Cost So Far
$57.5M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$28.6M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2022
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
57 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: local use ordinances. see more » environmental covenants local use ordinances prohibit agricultural-irrigation-livestock use of groundwater prohibit human consumption of groundwater prohibit installation of drinking water well « see less
20 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: FTMM-04
LANDFILL 4 (MAIN POST) SEE M-4
Landfill
Cost
$1.62M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2052
Contaminated Areas
Groundwater: High Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT MONITORING WELLS AND SURFACE WATER SAMPLING POINTS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: DDT 0.185 ug/L Beryllium and compounds 0.84 ug/L 1,2-Benzenedicarboxylic Acid, Bis(2-Ethylhexyl)Ester 4.0 ug/L Arsenic 5.099999 ug/L Lead 9.0 ug/L Manganese and compounds 110.5 ug/L Aluminum 6550.0 ug/L
Surface Water (Human): High Risk
CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT SURFACE WATER SAMPLING LOCATIONS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Phenol 1.11 ug/L Carbon Dichloride 5.9 ug/L 1,1,1-Trichloroethane 12.0 ug/L Lead 70.0 ug/L Manganese and compounds 120.0 ug/L Cadmium and compounds 190.0 ug/L
Site ID: FTMM-14
LANDFILL 14 (MAIN POST) SEE M-14
Landfill
Cost
$944K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2053
Contaminated Areas
Groundwater: High Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT MONITORING WELLS AND SURFACE WATER SAMPLING POINTS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Beryllium and compounds 0.245 ug/L Arsenic 6.3 ug/L Lead 18.75 ug/L Zinc 89.5 ug/L Manganese and compounds 550.5 ug/L Aluminum 1380.0 ug/L
Surface Water (Human): High Risk
CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT SURFACE WATER SAMPLING LOCATIONS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: 1,1,1-Trichloroethane 10.0 ug/L Arsenic 10.0 ug/L Trichloroethylene (TCE) 12.0 ug/L 1,2-Dichloroethylene (trans) 17.0 ug/L Cadmium and compounds 19.0 ug/L Lead 20.0 ug/L Manganese and compounds 310.0 ug/L
Site ID: FTMM-61
BLDG. 283, LEAKING UNDERGROUND STORAGE TANKS, GASOLINE
Underground Storage Tanks
Cost
$900K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Medium Risk
SITE IS LOCATED APPROX. 350FT. UPGRADIENT FROM PARKERS CREEK, A TIDAL BRACKISH WATER TRIB. TO THE SHREWSBURY RVR. GW CONTAMINANTS HAVE MIGRATED DOWNGRADIENT HOWEVER PLUME HSA STABILIZED. THE ADJACENT CREEK CONTAINS A LARGE VARIETY OF WETLANDS SPECIES AS WELL AS HARBOURS MIRATORY BIRDS THAT MAY BE THREATENED AND/OR ENDANGERED
Contaminants: Lead 26.1 ug/L Benzene 172.82 ug/L Toluene 175.6 ug/L Ethyl benzene 1160.4 ug/L Xylene (Mixed) 3960.7 ug/L
Soil: Low Risk
CONTAMINANTS ARE LOCATED BELOW AN ENXISTING STRUCTURE AND ARE NOT ANTICIPATED TO MIGRATE LATERALLY DUE TO THE LIMITED POTENTIAL OF LATERAL MIGRATION OF THE CONTAMINANTS AND THE REMOVAL OF THE SOURCE OF CONTAMINATION (THE UST)
Contaminants: Benzene 2.7 mg/kg Methyl Benzene 15.0 mg/kg Ethyl benzene 25.0 mg/kg Xylene (Mixed) 128.0 mg/kg
Site ID: FTMM-05
LANDFILL 5 (MAIN POST) SEE M-5
Landfill
Cost
$1.14M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Medium Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. LIMITED CONCENTRATIONS OF CONTAMINANTS REMAIN IN ONSITE MONITORING WELLS. SURFACE WATER SAMPLING LOCATIONS INDICATES IMPACTS HOWEVER NO EVIDENCE FROM SITE DISCHARGE. SURFACE SAMPLES IMPACTED UPSTREAM OFF POST. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Vinyl Chloride 1.21 ug/L Trichloroethylene (TCE) 19.4 ug/L cis-1,2-Dichloroethylene 47.6 ug/L Carbon Dichloride 66.1 ug/L
Surface Water (Human): Low Risk
CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT SURFACE WATER SAMPLING LOCATIONS HOWEVER NO EVIDENCE IMPACTS ASSOCIATED WITH SITE CONTAMINANTS. CONTAMINANTS HAVE BEEN IDENTIFIED UPSTREAM OFF POST. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Tetrachloroethylene 55.0 ug/L
Site ID: FTMM-08
LANDFILL 8 (MAIN POST) SEE M-8
Landfill
Cost
$1.36M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Soil: Medium Risk
PCBs have limited migration both horizontally and vertically within the soil column. The area of contamination is confined to a small area. Impact to human or ecological receptors is deemed limited.
Contaminants: PCB 342.5 mg/kg
Groundwater: Low Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. CONTAMINANTS HAVE BEEN IDENTIFIED IN MONITORING WELLS HOWEVER CONTAMINANTS HAVE NOT BEEN LINKED TO SURFACE WATER SAMPLES. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Tetrachloroethylene 1.66 ug/L Benzene 2.75 ug/L Chlorobenzene 39.0 ug/L
Surface Water (Human): Low Risk
CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT SURFACE WATER SAMPLING LOCATIONS, HOWEVER NO EVIDENCE CONTAMINANTS ONSITE CONTRIBUTE TO SURFACE WATER IMPACTS WHICH HAVE BEEN IDENTIFIED UPSTREAM BEYOND FTMM PROPERTY. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Trichloroethylene (TCE) 2.2 ug/L Carbon Dichloride 3.0 ug/L 1,1,1-Trichloroethane 10.0 ug/L
Site ID: FTMM-53
UNDERGROUND STORAGE TANKS, GASOLINE, B 699 (MAIN POST)
Underground Tank Farm
Cost
$1.5M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Medium Risk
PUMP AND TREAT ONLINE, PLUME CONTROLLED. REDUCTION OF CONTAMINANTS ONGOING. PLUME REDUCTION LIMITS POTENTIAL FOR SURFACE WATER DISCHARGE ATRECREATION / ECOLOGICAL AREAS
Contaminants: Lead 9.0 ug/L Naphthalene 50.0 ug/L Ethyl benzene 340.0 ug/L MTBE 535.0 ug/L Benzene 4052.0 ug/L Toluene 5430.0 ug/L Xylene (Mixed) 11076.0 ug/L
Site ID: FTMM-59
BLDG. 1122, UNKNOWN DISCHARGE
Spill Site Area
Cost
$1.44M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Medium Risk
Freshwater stream located approx. 80 feet from area of concern. Both PCE and Pb have been identified in downgradient stream samples above regulatory criteria. However this has been observed in upstream samples beyond FTMM property. No evidence of migratio THE AREA IS DIRECTLY ADJACENT TO A STREAM WHICH HARBORS AQUADIC LIFE AND OTHER POTENTIAL RECEPTORS. HOWEVER NO SIGNIFICANT MIGRATION OF COCS OBSERVED.
Contaminants: Perchloroethylene (PCE) 2.1 ug/L Naphthalene 14.0 ug/L
Surface Water (Human): Low Risk
Freshwater stream located approx. 80 feet from area of concern. Both PCE and Pb have been identified in downgradient stream samples above regulatory criteria. However this has been observed in upstream samples beyond FTMM property. No evidence of migratio THE AREA IS DIRECTLY ADJACENT TO A STREAM WHICH HARBORS AQUADIC LIFE AND OTHER POTENTIAL RECEPTORS. HOWEVER NO MIGRATION OF COCS OBSERVED.
Contaminants: Tetrachloroethylene 5.0 ug/L Lead 7.6 ug/L
Site ID: FTMM-02
LANDFILL 2 (MAIN POST) SEE M-2
Landfill
Cost
$1.71M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Medium Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT MONITORING WELLS, HOWEVER CANNOT BE LINKED WITH ONSITE CONTAMINANTS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Chlorobenzene 39.93 ug/L Benzene 116.0 ug/L
Soil: Low Risk
PCBs have been delineated both horizontally and vertically within the soil column. Non evidence of migration. Soils contaminated with PCBs occur adjacent to freshwater stream.
Contaminants: PCBs 212.0 mg/kg
Surface Water (Human): Low Risk
CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT SURFACE WATER SAMPLING LOCATIONS, HOWEVER CANNOT BE LINKED TO ONSITE CONTAMINANTS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Trichloroethylene (TCE) 9.0 ug/L
Site ID: FTMM-18
FORMER TRAINING AREA (MAIN POST) M-18
Landfill
Cost
$942K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Low Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. CONTAMINANTS HAVE BEEN IDENTIFIED IN MONITORING WELLS AT LOW TO MODERATE CONCENTRATIONS AND THERE IS NO EVIDENCE INDICATING ONSITE CONTAMINANTS HAVE MIGRATED. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Benzene 0.5 ug/L Arsenic 4.0 ug/L Lead 17.0 ug/L
Soil: Low Risk
CONTAMINANTS HAVE LIMITED MIGRATION HORIZONTALLY AND VERTICALLY. AREA OF CONCERN DIRECTLY ADJACENT TO STREAM. DOWN STREAM SURFACE WATER AREAS AREUTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Ethyl benzene 0.002 mg/kg Methyl Benzene 0.002 mg/kg Xylene (Mixed) 0.013 mg/kg 11,12-Benzofluoranthene 2.3 mg/kg Benzo(a)Pyrene 3.8 mg/kg 2,3-Benzofluoranthene 7.599999 mg/kg 1,2,5,6-Dibenzonaphthalene 10.0 mg/kg Benz(a)Anthracene 11.0 mg/kg
Site ID: FTMM-25
LANDFILL, SITE CW-3A, CHARLES WOOD
Landfill
Cost
$805K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Low Risk
Fresh water stream and wetlands area located directly downgradient of landfill site. Current analytical data does not reveal contaminants of concern in wetlands area.
Contaminants: Bis(2-Ethylhexyl)Phthalate 1.01 ug/L 4-Methylphenol (p-Cresol) 2.17 ug/L
Soil: Low Risk
Fresh water stream and wetlands area located directly downgradient of landfill site. Contaminants of concern are migrating in the direction of the fresh water stream and wetlands area.
Contaminants: 4,4-DDE 0.026 mg/kg 4,4-DDT 0.094 mg/kg 4,4-DDD 0.19 mg/kg Cadmium and compounds 2.741 mg/kg Benzo(a)Pyrene 6.2 mg/kg 1,2,5,6-Dibenzonaphthalene 8.8 mg/kg 1,2-Benzacenaphthene 12.0 mg/kg Pyrene 25.0 mg/kg
Site ID: FTMM-66
FORMER ABOVEGROUND STORAGE TANK SITE
Above Ground Storage Tank
Cost
$1.07M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Low Risk
Free product (#2 fuel oil) was observed floating on the ground water within several test pits excavated at the site. After excavation, no free product evident. Contaminant source has been removed. Ground water results indicate very low leverls of Naphthalene and BTEX remain. A surface water body is located 1,500 feet down gradient of the site.
Contaminants: Benzene 1.5 ug/L Naphthalene 2.0 ug/L
Soil: Low Risk
Petroleum contamination (# 2 fuel oil) has migrated both horizontally and vertically within the soil column. Soil exceeding criteria has been excavated. Buildings occupied by army personnel are located within 500 feet, down gradient of the site. A surface water body is located within 1,500 feet, down gradient of the site.
Contaminants: Pyrene 1.0 mg/kg Acenaphthene 4.2 mg/kg Fluorene 7.3 mg/kg 2-Methylnaphthalene 110.0 mg/kg Naphthalene 500.0 mg/kg
Site ID: FTMM-22
WASTEWATER TREAT. LIME PIT 1 (CHARLES W)
Industrial Discharge
Cost
$2.56M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2019
This site is under ongoing monitoring until Sep 2052
Contaminated Areas
Groundwater: Low Risk
TCE HAS MIGRATED BOTH HORIZONTALLY AND VERTICALLY THROUGH SOIL AND GROUNDWATER AT THE SITE. SYSTEM OPERATION HAS STOPPED MIGRATION AND REDUCED CONSTITUENT CONCENTRATIONS. TCE CONTAMINATION IS TRAVELING TOWARDS THE ALBERT J. MYER CENTER. THE BLDG. SUPPORTS SEVERAL THOUSAND BASE PERSONNEL. THE BLDG. HAS BELOW GRADE FACILITIES.
Contaminants: 1,2-Dichloroethylene (Total) 3.0 ug/L Trichloroethylene (TCE) 7.38 ug/L Tetrachloroethylene 7.75 ug/L
Soil: Low Risk
VAPOR EXTRACTION SYSTEM HAS CONTROLLED CONTAMINATION MIGRATION AND CONTINUES TO REDUCE THE PLUME. THE ALBERT J. MYER CENTER IS LOCATED DIRECTLY ADJACENT TO THE SITE. THE BLDG. SUPPORTS SEVERAL THOUSAND BASE PERSONNEL. THE BLDG. HAS BELOW GRADE FACILITIES.
Contaminants: Trichloroethylene (TCE) 1.0 mg/kg
Site ID: FTMM-12
LANDFILL 12 (MAIN POST) SEE M-12
Landfill
Cost
$1.17M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Low Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT MONITORING WELLS HOWEVER METALS EXCEEDENCES OBSERVED IN BACKGROUND SAMPLES. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Lead 3.1 ug/L Cadmium and compounds 3.4 ug/L Arsenic 4.05 ug/L
Surface Water (Human): Low Risk
CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN GRADIENT SURFACE WATER SAMPLING LOCATIONS, HOWEVER CONTAMINANTS ONSITE CANNOT BE LINKED TO SURFACE WATER IMPACTS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Lead 11.0 ug/L Arsenic 67.0 ug/L
Site ID: FTMM-64
UNDERGROUND STORAGE TANKS, GASOLINE, BLDG. 812
Underground Tank Farm
Cost
$1.13M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Soil: Low Risk
Listed contaminants are known to migrate within soils. Potential impact to ecological receptors.
Contaminants: Tetrachloroethylene 0.47 mg/kg 1,2-Dichloroethylene (cis) 3.7 mg/kg Lead 601.75 mg/kg
Groundwater: Low Risk
Listed contaminants have minimal potential for migrating within ground water. Ground water results indicated shrinking plume. Reduction of plume size due to HRC injection and natural attenuation limits potential impact to any receptors.
Contaminants: 1,2-Dichloroethylene (cis) 1.47 ug/L 1,2-Dichloroethylene (trans) 2.34 ug/L Tetrachloroethylene 2.74 ug/L Carbon Tetrachloride 4.83 ug/L Benzene 5.0 ug/L 1,1-Dichloroethylene 7.78 ug/L Vinyl Chloride 30.13 ug/L
Site ID: FTMM-54
UNDERGROUND STORAGE TANKS, GASOLINE, B 296 (MAIN POST)
Underground Tank Farm
Cost
$992K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Low Risk
GROUNDWATER CONTAMINANTS IN ONSITE WELLS. MINIMAL MIGRATION OBSERVED. WETLANDS AREA IN DOWNGRADIENT DIRECTION.
Contaminants: Benzene 0.5 ug/L Lead 17.0 ug/L
Site ID: FTMM-03
LANDFILL 3 (MAIN POST) SEE M-3
Landfill
Cost
$2.48M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2021
This site is under ongoing monitoring until Sep 2052
Contaminated Areas
Groundwater: Low Risk
GROUNDWATER DISCHARGES TO ADJACENT STREAM. CONTAMINANTS HAVE BEEN IDENTIFIED IN MONITORING WELLS. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Vinyl Chloride 2.0 ug/L Chlorobenzene 5.0 ug/L
Surface Water (Human): Low Risk
CONTAMINANTS HAVE BEEN IDENTIFIED IN DOWN DOWN GRADIENT SURFACE WATER SAMPLING LOCATIONS, HOWEVER CONTAMINANTS ARE NOT LINKED TO SITE. DOWN STREAM SURFACE WATER AREAS ARE UTILIZED FOR FISHING AND CRABBING PURPOSES.
Contaminants: Chlorobenzene 5.0 ug/L
Site ID: FTMM-56
PETROLEUM RELEASE, BLDG. 80
Maintenance Yard
Cost
$939K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Low Risk
THE AREA IS WITHIN 100 YARDS OF A MARSH WETLANDS AREA. GROUND WATER FLOW MODELING INDICATES MINIMAL MIGRATION. THIS SITE REQUIRES FURTHER GROUND WATER EVALUATION AND SOIL SAMPLING TO DETERMINE THE EXACT FACTORS
Contaminants: Chlordane 0.5 ug/L Lead 16.0 ug/L Arsenic 27.9 ug/L
Site ID: FTMM-55
UNDERGROUND STORAGE TANKS, GASOLINE, BLDG. 290
Underground Tank Farm
Cost
$895K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
Contaminated Areas
Groundwater: Low Risk
Groundwater data indicates that lead (Pb) and arsenic in ground water is not from any source area and is more evident of natural occurrence. The area is near a sensitive wetlands area, however no source area of contaminants has been identified.
Contaminants: Lead 14.0 ug/L Arsenic 28.8 ug/L
Site ID: FTMM-58
UNDERGROUND STORAGE TANKS, GASOLINE BLDG. 2567
Underground Tank Farm
Cost
$5,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2001
Site ID: FTMM-68
FORMER UNDERGROUND STORAGE TANKS, BUILDING 700
Underground Storage Tanks
Cost
$3.91M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
This site is under ongoing monitoring until Sep 2051
37 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: FTMM-35
FORMER METAL PLATING FAC, B 9007 (EVANS)
Contaminated Buildings
Cost
$1.01M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2000
This site is under ongoing monitoring until Sep 2044
Site ID: FTMM-57
UNDERGROUND STORAGE TANKS GASOLINE RELEASE, BLDG. 108
Underground Tank Farm
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2001
This site is under ongoing monitoring until Sep 2023
Site ID: FTMM-31
SLUDGE DUMP (CHARLES WOOD)
Contaminated Fill
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: FTMM-32
HAZ WASTE STORAGE AREA (CHARLES W) AOC-7
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: FTMM-33
SEWAGE TREATMENT PLANT (EVANS)
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Dec 1997
Site ID: FTMM-34
MARCONI BUILDING, B 9004-5 (EVANS)
Leach Field
Cost
Unknown
Final Cleanup Action
Apr 2011
Site ID: FTMM-38
HEAVY METAL POTENTIAL, B T9097 (EVANS)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Jun 1994
Site ID: FTMM-42
RAD (OPEN LAND)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Apr 1998
Site ID: FTMM-43
ALLEGED SMALL ARMS RANGE (EVANS)
Small Arms Range
Cost
Unknown
Final Cleanup Action
Dec 1993
Site ID: FTMM-44
FARMHOUSE DUMP (EVANS)
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jan 1997
Site ID: FTMM-45
SURFACE DUMPS, #1 & #2 (EVANS)
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Jan 1997
Site ID: FTMM-62
MERCURY MONITORING/ASSESSMENT
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 2001
Site ID: FTMM-49
PCB-CONTAMINATED, B 9049 & 9359 (EVANS)
Contaminated Buildings
Cost
Unknown
Final Cleanup Action
Jan 2001
Site ID: FTMM-50
FORMER STORAGE YARDS (EVANS)
Storage Area
Cost
Unknown
Final Cleanup Action
Jan 1997
Site ID: FTMM-63
UNDERGROUND STORAGE TANKS, GASOLINE, BLDG. 2603
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1999
This site is under ongoing monitoring until Sep 2001
Site ID: FTMM-28
FORMER PESTICIDE STORAGE AREA, SITE CW-6
Pesticide Shop
Cost
$65K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2000
This site is under ongoing monitoring until Sep 2018
Site ID: FTMM-29
PCB TRANSFORMER (CHARLES WOOD) SEE CW-7
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 1998
Site ID: FTMM-48
PCB TRANFORMER SITES (EVANS & CHARLES W)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jan 1997
Site ID: FTMM-23
WASTEWATER TREAT. LIME PIT 2 (CHARLES W)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Dec 2000
This site is under ongoing monitoring until Sep 2001
Site ID: FTMM-001-R-01
FORMER OUTDOOR FIRING RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: FTMM-27
SANITARY TREAT PLT (CHARLES WOOD) CW-5
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: FTMM-47
FORMER PCB TRANSFORMER SITE - BLDG. 1002
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: FTMM-26
INDOOR SMALL ARMS RANGE (CHARLES W) CW-4
Pistol Range
Cost
Unknown
Final Cleanup Action
Jul 1997
Site ID: FTMM-06
BURNING AREA (MAIN POST) SEE M-3
Burn Area
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: FTMM-07
BURNING AREA (MAIN POST) SEE M-7
Incinerator
Cost
Unknown
Final Cleanup Action
Apr 1994
Site ID: FTMM-09
PCB TRANSFORMER, B 1150-2 (MAIN POST)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Apr 1994
Site ID: FTMM-10
ASBESTOS STORAGE (MAIN POST) SEE M-10
Storage Area
Cost
Unknown
Final Cleanup Action
Apr 1994
Site ID: FTMM-11
ELEVATED WATER TANK (MAIN POST) SEE M-11
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Apr 1994
Site ID: FTMM-13
PATHOGENIC WASTE INCIN. (MAIN POST) M-13
Incinerator
Cost
Unknown
Final Cleanup Action
Apr 1994
Site ID: FTMM-15
WATER TANK (MAIN POST) SEE M-15
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Nov 1999
Site ID: FTMM-16
PESTICIDE STORAGE, B 498 (MAIN POST)M-16
Pesticide Shop
Cost
Unknown
Final Cleanup Action
Feb 1999
Site ID: FTMM-17
PESTICIDE STORAGE, B T-65 (MAIN POST)
Pesticide Shop
Cost
Unknown
Final Cleanup Action
Apr 1994
Site ID: FTMM-19
SANITARY TREAT PLT (MAIN POST) SEE AOC-3
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: FTMM-20
FORMER SANITARY TREAT PLT (MAIN POST)
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Sep 2000
Site ID: FTMM-21
FORMER FIRING RANGE (MAIN POST)
Pistol Range
Cost
Unknown
Final Cleanup Action
Apr 1994
Site ID: FTMM-24
SURFACE DISPOSAL AREA, CW-3 SITE
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 1997
Site ID: FTMM-30
SEWAGE LIFT STATION (CHARLES W) CW-8
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Apr 1994
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »