Incident on Jan. 22, 1988
Location
Gaines Borger Line "80" Mp 264 20+63 Section 66, Blk. T, Adams, Beaty, & Moulton Survey Approximately 1/4 Mile North Of F.M. 293.
,
Tex.
Type
Hazardous Liquid
Cause
Third Party Excavation Damage
Operator
Phillips Pipe Line Co
252 Adams Building,
Bartlesville,
OK 74004
Pipe Installed
1942
Barrels
Lost
800
Fatalities
0
Injuries
0
Property Damage
$15,280
Find Pipeline Incidents
Occasionally an incident's listed address may differ slightly from its location on the map because of a reporting discrepancy – in these cases the map is more accurate.
Source: PHMSA