Cost So Far
$191M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$32M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2074
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
45 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: local use ordinances, fences, dig permits. see more » fences guards signs environmental covenants dig permits local use ordinances education programs prohibit installation of drinking water well prohibit human consumption of groundwater prohibit agricultural-irrigation-livestock use of groundwater prohibit groundwater extraction that interferes with remedial action system restrict withdrawal or use of groundwater without treatment prohibit residential use prohibit sensitive use (e.g. hospital, daycare, school) landfill restriction - prohibit activities that would impact the landfill cap (or cover system) and drainage system landfill restriction - prohibit excavation on landfill cap or cover system « see less
3 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: MAAP-011
OU4 WESTERN PLUME AREA GROUNDWATER
Industrial Discharge
Cost
$5.02M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2014
Site ID: MAAP-034
NORTHERN BOUNDARY AREA OU1 & OU3
Drainage Ditch
Cost
$9.09M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2014
Site ID: MAAP-003
SITEWIDE GOUNDWATER (ALL PLUMES)
Industrial Discharge
Cost
$12.3M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2014
42 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: MAAP-014
O LINE LAGOON GROUNDWATER (SWMU 10)
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Mar 1996
Site ID: MAAP-004A
LINE B (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-003A
NI SOILS OU (AREAS NORTH OF RT. 54)
Industrial Discharge
Cost
$1.98M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2009
This site is under ongoing monitoring until Sep 2044
Site ID: MAAP-004
OU4, REGION 1 (LINE B (SWMU 9))
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: MAAP-005
LINE C (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: MAAP-006
LINE D (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: MAAP-007
LINE E (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: MAAP-007A
LINE E (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: CCMLAAP05
LNAPL REMOVAL AT LINE B
Spill Site Area
Cost
Unknown
Final Cleanup Action
Jun 2010
Site ID: MAAP-003-R-01
SUNNY SLOPES AREA
Open Burn
Cost
Unknown
Final Cleanup Action
Sep 2012
Site ID: MAAP-005A
LINE C (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
This site is under ongoing monitoring until Jul 2004
Site ID: MAAP-006A
LINE D (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-017A
OPEN BURNING GROUND OU5 (REMOVAL)
Explosive Ordnance Disposal Area
Cost
$1.8M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2011
This site is under ongoing monitoring until Sep 2044
Site ID: MAAP-008
LINE F (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: MAAP-013A
LINE O (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-008A
LINE F (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-009
LINE H (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: MAAP-009A
LINE H (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-010
LINE K (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: MAAP-012
LINE Z (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: MAAP-012A
LINE Z (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Apr 1999
Site ID: MAAP-013
LINE O (SWMU 9)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: MAAP-015
CLOSED BURNOUT AREA (SWMU 2)
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Dec 1991
Site ID: MAAP-016
AMMO DESTRUCTION AREA (SWMU 1)
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Sep 2002
Site ID: MAAP-018
CLOSED LANDFILL (SWMU 6)
Landfill
Cost
Unknown
Final Cleanup Action
Jan 2003
Site ID: MAAP-019
PRESENT LANDFILL (SWMU 4)
Landfill
Cost
Unknown
Final Cleanup Action
Dec 1991
Site ID: MAAP-022
SALVAGE YARD (SWMU 11)
Storage Area
Cost
Unknown
Final Cleanup Action
Nov 1992
Site ID: MAAP-032
CONSTRUCTION DISPOSAL SITE (SWMU 7)
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 2002
Site ID: MAAP-037
BUILDING Y-103 RAILROAD YARD
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 2002
This site is under ongoing monitoring until Sep 2003
Site ID: PBC AT MILAN
PBC AT MILAN
Site Never Existed
Cost
Unknown
Final Cleanup Action
Sep 2007
Site ID: MAAP-018A
CLOSED LANDFILL (BIOREMEDIATION)
Landfill
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-032A
CONSTRUCTION DISPOSAL SITE
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-035
EFF DRAINAGE DITCHES (CENTRAL)(SWMU 8)
Drainage Ditch
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: MAAP-017
OPEN BURNING GROUNDS (SWMU 3)
Explosive Ordnance Disposal Area
Cost
$183K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2004
Site ID: MAAP-011A
LINE X (BIOREMEDIATION)
Industrial Discharge
Cost
Unknown
Final Cleanup Action
May 1999
Site ID: MAAP-036
LEAD CONTAMINATION @ WATER TOWERS
Contaminated Soil Piles
Cost
Unknown
Final Cleanup Action
Oct 1997
This site is under ongoing monitoring until Jul 2004
Site ID: MAAP-033
FORMER AMMUN DESTRUCTION AREA (SWMU 3)
Explosive Ordnance Disposal Area
Cost
Unknown
Final Cleanup Action
Jul 2004
Site ID: CCMLAP06
AREA J TANK FARM
Above Ground Storage Tank
Cost
$10K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2015
Site ID: MAAP-002
TEST AREA
Firing Range
Cost
Unknown
Final Cleanup Action
Sep 2003
Site ID: MAAP-001-R-01
OPEN BURNING GROUND
Open Burn
Cost
$800K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2014
This site is under ongoing monitoring until Sep 2044
Site ID: MAAP 014A
OU2 O-LINE LAGOON (SOILS) SWMU 10
Surface Impoundment/Lagoon
Cost
$1.98M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 1997
This site is under ongoing monitoring until Sep 2045
Site ID: MAAP-002-R-01
MACHINE GUN RANGE
Small Arms Range
Cost
Unknown
Final Cleanup Action
Dec 2005
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »