Cost So Far
$35.3M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$9.03M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2046
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
17 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions, warning signs, signs. see more » annual written certification of compliance with lucs a deed restriction is documented in the parcel deed. incorporation of lucs into a base master plan a warning sign is in place surrounding the area prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. groundwater use restricted. prohibits any use other than industrial in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. « see less
4 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: SITE 00005
ST JULIEN'S CREEK ANNEX
Burn Area
Cost
$132K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2016
Contaminated Areas
Groundwater: High Risk
Contaminants: Vanadium 2900.0 ppb Methylene chloride 8000.0 ppb Nickel and compounds 16400.0 ppb Copper and compounds 22200.0 ppb Aluminum 96200.0 ppb Barium and compounds 264000.0 ppb Manganese 1890000.0 ppb
Soil: Medium Risk
Contaminants: Methylene chloride 0.01 ppb Aroclor 0.04 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.1 ppb Mercury and compounds (inorganic) 0.29 ppb Nitrosodiphenylamine, N- 0.33 ppb Beryllium and compounds 0.5 ppb Benzo[k]fluoranthene 0.54 ppb Indeno[1,2,3-cd]pyrene 0.58 ppb Benz(a)anthracene 0.7 ppb Chrysene 0.75 ppb Benzo[a]pyrene 0.8 ppb Benzo[b]fluoranthene 1.0 ppb Pyrene 1.2 ppb Dinitrotoluene, 2,6- 2.1 ppb Cadmium and compounds 6.6 ppb Arsenic (noncancer) 16.7 ppb Antimony and compounds 18.6 ppb Chromium VI and compounds 63.8 ppb Nickel and compounds 129.0 ppb Manganese 658.0 ppb Copper and compounds 1210.0 ppb Barium and compounds 4640.0 ppb Aluminum 5210.0 ppb Lead 7910.0 ppb
Site ID: SITE 00021
ST JULIEN'S CREEK ANNEX
Contaminated Ground Water
Cost
$2.13M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2012
Contaminated Areas
Groundwater: High Risk
Contaminants: Chloroform 2000.0 ppb Lead 2000.0 ppb Acetone 13000.0 ppb Cyanide (free) 15800.0 ppb Carbon tetrachloride 30000.0 ppb Zinc 36100.0 ppb Methylene chloride 160000.0 ppb Manganese 602000.0 ppb Trichloroethylene (TCE) 2400000.0 ppb
Soil: Low Risk
Contaminants: Arsenic (noncancer) 2.6 ppb Chromium VI and compounds 11.6 ppb Vanadium 20.9 ppb Copper and compounds 79.4 ppb Barium and compounds 94.8 ppb Lead 144.0 ppb Manganese 405.0 ppb Aluminum 4350.0 ppb
Site ID: UST 000001
ST JULIEN'S CREEK ANNEX
Underground Storage Tanks
Cost
$297K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2010
Site ID: SITE 00002
ST JULIEN'S CREEK ANNEX
Landfill
Cost
$6.05M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Feb 2014
Contaminated Areas
Groundwater: High Risk
Contaminants: Trinitrotoluene, 2,4,6- 580.0 ppb Trinitrobenzene, 1,3,5- 580.0 ppb Vanadium 3100.0 ppb Styrene 4000.0 ppb Nickel and compounds 12000.0 ppb Acetone 24000.0 ppb Zinc 29400.0 ppb Aluminum 72700.0 ppb Barium and compounds 72700.0 ppb Manganese 726000.0 ppb Trichloroethylene (TCE) 330000000.0 ppb
Soil: Medium Risk
Contaminants: Methylene chloride 0.01 ppb Benzo[b]fluoranthene 0.05 ppb Aroclor 0.07 ppb DDT 0.1 ppb Cadmium and compounds 2.1 ppb Mercury and compounds (inorganic) 2.7 ppb Arsenic (noncancer) 3.8 ppb Beryllium and compounds 11.5 ppb Antimony and compounds 12.8 ppb Vanadium 38.3 ppb Chromium VI and compounds 225.0 ppb Barium and compounds 241.0 ppb Manganese 417.0 ppb Lead 1830.0 ppb Copper and compounds 3450.0 ppb Aluminum 20700.0 ppb
13 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: SITE 00003
ST JULIEN'S CREEK ANNEX
Landfill
Cost
Unknown
Final Cleanup Action
Sep 2005
Contaminated Areas
Groundwater: High Risk
Contaminants: Trinitrobenzene, 1,3,5- 1100.0 ppb Vanadium 8600.0 ppb Nickel and compounds 24400.0 ppb Copper and compounds 29800.0 ppb Barium and compounds 787000.0 ppb Manganese 3500000.0 ppb Aluminum 4100000.0 ppb
Soil: Medium Risk
Contaminants: Aroclor 0.04 ppb Mercury and compounds (inorganic) 0.18 ppb Indeno[1,2,3-cd]pyrene 0.23 ppb Phenanthrene 0.42 ppb Chrysene 0.48 ppb Benzo[k]fluoranthene 0.49 ppb Benzo[a]pyrene 0.49 ppb Fluorene 0.49 ppb Pyrene 0.52 ppb Fluoranthene 0.66 ppb Benzo[b]fluoranthene 1.5 ppb Thallium 2.5 ppb Arsenic (noncancer) 13.1 ppb Barium and compounds 25.8 ppb Chromium VI and compounds 42.1 ppb Vanadium 79.8 ppb Copper and compounds 125.0 ppb Methylene chloride 130.0 ppb Lead 226.0 ppb Manganese 246.0 ppb Aluminum 17800.0 ppb
Site ID: SITE 00016
ST JULIEN'S CREEK ANNEX
Storage Area
Cost
Unknown
Final Cleanup Action
Jan 2001
Contaminated Areas
Soil: High Risk
Contaminants: Beryllium and compounds 0.32 ppb Mercury and compounds (inorganic) 1.9 ppb Arsenic (noncancer) 5.8 ppb Antimony and compounds 16.4 ppb Vanadium 18.7 ppb Cadmium and compounds 38.1 ppb Chromium VI and compounds 118.0 ppb Barium and compounds 274.0 ppb Lead 713.0 ppb Nickel and compounds 721.0 ppb Manganese 761.0 ppb Aluminum 3648.0 ppb Zinc 3780.0 ppb Copper and compounds 8270.0 ppb
Groundwater: Medium Risk
Contaminants: Nickel and compounds 9500.0 ppb Zinc 28300.0 ppb Barium and compounds 49000.0 ppb Aluminum 282000.0 ppb Manganese 632000.0 ppb
Site ID: SITE 00018
ST JULIEN'S CREEK ANNEX
Chemical Disposal
Cost
Unknown
Final Cleanup Action
Feb 2002
Contaminated Areas
Soil: Medium Risk
Contaminants: Carbazole 0.05 ppb Naphthalene 0.05 ppb Anthracene 0.06 ppb Mercury and compounds (inorganic) 0.15 ppb Benz(a)anthracene 0.25 ppb Beryllium and compounds 0.25 ppb Chrysene 0.33 ppb Fluoranthene 0.45 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.63 ppb Pyrene 0.78 ppb Arsenic (cancer) 3.9 ppb Nickel and compounds 12.7 ppb Cadmium and compounds 32.2 ppb Vanadium 34.0 ppb Manganese 49.6 ppb Chromium VI and compounds 111.0 ppb Barium and compounds 130.0 ppb Zinc 554.0 ppb Copper and compounds 589.0 ppb Lead 907.0 ppb Aluminum 4520.0 ppb
Site ID: SITE 00019
ST JULIEN'S CREEK ANNEX
Contaminated Ground Water
Cost
Unknown
Final Cleanup Action
May 2006
Contaminated Areas
Soil: High Risk
Contaminants: Mercury and compounds (inorganic) 2.6 ppb Cyanide (free) 12.6 ppb Vanadium 12.7 ppb Arsenic (noncancer) 24.3 ppb Antimony and compounds 120.0 ppb Cadmium and compounds 396.0 ppb Nickel and compounds 448.0 ppb Chromium VI and compounds 1040.0 ppb Manganese 1160.0 ppb Barium and compounds 2020.0 ppb Aluminum 2400.0 ppb Lead 6200.0 ppb Zinc 6670.0 ppb Copper and compounds 42500.0 ppb
Groundwater: Low Risk
Contaminants: Acetone 6000.0 ppb Chromium VI and compounds 8500.0 ppb Methylene chloride 11000.0 ppb Lead 15300.0 ppb Copper and compounds 29600.0 ppb Manganese 35600.0 ppb Zinc 45600.0 ppb Barium and compounds 89800.0 ppb Aluminum 2570000.0 ppb
Site ID: UXO 000001
ST JULIEN'S CREEK ANNEX
Contaminated Sediments
Cost
Unknown
Final Cleanup Action
Apr 2013
Site ID: SITE 00001
ST JULIEN'S CREEK ANNEX
Landfill
Cost
Unknown
Final Cleanup Action
Nov 2002
Contaminated Areas
Surface Water (Human): High Risk
Contaminants: Beryllium and compounds 6000.0 ppb Cobalt 54000.0 ppb Arsenic 66000.0 ppb Barium 259000.0 ppb Mercury (Inorganic) 917000.0 ppb Aluminum 95000000.0 ppb Iron 141000000.0 ppb Chromium 186000000.0 ppb
Groundwater: Medium Risk
Contaminants: Nitrobenzene 750.0 ppb Lead 2500.0 ppb Arsenic (noncancer) 2500.0 ppb Silver and compounds 6000.0 ppb Copper and compounds 7700.0 ppb Methylene chloride 16000.0 ppb Zinc 60800.0 ppb Barium and compounds 69600.0 ppb Manganese 186000.0 ppb Aluminum 603000.0 ppb Iron 2740000.0 ppb Magnesium-28 5890000.0 ppb
Soil: Medium Risk
Contaminants: Acetone 0.01 ppb Bis(2-ethylhexyl)phthalate 0.06 ppb Benz(a)anthracene 0.21 ppb Indeno[1,2,3-cd]pyrene 0.29 ppb Benzo[a]pyrene 0.37 ppb Pyrene 0.41 ppb Benzo[k]fluoranthene 0.48 ppb Fluoranthene 0.54 ppb Beryllium and compounds 0.55 ppb Chrysene 0.7 ppb Benzo[b]fluoranthene 0.71 ppb DDD 4.6 ppb Arsenic (noncancer) 4.7 ppb Nickel and compounds 10.0 ppb Chromium VI and compounds 26.2 ppb Vanadium 31.8 ppb DDE 43.0 ppb Copper and compounds 46.1 ppb DDT 47.0 ppb Barium and compounds 56.8 ppb Zinc 61.7 ppb Lead 64.7 ppb Manganese 174.0 ppb Iron 12200.0 ppb Aluminum 27200.0 ppb
Site ID: SITE 00006
ST JULIEN'S CREEK ANNEX
Burn Area
Cost
Unknown
Final Cleanup Action
Aug 2003
Contaminated Areas
Sediment (Marine): High Risk
Contaminants: DDD 0.06 ppb DDT 0.07 ppb DDE 0.12 ppb
Soil: Medium Risk
Contaminants: Methylene chloride 0.01 ppb DDT 0.08 ppb Carbazole 0.08 ppb Anthracene 0.09 ppb Dibenz[ah]anthracene 0.16 ppb Phenanthrene 0.42 ppb Cadmium and compounds 0.43 ppb Benzo[k]fluoranthene 0.5 ppb Cyanide (free) 0.59 ppb Benzo[b]fluoranthene 0.86 ppb Benzo[a]pyrene 0.91 ppb Benz(a)anthracene 0.92 ppb Chrysene 1.0 ppb Fluoranthene 1.3 ppb Nickel and compounds 3.5 ppb Arsenic (noncancer) 4.6 ppb Chromium VI and compounds 5.1 ppb Vanadium 6.4 ppb Copper and compounds 10.3 ppb Barium and compounds 30.4 ppb DDD 39.0 ppb Lead 69.2 ppb Manganese 104.0 ppb DDE 120.0 ppb Zinc 163.0 ppb Aluminum 2020.0 ppb
Site ID: SITE 00008
ST JULIEN'S CREEK ANNEX
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Mar 2003
Contaminated Areas
Soil: High Risk
Contaminants: DDD 0.05 ppb DDE 0.75 ppb Endrin 7.8 ppb DDT 1500.0 ppb
Site ID: SITE 00014
ST JULIEN'S CREEK ANNEX
Washrack
Cost
Unknown
Final Cleanup Action
Aug 1999
Contaminated Areas
Groundwater: Low Risk
Contaminants: Methylene chloride 11000.0 ppb Trichloroethylene (TCE) 46000.0 ppb Dichloroethane, 1,2- (EDC) 110000.0 ppb Manganese 1440000.0 ppb
Soil: Low Risk
Contaminants: Cadmium and compounds 2.1 ppb Arsenic (noncancer) 3.3 ppb Nickel and compounds 10.4 ppb Vanadium 24.3 ppb Chromium VI and compounds 32.3 ppb Manganese 61.6 ppb Barium and compounds 148.0 ppb Copper and compounds 362.0 ppb Zinc 461.0 ppb Lead 1040.0 ppb Aluminum 7400.0 ppb
Site ID: SITE 00015
ST JULIEN'S CREEK ANNEX
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Jan 2001
Contaminated Areas
Groundwater: High Risk
Contaminants: Mercury and compounds (inorganic) 990.0 ppb Acetone 12000.0 ppb Lead 19400.0 ppb Cadmium and compounds 50200.0 ppb Beryllium and compounds 51700.0 ppb Arsenic (cancer) 52800.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 70000.0 ppb Cyanide (free) 85200.0 ppb Chromium VI and compounds 213000.0 ppb Copper and compounds 266000.0 ppb Antimony and compounds 474000.0 ppb Vanadium 480000.0 ppb Nickel and compounds 504000.0 ppb Zinc 525000.0 ppb Manganese 622000.0 ppb Barium and compounds 2029000.0 ppb Aluminum 2187000.0 ppb
Soil: Medium Risk
Contaminants: Beryllium and compounds 0.21 ppb Mercury and compounds (inorganic) 0.25 ppb Cadmium and compounds 0.76 ppb Pyrene 3.2 ppb Arsenic (noncancer) 10.1 ppb Vanadium 11.7 ppb Chromium VI and compounds 21.0 ppb Lead 127.0 ppb Barium and compounds 155.0 ppb Manganese 242.0 ppb Copper and compounds 1390.0 ppb Aluminum 4440.0 ppb
Site ID: SITE 00017
ST JULIEN'S CREEK ANNEX
Chemical Disposal
Cost
Unknown
Final Cleanup Action
Jul 2004
Contaminated Areas
Soil: High Risk
Contaminants: Dieldrin 0.03 ppb DDD,4,4- 0.08 ppb Mercury and compounds (inorganic) 0.11 ppb DDE 0.18 ppb Beryllium and compounds 0.23 ppb DDT 0.24 ppb Chrysene 0.43 ppb Benzo[a]pyrene 0.47 ppb Benz(a)anthracene 0.52 ppb Bis(2-ethylhexyl)phthalate (DEHP) 0.62 ppb Arsenic (noncancer) 2.4 ppb Benzo[k]fluoranthene 3.7 ppb Carbazole 3.7 ppb Cadmium and compounds 7.3 ppb Nickel and compounds 27.4 ppb Chromium VI and compounds 29.9 ppb Barium and compounds 58.1 ppb Copper and compounds 72.3 ppb Vanadium 103.0 ppb Manganese 138.0 ppb Lead 211.0 ppb Zinc 272.0 ppb Benzo[b]fluoranthene 740.0 ppb Aluminum 2910.0 ppb
Groundwater: Medium Risk
Contaminants: Mercury and compounds (inorganic) 920.0 ppb Lead 20700.0 ppb Silver and compounds 40500.0 ppb Cadmium and compounds 47500.0 ppb Beryllium and compounds 49900.0 ppb Cyanide (free) 79000.0 ppb Chromium VI and compounds 212000.0 ppb Copper and compounds 256000.0 ppb Antimony and compounds 436000.0 ppb Vanadium 470000.0 ppb Nickel and compounds 490000.0 ppb Zinc 500000.0 ppb Barium and compounds 1961000.0 ppb Aluminum 2298000.0 ppb Manganese 3227000.0 ppb
Site ID: SITE 00004
ST JULIEN'S CREEK ANNEX
Landfill
Cost
$940K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2005
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Groundwater: High Risk
Contaminants: Vanadium 5100.0 ppb Methylene chloride 10000.0 ppb Chromium VI and compounds 15200.0 ppb Acetone 25000.0 ppb Aluminum 133000.0 ppb Barium and compounds 364000.0 ppb Manganese 947000.0 ppb
Soil: Medium Risk
Contaminants: Acetone 0.01 ppb Dieldrin 0.03 ppb Benz(a)anthracene 1.3 ppb Beryllium and compounds 1.4 ppb Pyrene 1.6 ppb Mercury and compounds (inorganic) 1.6 ppb Benzo[a]pyrene 1.9 ppb Fluoranthene 4.9 ppb Benzo[b]fluoranthene 5.2 ppb Barium and compounds 107.0 ppb Manganese 153.0 ppb Chromium VI and compounds 256.0 ppb Copper and compounds 263.0 ppb Lead 366.0 ppb Nickel and compounds 1400.0 ppb Vanadium 5330.0 ppb Aluminum 7390.0 ppb
Site ID: SITE 00011
ST JULIEN'S CREEK ANNEX
Chemical Disposal
Cost
Unknown
Final Cleanup Action
Feb 2002
Contaminated Areas
Groundwater: Medium Risk
Contaminants: Methylene chloride 11000.0 ppb Trichloroethylene (TCE) 46000.0 ppb Aluminum 120000.0 ppb Manganese 1440000.0 ppb
Soil: Medium Risk
Contaminants: Dieldrin 0.06 ppb Endrin 0.17 ppb Cadmium and compounds 2.1 ppb Arsenic (noncancer) 3.3 ppb Nickel and compounds 10.4 ppb Chromium VI and compounds 32.3 ppb Manganese 61.6 ppb Barium and compounds 148.0 ppb Copper and compounds 362.0 ppb Zinc 461.0 ppb Lead 1040.0 ppb Aluminum 7400.0 ppb
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »