Back to Map
AIR FORCE INSTALLATION ID: TX621162013300

JBSA-CAMP BULLIS

san antonio, Texas

Cost So Far

$5.66M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$3.77M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Completion Date

2017

The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.

13 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

4 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: LF002

LANDFILL #8

Landfill

Cost

$2.85M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2008

This site is under ongoing monitoring until Sep 2046

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: FR004

75MM MUNITIONS AREA

Firing Range

Cost

$426K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2015

This site is under ongoing monitoring until Sep 2045

Site ID: TU003

RS-C503

Underground Storage Tanks

Cost

$601K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2017

Site ID: FR001

STOKES MORTARS RANGE

Firing Range

Cost

$435K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2015

This site is under ongoing monitoring until Sep 2045

9 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SR002B

MACHINE GUN RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Aug 2005

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SR003

100 TARGET RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Aug 2005

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: FR001A

STOKES MORTARS RANGE

Firing Range

Cost

Unknown

Final Cleanup Action

Sep 2012

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: LF006

CAMP BULLIS LANDFILLS SITE 17

Landfill

Cost

Unknown

Final Cleanup Action

Jun 1994

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: RG005

RANGE IMPACT AREA SITE 14

Firing Range

Cost

Unknown

Final Cleanup Action

Jan 1989

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SA007

CAMP BULLIS MOTOR POOL SITE 15

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 1989

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: ST004

SEWAGE TREATMENT AREA SITE 13

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Jul 1997

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: OW008

TEXAS NATIONAL GUARD MOTOR POOL SITE 16

Oil/Water Separator

Cost

Unknown

Final Cleanup Action

Jul 1997

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Site ID: SR002

MACHINE GUN RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Aug 2005

Contaminated Areas

Groundwater: Risk Not Evaluated

Sediment (Ecological): Risk Not Evaluated

Sediment (Human): Risk Not Evaluated

Soil: Risk Not Evaluated

Surface Water: Risk Not Evaluated

Surface Water (Ecological): Risk Not Evaluated

See more details...

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »