ENTITY 1 - PART I BOND ISSUES: |
A. (A) ISSUER NAME: MARYLAND HEALTH AND HIGHER EDUCATIONAL FACILITIES AUTHORITY (MHHEFA) (F) DESCRIPTION OF PURPOSE: SHADY GROVE ADVENTIST HOSPITAL (SGAH) EXPANSION PROJECT - SHADY GROVE (SG) TOWER; RENOVATION TO SURGERY DEPARTMENT, MEDICAL/ONCOLOGY NURSING, MEDICAL NURSING, SURGICAL UNITS, EXPANDED EMERGENCY, OBSTETRICS, AND NEONATAL INTENSIVE CARE UNIT; POWER PLANT, ROAD AND ENTRANCEWAY; SIGNAGE AND PARKING; OTHER ROUTINE CAPITAL PROJECTS; B. (A) ISSUER NAME: MHHEFA (F) DESCRIPTION OF PURPOSE: REFUNDING SERIES 2003 B, 2004 AND 2005 ISSUED 2/27/2003, 9/14/04 AND 12/20/05. CONSTRUCTION AND RENOVATIONS AT WASHINGTON ADVENTIST HOSPITAL (WAH), SG, ADVENTIST BEHAVIORAL HEALTH (ABH), AND SG NURSING AND REHABILITATION CENTER EQUIPMENT AT WAH, SG, ABH, AND SG NURSING AND REHABILITATION CENTER, REFINANCE A LINE OF CREDIT; FINANCE AND REFINANCE, A PORTION OF THE EXISTING FACILITIES OF ADVENTIST REHABILITATION HOSPITAL OF MARYLAND (ARHM), ACQUISITION OF LIFE SCIENCES LAND, CONSTRUCTION, RENOVATIONS, PARKING LOTS, FENCES, WALKWAYS, AND LANDSCAPING FOR THE INSTITUTION, ARHM, AND SG NURSING, EQUIPMENT FOR ARHM AND SG NURSING, PLANNING AND DESIGN COSTS RELATED TO SG TOWER, COST OF ACQUISITION OF AN INTEREST IN ARHM; C. (A) ISSUE NAME: MHHEFA (F) DESCRIPTION OF PURPOSE: REFUNDING OF 2004 A AND 2005 B. FINANCE AND REFINANCE EXISTING FACILITIES AT ARHM, ACQUISITION OF LIFE SCIENCES LAND, FINANCE OR REFINANCE CONSTRUCTION, RENOVATION, PARKING LOTS, FENCES, WALKWAYS, LANDSCAPING, VARIOUS MAJOR MEDICAL EQUIPMENT, FINANCE OR REFINANCE CERTAIN PLANNING AND DESIGN COSTS RELATED TO THE CONSTRUCTION OF THE SG TOWER, COST OF ACQUISITION OF AN INTEREST IN ARHM; ACQUISITION, CONSTRUCTION, RENOVATION, AND EQUIPPING OF ARHM AND WAH, RENOVATION TO WAH AND SG. D. (A) ISSUE NAME: MHHEFA (F) DESCRIPTION OF PURPOSE: REFUND OF 2003 A BONDS REFUND 1991 A FOR THE "1991 A-1 PROJECT" - PROJECTS FINANCED OR REFINANCED WITH THE PROCEEDS OF THE 1983 BONDS, INCLUDING CONSTRUCTION, RENOVATION AND EQUIPPING OF FACILITIES AT WAH; PART II, COLUMN A: THE 2005 A BOND ISSUE WAS OFFERED AT $78,000,000.00, BUT AS THIS ISSUE WAS FOR A CONSTRUCTION PROJECT, THE PROCEEDS EARNED INTEREST IN A CONSTRUCTION FUND. THE PROCEEDS, THEREFORE, WERE MORE THAN THE ISSUING PRICE. PART II, COLUMN B: 2011 A HAS A RESERVE FUND VALUED AT $5,835,975.81 AS OF 12/31/2015. THIS RESERVE FUND WAS RESIZED WITH RESPECT TO THE REFUND OF THE 2003A BONDS WHICH WAS COMBINED WITH THE 2011 A RESERVE FUND. ROW 3 WILL NOT TIE TO THE SUM OF ROWS 4-12 FOR THIS BOND ISSUE. PART IV, COLUMN A: THE ARBITRAGE CALCULATION DATE FOR THE 2005 A BONDS WAS JANUARY 2015. PART IV, COLUMN B: THE ARBITRAGE CALCULATION DATE FOR THE 2011 A BONDS WILL BE SEPTEMBER 2016. PART IV, COLUMN C: THE ARBITRAGE CALCULATION DATE FOR THE 2011 B BONDS WILL BE SEPTEMBER 2016. |
ENTITY 2 - PART I BOND ISSUES: |
A. (A) ISSUER NAME: MHHEFA (F) DESCRIPTION OF PURPOSE: ADVENTIST HEALTHCARE SHADY GROVE MEDICAL CENTER (SGMC) F/K/A SHADY GROVE ADVENTIST HOSPITAL - CAF AND KITCHEN SANITARY PIPING CHANGES, PIXUS EXPANSION, INTERIOR WAY/EXTERIOR WAY FINDING, SGMC BASED IT PROJECTS (GE VIEWPOINT, I-HEAL, AEROSCOUT), BUILD OUT OF EXISTING SHELL; RENOVATION IN PLACE OF EXISTING PHARMACY AND IV PREP ROOMS; ADVENTIST HEALTHCARE WASHINGTON ADVENTIST HOSPITAL (AHC-WAH) F/K/A WASHINGTON ADVENTIST HOSPITAL - ULTRASOUND EQUIPMENT, AHC-WAH CERTIFICATE OF NEED EXPENSES |