Cost So Far
$75.2M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$47.1M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Expected Completion Date
2064
The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.
33 Hazardous Sites
Note: We are not showing a map of this installation's hazardous sites because we don't have location data for any of them. If you have more information, please contact us. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Land Controls & Restrictions
Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions, fences, signs. see more » fences deed restrictions notations in master plan other engineering control signs « see less
3 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: 034
OU 6, AREA 50 GROUNDWATER
Contaminated Ground Water
Cost
$19M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2015
This site is under ongoing monitoring until Sep 2065
Contaminated Areas
Groundwater: High Risk
IT HAS BEEN DETERMINED THE CONTAMINATION HAS MOVED OFF-SITE AND APPEARS TO BE DISCHARGING INTO THE SURFACE WATER. THE POTENTIAL EXISTS FOR CONTAMINATION TO ENTER TO A RECEPTOR THROUGH GROUNDWATER AND SURFACE WATER.
Contaminants: ARSENIC 2.6 ug/L 1,2-DICHLOROETHANE (EDC) 27.7 ug/L CHLOROFORM 70.2 ug/L NAPHTHALENE 72.0 ug/L VINYL CHLORIDE 117.0 ug/L 1,4-DICHLOROBENZENE 150.0 ug/L TETRACHLOROETHYLENE 229.0 ug/L CHLOROBENZENE 381.0 ug/L TRICHLOROETHYLENE (TCE) 1900.0 ug/L CIS-DICHLOROETHYLENE 2380.0 ug/L
Sediment (Marine): High Risk
THE MIGRATION PATHWAY IS KNOWN TO BE COMPLETE. BIOTA ARE KNOWN TO EXIST IN THE STREAM BED.
Contaminants: BENZO(A)PYRENE 9.5 mg/kg BENZO(A)ANTHRACENE 10.0 mg/kg ZINC 94.0 mg/kg
Surface Water (Fresh): High Risk
THE MIGRATION PATHWAY IS KNOWN TO BE COMPLETE. FISH ARE KNOWN TO EXIST IN THE STREAM.
Contaminants: IRON 22800.0 ug/L
Surface Water (Human): High Risk
MATERIAL IN THE SOURCE AREA(S) HAVE BEEN DETECTED IN SURFACE WATERS. HUMAN RECEPTORS ARE LOCATED ALONG THE STREAM.
Contaminants: CHRYSENE 0.12 ug/L VINYL CHLORIDE 6.1 ug/L VANADIUM 7.2 ug/L ARSENIC 12.4 ug/L LEAD 35.8 ug/L STYRENE 120.0 ug/L ALUMINUM 4270.0 ug/L
Sediment (Human): Medium Risk
THE MIGRATION PATHWAY IS KNOWN TO BE COMPLETE. HUMAN RECEPTORS ARE KNOWN TO BE ALONG THE STREAM.
Contaminants: CHLORDANE 0.006 mg/kg DDD 0.018 mg/kg ARSENIC 31.0 mg/kg LEAD 77.6 mg/kg MANGANESE AND COMPOUNDS 138.0 mg/kg
Site ID: 032
OU 7, FORMER FIRE TRAINING PIT GROUNDWATER
Contaminated Ground Water
Cost
$7.92M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2014
This site is under ongoing monitoring until Sep 2065
Contaminated Areas
Groundwater: High Risk
MATERIAL HAS BEEN DETECTED IN BOTH THE UPPER AND LOWER AQUIFERS. MOVEMENT HAS NOT BEEN DETECTED IN THE LOWER AQUIFER. THERE ARE NO KNOWN GROUNDWATER USERS DOWN GRADIENT OF THE CONTAMINATED PLUME. THE POTENTIAL DOES EXIST HOWEVER.
Contaminants: TETRACHLOROETHYLENE 23200.0 ug/L VINYL CHLORIDE 35600.0 ug/L TRICHLOROETHYLENE (TCE) 208000.0 ug/L
Surface Water (Human): Low Risk
KINGSLAND CREEK INTERSECTS THE LEADING EDGE OF THE OU-7 GROUNDWATER PLUME. PHYSICAL CHARACTERISTICS OF THE CREEK ARE NOT READILY SUITABLE FOR HUMAN RECREATIONAL USE.
Contaminants: BENZENE 6.7 ug/L METHYL TERT-BUTYL ETHER 12.3 ug/L
Site ID: 036
OU 8, ACID NEUTRALIZATION PIT GROUNDWATER
Contaminated Ground Water
Cost
$20.2M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2008
This site is under ongoing monitoring until Sep 2050
Contaminated Areas
Groundwater: High Risk
PATHWAY EVIDENT. POTENTIAL RECEPTOR.
Contaminants: VINYL CHLORIDE 0.773 ug/L 1,2-DICHLOROETHENE 5.7 ug/L CIS-DICHLOROETHYLENE 170.0 ug/L TRICHLOROETHYLENE (TCE) 539.0 ug/L TETRACHLOROETHYLENE 820.0 ug/L
30 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: 014
OU 12, PESTICIDES STORAGE AND MIXING FACILITY
Spill Site Area
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jan 2007
This site is under ongoing monitoring until Sep 2045
Site ID: 026
PART OU-3
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Sep 1993
Site ID: 002
OU 11, TRANSITORY SHELTER 202
Storage Area
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
May 2008
This site is under ongoing monitoring until Sep 2045
Site ID: 018
CAP-2
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Apr 1996
Site ID: 019
IAG-6
Underground Storage Tanks
Cost
Unknown
Final Cleanup Action
Jun 1995
Site ID: 021
IAG-7
Mixed Waste Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 022
IAG-8
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 023
MISC-1
Pistol Range
Cost
Unknown
Final Cleanup Action
May 1996
Site ID: 024
IAG-9
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 025
IAG-10
Burn Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 027
OU-5
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Mar 2005
This site is under ongoing monitoring until Dec 2012
Site ID: 029
ESI-2
Surface Impoundment/Lagoon
Cost
Unknown
Final Cleanup Action
Sep 1994
Site ID: 030
PART OU-4
Above Ground Storage Tank
Cost
Unknown
Final Cleanup Action
Sep 1999
Site ID: 004
OU 1: MALATHION CONTAMINATION SITE
Spill Site Area
Cost
$235K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2004
This site is under ongoing monitoring until Sep 2045
Site ID: 006
OU 10, BUILDING 68 POLYCHLORINATED BIPHENYL (PCB) STORAGE
Spill Site Area
Cost
$245K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2008
This site is under ongoing monitoring until Sep 2045
Site ID: 001
OU 11, TRANSITORY SHELTER 202
Storage Area
Cost
Unknown
Final Cleanup Action
May 2008
This site is under ongoing monitoring until Dec 2014
Site ID: 033
CAP-1
Underground Storage Tanks
Cost
$241K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2008
This site is under ongoing monitoring until Sep 2045
Site ID: 037
OU 13, POLYCYCLIC AROMATIC HYDROCARBON AREA
Contaminated Fill
Cost
$235K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 2013
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: Low Risk
DATA COLLECTED FOR THE RI CONCLUDED THAT THE WASTES ARE NOT IN THE GROUNDWATER. THE MATERIAL IS BURIED AND NOT MOVING AWAY FROM THE SITE.
Contaminants: TCDD 0.005414 mg/kg FLUORENE 70.0 mg/kg INDENO(1,2,3-CD)PYRENE 100.0 mg/kg BENZ(A)ANTHRACENE 220.0 mg/kg ARSENIC 237.0 mg/kg BENZO(K)FLUORANTHENE 740.0 mg/kg BENZO(A)PYRENE 760.0 mg/kg BENZO(B)FLUORANTHENE 960.0 mg/kg FLUORANTHENE 1000.0 mg/kg
Site ID: 010
IAG-1
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 011
IAG-2
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 012
IAG-3
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 013
IAG-4
Storage Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 015
IAG-5
Surface Disposal Area
Cost
Unknown
Final Cleanup Action
Oct 1990
Site ID: 017
PART OU-4
Fire/Crash Training Area
Cost
Unknown
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Dec 2012
Site ID: 038
CAP-3
Underground Tank Farm
Cost
Unknown
Final Cleanup Action
Mar 1998
Site ID: 028
OU 1: OPEN STORAGE AREA
Storage Area
Cost
$235K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1992
This site is under ongoing monitoring until Sep 2045
Site ID: 008
OU 1: RECOUPMENT AREA
Storage Area
Cost
$235K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Oct 1992
This site is under ongoing monitoring until Sep 2045
Site ID: 031
OU 3, NATIONAL GUARD AREA
Spill Site Area
Cost
$277K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2005
This site is under ongoing monitoring until Sep 2045
Site ID: 009
OU 2, AREA 50 LANDFILL
Landfill
Cost
$235K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Nov 2009
This site is under ongoing monitoring until Sep 2045
Contaminated Areas
Soil: High Risk
STUDIES INDICATE THAT SEMI-VOLATILES AND METALS ARE CONTAINED WITHIN THE AREA. VOLATILES HAVE BEEN FOUND IN THE GROUNDWATER. (SEE OU-6 & OU-9) BOTH HUMAN AND ECOLOGICAL RECEPTORS ARE IMPACTED VIA CONTAMINANT MOVEMENT IN BOTH GROUNDWATER AND SURFACE WATER.
Contaminants: 2,4-DIMETHYLPHENOL 7.4 mg/kg ARSENIC 41.0 mg/kg PCBS 47.0 mg/kg TRICHLOROETHYLENE (TCE) 53.4 mg/kg 1,4-DICHLOROBENZENE 92.0 mg/kg INDENO(1,2,3-CD)PYRENE 180.0 mg/kg BENZO(A)PYRENE 240.0 mg/kg BENZ(A)ANTHRACENE 360.0 mg/kg BENZO(B)FLUORANTHENE 540.0 mg/kg PYRENE 900.0 mg/kg
Site ID: 020
ESI-1
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
May 1994
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »