Cost So Far
$23.6M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$10.4M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2017
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
34 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
1 Active Site
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: CCHSAAP-42
WORLD WAR II COAL TAR SITE 2
Surface Disposal Area
Cost
$478K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2046
33 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: HSAAP-25
PESTICIDE DRAIN FIELD NEAR BLDG 148
Pesticide Shop
Cost
Unknown
Final Cleanup Action
Dec 1998
Site ID: HSAAP-27
SANITARY LANDFILL WEST OF B-155, CLOSED
Landfill
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: HSAAP-37
GAS PRODUCER CONTAMINATION
Contaminated Buildings
Cost
$627K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Site ID: HSAAP-34
HEATING OIL LEAKING UNDERGROUND STORAGE TANKS AT B-12, AREA A
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: HSAAP-13
FLYASH LF,POND 1&2 SWMU 22,28,38,39
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Sep 2045
Site ID: HSAAP-40
SANDBLASTING/LOADING AREAS
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Dec 2000
Site ID: HSAAAP-AOCO
AREA OF CONCERN O - COAL TAR BURIAL
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 2006
This site is under ongoing monitoring until Sep 2007
Site ID: HSAAP-001-R-01
BURNING GROUND
Open Burn
Cost
Unknown
Final Cleanup Action
Oct 2003
Site ID: HSAAP-01
MISC. LANDFILLS
Landfill
Cost
Unknown
Final Cleanup Action
Jul 2005
Site ID: HSAAP-04
ACTIVE SANITARY LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Aug 1991
Site ID: HSAAP-11
NITRIC ACID SPILL POND
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Feb 1991
Site ID: HSAAP-12
TAR BURIAL PIT AREA B
Landfill
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: HSAAP-15
BURNING GRND SOUTH OF MFG AREA
Burn Area
Cost
Unknown
Final Cleanup Action
Apr 2003
Site ID: HSAAP-16
BUILDING 8 EXPLOSIVES TESTING AREA
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Aug 1991
Site ID: HSAAP-17
PONDS (SODIUM NITRATE) 3 & 4
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Jun 1996
Site ID: HSAAP-19
STP E OF MFG AREA
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
Aug 1991
Site ID: HSAAP-20
FLY ASH LANDFILL, AREA B, CLOSED,
Landfill
Cost
Unknown
Final Cleanup Action
Jan 2000
Site ID: HSAAP-21
AERATION POND AREA A
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Mar 1998
Site ID: HSAAP-22
LANDFILL AREA A - COAL TAR
Landfill
Cost
Unknown
Final Cleanup Action
Mar 1998
Site ID: HSAAP-23
PRODUCTION AREA B DRAINAGE DITCHES
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: HSAAP-28
LEAKING UNDERGROUND STORAGE TANKS B-22
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Dec 1996
Site ID: HSAAP-29
LEAKING UNDERGROUND STORAGE TANKS B-105
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 2005
Site ID: HSAAP-30
FIRING RANGES
Firing Range
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: HSAAP-36
ACTIVE COAL PILE SOUTH OF B-200, STM PLT
Storage Area
Cost
Unknown
Final Cleanup Action
Aug 1991
Site ID: PBC AT HOLSTON
PBC
Site Never Existed
Cost
$350K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Sep 2017
Site ID: HSAAP-39
PAST SPILL SITES /LOADING SITES
Spill Site Area
Cost
Unknown
Final Cleanup Action
Aug 1991
Site ID: HSAAP-08
SURFACE IMPOUNDMENTS REQUIRING CONF
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Mar 2007
This site is under ongoing monitoring until Dec 2015
Site ID: HSAAP-26
PESTICIDE AREAS NEAR B-105,B-148
Surface Disposal Area
Cost
$109K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Sep 2045
Site ID: HSAAP-33
FORMER SOLVENT BURN TANK
Surface Impoundment/Lagoon
Cost
$7.81M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2007
This site is under ongoing monitoring until Sep 2045
Site ID: HSAAP-38
MISC.STORAGE AREAS REQUIRING CONFIRM.
Storage Area
Cost
Unknown
Final Cleanup Action
Sep 2006
Site ID: CCHSAAP-41
CATCH BASINS AND APRONS
Surface Impoundment/Lagoon
Cost
$723K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
This site is under ongoing monitoring until Sep 2045
Site ID: HSAAP-002-R-01
EXPLOSIVES TESTING AREA
Open Burn
Cost
Unknown
Final Cleanup Action
Oct 2003
Site ID: HSAAP-03
TAR (WWII) NEAR POND 3,AREA B TAR
Landfill
Cost
$530K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2005
This site is under ongoing monitoring until Sep 2045
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »