHOUT FACILITY (BLDG 2208)

Contaminated Buildings

Cost

$927K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2015

This site is under ongoing monitoring until Aug 2064

Site ID: SVAD-102

BUILDING 642 TILE FIELD

Leach Field

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-093

BUILDING 112 PESTICIDE MIXING PAD

Pesticide Shop

Cost

$5,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-095

BUILDING 104 FLAMMABLE STORAGE

Storage Area

Cost

$7,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-189

WATER TOWER, BLDG 904

Surface Disposal Area

Cost

$8,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-070

EXPLOSIVE WASTE INCINERATOR (BLDG 2217)

Incinerator

Cost

Unknown

Final Cleanup Action

May 1995

Site ID: SVAD-190

H AREA MATERIALS STORAGE/SCRAP YARD

Surface Disposal Area

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-010

WHITE PHOSPHOROUS BURN AREA

Burn Area

Cost

Unknown

Final Cleanup Action

Jun 2002

Site ID: SVAD-034

QUALITY CONTROL FACILITY (SAWWG)

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Dec 1999

Site ID: SVAD-060

SPECIAL WEAPONS MAINTENANCE AND STORAGE

Storage Area

Cost

$7,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-130

VINCENT ROAD SEPTIC SYSTEM

Leach Field

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-183

CL PLANT EQUIPMENT STORAGE BLDG 615

Spill Site Area

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Aug 2044

Site ID: SVAD-195

SLUDGE APPLICATION AREA C

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Sep 2014

Site ID: SVAD-069

CONTAMINATED WASTE PROCESSOR (BLDG 2215)

Incinerator

Cost

Unknown

Final Cleanup Action

Sep 2013

Site ID: SVAD-012

EXPLOSIVE CONTAMINATED SCRAP BURN AREA

Burn Area

Cost

Unknown

Final Cleanup Action

Sep 2002

Site ID: SVAD-056

BEDROCK WELL (BLDG 2205)

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-082

I-GATE CAFETERIA SEPTIC SYSTEM

Leach Field

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-180

WILDLIFE AREA ASPHALT DUMP

Industrial Discharge

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-192

MANGANESE ORE STORAGE MOUNDS

Storage Area

Cost

$598K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2013

This site is under ongoing monitoring until Nov 2063

Site ID: SVAD-006

ACID (IRFNA) BURN AREA (DISPOSAL PIT)

Burn Area

Cost

Unknown

Final Cleanup Action

Oct 2002

Site ID: SVAD-038

WWI AMMUNITION STORAGE AREA

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: SVAD-057

SHALLOW WELL (BLDG 2213)

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 1979

Site ID: SVAD-080

EMERGENCY/AUXILLARY ELEC GENERATION PLNT

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2008

Site ID: SVAD-185

CF PLANT HEATING PLANT, BLDG 704

Spill Site Area

Cost

Unknown

Final Cleanup Action

Oct 2010

Site ID: SVAD-026

CL MELT POUR FACILITY SUMP

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Jul 2001

Site ID: SVAD-011-R-01

PRE-1939 OB/OD GROUNDS - XD

Open Burn

Cost

Unknown

Final Cleanup Action

Jun 2003

Site ID: SVAD-013-R-01

PYROTECHNIC TRAINING AREA

Firing Range

Cost

Unknown

Final Cleanup Action

Jun 2003

Site ID: SVAD-003

CL MELT POUR FACILITY (BLDG 636)

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

May 2001

Site ID: SVAD-004

LEAD AZIDE DEMIL FACILITY (CF AREA)

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SVAD-005

LIQUID PROPELLANT BURN AREA

Burn Area

Cost

Unknown

Final Cleanup Action

Sep 2013

Site ID: SVAD-011

TNT AND AMMONIUM NITRATE BURN AREA

Burn Area

Cost

Unknown

Final Cleanup Action

Jul 2012

Site ID: SVAD-014

MUNDERGROUND STORAGE TANKSARD BURN AREA AT OBG-155MM MUNITIONS

Burn Area

Cost

Unknown

Final Cleanup Action

Jun 2000

Site ID: SVAD-015

SMALL ARMS AMMO BURN AREA

Burn Area

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: SVAD-016

SMALL ARMS AMMO DEACTIVATION FURNACE

Incinerator

Cost

Unknown

Final Cleanup Action

Sep 2014

Site ID: SVAD-018

SODIUM EXHAUNDERGROUND STORAGE TANKS VALVE BURIAL SITE

Landfill

Cost

Unknown

Final Cleanup Action

Dec 2001

Site ID: SVAD-021

OLD LEACHING PONDS (4)

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Jun 2000

Site ID: SVAD-022

NEW LEACHING PONDS (2)

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Jun 2000

Site ID: SVAD-027

CL MELT POUR FACILITY SUMP (CLEANED)

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Aug 1993

Site ID: SVAD-024

CF MELT POUR FACILITY LEACHING FIELD

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Sep 2013

Site ID: SVAD-002-R-01

90MM CASING TEST AREA - XD

Firing Range

Cost

Unknown

Final Cleanup Action

Nov 2004

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »