Cost So Far
$1.02M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$167K
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2017
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
28 Hazardous Sites
Note: We are not showing a map of this installation's hazardous sites because we don't have location data for any of them. If you have more information, please contact us. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
1 Active Site
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: TAMP-13
AST BLDG 2 POL WST
Contaminated Ground Water
Cost
$184K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2017
Contaminated Areas
Groundwater: High Risk
DATA FROM THIS SITE INDICATE THAT THE CONTAMINANTS ARE SPREADING. A SIZABLE PLUME HAS BEEN IDENTIFIED. RUST, SI ADDENDUM, 1995. ALTHOUGH THE GROUNDWATER IS NOT PRESENTLY BEING USED FOR DRINKING WATER, IT IS LOCATED NEAR A RESIDENTIAL AREA.
Contaminants: Chloroform 16.0 ug/L 1,1-Dichloroethylene 100.0 ug/L 1,2-Dichloroethylene (cis) 1200.0 ug/L 1,2-Dichloroethylene (Total) 1900.0 ug/L Carbon Dichloride 2500.0 ug/L Trichloroethylene (TCE) 11000.0 ug/L
Soil: Low Risk
THE CONTAMINATION IS MOVING FROM THE SOIL INTO THE GROUNDWATER. DATA FROM WESTON CSA, 1993. THE DATA IS FROM SOIL BORING SAMPLES THAT WERE COLLECTED BELOW THE 0-2' LEVEL. SITE IS PAVED BUT IS LOCATED NEXT TO A RESIDENTIAL AREA.
Contaminants: Trichloroethylene (TCE) 0.079 mg/kg 1,1,2,2,-Tetrachloroethylene 0.11 mg/kg
27 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: TAMP-02
PHOTO LAB BLDG 16
Storage Area
Cost
Unknown
Final Cleanup Action
Dec 1995
Site ID: TAMP-27
UNDERGROUND STORAGE TANKS-3, BLDG 5
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1995
Site ID: TAMP-01
PHOTO LAB BLDG 2
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1992
Site ID: TAMP-10
RAD SOURCES BLDG 16
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1992
Site ID: TAMP-24
UNDERGROUND STORAGE TANKS 1 BLDG 20
Soil Contamination After Tank Removal
Cost
Unknown
Final Cleanup Action
Dec 1995
Site ID: TAMP-26
UNDERGROUND STORAGE TANKS-2, BLDG 5
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1990
Site ID: TAMP-03
CHEMICAL LAB BLDG 11
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 1990
Site ID: TAMP-04
CHEMICAL LAB BLDG 20
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1992
Site ID: TAMP-05
ELECTRONIC COMPONENT LAB
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1992
Site ID: TAMP-07
INDUNDERGROUND STORAGE TANKS CHEM STG BLDG 22
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: TAMP-08
COMPRESSED GAS STG BLDG 28
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1992
Site ID: TAMP-09
RAD SOURCES BLDG 4
Spill Site Area
Cost
Unknown
Final Cleanup Action
Apr 1990
Site ID: TAMP-11
RAD SOURCES BLDG 13
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1992
Site ID: TAMP-06
STRG OF FLAMMABLE LIQ BLDG 19
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 1992
Site ID: TAMP-15
INDUNDERGROUND STORAGE TANKSRIAL WASTEWATER TRT SYS
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Oct 1995
Site ID: TAMP-16
STORMWATER OUTFALLS
Storm Drain
Cost
Unknown
Final Cleanup Action
Sep 1995
Site ID: TAMP-17
DRUMS 55 GAL STD AT DUKE POWER CO SS
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1995
Site ID: TAMP-18
DEEP WATER WELL
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Oct 1995
Site ID: TAMP-19
UNDERGROUND STORAGE TANKS BLDG 19
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1995
Site ID: TAMP-20
UNDERGROUND STORAGE TANKS-2, BLDG 19
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1995
Site ID: TAMP-21
UNDERGROUND STORAGE TANKS-3, BLDG 19
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1995
Site ID: TAMP-22
UNDERGROUND STORAGE TANKS-1, BLDG 12
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1992
Site ID: TAMP-23
UNDERGROUND STORAGE TANKS-2, BLDG 12
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1992
Site ID: TAMP-25
UNDERGROUND STORAGE TANKS-1, BLDG 5
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1990
Site ID: TAMP-28
UNDERGROUND STORAGE TANKS 1 BLDG 16
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1995
Site ID: TAMP-14
NEUTRALIZATION TNK BLDG 23
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Oct 1995
Site ID: TAMP-12
SANITARY SEWER OUTFALLS
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Oct 1995
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »