Back to Map
NAVY INSTALLATION ID: NC417302258000

CAMP LEJEUNE MCB

camp lejeune, North Carolina

Cost So Far

$226M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$120M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2057

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

227 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions, fences. see more » incorporation of lucs into a base master plan notices other than in deed, e.g., newspaper advertisements. annual written certification of compliance with lucs a deed restriction is documented in the parcel deed. a fence around controlled area, with or without gate. groundwater use restricted. prohibits the disturbance or use of existing groundwater wells, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits any use other than industrial in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. « see less

34 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SITE 00102

CAMP LEJEUNE MCB

Above Ground Storage Tank

Cost

$3.07M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2019

This site is under ongoing monitoring until May 2042

Contaminated Areas

Groundwater: High Risk

Contaminants: Naphthalene 240000.0 ppb 1,2-Dichloroethane (EDC) 498000.0 ppb Benzene 7540000.0 ppb

See more details...

Site ID: SITE 00088

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$14.6M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2020

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 1000000.0 ppb 1,2-Dichloroethane (EDC) 3500000.0 ppb Tetrachloroethylene (PCE) 4000000.0 ppb

Soil: High Risk

Contaminants: Trichloroethylene (TCE) 1.7 ppb 1,2-Dichloroethane (EDC) 33.0 ppb Methyl ethyl ketone 1200.0 ppb Tetrachloroethylene (PCE) 18000.0 ppb

See more details...

Site ID: UST 000093

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$747K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2016

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 282000.0 ppb Ethenylbenzene 3980000.0 ppb Toluene 35300000.0 ppb

See more details...

Site ID: UXO 000022

CAMP LEJEUNE MCB

Explosive Ordnance Disposal Area

Cost

$8.29M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2018

This site is under ongoing monitoring until Feb 2048

Site ID: UXO 000023

CAMP LEJEUNE MCB

Firing Range

Cost

$7.59M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2020

This site is under ongoing monitoring until Apr 2052

Contaminated Areas

Sediment (Human): High Risk

Contaminants: Lead 96.7 ppb

Soil: High Risk

Contaminants: Lead 3300.0 ppb

Groundwater: Medium Risk

Contaminants: Dibenz[ah]anthracene 120.0 ppb Lead 1050000.0 ppb

See more details...

Site ID: UXO 000029

CAMP LEJEUNE MCB

Firing Range

Cost

$16.8M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2021

This site is under ongoing monitoring until Apr 2053

Contaminated Areas

Soil: Risk Not Evaluated

See more details...

Site ID: UXO 000019

CAMP LEJEUNE MCB

Firing Range

Cost

$524K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Feb 2015

This site is under ongoing monitoring until Apr 2041

Site ID: UXO 000024

CAMP LEJEUNE MCB

Explosive Ordnance Disposal Area

Cost

$2.14M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2016

This site is under ongoing monitoring until May 2047

Site ID: UXO 000027

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

May 2025

This site is under ongoing monitoring until Apr 2064

Contaminated Areas

Groundwater: Risk Not Evaluated

Soil: Risk Not Evaluated

See more details...

Site ID: SITE 00096

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$1.62M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2018

This site is under ongoing monitoring until Jun 2061

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Vinyl Chloride 2800.0 ppb Trichloroethylene (TCE) 460000.0 ppb PCE 5100000.0 ppb

See more details...

Site ID: UXO 000006

CAMP LEJEUNE MCB

Unexploded Munitions and Ordnance Area

Cost

$13.6M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Mar 2049

Site ID: UXO 000028

CAMP LEJEUNE MCB

Firing Range

Cost

$6.9M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2019

This site is under ongoing monitoring until Apr 2054

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

See more details...

Site ID: UST 000011

CAMP LEJEUNE MCB

POL (Petroleum/Oil/Lubricants) Lines

Cost

$647K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 1996

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benzene 3060.0 ppb Ethylbenzene 5720.0 ppb Xylene, o- 6570.0 ppb Naphthalene 48000.0 ppb Dichlorobenzene, 1,2- 156080.0 ppb Methyl tertbutyl ether (MTBE) 194560.0 ppb

See more details...

Site ID: SITE 00086

CAMP LEJEUNE MCB

Above Ground Storage Tank

Cost

$1.02M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2010

Contaminated Areas

Groundwater: High Risk

Contaminants: Toluene 350.0 ppb Trichloroethane, 1,1,1- 2000.0 ppb Benzene 6000.0 ppb Trichloroethylene (TCE) 280000.0 ppb Dichloroethane, 1,1- 750000.0 ppb

See more details...

Site ID: SITE 00035

CAMP LEJEUNE MCB

Spill Site Area

Cost

$1.16M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2010

Contaminated Areas

Groundwater: High Risk

Contaminants: Acenaphthene 700.0 ppb Trichlorofluoromethane 900.0 ppb Dichloroethane, 1,2- (EDC) 1000.0 ppb Tetrachloroethylene (PCE) 1000.0 ppb Fluorene 1000.0 ppb Tetrachloroethane, 1,1,2,2- 12000.0 ppb Bromodichloromethane 14000.0 ppb Bromoform (tribromomethane) 16000.0 ppb Dibromochloromethane 27000.0 ppb Dichloroethylene, 1,2- (trans) 110000.0 ppb Naphthalene 220000.0 ppb Toluene 230000.0 ppb Methyl tertbutyl ether (MTBE) 410000.0 ppb Ethylbenzene 560000.0 ppb Trichloroethylene (TCE) 810000.0 ppb Xylene (mixed) 1900000.0 ppb Benzene 2300000.0 ppb 1,1,1,2-Tetrachloroethane 10000000.0 ppb

Soil: Low Risk

Contaminants: Lead 0.04 ppb

See more details...

Site ID: SITE 00089

CAMP LEJEUNE MCB

Soil Contamination After Tank Removal

Cost

$3.53M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2012

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethane, 1,1,2- 29000.0 ppb Tetrachloroethylene (PCE) 38000.0 ppb Trichloroethylene (TCE) 1500000.0 ppb Dichloroethylene, 1,2- (trans) 1580000.0 ppb Dichloroethylene, 1,2- (cis) 2130000.0 ppb Tetrachloroethane, 1,1,1,2- 8600000.0 ppb

Sediment (Human): High Risk

Contaminants: Chlordane, gamma- 4.6 ppb DDT 34.0 ppb 1,1-Dichloroethylene 37.0 ppb DDE,4,4- 44.0 ppb DDD,4,4- 79.0 ppb Vinyl chloride 230.0 ppb 1,2-Dichloroethylene (mixture) 1600.0 ppb 1,1,2,2-Tetrachloroethane 1700.0 ppb 1,1,2-Trichloroethane 2400.0 ppb Trichloroethylene (TCE) 2400.0 ppb

Surface Water (Human): High Risk

Contaminants: Tetrachloroethylene (PCE) 1200.0 ppb Chromium (III) 3600.0 ppb Vanadium 4200.0 ppb Lead 5400.0 ppb Copper and compounds 5700.0 ppb Zinc 17700.0 ppb Barium and compounds 25000.0 ppb Vinyl chloride 25000.0 ppb Trichloroethylene (TCE) 32900.0 ppb Trans-dichloroethylene, 1,2- 37000.0 ppb Manganese and compounds 50400.0 ppb cis-1,2-Dichloroethylene 52000.0 ppb 1,2-Dichloroethylene (mixture) 120000.0 ppb 1,1,2,2-Tetrachloroethane 150000.0 ppb Aluminum 554000.0 ppb

See more details...

Site ID: SITE 00073

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

$1.28M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2010

Contaminated Areas

Groundwater: High Risk

Contaminants: 1,2-Dichloroethane (EDC) 700.0 ppb Chloroform 700.0 ppb Fluorene 1000.0 ppb Phenol 2000.0 ppb Acetone 2000.0 ppb Ethylbenzene 3100.0 ppb Toluene 3100.0 ppb Acenaphthylene- 4000.0 ppb Xylene 5500.0 ppb Butyl benzyl phthalate 6000.0 ppb Naphthalene 6000.0 ppb Barium and compounds 23800.0 ppb Cobalt-60 26800.0 ppb Benzene 27000.0 ppb Vinyl chloride 43000.0 ppb 1,2-Dichloroethylene (mixture) 44000.0 ppb Zinc 46800.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 50000.0 ppb cis-1,2-Dichloroethylene 74000.0 ppb Trans-dichloroethylene, 1,2- 120000.0 ppb Aluminum 192000.0 ppb Trichloroethylene (TCE) 320000.0 ppb Manganese and compounds 356000.0 ppb Iron 2070000.0 ppb Magnesium-28 2230000.0 ppb

Surface Water (Human): High Risk

Contaminants: Toluene 3000.0 ppb Acetone 5000.0 ppb Silver and compounds 6400.0 ppb Barium and compounds 10500.0 ppb Manganese and compounds 37700.0 ppb Chloroform 50000.0 ppb Zinc 103000.0 ppb Antimony and compounds 216000.0 ppb Aluminum 500000.0 ppb Iron 4540000.0 ppb

Surface Water (Marine): Medium Risk

Contaminants: Cadmium and compounds 690.0 ppb Phenol,2,4-dichloro- 1560.0 ppb Lead 22200.0 ppb Chromium VI and compounds 53000.0 ppb

Sediment (Human): Low Risk

Contaminants: Methylene chloride 7.0 ppb Xylene 9.0 ppb Toluene 12.0 ppb Butanol, 1- 13.0 ppb Carbon disulfide 75.0 ppb Acetone 280.0 ppb

Sediment (Marine): Low Risk

Contaminants: Cadmium and compounds 0.69 ppb Phenol 1.56 ppb Lead 22.2 ppb Chromium (total) 53.0 ppb

See more details...

Site ID: UST 000009

CAMP LEJEUNE MCB

Underground Tank Farm

Cost

$7M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 1998

Contaminated Areas

Groundwater: High Risk

Contaminants: Methyl tertbutyl ether (MTBE) 2800000.0 ppb Ethylbenzene 11000000.0 ppb Benzene 29000000.0 ppb Xylene (mixed) 48000000.0 ppb Toluene 110000000.0 ppb

See more details...

Site ID: SITE 00078

CAMP LEJEUNE MCB

Industrial Discharge

Cost

$2.73M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2003

Contaminated Areas

Groundwater: High Risk

Contaminants: Tetrachloroethylene (PCE) 800.0 ppb Chloroform 2000.0 ppb Acetone 3000.0 ppb Dichloroethane, 1,1- 67000.0 ppb 1,1-Dichloroethylene 140000.0 ppb Vinyl chloride 340000.0 ppb 1,1,1-Trichloroethane 480000.0 ppb Trichloroethylene (TCE) 580000.0 ppb Dichloroethylene, 1,2- (mixture) 9500000.0 ppb

Sediment (Marine): Medium Risk

Contaminants: DDT 0.05 ppb Ethylbenzene 0.06 ppb Carbon disulfide 0.07 ppb DDE 0.09 ppb Butyl benzyl phthalate 0.1 ppb DDD,4,4- 0.11 ppb Methylene chloride 0.14 ppb Dibenz[ah]anthracene 0.16 ppb Acetone 0.26 ppb Naphthalene 0.28 ppb Acenaphthene 0.55 ppb Fluorene 0.6 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.62 ppb Indeno[1,2,3-cd]pyrene 0.63 ppb Carbazole 0.66 ppb Anthracene 1.0 ppb Beryllium and compounds 1.5 ppb Benzo[a]pyrene 1.7 ppb Methylphenol, 4- 1.8 ppb Benzo[k]fluoranthene 1.8 ppb Chrysene 2.4 ppb Benz[a]anthracene 2.5 ppb Selenium 2.6 ppb Benzo[b]fluoranthene 2.8 ppb Silver and compounds 3.9 ppb Pyrene 4.5 ppb Phenanthrene 4.5 ppb Fluoranthene 6.8 ppb Antimony and compounds 7.6 ppb Nickel and compounds 10.1 ppb Cadmium and compounds 11.9 ppb Chromium (total) 42.0 ppb Vanadium 59.4 ppb Barium and compounds 109.0 ppb Copper and compounds 116.0 ppb Arsenic (cancer endpoint) 121.1 ppb Lead 359.0 ppb Zinc 363.0 ppb Potassium cyanide 1550.0 ppb Aluminum 37100.0 ppb

Soil: Low Risk

Contaminants: Toluene 0.01 ppb Xylene (mixed) 0.01 ppb Chloromethane 0.01 ppb Methylene chloride 0.01 ppb Endrin 0.02 ppb Acetone 0.03 ppb Heptachlor 0.05 ppb Butyl benzyl phthalate 0.09 ppb Dibenz[ah]anthracene 0.21 ppb Beryllium and compounds 0.25 ppb Indeno[1,2,3-cd]pyrene 0.4 ppb Selenium 0.63 ppb Carbazole 1.1 ppb Dieldrin 1.3 ppb Antimony and compounds 1.3 ppb Acenaphthene 1.3 ppb Benzo[k]fluoranthene 1.4 ppb DDE 1.4 ppb Fluorene 1.4 ppb Naphthalene 1.4 ppb Bis(2-ethylhexyl)phthalate (DEHP) 1.7 ppb Anthracene 2.0 ppb Benzo[a]pyrene 2.0 ppb Mercury and compounds (inorganic) 2.2 ppb Chrysene 2.3 ppb Benzo[b]fluoranthene 2.7 ppb Arsenic (cancer endpoint) 2.8 ppb DDT 2.9 ppb Benz[a]anthracene 2.9 ppb Cadmium and compounds 4.2 ppb Pyrene 7.6 ppb Fluoranthene 8.8 ppb Phenanthrene 9.0 ppb Vanadium 16.1 ppb Copper and compounds 29.6 ppb Chromium (total) 74.6 ppb Potassium cyanide 303.0 ppb Barium and compounds 425.0 ppb Lead 962.0 ppb Zinc 4730.0 ppb Aluminum 4990.0 ppb

Surface Water (Fresh): Low Risk

Contaminants: DDT 180.0 ppb DDD 190.0 ppb Beryllium and compounds 1000.0 ppb Selenium 2000.0 ppb Silver and compounds 3000.0 ppb Arsenic (cancer endpoint) 4900.0 ppb Methylene chloride 5000.0 ppb Acetone 16000.0 ppb Chromium (total) 30000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 33000.0 ppb Vanadium 33000.0 ppb Lead 42000.0 ppb Copper and compounds 42000.0 ppb Trichloroethylene (TCE) 47000.0 ppb Barium and compounds 75000.0 ppb Zinc 152000.0 ppb Aluminum 17900000.0 ppb Potassium cyanide 110000000.0 ppb

Surface Water (Human): Low Risk

Contaminants: DDT 180.0 ppb DDD 190.0 ppb Beryllium and compounds 1000.0 ppb Selenium 2000.0 ppb Silver and compounds 3000.0 ppb Arsenic (cancer endpoint) 4900.0 ppb Methylene chloride 5000.0 ppb Acetone 16000.0 ppb Chromium (total) 30000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 33000.0 ppb Vanadium 33000.0 ppb Lead 42000.0 ppb Copper and compounds 42000.0 ppb Trichloroethylene (TCE) 47000.0 ppb Barium and compounds 75000.0 ppb Zinc 152000.0 ppb Aluminum 17900000.0 ppb Potassium cyanide 110000000.0 ppb

See more details...

Site ID: UST 000087

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$2.58M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2011

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 202000.0 ppb Naphthalene 1190000.0 ppb

See more details...

Site ID: UST 000092

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$738K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2004

Site ID: SITE 00069

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

$2.3M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2010

Contaminated Areas

Groundwater: High Risk

Contaminants: Dichloroethylene, 1,1- 2700.0 ppb Benzene 4000.0 ppb Dibromoethane, 1,2- 4740.0 ppb Dichloroethane, 1,2- (EDC) 5900.0 ppb Trichloroethane, 1,1,2- 7900.0 ppb Methylene chloride 10000.0 ppb Toluene 14000.0 ppb Chloroform 14000.0 ppb Tetrachloroethylene (PCE) 20000.0 ppb Tetrachloroethane, 1,1,2,2- 44000.0 ppb Chlorobenzene 55000.0 ppb Vinyl chloride 440000.0 ppb Trichloroethylene (TCE) 710000.0 ppb Dichloroethylene, 1,2- (trans) 37000000.0 ppb

Surface Water (Human): High Risk

Contaminants: Mercury and compounds (inorganic) 200.0 ppb Benzene 400.0 ppb Dichloroethane, 1,2- (EDC) 900.0 ppb Chlorobenzene 2100.0 ppb Ethylbenzene 3000.0 ppb Chloroform 6000.0 ppb Trichloroethane, 1,1,2- 6000.0 ppb Methylene chloride 8000.0 ppb Pentachlorophenol 10000.0 ppb Toluene 11000.0 ppb Vinyl chloride 41000.0 ppb Tetrachloroethane, 1,1,2,2- 59000.0 ppb Trichloroethylene (TCE) 63000.0 ppb Dichloroethylene, 1,2- (trans) 410000.0 ppb

Sediment (Marine): Low Risk

Contaminants: Pentachlorophenol 1.19 ppb

See more details...

Site ID: SITE 00006

CAMP LEJEUNE MCB

Storage Area

Cost

$3.81M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2003

Contaminated Areas

Groundwater: High Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 1000.0 ppb Trichloroethylene (TCE) 1000.0 ppb Tetrachloroethane, 1,1,2,2- 1000.0 ppb Tetrachloroethylene (PCE) 1200.0 ppb Phenol 2000.0 ppb Chloroform 2700.0 ppb Chlorophenol, 2- 5000.0 ppb Chlorobenzene 110000.0 ppb

Sediment (Marine): Medium Risk

Contaminants: Trichloroethylene (TCE) 0.02 ppb Dieldrin 0.04 ppb Naphthalene 0.05 ppb Ethylbenzene 0.06 ppb Carbazole 0.17 ppb Phenol 0.19 ppb DDD,4,4- 0.22 ppb Acenaphthene 0.22 ppb Fluorene 0.25 ppb Xylene (mixed) 0.38 ppb Benzo[k]fluoranthene 0.44 ppb Anthracene 0.48 ppb Diethyl phthalate 0.53 ppb Pyrene 0.81 ppb Methylene chloride 0.91 ppb Butyl benzyl phthalate 0.92 ppb Chrysene 1.1 ppb Fluoranthene 1.5 ppb Benzo[a]pyrene 1.6 ppb Phenanthrene 1.6 ppb Polychlorinated biphenyls (PCBs) 2.1 ppb Acetone 24.0 ppb

Soil: Low Risk

Contaminants: Acetone 0.04 ppb Chrysene 0.09 ppb Dichlorobenzene, 1,4- 0.16 ppb Dichlorobenzene, 1,2- 0.16 ppb Beryllium and compounds 0.21 ppb Dieldrin 0.27 ppb Anthracene 0.44 ppb Carbazole 0.91 ppb Fluorene 0.94 ppb Indeno[1,2,3-cd]pyrene 1.0 ppb Benzo[k]fluoranthene 1.1 ppb Naphthalene 1.4 ppb Benzo[a]pyrene 1.8 ppb Phenanthrene 2.0 ppb Fluoranthene 2.3 ppb Benzo[b]fluoranthene 2.7 ppb Pyrene 2.8 ppb Nickel and compounds 6.4 ppb Vanadium 7.3 ppb Cadmium and compounds 9.3 ppb Acenaphthene 9.5 ppb Arsenic (cancer endpoint) 9.7 ppb DDE 17.0 ppb Antimony and compounds 20.7 ppb Chromium (total) 25.2 ppb Barium and compounds 41.2 ppb Polychlorinated biphenyls (PCBs) 42.0 ppb Copper and compounds 75.0 ppb DDD 180.0 ppb Zinc 604.0 ppb DDT 1200.0 ppb Lead 1310.0 ppb Aluminum 5520.0 ppb

Surface Water (Human): Low Risk

Contaminants: Mercury and compounds (inorganic) 520.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 2000.0 ppb Toluene 3000.0 ppb Vanadium 3300.0 ppb Silver and compounds 3600.0 ppb Arsenic (cancer endpoint) 3700.0 ppb Tetrachloroethylene (PCE) 4000.0 ppb Vinyl chloride 6000.0 ppb Chromium (total) 8000.0 ppb Lead 12200.0 ppb Barium and compounds 56900.0 ppb Trichloroethylene (TCE) 98000.0 ppb Zinc 111000.0 ppb Copper and compounds 129000.0 ppb Acetone 900000.0 ppb Nickel and compounds 1380000.0 ppb Aluminum 2700000.0 ppb

See more details...

Site ID: UST 000013

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$1.32M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 1998

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 169000.0 ppb Ethylbenzene 229000.0 ppb Xylene (mixed) 1160000.0 ppb Naphthalene 83736000.0 ppb

See more details...

Site ID: UST 000016

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$555K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 1998

Contaminated Areas

Groundwater: High Risk

Contaminants: Ethylbenzene 7500000.0 ppb Methyl tertbutyl ether (MTBE) 7900000.0 ppb Benzene 31000000.0 ppb Xylene (mixed) 39000000.0 ppb Toluene 80000000.0 ppb

See more details...

Site ID: UST 000090

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 2004

Site ID: SITE 00082

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

$5.89M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2003

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethane, 1,1,1- 500.0 ppb Bromodichloromethane 600.0 ppb Xylene (mixed) 1400.0 ppb Benzene 1400.0 ppb Dichlorobenzene, 1,2- 4400.0 ppb Vinyl chloride 8600.0 ppb Phenol 22000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 22000.0 ppb Ethylbenzene 48000.0 ppb Trichloroethane, 1,1,2- 58000.0 ppb Methylene chloride 790000.0 ppb Tetrachloroethylene (PCE) 1200000.0 ppb Tetrachloroethane, 1,1,2,2- 9600000.0 ppb Trichloroethylene (TCE) 58000000.0 ppb

Soil: Low Risk

Contaminants: Acetone 0.01 ppb Di-n-octyl phthalate 0.04 ppb Dichlorobenzene, 1,4- 0.07 ppb Dieldrin 0.09 ppb Benzo[k]fluoranthene 0.11 ppb Methylphenol, 4- 0.12 ppb Toluene 0.12 ppb Butyl benzyl phthalate 0.14 ppb Naphthalene 0.14 ppb Phenol 0.16 ppb Carbazole 0.19 ppb Endrin 0.24 ppb Anthracene 0.26 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.32 ppb Acenaphthene 0.37 ppb Dibenz[ah]anthracene 0.38 ppb Benzene 0.85 ppb Indeno[1,2,3-cd]pyrene 1.3 ppb Dichloroethane, 1,2- (EDC) 1.5 ppb Benzo[a]pyrene 1.5 ppb Phenanthrene 1.5 ppb Chrysene 1.6 ppb Fluoranthene 2.0 ppb Benzo[b]fluoranthene 2.2 ppb Tetrachloroethylene (PCE) 2.6 ppb Pyrene 2.7 ppb Bromomethane 3.7 ppb DDE 4.2 ppb Trichloroethylene (TCE) 4.6 ppb DDT 6.0 ppb Chloromethane 9.8 ppb DDD 12.0 ppb Polychlorinated biphenyls (PCBs) 26.0 ppb Tetrachloroethane, 1,1,2,2- 55.0 ppb

See more details...

Site ID: SITE 00041

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Jul 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury and compounds (inorganic) 50.0 ppb 1,2-Dichloroethylene (mixture) 740.0 ppb Toluene 1000.0 ppb Chlorobenzene 2000.0 ppb Benzene 3800.0 ppb Copper and compounds 4100.0 ppb Zinc 5600.0 ppb Chromium VI and compounds 6200.0 ppb Trichloroethylene (TCE) 10000.0 ppb Nickel and compounds 10400.0 ppb Manganese and compounds 417000.0 ppb Aluminum 494000.0 ppb Barium and compounds 494000.0 ppb Iron 36200000.0 ppb

Sediment (Fresh): High Risk

Contaminants: Mercury 0.17 ppb Beryllium and compounds 0.27 ppb Cadmium and compounds 0.41 ppb Arsenic (cancer) 3.9 ppb Nickel and compounds 6.8 ppb Chromium VI and compounds 10.8 ppb Barium and compounds 11.0 ppb Copper and compounds 19.6 ppb Lead 23.1 ppb Vanadium 32.7 ppb Acetone 41.0 ppb Zinc 80.6 ppb Manganese and compounds 192.0 ppb Aluminum 8490.0 ppb Iron 18900.0 ppb

Surface Water (Fresh): High Risk

Contaminants: Mercury and compounds (inorganic) 50.0 ppb Toluene 880.0 ppb Trichloroethylene (TCE) 1200.0 ppb Arsenic (noncancer) 3000.0 ppb Chromium VI and compounds 3300.0 ppb Silver and compounds 3500.0 ppb Nickel and compounds 5900.0 ppb Acetone 8400.0 ppb Copper and compounds 8900.0 ppb Vanadium 19700.0 ppb Zinc 23800.0 ppb Barium and compounds 51200.0 ppb Manganese and compounds 187000.0 ppb Aluminum 1210000.0 ppb Iron 4910000.0 ppb

Sediment (Human): Medium Risk

Contaminants: Mercury 0.17 ppb Beryllium and compounds 0.27 ppb Cadmium and compounds 0.41 ppb Arsenic (cancer) 3.9 ppb Nickel and compounds 6.8 ppb 2-Butenal, (E)- 9.0 ppb Chromium VI and compounds 10.8 ppb Barium and compounds 11.0 ppb Copper and compounds 19.6 ppb Lead 23.1 ppb Vanadium 32.7 ppb Acetone 41.0 ppb Zinc 80.6 ppb Manganese 192.0 ppb Aluminum 8490.0 ppb Iron 18900.0 ppb

Surface Water (Human): Low Risk

Contaminants: Mercury and compounds (inorganic) 50.0 ppb Toluene 880.0 ppb Trichloroethylene (TCE) 1200.0 ppb Arsenic (noncancer) 3000.0 ppb Chromium VI and compounds 3300.0 ppb Silver and compounds 3500.0 ppb Nickel and compounds 5900.0 ppb Acetone 8400.0 ppb Copper and compounds 8900.0 ppb Vanadium 19700.0 ppb Zinc 23800.0 ppb Barium and compounds 51200.0 ppb Manganese and compounds 187000.0 ppb Aluminum 1210000.0 ppb Iron 4910000.0 ppb

See more details...

Site ID: UST 000062

CAMP LEJEUNE MCB

Above Ground Storage Tank

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 1998

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 17300000.0 ppb

See more details...

Site ID: UST 000088

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$680K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2004

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzene 8470.0 ppb MTBE 300000.0 ppb

See more details...

Site ID: UST 000050

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$3.77M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 1999

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethane, 1,1,1- 1000.0 ppb Phenanthrene 1300.0 ppb Dichloropropane, 1,2- 1400.0 ppb Acenaphthene 2400.0 ppb Fluorene 2800.0 ppb Dichloroethane, 1,2- (EDC) 3000.0 ppb Pyrene 3200.0 ppb Lead 169000.0 ppb Naphthalene 1300000.0 ppb Ethylbenzene 8700000.0 ppb Benzene 23000000.0 ppb Xylene (mixed) 28000000.0 ppb Toluene 58000000.0 ppb

See more details...

Site ID: UST 000089

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$49K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2004

This site is under ongoing monitoring until Oct 2022

Site ID: UST 000091

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2004

This site is under ongoing monitoring until Sep 2046

Site ID: SITE 00049

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

$958K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2012

Contaminated Areas

Groundwater: Low Risk

Contaminants: 1,1,2-Trichloroethane 1350.0 ppb 1,1,2,2-Tetrachloroethane 1960.0 ppb Tridiphane 54700.0 ppb

Soil: Low Risk

Contaminants: Chromium 27.9 ppb Aluminum 99000.0 ppb

See more details...

193 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00055

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: UST 000054

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 1994

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Barium and compounds 400.0 ppb Lead 11000.0 ppb

See more details...

Site ID: UXO 000017

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Feb 2012

Site ID: UXO 000011

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Aug 2011

Site ID: UST 000003

CAMP LEJEUNE MCB

POL (Petroleum/Oil/Lubricants) Lines

Cost

$66K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Feb 1997

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Anthracene 2000.0 ppb Phenanthrene 2000.0 ppb Dichlorobenzene, 1,3- 3910.0 ppb Fluorene 4000.0 ppb Dichlorobenzene, 1,2- 4570.0 ppb Toluene 7900.0 ppb Acenaphthene 10000.0 ppb Benzene 11900.0 ppb Ethylbenzene 28000.0 ppb Xylene (mixed) 46000.0 ppb Naphthalene 313000.0 ppb

See more details...

Site ID: SITE 00017

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00044

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 1999

Contaminated Areas

Sediment (Marine): High Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 0.29 ppb DDD,4,4- 1.0 ppb DDE 1.0 ppb Benzoic acid 1.8 ppb Arsenic (cancer endpoint) 5.3 ppb Chromium (total) 26.7 ppb Nickel and compounds 28.9 ppb Vanadium 49.4 ppb Barium and compounds 51.7 ppb Copper and compounds 79.5 ppb Lead 144.0 ppb Zinc 168.0 ppb Potassium cyanide 960.0 ppb Aluminum 15700.0 ppb

Groundwater: Low Risk

Contaminants: Mercury and compounds (inorganic) 1100.0 ppb Carbon disulfide 6000.0 ppb Fluoranthene 14000.0 ppb Acenaphthene 16000.0 ppb Phenanthrene 24000.0 ppb Cadmium and compounds 32000.0 ppb Beryllium and compounds 36600.0 ppb Naphthalene 62000.0 ppb Copper and compounds 86600.0 ppb Lead 481000.0 ppb Nickel and compounds 486000.0 ppb Arsenic (cancer endpoint) 570000.0 ppb Vanadium 759000.0 ppb Chromium (total) 895000.0 ppb Zinc 2800000.0 ppb Barium and compounds 3180000.0 ppb Potassium cyanide 32500000.0 ppb Aluminum 537000000.0 ppb

Soil: Low Risk

Contaminants: Chloromethane 0.01 ppb Carbon disulfide 0.01 ppb DDD 0.02 ppb DDE 0.03 ppb Methylene chloride 0.04 ppb Pyrene 0.45 ppb Fluoranthene 0.45 ppb Acenaphthene 0.45 ppb Phenanthrene 0.45 ppb Fluorene 0.45 ppb Naphthalene 0.45 ppb Selenium 1.1 ppb Benzoic acid 2.2 ppb Arsenic (cancer endpoint) 4.9 ppb Copper and compounds 5.1 ppb Nickel and compounds 6.9 ppb Lead 12.5 ppb Zinc 13.6 ppb Chromium (total) 17.9 ppb Barium and compounds 20.2 ppb Vanadium 28.2 ppb Potassium cyanide 617.0 ppb Aluminum 13400.0 ppb

Surface Water (Human): Low Risk

Contaminants: Arsenic (cancer endpoint) 9300.0 ppb Nickel and compounds 9600.0 ppb Chromium (total) 13300.0 ppb Carbon disulfide 18000.0 ppb Copper and compounds 24000.0 ppb Vanadium 34100.0 ppb Lead 44100.0 ppb Barium and compounds 75500.0 ppb Zinc 153000.0 ppb Potassium cyanide 3350000.0 ppb Aluminum 6930000.0 ppb

See more details...

Site ID: SITE 00054

CAMP LEJEUNE MCB

Burn Area

Cost

Unknown

Final Cleanup Action

Dec 1999

Contaminated Areas

Groundwater: High Risk

Contaminants: Phenol 1000.0 ppb Anthracene 1000.0 ppb Trichloroethylene (TCE) 1000.0 ppb Dibutyl phthalate 2000.0 ppb Nitrobenzene 2000.0 ppb 2,4-Dimethylphenol 3000.0 ppb Carbon disulfide 4000.0 ppb 1,2-Dichloroethylene (mixture) 23000.0 ppb Ethylbenzene 26000.0 ppb Diethyl phthalate 37000.0 ppb Lead 39700.0 ppb Benzene, 1,1'-oxybis(2,3,4,5,6-pentabromo-(9Cl) 40000.0 ppb Toluene 83000.0 ppb Xylenes (isomers and mixtures) 130000.0 ppb Naphthalene 240000.0 ppb Manganese 1280000.0 ppb Iron 74100000.0 ppb

See more details...

Site ID: SITE 00075

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Jun 2000

Contaminated Areas

Groundwater: Low Risk

Contaminants: 1,2-Dichloroethane (EDC) 13300.0 ppb Benzene 240000.0 ppb

See more details...

Site ID: SITE 00090

CAMP LEJEUNE MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Low Risk

Contaminants: Tetrachloroethylene (PCE) 7000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 30000.0 ppb

See more details...

Site ID: UST 000030

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzo[k]fluoranthene 50.0 ppb Benzo[a]pyrene 220.0 ppb Pyrene 350.0 ppb Benzo[b]fluoranthene 690.0 ppb Anthracene 850.0 ppb Naphthalene 6600.0 ppb

Soil: Low Risk

Contaminants: Barium and compounds 0.07 ppb

See more details...

Site ID: UST 000041

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene 500.0 ppb Pyrene 800.0 ppb Fluorene 930.0 ppb Ethylbenzene 1100.0 ppb

See more details...

Site ID: UST 000066

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1994

Site ID: UST 000076

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1994

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benzene 5400.0 ppb Naphthalene 10000.0 ppb

See more details...

Site ID: UXO 000001

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Apr 2013

Site ID: SITE 00001

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Jul 1996

Contaminated Areas

Groundwater: High Risk

Contaminants: Xylenes(mixed isomers) 760.0 ppb Trichloroethylene (TCE) 3600.0 ppb 1,2-Dichloroethylene (mixture) 14000.0 ppb

Soil: Low Risk

Contaminants: Cadmium and compounds 0.84 ppb Arsenic (cancer endpoint) 2.2 ppb Nickel and compounds 7.7 ppb Chromium (total) 8.1 ppb Copper and compounds 9.2 ppb Barium and compounds 13.3 ppb Vanadium 28.0 ppb Lead 32.7 ppb Zinc 71.2 ppb Benzo[a]pyrene 860.0 ppb Aluminum 6350.0 ppb

Surface Water (Human): Low Risk

Contaminants: Phenylphenol, 2- 1500.0 ppb Chromium (III) 7300.0 ppb

See more details...

Site ID: SITE 00004

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00007

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 1996

Contaminated Areas

Groundwater: Low Risk

Contaminants: Mercury and compounds (inorganic) 360.0 ppb Dieldrin 630.0 ppb Selenium 3400.0 ppb Antimony and compounds 4750.0 ppb Beryllium and compounds 9400.0 ppb Benzoic acid 12000.0 ppb Copper and compounds 41600.0 ppb Lead 67000.0 ppb Zinc 151000.0 ppb Vanadium 442000.0 ppb Barium and compounds 706000.0 ppb Potassium cyanide 5240000.0 ppb Iron 25400000.0 ppb Aluminum 137000000.0 ppb

Sediment (Human): Low Risk

Contaminants: Aluminum 10500.0 ppb

Soil: Low Risk

Contaminants: DDD 0.02 ppb Acenaphthene 0.04 ppb Fluorene 0.04 ppb Toluene 0.05 ppb Methyl ethyl ketone 0.05 ppb DDE,4,4- 0.06 ppb Anthracene 0.1 ppb Carbazole 0.11 ppb Endrin 0.14 ppb Phenol 0.17 ppb Acetone 0.17 ppb Dibutyl phthalate 0.17 ppb Indeno[1,2,3-cd]pyrene 0.25 ppb Benzo[a]pyrene 0.34 ppb Benzo[k]fluoranthene 0.37 ppb Benzo[b]fluoranthene 0.38 ppb Chrysene 0.42 ppb Benz(a)anthracene 0.42 ppb Selenium 0.54 ppb Pyrene 0.58 ppb Fluoranthene 0.75 ppb Bis(2-ethylhexyl)phthalate (DEHP) 1.0 ppb Endosulfan 1.4 ppb Arsenic (cancer endpoint) 1.7 ppb Beryllium and compounds 2.1 ppb Cyanide (free) 2.5 ppb Silver and compounds 3.0 ppb Cadmium and compounds 5.0 ppb Polychlorinated biphenyls (PCBs) 12.0 ppb Nickel and compounds 13.1 ppb Benzoic acid 15.0 ppb Vanadium 18.1 ppb Zinc 44.5 ppb Dieldrin 57.0 ppb Lead 114.0 ppb Barium and compounds 223.0 ppb DDT 280.0 ppb Potassium cyanide 507.0 ppb Phenanthrene 1700.0 ppb Aluminum 88800.0 ppb

See more details...

Site ID: SITE 00008

CAMP LEJEUNE MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00009

CAMP LEJEUNE MCB

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Feb 1995

Contaminated Areas

Groundwater: Low Risk

Contaminants: DDT 130.0 ppb DDD 940.0 ppb Chloroethyl vinyl ether, 2- 1000.0 ppb Dimethyl phthalate 1000.0 ppb DDE 1000.0 ppb Mercury and compounds (inorganic) 1400.0 ppb Toluene 2200.0 ppb Pyrene 3000.0 ppb Phenanthrene 3000.0 ppb Fluorene 3000.0 ppb Ethylbenzene 3400.0 ppb Dichlorobenzene, 1,3- 3400.0 ppb Di-n-octyl phthalate 6000.0 ppb Fluoranthene 6000.0 ppb Phenol 7000.0 ppb Selenium 7900.0 ppb Acenaphthene 11000.0 ppb Xylene (mixed) 14000.0 ppb Naphthalene 17000.0 ppb Arsenic (cancer endpoint) 25400.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 187500.0 ppb Vanadium 400000.0 ppb Zinc 409000.0 ppb Barium and compounds 1060000.0 ppb Potassium cyanide 53000000.0 ppb Aluminum 380000000.0 ppb

Soil: Low Risk

Contaminants: Acetone 0.02 ppb Mercury and compounds (inorganic) 0.03 ppb Benzo[b]fluoranthene 0.05 ppb Pyrene 0.06 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.07 ppb DDT 0.57 ppb DDE 0.65 ppb Copper and compounds 2.8 ppb Vanadium 4.8 ppb Chromium (total) 5.1 ppb Barium and compounds 8.9 ppb Zinc 17.5 ppb Lead 25.7 ppb Potassium cyanide 152.0 ppb Aluminum 4510.0 ppb

See more details...

Site ID: SITE 00010

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Jan 2000

Contaminated Areas

Groundwater: High Risk

Contaminants: Endosulfan 80.0 ppb Mercury 280.0 ppb Diethyl phthalate 1000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 3000.0 ppb Arsenic (cancer) 17600.0 ppb Acetone 33000.0 ppb Copper and compounds 36100.0 ppb Lead 48400.0 ppb Manganese and compounds 127000.0 ppb Chromium VI and compounds 184000.0 ppb Barium and compounds 190000.0 ppb Zinc 326000.0 ppb Nickel and compounds 369000.0 ppb Vanadium 388000.0 ppb Iron 57100000.0 ppb Aluminum 145000000.0 ppb

Soil: High Risk

Contaminants: Beryllium and compounds 0.39 ppb Dibenz[ah]anthracene 0.63 ppb Cobalt-60 0.88 ppb Arsenic (cancer) 1.2 ppb Chromium VI and compounds 2.6 ppb Indeno[1,2,3-cd]pyrene 2.8 ppb Benzo[a]pyrene 3.5 ppb Benz(a)anthracene 4.5 ppb Benzo[b]fluoranthene 4.6 ppb Copper and compounds 6.2 ppb Vanadium 13.9 ppb Barium and compounds 18.1 ppb Sodium-22 29.4 ppb Manganese and compounds 34.6 ppb Lead 99.8 ppb Zinc 148.0 ppb Potassium-45 213.0 ppb Benzo[k]fluoranthene 350.0 ppb Iron 1990.0 ppb

See more details...

Site ID: SITE 00011

CAMP LEJEUNE MCB

Pesticide Shop

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00012

CAMP LEJEUNE MCB

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 1999

Contaminated Areas

Groundwater: Low Risk

Contaminants: Xylene 20000.0 ppb

See more details...

Site ID: SITE 00013

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00015

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Mar 2012

This site is under ongoing monitoring until Apr 2012

Contaminated Areas

Groundwater: Low Risk

Contaminants: Chromium 17200.0 ppb Barium 32299.999999999996 ppb

Soil: Low Risk

Contaminants: Chromium 14.5 ppb Aluminum 10369.0 ppb

See more details...

Site ID: SITE 00016

CAMP LEJEUNE MCB

Burn Area

Cost

Unknown

Final Cleanup Action

Oct 1996

This site is under ongoing monitoring until Apr 2006

Contaminated Areas

Soil: Low Risk

Contaminants: Arsenic (cancer) 25.0 ppb Iron 70000.0 ppb

See more details...

Site ID: SITE 00018

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00019

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00022

CAMP LEJEUNE MCB

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00024

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Sep 1994

This site is under ongoing monitoring until Mar 2006

Contaminated Areas

Groundwater: Low Risk

Contaminants: Beryllium and compounds 130.0 ppb Chromium (III) 1100.0 ppb Chloroform 2000.0 ppb Antimony and compounds 2100.0 ppb Lead 3800.0 ppb Manganese and compounds 25800.0 ppb Iron 368000.0 ppb

Soil: Low Risk

Contaminants: Dieldrin 0.01 ppb Butyl benzyl phthalate 0.04 ppb Carbazole 0.04 ppb Fluorene 0.05 ppb Anthracene 0.07 ppb Acenaphthene 0.07 ppb DDD 0.13 ppb Benzo[k]fluoranthene 0.14 ppb Styrene 0.18 ppb Indeno[1,2,3-cd]pyrene 0.24 ppb Benzo[a]pyrene 0.24 ppb Chrysene 0.26 ppb DDT 0.32 ppb Benz[a]anthracene 0.33 ppb Benzo[b]fluoranthene 0.35 ppb DDE 0.35 ppb Phenanthrene 0.38 ppb Fluoranthene 0.52 ppb Acetone 0.78 ppb Pyrene 0.87 ppb Mercury and compounds (inorganic) 1.2 ppb Cyanide (free) 1.3 ppb Silver and compounds 1.3 ppb Cadmium and compounds 1.9 ppb Antimony and compounds 2.6 ppb Beryllium and compounds 4.0 ppb Selenium 18.0 ppb Chromium (total) 23.0 ppb Arsenic (cancer endpoint) 35.2 ppb Nickel and compounds 80.8 ppb Zinc 93.8 ppb Vanadium 253.0 ppb Copper and compounds 314.0 ppb Barium and compounds 502.0 ppb Aluminum 10400.0 ppb Lead 13900.0 ppb

See more details...

Site ID: SITE 00025

CAMP LEJEUNE MCB

Incinerator

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00026

CAMP LEJEUNE MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00027

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00028

CAMP LEJEUNE MCB

Burn Area

Cost

Unknown

Final Cleanup Action

May 1996

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury 110.0 ppb Thallium 4500.0 ppb Copper and compounds 4700.0 ppb Chromium VI and compounds 8200.0 ppb Zinc 23000.0 ppb Aluminum 54000.0 ppb Barium and compounds 809000.0 ppb Manganese and compounds 1270000.0 ppb Iron 43600000.0 ppb

Surface Water (Human): Medium Risk

Contaminants: Mercury and compounds (inorganic) 100.0 ppb Beryllium and compounds 460.0 ppb Chromium VI and compounds 3600.0 ppb Thallium 5000.0 ppb Zinc 8000.0 ppb Manganese and compounds 12200.0 ppb Barium and compounds 14400.0 ppb Antimony and compounds 34500.0 ppb Aluminum 130000.0 ppb Iron 398000.0 ppb

Soil: Low Risk

Contaminants: Copper cyanide 4260.0 ppb Manganese and compounds 39100.0 ppb

Sediment (Marine): Low Risk

Contaminants: Mercury 0.03 ppb Arsenic (cancer) 1.0 ppb Barium and compounds 2.4 ppb Chromium VI and compounds 3.1 ppb Vanadium 4.6 ppb Manganese and compounds 6.7 ppb Copper and compounds 9.4 ppb Zinc 13.7 ppb Lead 15.9 ppb Iron 1050.0 ppb Aluminum 1060.0 ppb

Sediment (Human): Low Risk

Contaminants: Mercury and compounds (inorganic) 0.03 ppb Arsenic (cancer) 1.0 ppb Barium and compounds 2.4 ppb Chromium VI and compounds 3.1 ppb Vanadium 4.6 ppb Manganese and compounds 6.7 ppb Copper and compounds 9.4 ppb Zinc 13.7 ppb Lead 15.9 ppb Iron 1050.0 ppb Aluminum 1060.0 ppb

See more details...

Site ID: SITE 00029

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00032

CAMP LEJEUNE MCB

Surface Runoff

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00034

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00037

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00038

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00039

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00040

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00043

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Sep 2003

Contaminated Areas

Groundwater: Low Risk

Contaminants: Mercury and compounds (inorganic) 240.0 ppb Beryllium and compounds 4300.0 ppb Carbon disulfide 7000.0 ppb Cadmium and compounds 11200.0 ppb Arsenic (cancer endpoint) 23400.0 ppb Lead 42300.0 ppb Phenanthrene 57000.0 ppb Copper and compounds 104000.0 ppb Nickel and compounds 143000.0 ppb Pyrene 210000.0 ppb Fluoranthene 230000.0 ppb Vanadium 233000.0 ppb Chromium (total) 249000.0 ppb Zinc 661000.0 ppb Barium and compounds 745000.0 ppb Potassium cyanide 10900000.0 ppb Aluminum 177000000.0 ppb

Soil: Low Risk

Contaminants: Indeno[1,2,3-cd]pyrene 0.06 ppb Phenanthrene 0.06 ppb Benzo[a]pyrene 0.11 ppb Benz[a]anthracene 0.11 ppb Chrysene 0.16 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.2 ppb Pyrene 0.21 ppb Fluoranthene 0.23 ppb Benzo[b]fluoranthene 0.3 ppb Benzo[k]fluoranthene 0.3 ppb Copper and compounds 5.4 ppb Nickel and compounds 7.6 ppb Chromium (total) 8.3 ppb Vanadium 9.6 ppb Lead 12.0 ppb Zinc 20.1 ppb Barium and compounds 77.6 ppb Potassium cyanide 126.0 ppb Aluminum 5640.0 ppb

Sediment (Marine): Low Risk

Contaminants: DDD,4,4- 0.01 ppb Chromium (total) 0.01 ppb Copper and compounds 0.01 ppb Vanadium 0.02 ppb Nickel and compounds 0.03 ppb Barium and compounds 0.03 ppb Butyl benzyl phthalate 0.05 ppb Lead 0.06 ppb Benzo[b]fluoranthene 0.07 ppb Zinc 0.1 ppb Pyrene 0.15 ppb DDT 0.22 ppb Benzo[k]fluoranthene 0.29 ppb DDE 0.58 ppb Methylphenol, 4- 0.81 ppb Methylphenol, 2- 0.81 ppb Aluminum 6.72 ppb Benzoic acid 7.6 ppb Bis(2-ethylhexyl)phthalate (DEHP) 16.0 ppb

Surface Water (Human): Low Risk

Contaminants: Vanadium 4700.0 ppb Nickel and compounds 9200.0 ppb Copper and compounds 11300.0 ppb Lead 21100.0 ppb Benzoic acid 50000.0 ppb Zinc 54300.0 ppb Barium and compounds 87600.0 ppb Aluminum 948000.0 ppb Potassium cyanide 13000000.0 ppb

See more details...

Site ID: SITE 00045

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00046

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00047

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00048

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Mercury and compounds (inorganic) 90.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 2000.0 ppb Acenaphthene 2000.0 ppb Phenol 3000.0 ppb Cadmium and compounds 3300.0 ppb Methylene chloride 12000.0 ppb Vanadium 12800.0 ppb Copper and compounds 13500.0 ppb Chromium (total) 17500.0 ppb Zinc 30300.0 ppb Barium and compounds 51300.0 ppb Potassium cyanide 1800000.0 ppb Aluminum 6830000.0 ppb

Soil: Low Risk

Contaminants: DDT 0.01 ppb DDE 0.01 ppb Acetone 0.22 ppb Cadmium and compounds 3.6 ppb Nickel and compounds 4.6 ppb Arsenic (cancer endpoint) 4.6 ppb Copper and compounds 4.8 ppb Zinc 24.8 ppb Barium and compounds 25.7 ppb Lead 32.3 ppb Chromium (total) 37.3 ppb Vanadium 53.9 ppb Potassium cyanide 1240.0 ppb Aluminum 28000.0 ppb

Sediment (Marine): Low Risk

Contaminants: DDT 0.01 ppb DDD,4,4- 0.03 ppb Chromium (total) 0.03 ppb Indeno[1,2,3-cd]pyrene 0.04 ppb Chrysene 0.06 ppb Benzo[b]fluoranthene 0.07 ppb Benz[a]anthracene 0.07 ppb Phenanthrene 0.1 ppb Pyrene 0.12 ppb DDE 0.15 ppb Fluoranthene 0.16 ppb Benzo[a]pyrene 0.18 ppb Potassium cyanide 2.01 ppb Antimony and compounds 3.4 ppb Cadmium and compounds 5.6 ppb Arsenic (cancer endpoint) 19.3 ppb Barium and compounds 21.4 ppb Aluminum 26.3 ppb Copper and compounds 29.2 ppb Zinc 73.2 ppb Vanadium 104.0 ppb

Surface Water (Human): Low Risk

Contaminants: Mercury and compounds (inorganic) 50.0 ppb Toluene 3000.0 ppb Lead 3000.0 ppb Xylene (mixed) 4000.0 ppb Vanadium 4000.0 ppb Copper and compounds 6000.0 ppb Chromium (total) 7000.0 ppb Barium and compounds 64200.0 ppb Aluminum 2070000.0 ppb Potassium cyanide 66000000.0 ppb

See more details...

Site ID: SITE 00050

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00051

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00052

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00057

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00059

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00060

CAMP LEJEUNE MCB

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00061

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00062

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00063

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1997

This site is under ongoing monitoring until Apr 2006

Contaminated Areas

Groundwater: Low Risk

Contaminants: Mercury and compounds (inorganic) 200.0 ppb Carbon disulfide 1000.0 ppb Benzoic acid 3000.0 ppb Beryllium and compounds 3100.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 9000.0 ppb Arsenic (cancer endpoint) 23400.0 ppb Nickel and compounds 54200.0 ppb Copper and compounds 126000.0 ppb Chromium (total) 134000.0 ppb Vanadium 163000.0 ppb Lead 369000.0 ppb Zinc 1110000.0 ppb Barium and compounds 5410000.0 ppb Potassium cyanide 17200000.0 ppb Aluminum 85300000.0 ppb

Soil: Low Risk

Contaminants: Arsenic (cancer endpoint) 1.9 ppb Nickel and compounds 3.1 ppb Chromium (total) 9.4 ppb Vanadium 12.1 ppb Copper and compounds 20.3 ppb Barium and compounds 22.9 ppb Lead 36.3 ppb Zinc 57.1 ppb Potassium cyanide 441.0 ppb Aluminum 5800.0 ppb

Sediment (Marine): Low Risk

Contaminants: Beryllium and compounds 0.31 ppb Arsenic (cancer endpoint) 3.5 ppb Chromium (total) 17.3 ppb Barium and compounds 34.2 ppb Copper and compounds 76.8 ppb Lead 90.0 ppb Aluminum 13400.0 ppb

Surface Water (Human): Low Risk

Contaminants: Lead 3000.0 ppb Copper and compounds 6300.0 ppb Nickel and compounds 10200.0 ppb Barium and compounds 34800.0 ppb Aluminum 1170000.0 ppb

See more details...

Site ID: SITE 00064

CAMP LEJEUNE MCB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00065

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Low Risk

Contaminants: 1,1,1,2-Tetrachloroethane 10000000.0 ppb

See more details...

Site ID: SITE 00030

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Mar 1996

Contaminated Areas

Groundwater: Low Risk

Contaminants: Mercury and compounds (inorganic) 900.0 ppb Beryllium and compounds 2400.0 ppb Cadmium and compounds 10700.0 ppb Arsenic (cancer endpoint) 12000.0 ppb Antimony and compounds 22000.0 ppb Copper and compounds 42500.0 ppb Nickel and compounds 52600.0 ppb Vanadium 101000.0 ppb Zinc 104000.0 ppb Chromium (total) 106000.0 ppb Lead 115000.0 ppb Barium and compounds 396000.0 ppb Chloroform 692000.0 ppb Iron 692000.0 ppb Aluminum 123000000.0 ppb

Surface Water (Human): Low Risk

Contaminants: Mercury and compounds (inorganic) 150.0 ppb Lead 2300.0 ppb

See more details...

Site ID: SITE 00093

CAMP LEJEUNE MCB

Contaminated Ground Water

Cost

$2.25M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2005

This site is under ongoing monitoring until Mar 2037

Contaminated Areas

Groundwater: High Risk

Contaminants: 1,1,1-Trichloroethane 200.0 ppb Mercury and compounds (inorganic) 300.0 ppb Ethylbenzene 1600.0 ppb Xylene (mixed) 2500.0 ppb 1,3,5-Trinitrobenzene 5800.0 ppb Selenium 8000.0 ppb 1,4-Dichlorobenzene 12300.0 ppb 1,2,4-Trichlorobenzene 13900.0 ppb Lead 18000.0 ppb Trichloroethylene (TCE) 39400.0 ppb Arsenic (cancer) 46000.0 ppb Cadmium and compounds 47000.0 ppb 1,1,2,2-Tetrachloroethane 48000.0 ppb Dichloroethylene, 1,2- (trans) 57000.0 ppb Naphthalene 57300.0 ppb Chlorobenzene 90000.0 ppb Tetrachloroethylene (PCE) 90000.0 ppb Dichlorobenzene, 1,2- 110000.0 ppb Dichloroethylene, 1,2- (cis) 250000.0 ppb

Soil: Low Risk

Contaminants: Selenium 0.01 ppb Tetrachloroethylene (PCE) 0.02 ppb Cadmium and compounds 0.02 ppb Silver and compounds 0.03 ppb Arsenic (noncancer) 0.03 ppb Naphthalene 0.05 ppb Lead 0.1 ppb Chromium VI and compounds 0.21 ppb 1,2,4-Tribromobenzene 0.93 ppb 1,2,4-Trichlorobenzene 2.3 ppb Barium and compounds 3.6 ppb

See more details...

Site ID: SITE 00097

CAMP LEJEUNE MCB

Pesticide Shop

Cost

$1.49M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2010

This site is under ongoing monitoring until May 2036

Site ID: SITE 00099

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$1.38M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2010

This site is under ongoing monitoring until May 2035

Site ID: SITE 00100

CAMP LEJEUNE MCB

Oil/Water Separator

Cost

$1.33M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2010

This site is under ongoing monitoring until May 2035

Site ID: SITE 00101

CAMP LEJEUNE MCB

Above Ground Storage Tank

Cost

$1.84M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2010

This site is under ongoing monitoring until May 2035

Site ID: SITE 00066

CAMP LEJEUNE MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00067

CAMP LEJEUNE MCB

Burn Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00070

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00071

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00072

CAMP LEJEUNE MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00074

CAMP LEJEUNE MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Apr 2006

Contaminated Areas

Groundwater: Low Risk

Contaminants: Mercury 50.0 ppb Lead 2500.0 ppb Thallium 3400.0 ppb Copper and compounds 7400.0 ppb Vanadium 8700.0 ppb Zinc 8700.0 ppb Manganese and compounds 8800.0 ppb Barium and compounds 96500.0 ppb Iron 1840000.0 ppb Aluminum 3710000.0 ppb

Soil: Low Risk

Contaminants: DDD 0.01 ppb DDE 0.01 ppb DDT 0.26 ppb

See more details...

Site ID: SITE 00076

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Jun 2000

Contaminated Areas

Groundwater: Low Risk

Contaminants: 1,2-Dichloroethane (EDC) 13300.0 ppb Benzene 240000.0 ppb 1,1,1-Trichloroethane 1500000.0 ppb

See more details...

Site ID: SITE 00080

CAMP LEJEUNE MCB

Contaminated Soil Piles

Cost

Unknown

Final Cleanup Action

Dec 1997

Contaminated Areas

Groundwater: Low Risk

Contaminants: Bis(2-ethylhexyl)phthalate 5000.0 ppb Arsenic (cancer) 102000.0 ppb Aluminum 43000000.0 ppb

Soil: Low Risk

Contaminants: Methylene chloride 0.01 ppb DDE 0.21 ppb Aldrin 0.22 ppb Dieldrin 0.44 ppb DDD 0.7 ppb Polychlorinated biphenyls (PCBs) 1.5 ppb DDT 260.0 ppb

Surface Water (Human): Low Risk

Contaminants: Carbon disulfide 6000.0 ppb Toluene 104000.0 ppb Acetone 190000.0 ppb

See more details...

Site ID: SITE 00084

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Mar 2005

This site is under ongoing monitoring until Apr 2010

Contaminated Areas

Groundwater: High Risk

Contaminants: Arochlor 1016 12000.0 ppb

Sediment (Fresh): High Risk

Contaminants: Arochlor 1016 17.0 ppb

Soil: High Risk

Contaminants: PCBs 12.0 ppb

Sediment (Human): Low Risk

Contaminants: PCBs 23.0 ppb

Surface Water (Fresh): Risk Not Evaluated

Surface Water (Human): Risk Not Evaluated

See more details...

Site ID: SITE 00085

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 1999

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury 2400.0 ppb Beryllium and compounds 3300.0 ppb Arsenic (cancer) 20200.0 ppb Cadmium and compounds 24600.0 ppb Copper and compounds 173000.0 ppb Lead 512000.0 ppb Barium and compounds 548000.0 ppb Chromium VI and compounds 821000.0 ppb Vanadium 908000.0 ppb Manganese and compounds 1270000.0 ppb Zinc 3970000.0 ppb Nickel and compounds 4550000.0 ppb Aluminum 429000000.0 ppb Iron 498000000.0 ppb

Soil: High Risk

Contaminants: Cyanide (free) 2.1 ppb Calcium-47 8.23 ppb Vanadium 13.9 ppb Cobalt-60 17.3 ppb Cadmium and compounds 47.1 ppb Sodium-22 69.0 ppb Mercury 70.7 ppb Arsenic (cancer) 76.8 ppb Nickel and compounds 117.0 ppb Barium and compounds 134.0 ppb Chromium VI and compounds 147.0 ppb Potassium-42 456.0 ppb Copper and compounds 1870.0 ppb Lead 3030.0 ppb Aluminum 10200.0 ppb Manganese and compounds 19700.0 ppb Zinc 63900.0 ppb Iron 339000.0 ppb

See more details...

Site ID: SITE 00087

CAMP LEJEUNE MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Jun 2000

Contaminated Areas

Groundwater: Low Risk

Contaminants: Pentachlorophenol 780.0 ppb 4-Nitrophenol 1000.0 ppb Lead 1100.0 ppb Selenium 1600.0 ppb Thallium 12000.0 ppb Copper and compounds 18400.0 ppb Zinc 28200.0 ppb Barium and compounds 35100.0 ppb Manganese and compounds 224000.0 ppb Iron 3130000.0 ppb Aluminum 3770000.0 ppb

Sediment (Fresh): Low Risk

Contaminants: Indeno[1,2,3-cd]pyrene 0.02 ppb Fluoranthene 0.02 ppb Benz(a)anthracene 0.02 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.03 ppb Pyrene 0.03 ppb Benzo[b]fluoranthene 0.03 ppb Benzo[k]fluoranthene 0.03 ppb Chrysene 0.03 ppb Benzo[a]pyrene 0.04 ppb Selenium 0.67 ppb Silver and compounds 2.1 ppb Vanadium 2.5 ppb Lead 6.1 ppb Nickel and compounds 7.2 ppb Zinc phosphide 11.0 ppb Chromium VI and compounds 11.5 ppb Barium and compounds 35.0 ppb Copper and compounds 38.4 ppb Manganese and compounds 45.2 ppb Aluminum 1060.0 ppb Iron 6040.0 ppb

Sediment (Human): Low Risk

Contaminants: Indeno[1,2,3-cd]pyrene 0.02 ppb Fluoranthene 0.02 ppb Benz(a)anthracene 0.02 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.03 ppb Pyrene 0.03 ppb Benzo[b]fluoranthene 0.03 ppb Benzo[k]fluoranthene 0.03 ppb Chrysene 0.03 ppb Benzo[a]pyrene 0.04 ppb Selenium 0.67 ppb Silver and compounds 2.1 ppb Vanadium 2.5 ppb Lead 6.1 ppb Nickel and compounds 7.2 ppb Zinc 11.0 ppb Chromium VI and compounds 11.5 ppb Barium and compounds 35.0 ppb Copper and compounds 38.4 ppb Manganese and compounds 45.2 ppb Aluminum 1060.0 ppb Iron 6040.0 ppb

Soil: Low Risk

Contaminants: Chlordane 0.03 ppb Fluorene 0.03 ppb Acenaphthene 0.04 ppb Carbazole 0.04 ppb Acetone 0.06 ppb DDE 0.1 ppb Dibenz[ah]anthracene 0.1 ppb Mercury 0.1 ppb Anthracene 0.11 ppb Indeno[1,2,3-cd]pyrene 0.27 ppb Butyl benzyl phthalate 0.29 ppb DDT 0.31 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.38 ppb Benzo[b]fluoranthene 0.38 ppb Benzo[a]pyrene 0.38 ppb Benz(a)anthracene 0.38 ppb Chrysene 0.4 ppb DDD 0.44 ppb Phenanthrene 0.5 ppb Selenium 0.55 ppb Pyrene 0.66 ppb Fluoranthene 0.84 ppb Cadmium and compounds 1.5 ppb Thallium 1.8 ppb Silver and compounds 2.3 ppb Arsenic (noncancer) 4.6 ppb Copper and compounds 16.2 ppb Barium and compounds 18.0 ppb Vanadium 19.3 ppb Nickel and compounds 19.7 ppb Chromium VI and compounds 25.2 ppb Manganese and compounds 25.8 ppb Zinc 65.7 ppb Lead 143.0 ppb Aluminum 4520.0 ppb Iron 6530.0 ppb

Surface Water (Fresh): Low Risk

Contaminants: Copper and compounds 4900.0 ppb Lead 8200.0 ppb Vanadium 11200.0 ppb Zinc 11700.0 ppb Selenium 22000.0 ppb Manganese and compounds 26100.0 ppb Barium and compounds 26700.0 ppb Cyanide (free) 53400.0 ppb Antimony and compounds 54500.0 ppb Iron 326000.0 ppb Aluminum 488000.0 ppb

Surface Water (Human): Low Risk

Contaminants: Copper and compounds 4900.0 ppb Lead 8200.0 ppb Vanadium 11200.0 ppb Zinc 11700.0 ppb Selenium 22000.0 ppb Manganese and compounds 26100.0 ppb Cyanide (free) 53400.0 ppb Antimony and compounds 54500.0 ppb Iron 326000.0 ppb Aluminum 488000.0 ppb

See more details...

Site ID: SITE 00091

CAMP LEJEUNE MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Low Risk

Contaminants: Tetrachloroethylene (PCE) 600.0 ppb Chloroform 15100.0 ppb Toluene 21000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 82000.0 ppb Acetone 2800000.0 ppb

See more details...

Site ID: SITE 00095

CAMP LEJEUNE MCB

Dip Tank

Cost

Unknown

Final Cleanup Action

Apr 2010

This site is under ongoing monitoring until May 2012

Contaminated Areas

Soil: High Risk

Contaminants: Chlordane 10.0 ppb Arsenic 50.0 ppb

See more details...

Site ID: SITE 00103

CAMP LEJEUNE MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Aug 2012

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benzo(a)Pyrene 83.0 ppb Indeno(1,2,3-cd)Pyrene 550.0 ppb Arsenic 9200.0 ppb

See more details...

Site ID: SITE 00104

CAMP LEJEUNE MCB

Contaminated Soil Piles

Cost

Unknown

Final Cleanup Action

Dec 2010

Site ID: SITE 00107

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Nov 2011

Site ID: SITE 00108

CAMP LEJEUNE MCB

Maintenance Yard

Cost

Unknown

Final Cleanup Action

Sep 2013

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Naphthalene 600.0 ppb Benzene 3100.0 ppb 1,2,4-Trimethylbenzene 44000.0 ppb

See more details...

Site ID: UST 000001

CAMP LEJEUNE MCB

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Oct 1993

Contaminated Areas

Groundwater: High Risk

Contaminants: Acenaphthene 700.0 ppb Trichlorofluoromethane 900.0 ppb Dichloroethane, 1,2- (EDC) 1000.0 ppb Fluorene 1000.0 ppb Tetrachloroethane, 1,1,2,2- 12000.0 ppb Bromodichloromethane 14000.0 ppb Bromoform (tribromomethane) 16000.0 ppb Dibromochloromethane 27000.0 ppb Naphthalene 220000.0 ppb Toluene 230000.0 ppb Methyl tertbutyl ether (MTBE) 410000.0 ppb Ethylbenzene 560000.0 ppb Xylene (mixed) 1900000.0 ppb Benzene 2300000.0 ppb

Soil: Low Risk

Contaminants: Lead 42.0 ppb

See more details...

Site ID: UST 000004

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2003

Contaminated Areas

Groundwater: High Risk

Contaminants: Chloromethane 1200.0 ppb Dichlorobenzene, 1,3- 9300.0 ppb Lead 34700.0 ppb Benzene 42000.0 ppb Ethylbenzene 47000.0 ppb Toluene 270000.0 ppb Xylene (mixed) 910000.0 ppb

Soil: Low Risk

Contaminants: Lead 262.0 ppb

See more details...

Site ID: UST 000005

CAMP LEJEUNE MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Sep 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene 3000.0 ppb

Soil: Low Risk

Contaminants: Barium and compounds 1.12 ppb

See more details...

Site ID: UST 000006

CAMP LEJEUNE MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

May 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene 2000.0 ppb Ethylbenzene 16000.0 ppb Dichloroethane, 1,1- 16000.0 ppb

Soil: Low Risk

Contaminants: Barium and compounds 1.24 ppb

See more details...

Site ID: UST 000007

CAMP LEJEUNE MCB

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Jun 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Trichlorofluoromethane 1000.0 ppb Ethylbenzene 17000.0 ppb Benzene 23000.0 ppb Xylene (mixed) 62000.0 ppb Toluene 190000.0 ppb

Soil: Low Risk

Contaminants: Pentachlorophenol 0.18 ppb Barium and compounds 2.16 ppb

See more details...

Site ID: UST 000010

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Lead 12000.0 ppb Ethylbenzene 3000000.0 ppb Benzene 11000000.0 ppb Xylene (mixed) 14900000.0 ppb Toluene 26000000.0 ppb

See more details...

Site ID: UST 000012

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzene 5070.0 ppb Xylene (mixed) 8370.0 ppb

See more details...

Site ID: UST 000017

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

Contaminated Areas

Groundwater: Low Risk

Contaminants: Ethylbenzene 2000.0 ppb Dichlorobenzene, 1,4- 2000.0 ppb Dichlorobenzene, 1,2- 4000.0 ppb Xylene (mixed) 9000.0 ppb Methyl tertbutyl ether (MTBE) 10000.0 ppb Benzene 21000.0 ppb

See more details...

Site ID: UST 000018

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1998

This site is under ongoing monitoring until Jan 2014

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury and compounds (inorganic) 1600.0 ppb Chloroform 1700.0 ppb Chrysene 5100.0 ppb Bromodichloromethane 5600.0 ppb Cadmium and compounds 10000.0 ppb Bromoform (tribromomethane) 11000.0 ppb Dibromochloromethane 13000.0 ppb Naphthalene 13000.0 ppb Arsenic (cancer endpoint) 83000.0 ppb Ethylbenzene 120000.0 ppb Benzene 140000.0 ppb Toluene 170000.0 ppb Lead 400000.0 ppb Xylene (mixed) 500000.0 ppb Barium and compounds 540000.0 ppb Chromium (total) 690000.0 ppb

See more details...

Site ID: UST 000019

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1997

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Methyl tertbutyl ether (MTBE) 3300.0 ppb Chlorobenzene 15000.0 ppb Dichlorobenzene, 1,4- 110000.0 ppb Dichlorobenzene, 1,2- 130000.0 ppb Dichlorobenzene, 1,3- 170000.0 ppb Benzene 357000.0 ppb Toluene 385000.0 ppb Ethylbenzene 1090000.0 ppb

See more details...

Site ID: UST 000020

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Ethylbenzene 11000.0 ppb Benzene 38000.0 ppb

See more details...

Site ID: UST 000022

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Toluene 280000.0 ppb Ethylbenzene 590000.0 ppb Xylene (mixed) 1100000.0 ppb Benzene 2300000.0 ppb

Soil: Low Risk

Contaminants: Benzene 0.01 ppb Toluene 0.13 ppb Ethylbenzene 2.3 ppb Xylene (mixed) 3.1 ppb

See more details...

Site ID: UST 000023

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1994

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Ethylbenzene 1400.0 ppb Phenanthrene 1800.0 ppb Dichlorobenzene, 1,3- 2100.0 ppb Acenaphthene 2200.0 ppb Toluene 2700.0 ppb Benz[a]anthracene 2800.0 ppb Dichlorobenzene, 1,4- 2900.0 ppb Chrysene 2900.0 ppb Dichlorobenzene, 1,2- 3400.0 ppb Anthracene 4100.0 ppb Naphthalene 6200.0 ppb Indeno[1,2,3-cd]pyrene 9600.0 ppb Pyrene 10000.0 ppb Xylene (mixed) 10000.0 ppb Fluoranthene 13000.0 ppb Benzene 13000.0 ppb

See more details...

Site ID: UST 000024

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Feb 1996

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Toluene 600.0 ppb Phenanthrene 800.0 ppb Mercury and compounds (inorganic) 1000.0 ppb Chrysene 1100.0 ppb Bromomethane 1600.0 ppb Anthracene 1700.0 ppb Fluoranthene 2200.0 ppb Trichloroethane, 1,1,1- 2200.0 ppb Dibromochloromethane 2300.0 ppb Benzene 2500.0 ppb Benz[a]anthracene 2600.0 ppb Trichloropropane, 1,2,3- 3600.0 ppb Bromodichloromethane 4400.0 ppb Acenaphthene 7900.0 ppb Naphthalene 13000.0 ppb Pyrene 15000.0 ppb Chloromethane 16000.0 ppb Chromium (total) 97000.0 ppb Cadmium and compounds 104000.0 ppb Lead 221000.0 ppb Silver and compounds 237000.0 ppb Barium and compounds 281000.0 ppb

See more details...

Site ID: UST 000025

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benz[a]anthracene 3900.0 ppb Toluene 4200.0 ppb Benzene 10000.0 ppb Ethylbenzene 29000.0 ppb Chrysene 32000.0 ppb Phenanthrene 41000.0 ppb Acenaphthene 58000.0 ppb Xylene (mixed) 93000.0 ppb Fluorene 120000.0 ppb Pyrene 270000.0 ppb Naphthalene 360000.0 ppb Fluoranthene 370000.0 ppb

See more details...

Site ID: UST 000026

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Phenanthrene 1300.0 ppb Fluorene 2200.0 ppb Toluene 2550.0 ppb Benzene 5900.0 ppb Ethylbenzene 7300.0 ppb Naphthalene 23000.0 ppb Xylene (mixed) 37000.0 ppb

Soil: Low Risk

Contaminants: Chromium (total) 0.01 ppb Barium and compounds 0.1 ppb

See more details...

Site ID: UST 000028

CAMP LEJEUNE MCB

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Fluorene 600.0 ppb Xylene (mixed) 5400.0 ppb Benzene 11000.0 ppb Ethylbenzene 13000.0 ppb Naphthalene 39000.0 ppb

See more details...

Site ID: UST 000029

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzo[k]fluoranthene 40.0 ppb Benz[a]anthracene 40.0 ppb Benzo[a]pyrene 70.0 ppb Benzo[b]fluoranthene 90.0 ppb Chrysene 90.0 ppb Indeno[1,2,3-cd]pyrene 140.0 ppb Pyrene 460.0 ppb Toluene 1400.0 ppb

See more details...

Site ID: UST 000031

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jan 1999

Contaminated Areas

Groundwater: High Risk

Contaminants: Dichlorobenzene, 1,4- 800.0 ppb Dichlorobenzene, 1,2- 900.0 ppb Dichlorobenzene, 1,3- 1000.0 ppb Chlorobenzene 1100.0 ppb Ethylbenzene 1300.0 ppb Toluene 1300.0 ppb Benzene 1400.0 ppb Mercury and compounds (inorganic) 2000.0 ppb Benz[a]anthracene 4200.0 ppb Xylene (mixed) 6200.0 ppb Indeno[1,2,3-cd]pyrene 11000.0 ppb Acenaphthene 16000.0 ppb Fluoranthene 19000.0 ppb Fluorene 29000.0 ppb Cadmium and compounds 49000.0 ppb Pyrene 52000.0 ppb Anthracene 73000.0 ppb Naphthalene 77000.0 ppb Lead 85000.0 ppb Barium and compounds 94000.0 ppb Phenanthrene 98000.0 ppb Silver and compounds 146000.0 ppb

See more details...

Site ID: UST 000002

CAMP LEJEUNE MCB

Underground Tank Farm

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 1997

This site is under ongoing monitoring until Jan 2045

Contaminated Areas

Groundwater: High Risk

Contaminants: Dichlorobenzene, 1,3- 9270.0 ppb Benzene 69500.0 ppb Dichlorobenzene, 1,2- 486000.0 ppb Ethylbenzene 661000.0 ppb Methyl tertbutyl ether (MTBE) 1490000.0 ppb Dichlorobenzene, 1,4- 3060000.0 ppb Xylene (mixed) 5518000.0 ppb

Soil: Risk Not Evaluated

See more details...

Site ID: UST 000034

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzo[b]fluoranthene 80.0 ppb Benzo[k]fluoranthene 80.0 ppb Benz[a]anthracene 120.0 ppb Benzo[a]pyrene 170.0 ppb Fluoranthene 380.0 ppb Indeno[1,2,3-cd]pyrene 420.0 ppb Fluorene 700.0 ppb Chrysene 840.0 ppb Phenanthrene 2000.0 ppb

See more details...

Site ID: UST 000035

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Dibenz[ah]anthracene 50.0 ppb Benzo[k]fluoranthene 130.0 ppb Benz[a]anthracene 280.0 ppb Benzo[a]pyrene 300.0 ppb Benzo[b]fluoranthene 410.0 ppb Indeno[1,2,3-cd]pyrene 520.0 ppb Fluoranthene 670.0 ppb Phenanthrene 780.0 ppb Fluorene 830.0 ppb

See more details...

Site ID: UST 000036

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

Contaminated Areas

Groundwater: Low Risk

Contaminants: Xylene (mixed) 180000.0 ppb

See more details...

Site ID: UST 000037

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Site ID: UST 000039

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benz[a]anthracene 30.0 ppb Benzene 600.0 ppb Acenaphthene 2200.0 ppb Xylene (mixed) 2600.0 ppb Fluorene 3000.0 ppb Ethylbenzene 3600.0 ppb Phenanthrene 15000.0 ppb Naphthalene 63000.0 ppb

See more details...

Site ID: UST 000040

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Lead 20.0 ppb

See more details...

Site ID: UST 000043

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Feb 1998

Contaminated Areas

Groundwater: High Risk

Contaminants: Silver and compounds 90.0 ppb Lead 100.0 ppb Dichlorobenzene, 1,3- 900.0 ppb Dibromochloromethane 1200.0 ppb Bromodichloromethane 1300.0 ppb Dichlorobenzene, 1,2- 1500.0 ppb Chloromethane 18000.0 ppb Ethylbenzene 130000.0 ppb Benzene 380000.0 ppb Toluene 660000.0 ppb Xylene (mixed) 700000.0 ppb

See more details...

Site ID: UST 000044

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1993

Site ID: UST 000045

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1993

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzo[k]fluoranthene 360.0 ppb Benz[a]anthracene 940.0 ppb Benzo[a]pyrene 1100.0 ppb Chrysene 1700.0 ppb Fluoranthene 2600.0 ppb

See more details...

Site ID: UST 000046

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

Contaminated Areas

Groundwater: Low Risk

Contaminants: Benzo[k]fluoranthene 20.0 ppb Benz[a]anthracene 40.0 ppb Benzo[b]fluoranthene 50.0 ppb Fluorene 370.0 ppb Phenanthrene 1500.0 ppb Fluoranthene 102000.0 ppb

See more details...

Site ID: UST 000048

CAMP LEJEUNE MCB

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Oct 1997

This site is under ongoing monitoring until Apr 2006

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Naphthalene 16000.0 ppb

See more details...

Site ID: UST 000049

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 58000.0 ppb Ethylbenzene 1200000.0 ppb Toluene 4500000.0 ppb Xylene (mixed) 6000000.0 ppb

See more details...

Site ID: UST 000051

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1994

Site ID: UST 000052

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1994

Contaminated Areas

Groundwater: Low Risk

Contaminants: Cadmium and compounds 10.0 ppb Barium and compounds 150.0 ppb

See more details...

Site ID: UST 000053

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1995

Contaminated Areas

Groundwater: Low Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 1300.0 ppb

See more details...

Site ID: UST 000055

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

May 1993

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benzene 25000.0 ppb Vinyl chloride 36000.0 ppb 1,2-Dichloroethylene (cis) 77000.0 ppb

See more details...

Site ID: UST 000057

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Apr 2006

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Benzene 1700.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 8600.0 ppb Ethylbenzene 49000.0 ppb

See more details...

Site ID: UST 000059

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1994

Site ID: UST 000060

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1996

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene 3900.0 ppb Benzene 8500.0 ppb

See more details...

Site ID: UST 000061

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

May 1994

Site ID: UST 000063

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1994

Contaminated Areas

Groundwater: Low Risk

Contaminants: Trichloroethane, 1,1,2- 50.0 ppb Benzene 120.0 ppb Dibromo-3-chloropropane, 1,2- 340.0 ppb Chloroform 730.0 ppb

See more details...

Site ID: UST 000064

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

May 1996

Contaminated Areas

Groundwater: Low Risk

Contaminants: Chloroform 3760.0 ppb

See more details...

Site ID: UST 000065

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Naphthalene 26000.0 ppb

See more details...

Site ID: UST 000032

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 1998

Contaminated Areas

Groundwater: High Risk

Contaminants: Pyrene 2600.0 ppb Phenanthrene 2600.0 ppb Cadmium and compounds 6000.0 ppb Toluene 6100.0 ppb Silver and compounds 18000.0 ppb Xylene (mixed) 19000.0 ppb Benzene 45000.0 ppb Ethylbenzene 55000.0 ppb Chromium (total) 59000.0 ppb Anthracene 62000.0 ppb Fluorene 98000.0 ppb Acenaphthene 200000.0 ppb Naphthalene 380000.0 ppb Barium and compounds 625000.0 ppb

See more details...

Site ID: UST 000067

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 2000

Contaminated Areas

Groundwater: High Risk

Contaminants: Benzene 10000000.0 ppb

See more details...

Site ID: UST 000068

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Feb 1993

Site ID: UST 000069

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Nov 1994

Contaminated Areas

Groundwater: Low Risk

Contaminants: Xylene (mixed) 4270.0 ppb Benzenedicarboxylate 72000.0 ppb

See more details...

Site ID: UST 000070

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1995

Site ID: UST 000071

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Feb 1996

Contaminated Areas

Groundwater: High Risk

Contaminants: Lead 34700.0 ppb Benzene 42000.0 ppb Toluene 270000.0 ppb Xylene (mixed) 910000.0 ppb

See more details...

Site ID: UST 000073

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Feb 1994

Site ID: UST 000074

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1994

Site ID: UST 000075

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1994

Site ID: UST 000078

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Naphthalene 222000.0 ppb Tetrachloroethylene (PCE) 1150000.0 ppb Chlorotoluene, o- 1508000.0 ppb Ethylbenzene 2750000.0 ppb Xylene (mixed) 11300000.0 ppb Toluene 14400000.0 ppb Benzene 30080000.0 ppb

See more details...

Site ID: UST 000080

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1995

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Tetrachloroethylene (PCE) 5300.0 ppb Benzene 22500.0 ppb Toluene 42200.0 ppb

See more details...

Site ID: UST 000081

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1995

Contaminated Areas

Groundwater: Low Risk

Contaminants: Chloromethane 10.0 ppb

See more details...

Site ID: UST 000082

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

This site is under ongoing monitoring until Apr 2008

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Lead 30.0 ppb Benzene 1400.0 ppb

See more details...

Site ID: UST 000083

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Nov 1995

Contaminated Areas

Groundwater: High Risk

Contaminants: Lead 20.0 ppb Cadmium and compounds 50.0 ppb Chlorobenzene 90000.0 ppb 1,2-Dichloroethylene (cis) 250000.0 ppb

See more details...

Site ID: UST 000084

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1997

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Cadmium and compounds 30.0 ppb Lead 70.0 ppb Chromium VI and compounds 100.0 ppb

See more details...

Site ID: UST 000085

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 1995

Contaminated Areas

Groundwater: High Risk

Contaminants: Arsenic (cancer) 20.0 ppb Xylene (mixed) 17000.0 ppb Naphthalene 29000.0 ppb

See more details...

Site ID: UST 000042

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1997

This site is under ongoing monitoring until Nov 2004

Contaminated Areas

Groundwater: High Risk

Contaminants: Barium and compounds 650.0 ppb Fluoranthene 900.0 ppb Benzene 1300.0 ppb Pyrene 3700.0 ppb Toluene 6500.0 ppb Ethylbenzene 6600.0 ppb Indeno[1,2,3-cd]pyrene 9900.0 ppb Anthracene 12000.0 ppb Fluorene 24000.0 ppb Acenaphthene 27000.0 ppb Xylene (mixed) 41000.0 ppb Naphthalene 200000.0 ppb

See more details...

Site ID: UXO 000003

CAMP LEJEUNE MCB

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2011

Site ID: UXO 000005

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Jul 2009

Site ID: UXO 000007

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Sep 2011

Site ID: UXO 000008

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Dec 2011

Site ID: UXO 000009

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Jun 2009

Site ID: UXO 000012

CAMP LEJEUNE MCB

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Mar 2011

Site ID: UXO 000013

CAMP LEJEUNE MCB

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Jan 2009

Site ID: UXO 000014

CAMP LEJEUNE MCB

Small Arms Range

Cost

Unknown

Final Cleanup Action

Aug 2013

Site ID: UXO 000015

CAMP LEJEUNE MCB

Small Arms Range

Cost

Unknown

Final Cleanup Action

Feb 2010

Site ID: UXO 000016

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Jul 2009

Site ID: UXO 000018

CAMP LEJEUNE MCB

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2011

This site is under ongoing monitoring until Mar 2011

Site ID: UXO 000020

CAMP LEJEUNE MCB

Small Arms Range

Cost

Unknown

Final Cleanup Action

Mar 2011

Site ID: UXO 000021

CAMP LEJEUNE MCB

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Jun 2014

Site ID: UXO 000025

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Feb 2013

Site ID: UXO 000026

CAMP LEJEUNE MCB

Firing Range

Cost

Unknown

Final Cleanup Action

Mar 2014

Contaminated Areas

Groundwater: Low Risk

Contaminants: 2,4-Dinitrotoluene 200.0 ppb Antimony and compounds 8300.0 ppb Arsenic 22600.0 ppb

Sediment (Human): Low Risk

Contaminants: Arsenic 0.6 ppb

Soil: Low Risk

Contaminants: Lead 325.0 ppb

Surface Water (Human): Low Risk

Contaminants: Arsenic 7500.0 ppb 2,4-Dinitrotoluene 11000.0 ppb

See more details...

Site ID: UST 000027

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2005

This site is under ongoing monitoring until Jan 2045

Contaminated Areas

Groundwater: High Risk

Contaminants: Chlorobenzene 1800.0 ppb Ethylbenzene 1500000.0 ppb Toluene 2600000.0 ppb Xylene (mixed) 4300000.0 ppb Benzene 6100000.0 ppb

See more details...

Site ID: UST 000033

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Oct 2044

Contaminated Areas

Groundwater: High Risk

Contaminants: Bromodichloromethane 700.0 ppb Anthracene 1200.0 ppb Dibromochloromethane 1600.0 ppb Bromoform (tribromomethane) 2300.0 ppb Fluoranthene 2700.0 ppb Acenaphthene 2800.0 ppb Chrysene 7000.0 ppb Naphthalene 16000.0 ppb Benz[a]anthracene 18000.0 ppb Methyl tertbutyl ether (MTBE) 130000.0 ppb Ethylbenzene 150000.0 ppb Toluene 620000.0 ppb Xylene (mixed) 710000.0 ppb Benzene 1700000.0 ppb

See more details...

Site ID: SITE 00036

CAMP LEJEUNE MCB

Landfill

Cost

$672K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2004

This site is under ongoing monitoring until Jul 2026

Contaminated Areas

Groundwater: High Risk

Contaminants: Methylene chloride 1000.0 ppb Mercury 1400.0 ppb Tetrachloroethylene (PCE) 2000.0 ppb 1,1,2,2-Tetrachloroethane 10000.0 ppb 1,2-Dichloroethylene (mixture) 37000.0 ppb Trichloroethylene (TCE) 97000.0 ppb Manganese 3180000.0 ppb Iron 16900000.0 ppb

Sediment (Marine): Low Risk

Contaminants: Cadmium and compounds 0.72 ppb Chromium (total) 14.2 ppb Lead 77.5 ppb Phenol 2030.0 ppb

See more details...

Site ID: SITE 00002

CAMP LEJEUNE MCB

Spill Site Area

Cost

$354K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2003

This site is under ongoing monitoring until Mar 2025

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Tetrachloroethylene (PCE) 1000.0 ppb Bromomethane 4000.0 ppb Ethylbenzene 460000.0 ppb Xylene (mixed) 1300000.0 ppb

Soil: Low Risk

Contaminants: DDE,4,4- 6300.0 ppb DDD 130000.0 ppb

See more details...

Site ID: UXO 000002

CAMP LEJEUNE MCB

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2012

Site ID: SITE 00033

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00005

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00003

CAMP LEJEUNE MCB

Contaminated Sediments

Cost

$419K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 1999

This site is under ongoing monitoring until Jul 2027

Contaminated Areas

Groundwater: High Risk

Contaminants: N-Nitrosodiphenylamine 1900.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 2200.0 ppb Acenaphthylene- 4000.0 ppb Anthracene 9200.0 ppb Toluene 13000.0 ppb Ethylbenzene 14000.0 ppb Pyrene 15000.0 ppb Nitrobenzene 18000.0 ppb Fluoranthene 23000.0 ppb Xylenes(mixed isomers) 39000.0 ppb 2,4-Dimethylphenol 150000.0 ppb Phenanthrene 170000.0 ppb Fluorene 180000.0 ppb Carbazole 180000.0 ppb 2-Methylphenol 220000.0 ppb Acenaphthene 390000.0 ppb Phenol 430000.0 ppb 4-Methylphenol 560000.0 ppb Naphthalene 2800000.0 ppb

Soil: High Risk

Contaminants: Benz[a]anthracene 0.66 ppb Indeno[1,2,3-cd]pyrene 1.0 ppb Benzo[k]fluoranthene 1.2 ppb Benzo[a]pyrene 1.3 ppb Pyrene 1.4 ppb Chrysene 1.4 ppb Fluoranthene 1.6 ppb Anthracene 1.9 ppb Benzo[b]fluoranthene 2.2 ppb Phenanthrene 2900.0 ppb Naphthalene 17000.0 ppb

Sediment (Marine): Low Risk

Contaminants: Bis(2-ethylhexyl)phthalate (DEHP) 0.75 ppb

See more details...

Site ID: SITE 00042

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00098

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 2009

Site ID: SITE 00105

CAMP LEJEUNE MCB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Mar 2011

Site ID: SITE 00109

CAMP LEJEUNE MCB

Spill Site Area

Cost

$209K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2015

Contaminated Areas

Soil: Low Risk

Contaminants: Dibenz[ah]anthracene 2.3 ppb Benzo(a)Pyrene 34.0 ppb Benz(a)Anthracene 38.0 ppb

See more details...

Site ID: UXO 000004

CAMP LEJEUNE MCB

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Sep 2009

Site ID: SITE 00021

CAMP LEJEUNE MCB

Storage Area

Cost

Unknown

Final Cleanup Action

May 1996

This site is under ongoing monitoring until Mar 2006

Contaminated Areas

Groundwater: Low Risk

Contaminants: Heptachlor epoxide 130.0 ppb Methylphenol, 4- 2000.0 ppb Mercury and compounds (inorganic) 2400.0 ppb Beryllium and compounds 5000.0 ppb Dimethylphenol, 2,4- 6000.0 ppb Selenium 11000.0 ppb Trichloroethylene (TCE) 41000.0 ppb Naphthalene 51000.0 ppb Benzene 77000.0 ppb Copper and compounds 84000.0 ppb Arsenic (cancer endpoint) 101000.0 ppb Nickel and compounds 123000.0 ppb Toluene 210000.0 ppb Chromium (total) 348000.0 ppb Vanadium 419000.0 ppb Zinc 487000.0 ppb Ethylbenzene 540000.0 ppb Barium and compounds 647000.0 ppb Xylene (mixed) 1300000.0 ppb Lead 2000000.0 ppb Aluminum 319000000.0 ppb

Soil: Low Risk

Contaminants: Anthracene 0.05 ppb Dibenz[ah]anthracene 0.06 ppb Indeno[1,2,3-cd]pyrene 0.18 ppb Beryllium and compounds 0.22 ppb Benzo[a]pyrene 0.31 ppb Benzo[k]fluoranthene 0.32 ppb Chrysene 0.45 ppb Benz[a]anthracene 0.51 ppb Pyrene 0.52 ppb Mercury and compounds (inorganic) 0.54 ppb Benzo[b]fluoranthene 0.56 ppb Fluoranthene 0.56 ppb Selenium 0.59 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.65 ppb Fluorene 1.3 ppb Phenanthrene 1.8 ppb DDD 3.1 ppb Naphthalene 3.2 ppb Arsenic (cancer endpoint) 3.9 ppb DDT 4.1 ppb Nickel and compounds 6.0 ppb Copper and compounds 16.3 ppb Vanadium 17.4 ppb Chromium (total) 19.9 ppb Barium and compounds 31.6 ppb DDE 34.0 ppb Zinc 67.7 ppb Lead 252.0 ppb Polychlorinated biphenyls (PCBs) 4600.0 ppb Aluminum 6160.0 ppb

Sediment (Marine): Low Risk

Contaminants: Heptachlor epoxide 0.03 ppb Acetone 0.04 ppb Di-n-octyl phthalate 0.08 ppb Butyl benzyl phthalate 0.11 ppb DDE 0.23 ppb Beryllium and compounds 0.25 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.82 ppb DDD,4,4- 1.1 ppb Cadmium and compounds 1.4 ppb Arsenic (cancer endpoint) 2.0 ppb DDT 3.5 ppb Nickel and compounds 5.6 ppb Chromium (total) 11.4 ppb Vanadium 11.6 ppb Barium and compounds 15.7 ppb Zinc 21.4 ppb Lead 38.2 ppb Copper and compounds 48.1 ppb Aluminum 1960.0 ppb

Surface Water (Human): Low Risk

Contaminants: Methylene chloride 3000.0 ppb Selenium 3400.0 ppb Copper and compounds 5000.0 ppb Zinc 7000.0 ppb Acetone 14000.0 ppb Barium and compounds 24000.0 ppb Aluminum 621000.0 ppb

See more details...

Site ID: SITE 00031

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00058

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00094

CAMP LEJEUNE MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Aug 2005

Contaminated Areas

Groundwater: High Risk

Contaminants: Tetrachloroethylene (PCE) 800.0 ppb Chloroform 2000.0 ppb Dichloroethane, 1,1- 67000.0 ppb 1,1-Dichloroethylene 140000.0 ppb 1,1,1-Trichloroethane 480000.0 ppb Trichloroethylene (TCE) 580000.0 ppb 1,2-Dichloroethylene (mixture) 9500000.0 ppb

See more details...

Site ID: UST 000008

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1997

Contaminated Areas

Groundwater: Low Risk

Contaminants: Ethylbenzene 2000.0 ppb Toluene 8000.0 ppb Benzene 14000.0 ppb Xylene (mixed) 15000.0 ppb Phenanthrene 2900000.0 ppb

Soil: Low Risk

Contaminants: Lead 0.03 ppb Barium and compounds 1.74 ppb

See more details...

Site ID: UST 000056

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Oct 1994

Site ID: UST 000072

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1995

This site is under ongoing monitoring until Sep 1998

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene 500.0 ppb

See more details...

Site ID: UST 000021

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 1998

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Groundwater: High Risk

Contaminants: Dichlorobenzene, 1,2- 500.0 ppb Dichlorobenzene, 1,4- 600.0 ppb Dichlorobenzene, 1,3- 700.0 ppb Fluorene 700.0 ppb Pyrene 1100.0 ppb Benz[a]anthracene 1700.0 ppb Phenanthrene 3000.0 ppb Anthracene 5100.0 ppb Fluoranthene 6400.0 ppb Methyl tertbutyl ether (MTBE) 12000.0 ppb Acenaphthene 15000.0 ppb Lead 33000.0 ppb Naphthalene 44000.0 ppb Ethylbenzene 2400000.0 ppb Benzene 8800000.0 ppb Xylene (mixed) 17000000.0 ppb Toluene 26000000.0 ppb

Soil: Low Risk

Contaminants: Cadmium and compounds 11.0 ppb Lead 13.0 ppb Chromium (total) 37.0 ppb Barium and compounds 520.0 ppb

See more details...

Site ID: UST 000014

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 1998

This site is under ongoing monitoring until Sep 2045

Contaminated Areas

Groundwater: High Risk

Contaminants: Fluorene 800.0 ppb Phenanthrene 1900.0 ppb Anthracene 2400.0 ppb Chrysene 2500.0 ppb Pyrene 2800.0 ppb Benz[a]anthracene 7100.0 ppb Naphthalene 24000.0 ppb Ethylbenzene 800000.0 ppb Toluene 1700000.0 ppb Xylene (mixed) 3600000.0 ppb Benzene 3800000.0 ppb

See more details...

Site ID: UST 000015

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

$331K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 1996

This site is under ongoing monitoring until Apr 2045

Contaminated Areas

Groundwater: High Risk

Contaminants: Fluorene 2900.0 ppb Nitroso di-n-propylamine, N- 3200.0 ppb Benzene 8000.0 ppb Benz[a]anthracene 10900.0 ppb Dichloroethane, 1,2- (EDC) 11000.0 ppb Toluene 14000.0 ppb Ethylbenzene 22000.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 34200.0 ppb Naphthalene 48000.0 ppb Di-n-octyl phthalate 374000.0 ppb

Soil: Low Risk

Contaminants: Chloroform 0.04 ppb Barium and compounds 0.44 ppb

See more details...

Site ID: SITE 00014

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00023

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00053

CAMP LEJEUNE MCB

Storage Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00056

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Apr 1983

Site ID: SITE 00068

CAMP LEJEUNE MCB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 2000

This site is under ongoing monitoring until Apr 2006

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 1800.0 ppb 1,2-Dichloroethane (EDC) 5400.0 ppb Methylene chloride 14600.0 ppb Chloroform 53400.0 ppb 1,1,1,2-Tetrachloroethane 5000000.0 ppb

See more details...

Site ID: SITE 00092

CAMP LEJEUNE MCB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Low Risk

Contaminants: DDE,4,4- 2700.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 210000.0 ppb

See more details...

Site ID: SITE 00106

CAMP LEJEUNE MCB

Landfill

Cost

Unknown

Final Cleanup Action

Apr 2008

Site ID: UST 000038

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1997

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury and compounds (inorganic) 360.0 ppb Anthracene 1000.0 ppb Fluorene 2500.0 ppb Fluoranthene 3000.0 ppb Acenaphthene 4800.0 ppb Xylene (mixed) 6000.0 ppb Cadmium and compounds 7000.0 ppb Chrysene 7500.0 ppb Toluene 9500.0 ppb Benzene 22000.0 ppb Chromium (total) 31000.0 ppb Ethylbenzene 65000.0 ppb Lead 81000.0 ppb Naphthalene 130000.0 ppb Barium and compounds 1000000.0 ppb

See more details...

Site ID: UST 000047

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1996

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Trichlorobenzene, 1,2,4- 500.0 ppb Benzene 1100.0 ppb Fluorene 1200.0 ppb Ethylbenzene 1400.0 ppb Trichloroethane, 1,1,1- 2100.0 ppb Dichloroethane, 1,1- 4600.0 ppb Indeno[1,2,3-cd]pyrene 5600.0 ppb Toluene 5700.0 ppb Xylene (mixed) 16500.0 ppb Pyrene 22000.0 ppb Naphthalene 36000.0 ppb Cadmium and compounds 44000.0 ppb Arsenic (cancer endpoint) 62000.0 ppb Silver and compounds 89000.0 ppb

Soil: Low Risk

Contaminants: Xylene (mixed) 0.01 ppb

See more details...

Site ID: UST 000058

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1994

Site ID: UST 000077

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1994

Site ID: UST 000079

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jul 1998

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Chromium VI and compounds 10.0 ppb Barium and compounds 70.0 ppb Toluene 23300.0 ppb

See more details...

Site ID: UST 000086

CAMP LEJEUNE MCB

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Jun 1997

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Chloromethane 10.0 ppb Vinyl chloride 2070.0 ppb Chloroform 5610.0 ppb Styrene 16000.0 ppb Xylene, o- 16000.0 ppb Chlorotoluene, o- 42000.0 ppb Trichlorobenzene, 1,2,4- 177000.0 ppb

See more details...

Site ID: UXO 000010

CAMP LEJEUNE MCB

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Mar 2012

Site ID: SITE 00020

CAMP LEJEUNE MCB

Incinerator

Cost

Unknown

Final Cleanup Action

Apr 1983

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »