FORMERLY USED DEFENSE SITE INSTALLATION ID: NC49799F887400

COROLLA NAVAL TARGET

corolla, North Carolina

Cost So Far

$2.39M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$566K

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Completion Date

2017

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

The site consisted of approximately 297 acres and is Currently part of the Currituck National Wildlife Refuge. It is located on the Outer Banks above Corolla, North Carolina. The site is owned by the Detent of Interior. see more » The site consisted of approximately 297 acres and is Currently part of the Currituck National Wildlife Refuge. It is located on the Outer Banks above Corolla, North Carolina. The site is owned by the Detent of Interior. (Source: U.S. Army Corps of Engineers) « see less

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

1 Active Site

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: 01OEW

COROLLA NAVAL TARGET

Air to Land

Cost

$567K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2017

This site is under ongoing monitoring until Sep 2038

Contaminated Areas

Groundwater: Low Risk

Contaminants: Antimony 0.12 ug/L Perchlorate 0.32 ug/L Barium 3.7 ug/L Lead 5.3 ug/L Titanium 100.0 ug/L Aluminum 110.0 ug/L Strontium 120.0 ug/L Copper 150.0 ug/L Zinc 150.0 ug/L Iron 17000.0 ug/L

Soil: Low Risk

Contaminants: Copper 0.94 mg/kg Strontium 1.3 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 1.9 mg/kg Lead 2.8 mg/kg Barium 7.6 mg/kg Titanium 100.0 mg/kg Aluminum 500.0 mg/kg Iron 1100.0 mg/kg

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »