Cost So Far
$117M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$30.2M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2046
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
29 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: fences, warning signs, signs. see more » annual written certification of compliance with lucs state or local permits required for construction, development, excavation, well drilling, etc. the agencies issuing the permits should be notified of areas impacted by lucs. incorporation of lucs into a base master plan a warning sign is in place surrounding the area a fence around controlled area, with or without gate. prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. groundwater use restricted. prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. « see less
11 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SITE 0012B
BRUNSWICK NAS
Open Detonation
Cost
$228K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2016
This site is under ongoing monitoring until Jun 2046
Contaminated Areas
Soil: High Risk
Contaminants: Mercury and compounds (inorganic) 0.27 ppb Nitrate 2.0 ppb Nitrite 2.0 ppb Chromium (total) 19.0 ppb Phosphorus (white) 240.0 ppb
Site ID: UXO 000001
BRUNSWICK NAS
Unexploded Munitions and Ordnance Area
Cost
$267K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2017
This site is under ongoing monitoring until Jun 2050
Site ID: UXO 000002
BRUNSWICK NAS
Trap and Skeet Range
Cost
Unknown
Final Cleanup Action
Nov 2017
Site ID: SITE 0007B
BRUNSWICK NAS
Contaminated Ground Water
Cost
$475K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2006
This site is under ongoing monitoring until Jun 2050
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Lead 14000.0 ppb Cadmium and compounds 15000.0 ppb Zinc 39000.0 ppb Aluminum 417000.0 ppb Manganese and compounds 950000.0 ppb Calcium 17000000.0 ppb
Soil: Low Risk
Contaminants: DDD 0.03 ppb DDE 0.06 ppb DDT 0.34 ppb Fluorene 0.45 ppb Acenaphthene 0.66 ppb Lead 167.0 ppb Zinc 208.0 ppb
Site ID: SITE 00001
BRUNSWICK NAS
Landfill
Cost
$5.44M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2006
Contaminated Areas
Groundwater: Low Risk
Contaminants: Mercury and compounds (inorganic) 1000.0 ppb 1,1,2,2-Tetrachloroethane 2000.0 ppb Chloroform 7000.0 ppb Ethyl chloride (Chloroethane) 7000.0 ppb 1,1,2-Trichloro-1,2,2-trifluoroethane 9000.0 ppb Methyl isobutyl ketone 13000.0 ppb Cadmium and compounds 13000.0 ppb 1,2-Dichloroethane (EDC) 20000.0 ppb Naphthalene 21000.0 ppb Chlorobenzene 32000.0 ppb Beryllium and compounds 33000.0 ppb Tetrachloroethylene (PCE) 44000.0 ppb Methylene chloride 53000.0 ppb Dichloroethylene, 1,2- (mixture) 60000.0 ppb Benzoic acid 86000.0 ppb Dichloroethane, 1,1- 87000.0 ppb Methylphenol, 4- 95000.0 ppb Antimony and compounds 177000.0 ppb Vinyl chloride 180000.0 ppb Ethylbenzene 200000.0 ppb Toluene 210000.0 ppb Phenol 230000.0 ppb Methylphenol, 2- 410000.0 ppb 1,2-Dichloroethylene, (z)- 430000.0 ppb Dichloroethylene, 1,1- 570000.0 ppb Cobalt 652000.0 ppb Xylene (mixed) 660000.0 ppb Copper and compounds 984000.0 ppb Chromium (total) 1040000.0 ppb Nickel and compounds 1100000.0 ppb Vanadium 1590000.0 ppb Arsenic (cancer endpoint) 1645000.0 ppb Barium and compounds 1840000.0 ppb Zinc 2500000.0 ppb 1,1,1-Trichloroethane 7100000.0 ppb Trichloroethylene (TCE) 7100000.0 ppb Manganese and compounds 24900000.0 ppb Calcium 113000000.0 ppb Aluminum 550000000.0 ppb
Sediment (Fresh): Low Risk
Contaminants: Arsenic (cancer) 14.0 ppb Chromium VI and compounds 26.0 ppb Zinc 38.0 ppb
Sediment (Human): Low Risk
Contaminants: Tetrachloroethane, 1,1,2,2- 0.01 ppb Trichloroethane, 1,1,1- 0.08 ppb Methylphenol, 4- 1.2 ppb Arsenic (cancer endpoint) 14.0 ppb Chromium (total) 26.0 ppb Zinc 38.0 ppb Barium and compounds 313.0 ppb
Soil: Low Risk
Contaminants: DDT 0.05 ppb Tetrachloroethane, 1,1,2,2- 0.1 ppb Mercury and compounds (inorganic) 3.3 ppb Lead 75.0 ppb
Surface Water (Fresh): Low Risk
Contaminants: Mercury and compounds (inorganic) 1100.0 ppb Beryllium and compounds 9500.0 ppb Tetrachloroethane, 1,1,2,2- 12000.0 ppb Cadmium and compounds 12100.0 ppb Cyanide (free) 20800.0 ppb Tetrachloroethylene (PCE) 30000.0 ppb Trichloroethane, 1,1,1- 30000.0 ppb Trichloroethylene (TCE) 31000.0 ppb Chromium (total) 68700.0 ppb Arsenic (cancer endpoint) 70900.0 ppb Antimony and compounds 122000.0 ppb Nickel and compounds 153000.0 ppb Cobalt 223000.0 ppb Copper and compounds 326000.0 ppb Lead 415000.0 ppb Vanadium 721000.0 ppb Barium and compounds 1380000.0 ppb Zinc 6760000.0 ppb Manganese and compounds 6880000.0 ppb Aluminum 60500000.0 ppb Calcium 78200000.0 ppb
Surface Water (Human): Low Risk
Contaminants: Mercury and compounds (inorganic) 1100.0 ppb Beryllium and compounds 9500.0 ppb Tetrachloroethane, 1,1,2,2- 12000.0 ppb Cadmium and compounds 12100.0 ppb Cyanide (free) 20800.0 ppb Tetrachloroethylene (PCE) 30000.0 ppb Trichloroethane, 1,1,1- 30000.0 ppb Trichloroethylene (TCE) 31000.0 ppb Chromium (total) 68700.0 ppb Arsenic (cancer endpoint) 70900.0 ppb Antimony and compounds 122000.0 ppb Nickel and compounds 153000.0 ppb Cobalt 223000.0 ppb Copper and compounds 326000.0 ppb Lead 415000.0 ppb Vanadium 721000.0 ppb Barium and compounds 1380000.0 ppb Zinc 6760000.0 ppb Manganese and compounds 6880000.0 ppb Aluminum 60500000.0 ppb Calcium 78200000.0 ppb
Site ID: SITE 00009
BRUNSWICK NAS
Landfill
Cost
$4.57M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2006
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Vinyl chloride 27000.0 ppb
Soil: Low Risk
Contaminants: DDT 0.4 ppb DDE 0.47 ppb Fluorene 0.5 ppb Acenaphthene 0.55 ppb Lead 32.5 ppb Aluminum 7290.0 ppb
Site ID: SITE 00011
BRUNSWICK NAS
Fire/Crash Training Area
Cost
$18.5M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Apr 2006
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Tetrachloroethylene (PCE) 9000.0 ppb Ethylbenzene 19000.0 ppb Dichloroethylene, 1,2- (mixture) 60000.0 ppb Dichloroethane, 1,1- 65000.0 ppb Toluene 87000.0 ppb Xylene (mixed) 120000.0 ppb Trichloroethylene (TCE) 310000.0 ppb Trichloroethane, 1,1,1- 450000.0 ppb Manganese and compounds 733000.0 ppb Calcium 7310000.0 ppb
Site ID: RAD BASWD
BRUNSWICK NAS
Radioactive Waste Area
Cost
Unknown
Final Cleanup Action
Mar 2018
Site ID: SITE 0004B
BRUNSWICK NAS
Disposal Pit and Dry Well
Cost
$75K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 1998
This site is under ongoing monitoring until Jun 2050
Site ID: SITE 00002
BRUNSWICK NAS
Landfill
Cost
$1.4M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2004
Contaminated Areas
Sediment (Fresh): Medium Risk
Contaminants: Chromium VI and compounds 14.0 ppb Zinc 26.0 ppb Arsenic (cancer) 38.0 ppb
Surface Water (Fresh): Medium Risk
Contaminants: Mercury and compounds (inorganic) 1100.0 ppb Beryllium and compounds 9500.0 ppb Tetrachloroethane, 1,1,2,2- 12000.0 ppb Cadmium and compounds 12100.0 ppb Cyanide (free) 20800.0 ppb Tetrachloroethylene (PCE) 30000.0 ppb Trichloroethane, 1,1,1- 30000.0 ppb Trichloroethylene (TCE) 31000.0 ppb Chromium (total) 68700.0 ppb Arsenic (cancer endpoint) 70900.0 ppb Antimony and compounds 122000.0 ppb Nickel and compounds 153000.0 ppb Cobalt 223000.0 ppb Copper and compounds 326000.0 ppb Lead 415000.0 ppb Vanadium 721000.0 ppb Barium and compounds 1380000.0 ppb Zinc 6760000.0 ppb Manganese and compounds 6880000.0 ppb Aluminum 60500000.0 ppb Calcium 78200000.0 ppb
Groundwater: Low Risk
Contaminants: Chromium (total) 12000.0 ppb Zinc 33000.0 ppb Lead 60000.0 ppb Manganese and compounds 180000.0 ppb Aluminum 5200000.0 ppb Calcium 7000000.0 ppb
Sediment (Human): Low Risk
Contaminants: Tetrachloroethane, 1,1,2,2- 0.01 ppb Trichloroethane, 1,1,1- 0.08 ppb Methylphenol, 4- 1.2 ppb Arsenic (cancer endpoint) 14.0 ppb Chromium (total) 26.0 ppb Zinc 38.0 ppb Barium and compounds 313.0 ppb
Soil: Low Risk
Contaminants: DDT 0.02 ppb Mercury and compounds (inorganic) 0.65 ppb Chromium (total) 9.4 ppb Lead 19.9 ppb Vanadium 20.0 ppb Zinc 25.0 ppb Manganese and compounds 98.0 ppb Aluminum 7390.0 ppb
Surface Water (Human): Low Risk
Contaminants: Mercury and compounds (inorganic) 1100.0 ppb Beryllium and compounds 9500.0 ppb Tetrachloroethane, 1,1,2,2- 12000.0 ppb Cadmium and compounds 12100.0 ppb Cyanide (free) 20800.0 ppb Tetrachloroethylene (PCE) 30000.0 ppb Trichloroethane, 1,1,1- 30000.0 ppb Trichloroethylene (TCE) 31000.0 ppb Chromium (total) 68700.0 ppb Arsenic (cancer endpoint) 70900.0 ppb Antimony and compounds 122000.0 ppb Nickel and compounds 153000.0 ppb Cobalt 223000.0 ppb Copper and compounds 326000.0 ppb Lead 415000.0 ppb Vanadium 721000.0 ppb Barium and compounds 1380000.0 ppb Zinc 6760000.0 ppb Manganese and compounds 6880000.0 ppb Aluminum 60500000.0 ppb Calcium 78200000.0 ppb
Site ID: SITE 0017B
BRUNSWICK NAS
Pesticide Shop
Cost
$381K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2011
This site is under ongoing monitoring until Nov 2048
Contaminated Areas
Groundwater: Low Risk
Contaminants: DDT 170.0 ppb Diazinon 5000.0 ppb
Soil: Low Risk
Contaminants: Rotenone 1.8 ppb
18 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: UST 000002
BRUNSWICK NAS
Underground Storage Tanks
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2010
Contaminated Areas
Groundwater: High Risk
Contaminants: Methyl tert-butyl ether 70000.0 ppb Benzene 1000000.0 ppb Ethylbenzene 3900000.0 ppb Toluene 12000000.0 ppb Xylene (mixed) 22000000.0 ppb
Soil: Medium Risk
Contaminants: Benzene 5.3 ppb Ethylbenzene 340.0 ppb Toluene 640.0 ppb Xylene (mixed) 1800.0 ppb
Site ID: SITE 00014
BRUNSWICK NAS
Landfill
Cost
Unknown
Final Cleanup Action
Aug 1991
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 2.1 ppb Nickel and compounds 9.7 ppb Barium and compounds 26.0 ppb Aluminum 6900.0 ppb
Site ID: SITE 00015
BRUNSWICK NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1993
Contaminated Areas
Soil: Low Risk
Contaminants: Cadmium and compounds 2.1 ppb Nickel and compounds 17.5 ppb Aluminum 19.3 ppb Chromium VI and compounds 27.0 ppb Zinc 330.0 ppb Potassium cyanide 1920.0 ppb Calcium cyanide 6780.0 ppb
Surface Water (Human): Low Risk
Contaminants: Arsenic (cancer) 20.0 ppb Barium and compounds 540.0 ppb Manganese and compounds 1960.0 ppb Aluminum 134000.0 ppb
Site ID: SITE 00016
BRUNSWICK NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1993
Contaminated Areas
Soil: Low Risk
Contaminants: DDE,4,4- 0.25 ppb DDT 1.8 ppb Chromium VI and compounds 38.2 ppb Barium and compounds 76.6 ppb Zinc 105.0 ppb Calcium cyanide 2480.0 ppb
Surface Water (Human): Low Risk
Contaminants: Arsenic (cancer) 140.0 ppb Aluminum 4500.0 ppb
Site ID: SITE 00018
BRUNSWICK NAS
Spill Site Area
Cost
Unknown
Final Cleanup Action
Oct 1994
Contaminated Areas
Sediment (Human): Low Risk
Contaminants: Nickel and compounds 17.0 ppb Arsenic (cancer) 107.0 ppb Aluminum 9210.0 ppb
Soil: Low Risk
Contaminants: Arsenic (cancer) 6.8 ppb Lead 12.6 ppb Barium and compounds 25.1 ppb Zinc 40.9 ppb
Surface Water (Human): Low Risk
Contaminants: Barium cyanide 20.0 ppb Arsenic (cancer) 20.0 ppb Zinc 40.0 ppb Manganese and compounds 110.0 ppb Sodium cyanide 12000.0 ppb
Site ID: SITE 0013B
BRUNSWICK NAS
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: UST 000003
BRUNSWICK NAS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2006
Contaminated Areas
Soil: Medium Risk
Contaminants: Arsenic 17.4 ppb
Groundwater: Low Risk
Contaminants: Arsenic 12700.0 ppb
Site ID: SITE 00013
BRUNSWICK NAS
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1997
Contaminated Areas
Groundwater: Low Risk
Contaminants: DDT 540.0 ppb Dichloroethane, 1,1- 5000.0 ppb Toluene 7000.0 ppb Benzene 16000.0 ppb Cadmium and compounds 20200.0 ppb Lead 27500.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 36000.0 ppb Trichloroethane, 1,1,1- 53000.0 ppb Cobalt 77000.0 ppb Trichloroethylene (TCE) 120000.0 ppb Copper and compounds 140000.0 ppb Nickel and compounds 150000.0 ppb Chromium (total) 200000.0 ppb Vanadium 280000.0 ppb Zinc 351000.0 ppb Dichloroethylene, 1,2- (mixture) 770000.0 ppb Barium and compounds 770000.0 ppb Manganese and compounds 2200000.0 ppb Calcium 19900000.0 ppb Aluminum 160000000.0 ppb
Soil: Low Risk
Contaminants: DDT 0.02 ppb
Site ID: UST 000001
BRUNSWICK NAS
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Dec 2000
This site is under ongoing monitoring until Dec 2006
Contaminated Areas
Groundwater: High Risk
Contaminants: Ethylbenzene 1700000.0 ppb Xylene (mixed) 5000000.0 ppb Benzene 5900000.0 ppb Toluene 12400000.0 ppb
Site ID: SITE 00017
BRUNSWICK NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 2000
Contaminated Areas
Groundwater: Low Risk
Contaminants: DDT 170.0 ppb Diazinon 5000.0 ppb
Soil: Low Risk
Contaminants: Rotenone 1.8 ppb
Site ID: SITE 00003
BRUNSWICK NAS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Jun 1995
Contaminated Areas
Groundwater: Low Risk
Contaminants: Dichloroethane, 1,1- 6000.0 ppb Toluene 12000.0 ppb Vinyl chloride 18000.0 ppb Dichloroethylene, 1,2- (trans) 20000.0 ppb Xylene (mixed) 37000.0 ppb Manganese and compounds 1260000.0 ppb
Soil: Low Risk
Contaminants: DDT 0.05 ppb Tetrachloroethane, 1,1,2,2- 0.1 ppb Mercury and compounds (inorganic) 3.3 ppb Lead 75.0 ppb
Surface Water (Human): Low Risk
Contaminants: Mercury and compounds (inorganic) 1100.0 ppb Beryllium and compounds 9500.0 ppb Tetrachloroethane, 1,1,2,2- 12000.0 ppb Cadmium and compounds 12100.0 ppb Cyanide (free) 20800.0 ppb Tetrachloroethylene (PCE) 30000.0 ppb Trichloroethane, 1,1,1- 30000.0 ppb Trichloroethylene (TCE) 31000.0 ppb Chromium (total) 68700.0 ppb Arsenic (cancer endpoint) 70900.0 ppb Antimony and compounds 122000.0 ppb Nickel and compounds 153000.0 ppb Cobalt 223000.0 ppb Copper and compounds 326000.0 ppb Lead 415000.0 ppb Vanadium 721000.0 ppb Barium and compounds 1380000.0 ppb Zinc 6760000.0 ppb Manganese and compounds 6880000.0 ppb Aluminum 60500000.0 ppb Calcium 78200000.0 ppb
Site ID: SITE 00004
BRUNSWICK NAS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 1995
Contaminated Areas
Groundwater: Low Risk
Contaminants: Trichloroethylene (TCE) 23000.0 ppb Zinc 43100.0 ppb Manganese and compounds 280000.0 ppb Calcium 5220000.0 ppb
Soil: Low Risk
Contaminants: Lead 39.0 ppb
Site ID: SITE 00005
BRUNSWICK NAS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Jun 1996
Contaminated Areas
Soil: Low Risk
Contaminants: Lead 2.1 ppb Chromium VI and compounds 12.0 ppb Aluminum 6900.0 ppb
Site ID: SITE 00006
BRUNSWICK NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SITE 00007
BRUNSWICK NAS
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 2002
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Lead 14000.0 ppb Cadmium and compounds 15000.0 ppb Zinc 39000.0 ppb Aluminum 417000.0 ppb Manganese and compounds 950000.0 ppb Calcium 17000000.0 ppb
Soil: Low Risk
Contaminants: DDD 0.03 ppb DDE 0.06 ppb DDT 0.34 ppb Fluorene 0.45 ppb Acenaphthene 0.66 ppb Lead 167.0 ppb Zinc 208.0 ppb
Site ID: SITE 00008
BRUNSWICK NAS
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: SITE 00010
BRUNSWICK NAS
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1983
Site ID: SITE 00012
BRUNSWICK NAS
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 2000
Contaminated Areas
Soil: High Risk
Contaminants: Mercury and compounds (inorganic) 0.27 ppb Nitrate 2.0 ppb Nitrite 2.0 ppb Chromium (total) 19.0 ppb Phosphorus (white) 240.0 ppb
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »