Cost So Far
$132M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$26.8M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2031
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
88 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: local use ordinances, fences, dig permits. see more » fences signs dig permits local use ordinances notations in master plan education programs prohibit residential use prohibit sensitive use (e.g. hospital, daycare, school) landfill restriction - prohibit activities that would impact the landfill cap (or cover system) and drainage system landfill restriction - prohibit excavation on landfill cap or cover system landfill restriction - prohibit installation of utility system lines through the site landfill restriction - restrict access to the site landfill restriction - restrict construction of buildings that may interfere with landfill cap or cover system landfill restriction - restrict plantings that interfere landfill cap or cover system (roots that penetrate the cap or cover system) landfill restriction - restrict vehicular traffic restrict land use - mitigation area(s) protection prohibit human consumption of groundwater « see less
52 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: RVAAP-03
OPEN DEMOLITION AREA #1
Explosive Ordnance Disposal Area
Cost
$875K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2017
This site is under ongoing monitoring until Apr 2047
Contaminated Areas
Soil: High Risk
There is no evidence that contaminants are migrating. There are no physical barriers to restrict the migration. Access to the site is not restricted and nearby areas are used by the Ohio National Guard.
Contaminants: Arsenic 9.0 mg/kg Cadmium and compounds 41.1 mg/kg 2,4,6-Trinitrotoluene 23000.0 mg/kg
Site ID: RVAAP-08
LOAD LINE 1
Industrial Discharge
Cost
$1.16M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2019
Contaminated Areas
Groundwater: High Risk
site is close the the boundary of the facility and the potential exists as long as there is no cleanup that the groundwater could be contaminated. The pulbic residents live close to the boundary of the facility and they use shallow wells for their drinking water supllies. Potable water reservoir downstream
Contaminants: Arsenic 61.4 ug/L Manganese and compounds 3120.0 ug/L
Soil: High Risk
Future potential for diorect contact by on-site receptor. Indirect contact exposures via migration to sediment.surface water. Drainage to off-site reservoir.
Contaminants: PCB 1016 36.0 mg/kg Arsenic 77.0 mg/kg Free cyanide 112.0 mg/kg Lead 3610.0 mg/kg 2,4,6-Trinitrotoluene 5800.0 mg/kg
Surface Water (Human): High Risk
Several metals identified at source and in downgradient sediments. Site drains to off site reservior.
Contaminants: Chrysene 0.12 pCi/L Lead 22.2 ug/L Antimony and compounds 24.6 ug/L Zinc 25.3 pCi/L
Site ID: RVAAP-10
LOAD LINE 3
Industrial Discharge
Cost
$1M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2019
Contaminated Areas
Soil: High Risk
Indirect contact via migration to sediments/surface water. Site drains to Cobbs Pond.
Contaminants: Beryllium and compounds 1.2 mg/kg Arsenic 23.2 mg/kg 1,3,5-Trinitrobenzene 110.0 mg/kg Lead 2620.0 mg/kg 2,4,6-Trinitrotoluene 5800.0 mg/kg
Surface Water (Human): Low Risk
Metals found are likely not to be due to source. Site drains to Cobbs Pond, Sand Creek, north to facility boundary.
Contaminants: Silver and compounds 2.4 ug/L Zinc 560.0 pCi/L
Site ID: RVAAP-12
LOAD LINE 12
Industrial Discharge
Cost
$1.13M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2019
Contaminated Areas
Soil: High Risk
Indirect contact exposures via migration to sediments and surface water. Site drains to Sand Creek which exists facility approximately 2.5 miles north.
Contaminants: 1-Methyl-2,4-Dinitrobenzene 13.0 mg/kg Lead 589.0 mg/kg 2,4,6-Trinitrotoluene 19000.0 mg/kg
Surface Water (Human): Medium Risk
Several metals detected at source and in downgradient sediments. Site drains to Cobb Pond and Sand Creek.
Contaminants: Arsenic 2.17 ug/L Silver and compounds 58.0 ug/L Copper and compounds 399.0 ug/L
Site ID: RVAAP-09
LOAD LINE 2
Industrial Discharge
Cost
$1M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2019
Contaminated Areas
Soil: High Risk
Indirect contact exposures via migration to sediments/surface water: future potential direct contact by on-site receptor. Drainage to off-site resovoir.
Contaminants: PCB 1016 2.5 mg/kg Cadmium and compounds 22.7 mg/kg 1,3,5-Trinitrobenzene 160.0 mg/kg Lead 881.0 mg/kg RDX 9800.0 mg/kg 2,6-Dinitrotoluene 12000.0 mg/kg
Groundwater: Low Risk
Site chemicals found in sediments. GW potentially flows to off site reservoir. Site is located upgradient from a drinking water resovoir.
Contaminants: 2,4-Dinitrotoluene 0.34 pCi/L
Sediment (Human): Low Risk
the facility workers can come into contact with the sediment and the public some time in the future. The workers at the facility can be exposed to the sediments and the public sometime in the future.
Contaminants: 2,4,6-Trinitrotoluene 0.6 mg/kg Cyclonite 1.75 mg/kg
Surface Water (Human): Low Risk
Several metals found at source and in downgradients. 11/11/97 AEC H. Dutcher requested MPS revision from identified to potential. Drainage to off-site resovoir. 11/11/97 AEC H. Dutcher requested change to identified to potential.
Contaminants: Silver and compounds 1.0 ug/L
Site ID: RVAAP-001-R-01
RAMSDELL QUARRY
Open Burn
Cost
$2.15M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2019
This site is under ongoing monitoring until Sep 2049
Site ID: RVAAP-033-R-01
FIRESTONE TEST FACILITY
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Oct 2016
Site ID: RVAAP-42
LOAD LINE 9
Contaminated Buildings
Cost
$704K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
Contaminated Areas
Groundwater: Medium Risk
Newly discovered, previously uninvestigated sites, which are Environmental Restoration, Army (ER, A)-eligible, according to the Relative Risk Site Evaluation (RRSE) guidelines. There is no evidence that contaminants are migrating from the site. It is inknown if any wells are directly down gradient from this AOC; however, ground-water from near this AOC may be used for irrigation or drinking water.
Contaminants: Arsenic 18.2 ug/L
Soil: Low Risk
There is no evidence that the cotaminants are migrating from the site. However, there are no physical barriers in place to prevent migration. While this area is surrounded by a fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: Lead 2700.0 mg/kg Manganese and compounds 3200.0 mg/kg Iron 41500.0 mg/kg
Site ID: RVAAP-44
LOAD LINE 11
Contaminated Buildings
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Contaminated Areas
Groundwater: Medium Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. It is inknown if any wells are directly down gradient from this AOC; however, ground-water from near this AOC may be used for irrigation or drinking water.
Contaminants: Arsenic 33.4 ug/L Chromium 62.7 ug/L
Sediment (Fresh): Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. There are no listed critical habitats that would be affected.
Contaminants: Copper 14.0 mg/kg Arsenic 15.0 mg/kg Chromium 17.0 mg/kg Manganese 570.0 mg/kg Iron 24000.0 mg/kg
Sediment (Human): Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. While this area is surrounded by a fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: Arsenic 15.0 mg/kg Manganese and compounds 570.0 mg/kg Iron 24000.0 mg/kg
Soil: Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. While this area is surrounded by a fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: Cadmium and compounds 41.0 mg/kg Antimony and compounds 41.9 mg/kg Manganese and compounds 1700.0 mg/kg Copper and compounds 3300.0 mg/kg Lead 11000.0 mg/kg Iron 40000.0 mg/kg
Site ID: RVAAP-33
LOAD LINE 6
Contaminated Buildings
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Contaminated Areas
Soil: Medium Risk
No evidence of site contaminats migrating. Although, there exist no physical barriers to prevent the migration of contaminants. Access to the site is not restricted.
Contaminants: Arsenic 17.6 mg/kg Antimony and compounds 58.5 mg/kg Copper and compounds 30400.0 mg/kg
Surface Water (Human): Medium Risk
There is no evidence of contaminats migrating. Although there exists no physical barriers to prevent the migration of contaminants. Access to the site is not restricted for those individuals who are authorized within the boundaries of the plant.
Contaminants: Lead 20.0 ug/L Copper and compounds 33.0 ug/L
Sediment (Human): Low Risk
No evidence of site contaminants migrating from the site. although no physical barriers exist to prevent such migartion. Acccess to the site is not restricted.
Contaminants: Arsenic 5.78 mg/kg
Site ID: RVAAP-061-R-01
BLOCK D IGLOO -TD
Unexploded Munitions and Ordnance Area
Cost
$64K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2017
Site ID: RVAAP-063-R-01
GROUP 8 MRS
Unexploded Munitions and Ordnance Area
Cost
$430K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2018
Site ID: RVAAP-38
NACA TEST AREA
Surface Disposal Area
Cost
$459K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
This site is under ongoing monitoring until Feb 2048
Contaminated Areas
Sediment (Fresh): Medium Risk
There are no physical barriers to prevent the migration of contaminants. However there are no physical barriers to prevent the migration of contaminants. Sediment running off of this site could enter into Sand Creek which is a habitat for State Endangered species.
Contaminants: Pyrene 2.2 mg/kg Arsenic 3.9 mg/kg Copper 4.95 mg/kg
Sediment (Human): Medium Risk
No evidence that the site contamination is migrating. However, there are no physical barriers in place to prevent the migration of contaminants. Access to the site is not restricted.
Contaminants: Arsenic 3.9 mg/kg Pentachlorophenol 4.4 mg/kg
Soil: Medium Risk
No evidence that contaminats are migrating. Access to the site is not restricted.
Contaminants: Arsenic 12.7 mg/kg Cadmium and compounds 46.0 mg/kg Chromium 48.3 mg/kg Barium 179.0 mg/kg
Site ID: RVAAP-41
LOAD LINE 8
Contaminated Buildings
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Contaminated Areas
Groundwater: Medium Risk
There is no evidence that the site contaminants are migrating. However, there are no physical barriers in place to prevent migration. It is unknown if any wells are directly down gradient from this AOC; however, ground-water from near this site may be used for irrigation or drinking water.
Contaminants: Nickel (Soluble Salts) 0.37 ug/L Vanadium 0.85 ug/L Antimony and compounds 1.66 ug/L Zinc 4.54 ug/L Arsenic 22.4 ug/L Barium 27.7 ug/L Chromium 45.8 ug/L
Sediment (Human): Low Risk
There is no evidence that site contaminants are migrating. However, there are no physical barriers in place to prevent migration. While this area is surrounded with fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: Antimony and compounds 1.1 mg/kg Selenium 1.6 mg/kg Arsenic 11.3 mg/kg Chromium 13.5 mg/kg Vanadium 22.5 mg/kg Lead 24.5 mg/kg Copper and compounds 51.0 mg/kg Barium 79.5 mg/kg Manganese and compounds 455.0 mg/kg Zinc 850.0 mg/kg Aluminum 12000.0 mg/kg Iron 43000.0 mg/kg
Soil: Low Risk
There is no evidence that the site contaminants are migrating. However, there are no physical barriers in place to prevent migration. While this area is surrounded by fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: Lead 1000.0 mg/kg Manganese and compounds 4000.0 mg/kg Iron 4700.0 mg/kg
Site ID: RVAAP-43
LOAD LINE 10
Contaminated Buildings
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Contaminated Areas
Groundwater: Medium Risk
There is no evidence that the cotaminants are migrating. However, there are no physical barriers in place to prevent migration. It is inknown if any wells are directly down gradient from this AOC; however, ground-water from near this AOC may be used for irrigation or drinking water.
Contaminants: Arsenic 16.6 ug/L
Soil: Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. While this area is surrounded by a fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: Antimony and compounds 660.0 mg/kg Manganese and compounds 710.0 mg/kg Lead 3100.0 mg/kg Iron 31000.0 mg/kg
Site ID: RVAAP-39
LOAD LINE 5
Contaminated Buildings
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Contaminated Areas
Groundwater: Medium Risk
There is no evidence that site contaminants are migrating. However, there are no physical barriers in place tp prevent migration. It is unknown if any wells are directly down gradient from this AOC; however, ground-water from near this AOC may be used for drinking or irrigation water
Contaminants: Mercuric chloride 0.31 ug/L Arsenic 14.0 ug/L Chromium 42.0 ug/L Copper and compounds 102.0 ug/L Lead 178.0 ug/L Zinc 289.0 ug/L Barium 593.0 ug/L
Soil: Low Risk
There is no evidence that site contaminants are migrating. However, there are no physical barriers in place to prevent migration/ While this area is surrounded by a fence with locked gates, hunters, scrappers, and fire wood cutters have access to the site.
Contaminants: Beryllium and compounds 1.8 mg/kg Antimony and compounds 3.9 mg/kg Selenium 9.2 mg/kg Mercuric chloride 12.0 mg/kg Cobalt 16.0 mg/kg Nickel (Soluble Salts) 17.0 mg/kg Arsenic 18.0 mg/kg Vanadium 20.0 mg/kg Cadmium and compounds 36.0 mg/kg Copper and compounds 160.0 mg/kg Chromium 270.0 mg/kg Barium 1000.0 mg/kg Manganese and compounds 1400.0 mg/kg Zinc 2500.0 mg/kg Lead 2800.0 mg/kg Aluminum 10000.0 mg/kg Iron 88000.0 mg/kg
Site ID: RVAAP-29
UPPER AND LOWER COBBS PONDS
Surface Impoundment/Lagoon
Cost
$413K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
This site is under ongoing monitoring until Feb 2048
Contaminated Areas
Soil: Medium Risk
No apparent migration to sediment. Site drains to Sand Creek and exists facility approximately 2.5 miles to north.
Contaminants: Beryllium and compounds 0.51 mg/kg Dinitrotoluene Mixture 3.0 mg/kg Arsenic 30.8 mg/kg Barium 598.0 mg/kg Lead 1900.0 mg/kg
Sediment (Human): Low Risk
if the sediments are disturbed the contamination can flow off the facility into land owned by the public. The public of the facility can be exposed to disturbed sediment s on the facility.also the birds can be exposed to the sediments.
Contaminants: 2,4,6-Trinitrotoluene 0.17 mg/kg Chromium 329.0 mg/kg
Surface Water (Human): Low Risk
Mg detected in both GW and sediments No human receptors immediately downstream.
Contaminants: Manganese and compounds 1.0 ug/L
Site ID: RVAAP-50
ATLAS SCRAP YARD
Storage Area
Cost
$1.71M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
This site is under ongoing monitoring until Feb 2048
Contaminated Areas
Groundwater: Medium Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. It is known if any wells are directly down gradient from this AOC; however, ground-water from near this AOC may be used for irrigation or drinking water.
Contaminants: Arsenic 25.6 ug/L
Soil: Medium Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. This area is not used for production and is not populated by workers. However, there is no fence around the site to prevent access by hunters, scrappers and others.
Contaminants: Dibenz[ah]anthracene 7.3 mg/kg Benzo(a)Pyrene 22.0 mg/kg Lead 44.0 mg/kg Manganese and compounds 1900.0 mg/kg Iron 33000.0 mg/kg
Site ID: RVAAP-46
BUILDING F-15 AND F-16
Industrial Discharge
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Contaminated Areas
Soil: Medium Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. This area is not used for production and is not populated by workers. However, there is no fence around the site; and hunters, scrappers, and others could access the site.
Contaminants: Arsenic 28.0 mg/kg Lead 430.0 mg/kg Manganese and compounds 4100.0 mg/kg Iron 45000.0 mg/kg
Sediment (Fresh): Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. Sediment running oof this site enters into Sand Creek, a known habitat for State Endangered Species.
Contaminants: Arsenic 9.0 mg/kg Chromium 20.0 mg/kg Copper 20.0 mg/kg Manganese 650.0 mg/kg Iron 28000.0 mg/kg
Sediment (Human): Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. This site has no immediate fencing but access is controlled by the perimeter fence controlled by a full-time security staff. However, hunters, scrappers, or others could acces the site.
Contaminants: Manganese and compounds 650.0 mg/kg Iron 28000.0 mg/kg
Site ID: RVAAP-11
LOAD LINE 4
Industrial Discharge
Cost
$1M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2019
Contaminated Areas
Groundwater: Medium Risk
Potential is Mg found in GW to be naturally occuring. Site drains off-site within 1500 feet of site.
Contaminants: Manganese and compounds 2670.0 ug/L
Sediment (Human): Low Risk
workers at the facility could be exposed to the sediments and the public some time in the future. workers at the facility could be exposed to the sediments at the facility as well as the public sometime in the future.
Contaminants: Cyclonite 0.54 mg/kg 2,4,6-Trinitrotoluene 8.7 mg/kg
Soil: Low Risk
Migration off site portential exists. Downgradient receptors: site drains to reservoir.
Contaminants: Mercury (Methyl) 0.16 mg/kg TNT 2.2 mg/kg Aramite 4.5 mg/kg Lead 384.0 mg/kg Zinc 1850.0 mg/kg
Site ID: RVAAP-016-R-01
FUZE AND BOOSTER QUARRY
Open Burn
Cost
$1.14M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2019
This site is under ongoing monitoring until Sep 2049
Site ID: RVAAP-060-R-01
BLOCK D IGLOO
Unexploded Munitions and Ordnance Area
Cost
$430K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2018
Site ID: RVAAP-05
WINKLEPECK BURNING GROUNDS
Burn Area
Cost
$3.18M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2017
This site is under ongoing monitoring until Sep 2047
Contaminated Areas
Groundwater: Medium Risk
Contamination in the groundwater is largely restricted to the area directly under the source; no evidence of appreciable contaminant migration. Because of the uncertain use of the facility after cleanup the OHARNG may be exposed to the groundwater at some future date.
Contaminants: Cyclonite 1.2 ug/L 2,4,6-Trinitrotoluene 3.9 ug/L 1,3,5-Trinitrobenzene 15.0 ug/L Arsenic 52.0 ug/L Barium 210.0 ug/L
Soil: Medium Risk
employes can come into contact with the soil and the public could at some future date after cleanup of the facility. workers can be exposed to the soil at the facility.
Contaminants: Beryllium and compounds 2.6 mg/kg Arsenic 21.6 mg/kg 2,4,6-Trinitrotoluene 38.03 mg/kg 1,4-Dinitrobenzene 490.0 mg/kg Cadmium and compounds 877.7 mg/kg Lead 916.0 mg/kg Barium 7780.0 mg/kg RDX 9500.0 mg/kg
Site ID: RVAAP-66
FACILITY-WIDE GROUNDWATER
Contaminated Ground Water
Cost
$3.62M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2031
Contaminated Areas
Groundwater: Medium Risk
It has moved slightly away from the source but not off post. There is no GW wells within the area
Contaminants: Arsenic 23.0 ug/L RDX 88.0 ug/L Chromium 120.0 ug/L TNT 130.0 ug/L Manganese and compounds 7660.0 ug/L Nitrate 1200000.0 ug/L
Site ID: RVAAP-034-R-01
SAND CREEK DUMP
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 2016
Site ID: RVAAP-002-R-01
ERIE BURNING GROUNDS
Open Burn
Cost
$1.14M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2019
This site is under ongoing monitoring until Sep 2049
Site ID: RVAAP-008-R-01
LOAD LINE #1
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Oct 2016
Site ID: RVAAP-019-R-01
LANDFILL NORTH OF WINKLEPECK
Disposal Pit and Dry Well
Cost
$64K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2017
Site ID: RVAAP-004-R-01
OPEN DEMOLITION AREA #2
Open Burn
Cost
$4.16M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2018
Site ID: RVAAP-45
WET STORAGE AREA
Storage Area
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2017
Contaminated Areas
Soil: Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. While this area is surrounded by a fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: Cadmium and compounds 41.0 mg/kg Mercuric chloride 49.0 mg/kg Manganese and compounds 870.0 mg/kg Iron 3100.0 mg/kg Lead 3100.0 mg/kg
Site ID: RVAAP-28
SUSPECTED MUNDERGROUND STORAGE TANKSARD AGENT BURIAL SITE
Chemical Disposal
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
Contaminated Areas
Soil: Low Risk
No physical barriers exist to prevent contamination migration. There is no restriction to the site to those authrized to be within the boundaries of the plant.
Contaminants: Arsenic 5.38 mg/kg Lead 29.5 mg/kg
Site ID: RVAAP-062-R-01
WATER WORKS #4 DUMP
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Oct 2016
Site ID: RVAAP-19
LANDFILL NORTH OF WINKLEPECK BURN GRND
Landfill
Cost
$484K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
This site is under ongoing monitoring until Feb 2048
Contaminated Areas
Groundwater: Low Risk
Nickel found in groundwater but not likely to be from source. Limited access to work force.
Contaminants: Nickel (Soluble Salts) 110.0 ug/L
Soil: Low Risk
No apparent migration. Minimal contact by site personnel.
Contaminants: Beryllium and compounds 0.53 mg/kg
Site ID: RVAAP-06
C BLOCK QUARRY
Surface Disposal Area
Cost
$455K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
This site is under ongoing monitoring until Feb 2048
Contaminated Areas
Soil: Low Risk
No evidence of migration, although there exist no barriers to prevent the migration. The area is npt populated b the workforce.
Contaminants: Arsenic 12.3 mg/kg Lead 31.2 mg/kg
Site ID: RVAAP-67
FACILITY-WIDE SEWERS
Waste Lines
Cost
$793K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
Contaminated Areas
Sediment (Human): Low Risk
Sediments are contained within the sewer lines. Within a sewer line, so very little access to direct exposures.
Contaminants: Lead 39000.0 mg/kg
Site ID: RVAAP-40
LOAD LINE 7
Contaminated Buildings
Cost
$459K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
Contaminated Areas
Groundwater: Low Risk
There is no evidence that the site contaminants are migrating. However, there are no physical barriers in place to prevent migration. It is unknown if any well are directly down gradient from the AOC; however, ground-water from near this AOC may be used for irrigation or drinking water.
Contaminants: RDX 0.765 ug/L Iron 185.0 ug/L Manganese and compounds 250.0 ug/L
Soil: Low Risk
There is no evidence the site contaminants are migrating. However, there are no physical barriers in place to prevent migration. While this area is surrounded with a fence with locked gates, hunters, scrappers, and fire wood cutters may have access to the site.
Contaminants: RDX 1.1 mg/kg Mercuric chloride 1.6 mg/kg Antimony and compounds 1.7 mg/kg Silver and compounds 3.0 mg/kg Selenium 3.3 mg/kg 2,4,6-Trinitrotoluene 3.4 mg/kg Cadmium and compounds 7.6 mg/kg Arsenic 12.0 mg/kg Nickel (Soluble Salts) 15.0 mg/kg Vanadium 23.0 mg/kg Copper and compounds 68.0 mg/kg Chromium 85.0 mg/kg HMX 100.0 mg/kg Barium 1400.0 mg/kg Lead 2000.0 mg/kg Manganese and compounds 2700.0 mg/kg Zinc 6800.0 mg/kg Iron 26000.0 mg/kg Aluminum 27000.0 mg/kg
Site ID: RVAAP-34
SAND CREEK DISPOSAL ROAD LANDFILL
Landfill
Cost
$1.15M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2018
Contaminated Areas
Sediment (Fresh): Low Risk
There is no evidence that site contamination is migrating. Although no physical barriers exist to prevent the migration. State Endangered Species habitat.
Contaminants: Copper 39.0 mg/kg Arsenic 55.0 mg/kg Zinc 59.0 mg/kg
Sediment (Human): Low Risk
Migration does not appear evident, although the potential exist for migration. Site access is not restricted.
Contaminants: Arsenic 11.2 mg/kg
Soil: Low Risk
No evidence of the site contaminants migrating from the site. Although no physical barriers exist to prevent the migration of contaminants. Access to the site is not restricted to those individuals autorized within the boundaries of the plant.
Contaminants: Arsenic 10.31 mg/kg Barium 61.0 mg/kg
Site ID: RVAAP-51
DUMP ALONG PARIS-WINDHAM ROAD
Surface Disposal Area
Cost
$151K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2017
This site is under ongoing monitoring until Apr 2047
Contaminated Areas
Sediment (Fresh): Low Risk
There is no evidence that contaminants are migrating from the site. State endangered species habitat.
Contaminants: Arsenic 7.3 mg/kg Chromium 18.0 mg/kg Copper 23.0 mg/kg Manganese 140.0 mg/kg Zinc 150.0 mg/kg Iron 23000.0 mg/kg
Sediment (Human): Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. This area is not used for production and is not populated by workers. However, there is no fence around the site to prevent access by hunters, scrappers and others.
Contaminants: Arsenic 7.3 mg/kg Manganese and compounds 140.0 mg/kg Iron 2300.0 mg/kg
Soil: Low Risk
There is no evidence that the contaminants are migrating. However, there are no physical barriers in place to prevent migration. This area is not used for production and is not populated by workers. However, there is no fence around the site to prevent access by hunters, scrappers and others.
Contaminants: Arsenic 14.0 mg/kg Manganese and compounds 520.0 mg/kg Iron 24000.0 mg/kg
Site ID: CC RVAAP-79
DLA ORE STORAGE SITES
Storage Area
Cost
$1.61M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Site ID: CC RVAAP-78
QUARRY POND SURFACE DUMP
Spill Site Area
Cost
$735K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Site ID: CC RVAAP-73
FACILITY-WIDE COAL STORAGE
Storage Area
Cost
$964K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Site ID: CC RVAAP-68
ELECTRIC SUBSTATIONS (E,W,NO. 3)
Spill Site Area
Cost
$182K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Site ID: CC RVAAP-76
DEPOT AREA
Spill Site Area
Cost
$75K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
Site ID: CC RVAAP-74
BLDG 1034 MOTOR POOL HYDRAULIC LIFT
Spill Site Area
Cost
$944K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2019
Site ID: CC RVAAP-75
GEORGE ROAD STP MERCURY SPILL
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Oct 2015
Site ID: PBA@MR RAVENNA
MR PBA 2009
Site Never Existed
Cost
$1.25M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
Site ID: CC RVAAP-72
FACILITY-WIDE UNDERGROUND STORAGE TANKSS
Spill Site Area
Cost
$564K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2019
Site ID: CC RVAAP-70
EAST CLASSIFICATION YARD
Spill Site Area
Cost
$315K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2019
Site ID: CC RVAAP-69
BUILDING 1048 - FIRE STATION
Surface Disposal Area
Cost
$182K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Site ID: RVAAP-050-R-01
ATLAS SCRAP YARD
Unexploded Munitions and Ordnance Area
Cost
$64K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2017
Site ID: CC RVAAP-80
GROUP 2 PROPELLANT CAN TOPS
Storage Area
Cost
$43K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2016
Site ID: RVAAP-032-R-01
40MM FIRING RANGE
Disposal Pit and Dry Well
Cost
$1.14M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2019
This site is under ongoing monitoring until Sep 2049
36 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: RVAAP-48
ANCHOR TEST AREA
Contaminated Soil Piles
Cost
Unknown
Final Cleanup Action
Apr 2015
Site ID: RVAAP-046-R-01
BUILDING #F-15 AND F-16
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
May 2008
Site ID: RVAAP-048-R-01
ANCHOR TEST AREA
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
May 2008
Site ID: RVAAP-01
RAMSDELL QUARRY LANDFILL
Landfill
Cost
$676K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Feb 2045
Site ID: CC RVAAP-71
BARN NO. 5 PETROLEUM RELEASE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2015
Site ID: PBC AT RAVENNA
PBA 2008
Site Never Existed
Cost
Unknown
Final Cleanup Action
Jul 2015
Site ID: RVAAP-005-R-01
WINKLEPECK BURNING GROUNDS
Open Burn
Cost
Unknown
Final Cleanup Action
Mar 2006
Site ID: RVAAP-02
ERIE BURNING GROUNDS
Burn Area
Cost
Unknown
Final Cleanup Action
Sep 2008
Site ID: CC RVAAP-77
BLDG 1037 LAUNDRY WASTEWATER SUMP
Spill Site Area
Cost
Unknown
Final Cleanup Action
Feb 2015
Site ID: CC RVAAP-83
FORMER BUILDINGS 1031 AND 1039
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 2015
Site ID: RVAAP-31
ORE PILE RETENTION POND
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: RVAAP-04
OPEN DEMOLITION AREA #2
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Jan 2008
Site ID: RVAAP-064-R-01
OLD HAY FIELD MRS
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
May 2008
Site ID: RVAAP-07
BLD 1601 HAZ WST STG
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-14
LOAD LINE 6 EVAPORATION UNIT
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-15
LOAD LINE 6 TREATMENT PLANT
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: RVAAP-16
FUZE&BOOSTER QUARRY LANDFILL/PONDS
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Sep 2010
Site ID: RVAAP-17
DEACTIVATION FURNACE
Unknown Site Type
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-18
LOAD LINE 12 WWT PLANT
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Mar 1997
Site ID: RVAAP-20
SAND CREEK STP
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-21
DEPOT STP
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-22
GEORGE RD STP
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-23
UNIT TRAINING EQUIPMENT SITE UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Nov 1989
Site ID: RVAAP-24
DEPOT AREA
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-25
BLD 1034 MOTOR POOL AST
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-26
FUZE BOOSTER AREA SETTLING TANKS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: RVAAP-27
BUILDING 854, PCB STORAGE
Storage Area
Cost
Unknown
Final Cleanup Action
Jun 1989
Site ID: RVAAP-30
LL 7 TREATMENT PLANT
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: RVAAP-012-R-01
LOAD LINE #12
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
May 2008
Site ID: RVAAP-13
BLDG 1200-DILUTION\SETTLING POND
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 2015
Site ID: RVAAP-35
1037 BUILDING-LAUNDRY WASTEWATER SUMP
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: RVAAP-36
PISTOL RANGE
Pistol Range
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: RVAAP-37
PESTICIDE BUILDING S-4452
Pesticide Shop
Cost
Unknown
Final Cleanup Action
Feb 1996
Site ID: RVAAP-32
40 MM FIRING RANGE
Firing Range
Cost
Unknown
Final Cleanup Action
Sep 2007
Site ID: RVAAP-49
CENTRAL BURN PITS
Burn Area
Cost
Unknown
Final Cleanup Action
Jul 2009
Site ID: RVAAP-47
BUILDING T-5301
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Sep 2001
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »