ProPublica

Journalism in the Public Interest

Pipeline Safety Tracker

Find the Accidents Near You

Incident on Feb. 11, 1989

Location
Redington Station, Section 7 T18 N, R52 W, Morrill County, Ne Approximately 7 1/2 Miles Sw Of The Town Of Redington.
, Neb.

Type
Hazardous Liquid

Cause
Miscellaneous Cause

Operator
Platte Pipe Line Co

Pipe Installed
1975

Barrels Lost
69

Fatalities
0

Injuries
0

Property Damage
$178,788

More on this Data

Occasionally an incident's listed address may differ slightly from its location on the map because of a reporting discrepancy – in these cases the map is more accurate.

Source: PHMSA