« Money as a Folded Flag
Detailed Record
TF 3/3 CERP Bulk Funds Draw (Lt Feaman)
Planned Start Month
July 2010
Estimated Cost
$50,000
Status
Completed
Province
Helmand
Regional Command
RC-SouthWest
Project Description
3/3 PA Lt Feaman is drawing 50,000 USD in order to support with battle damage, condolence, hero, and former detainee payments and Commander's small scale projects
Project Goals
To mitigate the effects of military operations on the local population and better enable the Commander of 3/3, to respond to urgent humanitarian needs in his battle space
Results
1 Contractor: Abdul Bari Description: Canal Embankment/Road Improvement Date Paid: 28 Jul 2010 Location: Fakhiran Wataan Along Route Mateo at "No Name" Intersection Justification: This project significantly reduced the risk of vehicular traffic falling into the canal in a spot where the road was severely deteriorating. 2 Contractor: Abdul Raziq Description: Watergates Date Paid: 28 Jul 2010 Location: Khalaj Wataan Central Grid PQ 233 744 Justification: 3 Watergates were constructed in the village in order to alleviate the immediate need for the farmers to better irrigate their crops. 3 Contractor: Haju Abdul Ghafar Description: Mosque Date Paid: 28 Jul 2010 Location: Khalaj Wataan PQ 23807 74517 Justification: Building Mosques falls under the criteria for uses of CERP under the MAAWS-A 4 Contractor: Khan Agah Description: Drainage Gutter Date Paid: 29 Jul 2010 Location: Nawa District Center Bazaar IVO PB Jaker Justification: This Drainage Gutter was constructed on the south side of the district center bazaar in order to facilitate the immediate need for sanitation in a heavily trafficked and used location. 5 Contractor: Abdul Hadi Description: Tractor Bridge Date Paid: 29 Jul 2010 Location: Khalaj Wataan PQ 23666 72340 Justification: This bridge construction met the urgent needs of the community by allowing farmers to bring their crops fom their fields across the canal which formerly obstructed their ability to bring their products to the bazaar and market. 6 Contractor: Sobol Khan Description: Road Improvement Date Paid: 30 Jul 2010 Location: Putian Wataan along Route Shirley Justification: This road improvement completed in Putian dramatically increased mobility for all traffic in the area. 7 Contractor: Mohammad Din Description: 3 Bridges Date Paid: 31 Jul 2010 Location: Karabah Wataan center grid PQ 270 800 Justification: These bridges allow for farmers in previously less trafficable areas to be able to have the opportunity to travel with their goods along the same lines of communication as their neighbors in the village leading to further cohesion and sense of community there. 8 Contractor: Mohammad Din Description: Road Improvement Date Paid: 31 Jul 2010 Location: Khosarabad Wataan along Route Coors Justification: This road improvement allows for the increased trafficability to Route Coors as an alternative to the heavily trafficked and overcrowded Route Shiner, making travel signifacantly less hazardous for travelers. 9 Contractor: Mohammad LalaGul Description: Tractor Bridge Date Paid: 31 Jul 2010 Location: Khalaj Wataan 23648 72592 Justification: This bridge significantly eased the burden for local farmers to transport their crops across the canal previously obstructing their route to the bazaar/market. 10 Contractor: Mohammad Khan Description: Vehicle Bridge Date Paid: 31 Jul 2010 Location: Khalaj Wataan PQ 25670 73739 Justification: This bridge located almost directly behind the bazaar dramatically reduced the treacherous nature by which herders brought their livestock across the canal to the field for trading and selling on bazaar Fridays. 11 Contractor: Nesar Ahmad Description: Waterwheel Repair Date Paid: 31 Jul 2010 Location: Nawa District Center Bazaar Justification: This waterwheel was repaired in order to facilitate the desparate need for electricity to in the bazaar. This project is separate from the Waterwheel being installed North of the bazaar, although both support the need for electricity. 12 Contractor: Mir Jan Description: Vehicle Bridge Date Paid: 31 Jul 2010 Location: Khalaj Wataan at the Shiner-King Cobra intersection Justification: The previously existing bridge at the location was able to sustain foot traffic and light motorcycle traffic, however cars and trucks previously were unable to cross the critical intersection without undue risk to life and vehicle. 13 Contractor: Sheir Jan Description: Road Improvement Date Paid: 01 Aug 2010 Location: Khalaj Wataan from PQ 28261 77211 to PQ 28821 77931 Justification: This road improvement significantly increased the trafficability for all motorvehicles along this section of the Kalaj Wataan. 14 Contractor: JoJo Description: Refreshments for Project Shura Date Paid: 28 Jul 2010 Location: PB Dre Wazaran - Achaksai Justification: These refreshments were served at the project shura which commemorated/acknowledged the projects done over the last several months as well as facilitated discussion for further future projects in the area. 15 Contractor: Chari Description: Refreshments for Project Shura Date Paid: 01 Aug 2010 Location: PB Khiyal Zmeka - Fakhiran Justification: These refreshments were served at the project shura which commemorated/acknowledged the projects done over the last several months as well as facilitated discussion for further future projects in the area. 16 Recipient: Fida Mohammad Description: Hero Payment Date Paid: 06 Aug 2010 Location: PB Sopar Dostan Justification: Hero Payment for recipient's son killed in the line of duty. 17 Contractor: Hamid Ullah Description: Road Improvement Date Paid: 06 Aug 2010 Location: Tabeen Wataan along Routes Shiner and King Cobra Justification: This road improvement dramatically increased the trafficability of the Tabeen Wataan villagers allowing them access to major lines of communication connecting the populace to the district center as well as increasing freedom of movement to Lashkar Gah. 18 Contractor: Nak Mohammad Description: Canal Wall Sustainment Date Paid: 07 Aug 2010 Location: Khalaj Wataan along Route Keystone Justification: This road was severely deteriorating and its condition was further evidenced by a recent motorvehicle accident in which a car fell into the canal where the road gave way. 19 Contractor: Lala Gul Description: Refreshments for Project Shura Date Paid: 07 Aug 2010 Location: PB Jaker - Khalaj Justification: These refreshments were served at the project shura which commemorated/acknowledged the projects done over the last several months as well as facilitated discussion for further future projects in the area. 20 Contractor: Sobol Khan Description: Road Improvement Date Paid: 10 Aug 2010 Location: Negari Wataan along Route Shirley Justification: This road improvement dramatically increased the trafficability of this route for the residents of Negari Wataan, allowing them increased freedom of movement around their own village. 21 Contractor: Zabi Description: Refreshments for Project Shura Date Paid: 10 Aug 2010 Location: PB Luy Julah - Khalaj Justification: These refreshments were served at the project shura which commemorated/acknowledged the projects done over the last several months as well as facilitated discussion for further future projects in the area. 22 Contractor: Mir Agah Description: Refreshments for Project Shura Date Paid: 12 Aug 2010 Location: PB Sopar Dostan - Khosarabad Justification: These refreshments were served at the project shura which commemorated/acknowledged the projects done over the last several months as well as facilitated discussion for further future projects in the area.
Updates
No updates provided.
SOURCES
Illustrations: Sarah Way for ProPublica. Data: Assembled from several different Department of Defense databases by the Special Inspector General for Afghanistan Reconstruction and provided to ProPublica under a Freedom of Information Act Request.