Cost So Far
$96.4M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$12.4M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2045
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
81 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: local use ordinances, fences, dig permits. see more » fences signs dig permits local use ordinances notations in master plan landfill restriction - prohibit activities that would impact the landfill cap (or cover system) and drainage system prohibit human consumption of groundwater prohibit installation of drinking water well landfill restriction - prohibit excavation on landfill cap or cover system landfill restriction - prohibit installation of utility system lines through the site landfill restriction - restrict access to the site landfill restriction - restrict construction of buildings that may interfere with landfill cap or cover system landfill restriction - restrict plantings that interfere landfill cap or cover system (roots that penetrate the cap or cover system) landfill restriction - restrict vehicular traffic prohibit residential use « see less
15 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: CC-FTRI-11
FORMER BUILDING 700 FUELS SITE
Underground Storage Tanks
Cost
$832K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2017
Contaminated Areas
Groundwater: High Risk
There is soil and ground-water contamination present at the site. The site is open at this time but has the potential to become a TEMF.
Contaminants: 1,2-Dichloroethane (EDC) 25.0 ug/L Ethyl benzene 59.0 ug/L Benzene 270.0 ug/L Naphthalene 420.0 ug/L
Soil: Medium Risk
Sampling has confirmed the presence of contamination in the soil and ground water. The site is an open area at this time but has the potential to become a TEMF.
Contaminants: Benzene 0.91 mg/kg Naphthalene 13.0 mg/kg Ethyl benzene 59.0 mg/kg
Site ID: FTRI-003-R-01
CAMP FORSYTH LANDFILL AREA 2 MRS
Unexploded Munitions and Ordnance Area
Cost
$96K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2018
Site ID: FTRI-009
OB/OD GROUND (RANGE 16)
Explosive Ordnance Disposal Area
Cost
$4.91M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2017
Contaminated Areas
Soil: Medium Risk
Soil is impacted with solvent, metals, & SVOCs. Contaminant movement is limited due to grass cover & little disturbance as this is an ordnance disposal range. Receptors to have limited access to contaminated soil. Area is off-limits to personnel except current demolition & range workers. The site is accessed & occupied for brief periods of time for disposal or limited training.
Contaminants: Tetrachloroethylene 0.6 mg/kg Perchlorate 0.8 mg/kg Beryllium and compounds 1.6 mg/kg N-Nitrosodiphenylamine 1.7 mg/kg 2,6-Dinitrotoluene 2.8 mg/kg 1,1,2,2-Tetrachloroethane 3.2 mg/kg Arsenic 9.2 mg/kg Cadmium and compounds 16.8 mg/kg Dibutyl Phthalate 29.0 mg/kg 2,4-Dinitrotoluene 37.0 mg/kg Chromium 51.4 mg/kg Trichloroethylene (TCE) 181.0 mg/kg Copper and compounds 207.0 mg/kg Lead 231.0 mg/kg
Groundwater: Low Risk
The data demonstrate some potential for migration. The ephemeral stream has minor hits as had seeps but there are limited periods of flow in the stream or in the seeps. Ground water has TCE greater than the MCL of 5 ug/L and TCA above risk-based standards, but is not a source of drinking water. There is a limited potential for human exposure.
Contaminants: Benzo(a)Pyrene 0.76 ug/L Naphthalene 2.5 ug/L Bis(2-Ethylhexyl)Phthalate 24.0 ug/L 1,1,2,2-Tetrachloroethane 45.0 ug/L Trichloroethylene (TCE) 260.0 ug/L
Sediment (Human): Low Risk
Low potential for contaminant migration to a potential point of exposure. Limited for receptors to have access to sediment.
Contaminants: Selenium 0.87 mg/kg Beryllium and compounds 1.5 mg/kg Cadmium and compounds 1.5 mg/kg Arsenic 7.7 mg/kg Lead 28.1 mg/kg Copper and compounds 35.4 mg/kg Chromium 40.0 mg/kg Zinc 66.4 mg/kg
Surface Water (Human): Low Risk
Potential for contaminant migration from the source but only limited evidence of migration to an ephemeral stream with minimal potential for impact.. There is extremely limited access to the site and thus, receptor exposure potential is very limited.
Contaminants: Benzo(a)Pyrene 1.1 ug/L Bis(2-Ethylhexyl)Phthalate 1.3 ug/L Tetrachloroethylene 1.8 ug/L 1,1,2,2-Tetrachloroethane 16.0 ug/L Trichloroethylene (TCE) 91.0 ug/L
Site ID: FTRI-001-R-02
SHSAR IMPACT SLOPE
Small Arms Range
Cost
$396K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2016
Site ID: FTRI-074
WWI INCINERATOR, NW CAMP FUNSTON
Incinerator
Cost
$629K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Contaminated Areas
Soil: Low Risk
Based on limited surface soil sampling, elevated levels of metals exist in surface soils. A portion of the site (in use circa WWI) has been eroded by a former meandering river channel. The area is currently wooded and the ground is covered by a layer of While the site is close to a main roadway, it is separated from the road by railroad tracks. The site is close to the tracks,in a wooded area, and might be visited only very intermittently by hunters and wildlife watchers. A thick vegetative cover also
Contaminants: Mercury (Methyl) 0.2 mg/kg Arsenic 23.3 mg/kg Copper and compounds 88.2 mg/kg Lead 488.0 mg/kg Zinc 1380.0 mg/kg
Site ID: CC-FTRI-09
FUEL DISPENSING STATIONS
Underground Storage Tanks
Cost
$282K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
Site ID: FTRI-027
DRY CLEANING FACILITIES AREA
Spill Site Area
Cost
$1.63M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2008
Site ID: FTRI-001
CUNDERGROUND STORAGE TANKSER HILL SANITARY LANDFILL
Landfill
Cost
$606K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 1995
Site ID: CC-FTRI-01
POL TANK FARM SITE
Contaminated Ground Water
Cost
$1.89M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2014
Site ID: CC-FTRI-12
FORMER 7353 FUEL DISPENSING STATION
Underground Tank Farm
Cost
$829K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2017
Site ID: FTRI-056
ABANDONED GASOLINE LINE
Soil Contamination After Tank Removal
Cost
$78K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2011
Site ID: FTRI-066
FMR BLDG 1245 DISPENSING STATION
Underground Tank Farm
Cost
$447K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2010
Site ID: FTRI-068
FMR BLDG 1637 DISPENSING STATION
Underground Tank Farm
Cost
$395K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2010
Site ID: FTRI-063
FMR BLDG 1044 DISPENSING STATION
Underground Tank Farm
Cost
$434K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2010
Site ID: FTRI-031
354 AREA SOLVENT DETECTIONS (354)
Spill Site Area
Cost
$500K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2007
66 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: FTRI-033
DOUTHIT RANGE
Firing Range
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-004
MAIN POST LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Dec 1997
Site ID: FTRI-005
CUNDERGROUND STORAGE TANKSER HILL ROAD RUBBLE DUMP
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-006
DRMO STORAGE AREA
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: FTRI-008
PCB STORAGE CONEX (BUILDING 348)
Storage Area
Cost
Unknown
Final Cleanup Action
Dec 1990
Site ID: FTRI-002-R-01
SOUTHEAST FUNSTON LANDFILL
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
May 2006
Site ID: FTRI-036
SOUTHEAST FUNSTON LANDFILL (ANCHOR)
Landfill
Cost
Unknown
Final Cleanup Action
Jan 2009
Site ID: FTRI-010
PESTICIDE (2-4D) UNDERGROUND STORAGE TANKS AT CAMP FUNSTON
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Apr 1992
Site ID: FTRI-011
CAMP FUNSTON GW DETECTIONS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Oct 2004
This site is under ongoing monitoring until Jan 2005
Site ID: FTRI-012
WASTE STORAGE DRMO SECONDARY AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 1995
Site ID: FTRI-013
ABANDONED VOC TANKS NORTH OF IACH
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Feb 1992
Site ID: FTRI-014
HOSPITAL INCINERATOR-IRWIN ACH
Incinerator
Cost
Unknown
Final Cleanup Action
Sep 1989
Site ID: FTRI-015
FORMER DRMO LOCATION (DRMO AREA 2)
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 1995
Site ID: FTRI-016
WASTE OIL AST-3RD BATTERY
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Sep 1989
Site ID: FTRI-017
WASTE OIL AST-4TH BATTERY
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Sep 1989
Site ID: FTRI-018
FIRE TRAINING AREA FACILITY (892)
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Sep 1989
Site ID: FTRI-019
FORMER FIRE TRAINING AREA FFTA-MAAF
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Oct 2005
This site is under ongoing monitoring until Sep 2012
Site ID: FTRI-022
FORMER WWTP & SLUDGE BEDS (ANCHOR)
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
May 1993
This site is under ongoing monitoring until May 2007
Site ID: FTRI-002
WHITSIDE C/D LANDFILL-CLOSED
Landfill
Cost
Unknown
Final Cleanup Action
Mar 1998
Site ID: FTRI-023
CUNDERGROUND STORAGE TANKSER HILL WWTP AND SLUDGE BEDS
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-025
MAIN POST WWTP AND SLUDGE BEDS
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-026
RANGE COMPLEX WW LAGOONS
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-028
FMR FIRE TRAINING AREA CAMP FUNSTON
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Feb 1994
Site ID: FTRI-029
OLD INCINERATOR SITE SE-CAMP FUNSTON
Incinerator
Cost
Unknown
Final Cleanup Action
Aug 2003
Site ID: FTRI-030
PESTICIDE STORAGE FACILITY (MIXING)
Pesticide Shop
Cost
Unknown
Final Cleanup Action
Sep 1997
This site is under ongoing monitoring until May 2010
Site ID: FTRI-032
IMPACT ZONE
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Sep 1993
Site ID: FTRI-035
NON-IMPACT AREA SMALL ARMS RANGES
Small Arms Range
Cost
Unknown
Final Cleanup Action
Jul 2000
Site ID: FTRI-037
OLD WHITSIDE INCINERATOR AREA
Incinerator
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: FTRI-053
POL TANK FARM
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
May 2005
Site ID: FTRI-054
CUNDERGROUND STORAGE TANKSER HILL PX UNDERGROUND STORAGE TANKSS BLDG 5320
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Sep 1997
Site ID: FTRI-039
CONSOLIDATED MAINTENANCE FACILITY
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-040
FORMER OIL TESTING LAB (ANCHOR)
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1993
This site is under ongoing monitoring until Nov 2007
Site ID: FTRI-041
FURNITURE REPAIR SHOPS (3)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: FTRI-042
TAC VEHICLE MAINTENANCE SHOPS
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-043
FORMER GAS STATIONS/GARAGES
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-044
FORMER ASPHALT PLANT (NEAR BLDG 354)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1995
Site ID: FTRI-045
PHOTO AND PRINT PLANTS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: FTRI-046
FRMR DS/GS BLDG 1693 ADJ AREAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: FTRI-047
FORMER LIVESTOCK DIPPING FACILITY
Dip Tank
Cost
Unknown
Final Cleanup Action
Jul 1995
This site is under ongoing monitoring until Nov 2007
Site ID: FTRI-049
MERCURY CONTAMINATION AREAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-050
PCB SPILL AREAS /TRANSFORMER SITES
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 1998
Site ID: FTRI-051
BLDG. 727 WASTE PIT
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Mar 1999
Site ID: FTRI-052
INACTIVE LANDFILLS - CAMP WHITSIDE
Landfill
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: FTRI-057
6200 AREA FUEL OIL LINE
POL (Petroleum/Oil/Lubricants) Lines
Cost
Unknown
Final Cleanup Action
Oct 2013
Site ID: FTRI-059
REMOVE UNDERGROUND STORAGE TANKSS
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Dec 1990
Site ID: FTRI-055
MILFORD LAKE CAMPGROUND/MARINA WELLS
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: FTRI-024
FORSYTH WWTP AND SLUDGE BEDS
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: FTRI-064
FMR BLDG 1090 DISPENSING STATION
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Jun 1995
Site ID: FTRI-048
FORMER PESTICIDES FACILITIES
Pesticide Shop
Cost
Unknown
Final Cleanup Action
Jul 1995
Site ID: FTRI-061
FORMER GAS SERVICE STATION BLDG 354
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Oct 1995
Site ID: FTRI-065
FMR BLDG 1190 DISPENSING STATION
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Jun 1995
Site ID: FTRI-067
FMR BLDG 1539 DISPENSING STATION
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Aug 1997
Site ID: FTRI-069
FMR BLDG 1890 DISPENSING STATION
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Aug 1997
Site ID: FTRI-070
FMR BLDG 2341 DISPENSING STATION
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Jan 1996
Site ID: FTRI-071
FMR BLDG 2345 DISPENSING STATION
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Nov 1994
Site ID: FTRI-072
BLDG 8340 FUEL OIL UNDERGROUND STORAGE TANKS
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Nov 1994
Site ID: FTRI-073
BLDG 8360 FUEL OIL UNDERGROUND STORAGE TANKS
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
May 1995
Site ID: FTRI-020
INDUNDERGROUND STORAGE TANKSRIAL WASTEWATER SYSTEM (CUNDERGROUND STORAGE TANKSER HL)
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Mar 1998
Site ID: FTRI-038
FORSYTH LANDFILL(S)
Landfill
Cost
Unknown
Final Cleanup Action
Sep 2001
This site is under ongoing monitoring until Aug 2007
Site ID: FTRI-060
MAINPOST PX GAS STATION / 218
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Jun 1995
Site ID: FTRI-062
TMP GAS STATION BLDG 388
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Oct 1997
This site is under ongoing monitoring until Jan 2005
Site ID: FTRI-007
PCB STORAGE BUILDING 343
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 1989
Site ID: CC-FTRI-10
FUEL UNDERGROUND STORAGE TANKSS (ACTIVE & ABANDONED)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2010
Site ID: FTRI-034
IMPACT AREA PERIMETER SMALL ARM RANGES
Small Arms Range
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: FTRI-001-R-01
SHSAR FIRING POINTS
Small Arms Range
Cost
Unknown
Final Cleanup Action
May 2006
Site ID: FTRI-003
SOUTHWEST FUNSTON LANDFILL
Landfill
Cost
$258K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1997
This site is under ongoing monitoring until Mar 2018
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »