Cost So Far

$35.9M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$887K

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2050

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

82 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: see more » environmental covenants prohibit construction of buildings, unless the buildings do not have basements, and a barrier to the ground water is provided to prevent the intrusion of contaminated vapor « see less

5 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SS042

JET ENGINE TEST STAND, BLDG 896

Spill Site Area

Cost

$41K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2001

This site is under ongoing monitoring until Sep 2017

Contaminated Areas

Groundwater: Risk Not Evaluated

Contaminants: Cadmium and compounds 0.068 ug/L Benzene, p-dichloro- 0.13 ug/L sec-Butylbenzene 0.15 ug/L Naphthalene 0.18 ug/L Benzene, methyl- 0.21 ug/L 1,1-Dichloroethylene 0.21 ug/L 1-Phenylpropane 0.23 ug/L Benzene 0.255 ug/L Cumene 0.32 ug/L Chloromethane (methyl chloride) 0.37 ug/L tert-Butylbenzene 0.42 ug/L 1,2-trans-dichloroethylene 0.645 ug/L Ethyl benzene 0.76 ug/L Ether,tert-butyl methyl 0.81 ug/L Methylene Chloride 3.1 ug/L Zinc 8.6 ug/L Acetone 8.9 ug/L 1,3-Dichlorobenzene 17.9 ug/L cis-1,2-Dichloroethylene 19.0 ug/L Trichloroethylene (TCE) 19.0 ug/L Vinyl Chloride 43.0 ug/L Arsenic 200.0 ug/L Manganese and compounds 1800.0 ug/L

See more details...

Site ID: SS021

OIL CHANGE AREA

Underground Storage Tanks

Cost

$41K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2001

This site is under ongoing monitoring until Sep 2017

Site ID: SS001

FORMER HAZARDOUS WASTE STORAGE AREA

Spill Site Area

Cost

$111K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2001

Contaminated Areas

Groundwater: Risk Not Evaluated

Contaminants: Hexachloroethane 0.184 ug/L Diethyl Phthalate 0.23 ug/L 1,2,4-Trimethylbenzene 0.23 ug/L Naphthalene 0.24 ug/L Benzene, p-dichloro- 0.247 ug/L 1,3,5-Trimethylbenzene 0.27 ug/L 1,3-Dichlorobenzene 0.272 ug/L tert-Butylbenzene 0.28 ug/L Cadmium and compounds 0.4 ug/L o-Xylene 0.43 ug/L n-Butylbenzene 0.44 ug/L Benzene, methyl- 0.495 ug/L Chloromethane (methyl chloride) 0.51 ug/L 1-Phenylpropane 0.755 ug/L 4-Cresol 0.992 ug/L Ethyl benzene 1.04 ug/L Dibutyl Phthalate 1.1 ug/L Butyl Benzyl Phthalate 1.1 ug/L 8,9-Benzofluoranthene 1.2 ug/L sec-Butylbenzene 1.35 ug/L 1,2-Dichlorobenzene 1.7 ug/L Bis(2-Ethylhexyl)Phthalate 1.8 ug/L Benzo(def)Phenanthrene 1.85 ug/L Anthracene 2.2 ug/L 1,1-Dichloroethane 3.0 ug/L 1,2-Benzacenaphthene 3.05 ug/L 4-Nitroaniline 3.2 ug/L Hexachlorocyclopentadiene 3.2 ug/L 1,1,1-Trichloroethane 3.5 ug/L Cumene 3.875 ug/L Benzoic Acid 5.03 ug/L Acenaphthene 5.15 ug/L Benzenol 5.4 ug/L Methyl Ethyl Ketone 5.89 ug/L Dibenzofuran 6.6 ug/L 2,4-Dinitrophenol 7.3 ug/L Fluorene 9.1 ug/L 1,2-Dichloroethane (EDC) 11.0 ug/L Chloroethane 11.0 ug/L Carbazole 11.0 ug/L 1,1-Dichloroethylene 12.0 ug/L Methylene Chloride 52.3 ug/L Acetone 68.0 ug/L N-Nitrosodimethylamine 87.0 ug/L Chloroform 110.0 ug/L Zinc 120.0 ug/L Benzene 145.0 ug/L Hexachlorobutadiene 150.0 ug/L Vinyl Chloride 212.5 ug/L 1,2-trans-dichloroethylene 1050.0 ug/L Manganese and compounds 1380.0 ug/L cis-1,2-Dichloroethylene 3250.0 ug/L Trichloroethylene (TCE) 6950.0 ug/L

Soil: Risk Not Evaluated

Contaminants: Benzene, methyl- 0.000648 mg/kg o-Xylene 0.000708 mg/kg Carbon Disulfide 0.00256 mg/kg Benzene 0.0035299999999999997 mg/kg Methyl Ethyl Ketone 0.0056 mg/kg Chloroethane 0.00561 mg/kg Vinyl Chloride 0.009425000000000001 mg/kg Acetone 0.01399 mg/kg Carbon Dichloride 0.01801 mg/kg Cumene 0.11900000000000001 mg/kg n-Butylbenzene 0.233 mg/kg Methylene Chloride 0.276 mg/kg 1,1-Dichloroethylene 0.30110000000000003 mg/kg Naphthalene 0.401 mg/kg sec-Butylbenzene 0.5760000000000001 mg/kg Dichloropropane 0.578 mg/kg Barium 1.1300000000000001 mg/kg 1,2-trans-dichloroethylene 1.361 mg/kg cis-1,2-Dichloroethylene 12.777965 mg/kg Trichloroethylene (TCE) 70.86300800000001 mg/kg

See more details...

Site ID: CAT371P

PFC RESEARCH SITE

Fire/Crash Training Area

Cost

$352K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2021

Site ID: SS041

MULTI-CHAMBERED OIL/WATER SEPARATOR NORTH OF BLDG 848

Spill Site Area

Cost

$41K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2000

This site is under ongoing monitoring until Sep 2017

Contaminated Areas

Groundwater: Risk Not Evaluated

Contaminants: 1,2-Dibromo-3-Chloropropane 0.012 ug/L Cadmium and compounds 0.02 ug/L Ethenylbenzene 0.13 ug/L Benzene, p-dichloro- 0.13 ug/L Chloromethane (methyl chloride) 0.171 ug/L sec-Butylbenzene 0.2 ug/L Chloroethane 0.26 ug/L 1,1-Dichloroethane 0.26 ug/L Ether,tert-butyl methyl 0.32 ug/L 1,1-Dichloroethylene 0.325 ug/L 1,2-Dichloroethane (EDC) 0.33 ug/L tert-Butylbenzene 0.34 ug/L Naphthalene 0.38 ug/L Benzene 0.39 ug/L 1,3,5-Trimethylbenzene 0.42 ug/L Methylene Chloride 0.55 ug/L 1,2-trans-dichloroethylene 0.59 ug/L Chloroform 0.6 ug/L Ethyl benzene 0.66 ug/L Trichloroethylene (TCE) 0.66 ug/L n-Butylbenzene 0.69 ug/L 1,2,4-Trimethylbenzene 0.95 ug/L Carbon Dichloride 1.5 ug/L 1-Phenylpropane 1.6 ug/L cis-1,2-Dichloroethylene 1.9 ug/L Cumene 3.5 ug/L Acetone 4.1 ug/L Benzene, methyl- 7.1 ug/L o-Xylene 7.4 ug/L Zinc 8.8 ug/L Arsenic 9.2 ug/L 1,3-Dichlorobenzene 17.5 ug/L Vinyl Chloride 19.5 ug/L Manganese and compounds 1300.0 ug/L

See more details...

77 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: CSA026

740 EQUIPMENT MAINTENANCE BLDG. 740

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2016

Site ID: CSA032

EBS SITE 26 FORMER COAL STORAGE AREAS

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2016

Site ID: CSA035

380 WATER TOWER, BLDG. 380

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2016

Site ID: CST012

EBS SITE 1 FORMER SEWAGE WATER TREATMENT PLANT

Sewage Treatment Plant

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2016

Site ID: CST014

600 ABANDONED SEWAGE TREATMENT WATER TREATMENT PLANT BLDG. 600

Sewage Treatment Plant

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2016

Site ID: CSA033

432 FORMER BUILDING 432

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Jun 2016

Site ID: SS043

TEST CELL, BLDG. 926

Spill Site Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2000

This site is under ongoing monitoring until Jun 2016

Contaminated Areas

Groundwater: Risk Not Evaluated

Contaminants: Chloromethane (methyl chloride) 0.35 ug/L Dichlorodifluoromethane 0.415 ug/L Benzene 0.52 ug/L Naphthalene 0.8 ug/L Cumene 1.0 ug/L 1-Phenylpropane 2.0 ug/L 1,3,5-Trimethylbenzene 2.0 ug/L 1,2,4-Trimethylbenzene 2.0 ug/L tert-Butylbenzene 2.0 ug/L Arsenic 2.9 ug/L Methylene Chloride 3.6 ug/L Acetone 8.6 ug/L Manganese and compounds 130.0 ug/L

See more details...

Site ID: WP024

SEWAGE SLUDGE BEDS

Underground Storage Tanks

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1998

This site is under ongoing monitoring until Jun 2016

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: Mercury (Inorganic) 0.14 mg/kg Silver and compounds 0.72 mg/kg Selenium 0.72 mg/kg Beryllium and compounds 0.89 mg/kg Cadmium and compounds 1.53 mg/kg Thallium 1.93 mg/kg Lead 18.3 mg/kg Chromium VI and compounds 18.6 mg/kg Arsenic 22.6 mg/kg Copper and compounds 29.6 mg/kg Nickel (Soluble Salts) 34.0 mg/kg Zinc 85.60000000000001 mg/kg

See more details...

Site ID: FT023

FIRE TRAINING AREA

Surface Disposal Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1998

This site is under ongoing monitoring until Sep 2016

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: Chlorobenzene 0.0006 mg/kg Methyl Ethyl Ketone 0.011 mg/kg Bis(2-Ethylhexyl)Phthalate 0.035 mg/kg Nickel (Soluble Salts) 0.053700000000000005 mg/kg Toluene 0.064 mg/kg Acetone 0.068 mg/kg Ethylbenzene 0.16 mg/kg Naphthalene 0.17 mg/kg Benzene 0.24 mg/kg Dibenz[ah]anthracene 0.27 mg/kg Cadmium and compounds 0.607 mg/kg Selenium 0.963 mg/kg Beryllium and compounds 1.03 mg/kg 1,4-Dichlorobenzene 1.1 mg/kg 1,2,4-Trichlorobenzene 1.2 mg/kg Xylene (Mixed) 1.2 mg/kg N-Nitrosodi-n-propylamine 1.4000000000000001 mg/kg Butyl Benzyl Phthalate 1.4000000000000001 mg/kg Thallium 1.83 mg/kg Indeno(1,2,3-cd)Pyrene 2.4 mg/kg Anthracene 2.6 mg/kg Benzo(k)Fluoranthene 2.7 mg/kg Benzo(b)Fluoranthene 3.0 mg/kg Benzo(a)Pyrene 3.4 mg/kg Chrysene 4.1 mg/kg Benzo(a)Anthracene 4.5 mg/kg Di-n-butyl phthalate 5.4 mg/kg Phenanthrene 5.8 mg/kg Pyrene 7.5 mg/kg Fluoranthene 10.0 mg/kg Chromium VI and compounds 24.6 mg/kg Arsenic 28.2 mg/kg Lead 33.4 mg/kg Copper and compounds 39.6 mg/kg Zinc 120.0 mg/kg

See more details...

Site ID: SD025

STORM DRAIN DITCH SYSTEM (A, B, C, D)

Storm Drain

Cost

$42K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2001

This site is under ongoing monitoring until Sep 2017

Site ID: SS002

JP-4, BULK STORAGE TANK

Spill Site Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2000

This site is under ongoing monitoring until Jun 2016

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: Xylene (Mixed) 0.00076 mg/kg Acetone 0.0086 mg/kg Lead 16.9 mg/kg

See more details...

Site ID: SS007

TRANSMITTER OIL TANK

Spill Site Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1997

This site is under ongoing monitoring until Jun 2016

Site ID: SS009

SALVAGE YARD BLDG 906

POL (Petroleum/Oil/Lubricants) Lines

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1998

This site is under ongoing monitoring until Jun 2016

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: Zinc 0.0616 mg/kg DDD 0.089 mg/kg Naphthalene 0.097 mg/kg DDE 0.12 mg/kg DDT 0.14 mg/kg Methylnaphthalene,2- 0.25 mg/kg Cadmium and compounds 0.64 mg/kg Chrysene 0.75 mg/kg Selenium 0.8300000000000001 mg/kg Fluorene 0.89 mg/kg Acenaphthene 1.2 mg/kg Anthracene 1.3 mg/kg Beryllium and compounds 2.3000000000000003 mg/kg Indeno(1,2,3-cd)Pyrene 2.5 mg/kg Benzo(k)Fluoranthene 5.2 mg/kg Phenanthrene 6.3 mg/kg Benzo(b)Fluoranthene 6.8 mg/kg Benzo(a)Pyrene 9.700000000000001 mg/kg Benzo(a)Anthracene 10.0 mg/kg Pyrene 11.0 mg/kg Chromium VI and compounds 13.6 mg/kg Fluoranthene 14.0 mg/kg Nickel (Soluble Salts) 20.6 mg/kg Arsenic 23.400000000000002 mg/kg Copper and compounds 24.900000000000002 mg/kg Lead 29.900000000000002 mg/kg

See more details...

Site ID: SS010

JP-4 FUEL LINE RUPTURE

POL (Petroleum/Oil/Lubricants) Lines

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1997

This site is under ongoing monitoring until Jun 2016

Site ID: SS017

OLD ENTOMOLOGY LAB

Spill Site Area

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1998

This site is under ongoing monitoring until Nov 2014

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: Chlordane 0.0038 mg/kg DDE 0.053 mg/kg DDD 0.056 mg/kg DDT 0.066 mg/kg

See more details...

Site ID: SS046

FACILITIES (PUMPHOUSES) 898/899

Underground Storage Tanks

Cost

$111K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2000

This site is under ongoing monitoring until Sep 2018

Site ID: SD027

DRAINAGE DITCH NEAR LANDFILL

Surface Disposal Area

Cost

$42K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2001

This site is under ongoing monitoring until Sep 2017

Contaminated Areas

Sediment (Human): Risk Not Evaluated

Contaminants: Cadmium and compounds 0.000507 mg/kg Endosulfan 0.0019 mg/kg Methylene Chloride 0.011 mg/kg Di-n-Octyl Phthalate 0.019 mg/kg Fluorene 0.035 mg/kg Acenaphthene 0.037 mg/kg Anthracene 0.08700000000000001 mg/kg Mercury (Inorganic) 0.13 mg/kg Dibenz[ah]anthracene 0.16 mg/kg Butyl Benzyl Phthalate 0.2 mg/kg Benzo(k)Fluoranthene 0.29 mg/kg Benzo(a)Anthracene 0.37 mg/kg Silver and compounds 0.397 mg/kg Indeno(1,2,3-cd)Pyrene 0.54 mg/kg Phenanthrene 0.54 mg/kg Beryllium and compounds 0.646 mg/kg Benzo(a)Pyrene 0.73 mg/kg Chrysene 0.81 mg/kg Pyrene 1.0 mg/kg Selenium 1.18 mg/kg Thallium 1.37 mg/kg Benzo(b)Fluoranthene 1.4000000000000001 mg/kg Fluoranthene 1.4000000000000001 mg/kg Di-n-butyl phthalate 2.2 mg/kg Chromium VI and compounds 9.77 mg/kg Lead 13.1 mg/kg Arsenic 15.700000000000001 mg/kg Copper and compounds 24.2 mg/kg Nickel (Soluble Salts) 25.6 mg/kg Zinc 67.4 mg/kg

See more details...

Site ID: CSA029

422 BLDG. 422 BCE MAINTENANCE SHOP

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: SS014

KC-135 CRASH SITE

Spill Site Area

Cost

Unknown

Final Cleanup Action

Aug 1997

This site is under ongoing monitoring until Sep 2014

Site ID: ST029

EIGHT 50,000 GALLON, ONE 25,000 GALLON AND ONE 6,000 GALLON UNDERGROUND STORAGE TANKSS

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: CSA017

711 PAINT STORAGE BLDG. 711

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1997

This site is under ongoing monitoring until Sep 2016

Site ID: CRW013

553 AIRCRAFT WASH RACK (FUELS ADMINISTRATION TRAILER – FORMERLY

Washrack

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1998

This site is under ongoing monitoring until Nov 2014

Site ID: CSA027

409 BLDG. 409 STORAGE FACILITY

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: CSA036

597 FUEL CELL HANGAR BLDG. 597

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: SD020

SOUTH COAL PILE

Storm Drain

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1998

This site is under ongoing monitoring until Jun 2016

Contaminated Areas

Sediment (Human): Risk Not Evaluated

Contaminants: Diethyl Phthalate 0.021 mg/kg Butyl Benzyl Phthalate 0.052000000000000005 mg/kg Mercury (Inorganic) 0.36 mg/kg Di-n-butyl phthalate 0.77 mg/kg Naphthalene 0.9400000000000001 mg/kg Acenaphthene 1.8 mg/kg Beryllium and compounds 2.3000000000000003 mg/kg Methylnaphthalene,2- 2.4 mg/kg Fluorene 3.2 mg/kg Dibenz[ah]anthracene 4.4 mg/kg Anthracene 7.0 mg/kg Selenium 7.88 mg/kg Indeno(1,2,3-cd)Pyrene 11.0 mg/kg Cadmium and compounds 13.200000000000001 mg/kg Benzo(b)Fluoranthene 16.0 mg/kg Chrysene 19.0 mg/kg Benzo(a)Pyrene 19.0 mg/kg Benzo(a)Anthracene 19.0 mg/kg Benzo(k)Fluoranthene 26.0 mg/kg Phenanthrene 29.0 mg/kg Pyrene 33.0 mg/kg Fluoranthene 38.0 mg/kg Chromium VI and compounds 39.0 mg/kg Nickel (Soluble Salts) 54.0 mg/kg Silver and compounds 55.9 mg/kg Copper and compounds 99.0 mg/kg Arsenic 150.0 mg/kg Lead 184.0 mg/kg Zinc 332.0 mg/kg

Soil: Risk Not Evaluated

Contaminants: Selenium 0.00079 mg/kg Diethyl Phthalate 0.022 mg/kg Butyl Benzyl Phthalate 0.028 mg/kg Indeno(1,2,3-cd)Pyrene 0.051000000000000004 mg/kg Benzo(a)Anthracene 0.07200000000000001 mg/kg Benzo(a)Pyrene 0.082 mg/kg Benzo(b)Fluoranthene 0.089 mg/kg Benzo(k)Fluoranthene 0.1 mg/kg Chrysene 0.1 mg/kg Phenanthrene 0.1 mg/kg Pyrene 0.15 mg/kg Fluoranthene 0.18 mg/kg Bis(2-Ethylhexyl)Phthalate 0.31 mg/kg Silver and compounds 0.35000000000000003 mg/kg Beryllium and compounds 0.6900000000000001 mg/kg Thallium 1.1 mg/kg Antimony and compounds 3.6 mg/kg Arsenic 10.200000000000001 mg/kg Chromium VI and compounds 15.1 mg/kg Copper and compounds 16.0 mg/kg Nickel (Soluble Salts) 16.3 mg/kg Lead 22.0 mg/kg Zinc 56.300000000000004 mg/kg

See more details...

Site ID: SS004

SPILL AT POL PUMPHOUSE 5

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: SS008

PAINT DUMP LOCATION

Spill Site Area

Cost

Unknown

Final Cleanup Action

Mar 1996

Site ID: SS018

PESTICIDE STORAGE BLDG 412

Pesticide Shop

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2016

Site ID: ST034

5,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 848

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1996

Site ID: ST038

FOUR 50,000 GALLON, ONE 25,000 GALLON, AND ONE 6,000 GALLON UNDERGROUND STORAGE TANKSS

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: CSA023

709 MUNITIONS BUILDUP, BLDG. 709

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: CSA024

710 MISSILE MAINTENANCE, BLDG. 710

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: CSA025

739 MUNITIONS STORAGE, BLDG. 739

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: CCB015

1034 ELECTRIC SUBSTATION BLDG. 1034

Contaminated Buildings

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Jun 2016

Site ID: CSA031

435 BLDG. 435 ELECTRIC SUBSTATION

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: CST022

702 PACKAGE SEWAGE TREATMENT PLAN BLDG. 702

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: SD045

ABANDONED GAS STATION (TU045)

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1997

Site ID: CSA034

557 BUILDING 557 FLIGHT LINE STORAGE

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: CST028

413 BLDG. 413 WATER TREATMENT PLANT

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Aug 1996

Site ID: CSA030

423 BLDG. 423 STORAGE FACILITY

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Jun 2016

Site ID: SD019

NORTH COAL PILE

Storm Drain

Cost

Unknown

Final Cleanup Action

Sep 1998

Contaminated Areas

Sediment (Human): Risk Not Evaluated

Contaminants: Di-n-Octyl Phthalate 0.034 mg/kg Fluorene 0.18 mg/kg 2,6-Dinitrotoluene 0.19 mg/kg Acenaphthene 0.2 mg/kg N-Nitrosodiphenylamine 0.28 mg/kg Anthracene 0.48 mg/kg Dibenz[ah]anthracene 0.54 mg/kg Naphthalene 0.54 mg/kg Mercury (Inorganic) 0.58 mg/kg Butyl Benzyl Phthalate 0.71 mg/kg Indeno(1,2,3-cd)Pyrene 1.3 mg/kg Methylnaphthalene,2- 1.3 mg/kg Beryllium and compounds 2.1 mg/kg Benzo(a)Anthracene 2.3000000000000003 mg/kg Chrysene 2.5 mg/kg Phenanthrene 2.8000000000000003 mg/kg Benzo(a)Pyrene 2.9 mg/kg Benzo(k)Fluoranthene 3.0 mg/kg Benzo(b)Fluoranthene 4.0 mg/kg Fluoranthene 5.0 mg/kg Pyrene 5.3 mg/kg Selenium 10.3 mg/kg Chromium VI and compounds 18.0 mg/kg Arsenic 29.1 mg/kg Cadmium and compounds 30.900000000000002 mg/kg Copper and compounds 37.7 mg/kg Nickel (Soluble Salts) 45.6 mg/kg Lead 48.6 mg/kg Zinc 120.0 mg/kg

Soil: Risk Not Evaluated

Contaminants: Beryllium and compounds 0.00136 mg/kg Di-n-Octyl Phthalate 0.034 mg/kg Anthracene 0.085 mg/kg Fluorene 0.18 mg/kg 2,6-Dinitrotoluene 0.19 mg/kg Acenaphthene 0.2 mg/kg N-Nitrosodiphenylamine 0.28 mg/kg Dibenz[ah]anthracene 0.54 mg/kg Naphthalene 0.54 mg/kg Mercury (Inorganic) 0.58 mg/kg Phenanthrene 0.59 mg/kg Butyl Benzyl Phthalate 0.71 mg/kg Cadmium and compounds 1.2 mg/kg Indeno(1,2,3-cd)Pyrene 1.3 mg/kg Selenium 2.15 mg/kg Benzo(a)Anthracene 2.3000000000000003 mg/kg Chrysene 2.5 mg/kg Benzo(a)Pyrene 2.9 mg/kg Benzo(k)Fluoranthene 3.0 mg/kg Benzo(b)Fluoranthene 4.0 mg/kg Fluoranthene 5.0 mg/kg Pyrene 5.3 mg/kg Chromium VI and compounds 18.0 mg/kg Arsenic 29.1 mg/kg Copper and compounds 37.5 mg/kg Nickel (Soluble Salts) 45.6 mg/kg Lead 48.6 mg/kg Zinc 89.4 mg/kg

See more details...

Site ID: CTA005

824 JET FUEL STORAGE TANK

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTA006

825 JET FUEL STORAGE TANK

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTA007

826 JET FUEL STORAGE TANK

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTA008

827 JET FUEL STORAGE TANK

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTA010

829 JET FUEL STORAGE TANK

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTU001

430 EXCHANGE SERVICE STN.

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTU003

430 EXCHANGE SERVICE STN.

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTU004

430 EXCHANGE SERVICE STN.

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CTU011

830 PUMP STATION FOR JET FUEL

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: SS005

LATERAL SAFETY ZONE

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 1997

This site is under ongoing monitoring until Sep 2014

Site ID: SS016

FUEL DUMP NE END OF RUNWAY

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 1997

This site is under ongoing monitoring until Sep 2014

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: p-Xylene 0.00064 mg/kg m-Xylene 0.00064 mg/kg Toluene 0.004 mg/kg Lead 25.2 mg/kg

See more details...

Site ID: SS022

STORAGE PAD HOT SPOT REMOVAL

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1997

Site ID: SS026

ELECTRICAL TRANSFORMER STORAGE

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1997

This site is under ongoing monitoring until Jul 2012

Site ID: SS039

FUEL DUMP SW END OF OLD RUNWAY

Spill Site Area

Cost

Unknown

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2014

Site ID: SS040

FUEL DUMP NE END OF OLD RUNWAY

Spill Site Area

Cost

Unknown

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2014

Site ID: ST028

29 UNDERGROUND STORAGE TANKSS AT MULTIPLE LOCATIONS

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 2000

This site is under ongoing monitoring until Jul 2003

Site ID: ST030

300 GALLON UNDERGROUND STORAGE TANKS AT BLDG 1093

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1996

Site ID: ST031

8,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 846

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: ST032

15,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 846

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: ST033

8,000 GALLON UNDERGROUND STORAGE TANKS AT BLDG 846

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: ST035

940 GALLON UNDERGROUND STORAGE TANKS AT BLDG 877

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Apr 1996

Site ID: ST036

15,000 GALLON HEATING OIL UNDERGROUND STORAGE TANKS AT BLDG 932

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1998

Site ID: SS003

SPILL AT POL PUMPHOUSE 4

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1998

Site ID: SS006

BASE FILLING STATION

Spill Site Area

Cost

Unknown

Final Cleanup Action

Dec 1997

Site ID: SS011

JP-4 FUEL LINE RUPTURE AT BLDG 844

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 1998

Site ID: SS012

OLD DRUM STORAGE AREA (ANG AREA)

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: Xylene (Mixed) 0.0015 mg/kg Toluene 0.0022 mg/kg Tetrachloroethylene 0.0028 mg/kg Trichloroethylene (TCE) 0.0038 mg/kg Selenium 0.561 mg/kg Beryllium and compounds 0.741 mg/kg Silver and compounds 0.745 mg/kg Cadmium and compounds 0.848 mg/kg Thallium 1.6300000000000001 mg/kg Chromium VI and compounds 21.1 mg/kg Lead 30.3 mg/kg Arsenic 32.6 mg/kg Copper and compounds 37.0 mg/kg Nickel (Soluble Salts) 70.4 mg/kg Zinc 105.0 mg/kg

See more details...

Site ID: SS013

RB47 CRASH SITE

Spill Site Area

Cost

Unknown

Final Cleanup Action

Aug 1997

This site is under ongoing monitoring until Sep 2014

Site ID: SS015

FUEL DUMP SW END OF RUNWAY

Spill Site Area

Cost

Unknown

Final Cleanup Action

Sep 1997

This site is under ongoing monitoring until Sep 2014

Contaminated Areas

Soil: Risk Not Evaluated

Contaminants: Lead 16.7 mg/kg

See more details...

Site ID: ST037

800 GALLON UNDERGROUND STORAGE TANKS AT BLDG 944

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1998

Site ID: CTA009

828 JET FUEL STORAGE TANK

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CCB016

701 ELECTRIC SUBSTATION BLDG. 701

Contaminated Buildings

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Jun 2016

Site ID: CTU002

430 EXCHANGE SERVICE STN.

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Mar 2000

Site ID: CDD021

MUNITIONS DITCH STORM DRAINAGE DITCH

Drainage Ditch

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2001

This site is under ongoing monitoring until Sep 2016

Site ID: CSA018

439 BLDG. 439 PAINT STORAGE

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1997

This site is under ongoing monitoring until Sep 2016

Site ID: CSA019

550 BLDG. 550 HEAVY EQUIPMENT STORAGE

Storage Area

Cost

$13K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1997

This site is under ongoing monitoring until Jun 2016

Site ID: CSA020

800 CONSOLIDATED CLUB COMPLEX, BLDG. 800

Storage Area

Cost

$6,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1997

This site is under ongoing monitoring until Nov 2014

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »