Cost So Far
$35.9M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$887K
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2050
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
82 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: see more » environmental covenants prohibit construction of buildings, unless the buildings do not have basements, and a barrier to the ground water is provided to prevent the intrusion of contaminated vapor « see less
5 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SS042
JET ENGINE TEST STAND, BLDG 896
Spill Site Area
Cost
$41K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2001
This site is under ongoing monitoring until Sep 2017
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Cadmium and compounds 0.068 ug/L Benzene, p-dichloro- 0.13 ug/L sec-Butylbenzene 0.15 ug/L Naphthalene 0.18 ug/L Benzene, methyl- 0.21 ug/L 1,1-Dichloroethylene 0.21 ug/L 1-Phenylpropane 0.23 ug/L Benzene 0.255 ug/L Cumene 0.32 ug/L Chloromethane (methyl chloride) 0.37 ug/L tert-Butylbenzene 0.42 ug/L 1,2-trans-dichloroethylene 0.645 ug/L Ethyl benzene 0.76 ug/L Ether,tert-butyl methyl 0.81 ug/L Methylene Chloride 3.1 ug/L Zinc 8.6 ug/L Acetone 8.9 ug/L 1,3-Dichlorobenzene 17.9 ug/L cis-1,2-Dichloroethylene 19.0 ug/L Trichloroethylene (TCE) 19.0 ug/L Vinyl Chloride 43.0 ug/L Arsenic 200.0 ug/L Manganese and compounds 1800.0 ug/L
Site ID: SS021
OIL CHANGE AREA
Underground Storage Tanks
Cost
$41K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2001
This site is under ongoing monitoring until Sep 2017
Site ID: SS001
FORMER HAZARDOUS WASTE STORAGE AREA
Spill Site Area
Cost
$111K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2001
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Hexachloroethane 0.184 ug/L Diethyl Phthalate 0.23 ug/L 1,2,4-Trimethylbenzene 0.23 ug/L Naphthalene 0.24 ug/L Benzene, p-dichloro- 0.247 ug/L 1,3,5-Trimethylbenzene 0.27 ug/L 1,3-Dichlorobenzene 0.272 ug/L tert-Butylbenzene 0.28 ug/L Cadmium and compounds 0.4 ug/L o-Xylene 0.43 ug/L n-Butylbenzene 0.44 ug/L Benzene, methyl- 0.495 ug/L Chloromethane (methyl chloride) 0.51 ug/L 1-Phenylpropane 0.755 ug/L 4-Cresol 0.992 ug/L Ethyl benzene 1.04 ug/L Dibutyl Phthalate 1.1 ug/L Butyl Benzyl Phthalate 1.1 ug/L 8,9-Benzofluoranthene 1.2 ug/L sec-Butylbenzene 1.35 ug/L 1,2-Dichlorobenzene 1.7 ug/L Bis(2-Ethylhexyl)Phthalate 1.8 ug/L Benzo(def)Phenanthrene 1.85 ug/L Anthracene 2.2 ug/L 1,1-Dichloroethane 3.0 ug/L 1,2-Benzacenaphthene 3.05 ug/L 4-Nitroaniline 3.2 ug/L Hexachlorocyclopentadiene 3.2 ug/L 1,1,1-Trichloroethane 3.5 ug/L Cumene 3.875 ug/L Benzoic Acid 5.03 ug/L Acenaphthene 5.15 ug/L Benzenol 5.4 ug/L Methyl Ethyl Ketone 5.89 ug/L Dibenzofuran 6.6 ug/L 2,4-Dinitrophenol 7.3 ug/L Fluorene 9.1 ug/L 1,2-Dichloroethane (EDC) 11.0 ug/L Chloroethane 11.0 ug/L Carbazole 11.0 ug/L 1,1-Dichloroethylene 12.0 ug/L Methylene Chloride 52.3 ug/L Acetone 68.0 ug/L N-Nitrosodimethylamine 87.0 ug/L Chloroform 110.0 ug/L Zinc 120.0 ug/L Benzene 145.0 ug/L Hexachlorobutadiene 150.0 ug/L Vinyl Chloride 212.5 ug/L 1,2-trans-dichloroethylene 1050.0 ug/L Manganese and compounds 1380.0 ug/L cis-1,2-Dichloroethylene 3250.0 ug/L Trichloroethylene (TCE) 6950.0 ug/L
Soil: Risk Not Evaluated
Contaminants: Benzene, methyl- 0.000648 mg/kg o-Xylene 0.000708 mg/kg Carbon Disulfide 0.00256 mg/kg Benzene 0.0035299999999999997 mg/kg Methyl Ethyl Ketone 0.0056 mg/kg Chloroethane 0.00561 mg/kg Vinyl Chloride 0.009425000000000001 mg/kg Acetone 0.01399 mg/kg Carbon Dichloride 0.01801 mg/kg Cumene 0.11900000000000001 mg/kg n-Butylbenzene 0.233 mg/kg Methylene Chloride 0.276 mg/kg 1,1-Dichloroethylene 0.30110000000000003 mg/kg Naphthalene 0.401 mg/kg sec-Butylbenzene 0.5760000000000001 mg/kg Dichloropropane 0.578 mg/kg Barium 1.1300000000000001 mg/kg 1,2-trans-dichloroethylene 1.361 mg/kg cis-1,2-Dichloroethylene 12.777965 mg/kg Trichloroethylene (TCE) 70.86300800000001 mg/kg
Site ID: CAT371P
PFC RESEARCH SITE
Fire/Crash Training Area
Cost
$352K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2021
Site ID: SS041
MULTI-CHAMBERED OIL/WATER SEPARATOR NORTH OF BLDG 848
Spill Site Area
Cost
$41K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2000
This site is under ongoing monitoring until Sep 2017
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: 1,2-Dibromo-3-Chloropropane 0.012 ug/L Cadmium and compounds 0.02 ug/L Ethenylbenzene 0.13 ug/L Benzene, p-dichloro- 0.13 ug/L Chloromethane (methyl chloride) 0.171 ug/L sec-Butylbenzene 0.2 ug/L Chloroethane 0.26 ug/L 1,1-Dichloroethane 0.26 ug/L Ether,tert-butyl methyl 0.32 ug/L 1,1-Dichloroethylene 0.325 ug/L 1,2-Dichloroethane (EDC) 0.33 ug/L tert-Butylbenzene 0.34 ug/L Naphthalene 0.38 ug/L Benzene 0.39 ug/L 1,3,5-Trimethylbenzene 0.42 ug/L Methylene Chloride 0.55 ug/L 1,2-trans-dichloroethylene 0.59 ug/L Chloroform 0.6 ug/L Ethyl benzene 0.66 ug/L Trichloroethylene (TCE) 0.66 ug/L n-Butylbenzene 0.69 ug/L 1,2,4-Trimethylbenzene 0.95 ug/L Carbon Dichloride 1.5 ug/L 1-Phenylpropane 1.6 ug/L cis-1,2-Dichloroethylene 1.9 ug/L Cumene 3.5 ug/L Acetone 4.1 ug/L Benzene, methyl- 7.1 ug/L o-Xylene 7.4 ug/L Zinc 8.8 ug/L Arsenic 9.2 ug/L 1,3-Dichlorobenzene 17.5 ug/L Vinyl Chloride 19.5 ug/L Manganese and compounds 1300.0 ug/L
77 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: CSA026
740 EQUIPMENT MAINTENANCE BLDG. 740
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2016
Site ID: CSA032
EBS SITE 26 FORMER COAL STORAGE AREAS
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2016
Site ID: CSA035
380 WATER TOWER, BLDG. 380
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2016
Site ID: CST012
EBS SITE 1 FORMER SEWAGE WATER TREATMENT PLANT
Sewage Treatment Plant
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2016
Site ID: CST014
600 ABANDONED SEWAGE TREATMENT WATER TREATMENT PLANT BLDG. 600
Sewage Treatment Plant
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2016
Site ID: CSA033
432 FORMER BUILDING 432
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Jun 2016
Site ID: SS043
TEST CELL, BLDG. 926
Spill Site Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2000
This site is under ongoing monitoring until Jun 2016
Contaminated Areas
Groundwater: Risk Not Evaluated
Contaminants: Chloromethane (methyl chloride) 0.35 ug/L Dichlorodifluoromethane 0.415 ug/L Benzene 0.52 ug/L Naphthalene 0.8 ug/L Cumene 1.0 ug/L 1-Phenylpropane 2.0 ug/L 1,3,5-Trimethylbenzene 2.0 ug/L 1,2,4-Trimethylbenzene 2.0 ug/L tert-Butylbenzene 2.0 ug/L Arsenic 2.9 ug/L Methylene Chloride 3.6 ug/L Acetone 8.6 ug/L Manganese and compounds 130.0 ug/L
Site ID: WP024
SEWAGE SLUDGE BEDS
Underground Storage Tanks
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Jun 2016
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Mercury (Inorganic) 0.14 mg/kg Silver and compounds 0.72 mg/kg Selenium 0.72 mg/kg Beryllium and compounds 0.89 mg/kg Cadmium and compounds 1.53 mg/kg Thallium 1.93 mg/kg Lead 18.3 mg/kg Chromium VI and compounds 18.6 mg/kg Arsenic 22.6 mg/kg Copper and compounds 29.6 mg/kg Nickel (Soluble Salts) 34.0 mg/kg Zinc 85.60000000000001 mg/kg
Site ID: FT023
FIRE TRAINING AREA
Surface Disposal Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Sep 2016
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Chlorobenzene 0.0006 mg/kg Methyl Ethyl Ketone 0.011 mg/kg Bis(2-Ethylhexyl)Phthalate 0.035 mg/kg Nickel (Soluble Salts) 0.053700000000000005 mg/kg Toluene 0.064 mg/kg Acetone 0.068 mg/kg Ethylbenzene 0.16 mg/kg Naphthalene 0.17 mg/kg Benzene 0.24 mg/kg Dibenz[ah]anthracene 0.27 mg/kg Cadmium and compounds 0.607 mg/kg Selenium 0.963 mg/kg Beryllium and compounds 1.03 mg/kg 1,4-Dichlorobenzene 1.1 mg/kg 1,2,4-Trichlorobenzene 1.2 mg/kg Xylene (Mixed) 1.2 mg/kg N-Nitrosodi-n-propylamine 1.4000000000000001 mg/kg Butyl Benzyl Phthalate 1.4000000000000001 mg/kg Thallium 1.83 mg/kg Indeno(1,2,3-cd)Pyrene 2.4 mg/kg Anthracene 2.6 mg/kg Benzo(k)Fluoranthene 2.7 mg/kg Benzo(b)Fluoranthene 3.0 mg/kg Benzo(a)Pyrene 3.4 mg/kg Chrysene 4.1 mg/kg Benzo(a)Anthracene 4.5 mg/kg Di-n-butyl phthalate 5.4 mg/kg Phenanthrene 5.8 mg/kg Pyrene 7.5 mg/kg Fluoranthene 10.0 mg/kg Chromium VI and compounds 24.6 mg/kg Arsenic 28.2 mg/kg Lead 33.4 mg/kg Copper and compounds 39.6 mg/kg Zinc 120.0 mg/kg
Site ID: SD025
STORM DRAIN DITCH SYSTEM (A, B, C, D)
Storm Drain
Cost
$42K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2001
This site is under ongoing monitoring until Sep 2017
Site ID: SS002
JP-4, BULK STORAGE TANK
Spill Site Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2000
This site is under ongoing monitoring until Jun 2016
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Xylene (Mixed) 0.00076 mg/kg Acetone 0.0086 mg/kg Lead 16.9 mg/kg
Site ID: SS007
TRANSMITTER OIL TANK
Spill Site Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1997
This site is under ongoing monitoring until Jun 2016
Site ID: SS009
SALVAGE YARD BLDG 906
POL (Petroleum/Oil/Lubricants) Lines
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Jun 2016
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Zinc 0.0616 mg/kg DDD 0.089 mg/kg Naphthalene 0.097 mg/kg DDE 0.12 mg/kg DDT 0.14 mg/kg Methylnaphthalene,2- 0.25 mg/kg Cadmium and compounds 0.64 mg/kg Chrysene 0.75 mg/kg Selenium 0.8300000000000001 mg/kg Fluorene 0.89 mg/kg Acenaphthene 1.2 mg/kg Anthracene 1.3 mg/kg Beryllium and compounds 2.3000000000000003 mg/kg Indeno(1,2,3-cd)Pyrene 2.5 mg/kg Benzo(k)Fluoranthene 5.2 mg/kg Phenanthrene 6.3 mg/kg Benzo(b)Fluoranthene 6.8 mg/kg Benzo(a)Pyrene 9.700000000000001 mg/kg Benzo(a)Anthracene 10.0 mg/kg Pyrene 11.0 mg/kg Chromium VI and compounds 13.6 mg/kg Fluoranthene 14.0 mg/kg Nickel (Soluble Salts) 20.6 mg/kg Arsenic 23.400000000000002 mg/kg Copper and compounds 24.900000000000002 mg/kg Lead 29.900000000000002 mg/kg
Site ID: SS010
JP-4 FUEL LINE RUPTURE
POL (Petroleum/Oil/Lubricants) Lines
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1997
This site is under ongoing monitoring until Jun 2016
Site ID: SS017
OLD ENTOMOLOGY LAB
Spill Site Area
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Nov 2014
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Chlordane 0.0038 mg/kg DDE 0.053 mg/kg DDD 0.056 mg/kg DDT 0.066 mg/kg
Site ID: SS046
FACILITIES (PUMPHOUSES) 898/899
Underground Storage Tanks
Cost
$111K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2000
This site is under ongoing monitoring until Sep 2018
Site ID: SD027
DRAINAGE DITCH NEAR LANDFILL
Surface Disposal Area
Cost
$42K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2001
This site is under ongoing monitoring until Sep 2017
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Contaminants: Cadmium and compounds 0.000507 mg/kg Endosulfan 0.0019 mg/kg Methylene Chloride 0.011 mg/kg Di-n-Octyl Phthalate 0.019 mg/kg Fluorene 0.035 mg/kg Acenaphthene 0.037 mg/kg Anthracene 0.08700000000000001 mg/kg Mercury (Inorganic) 0.13 mg/kg Dibenz[ah]anthracene 0.16 mg/kg Butyl Benzyl Phthalate 0.2 mg/kg Benzo(k)Fluoranthene 0.29 mg/kg Benzo(a)Anthracene 0.37 mg/kg Silver and compounds 0.397 mg/kg Indeno(1,2,3-cd)Pyrene 0.54 mg/kg Phenanthrene 0.54 mg/kg Beryllium and compounds 0.646 mg/kg Benzo(a)Pyrene 0.73 mg/kg Chrysene 0.81 mg/kg Pyrene 1.0 mg/kg Selenium 1.18 mg/kg Thallium 1.37 mg/kg Benzo(b)Fluoranthene 1.4000000000000001 mg/kg Fluoranthene 1.4000000000000001 mg/kg Di-n-butyl phthalate 2.2 mg/kg Chromium VI and compounds 9.77 mg/kg Lead 13.1 mg/kg Arsenic 15.700000000000001 mg/kg Copper and compounds 24.2 mg/kg Nickel (Soluble Salts) 25.6 mg/kg Zinc 67.4 mg/kg
Site ID: CSA029
422 BLDG. 422 BCE MAINTENANCE SHOP
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: SS014
KC-135 CRASH SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 1997
This site is under ongoing monitoring until Sep 2014
Site ID: ST029
EIGHT 50,000 GALLON, ONE 25,000 GALLON AND ONE 6,000 GALLON UNDERGROUND STORAGE TANKSS
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: CSA017
711 PAINT STORAGE BLDG. 711
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1997
This site is under ongoing monitoring until Sep 2016
Site ID: CRW013
553 AIRCRAFT WASH RACK (FUELS ADMINISTRATION TRAILER – FORMERLY
Washrack
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Nov 2014
Site ID: CSA027
409 BLDG. 409 STORAGE FACILITY
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CSA036
597 FUEL CELL HANGAR BLDG. 597
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: SD020
SOUTH COAL PILE
Storm Drain
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1998
This site is under ongoing monitoring until Jun 2016
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Contaminants: Diethyl Phthalate 0.021 mg/kg Butyl Benzyl Phthalate 0.052000000000000005 mg/kg Mercury (Inorganic) 0.36 mg/kg Di-n-butyl phthalate 0.77 mg/kg Naphthalene 0.9400000000000001 mg/kg Acenaphthene 1.8 mg/kg Beryllium and compounds 2.3000000000000003 mg/kg Methylnaphthalene,2- 2.4 mg/kg Fluorene 3.2 mg/kg Dibenz[ah]anthracene 4.4 mg/kg Anthracene 7.0 mg/kg Selenium 7.88 mg/kg Indeno(1,2,3-cd)Pyrene 11.0 mg/kg Cadmium and compounds 13.200000000000001 mg/kg Benzo(b)Fluoranthene 16.0 mg/kg Chrysene 19.0 mg/kg Benzo(a)Pyrene 19.0 mg/kg Benzo(a)Anthracene 19.0 mg/kg Benzo(k)Fluoranthene 26.0 mg/kg Phenanthrene 29.0 mg/kg Pyrene 33.0 mg/kg Fluoranthene 38.0 mg/kg Chromium VI and compounds 39.0 mg/kg Nickel (Soluble Salts) 54.0 mg/kg Silver and compounds 55.9 mg/kg Copper and compounds 99.0 mg/kg Arsenic 150.0 mg/kg Lead 184.0 mg/kg Zinc 332.0 mg/kg
Soil: Risk Not Evaluated
Contaminants: Selenium 0.00079 mg/kg Diethyl Phthalate 0.022 mg/kg Butyl Benzyl Phthalate 0.028 mg/kg Indeno(1,2,3-cd)Pyrene 0.051000000000000004 mg/kg Benzo(a)Anthracene 0.07200000000000001 mg/kg Benzo(a)Pyrene 0.082 mg/kg Benzo(b)Fluoranthene 0.089 mg/kg Benzo(k)Fluoranthene 0.1 mg/kg Chrysene 0.1 mg/kg Phenanthrene 0.1 mg/kg Pyrene 0.15 mg/kg Fluoranthene 0.18 mg/kg Bis(2-Ethylhexyl)Phthalate 0.31 mg/kg Silver and compounds 0.35000000000000003 mg/kg Beryllium and compounds 0.6900000000000001 mg/kg Thallium 1.1 mg/kg Antimony and compounds 3.6 mg/kg Arsenic 10.200000000000001 mg/kg Chromium VI and compounds 15.1 mg/kg Copper and compounds 16.0 mg/kg Nickel (Soluble Salts) 16.3 mg/kg Lead 22.0 mg/kg Zinc 56.300000000000004 mg/kg
Site ID: SS004
SPILL AT POL PUMPHOUSE 5
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: SS008
PAINT DUMP LOCATION
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: SS018
PESTICIDE STORAGE BLDG 412
Pesticide Shop
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2016
Site ID: ST034
5,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 848
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: ST038
FOUR 50,000 GALLON, ONE 25,000 GALLON, AND ONE 6,000 GALLON UNDERGROUND STORAGE TANKSS
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: CSA023
709 MUNITIONS BUILDUP, BLDG. 709
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CSA024
710 MISSILE MAINTENANCE, BLDG. 710
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CSA025
739 MUNITIONS STORAGE, BLDG. 739
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CCB015
1034 ELECTRIC SUBSTATION BLDG. 1034
Contaminated Buildings
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Jun 2016
Site ID: CSA031
435 BLDG. 435 ELECTRIC SUBSTATION
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CST022
702 PACKAGE SEWAGE TREATMENT PLAN BLDG. 702
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: SD045
ABANDONED GAS STATION (TU045)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1997
Site ID: CSA034
557 BUILDING 557 FLIGHT LINE STORAGE
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CST028
413 BLDG. 413 WATER TREATMENT PLANT
Sewage Treatment Plant
Cost
Unknown
Final Cleanup Action
Aug 1996
Site ID: CSA030
423 BLDG. 423 STORAGE FACILITY
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Jun 2016
Site ID: SD019
NORTH COAL PILE
Storm Drain
Cost
Unknown
Final Cleanup Action
Sep 1998
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Contaminants: Di-n-Octyl Phthalate 0.034 mg/kg Fluorene 0.18 mg/kg 2,6-Dinitrotoluene 0.19 mg/kg Acenaphthene 0.2 mg/kg N-Nitrosodiphenylamine 0.28 mg/kg Anthracene 0.48 mg/kg Dibenz[ah]anthracene 0.54 mg/kg Naphthalene 0.54 mg/kg Mercury (Inorganic) 0.58 mg/kg Butyl Benzyl Phthalate 0.71 mg/kg Indeno(1,2,3-cd)Pyrene 1.3 mg/kg Methylnaphthalene,2- 1.3 mg/kg Beryllium and compounds 2.1 mg/kg Benzo(a)Anthracene 2.3000000000000003 mg/kg Chrysene 2.5 mg/kg Phenanthrene 2.8000000000000003 mg/kg Benzo(a)Pyrene 2.9 mg/kg Benzo(k)Fluoranthene 3.0 mg/kg Benzo(b)Fluoranthene 4.0 mg/kg Fluoranthene 5.0 mg/kg Pyrene 5.3 mg/kg Selenium 10.3 mg/kg Chromium VI and compounds 18.0 mg/kg Arsenic 29.1 mg/kg Cadmium and compounds 30.900000000000002 mg/kg Copper and compounds 37.7 mg/kg Nickel (Soluble Salts) 45.6 mg/kg Lead 48.6 mg/kg Zinc 120.0 mg/kg
Soil: Risk Not Evaluated
Contaminants: Beryllium and compounds 0.00136 mg/kg Di-n-Octyl Phthalate 0.034 mg/kg Anthracene 0.085 mg/kg Fluorene 0.18 mg/kg 2,6-Dinitrotoluene 0.19 mg/kg Acenaphthene 0.2 mg/kg N-Nitrosodiphenylamine 0.28 mg/kg Dibenz[ah]anthracene 0.54 mg/kg Naphthalene 0.54 mg/kg Mercury (Inorganic) 0.58 mg/kg Phenanthrene 0.59 mg/kg Butyl Benzyl Phthalate 0.71 mg/kg Cadmium and compounds 1.2 mg/kg Indeno(1,2,3-cd)Pyrene 1.3 mg/kg Selenium 2.15 mg/kg Benzo(a)Anthracene 2.3000000000000003 mg/kg Chrysene 2.5 mg/kg Benzo(a)Pyrene 2.9 mg/kg Benzo(k)Fluoranthene 3.0 mg/kg Benzo(b)Fluoranthene 4.0 mg/kg Fluoranthene 5.0 mg/kg Pyrene 5.3 mg/kg Chromium VI and compounds 18.0 mg/kg Arsenic 29.1 mg/kg Copper and compounds 37.5 mg/kg Nickel (Soluble Salts) 45.6 mg/kg Lead 48.6 mg/kg Zinc 89.4 mg/kg
Site ID: CTA005
824 JET FUEL STORAGE TANK
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTA006
825 JET FUEL STORAGE TANK
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTA007
826 JET FUEL STORAGE TANK
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTA008
827 JET FUEL STORAGE TANK
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTA010
829 JET FUEL STORAGE TANK
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTU001
430 EXCHANGE SERVICE STN.
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTU003
430 EXCHANGE SERVICE STN.
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTU004
430 EXCHANGE SERVICE STN.
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CTU011
830 PUMP STATION FOR JET FUEL
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: SS005
LATERAL SAFETY ZONE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1997
This site is under ongoing monitoring until Sep 2014
Site ID: SS016
FUEL DUMP NE END OF RUNWAY
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1997
This site is under ongoing monitoring until Sep 2014
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: p-Xylene 0.00064 mg/kg m-Xylene 0.00064 mg/kg Toluene 0.004 mg/kg Lead 25.2 mg/kg
Site ID: SS022
STORAGE PAD HOT SPOT REMOVAL
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1997
Site ID: SS026
ELECTRICAL TRANSFORMER STORAGE
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1997
This site is under ongoing monitoring until Jul 2012
Site ID: SS039
FUEL DUMP SW END OF OLD RUNWAY
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2014
Site ID: SS040
FUEL DUMP NE END OF OLD RUNWAY
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Sep 2014
Site ID: ST028
29 UNDERGROUND STORAGE TANKSS AT MULTIPLE LOCATIONS
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2000
This site is under ongoing monitoring until Jul 2003
Site ID: ST030
300 GALLON UNDERGROUND STORAGE TANKS AT BLDG 1093
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: ST031
8,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 846
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: ST032
15,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 846
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: ST033
8,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 846
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: ST035
940 GALLON UNDERGROUND STORAGE TANKS AT BLDG 877
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: ST036
15,000 GALLON HEATING OIL UNDERGROUND STORAGE TANKS AT BLDG 932
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1998
Site ID: SS003
SPILL AT POL PUMPHOUSE 4
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: SS006
BASE FILLING STATION
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 1997
Site ID: SS011
JP-4 FUEL LINE RUPTURE AT BLDG 844
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1998
Site ID: SS012
OLD DRUM STORAGE AREA (ANG AREA)
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2001
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Xylene (Mixed) 0.0015 mg/kg Toluene 0.0022 mg/kg Tetrachloroethylene 0.0028 mg/kg Trichloroethylene (TCE) 0.0038 mg/kg Selenium 0.561 mg/kg Beryllium and compounds 0.741 mg/kg Silver and compounds 0.745 mg/kg Cadmium and compounds 0.848 mg/kg Thallium 1.6300000000000001 mg/kg Chromium VI and compounds 21.1 mg/kg Lead 30.3 mg/kg Arsenic 32.6 mg/kg Copper and compounds 37.0 mg/kg Nickel (Soluble Salts) 70.4 mg/kg Zinc 105.0 mg/kg
Site ID: SS013
RB47 CRASH SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 1997
This site is under ongoing monitoring until Sep 2014
Site ID: SS015
FUEL DUMP SW END OF RUNWAY
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1997
This site is under ongoing monitoring until Sep 2014
Contaminated Areas
Soil: Risk Not Evaluated
Contaminants: Lead 16.7 mg/kg
Site ID: ST037
800 GALLON UNDERGROUND STORAGE TANKS AT BLDG 944
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Aug 1998
Site ID: CTA009
828 JET FUEL STORAGE TANK
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CCB016
701 ELECTRIC SUBSTATION BLDG. 701
Contaminated Buildings
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 1996
This site is under ongoing monitoring until Jun 2016
Site ID: CTU002
430 EXCHANGE SERVICE STN.
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Mar 2000
Site ID: CDD021
MUNITIONS DITCH STORM DRAINAGE DITCH
Drainage Ditch
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2001
This site is under ongoing monitoring until Sep 2016
Site ID: CSA018
439 BLDG. 439 PAINT STORAGE
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1997
This site is under ongoing monitoring until Sep 2016
Site ID: CSA019
550 BLDG. 550 HEAVY EQUIPMENT STORAGE
Storage Area
Cost
$13K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1997
This site is under ongoing monitoring until Jun 2016
Site ID: CSA020
800 CONSOLIDATED CLUB COMPLEX, BLDG. 800
Storage Area
Cost
$6,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 1997
This site is under ongoing monitoring until Nov 2014
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »