Back to Map
FORMERLY USED DEFENSE SITE INSTALLATION ID: NJ29799F098500

MILLVILLE BOMB&GUN RGE

millville, New Jersey

Cost So Far

$230K

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$30.5M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2035

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

The site is known as the Millville Bombing and Gunnery Range. It was used by the Army Air Force. Improvements to the site consisted of runways, hangars, concrete firing bunkers, fuel tanks, a gasoline station, and administration and... see more » The site is known as the Millville Bombing and Gunnery Range. It was used by the Army Air Force. Improvements to the site consisted of runways, hangars, concrete firing bunkers, fuel tanks, a gasoline station, and administration and personnel buildings. The entire site was under the Army Air Force control during the period of DOD occupancy. (Source: U.S. Army Corps of Engineers) « see less

6 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

6 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: 04OEW

ZEROING BUTT

Firing Range

Cost

$3.5M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2034

This site is under ongoing monitoring until Sep 2063

Contaminated Areas

Soil: Medium Risk

Contaminants: Silver 0.056 mg/kg Cadmium 0.16 mg/kg Beryllium 0.2 mg/kg Cobalt 1.4 mg/kg Arsenic 3.4 mg/kg Nickel 3.9 mg/kg Antimony 7.8 mg/kg Vanadium 18.0 mg/kg Zinc 28.4 mg/kg Barium 28.7 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 30.7 mg/kg Copper 57.0 mg/kg Strontium 83.2 mg/kg Manganese 88.8 mg/kg Lead 1010.0 mg/kg Aluminum 7630.0 mg/kg Iron 13100.0 mg/kg

See more details...

Site ID: 07OEW

LANDFILL

Munitions Burial

Cost

$1.83M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2023

This site is under ongoing monitoring until Sep 2053

Site ID: 05OEW

MILLVILLE COMPLEX

Multi Use Range

Cost

$17.2M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2031

This site is under ongoing monitoring until Sep 2063

Contaminated Areas

Sediment (Ecological): High Risk

Contaminants: Mercury 0.059 mg/kg Cadmium 0.068 mg/kg Cobalt 0.69 mg/kg Antimony 0.88 mg/kg Selenium 1.3 mg/kg Arsenic 1.7 mg/kg Nickel 3.0 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 9.8 mg/kg Manganese 13.9 mg/kg Zinc 17.2 mg/kg Copper 37.4 mg/kg Barium 37.8 mg/kg Lead 87.4 mg/kg Iron 2690.0 mg/kg Aluminum 11100.0 mg/kg

Surface Water (Ecological): High Risk

Contaminants: Cobalt 0.17 ug/L Thallium 0.18 ug/L Antimony 0.29 ug/L Nickel 0.99 ug/L Strontium 3.7 ug/L Lead 4.8 ug/L Barium 7.2 ug/L Copper 23.1 ug/L Zinc 31.3 ug/L Manganese 33.0 ug/L Iron 49.6 ug/L Aluminum 62.4 ug/L Magnesium 274.0 ug/L Potassium 386.0 ug/L Sodium 419.0 ug/L Calcium 666.0 ug/L

Groundwater: Medium Risk

Contaminants: Perchlorate 0.127 ug/L Nitrobenzene 0.22 ug/L

Sediment (Human): Medium Risk

Contaminants: Mercury and compounds 0.059 mg/kg Cadmium 0.068 mg/kg Beryllium 0.33 mg/kg Molybdenum 0.46 mg/kg Cobalt 0.69 mg/kg Antimony 0.88 mg/kg Selenium 1.3 mg/kg Arsenic 1.7 mg/kg Strontium 2.7 mg/kg Nickel 3.0 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 9.8 mg/kg Vanadium 13.3 mg/kg Manganese 13.9 mg/kg Zinc 17.2 mg/kg Copper 37.4 mg/kg Barium 37.8 mg/kg Lead 87.4 mg/kg Titanium 123.0 mg/kg Iron 2690.0 mg/kg Aluminum 11100.0 mg/kg

Soil: Medium Risk

Contaminants: Silver 0.17 mg/kg Mercury and compounds 0.24 mg/kg Cadmium 0.25 mg/kg Beryllium 0.86 mg/kg Selenium 1.4 mg/kg Cobalt 2.3 mg/kg Ethyl benzene 4.2 mg/kg Molybdenum 6.9 mg/kg Nickel 7.0 mg/kg Arsenic 7.8 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 16.6 mg/kg Xylenes 17.0 mg/kg Vanadium 22.4 mg/kg Strontium 23.6 mg/kg Antimony 35.8 mg/kg Zinc 40.7 mg/kg Barium 67.2 mg/kg Copper 113.0 mg/kg Manganese 179.0 mg/kg Titanium 193.0 mg/kg Lead 738.0 mg/kg Iron 12500.0 mg/kg Aluminum 13900.0 mg/kg

Surface Water (Human): Medium Risk

Contaminants: Cobalt 0.17 ug/L Antimony 0.29 ug/L Nickel 0.99 ug/L Titanium 3.2 ug/L Strontium 3.7 ug/L Lead 4.8 ug/L Barium 7.2 ug/L Copper 23.1 ug/L Zinc 31.3 ug/L Manganese 33.0 ug/L Iron 49.6 ug/L Aluminum 62.4 ug/L

See more details...

Site ID: 02OEW

SMALL ARMS RANGE

Small Arms Range

Cost

$870K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2023

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium 0.14 mg/kg Cobalt 0.68 mg/kg Arsenic 2.8 mg/kg Nickel 3.2 mg/kg Copper 3.9 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 10.8 mg/kg Vanadium 18.2 mg/kg Barium 19.1 mg/kg Manganese 22.6 mg/kg Zinc 25.0 mg/kg Aluminum 8590.0 mg/kg Iron 8670.0 mg/kg

See more details...

Site ID: 06OEW

SHAWS MILL POND

Air to Land

Cost

$4.99M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2035

This site is under ongoing monitoring until Sep 2069

Contaminated Areas

Groundwater: Low Risk

Contaminants: Nitrobenzene 0.091 ug/L

Sediment (Ecological): Low Risk

Contaminants: Mercury 0.052 mg/kg Cadmium 0.29 mg/kg Cobalt 0.84 mg/kg Arsenic 1.1 mg/kg Selenium 1.1 mg/kg Antimony 1.2 mg/kg Nickel 1.8 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 2.6 mg/kg Copper 5.1 mg/kg Zinc 9.5 mg/kg Manganese 11.0 mg/kg Barium 27.2 mg/kg Lead 71.2 mg/kg Iron 399.0 mg/kg Aluminum 2760.0 mg/kg

Sediment (Human): Low Risk

Contaminants: Mercury and compounds 0.052 mg/kg Beryllium 0.27 mg/kg Cadmium 0.29 mg/kg Cobalt 0.84 mg/kg Arsenic 1.1 mg/kg Selenium 1.1 mg/kg Antimony 1.2 mg/kg Nickel 1.8 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 2.6 mg/kg Strontium 3.9 mg/kg Vanadium 4.1 mg/kg Copper 5.1 mg/kg Zinc 9.5 mg/kg Manganese 11.0 mg/kg Barium 27.2 mg/kg Lead 71.2 mg/kg Titanium 159.0 mg/kg Iron 399.0 mg/kg Aluminum 2760.0 mg/kg

Soil: Low Risk

Contaminants: Mercury and compounds 0.08 mg/kg Antimony 0.88 mg/kg Molybdenum 0.94 mg/kg Selenium 1.3 mg/kg Arsenic 2.9 mg/kg Copper 7.1 mg/kg Lead 74.2 mg/kg Iron 5420.0 mg/kg

Surface Water (Ecological): Low Risk

Contaminants: Beryllium 0.23 ug/L Nitrobenzene 0.24 ug/L Antimony 0.28 ug/L Copper 1.0 ug/L Nickel 2.2 ug/L Lead 2.4 ug/L Cobalt 2.4 ug/L Strontium 12.1 ug/L Zinc 14.8 ug/L Manganese 17.7 ug/L Barium 69.5 ug/L Iron 291.0 ug/L Aluminum 473.0 ug/L Potassium 712.0 ug/L Calcium 796.0 ug/L Magnesium 1180.0 ug/L Sodium 2670.0 ug/L

Surface Water (Human): Low Risk

Contaminants: Beryllium 0.23 ug/L Nitrobenzene 0.24 ug/L Antimony 0.28 ug/L Copper 1.0 ug/L Nickel 2.2 ug/L Lead 2.4 ug/L Cobalt 2.4 ug/L Titanium 3.9 ug/L Strontium 12.1 ug/L Zinc 14.8 ug/L Manganese 17.7 ug/L Barium 69.5 ug/L Iron 291.0 ug/L Aluminum 473.0 ug/L

See more details...

Site ID: 03OEW

SKEET RANGE

Trap and Skeet Range

Cost

$2.16M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2024

Contaminated Areas

Soil: Low Risk

Contaminants: Beryllium 0.15 mg/kg Cobalt 0.65 mg/kg Selenium 0.66 mg/kg Antimony 2.6 mg/kg Nickel 2.8 mg/kg Arsenic 2.9 mg/kg Copper 4.3 mg/kg Total Chromium (1:6 ratio Cr VI:Cr III) 9.1 mg/kg Vanadium 16.6 mg/kg Zinc 17.0 mg/kg Barium 23.8 mg/kg Manganese 40.0 mg/kg Lead 375.0 mg/kg Iron 7970.0 mg/kg Aluminum 8230.0 mg/kg

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »