Cost So Far
$1.77M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$70K
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2018
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
16 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: local use ordinances, dig permits. see more » dig permits local use ordinances prohibit residential use prohibit or otherwise manage excavation « see less
1 Active Site
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SITE 5
FORMER GASOLINE UNDERGROUND STORAGE TANKS
Soil Contamination After Tank Removal
Cost
Unknown
Final Cleanup Action
Apr 2018
Contaminated Areas
Groundwater: High Risk
contamination is moving off site and has migrated from the source area. Water supply wells located approximately 0.5 miles downgradient of the site. Grounwater intersects the surface in this area frequently.
Contaminants: Naphthalene 110.0 ug/L Ethyl benzene 530.0 ug/L Xylene (Mixed) 1500.0 ug/L Toluene 3000.0 ug/L Benzene 9820.0 ug/L
Soil: Low Risk
Groundwater at site 4 impacted with similiar soil BTEX concentrations, petroluem odor to soil. Public access prevented, center personnel access prevented by asphalt cap on area.
Contaminants: Ethyl benzene 1.2 mg/kg Lead 4.9 mg/kg Xylene (Mixed) 7.3 mg/kg Naphthalene 8.5 mg/kg
15 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: SITE 12
#2 FUEL OIL UNDERGROUND STORAGE TANKS (6,000 GAL.)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 4
POTENTIAL PAST DISPOSAL AREA
Surface Disposal Area
Cost
$70K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2008
This site is under ongoing monitoring until Sep 2042
Site ID: SITE 1
PARTS CLEANER
Unknown Site Type
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 10
PAINT STORAGE LOCKER
Storage Area
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 11
BRAKE CHANGING AREA
Unknown Site Type
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 13
SEPTIC SYSTEM
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Sep 2007
Site ID: SITE 15
114 GALLON DIESEL FUEL TANK
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 14
SOIL IN VICINITY OF FORMER QUONSET HUT
Unknown Site Type
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 2
WASTE OIL UNDERGROUND STORAGE TANKS (1,000 GAL.)
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 3
O/W SEPARATOR/DRY WELL
Oil/Water Separator
Cost
Unknown
Final Cleanup Action
May 1995
Site ID: SITE 6
POL ROOM
Storage Area
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 7
TRANSFORMERS
Unknown Site Type
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 8
SUPPLY ROOM
Storage Area
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 9
PARTS CLEANER
Unknown Site Type
Cost
Unknown
Final Cleanup Action
May 1993
Site ID: SITE 16
INTERMITTENT STREAM SW OF AMSA 68
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 2007
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »