Cost So Far
$11.3M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$13.1M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2021
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
33 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
11 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: FTMON-IR-10
MOAT
Contaminated Sediments
Cost
$518K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Aug 2016
This site is under ongoing monitoring until Sep 2046
Contaminated Areas
Sediment (Marine): High Risk
Chronic exposure to surface sediments. Use of sediments by benthic and pelagic organisms.
Contaminants: Benzo(a)Pyrene 0.271 mg/kg Phenanthrene 0.502 mg/kg Benzo(a)Anthracene 0.624 mg/kg Chrysene 0.675 mg/kg Fluoranthene 0.899 mg/kg Pyrene 1.32 mg/kg Mercury 24.4 mg/kg Copper 72.6 mg/kg Lead 136.0 mg/kg Zinc 210.0 mg/kg
Site ID: FTMON-IR-17
FORMER DEH COMPOUND
Storage Area
Cost
$10K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2015
Contaminated Areas
Soil: Medium Risk
Direct exposure to surface soils. Area has grass, gravel and some pavement.
Contaminants: Aldrin 0.0274 mg/kg Heptachlor Epoxide 0.161 mg/kg Heptachlor 0.769 mg/kg DDT 1.92 mg/kg Dieldrin 9.53 mg/kg Chlordane 178.0 mg/kg
Site ID: FTMON-006-R-01
WATER RANGE FANS
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Dec 2016
Site ID: FTMON-IR-14
MEDICAL/DENTAL CLINIC, BLDG 82
Industrial Discharge
Cost
$152K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
Contaminated Areas
Soil: Low Risk
Exposure from intrusive activities. Area is predominantly paved.
Contaminants: Mercury (Methyl) 28.6 mg/kg
Site ID: FTMON-IR-12
BLDGS 204 & 205
Maintenance Yard
Cost
$1.99M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2017
This site is under ongoing monitoring until Dec 2057
Contaminated Areas
Soil: Low Risk
Direct exposure from intrusive activities. This site is paved or covered by buildings thus limiting exposure to soils.
Contaminants: Dibenz[ah]anthracene 0.344 mg/kg Mercury (Methyl) 0.521 mg/kg Indeno(1,2,3-cd)Pyrene 0.587 mg/kg Benzo(a)Pyrene 0.849 mg/kg Benz(a)Anthracene 0.962 mg/kg Benzo(b)Fluoranthene 1.31 mg/kg Cadmium and compounds 5.24 mg/kg Copper and compounds 590.0 mg/kg Lead 1520.0 mg/kg Zinc 2620.0 mg/kg
Site ID: FTMON-IR-01
DOG BEACH LANDFILL
Landfill
Cost
$8.92M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2020
This site is under ongoing monitoring until Dec 2049
Contaminated Areas
Soil: Low Risk
Contaminant found at depth; unknown if present at surface. Potential for exposure to construction worker during intrusive activities.
Contaminants: Dioxin (2,3,7,8-TCDD) 6.0e-06 mg/kg 1,3-Dinitrobenzene 1.84 mg/kg
Site ID: FTMON-IR-09
AREA 200
Landfill
Cost
$5,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2015
Contaminated Areas
Soil: Low Risk
Indirect exposure during intrusive activities. Exposure limited to construction workers.
Contaminants: Benzo(a)Pyrene 0.08 mg/kg Benz(a)Anthracene 0.314 mg/kg Benzo(b)Fluoranthene 0.48 mg/kg Lead 660.0 mg/kg
Site ID: FTMON-IR-05
FORMER SKEET RANGE
Small Arms Range
Cost
$50K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2016
Contaminated Areas
Soil: Low Risk
Direct exposure to PAHs in surface soils. Site has unrestricted access and is primarily used for recreation.
Contaminants: Indeno(1,2,3-cd)Pyrene 2.7 mg/kg Benzo(a)Pyrene 4.1 mg/kg Benzo(b)Fluoranthene 5.7 mg/kg
Site ID: FTMON-IR-15
BUILDING 168
Industrial Discharge
Cost
$167K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2017
Contaminated Areas
Soil: Low Risk
Exposure from intrusive activities. Most of the area is paved.
Contaminants: Mercury (Methyl) 0.452 mg/kg Benz(a)Anthracene 1.16 mg/kg Benzo(a)Pyrene 1.21 mg/kg Benzo(b)Fluoranthene 1.78 mg/kg Lead 491.0 mg/kg
Site ID: FTMON-IR-16
FORMER ORDNANCE MACHINE SHOP
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jun 2016
Contaminated Areas
Soil: Low Risk
Exposure from extremely deep intrusive activities. Entire area is paved and full of underground utilities.
Contaminants: Benzo(a)Pyrene 1.72 mg/kg Benzo(b)Fluoranthene 1.91 mg/kg Benz(a)Anthracene 2.07 mg/kg Indeno(1,2,3-cd)Pyrene 2.25 mg/kg
Site ID: FTMON-007-R-01
BATTERY RANGE FANS-2
Unexploded Munitions and Ordnance Area
Cost
$54K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Dec 2016
22 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: FTMON-008-R-01
HISTORIC FORT
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-010-R-01
MOAT
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-012-R-01
TARGET RANGE-TD
Small Arms Range
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-013-R-01
WATER BATTERY
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-IR-13
FORMER PHOTO LAB, BLDG 183
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Mar 2010
Site ID: SITE 02
200 AREA LANDFILL
Landfill
Cost
Unknown
Final Cleanup Action
Aug 1992
Site ID: SITE 03
CLASS. DOCUMENT INCINERATOR
Burn Area
Cost
Unknown
Final Cleanup Action
Oct 1992
Site ID: SITE 04
UNEXPLODED ORDNANCE, INST WIDE
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Jan 1995
Site ID: FTMON-005-R-01
BATTERY IRWIN/PARROTT
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-014-R-01
MAIN CANTONMENT AREA
Storage Area
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-011-R-01
ANTI AIRCRAFT ARTILLERY AREA
Unexploded Munitions and Ordnance Area
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-015-R-01
ORDNANCE STORAGE YARD
Storage Area
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-IR-07
FORMER AUTOCRAFT SHOP
Maintenance Yard
Cost
Unknown
Final Cleanup Action
Mar 2012
Site ID: FTMON-IR-11
FORMER PHOTO LAB, BLDG 217
Industrial Discharge
Cost
Unknown
Final Cleanup Action
Jan 2011
Site ID: FTMON-002-R-01
COASTAL DEFENSE BATTERIES
Unexploded Munitions and Ordnance Area
Cost
$1,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Sep 2045
Site ID: FTMON-IR-08
FORMER GAS STATION
Soil Contamination After Tank Removal
Cost
Unknown
Final Cleanup Action
Mar 2010
Site ID: FTMON-003-R-01
BATTERY CHURCH/MONTGOMERY
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-001-R-01
ARTILLERY TARGET AREA
Unexploded Munitions and Ordnance Area
Cost
$1.25M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2015
This site is under ongoing monitoring until Sep 2045
Site ID: FTMON-004-R-01
BATTERY DERUSSY
Unexploded Munitions and Ordnance Area
Cost
Unknown
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-009-R-01
BUILDING 205
Unexploded Munitions and Ordnance Area
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Site ID: FTMON-IR-06
FORMER FIRE TRAINING PIT
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Oct 2011
Site ID: FTMON-016-R-01
1940S FILL AREA
Unexploded Munitions and Ordnance Area
Cost
$0
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Mar 2015
This site is under ongoing monitoring until Mar 2045
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »