Incident on Feb. 19, 1992
Location
Goldsmith Benedum, Line 80 1 6, Mp 60 04+22. Sec 27, Block 37, T4 S, T&P Survey. Approximately 6 Miles North Of Midkiff, Tx, On Hwy. 3095, Then East Approximat
,
Tex.
Type
Hazardous Liquid
Cause
Miscellaneous Cause
Operator
Phillips Pipe Line Co
252 Adams Building,
Bartlesville,
OK 74004
Pipe Installed
1952
Barrels
Lost
5
Fatalities
0
Injuries
0
Property Damage
$25,047
Find Pipeline Incidents
Occasionally an incident's listed address may differ slightly from its location on the map because of a reporting discrepancy – in these cases the map is more accurate.
Source: PHMSA