AIR FORCE INSTALLATION ID: OH557172431200

WRIGHT PATTERSON

wright-patterson afb, Ohio

Cost So Far

$219M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$82.4M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2045

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

93 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

20 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: TS899

FORMER SKEET AND TRAP RANGE

Trap and Skeet Range

Cost

$1.29M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2016

This site is under ongoing monitoring until Sep 2047

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Fresh): Risk Not Evaluated

Contaminants: Dibenz[ah]anthracene 0.000554 mg/kg Benzo(k)Fluoranthene 0.00204 mg/kg Benz(a)Anthracene 0.00309 mg/kg Indeno(1,2,3-cd)Pyrene 0.00357 mg/kg Benzo(a)Pyrene 0.00395 mg/kg Benzo(b)Fluoranthene 0.00562 mg/kg

Sediment (Human): Risk Not Evaluated

Contaminants: Dibenz[ah]anthracene 0.000554 mg/kg Benzo(k)Fluoranthene 0.00204 mg/kg Benz(a)Anthracene 0.00309 mg/kg Indeno(1,2,3-cd)Pyrene 0.00357 mg/kg Benzo(a)Pyrene 0.00395 mg/kg Benzo(b)Fluoranthene 0.00562 mg/kg

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: DP068

BUILDING 20059

Contaminated Buildings

Cost

$779K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2017

This site is under ongoing monitoring until Sep 2047

Contaminated Areas

Groundwater: Medium Risk

DEPTH TO GROUNDWATER SIX FEET, NEAREST DRINKING WATER WELL APPROXIMATELY 12,000 FEET TO CITY OF DAYTON WELL FIELD NO DRINKING WATER WELLS AFFECTED AT THIS TIME, CONTAMINANTS MOVE SLOWLY IN THE GEOLOGIC SETTING

Contaminants: Trichloroethylene (TCE) 19.0 ug/L Vinyl Chloride 27.0 ug/L 1,2-Dichloroethylene (cis) 190.0 ug/L

Soil: Low Risk

SOIL CONTAMINATION AROUND BUILDING; BUILDING TO BE DEMOLISHED IN NEAR FUTURE RESULTS IN POTENTIAL EXPOSURE TO SOILS POTENTIAL FOR DEMOLITION WORKERS TO BE EXPOSED TO CONTAMINATED SOILS

Contaminants: Trichloroethylene (TCE) 0.00029 mg/kg

See more details...

Site ID: SR898

RIFLE/1000 INCH RANGE

Small Arms Range

Cost

$16K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2015

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 1.731 mg/kg

See more details...

Site ID: MU897

BOMB TARGET AND PISTOL RANGE

Multi Use Range

Cost

$1.35M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2017

This site is under ongoing monitoring until Sep 2048

Contaminated Areas

Soil: Low Risk

Contaminants: Lead 0.05 mg/kg

See more details...

Site ID: SS071

20055

Spill Site Area

Cost

$139K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2016

Site ID: OT069

CONTAMINATED GROUNDWATER IN AREA'S A & C

Contaminated Ground Water

Cost

$9.73M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 1999

This site is under ongoing monitoring until Sep 2077

Contaminated Areas

Groundwater: Low Risk

An above ground air sparging unit was installed in 1991 to contain and treat the groundwater plume. Drinking water extraction wells for the City of Dayton are directly downgradient of the plume.

Contaminants: 1,1,2,2,-Tetrachloroethylene 140.0 ug/L Trichloroethylene (TCE) 170.0 ug/L

See more details...

Site ID: OT070

CONTAMINATED GROUNDWATER AREA B

Contaminated Ground Water

Cost

$7.43M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Feb 2002

This site is under ongoing monitoring until Sep 2095

Contaminated Areas

Groundwater: Medium Risk

Geology in the area of the Vinyl Cloride plume acts to limit contaminant migration. City of Dayton drinking water wells are located down gradient; however, contaminant transport modeling indicates that due to the relatively slow movement of groundwater in the area, downgradient drinking water wells are not likely to be impacted.

Contaminants: Trichloroethylene (TCE) 11.0 ug/L Vinyl Chloride 200.0 ug/L

See more details...

Site ID: CD076

OWS-OS40R, NW OF BLDG 224

Contaminated Soil Piles

Cost

$456K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2017

Site ID: ZZ671

Duplicate Site Within Same Program

Cost

Unknown

Site ID: DPO67

Duplicate Site Within Same Program

Cost

Unknown

Site ID: DP071

BUILDING 20079 COMPLEX

Contaminated Buildings

Cost

$535K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2018

Site ID: LF583

Duplicate Site Within Same Program

Cost

Unknown

Site ID: LF002

LANDFILL NO 2 (TILLMAN PIT)

Landfill

Cost

$693K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Medium Risk

Some contamination downgradient, but not significantly beyond edge of source. There are some private wells downgradient.

Contaminants: Benzene 0.7 ug/L 1,2-Dichloroethylene (Total) 1.0 ug/L Chloromethane 1.0 ug/L Beryllium and compounds 1.2 ug/L Lead 1.8 ug/L Toluene 3.0 ug/L Tetrachloroethylene 6.0 ug/L

Surface Water: Medium Risk

Some evidence of limited contaminant migration. Area is fenced, however surface water does flow from site to areas accessible by local residents.

Contaminants: 4,4-DDT 0.02 ug/L Chloroform 0.2 ug/L Bromoform 0.3 ug/L Bromodichloromethane 0.4 ug/L Dibromochloromethane 0.6 ug/L Arsenic 2.7 ug/L Cadmium and compounds 3.2 ug/L Selenium 3.2 ug/L Lead 29.7 ug/L Nickel (soluble salts) 90.7 ug/L

Sediment (Fresh): Low Risk

Some evidence of limited contaminant migration. No significant ecological receptors (per Table 2 of Primer)

Contaminants: Endrin 1.3e-06 mg/kg Antimony and compounds 1.5100000000000001e-05 mg/kg Phenol 5.2e-05 mg/kg Methoxychlor 6.7e-05 mg/kg Diethyl Phthalate 6.900000000000001e-05 mg/kg Bis(2-Ethylhexyl)Phthalate 0.00011 mg/kg 4-Methylphenol (p-Cresol) 0.00045000000000000004 mg/kg

Sediment (Human): Low Risk

Some evidence of limited contaminant migration. Area is fenced, however surface water does flow from site to areas accessible by local residents.

Contaminants: Endrin 1.3e-06 mg/kg Antimony and compounds 1.5100000000000001e-05 mg/kg Phenol 5.2e-05 mg/kg Methoxychlor 6.7e-05 mg/kg Diethyl Phthalate 6.900000000000001e-05 mg/kg Bis(2-Ethylhexyl)Phthalate 0.00011 mg/kg 4-Methylphenol (p-Cresol) 0.00045000000000000004 mg/kg

Soil: Low Risk

Area is fenced. Only grounds maintenance personnel and trespassers have potential for exposure.

Contaminants: Heptachlor Epoxide 3.8e-07 mg/kg Endrin 1.9e-06 mg/kg Naphthalene 2.0e-05 mg/kg Bis(2-Ethylhexyl)Phthalate 4.8e-05 mg/kg Chrysene 0.0011 mg/kg Benzo(b)Fluoranthene 0.0015 mg/kg Nickel (soluble salts) 0.018600000000000002 mg/kg

Surface Water (Fresh): Low Risk

Some evidence of limited contaminant migration. No significant ecological receptors (per Table 2 of Primer)

Contaminants: 4,4-DDT 0.02 ug/L Chloroform 0.2 ug/L Bromoform 0.3 ug/L Bromodichloromethane 0.4 ug/L Dibromochloromethane 0.6 ug/L Arsenic 2.7 ug/L Cadmium and compounds 3.2 ug/L Selenium 3.2 ug/L Lead 29.7 ug/L Nickel (soluble salts) 90.7 ug/L

See more details...

Site ID: LF008

LANDFILL NO 8

Landfill

Cost

$9.35M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 1997

This site is under ongoing monitoring until Sep 2077

Contaminated Areas

Groundwater: Low Risk

Minimal evidence of groundwater contaminant migration. No receptors of groundwater in this vicinity

Contaminants: Bromodichloromethane 2.0 ug/L Selenium 3.0 ug/L Bis(2-Ethylhexyl)Phthalate 5.0 ug/L Chloroform 49.0 ug/L Antimony and compounds 76.0 ug/L Nickel (soluble salts) 152.0 ug/L Copper and compounds 162.0 ug/L Manganese and compounds 3140.0 ug/L Aluminum 55700.0 ug/L

Soil: Low Risk

Confined Area is fenced, restricted access

Contaminants: Iron 0.0 mg/kg Lead 0.0 mg/kg Manganese and compounds 0.0 mg/kg Antimony and compounds 0.0 mg/kg Arsenic 0.0 mg/kg Beryllium and compounds 0.0 mg/kg Copper and compounds 0.0 mg/kg Zinc 0.0 mg/kg

Surface Water: Low Risk

Installation of leachate collection system has eliminated this pathway. Only isolated trespassers are potential receptors.

Contaminants: Antimony and compounds 0.0 ug/L Barium 0.0 ug/L Cadmium and compounds 0.0 ug/L Vanadium 0.0 ug/L Lead 90.0 ug/L Zinc 366.0 ug/L Manganese and compounds 6230.0 ug/L Iron 143000.0 ug/L

Surface Water (Fresh): Low Risk

Installation of leachate collection system has eliminated this pathway. There are no ecologically significant receptors at the site (as defined in Table 2 of the Primer)

Contaminants: Antimony and compounds 0.0 ug/L Barium 0.0 ug/L Cadmium and compounds 0.0 ug/L Vanadium 0.0 ug/L Lead 90.0 ug/L Zinc 366.0 ug/L Manganese and compounds 6230.0 ug/L Iron 143000.0 ug/L

See more details...

Site ID: LF010

LANDFILL NO 10

Landfill

Cost

$11.3M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 1997

This site is under ongoing monitoring until Sep 2077

Contaminated Areas

Groundwater: Low Risk

There is minor groundwater contamination, but cap in place will minimize any additional migration. There are no groundwater receptors in the vicinity.

Contaminants: Dieldrin 0.0 ug/L Copper and compounds 0.0 ug/L Heptachlor 0.0 ug/L Selenium 6.0 ug/L Benzene 7.0 ug/L Chloroform 49.0 ug/L Antimony and compounds 76.0 ug/L Manganese and compounds 3760.0 ug/L Zinc 25100.0 ug/L

Soil: Low Risk

pathway is isolated becasue cap has been installed Landfill cap eliminates potential for exposure.

Contaminants: 1,4-Dichlorobenzene 0.0 mg/kg 1,2-Dichloroethylene (cis) 0.0 mg/kg Acetone 0.0 mg/kg Benzene 0.0 mg/kg 1,1,1-Trichloroethane 0.0 mg/kg Iron 0.0 mg/kg Lead 0.0 mg/kg Manganese and compounds 0.0 mg/kg Antimony and compounds 0.0 mg/kg Arsenic 0.0 mg/kg Beryllium and compounds 0.0 mg/kg Copper and compounds 0.0 mg/kg Zinc 0.0 mg/kg Methylene Chloride 0.0 mg/kg Carbon Disulfide 0.0 mg/kg Methyl Ethyl Ketone 0.0 mg/kg Trichloroethylene (TCE) 0.0 mg/kg

Surface Water: Low Risk

Installation of leachate collection system has eliminated pathway. Access to surface water impacted by LF 10 is restricted.

Contaminants: DDE 0.0 ug/L Benzo(b)Fluoranthene 1.0 ug/L Benzo(k)Fluoranthene 1.0 ug/L Benzo(a)Pyrene 1.0 ug/L Chrysene 2.0 ug/L Bis(2-Ethylhexyl)Phthalate 7.0 ug/L Benzene 37.0 ug/L Manganese and compounds 1320.0 ug/L Aluminum 26300.0 ug/L

Surface Water (Fresh): Low Risk

Installation of leachate collection system has eliminated pathway. No ecologically significant receptors at this site (as defined in Table 2 of the Primer).

Contaminants: DDE 0.0 ug/L Benzo(b)Fluoranthene 1.0 ug/L Benzo(k)Fluoranthene 1.0 ug/L Benzo(a)Pyrene 1.0 ug/L Chrysene 2.0 ug/L Bis(2-Ethylhexyl)Phthalate 7.0 ug/L Benzene 37.0 ug/L Manganese and compounds 1320.0 ug/L Aluminum 26300.0 ug/L

See more details...

Site ID: LF512

BLDG 30013 SUMP PIT AREA

Landfill

Cost

$923K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2017

This site is under ongoing monitoring until Sep 2049

Site ID: OW074

BLDG 20056

Oil/Water Separator

Cost

$510K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2017

This site is under ongoing monitoring until Sep 2048

Site ID: TU921

UNDERGROUND STORAGE TANKS AT BLDG 30154 AREA C

Underground Storage Tanks

Cost

$114K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2018

This site is under ongoing monitoring until Jul 2019

Site ID: CD073

FACILITY 20025B

Contaminated Soil Piles

Cost

$580K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2010

This site is under ongoing monitoring until Nov 2047

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT059

AREA A GROUNDWATER TREATMENT SYSTEM OU5

Contaminated Ground Water

Cost

$7.17M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 1992

This site is under ongoing monitoring until Sep 2062

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

73 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: DP047

BURIAL SITE #3

Disposal Pit and Dry Well

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: DP048

BURIAL SITE 4

Disposal Pit and Dry Well

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1991

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: DP066

WRIGHT FIELD PAINT WASTE BURIAL SITE

Disposal Pit and Dry Well

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 1999

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: DP067

BURIAL SITE NO. 6

Disposal Pit and Dry Well

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS065

SPILL SITE 11

Spill Site Area

Cost

$1.11M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Surface Water: Medium Risk

Fuel and fuel components are flushed form the soil to the storm drain during significant rain events. Groundskeepers may be infrequently exposed.

Contaminants: Benzo(b)Fluoranthene 2.0 ug/L Benzo(k)Fluoranthene 2.0 ug/L Benzo(a)Pyrene 2.0 ug/L Fluoranthene 4.0 ug/L Pyrene 6.0 ug/L

Groundwater: Low Risk

Bedrock limits contaminant migration. Down gradient aquifer is used for water supply.

Contaminants: Methyl Ethyl Ketone 5.0 ug/L

Sediment (Fresh): Low Risk

Contamination may migrate to storm drains. No ecologically significant receptors (as defined in Table 2 of the Primer) at this site.

Contaminants: Benzo(a)Pyrene 0.00031 mg/kg Benzo(b)Fluoranthene 0.00039000000000000005 mg/kg Benzo(k)Fluoranthene 0.00041 mg/kg Chrysene 0.00043 mg/kg Fluoranthene 0.00063 mg/kg Pyrene 0.0007 mg/kg

Sediment (Human): Low Risk

Contamination may migrate to storm drains. Site workers may be exposed to sediments.

Contaminants: Benzo(a)Pyrene 0.00031 mg/kg Benzo(b)Fluoranthene 0.00039000000000000005 mg/kg Benzo(k)Fluoranthene 0.00041 mg/kg Chrysene 0.00043 mg/kg Fluoranthene 0.00063 mg/kg Pyrene 0.0007 mg/kg

Surface Water (Fresh): Low Risk

Fuel and fuel components are flushed form the soil to the storm drain during significant rain events. No ecologically significant receptors (as defined in Table 2 of the Primer) at this site.

Contaminants: Benzo(b)Fluoranthene 2.0 ug/L Benzo(k)Fluoranthene 2.0 ug/L Benzo(a)Pyrene 2.0 ug/L Fluoranthene 4.0 ug/L Pyrene 6.0 ug/L

See more details...

Site ID: TS896

ABANDONED ORDNANCE AND SKEET RANGE

Trap and Skeet Range

Cost

Unknown

Final Cleanup Action

Sep 2013

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF007

LANDFILL NO 7

Landfill

Cost

$685K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Medium Risk

Contamination is largely confined to vicinity of source. No supply wells downgradient, but aquifer is capable of production.

Contaminants: Bis(2-Ethylhexyl)Phthalate 1.0 ug/L 1,1-Dichloroethane 2.0 ug/L Vinyl Chloride 4.0 ug/L Arsenic 14.5 ug/L Manganese and compounds 929.0 ug/L

Sediment (Fresh): Low Risk

Surface water is present intermittently following rain events. landfill cover prevents migration of sediments Ecologically significant (as defined in Table 2 of the Primer) receptors may be found in this area.

Contaminants: Carbazole 5.0e-05 mg/kg Anthracene 5.3e-05 mg/kg Dibenzofuran 5.9e-05 mg/kg Naphthalene 0.00014000000000000001 mg/kg Mercury 0.00025 mg/kg Beryllium and compounds 0.0013000000000000002 mg/kg Copper and compounds 0.028399999999999998 mg/kg Manganese and compounds 0.721 mg/kg

Sediment (Human): Low Risk

Surface water is present intermittently following rain events. landfill cover prevents migration of sediments Recreational users frequent this area.

Contaminants: Carbazole 5.0e-05 mg/kg Anthracene 5.3e-05 mg/kg Dibenzofuran 5.9e-05 mg/kg Naphthalene 0.00014000000000000001 mg/kg Mercury 0.00025 mg/kg Beryllium and compounds 0.0013000000000000002 mg/kg Copper and compounds 0.028399999999999998 mg/kg Manganese and compounds 0.721 mg/kg

Soil: Low Risk

landfill cap isolates contamination Area is frequented by recreational users.

Contaminants: Fluorene 0.0011 mg/kg Carbazole 0.0015 mg/kg Beryllium and compounds 0.0027 mg/kg Benzo(k)Fluoranthene 0.0031000000000000003 mg/kg Benzo(b)Fluoranthene 0.0048 mg/kg Benzo(a)Pyrene 0.004900000000000001 mg/kg Pyrene 0.008199999999999999 mg/kg Fluoranthene 0.011 mg/kg Lead 0.068 mg/kg

See more details...

Site ID: FT035

FTA NO 1

Fire/Crash Training Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1994

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: AL100

BOMBING RANGE

Air to Land

Cost

Unknown

Final Cleanup Action

Sep 2003

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS063

SPILL SITE 10

Spill Site Area

Cost

$84K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1997

This site is under ongoing monitoring until Mar 2019

Contaminated Areas

Groundwater: Medium Risk

Free product on the water table, with a well-defined plume at this site. Site is located over a highly productive aquifer; however, modeling indicates that the contamination will naturally degrade before production wells are impacted.

Contaminants: 2-Methylphenol (o-Cresol) 4.0 ug/L Bis(2-Ethylhexyl)Phthalate 11.0 ug/L Phenol 23.0 ug/L Naphthalene 68.0 ug/L Xylene (Mixed) 280.0 ug/L Benzene 570.0 ug/L

Soil: Low Risk

Workers have potential to come in contact with contaminated soils if disturbed; however, institutional controls are in-place to prevent excavation.

Contaminants: Bis(2-Ethylhexyl)Phthalate 0.00016 mg/kg Naphthalene 0.00016 mg/kg Methyl Ethyl Ketone 0.00023 mg/kg Benzene 0.0024 mg/kg Toluene 0.0025 mg/kg Lead 0.0436 mg/kg Xylene (Mixed) 0.055 mg/kg

Surface Water: Low Risk

RI did not indicate significant surface water contamination. No significant surface water associated with the site.

Contaminants: Aluminum 0.0 ug/L Iron 0.0 ug/L Antimony and compounds 0.0 ug/L Arsenic 0.0 ug/L Copper and compounds 0.0 ug/L Selenium 0.0 ug/L Lead 2.0 ug/L Manganese and compounds 8.0 ug/L Barium 121.0 ug/L

Surface Water (Fresh): Low Risk

RI did not indicate significant surface water contamination. No significant ecological receptors at the site (as per Table 2 of Primer).

Contaminants: Aluminum 0.0 ug/L Iron 0.0 ug/L Antimony and compounds 0.0 ug/L Arsenic 0.0 ug/L Copper and compounds 0.0 ug/L Selenium 0.0 ug/L Lead 2.0 ug/L Manganese and compounds 8.0 ug/L Barium 121.0 ug/L

See more details...

Site ID: LF001

LANDFILL NO 1

Landfill

Cost

$668K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Medium Risk

Contaminants have migrated away from the site. Dayton's Rohrer's Island Wellfield is 1/2 mile downgradient.

Contaminants: Aldrin 0.03 ug/L 4,4-DDT 0.07 ug/L Carbon tetrachloride 2.0 ug/L Chloromethane 3.0 ug/L Selenium 3.7 ug/L Chromium 76.0 ug/L Nickel (soluble salts) 135.0 ug/L

Soil: Low Risk

Area is mowed periodically, but well grassed. Very little likelihood of exposure to maintenance personnel.

Contaminants: Tetrachloroethylene 1.0e-06 mg/kg Carbon tetrachloride 1.0e-06 mg/kg Methyl Ethyl Ketone 1.0e-06 mg/kg Acetone 4.0e-06 mg/kg Trichloroethylene (TCE) 9.0e-06 mg/kg

See more details...

Site ID: DP045

BURIAL SITE #1

Disposal Pit and Dry Well

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1993

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF003

LANDFILL NO 3

Landfill

Cost

$532K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Low Risk

Limited potential for migration. No water supply wells downgradient.

Contaminants: 1,1-Dichloroethane 0.75 ug/L Arsenic 2.5 ug/L Tetrachloroethylene 21.0 ug/L Trichloroethylene (TCE) 22.0 ug/L

Soil: Low Risk

Some potential for exposure to golf course maintenance personnel.

Contaminants: Chlordane 4.0e-05 mg/kg Naphthalene 0.00013000000000000002 mg/kg Fluorene 0.00025 mg/kg Acenaphthene 0.004 mg/kg Cadmium and compounds 0.004200000000000001 mg/kg Chrysene 0.011 mg/kg Fluoranthene 0.013000000000000001 mg/kg

See more details...

Site ID: LF005

LANDFILL NO 5

Landfill

Cost

$707K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Medium Risk

There is evidence that some VOC contamination in groundwater has migrated considerable distance. There are not likely to be receptors of any contamination attributable to LF5.

Contaminants: Antimony and compounds 0.0 ug/L Selenium 0.0 ug/L Benzene 11.0 ug/L Vinyl Chloride 33.0 ug/L Methylene Chloride 150.0 ug/L Bis(2-Ethylhexyl)Phthalate 380.0 ug/L Trichloroethylene (TCE) 770.0 ug/L

Surface Water: Medium Risk

Additional runoff to surface water has been eliminated by cap. There is recreational use of nearby lakes.

Contaminants: Carbon Disulfide 2.0 ug/L Lead 40.0 ug/L Antimony and compounds 55.0 ug/L Arsenic 780.0 ug/L Manganese and compounds 3700.0 ug/L

Soil: Low Risk

Site is capped.

Contaminants: Toluene 1.0e-06 mg/kg Tetrachloroethylene 2.0e-06 mg/kg 1,1,1-Trichloroethane 3.0e-06 mg/kg Trichlorofluoromethane 2.6e-05 mg/kg Acetone 3.1e-05 mg/kg Xylene (Mixed) 0.00017 mg/kg Methylene Chloride 0.00021 mg/kg Anthracene 0.00082 mg/kg Pyrene 0.005 mg/kg Selenium 0.0053 mg/kg Cadmium and compounds 0.0079 mg/kg Nickel (soluble salts) 0.0253 mg/kg Arsenic 0.032600000000000004 mg/kg Beryllium and compounds 0.0375 mg/kg Lead 0.234 mg/kg

Surface Water (Fresh): Low Risk

Additional runoff to surface water has been eliminated by cap.

Contaminants: Carbon Disulfide 2.0 ug/L Lead 40.0 ug/L Antimony and compounds 55.0 ug/L Arsenic 780.0 ug/L Manganese and compounds 3700.0 ug/L

See more details...

Site ID: LF006

LANDFILL NO 6

Landfill

Cost

$785K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Low Risk

Contaminants have limited potentail for migration Aquifer is usable but little potential for exposure

Contaminants: Cyanide (free) 0.72 ug/L 1,1-Dichloroethane 1.0 ug/L Vinyl Chloride 2.0 ug/L Arsenic 16.2 ug/L Trichloroethylene (TCE) 24.0 ug/L Manganese and compounds 677.0 ug/L

Sediment (Fresh): Low Risk

There is a tributary of Hebble Creek flowing across LF6. There appears to be little contamination migrating from the site.

Contaminants: Trichloroethylene (TCE) 2.0e-06 mg/kg Chlordane 9.400000000000001e-05 mg/kg Cadmium and compounds 0.0011 mg/kg Manganese and compounds 0.783 mg/kg

Sediment (Human): Low Risk

There is a tributary of Hebble Creek flowing across LF6. There appears to be little contamination migrating from the site. There is some potential for exposure to recreational users and grounds maintenance personnel.

Contaminants: Trichloroethylene (TCE) 2.0e-06 mg/kg Chlordane 9.400000000000001e-05 mg/kg Cadmium and compounds 0.0011 mg/kg Manganese and compounds 0.783 mg/kg

Surface Water: Low Risk

There is a tributary of Hebble Creek flowing across LF6. There appears to be little contamination migrating from the site. There is some potential for exposure to recreational users and grounds maintenance personnel.

Contaminants: Chloromethane 2.0 ug/L

Surface Water (Fresh): Low Risk

There is a tributary of Hebble Creek flowing across LF6. There appears to be little contamination migrating from the site.

Contaminants: Chloromethane 2.0 ug/L

See more details...

Site ID: FT036

FPTA NO 2

Fire/Crash Training Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1994

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF009

LANDFILL NO 9

Landfill

Cost

$675K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Soil: Low Risk

Trespassers or occasional hunters are the only receptors.

Contaminants: Naphthalene 1.4e-05 mg/kg Benzo(a)Pyrene 1.9e-05 mg/kg Indeno(1,2,3-cd)Pyrene 2.2e-05 mg/kg Chrysene 3.0e-05 mg/kg Pyrene 4.9000000000000005e-05 mg/kg Fluoranthene 5.0e-05 mg/kg

See more details...

Site ID: FT037

FDTA NO 3

Fire/Crash Training Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1995

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF011

LANDFILL NO 11

Landfill

Cost

$702K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Low Risk

A landfill cap was completed in June 1997. The Mad River forms a hydraulic barrier to any downgradient supply wells.

Contaminants: Trichloroethylene (TCE) 23.0 ug/L Arsenic 31.0 ug/L Benzene 34.0 ug/L Vinyl Chloride 36.0 ug/L Nickel (soluble salts) 67.1 ug/L Chlorobenzene 83.0 ug/L Lead 188.0 ug/L Chromium 191.0 ug/L Cobalt 349.0 ug/L Methylene Chloride 830.0 ug/L Toluene 1500.0 ug/L Acetone 13000.0 ug/L Methyl Ethyl Ketone 13000.0 ug/L

Sediment (Fresh): Low Risk

Landfill cap was completed in June 1997. Ecologically significant receptors (as defined in Table 2 of the Primer) may frequent the area.

Contaminants: Mercury 0.00023 mg/kg Benzo(k)Fluoranthene 0.0005600000000000001 mg/kg Benzo(a)Pyrene 0.00069 mg/kg Pyrene 0.00074 mg/kg Beryllium and compounds 0.001 mg/kg Arsenic 0.0132 mg/kg Vanadium 0.0347 mg/kg Copper and compounds 0.0499 mg/kg

Sediment (Human): Low Risk

Landfill cap was completed in June 1997. Recreational users of the area have access to contaminated sediment.

Contaminants: Mercury 0.00023 mg/kg Benzo(k)Fluoranthene 0.0005600000000000001 mg/kg Benzo(a)Pyrene 0.00069 mg/kg Pyrene 0.00074 mg/kg Beryllium and compounds 0.001 mg/kg Arsenic 0.0132 mg/kg Vanadium 0.0347 mg/kg Copper and compounds 0.0499 mg/kg

Soil: Low Risk

Trespassers and recreational users (hunters) may be exposed.

Contaminants: DDD 7.3e-06 mg/kg DDT 1.6e-05 mg/kg DDE 4.7000000000000004e-05 mg/kg Acenaphthene 5.5e-05 mg/kg Chrysene 0.0001 mg/kg Anthracene 0.00033 mg/kg Benzo(a)Pyrene 0.0006 mg/kg Benzo(k)Fluoranthene 0.00083 mg/kg Benzo(b)Fluoranthene 0.0012 mg/kg Beryllium and compounds 0.0019 mg/kg Lead 0.09709999999999999 mg/kg

Surface Water: Low Risk

Landfill cap was completed in June 1997. Cap limits the migration of leachate. Recreational users of the area have access to contaminated surface water.

Contaminants: Arsenic 1.7 ug/L Lead 13.9 ug/L Trichloroethylene (TCE) 23.0 ug/L Aluminum 478.0 ug/L Iron 811.0 ug/L

Surface Water (Fresh): Low Risk

Landfill cap was completed in June 1997. Cap limits the migration of leachate. Ecologically significant receptors (as defined in Table 2 of the Primer) may frequent the area.

Contaminants: Arsenic 1.7 ug/L Lead 13.9 ug/L Trichloroethylene (TCE) 23.0 ug/L Aluminum 478.0 ug/L Iron 811.0 ug/L

See more details...

Site ID: LF013

LANDFILL NO 13

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1996

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF014

EARTH FILL SITE 1

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF016

EARTH FILL SITE 3

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF017

EARTH FILL SITE 4

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Low Risk

Very little likelihood of contaminant migration. Not currently being used as water supply, but has the potential.

Contaminants: Toluene 2.0 ug/L Benzene 5.0 ug/L 1,2-Dichloroethane (EDC) 14.0 ug/L

Soil: Low Risk

Area is well grassed, with little potential for receptor exposure.

Contaminants: Fluorene 5.5e-05 mg/kg Anthracene 0.00012 mg/kg Indeno(1,2,3-cd)Pyrene 0.00016 mg/kg Benzo(b)Fluoranthene 0.00024 mg/kg Benzo(k)Fluoranthene 0.00024 mg/kg Benzo(a)Pyrene 0.00024 mg/kg Fluoranthene 0.00045000000000000004 mg/kg Beryllium and compounds 0.00047 mg/kg Cadmium and compounds 0.00071 mg/kg Arsenic 0.0048 mg/kg Methylene Chloride 0.015 mg/kg Nickel (soluble salts) 0.0245 mg/kg Lead 0.04070000000000001 mg/kg

See more details...

Site ID: LF019

EARTH FILL SITE 6

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF020

EARTH FILL SITE 7

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF022

EARTH FILL SITE 9

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Medium Risk

Contamination has moved away from the source area. Geology in this area precludes placement of any supply wells.

Contaminants: Butyl Benzyl Phthalate 1.0 ug/L Bis(2-Ethylhexyl)Phthalate 2.0 ug/L Tetrachloroethylene 4.0 ug/L Trichloroethylene (TCE) 6.0 ug/L Vinyl Chloride 9.0 ug/L Chloroform 11.0 ug/L

Surface Water: Medium Risk

There is a small pond in the vicinity which receives runoff from EFDZ 9. There is evidence of contamination. Groundskeepers may be exposed infrequently.

Contaminants: Mercury 0.2 ug/L Bis(2-Ethylhexyl)Phthalate 2.0 ug/L Butyl Benzyl Phthalate 2.0 ug/L Naphthalene 2.0 ug/L Chloroform 5.0 ug/L Methyl Ethyl Ketone 9.0 ug/L Acetone 13.0 ug/L Ethylbenzene 15.0 ug/L Chromium 16.2 ug/L Lead 21.6 ug/L Xylene (Mixed) 74.0 ug/L Manganese and compounds 1070.0 ug/L

Surface Water (Fresh): Medium Risk

There is a small pond in the vicinity which receives runoff from EFDZ 9. There is evidence of contamination. No ecologically significant receptors (as defined in Table 2 of the Primer).

Contaminants: Mercury 0.2 ug/L Bis(2-Ethylhexyl)Phthalate 2.0 ug/L Butyl Benzyl Phthalate 2.0 ug/L Naphthalene 2.0 ug/L Chloroform 5.0 ug/L Methyl Ethyl Ketone 9.0 ug/L Acetone 13.0 ug/L Ethylbenzene 15.0 ug/L Chromium 16.2 ug/L Lead 21.6 ug/L Xylene (Mixed) 74.0 ug/L Manganese and compounds 1070.0 ug/L

Sediment (Fresh): Low Risk

There is a small pond in the vicinity which receives runoff from EFDZ 9. There is evidence of contamination. No ecologically significant receptors (as defined in Table 2 of the Primer).

Contaminants: Toluene 2.0e-06 mg/kg Carbon Disulfide 7.0e-06 mg/kg Dinoseb 2.1000000000000002e-05 mg/kg Methyl Ethyl Ketone 2.3e-05 mg/kg Acetone 0.00021 mg/kg Benzo(g,h,i)Perylene 0.00029 mg/kg Benzo(a)Pyrene 0.00058 mg/kg Benzo(k)Fluoranthene 0.00074 mg/kg

Sediment (Human): Low Risk

There is a small pond in the vicinity which receives runoff from EFDZ 9. There is evidence of contamination. Groundskeepers may be exposed infrequently.

Contaminants: Toluene 2.0e-06 mg/kg Carbon Disulfide 7.0e-06 mg/kg Dinoseb 2.1000000000000002e-05 mg/kg Methyl Ethyl Ketone 2.3e-05 mg/kg Acetone 0.00021 mg/kg Benzo(g,h,i)Perylene 0.00029 mg/kg Benzo(a)Pyrene 0.00058 mg/kg Benzo(k)Fluoranthene 0.00074 mg/kg

Soil: Low Risk

Groundskeepers may be exposed infrequently.

Contaminants: Carbazole 5.0e-05 mg/kg Anthracene 6.6e-05 mg/kg Benzo(b)Fluoranthene 0.00015 mg/kg Benzo(a)Pyrene 0.00017 mg/kg Benzo(k)Fluoranthene 0.0002 mg/kg Pyrene 0.00029 mg/kg Fluoranthene 0.00037 mg/kg Arsenic 0.008 mg/kg Nickel (soluble salts) 0.0152 mg/kg Lead 0.032100000000000004 mg/kg

See more details...

Site ID: LF023

EARTH FILL SITE 10

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF024

EARTH FILL ZONE 11

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF021

EARTH FILL SITE 8

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT040

CENTRAL HEATING PLANT NO 1

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1991

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT041

CENTRAL HEATING PLANT NO 2

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1991

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT042

CENTRAL HEATING PLANT NO 3

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1995

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT043

CENTRAL HEATING PLANT NO 4

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: FT038

FDTA NO 4

Fire/Crash Training Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1994

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF012

LANDFILL NO 12

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Low Risk

Data indicate there may be some contaminants downgradient. Groundwater moves toward the adjacent Mad River. There is no potential impact to a drinking water source.

Contaminants: DDT 0.0 ug/L HCH (gamma) Lindane 0.0 ug/L Benzene 0.0 ug/L DDD 0.0 ug/L Chloroform 2.0 ug/L Lead 2.2 ug/L Arsenic 56.4 ug/L Aluminum 325.0 ug/L

Sediment (Fresh): Low Risk

Surface water drainage is shared with another site (LF11). There is some possibility of contamination migrating from site. Ecologically significant receptorsmay frequent this area.

Contaminants: Arsenic 1.06e-05 mg/kg Trichloroethylene (TCE) 1.4e-05 mg/kg Methylene Chloride 3.0e-05 mg/kg 1,2-Dichloroethane (EDC) 3.2e-05 mg/kg Chromium 3.54e-05 mg/kg Zinc 0.000128 mg/kg Bis(2-Ethylhexyl)Phthalate 0.00022 mg/kg

Sediment (Human): Low Risk

Surface water drainage is shared with another site (LF11). There is some possibility of contamination migrating from site. Trespassers and recreational users can come into contact with contaminated sediments.

Contaminants: Arsenic 1.06e-05 mg/kg Trichloroethylene (TCE) 1.4e-05 mg/kg Methylene Chloride 3.0e-05 mg/kg 1,2-Dichloroethane (EDC) 3.2e-05 mg/kg Chromium 3.54e-05 mg/kg Zinc 0.000128 mg/kg Bis(2-Ethylhexyl)Phthalate 0.00022 mg/kg

Soil: Low Risk

Base workers or tresspassers can come in contact with surface soils

Contaminants: Benzene 3.0e-06 mg/kg Xylene (Mixed) 5.0e-06 mg/kg Carbon Disulfide 7.0e-06 mg/kg Toluene 1.1e-05 mg/kg Methylene Chloride 1.2e-05 mg/kg Benzo(a)Pyrene 4.8e-05 mg/kg Benzo(b)Fluoranthene 5.2e-05 mg/kg Bis(2-Ethylhexyl)Phthalate 8.0e-05 mg/kg Indeno(1,2,3-cd)Pyrene 0.00021 mg/kg Naphthalene 0.00022 mg/kg Fluoranthene 0.0003 mg/kg Arsenic 0.0103 mg/kg Acetone 0.024 mg/kg Manganese and compounds 0.595 mg/kg Aluminum 9.790000000000001 mg/kg

Surface Water: Low Risk

RI/FS investigation indicated contamination has moved to the surface water body downgradient of the site. Tresspassers and recreational users (hunters) could be exposed to the surface waters.

Contaminants: Arsenic 1.06 ug/L Trichloroethylene (TCE) 14.0 ug/L Methylene Chloride 30.0 ug/L 1,2-Dichloroethylene (cis) 32.0 ug/L Zinc 128.0 ug/L Bis(2-Ethylhexyl)Phthalate 220.0 ug/L

Surface Water (Fresh): Low Risk

RI/FS investigation indicated contamination has moved to the surface water body downgradient of the site. Site is bordered by a state-designated scenic river, could be visited by ecological receptors.

Contaminants: Arsenic 1.06 ug/L Trichloroethylene (TCE) 14.0 ug/L Methylene Chloride 30.0 ug/L 1,2-Dichloroethylene (cis) 32.0 ug/L Zinc 128.0 ug/L Bis(2-Ethylhexyl)Phthalate 220.0 ug/L

See more details...

Site ID: OT056

COAL STORAGE (BLDG 89)

Surface Disposal Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT057

COAL & CHEMICAL STORAGE

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT044

CENTRAL HEATING PLANT NO 5

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Soil: High Risk

Soil contamination is evident at the DRMO yard in the top 6 of soil. Potential for human receptors to be exposed to contaminated surface soils.

Contaminants: Lead 0.0077 mg/kg Anthracene 0.066 mg/kg Indeno(1,2,3-cd)Pyrene 0.15 mg/kg Manganese and compounds 0.161 mg/kg Chrysene 0.18 mg/kg Benzo(a)Pyrene 0.2 mg/kg Benzo(b)Fluoranthene 0.29 mg/kg

Groundwater: Low Risk

These data are mostly side gradient to the site. There is little likelihood of contaminants migrating from the site. Site is located withn 1000 yards of future production wells.

Contaminants: 1,2-Dichloroethane (EDC) 1.0 ug/L Chloromethane 1.0 ug/L Carbon tetrachloride 3.0 ug/L Antimony and compounds 55.4 ug/L Iron 289.0 ug/L Manganese and compounds 2130.0 ug/L

Sediment (Fresh): Low Risk

Contaminants have some potential to migrate during heavy storm water flows. No biologically significant receptors at this site (per Table 2 of the Primer).

Contaminants: Toluene 1.0e-06 mg/kg Dieldrin 2.2e-05 mg/kg Endrin 5.2e-05 mg/kg 4,4-DDT 9.3e-05 mg/kg 4,4-DDD 0.00012 mg/kg 4,4-DDE 0.00013000000000000002 mg/kg Arochlor 1260 0.0007199999999999999 mg/kg

Sediment (Human): Low Risk

Contaminants have some potential to migrate during heavy storm water flows. Trespassers are only likely receptors.

Contaminants: Toluene 1.0e-06 mg/kg Dieldrin 2.2e-05 mg/kg Endrin 5.2e-05 mg/kg 4,4-DDT 9.3e-05 mg/kg 4,4-DDD 0.00012 mg/kg 4,4-DDE 0.00013000000000000002 mg/kg Arochlor 1260 0.0007199999999999999 mg/kg

See more details...

Site ID: RW060

RAD WASTE BURIAL SITE

Radioactive Waste Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Feb 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: RW061

DEACTIVATED NUCLEAR REACTOR

Radioactive Waste Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1996

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SD058

CHEMICAL DISPOSAL AREA

Surface Disposal Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 1993

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS026

SPILL NO 1

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1994

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS029

SITE 1 BURIAL PIT

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1991

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS027

SPILL NO 2

Spill Site Area

Cost

$505K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1996

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Medium Risk

Free product on the water table, with a well-defined plume at this site. Site is located over a highly productive aquifer; however, modeling data indicate that contamination will naturally degrade before production wells are impacted.

Contaminants: Selenium 0.0 ug/L Bis(2-Ethylhexyl)Phthalate 3.0 ug/L Chrysene 4.0 ug/L Phenol 46.0 ug/L Toluene 54.0 ug/L Benzene 77.0 ug/L Xylene (Mixed) 150.0 ug/L Naphthalene 170.0 ug/L

Soil: Medium Risk

Commercial/industrial workers may be exposed to soils during excavation; however, institutional controls are in place to limit excavation.

Contaminants: Methylene Chloride 2.0e-06 mg/kg Toluene 7.0e-06 mg/kg Naphthalene 8.999999999999999e-05 mg/kg Beryllium and compounds 0.00022 mg/kg Benzene 0.00086 mg/kg Xylene (Mixed) 0.0027 mg/kg Lead 0.0077 mg/kg Antimony and compounds 0.0097 mg/kg Nickel (soluble salts) 0.0158 mg/kg Vanadium 0.0159 mg/kg Copper and compounds 0.0233 mg/kg Zinc 0.0324 mg/kg Arsenic 0.0418 mg/kg Aluminum 5.33 mg/kg

Surface Water: Low Risk

RI did not indicate significant surface water contamination. No significant surface water associated with the site.

Contaminants: Aluminum 0.0 ug/L Antimony and compounds 0.0 ug/L Arsenic 0.0 ug/L Copper and compounds 0.0 ug/L Selenium 0.0 ug/L Lead 2.0 ug/L Manganese and compounds 8.0 ug/L Barium 137.0 ug/L

Surface Water (Fresh): Low Risk

RI did not indicate significant surface water contamination. No significant ecological receptors at the site (as per Table 2 of Primer).

Contaminants: Aluminum 0.0 ug/L Antimony and compounds 0.0 ug/L Arsenic 0.0 ug/L Copper and compounds 0.0 ug/L Selenium 0.0 ug/L Lead 2.0 ug/L Manganese and compounds 8.0 ug/L Barium 137.0 ug/L

See more details...

Site ID: SS028

SPILL NO 3

Spill Site Area

Cost

$505K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1996

This site is under ongoing monitoring until Jul 2099

Contaminated Areas

Groundwater: Medium Risk

Free product on the water table, with a well-defined plume at this site. Site is located over a highly productive aquifer; however, modeling indicates that the contamination will naturally degrade before production wells are impacted..

Contaminants: Copper and compounds 0.0 ug/L Selenium 0.0 ug/L Bis(2-Ethylhexyl)Phthalate 2.0 ug/L Di-n-Octyl Phthalate 2.0 ug/L Phenol 13.0 ug/L Arsenic 14.0 ug/L Benzene 500.0 ug/L Aluminum 1940.0 ug/L

Soil: Medium Risk

Workers may be exposed to contaminated soils;however, institutional controls are in-place to limit excavation.

Contaminants: Beryllium and compounds 0.00062 mg/kg Cadmium and compounds 0.0023 mg/kg Arsenic 0.010029999999999999 mg/kg Benzene 0.012 mg/kg Xylene (Mixed) 0.013000000000000001 mg/kg Nickel (soluble salts) 0.0162 mg/kg Naphthalene 0.023 mg/kg Toluene 0.03 mg/kg Lead 0.296 mg/kg Manganese and compounds 0.523 mg/kg Bis(2-Ethylhexyl)Phthalate 0.54 mg/kg Aluminum 6.86 mg/kg

Surface Water (Fresh): Medium Risk

RI did not indicate significant surface water contamination. No significant ecological receptors at the site (as per Table 2 of Primer).

Contaminants: Aluminum 0.0 ug/L Iron 0.0 ug/L Antimony and compounds 0.0 ug/L Arsenic 0.0 ug/L Copper and compounds 0.0 ug/L Selenium 0.0 ug/L Lead 2.0 ug/L Manganese and compounds 8.0 ug/L

Surface Water: Low Risk

RI did not indicate significant surface water contamination. No significant surface water associated with the site.

Contaminants: Aluminum 0.0 ug/L Iron 0.0 ug/L Antimony and compounds 0.0 ug/L Arsenic 0.0 ug/L Copper and compounds 0.0 ug/L Selenium 0.0 ug/L Lead 2.0 ug/L Manganese and compounds 8.0 ug/L

See more details...

Site ID: SS030

SITE 2 BURIAL PIT

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Low Risk

Difficult to tell if this contamination is attributable to SS030.. Site is located within 1000 feet of supply wells.

Contaminants: Xylene (Mixed) 548.0 ug/L

See more details...

Site ID: SS031

SPILL SITE 6

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS032

SPILL SITE 7

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1993

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS033

SPILL SITE 8

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 1991

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SS034

SPILL SITE 9

Spill Site Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1993

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF018

EARTH FILL SITE 5

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: ST049

UNDERGROUND STORAGE TANKS, BLDG 4020

Underground Storage Tanks

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Soil: Low Risk

Area is grassed and paved.

Contaminants: Toluene 4.4999999999999996e-05 mg/kg

See more details...

Site ID: ST050

REMOVED UNDERGROUND STORAGE TANKS, BLDG 71A

Underground Storage Tanks

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Medium Risk

Free fuel related product present atop water table. Clay lenses in area slows contaminant migration. A three phase portable bioslurper unit was installed in March 1997 to capture and treat product, groundwater and soil vapor. Product and groundwater extra This site is 1000 ft upgradient of Base water supply wells

Contaminants: Benzene 3.0 ug/L Vinyl Chloride 4.0 ug/L Trichloroethylene (TCE) 4.0 ug/L 1,2-Dichloroethylene (trans) 6.0 ug/L 1,2-Dichlorobenzene 6.0 ug/L Chlorobenzene 20.0 ug/L 1,2-Dichloroethylene (cis) 29.0 ug/L Naphthalene 59.0 ug/L

Sediment (Fresh): Low Risk

Storm sewers in area, no significant surface water. No ecologically significant receptors at the site (as per Table 2 of Primer).

Contaminants: Barium 0.000111 mg/kg

Sediment (Human): Low Risk

Storm sewers in area, no significant surface water. No surface water receptors.

Contaminants: Barium 0.000111 mg/kg

Soil: Low Risk

subsurface contamination present

Contaminants: Tetrachloroethylene 2.0e-06 mg/kg Lead 0.0628 mg/kg

Surface Water: Low Risk

No impacts to surface water. No receptors.

Contaminants: Barium 111.0 ug/L

Surface Water (Fresh): Low Risk

No impacts to surface water. No ecologically significant receptors at the site (per Table 2 in Primer).

Contaminants: Barium 111.0 ug/L

See more details...

Site ID: ST051

TANK FARM 49A

Underground Storage Tanks

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1995

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: ST052

EAST RAMP TANK REMOVAL

Underground Storage Tanks

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1991

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: ST053

GRAVEL LAKE TANKS

Underground Storage Tanks

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1995

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: TU930

UNDERGROUND STORAGE TANKS 57 AT BLDG 30119, AREA C

Underground Storage Tanks

Cost

$4,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2014

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: FT039

FDTA NO 5

Fire/Crash Training Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1995

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT055

TEMPORARY COAL STORAGE

Surface Disposal Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 1995

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF004

LANDFILL NO 4

Landfill

Cost

$924K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Low Risk

Contamination is largely confined to source area. No potential for receptors.

Contaminants: 1,1-Dichloroethane 1.0 ug/L 1,2-Dichloroethylene (cis) 2.0 ug/L Chlorobenzene 5.0 ug/L 1,1,1-Trichloroethane 5.0 ug/L Trichloroethylene (TCE) 24.0 ug/L

Sediment (Fresh): Low Risk

Contamination not likely to be migrating away from LF4.

Contaminants: Mercury 1.1e-07 mg/kg Manganese and compounds 0.0007830000000000001 mg/kg Cadmium and compounds 0.0011 mg/kg Silver and compounds 0.0014 mg/kg

Sediment (Human): Low Risk

Contamination not likely to be migrating away from LF4. Little potential for receptors (intermittent grounds maintenance personnel)

Contaminants: Mercury 1.1e-07 mg/kg Manganese and compounds 0.0007830000000000001 mg/kg Cadmium and compounds 0.0011 mg/kg Silver and compounds 0.0014 mg/kg

Surface Water: Low Risk

Contamination not likely to be migrating away from LF4. Little potential for receptors (intermittent grounds maintenance personnel).

Contaminants: Arsenic 2.1 ug/L

Surface Water (Fresh): Low Risk

Contamination not likely to be migrating away from LF4.

Contaminants: Arsenic 2.1 ug/L

See more details...

Site ID: LF062

LANDFILL 14

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1994

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: TU934

BLDG 34020 UNDERGROUND STORAGE TANKS 333 AND 334

Underground Storage Tanks

Cost

$45K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2014

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: ST064

UNDERGROUND STORAGE TANKS BLDG 30119

Underground Storage Tanks

Cost

$478K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1996

This site is under ongoing monitoring until Sep 2047

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: TU941

BLDG 26933 UNDERGROUND STORAGE TANKS 78 PAGE MANOR

Underground Storage Tanks

Cost

$65K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2014

This site is under ongoing monitoring until Nov 2018

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF015

EARTH FILL SITE 2

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF025

EARTH FILL ZONE 12

Landfill

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1992

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: TU942

BLDG 30159 AREA C UNDERGROUND STORAGE TANKS 85

Underground Storage Tanks

Cost

$93K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2014

This site is under ongoing monitoring until Dec 2018

Contaminated Areas

Groundwater: Risk Not Evaluated

Contaminants: Xylene (Mixed) 136.0 ug/L Toluene 203.0 ug/L Benzene 846.0 ug/L

See more details...

Site ID: PL583

PETROLEUM RELEASE SITE BLDG 30151 AND AREA C

POL (Petroleum/Oil/Lubricants) Lines

Cost

Unknown

Final Cleanup Action

Oct 2014

Contaminated Areas

Groundwater: Risk Not Evaluated

Contaminants: Benzo(b)Fluoranthene 0.65 ug/L Fluoranthene 1.9 ug/L Methyl tert-Butyl Ether 37.0 ug/L Fluorene 76.0 ug/L Pyrene 88.0 ug/L Benzo(a)Anthracene 98.0 ug/L Phenanthrene 120.0 ug/L Benzene 230.0 ug/L Ethyl benzene 310.0 ug/L Toluene 400.0 ug/L

Soil: Risk Not Evaluated

Contaminants: Benzene 100.0 mg/kg Fluorene 540.0 mg/kg Acenaphthene 580.0 mg/kg Toluene 710.0 mg/kg

See more details...

Site ID: ML895

ARMAMENT LAB AND ASSOCIATED RANGES

Medium/Large Caliber

Cost

Unknown

Final Cleanup Action

Sep 2013

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OT054

COAL STORAGE PILE(SHEEP PASTURE)

Surface Disposal Area

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1993

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: TU940

BLDG S-841 UNDERGROUND STORAGE TANKS 100 AND 111

Underground Storage Tanks

Cost

$91K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2014

This site is under ongoing monitoring until Nov 2018

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: TU943

BLDG 20062 UNDERGROUND STORAGE TANKSS (FMR FF L)

Underground Storage Tanks

Cost

$111K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2014

This site is under ongoing monitoring until Sep 2018

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: DP046

BURIAL SITE #2

Disposal Pit and Dry Well

Cost

$483K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 1998

This site is under ongoing monitoring until Sep 2099

Contaminated Areas

Soil: Low Risk

The area is in very remote part of base

Contaminants: Cadmium and compounds 0.0018000000000000002 mg/kg Nickel (soluble salts) 0.01 mg/kg Arsenic 0.013300000000000001 mg/kg Lead 0.05670000000000001 mg/kg

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »