ProPublica

Journalism in the Public Interest

Pipeline Safety Tracker

Find the Accidents Near You

Incident on Feb. 7, 2000

Location
Station: At Milepost 0920.6 Township: 148 N Section 24 Quarter Se Range 36, Tract T 661/662, Meridian:W Of 5 Th E Of 6 Th
Minn.

Type
Hazardous Liquid

Cause
Unspecified Weld

Operator
Enbridge Energy, Limited Partnership
1100 Louisiana, Suite 3300,
Houston, TX 77002

Pipe Installed
1994

Barrels Lost
25

Fatalities
0

Injuries
0

Property Damage
$244,473

More on this Data

Occasionally an incident's listed address may differ slightly from its location on the map because of a reporting discrepancy – in these cases the map is more accurate.

Source: PHMSA