Incident on March 6, 1987
Location
Approximately 1/2 Miles Downstream Of Operator's Clearbrook, Minnesota Terminal In Section 33, Township 149 N, Range 37 W.
,
Minn.
Type
Hazardous Liquid
Cause
Unspecified Weld
Operator
Enbridge Energy, Limited Partnership
1100 Louisiana, Suite 3300,
Houston,
TX 77002
Pipe Installed
1954
Barrels
Lost
500
Fatalities
0
Injuries
0
Property Damage
$122,958
Find Pipeline Incidents
Occasionally an incident's listed address may differ slightly from its location on the map because of a reporting discrepancy – in these cases the map is more accurate.
Source: PHMSA