ARMY INSTALLATION ID: VA321022008200

FORT BELVOIR

fort belvoir, Virginia

Cost So Far

$48.8M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$15.7M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2049

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

147 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: local use ordinances, fences, dig permits. see more » fences guards signs environmental covenants easements dig permits local use ordinances notations in master plan education programs prohibit residential use prohibit sensitive use (e.g. hospital, daycare, school) prohibit exposure to sediments prohibit or otherwise manage excavation prohibit human consumption of groundwater prohibit installation of drinking water well prohibit agricultural-irrigation-livestock use of groundwater landfill restriction - prohibit activities that would impact the landfill cap (or cover system) and drainage system landfill restriction - prohibit excavation on landfill cap or cover system landfill restriction - prohibit installation of utility system lines through the site landfill restriction - restrict construction of buildings that may interfere with landfill cap or cover system landfill restriction - restrict plantings that interfere landfill cap or cover system (roots that penetrate the cap or cover system) restrict withdrawal or use of groundwater without treatment prohibit groundwater extraction that interferes with remedial action system restrict land use - mitigation area(s) protection prohibit, or otherwise manage excavation below a specified depth « see less

35 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: FTBL-003-R-01

COMBAT RANGE COMPLEX

Small Arms Range

Cost

$359K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2017

This site is under ongoing monitoring until Sep 2046

Site ID: FTBL-027-R-01

T-16

Firing Range

Cost

$103K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2017

This site is under ongoing monitoring until Sep 2046

Site ID: FTBL-025-R-01

DEMOLITION AREA - USACE

Explosive Ordnance Disposal Area

Cost

$120K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2017

This site is under ongoing monitoring until Sep 2046

Site ID: FTBL-004-R-01

COMBAT RANGE COMPLEX-WATER

Small Arms Range

Cost

Unknown

Final Cleanup Action

Dec 2018

Site ID: FTBL-005-R-05

INERT MINE TESTING AREA AT RANGE 5

Training and Maneuver Area

Cost

$891K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

Site ID: FTBL-66

SITES M-07/18 AND AOPC-4

Fire/Crash Training Area

Cost

$96K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2017

Contaminated Areas

Groundwater: Medium Risk

Area slated for BRAC construction. Potential for construction worker/office worker exposure.

Contaminants: Vinyl Chloride 2.4 ug/L Naphthalene 19.0 ug/L Chloroform 200.0 ug/L Benzene 230.0 ug/L Carbon Tetrachloride 510.0 ug/L

See more details...

Site ID: FTBL-001-R-02

INFILTRATION COURSE

Firing Range

Cost

$187K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2018

This site is under ongoing monitoring until Sep 2047

Site ID: FTBL-018-R-01

DEMOLITION AREA - 01

Explosive Ordnance Disposal Area

Cost

$107K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2017

This site is under ongoing monitoring until Sep 2046

Site ID: FTBL-026-R-01

MINES AND BOOBY TRAP AREA

Training and Maneuver Area

Cost

$361K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

May 2017

This site is under ongoing monitoring until Sep 2046

Site ID: FTBL-005-R-01

FORT BELVOIR NORTH AREA (EPG)

Storage Area

Cost

$308K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2018

This site is under ongoing monitoring until Sep 2048

Site ID: FTBL-005-R-09

FBNA SOILS AND GROUNDWATER

Contaminated Ground Water

Cost

$746K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2019

Site ID: FTBL-005-R-10

MUNITIONS DISPOSAL PIT AT RANGE 5

Disposal Pit and Dry Well

Cost

$1.61M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2017

Site ID: FTBL-024-R-01

BOOBY TRAP SITE

Training and Maneuver Area

Cost

$86K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2017

This site is under ongoing monitoring until Sep 2046

Site ID: FTBL-014-R-01

TRACY ROAD RANGE

Small Arms Range

Cost

$187K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2016

This site is under ongoing monitoring until Sep 2046

Site ID: FTBL-007-R-01

GRENADE COURT

Small Arms Range

Cost

$105K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2017

This site is under ongoing monitoring until Sep 2046

Site ID: CC-MP11

FORMER PCB TRANSFORMER STORAGE AREA

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Aug 2019

Site ID: CC-A04A23

FORMER COAL STORAGE AREA & PCB SPILL SIT

Spill Site Area

Cost

$130K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2016

Site ID: CC-L45

SEWAGE TREATMENT PLANT #1

Sewage Treatment Plant

Cost

$225K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

Site ID: CC-A08A16

GW VILLAGE LANDFILL & INTERCEPTOR T

Landfill

Cost

$523K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2016

Site ID: CC-A12

ACCOTINK LANDFILL

Landfill

Cost

$953K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2016

Site ID: FTBL-24

SEWAGE TREATMENT PLANT 2

Sewage Treatment Plant

Cost

$244K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

Site ID: FTBL-51

TANK FARM - BLDG 324, 325

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Feb 2008

Site ID: CC-A05

ROAD AND GROUNDS/LAND MGMT STORAGE AREA

Landfill

Cost

$2.32M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2016

This site is under ongoing monitoring until Sep 2045

Site ID: FTBL-69

M-27, WASTE ORDNANCE PIT AT RANGE 1

Explosive Ordnance Disposal Area

Cost

$794K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2009

This site is under ongoing monitoring until Sep 2045

Site ID: CC-AOPC-20 BNA

CONTAMINATED SOIL AND GROUNDWATER

Contaminated Sediments

Cost

Unknown

Final Cleanup Action

Jun 2017

Site ID: CC-MPS2009

PSAS 2009, 2033, AND 2034

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jun 2018

Site ID: FTBL-68

M-26, HYDROCARBON SPILL AREA

Spill Site Area

Cost

$792K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2008

Site ID: CC-A09

MARKHAM SCHOOL LANDFILL & INTERCEPT

Landfill

Cost

$1.55M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2016

Site ID: CC-L09

FORMER COAL STORAGE AREA IN-GROUND CONCR

Oil/Water Separator

Cost

Unknown

Final Cleanup Action

Jun 2018

Site ID: CC-A11

POE ROAD LANDFILL

Landfill

Cost

$713K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Apr 2016

Site ID: CC-MP1

FORMER POL AREA AT ACCOTINK LANDFIL

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Sep 2016

Site ID: CC-MP10

21ST STREET LIQUID DUMP SITE

Drainage Ditch

Cost

$2,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Mar 2017

Site ID: CC-MP2

1124 PCE DETECTIONS

Contaminated Ground Water

Cost

$3,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2017

Site ID: CC-A24

FORMER DPDO STORAGE AREA- PCB SPILL

Spill Site Area

Cost

$127K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2016

Site ID: CC-A29

MASON PIT DEBRIS FILL

Landfill

Cost

$20K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2016

112 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: CC-L33

BUILDING 326 DITCH CONT. BY OIL SPI

Spill Site Area

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2012

This site is under ongoing monitoring until Feb 2045

Site ID: CCBLDG1124

BLDG 1124 - VEHICLE FUELING FACILITY

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Oct 2008

This site is under ongoing monitoring until Dec 2013

Site ID: CCBLDG2209

BLDG 2209/2217- FORMER MILITARY BARRACKS

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jul 2008

This site is under ongoing monitoring until Dec 2013

Site ID: CCBLDG305

BLDG 305 - RESEARCH & DEVELOPMENT CENTER

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jun 2008

This site is under ongoing monitoring until Oct 2010

Site ID: CCBLDG3161

BG 3161- DAVISON ARMY AIRFIELD FUEL YARD

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Feb 2002

Site ID: CCBLDG773

FORMER BUILDING 773

Soil Contamination After Tank Removal

Cost

Unknown

Final Cleanup Action

Jun 2006

This site is under ongoing monitoring until Apr 2010

Site ID: CC-DAAF1

DAAF FLIGHT TOWER

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Mar 2014

Site ID: CC-F06

BUILDING 1906 ABOVEGROUND WASTE POL TANK

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Dec 2013

Site ID: CC-G13

B1453 FORMER UNDERGROUND STORAGE TANKSS & RELATED CONTAM.

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Aug 2011

Site ID: CC-L05

BLDG 307 CONCRETE APRON DISPOSAL AREA

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 2012

Site ID: CC-A27

SUSPECTED SANITARY LANDFILL C

Landfill

Cost

$134K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2012

This site is under ongoing monitoring until Feb 2045

Site ID: CC_E10

BUILDING 328 WASTE POL STORAGE AREA

Storage Area

Cost

Unknown

Final Cleanup Action

Dec 2013

Site ID: CC-MP9

OLD DUMP

Surface Disposal Area

Cost

$3,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2015

Site ID: CC-N05

BUILDING 328A OIL/WATER SEPARATOR

Oil/Water Separator

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2012

This site is under ongoing monitoring until Feb 2045

Site ID: CC-N23

POST DUMP

Landfill

Cost

$132K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2013

This site is under ongoing monitoring until Aug 2045

Site ID: CC-MP7

FUTURE OSEG FACILITY

Contaminated Soil Piles

Cost

Unknown

Final Cleanup Action

Sep 2011

Site ID: CC-MP8

AAFES SHOPPETTE PROJECT

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Dec 2012

Site ID: CCPBA@BELVOIR

PBA@IR AND CR BELVOIR

Site Never Existed

Cost

Unknown

Final Cleanup Action

Sep 2014

Site ID: FTBL-002-R-01

SMALL ARMS RANGE COMPLEX-WATER

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-005-R-04

BURIAL PIT AT RANGE 1A

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Sep 2009

Site ID: FTBL-005-R-06

WASTE ORDNANCE PITS AT RANGE 5

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2009

Site ID: FTBL-005-R-07

TROOP TRAINING AREA AT RANGE 5B

Training and Maneuver Area

Cost

Unknown

Final Cleanup Action

Jun 2010

Site ID: FTBL-005-R-08

RANGE 5 (BUILDING 5091)

Firing Range

Cost

Unknown

Final Cleanup Action

Jun 2010

Site ID: FTBL-006-R-01

FAIRFAX RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-009-R-01

LORTON COMBAT RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-01

CLOSED LANDFILL (REVEGETATED)

Landfill

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: FTBL-010-R-01

LORTON COMBAT RANGE-TD

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-013-R-01

PIG FARM RANGE-TD

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: CC-MP4

CONTAMINATED SOIL AT 9TH AND GUNSTO

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Feb 2012

Site ID: FTBL-008-R-01

GUNSTON ROAD 1000" RIFLE RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-015-R-01

TRACY ROAD RANGE-TD

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-02

INACTIVE LANDFILL(BORDERS ACCOTINK CREEK

Landfill

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-04

BATTERY STORAGE AREA-BLDGS 324,1146

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-05

LABORATORY STORAGE AREA,#305,307,357

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-06

SEWAGE TREATMENT PLANT 1(INACTIVE)

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-07

FUEL STORAGE/AREA 300 BLDGS

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-08

OIL/WATER SEPARATOR (3)

Oil/Water Separator

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-09

THOETE ROAD LANDFILL

Landfill

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: FTBL-11

FORMER GRENADE STG BUNKER

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1982

Site ID: FTBL-12

FIRE FIGHTING TRAINING/BURN AREA

Fire/Crash Training Area

Cost

Unknown

Final Cleanup Action

Aug 1982

Site ID: FTBL-13

PESTICIDE MIXING ROOM-BLDG 1490

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: FTBL-14

HAZ WST STG BLDGS 317A,327C,362,362A,363

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: FTBL-15

HAZARDOUS WASTE STORAGE 5 BRICK BLDGS

Storage Area

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: FTBL-17

FORMER COAL STORAGE AREA

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-18

INSTALLATION MOTOR POOL

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-017-R-01

CONGRESSIONAL DEMONSTRATION AREA

Firing Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-019-R-01

ENTRENCHMENT AND GAS SCHOOL AREA

Training and Maneuver Area

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-020-R-01

GAS AREA

Training and Maneuver Area

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-021-R-01

MOCK VILLAGE

Firing Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-21

ACID NEUTRALIZATION UNITS (3) BLDG 707

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-012-R-01

PIG FARM RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-23

TRANSFORMER STORAGE AREA-BLDG 1430

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-30

REACTOR CONTAINMENT BLDG

Radioactive Waste Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-32

RUNOFF DISCHARGE DITCH(FROM EQUIP AREA)

Drainage Ditch

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-33

CULLUM WOODS LANDFILL (ACTIVE)

Landfill

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: FTBL-36

ACID NEUTRALIZATION PIT

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-39

DRMO SALVAGE STORAGE AREA

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-40

PESTICIDE STORAGE-BLDG 2505

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-45

STEAM CLEANING UNIT (CINDER BLOCK BLDG)

Washrack

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-48

SHOP SWEEPER DUMP SITE

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-49

EXCAVATED DRUMSITE (1985)

Landfill

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-50

DUMPS(2) (ABANDONED)

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-52

UNDERGROUND STORAGE TANKS-INST WIDE

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Sep 1999

Site ID: FTBL-53

ELECTRICAL TRANSFORMERS(17)VAR LOCATIONS

Spill Site Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-54

AIRFIELD HANGERS-VARIOUS LOCATIONS

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-55

FIRING RANGES-1 PISTOL,2 RIFLE

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-56

SILVER RECOVERY UNITS (9)

Unknown Site Type

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: CC-A28

NON-AUTHORIZED DEBRIS LANDFILL

Landfill

Cost

$134K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2012

This site is under ongoing monitoring until Dec 2044

Site ID: FTBL-62

PETROLEUM CONTAMINATION - BUILDING 1803

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jul 1997

This site is under ongoing monitoring until Mar 2002

Site ID: FTBL-63

EPG SOLIDWASTE MANAGEMENT UNITS(28)

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Jun 1999

Site ID: FTBL-65

SEPTIC TANK & LEACH FIELD (B2075)

Leach Field

Cost

Unknown

Final Cleanup Action

Dec 2010

Site ID: FTBL-67

PETROLEUM STORAGE AREA-BLDG. 2000

Above Ground Storage Tank

Cost

Unknown

Final Cleanup Action

Sep 2007

Site ID: PBA@MR BELVOIR

PBA@MMRP FT BELVOIR

Site Never Existed

Cost

Unknown

Final Cleanup Action

Apr 2014

Site ID: FTBL-25

HAZARDOUS WASTE STORAGE-BLDG 1124

Underground Storage Tanks

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: CC-N20

BUILDING 1330 WASTE POL STORAGE ARE

Storage Area

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2012

This site is under ongoing monitoring until Feb 2045

Site ID: FTBL-011-R-01

LORTON LANDSCAPE RANGE

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: CC-A025

SUSPECTED SANITARY/DEBRIS LANDFILL A

Landfill

Cost

$132K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2013

This site is under ongoing monitoring until Aug 2045

Site ID: FTBL-61

DOGUE CREEK FAMILY HOUSING AREA

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Apr 1994

Site ID: CC-E06

BUILDING T-1423 WASTE POL STORAGE AREA

Storage Area

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2013

This site is under ongoing monitoring until Apr 2045

Site ID: CC-MP6

1425 PIPELINE CONTAMINATION

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Dec 2012

Site ID: FTBL-64

LEACHING CESSPOOLS- BLDG 2073- M37

Leach Field

Cost

Unknown

Final Cleanup Action

Oct 2007

Site ID: CC-A26

SUSPECTED SANITARY LANDFILL B

Landfill

Cost

$132K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2013

This site is under ongoing monitoring until Aug 2045

Site ID: CC-N03F09

BUILDING 788 ABANDONED TANK STORAGE

Above Ground Storage Tank

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2012

This site is under ongoing monitoring until Feb 2045

Site ID: FTBL-016-R-01

RANGE T-15

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-42

AVIATION FUEL STORAGE AREA

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-38

DRMO STUMP DUMP

Landfill

Cost

$134K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2010

This site is under ongoing monitoring until Feb 2045

Site ID: FTBL-10

LEAKING TRANSFORMERS(3)(NEAR DAVISON AF)

Spill Site Area

Cost

Unknown

Final Cleanup Action

Aug 1982

Site ID: FTBL-018-R-02

DEMOLITION AREA-02

Explosive Ordnance Disposal Area

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-60

PAINTBOOTHS-BLDS 363,1115,1339,1349,1462

Contaminated Buildings

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-023-R-01

SOUTHWEST PISTOL RANGE

Pistol Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-16

DEMOLITION RANGE

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: CC-MP5

RECYCLE CENTER CONTAMINATED SOIL

Contaminated Fill

Cost

$3,000

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2015

Site ID: CC-E01

BLDG 3232 WASTE POL & EMPTY DRUM STORAGE

Storage Area

Cost

Unknown

Final Cleanup Action

Sep 2014

Site ID: CC-MP3

ARTS & CRAFTS CNTR PETROLEUM CONT.

Contaminated Fill

Cost

Unknown

Final Cleanup Action

Feb 2012

Site ID: FTBL-001-R-01

SMALL ARMS RANGE COMPLEX

Small Arms Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: FTBL-022-R-01

MOUNTED PISTOL RANGE

Pistol Range

Cost

Unknown

Final Cleanup Action

Jan 2008

Site ID: CC-A19

ACTIVE COAL STORAGE WSTWTR TRMT UNIT 2

Waste Treatment Plant

Cost

Unknown

Final Cleanup Action

Dec 2012

Site ID: FTBL-19

VEHICLE WASH RACKS (10)

Washrack

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-22

INDOOR FIRING RANGE

Unexploded Munitions and Ordnance Area

Cost

Unknown

Final Cleanup Action

Oct 1990

Site ID: FTBL-20

SUPPLY CENTER-BLDG 712

Storage Area

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: FTBL-41

CULLUM WOODS LF CATCHMENT POND

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Aug 1990

Site ID: CC-A14

DRMO SALVAGE STORAGE AREA

Landfill

Cost

Unknown

Final Cleanup Action

Aug 2015

Site ID: CC-A07

MULLIGAN ROAD LANDFILL

Landfill

Cost

$132K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2013

This site is under ongoing monitoring until Aug 2045

Site ID: CC-A13

DRMO SPOIL FILL

Landfill

Cost

$134K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2012

This site is under ongoing monitoring until Feb 2045

Site ID: CC-A15

DEMOLITION RANGE

Explosive Ordnance Disposal Area

Cost

$134K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2003

This site is under ongoing monitoring until Feb 2045

Site ID: CC-A18

ACTIVE COAL STORAGE WSTWTR TRMT UNIT 1

Waste Treatment Plant

Cost

Unknown

Final Cleanup Action

Dec 2012

Site ID: CC-A06

KINGMAN ROAD LANDFILL

Landfill

Cost

$132K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jul 2013

This site is under ongoing monitoring until Aug 2045

Site ID: CC-C08D10

BLDG 2585 INACTIVE WASHRACK&GRITCHA

Washrack

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2012

This site is under ongoing monitoring until Feb 2045

Site ID: CC-C11D11

BLDG 715 WASHRACK & OIL/WATER SEPAR

Washrack

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2012

This site is under ongoing monitoring until Feb 2045

Site ID: CC-E09

NORTH GOLF COURSE WASTE POL STORAGE

Storage Area

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Nov 2013

This site is under ongoing monitoring until Feb 2045

Site ID: CC-E14

BUILDING 1939 WASTE POL STORAGE AREA

Storage Area

Cost

$982K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2013

This site is under ongoing monitoring until Apr 2045

Site ID: CC-I02

BUILDING 307 ACID NEUTRALIZATION PI

Contaminated Fill

Cost

$67K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Dec 2012

This site is under ongoing monitoring until Feb 2045

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »