Back to Map
NAVY INSTALLATION ID: WV317002369100

ALLEGANY BALLISTICS LAB

rocket center, West Virginia

Cost So Far

$68.5M

Money already spent on the evaluation and cleanup of hazardous sites.

Expected Additional Cost

$36.9M

The estimated amount of money needed for evaluation and cleanup of hazardous sites at this installation.

Expected Completion Date

2046

The date by which the DOD estimates cleanup of all sites will be complete. Long term monitoring may continue after this date.

41 Hazardous Sites

Below are the locations of hazardous sites associated with this military installation, according to the DOD. A site’s contamination may affect a much larger area, including public and private lands and the water supplies beneath them.

High Risk

Medium Risk

Low Risk

Risk Not Evaluated or Not Required

Response Complete

We haven't independently confirmed the location of every site. If you notice a site placed at the incorrect location, please contact us.

Not all sites in the DOD data include location information, so there may be sites listed below that are missing from the map. The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Land Controls & Restrictions

Many sites have been declared “clean” by the DOD but are still not safe for people. This military installation is safe only with the following conditions in place: deed restrictions. see more » state or local permits required for construction, development, excavation, well drilling, etc. the agencies issuing the permits should be notified of areas impacted by lucs. annual written certification of compliance with lucs incorporation of lucs into a base master plan notices other than in deed, e.g., newspaper advertisements. a deed restriction is documented in the parcel deed. notice to federal or state regulators, property owners, etc. before changes in land use or ownership. groundwater use restricted. prohibits access, unless prior written approval of the navy and lead regulatory agency is obtained. prohibit residential use in certain areas, unless prior written approval of the navy and lead regulatory agency is obtained. prohibits disturbance of surface or subsurface soil due to invasive activities such as construction, unless prior written approval of the navy and lead regulatory agency is obtained. « see less

7 Active Sites

Sites where military cleanup actions are still ongoing. The risk level of a site refers to a relative risk assessment made by the DOD, which prioritizes the cleanup of sites that pose greatest threat to safety, human health, and the environment.

Site ID: SWMU 00027

ALLEGANY BALLISTICS LAB

Drainage Ditch

Cost

$844K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jan 2019

Contaminated Areas

Soil: High Risk

Contaminants: Lead 32.2 ppb Manganese and compounds 177.0 ppb

See more details...

Site ID: SITE 0001D

ALLEGANY BALLISTICS LAB

Surface Disposal Area

Cost

$1.25M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Sep 2018

This site is under ongoing monitoring until Mar 2047

Contaminated Areas

Soil: High Risk

Contaminants: Trichloroethylene (TCE) 3700000.0 ppb

See more details...

Site ID: SITE 0001A

ALLEGANY BALLISTICS LAB

Surface Disposal Area

Cost

$1.05M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Feb 2018

This site is under ongoing monitoring until Sep 2047

Contaminated Areas

Soil: High Risk

Contaminants: Trichloroethylene (TCE) 3700000.0 ppb

See more details...

Site ID: SWMU 00052

ALLEGANY BALLISTICS LAB

Storage Area

Cost

$339K

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2011

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 12000.0 ppb Dichloroethylene, 1,2- (mixture) 20000.0 ppb Vinyl chloride 22000.0 ppb Beryllium and compounds 23900.0 ppb Lead 51100.0 ppb 1,2-Dichlorobenzene 61000.0 ppb Cadmium and compounds 88500.0 ppb Chlorobenzene 150000.0 ppb Chromium VI and compounds 204000.0 ppb Manganese and compounds 155000000.0 ppb

Soil: High Risk

Contaminants: Benzo[a]pyrene 0.69 ppb Benz(a)anthracene 0.99 ppb Benzo[b]fluoranthene 1.1 ppb Fluoranthene 1.6 ppb Antimony and compounds 11.4 ppb Arsenic (noncancer) 12.2 ppb Cadmium and compounds 48.2 ppb Lead 111.0 ppb Manganese and compounds 886.0 ppb Aluminum 15300.0 ppb

See more details...

Site ID: SITE 00001

ALLEGANY BALLISTICS LAB

Disposal Pit and Dry Well

Cost

$20.1M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Oct 2007

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury 1000.0 ppb Carbon disulfide 1000.0 ppb Bromomethane 2000.0 ppb Dichloroethylene, 1,2- (trans) 17000.0 ppb Vinyl chloride 41000.0 ppb Acetone 48000.0 ppb Chromium (III) 71800.0 ppb Tetrachloroethylene (PCE) 410000.0 ppb Toluene 700000.0 ppb Dichloroethylene, 1,1- 720000.0 ppb 1,2-Dichloroethane (EDC) 870000.0 ppb 1,1,1,2-Tetrachloroethane 7700000.0 ppb Dichloroethylene, 1,2- (cis) 17000000.0 ppb Dichloroethane, 1,1- 41000000.0 ppb 1,1,1-Trichloroethane 260000000.0 ppb Trichloroethylene (TCE) 3700000000.0 ppb Methylene chloride 8000000000.0 ppb

Sediment (Human): High Risk

Contaminants: Mercury 230.0 ppb Methylene chloride 11000.0 ppb Arsenic (cancer) 11800.0 ppb Chromium (III) 17300.0 ppb Tetrachloroethylene (PCE) 22000.0 ppb Lead 53200.0 ppb Acetone 210000.0 ppb Trichloroethylene (TCE) 510000.0 ppb Vinyl chloride 1700000.0 ppb Dichloroethylene, 1,1- 15000000.0 ppb

Soil: High Risk

Contaminants: Dinitrotoluene, 2,6- 0.13 ppb Mercury and compounds (inorganic) 0.56 ppb Dinitrotoluene, 2,4- 0.72 ppb Phenanthrene 0.72 ppb Pyrene 0.97 ppb Selenium 3.9 ppb Nitroaniline, 2- 13.0 ppb Octahydro-1357-tetranitro-1357- tetrazocine (HMX) 14.0 ppb Arsenic (cancer) 15.8 ppb Chromium (III) 24.0 ppb Methylene chloride 27.0 ppb RDX (Cyclonite) 34.0 ppb Vanadium 34.7 ppb Nitrobenzene 55.0 ppb Silver and compounds 65.2 ppb Nickel and compounds 107.0 ppb Diethyl phthalate 410.0 ppb 1,1,1-Trichloroethane 670.0 ppb Tetrachloroethylene (PCE) 2200.0 ppb 4-Methylphenol 2500.0 ppb Zinc 3860.0 ppb di-n-Octyl phthalate 9700.0 ppb Lead 12100.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 26000.0 ppb Trans-dichloroethylene, 1,2- 27000.0 ppb Trichloroethylene (TCE) 230000.0 ppb

Surface Water (Human): High Risk

Contaminants: Mercury 650.0 ppb Bis(2-ethylhexyl)phthalate (DEHP) 1000.0 ppb Methylene chloride 6000.0 ppb Dichloroethylene, 1,2- (cis) 10000.0 ppb Trichloroethylene (TCE) 10000.0 ppb Chromium (III) 11400.0 ppb Acetone 19000.0 ppb Lead 35300.0 ppb

See more details...

Site ID: SITE 00010

ALLEGANY BALLISTICS LAB

Contaminated Ground Water

Cost

$12.8M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Aug 2004

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury and compounds (inorganic) 920.0 ppb Dichloroethane, 1,2- (EDC) 1000.0 ppb Toluene 1000.0 ppb Silver and compounds 1500.0 ppb Carbon disulfide 2000.0 ppb Cadmium and compounds 3700.0 ppb Acetone 10000.0 ppb Chloroform 12000.0 ppb Dichloroethylene, 1,2- (trans) 15000.0 ppb Antimony and compounds 15200.0 ppb Beryllium and compounds 28200.0 ppb Tetrachloroethylene (PCE) 78000.0 ppb Arsenic (cancer endpoint) 140000.0 ppb Zinc 177000.0 ppb Lead 212000.0 ppb Chromium (total) 451000.0 ppb Vanadium 544000.0 ppb Copper and compounds 667000.0 ppb Nickel and compounds 857000.0 ppb Dichloroethylene, 1,1- 920000.0 ppb Trichloroethane, 1,1,1- 2400000.0 ppb Dichloroethane, 1,1- 2500000.0 ppb Methylene chloride 4000000.0 ppb Barium and compounds 4020000.0 ppb Dichloroethylene, 1,2- (cis) 4200000.0 ppb Dichloroethylene, 1,2- (mixture) 12000000.0 ppb Trichloroethylene (TCE) 71000000.0 ppb Aluminum 394000000.0 ppb

See more details...

Site ID: SITE 00005

ALLEGANY BALLISTICS LAB

Landfill

Cost

$3.58M

Cost in 2015 plus expected future cost of cleanup

Final Cleanup Action

Jun 2006

Contaminated Areas

Groundwater: High Risk

Contaminants: Toluene 1000.0 ppb Benzene 1000.0 ppb Methylene chloride 6000.0 ppb Chloroform 11000.0 ppb Trichloroethane, 1,1,1- 14000.0 ppb Dichloroethylene, 1,2- (mixture) 25000.0 ppb Trichloroethylene (TCE) 470000.0 ppb Acetone 5300000.0 ppb

Soil: High Risk

Contaminants: Hexane, n- 5000.0 ppb Trichloroethylene (TCE) 5000.0 ppb 1,1,1-Trichloroethane 7000.0 ppb Toluene 9000.0 ppb

Sediment (Marine): High Risk

Contaminants: Trichloroethylene (TCE) 0.46 ppb Silver and compounds 0.63 ppb Vinyl chloride 1.7 ppb Beryllium and compounds 2.1 ppb Antimony and compounds 15.2 ppb Vanadium 23.7 ppb Lead 49.1 ppb Nickel and compounds 78.9 ppb Barium and compounds 100.0 ppb Aluminum 8320.0 ppb

Surface Water (Human): Medium Risk

Contaminants: Methylene chloride 2000.0 ppb Vanadium 3100.0 ppb Chromium (total) 3400.0 ppb Trichloroethylene (TCE) 9000.0 ppb Antimony and compounds 15200.0 ppb Nickel and compounds 17200.0 ppb Copper and compounds 23600.0 ppb Lead 35300.0 ppb Barium and compounds 56100.0 ppb Aluminum 379000.0 ppb Zinc 488000.0 ppb

Surface Water (Fresh): Low Risk

Contaminants: Methylene chloride 2000.0 ppb Vanadium 3100.0 ppb Chromium (total) 3400.0 ppb Trichloroethylene (TCE) 9000.0 ppb Antimony and compounds 15200.0 ppb Nickel and compounds 17200.0 ppb Copper and compounds 23600.0 ppb Lead 35300.0 ppb Barium and compounds 56100.0 ppb Aluminum 379000.0 ppb Zinc 488000.0 ppb

See more details...

34 Inactive Sites

Sites where military cleanup actions are complete, according to the DOD. Note that this status does not necessarily mean the site is no longer hazardous, as many of these sites are put under long-term monitoring or other restrictions.

Site ID: SITE 00041

ALLEGANY BALLISTICS LAB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Nov 2007

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene 2000.0 ppb Methylene chloride 6000.0 ppb Silver and compounds 10000.0 ppb Trichloroethylene (TCE) 37000.0 ppb

Soil: Low Risk

Contaminants: Silver and compounds 122.0 ppb

See more details...

Site ID: SWMU 00024

ALLEGANY BALLISTICS LAB

Storage Area

Cost

Unknown

Final Cleanup Action

Feb 2002

Contaminated Areas

Soil: High Risk

Contaminants: Xylene (mixed) 1.3 ppb Cadmium and compounds 9.2 ppb Tetrachloroethylene (PCE) 12.0 ppb Arsenic (noncancer) 13.4 ppb Copper and compounds 565.0 ppb Lead 592.0 ppb Manganese and compounds 2320.0 ppb

See more details...

Site ID: SWMU 00059

ALLEGANY BALLISTICS LAB

Industrial Discharge

Cost

Unknown

Final Cleanup Action

Feb 2002

Site ID: SITE 00002

ALLEGANY BALLISTICS LAB

Burn Area

Cost

Unknown

Final Cleanup Action

Aug 2008

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury and compounds (inorganic) 180.0 ppb 1,1,1-Trichloroethane 1000.0 ppb Methylene chloride 5000.0 ppb Dichloroethylene, 1,2- (cis) 8000.0 ppb Chromium (III) 17700.0 ppb Trichloroethylene (TCE) 19000.0 ppb Acetone 42000.0 ppb Lead 51000.0 ppb Arsenic (cancer) 62600.0 ppb

Soil: High Risk

Contaminants: Selenium 0.48 ppb Cadmium and compounds 1.0 ppb Beryllium and compounds 1.2 ppb Antimony and compounds 2.9 ppb Arsenic (cancer endpoint) 5.0 ppb Chromium (total) 13.8 ppb Lead 17.1 ppb Vanadium 19.2 ppb Nickel and compounds 23.2 ppb Copper and compounds 26.2 ppb Zinc 80.3 ppb Barium and compounds 220.0 ppb Dichloroethylene, 1,2- (cis) 890.0 ppb Aluminum 8220.0 ppb Trichloroethylene (TCE) 14000.0 ppb

See more details...

Site ID: SITE 00007

ALLEGANY BALLISTICS LAB

Landfill

Cost

Unknown

Final Cleanup Action

Sep 2001

Contaminated Areas

Soil: High Risk

Contaminants: Arsenic (cancer) 4.9 ppb Silver and compounds 12.0 ppb Chromium (III) 18.0 ppb Lead 27.0 ppb Mercury and compounds (inorganic) 28.0 ppb Methylene chloride 47000.0 ppb

See more details...

Site ID: SITE 00008

ALLEGANY BALLISTICS LAB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Jan 1998

Site ID: SITE 00011

ALLEGANY BALLISTICS LAB

Contaminated Ground Water

Cost

Unknown

Final Cleanup Action

Jul 2007

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 6000.0 ppb Vinyl chloride 9000.0 ppb Chloromethane 68000.0 ppb Chlorobenzene 270000.0 ppb Manganese and compounds 460000.0 ppb Tetrachloroethylene (PCE) 910000.0 ppb Dichlorobenzene, 1,4- 4500000.0 ppb Naphthalene 11000000.0 ppb Dichlorobenzene, 1,2- 44000000.0 ppb Methylnaphthalene,2 64000000.0 ppb

Soil: Low Risk

Contaminants: Beryllium and compounds 1.7 ppb Phenanthrene 1.7 ppb Methylnaphthalene,2 2.7 ppb

See more details...

Site ID: SITE 00040

ALLEGANY BALLISTICS LAB

Waste Lines

Cost

Unknown

Final Cleanup Action

Jan 1998

Contaminated Areas

Groundwater: Low Risk

Contaminants: Toluene 2000.0 ppb Methylene chloride 6000.0 ppb Silver and compounds 10000.0 ppb Trichloroethylene (TCE) 37000.0 ppb

Soil: Low Risk

Contaminants: Silver and compounds 122.0 ppb

See more details...

Site ID: SWMU 00016

ALLEGANY BALLISTICS LAB

Sewage Treatment Plant

Cost

Unknown

Final Cleanup Action

Jan 1998

Site ID: SWMU 00021

ALLEGANY BALLISTICS LAB

Surface Runoff

Cost

Unknown

Final Cleanup Action

Jul 2001

Contaminated Areas

Soil: High Risk

Contaminants: Mercury 0.16 ppb Arsenic (cancer) 7.1 ppb Cadmium and compounds 8.1 ppb Vanadium 17.3 ppb Lead 167.0 ppb Manganese and compounds 520.0 ppb Aluminum 6540.0 ppb Iron 28500.0 ppb

See more details...

Site ID: SWMU 00023

ALLEGANY BALLISTICS LAB

Storage Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Soil: Low Risk

Contaminants: Antimony and compounds 11.0 ppb Arsenic (noncancer) 12.2 ppb Lead 17.6 ppb Manganese and compounds 1180.0 ppb

See more details...

Site ID: SWMU 00034

ALLEGANY BALLISTICS LAB

Oil/Water Separator

Cost

Unknown

Final Cleanup Action

Sep 2007

Contaminated Areas

Soil: Medium Risk

Contaminants: Lead 1110.0 ppb

Groundwater: Low Risk

Contaminants: Trichloroethylene (TCE) 10000.0 ppb

See more details...

Site ID: SWMU 00036

ALLEGANY BALLISTICS LAB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jul 1996

Contaminated Areas

Groundwater: High Risk

Contaminants: Trichloroethylene (TCE) 6000.0 ppb Vinyl chloride 8000.0 ppb Tetrachloroethylene (PCE) 16000.0 ppb Chlorobenzene 270000.0 ppb

Soil: High Risk

Contaminants: Acetone 1.6 ppb Chlorobenzene 8.8 ppb

See more details...

Site ID: SWMU 00040

ALLEGANY BALLISTICS LAB

Storage Area

Cost

Unknown

Final Cleanup Action

Jul 2002

Contaminated Areas

Soil: High Risk

Contaminants: Arsenic (noncancer) 7.8 ppb Manganese and compounds 289.0 ppb Nickel and compounds 3210.0 ppb Lead 11800.0 ppb

See more details...

Site ID: SWMU 00044

ALLEGANY BALLISTICS LAB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Jan 1998

Site ID: SWMU 00058

ALLEGANY BALLISTICS LAB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Feb 2002

Site ID: SWMU 00060

ALLEGANY BALLISTICS LAB

Storage Area

Cost

Unknown

Final Cleanup Action

Feb 2002

Site ID: SWMU 10000

ALLEGANY BALLISTICS LAB

Underground Tank Farm

Cost

Unknown

Final Cleanup Action

Feb 2002

Site ID: SWMU 10001

ALLEGANY BALLISTICS LAB

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 1998

Site ID: SWMU 00037

ALLEGANY BALLISTICS LAB

Industrial Discharge

Cost

Unknown

Final Cleanup Action

Sep 2009

Contaminated Areas

Soil: High Risk

Contaminants: Anthracene 1.3 ppb Benzo[a]pyrene 1.9 ppb Chrysene 2.2 ppb Benzo[b]fluoranthene 2.6 ppb Benz(a)anthracene 2.6 ppb Pyrene 3.2 ppb Indeno[1,2,3-cd]pyrene 10.0 ppb Arsenic (noncancer) 11.5 ppb RDX (Cyclonite) 100.0 ppb Lead 333.0 ppb Manganese and compounds 4140.0 ppb

See more details...

Site ID: SWMU 10003

ALLEGANY BALLISTICS LAB

Storage Area

Cost

Unknown

Final Cleanup Action

Jan 1998

Site ID: SWMU 10004

ALLEGANY BALLISTICS LAB

Spill Site Area

Cost

Unknown

Final Cleanup Action

Jan 1998

Site ID: SWMU 10005

ALLEGANY BALLISTICS LAB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Jan 1998

Site ID: SWMU 10006

ALLEGANY BALLISTICS LAB

Firing Range

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Groundwater: Medium Risk

Contaminants: Mercury 450.0 ppb Dichloroethylene, 1,2- (cis) 1000.0 ppb Arsenic (cancer) 2000.0 ppb Chromium (III) 6700.0 ppb Lead 9900.0 ppb 1,1,1-Trichloroethane 11000.0 ppb Tetrachloroethylene (PCE) 12000.0 ppb Trichloroethylene (TCE) 29000.0 ppb

Soil: Low Risk

Contaminants: Lead 4.7 ppb

See more details...

Site ID: SITE 0001B

ALLEGANY BALLISTICS LAB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2010

Contaminated Areas

Soil: High Risk

Contaminants: Trichloroethylene (TCE) 3700000.0 ppb

See more details...

Site ID: SITE 00003

ALLEGANY BALLISTICS LAB

Burn Area

Cost

Unknown

Final Cleanup Action

Jul 2007

Contaminated Areas

Groundwater: High Risk

Contaminants: Mercury and compounds (inorganic) 200.0 ppb RDX (Cyclonite) 5300.0 ppb 2,4,6-Trinitrotoluene 8930.0 ppb Lead 59600.0 ppb Chromium (III) 71100.0 ppb Arsenic (cancer) 159000.0 ppb

Soil: High Risk

Contaminants: Toluene 2000.0 ppb Benzene 2000.0 ppb Dichloroethylene, 1,2- (mixture) 13000.0 ppb Acetone 30000.0 ppb Trichloroethylene (TCE) 295000.0 ppb

See more details...

Site ID: SWMU 10007

ALLEGANY BALLISTICS LAB

Firing Range

Cost

Unknown

Final Cleanup Action

Sep 1999

Site ID: SITE 00006

ALLEGANY BALLISTICS LAB

Surface Impoundment/Lagoon

Cost

Unknown

Final Cleanup Action

Oct 1989

Contaminated Areas

Sediment (Human): Medium Risk

Contaminants: 2,6-Dinitrotoluene 1.0 ppb 2,4-Dinitrotoluene 1.1 ppb

Surface Water (Human): Medium Risk

Contaminants: RDX (Cyclonite) 1600.0 ppb Silver and compounds 13500.0 ppb

Surface Water (Fresh): Low Risk

Contaminants: RDX (Cyclonite) 1600.0 ppb Silver and compounds 13500.0 ppb

Sediment (Marine): Risk Not Evaluated

See more details...

Site ID: SWMU 00026

ALLEGANY BALLISTICS LAB

Leach Field

Cost

Unknown

Final Cleanup Action

Jul 2002

Contaminated Areas

Soil: Medium Risk

Contaminants: Arsenic (noncancer) 20.8 ppb Manganese and compounds 1240.0 ppb

See more details...

Site ID: SWMU 10008

ALLEGANY BALLISTICS LAB

Firing Range

Cost

Unknown

Final Cleanup Action

Jul 2001

Site ID: SITE 0001C

ALLEGANY BALLISTICS LAB

Surface Disposal Area

Cost

Unknown

Final Cleanup Action

Sep 2010

Contaminated Areas

Soil: High Risk

Contaminants: Trichloroethylene (TCE) 3700000.0 ppb

See more details...

Site ID: SWMU 00022

ALLEGANY BALLISTICS LAB

Incinerator

Cost

Unknown

Final Cleanup Action

Sep 2000

Contaminated Areas

Soil: High Risk

Contaminants: Beryllium and compounds 1.3 ppb Thallium 2.3 ppb Cadmium and compounds 2.7 ppb Mercury and compounds (inorganic) 5.3 ppb Arsenic (cancer) 8.5 ppb Lead 74.9 ppb Manganese and compounds 1430.0 ppb Iron 28500.0 ppb

See more details...

Site ID: SWMU 10002

ALLEGANY BALLISTICS LAB

Storage Area

Cost

Unknown

Final Cleanup Action

Sep 2000

Site ID: SITE 00009

ALLEGANY BALLISTICS LAB

Disposal Pit and Dry Well

Cost

Unknown

Final Cleanup Action

Jan 1998

Update (Dec. 5, 2017): We have changed the source of the installation cost data after being notified by the Department of Defense that they erroneously reported their own cost figures on the DERP website. We are now displaying the costs the department says are the most accurate available, from the Pentagon’s DERP database that we received in a FOIA request.

Note: The risk level of a site refers to a relative risk assessment made by the DOD to prioritize the cleanup of sites.

Data: All data comes from the Defense Environmental Restoration Program and the U.S. Army Corps of Engineers, and will be released soon at the ProPublica Data Store. Read our methodology »