Cost So Far
$16.5M
Money already spent on the evaluation and cleanup of hazardous sites.
Expected Additional Cost
$1.08M
The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.
Completion Date
2019
The date the DOD says cleanup of all sites was completed. Long term monitoring may continue after this date.
53 Hazardous Sites
Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.
High Risk
Medium Risk
Low Risk
Risk Not Evaluated or Not Required
Response Complete
We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.
Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
14 Active Sites
Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.
Site ID: FR501
FR 501
Firing Range
Cost
$119K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2019
Contaminated Areas
Soil: Low Risk
Contaminated soil is restricted to less than 2 feet in depth. Area within a secure Installation.
Contaminants: Lead 0.14 mg/kg
Site ID: SR503C
SAR#250
Small Arms Range
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Contaminated Areas
Soil: High Risk
Metals (lead) exceed USEPA Residental Screening Levels at impact area locations.
Contaminants: Lead 1.9000000000000001 mg/kg
Site ID: MU507
POTENTIAL CIVIL WAR ERA IMPACT AREA
Multi Use Range
Cost
$119K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2019
Site ID: SR506
FORMER SMALL ARMS DEBRIS AREA
Small Arms Range
Cost
$119K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2019
Contaminated Areas
Soil: Low Risk
The contamination appears to be limited in depth (less than 12"). Area is wooded and unused, within a secure Installation.
Contaminants: Antimony and compounds 0.0017 mg/kg Zinc 0.0033 mg/kg Copper and compounds 0.039 mg/kg Lead 0.91 mg/kg
Site ID: SR503
FORMER RIFLE/SMALL ARMS RANGES MULTIPLE SITES
Small Arms Range
Cost
$119K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2019
Contaminated Areas
Soil: Medium Risk
Metals (lead) exceed USEPA Residental Screening Levels at 4 impact area locations
Contaminants: Antimony and compounds 0.25 mg/kg Lead 6.8 mg/kg
Site ID: MU505
FORMER MORTAR/ARTILLERY IMPACT AREA
Multi Use Range
Cost
$1.04M
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2019
Site ID: TS509
FORMER SKEET AND TRAP RANGES # 1, AND TRAP RANGE #
Trap and Skeet Range
Cost
$121K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2018
This site is under ongoing monitoring until Sep 2019
Contaminated Areas
Soil: Low Risk
PAHs above screening levels were detected at the maximum depth investigated (12").
Contaminants: Naphthalene 0.0005 mg/kg Dibenz[ah]anthracene 0.0013000000000000002 mg/kg Acenaphthene 0.0013000000000000002 mg/kg Fluorene 0.0018000000000000002 mg/kg Anthracene 0.004 mg/kg Benzo(k)Fluoranthene 0.0044 mg/kg Benzo(a)Pyrene 0.0081 mg/kg Benz(a)Anthracene 0.0087 mg/kg Chrysene 0.0092 mg/kg Benzo(b)Fluoranthene 0.01 mg/kg Pyrene 0.016 mg/kg Fluoranthene 0.018000000000000002 mg/kg Copper and compounds 0.054 mg/kg Lead 0.094 mg/kg Zinc 0.15 mg/kg
Site ID: XU508
FORMER C4 EXPLOSIVE BURIAL AREA
Unexploded Munitions and Ordnance Area
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Site ID: TS510
FORMER SKEET RANGE # 2
Trap and Skeet Range
Cost
$121K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2019
This site is under ongoing monitoring until Sep 2020
Contaminated Areas
Soil: Low Risk
PAHs above project action limits present at depth of investigation (12"). MRS is located within a developed portion of the base. However, all structures adjacent to the MRS are administrative facilities.
Contaminants: Dibenz[ah]anthracene 0.00069 mg/kg Benzo(k)Fluoranthene 0.0017 mg/kg Benz(a)Anthracene 0.0025 mg/kg Antimony and compounds 0.0025 mg/kg Indeno(1,2,3-cd)Pyrene 0.0033 mg/kg Benzo(a)Pyrene 0.0044 mg/kg Benzo(b)Fluoranthene 0.005900000000000001 mg/kg Lead 0.067 mg/kg
Site ID: XU511
BUILDING 324 MEC DISCOVERY
Unexploded Munitions and Ordnance Area
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Site ID: OB513
FORMER FTA (SITE 1)/SUSPECTED MUNITIONS BURN/BURIA
Open Burn
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Site ID: XU512
POL AREA - MEC DISCOVERY
Unexploded Munitions and Ordnance Area
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Site ID: SR502
FIRING-IN BUTT # 2
Small Arms Range
Cost
$14K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
Site ID: SR504
FORMER SMALL ARMS RANGE # 251
Small Arms Range
Cost
$119K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2017
This site is under ongoing monitoring until Sep 2019
Contaminated Areas
Soil: Low Risk
Lead in soil values slightly exceed USEPA RSLs. Lead contamination appears to be limited to within 12" in depth. Lead in soil values slightly exceed USEPA RSLs
Contaminants: Lead 0.85 mg/kg
39 Inactive Sites
Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.
Site ID: LF007
FORMER LANDFILL A
Landfill
Cost
Unknown
Final Cleanup Action
Feb 2006
Contaminated Areas
Groundwater: Low Risk
Underlalying the 5 foot of silty sand is a 5 to 15 foot layer of varved clay. Ground water velocity is about 18.6 ft/yr. Down gradient wells were sampled and found free of contaminants.
Contaminants: Cadmium and compounds 29.0 ug/L Silver and compounds 30.0 ug/L Lead 46.0 ug/L Arsenic 55.0 ug/L Nickel (soluble salts) 70.0 ug/L Chromium 100.0 ug/L Copper and compounds 117.0 ug/L Zinc 180.0 ug/L
Site ID: LF014
RUBBLE LANDFILL HARDWOOD ATG RANGE
Landfill
Cost
Unknown
Final Cleanup Action
Mar 2001
Contaminated Areas
Soil: Low Risk
data assumed for afrims
Contaminants: Benzene 5.0e-06 mg/kg
Site ID: PL022
POL FACILITY
POL (Petroleum/Oil/Lubricants) Lines
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SR503B
SR503- NFA
Small Arms Range
Cost
$9,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU019
POL FACILITY UNDERGROUND STORAGE TANKS 2
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU020
POL FACILITY UNDERGROUND STORAGE TANKS 1
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Surface Water: Risk Not Evaluated
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU024
MOWER SHED UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU026
FORMER HYDRAULIC LIFT- BUILDING 325
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OT012
OILED ROADS AND PARKING LOT
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1985
Contaminated Areas
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Site ID: SR503A
FORMER RIFLE/SMALL ARMS RANGES MULTIPLE SITES
Small Arms Range
Cost
Unknown
Final Cleanup Action
Sep 2012
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS005
KC-97 CRASH SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1993
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS006
JP-4 SPILL SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 2003
Contaminated Areas
Groundwater: Medium Risk
The concentration of benzene (570 micrograms per liter (ug/L) continues to exceed the NR 140 ES, however it has decreased from a concentration of 6,000 ug/L in March 2000. Priority pollutant metal concentrations show a decrease since the June 2000 samplin Contamination of downgradient water supply wells is possible in the future. Identified wells are over 1 mile from the site. (Engineering-Science, RI Report, September 1993, p. 2-15, 2-16, 7-11)
Contaminants: Toluene 12.0 ug/L Xylene (Mixed) 92.0 ug/L Ethyl benzene 260.0 ug/L Benzene 570.0 ug/L
Soil: Low Risk
Contaminants were detected in exposed surface soils at the site. No samples were collected beyond the site area to determine migration. (Engineering-Science, RI Report, September 1993, pp. 7-10, 7-20) Access is restricted by fencing. Incidental ingestion and demal contact with soil are unlikely, but possible for one or two workers and truck drivers coming to refuel. The site is covered with sparse to thick vegetation and some concrete. (Engineering-Sci
Contaminants: Lead 0.014 mg/kg
Site ID: SS013
ETHYLENE GLYCOL RELEASE SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Dec 2000
Contaminated Areas
Soil: Low Risk
contaminant assumed, no data yet
Contaminants: Benzene 5.0e-06 mg/kg
Site ID: SS016
BROMOCHLOROMETHANE SPILL SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 2000
Contaminated Areas
Soil: Low Risk
data assumed, no data yet
Contaminants: Benzene 5.0e-06 mg/kg
Site ID: SS017
TRANSFORMER FLUID SPILL SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
May 1985
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OW025
MOTOR POOL (BUILDING 324) OWS
Oil/Water Separator
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OW034
BUILDING 510 OWS
Oil/Water Separator
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU033
BUILDING 933 UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU035
BUILDING 398 UNDERGROUND STORAGE TANKS
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: WP015
SANITARY WASTEWATER TREATMENT SYSTEM
Waste Treatment Plant
Cost
Unknown
Final Cleanup Action
May 1985
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU031
FORMER FUEL OIL TANK- BUILDING 324
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: DA036
AIRCRAFT MAINTENANCE BUILDING 951
Surface Disposal Area
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: OW021
POL FACILITY OWS
Oil/Water Separator
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU028
FORMER FUEL OIL TANK- BUILDING 517
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU030
FORMER FUEL OIL TANK- BUILDING 331
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: FR501A
FR 501-NFA
Firing Range
Cost
$9,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jun 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU023
PAINT SHOP WASTE UNDERGROUND STORAGE TANKS- BUILDING 329
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU027
FORMER FUEL OIL TANKS- BUILDING 116
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: LF009
FORMER LANDFILL B
Landfill
Cost
Unknown
Final Cleanup Action
Apr 2001
Contaminated Areas
Groundwater: Low Risk
Groundwater quality data from Site 9 (Table 9) shows low level concentrations of priority pollutant metals. The NR 140 PAL for cadmium was exceeded in the sample from well VF9 MW-3. However, the cadmium concentration has declined since October 1990 (10.2 Private water supply wells and base production wells exist downgradient (less than 2,000 feet) of the site and future contamination is possible because chemicals have been detected in monitoring wells immediately downgradient of the site. (Engineering-Sci
Contaminants: Ethyl benzene 0.0 ug/L Benzene 0.0 ug/L Zinc 0.0 ug/L Toluene 0.8 ug/L Cadmium and compounds 3.8 ug/L
Soil: Low Risk
No samples were collected beyond the immediate vicinity of the site. Migration potential cannot be determined. (Engineering-Science, RI Report, September 1993, p. 12-13) Site 9 is not fenced. The landfill is vegetated; therefore, incidental ingestion and demal contact with soil are unlikely, but possible for base workers during work activities at the site. (Engineering-Science, RI Report, September 1993, p. 12-5)
Contaminants: DDD 3.7e-05 mg/kg Chrysene 0.00021 mg/kg Benzo(b)Fluoranthene 0.00025 mg/kg DDT 0.000287 mg/kg Pyrene 0.00032 mg/kg Fluoranthene 0.00035999999999999997 mg/kg Nickel (soluble salts) 0.0026000000000000003 mg/kg Copper and compounds 0.004200000000000001 mg/kg Lead 0.013000000000000001 mg/kg Zinc 0.0223 mg/kg
Site ID: SS008
F-84 CRASH SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Sep 1993
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU032
FORMER FUEL OIL TANK- BUILDING 137
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: TU029
FORMER FUEL OIL TANK- BUILDING 504
Underground Storage Tanks
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: SS003
CHRONIC FUEL SPILL SITE
Spill Site Area
Cost
Unknown
Final Cleanup Action
Mar 2003
Contaminated Areas
Groundwater: Medium Risk
The concentration of benzene (570 micrograms per liter (ug/L) continues to exceed the NR 140 ES, however it has decreased from a concentration of 6,000 ug/L in March 2000. Priority pollutant metal concentrations show a decrease since the June 2000 samplin Contamination of downgradient water supply wells is possible in the future. Identified wells are over 1 mile from the site. (Engineering Science, RI Report, September 1993, pp. 2-15, 2-16, 7-11)
Contaminants: Toluene 12.0 ug/L Xylene (Mixed) 92.0 ug/L Benzene 570.0 ug/L
Site ID: DA018
AIRCRAFT MAINTENANCE BUILDING 958
Surface Disposal Area
Cost
$4,000
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Jul 2015
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: FT001
FIRE TRAINING AREA
Fire/Crash Training Area
Cost
$17K
Cost in 2015 plus expected future cost of cleanup
Final Cleanup Action
Sep 2002
This site is under ongoing monitoring until Sep 2017
Contaminated Areas
Groundwater: Medium Risk
Benzene concentrations in samples from monitoring well VF1 MW-1R are continuing to follow a decreasing trend since September 1990. Benzene concentrations have been less than the NR 140 ES at well VF1 MR-1R since June 2000. Analytical data from the sample Monitoring shows NA is reducing the contaminant levels.
Contaminants: Zinc 24.0 ug/L Bis(2-Ethylhexyl)Phthalate 36.0 ug/L Toluene 40.0 ug/L Naphthalene 60.0 ug/L 1,3,5-Trimethylbenzene 110.0 ug/L Ethyl benzene 240.0 ug/L 1,2,4-Trimethylbenzene 250.0 ug/L Xylene (Mixed) 1200.0 ug/L Benzene 1700.0 ug/L
Soil: Low Risk
Contaminants were detected in exposed surface soils at the site; however, the site is covered by a gravel parking area, mowed grass, and two stands of trees. Soil samples were not collected beyond the immediate vicinity of the site. (Engineering-Science, The site is covered by a gravel parking area, mowed grass, and two stands of trees. The fire training pit is covered with four inches of gravel. The site is not fenced. Incidential ingestion and demal contact with soils at Site 1 are unlikely, but possibl
Contaminants: Tetrachloroethylene 9.4e-07 mg/kg Trichloroethylene (TCE) 4.1e-05 mg/kg Toluene 0.0036000000000000003 mg/kg Benzene 0.016 mg/kg Ethyl benzene 0.017 mg/kg Xylene (Mixed) 0.083 mg/kg Lead 0.085 mg/kg
Site ID: DP004
TRANSFORMER FLUID DISPOSAL SITE
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Sep 1993
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: DP010
MUNITIONS BURIAL SITE HARDWOOD ATG
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
Apr 2001
Contaminated Areas
Groundwater: Low Risk
Chemicals were detected in monitoring wells approximately 80 feet downgradient of the site. (Engineering-Science, RI Report, September 1993, pp. 13-7, 13-19) Private water supply wells exist approximately 1 mile downgradient of the site and contamination of these wells is possible. (Engineering-Science, RI Report, September 1993, p. 13-7, 13-18)
Contaminants: Ethyl benzene 0.0 ug/L Toluene 0.0 ug/L Bis(2-Ethylhexyl)Phthalate 0.0 ug/L Xylene (Mixed) 0.0 ug/L Benzene 0.0 ug/L Lead 0.0 ug/L Zinc 0.0 ug/L Naphthalene 0.0 ug/L
Soil: Low Risk
Deleted lead, mercury, nickel, copper, and zinc because detected concentrations were within site and/or base background levels. No samples were collected beyond vicinity of site to confirm migration. (Engineering-Science, RI Report, September 1993, pp. 4- The site area is marked by warning signs and a wire line which surrounds the perimeter. The site is covered with sparse vegetation. Harwood Range is open to the public during hunting season, which may result in a limited number of people passing by Site 1
Contaminants: Chromium 0.0031000000000000003 mg/kg
Surface Water: Low Risk
Bis(2-Ethylhexyl)phthalate was detected in one of three surface water samples collected downstream (approximately 80 feet) of the site. (Engineering-Science, September 1993, RI Report, p. 13-7) Exposure to chemicals could occur during recreational use of the site (e.g., hunting). (Engineering-Science, RI Report, September 1993, p. 13-7)
Contaminants: Bis(2-Ethylhexyl)Phthalate 35.0 ug/L
Surface Water (Fresh): Low Risk
Bis(2-Ethylhexyl)phthalate was detected in one of three surface water samples collected downstream (approximately 80 feet) of the site. (Engineering-Science, September 1993, RI Report, p. 13-7) Site 10 is situated on the west side of Hardwood Range in the Juneau County Forest which is maintained as wildlife habitat and is used by several threatened and endangered species. The Necedah National Wildlife Refuge is located south (the direction of su
Contaminants: Bis(2-Ethylhexyl)Phthalate 35.0 ug/L
Site ID: DP011
ELECTRON TUBE DISPOSAL SITE
Disposal Pit and Dry Well
Cost
Unknown
Final Cleanup Action
May 1985
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Site ID: LF002
FORMER LANDFILL C
Landfill
Cost
Unknown
Final Cleanup Action
Sep 1993
Contaminated Areas
Groundwater: Risk Not Evaluated
Sediment (Ecological): Risk Not Evaluated
Sediment (Human): Risk Not Evaluated
Soil: Risk Not Evaluated
Surface Water: Risk Not Evaluated
Surface Water (Ecological): Risk Not Evaluated
Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.
Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.
Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »