Listing all stimulus spending by amount, in descending order. Return to Forest Service page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
GULF ATLANTIC CULVERT COMPANY INC | $50,191 | Contract | : PURCHASE BITUMINOUS COATED CORRUGATED ARCH PIPES, VARIOUS SIZES. | Agriculture, Department of / Forest Service | 8/09/2010 |
DUBOIS & KING, INC | $72,296 | Contract | : CIM-0900-1F-569-0920-02 GMNF Lefferts Pond Dam Reconstruction - Inspection Services. Provide construction inspection services for Lefferts Pond Dam Reconstruction (including preconstruction submittals, permit review, and on-site construction observation | Agriculture, Department of / Forest Service | 3/29/2010 |
KRUEGER & STEINFEST INC | $86,284 | Contract | : Resurfacing of forest road with gravel | Agriculture, Department of / Forest Service | 1/05/2010 |
ONAN CORPORATION | $6,059 | Contract | : CONSUMER MOBILE GENERATOR SET | Agriculture, Department of / Forest Service | 10/14/2010 |
OUTDOOR CREATIONS, INC. | $47,663 | Contract | : Manufacture and deliver 64 picnic tables, 3 group bbq's and 2 service tables to a campground. | Agriculture, Department of / Forest Service | 6/07/2010 |
FUTURE FOREST LLC | $20,741 | Contract | : This is to improve site specific road conditions to failitate the removal of hazardous fuels / forest products | Agriculture, Department of / Forest Service | 8/24/2010 |
LILLY TREE FARM | $395,688 | Contract | : The purpose of this project is to reduce hazardous fuels at Midewin National Tallgrass Prairie. The goal is to reduce the amount of woody vegetation that fire cannot kill and to help control the spread of invasive woody vegetation such as Autumn Olive, Bu | Agriculture, Department of / Forest Service | 7/28/2010 |
TOM STEVENS CONSTRUCTION LLC | $25,985 | Contract | : This is an equipment and operator rental contract for the purpose of repairing and rehabilitating approximatly 4 miles of illegal user created off highway vehicle trails. Accesses are then blocked to prevent farther damage reoccuring. This is an hourly co | Agriculture, Department of / Forest Service | 7/15/2010 |
MCCLUNGS EXCATIVING A PARTNERSHIP | $25,405 | Contract | : Beard Mountain Trail Bridge Stream Bank Stabilization | Agriculture, Department of / Forest Service | 12/16/2009 |
WOOD PRODUCT SIGNS/RECYCLE PLUS, INC. | $3,293 | Contract | : ROUTED US FOREST SERVICE TRAIL SIGNS | Agriculture, Department of / Forest Service | 6/22/2010 |
BEAR MOUNTAIN FIRE LLC | $120,825 | Contract | : 2010 ARRA Sparky Hazard Tree Felling project in Deschutes National Forest, Bend/Fort Rock Ranger District in Deschutes County Oregon along 16.8 miles of road. We are responsible for the felling of hazard trees in units 1, 4, and 5. Work includes the han | Agriculture, Department of / Forest Service | 7/14/2010 |
SANTOS REFORESTATION INCORPORATED | $197,085 | Contract | : THINNING AND HANDPILING | Agriculture, Department of / Forest Service | 6/14/2010 |
TIM FULLER LOGGING, LLC | $62,700 | Contract | : Biomass Removal, Non- Commercial Thinning | Agriculture, Department of / Forest Service | 7/26/2010 |
NORTHSTAR TECHNOLOGY CORP | $90,007 | Contract | : CAPITAL IMPROVEMENR AND MAINTENANCE SERVICES | Agriculture, Department of / Forest Service | 8/12/2010 |
SEQUOIA TREES INC | $98,325 | Contract | : The purpose of this project is to provide tree maintenance and removal for Grey Towers, a National Historic Site located in Milford, Pennsylvania. | Agriculture, Department of / Forest Service | 7/18/2010 |
GREER OUTDOOR SERVICES | $116,327 | Contract | : Recovery-CIM-0811-04T Trail package #6 GF. Maintenence to be performed on 12.4 miles of existing horse,mountain bike and hiking trails to bring them up to current USDA Forest Service standards. | Agriculture, Department of / Forest Service | 8/03/2010 |
WOOD PRODUCT SIGNS/RECYCLE PLUS, INC. | $11,753 | Contract | : ROUTED SIGNS FOR THE US FOREST SERVICE, CAMPGROUNDS | Agriculture, Department of / Forest Service | 7/30/2010 |
BRISTON CONSTRUCTION, LLC | $1,596,238 | Contract | : Reconstruction of US 82, construction of platform parking area and parking Lot embankment. | Agriculture, Department of / Forest Service | 9/16/2010 |
URECO | $14,670 | Contract | : USDA Recovery-Gravel Stockpiling for the Bitterroot National Forest | Agriculture, Department of / Forest Service | 10/22/2009 |
INVASIVE PLANT CONTROL, INC. | $165,000 | Contract | : Mapping and flagging of 13,200 acres of non-native invasive plant locations within the Francis Marion and Sumter Nation Forest | Agriculture, Department of / Forest Service | 8/30/2010 |
DIANI BUILDING CORP. | $15,000 | Contract | : USDA Forest Service EROC Southwest Stipend. A stipend was awarded to contractor to prepared a Request for Proposal. The stipend is a one time payment to help offset the cost involved in the preparation of the proposal. | Agriculture, Department of / Forest Service | 9/15/2010 |
MCCONNELL, MIKE CONSTRUCTION | $129,725 | Contract | : NON-MOTOR/NON-WILDERNESS TRAILS STANISLAUS ADA TRAILES-DONNELLS | Agriculture, Department of / Forest Service | 4/06/2010 |
CLEAN KILL PEST CONTROL, INC. | $13,761 | Contract | : Hiawatha National Forest Stockyard Hazardous Fuel Reduction Remaining 66 acres | Agriculture, Department of / Forest Service | 9/07/2010 |
INTEGRATED WATER SERVICES, INC. | $779,896 | Contract | : wastewater system | Agriculture, Department of / Forest Service | 6/02/2010 |
PESTMASTER SERVICES, INC. | $29,748 | Contract | : Inspection services | Agriculture, Department of / Forest Service | 7/15/2010 |
COMPUMERIC ENGINEERING, INC. | $25,048 | Contract | : Manufacture and delivery of bear-proof food storage lockers for Flathead National Forest | Agriculture, Department of / Forest Service | 9/21/2010 |
WESTERN RECLAMATION, LLC | $623,635 | Contract | : The purpose of this award is for subgrade preparation and road reconstruction work prior to gravel placement on USFS Road 250, Mineral County, Montana. Work includes road subgrade shaping, ditch and catch basin cleaning, and excess berm removal. | Agriculture, Department of / Forest Service | 7/29/2010 |
COOL ROOFING SYSTEMS, INC. | $752,145 | Contract | : Recovery-San Jacinto Ranger District-CIM-05-03F. Facilities Roofing Project-Total Price includes Base bid plus additive itemsd-San Jacinto Ranger District. | Agriculture, Department of / Forest Service | 7/23/2010 |
HUECKMAN, TODD | $84,447 | Contract | : Cabin Thin and Grapple Pile with excavator. Cutting of small trees to provide growing space for remaining stand and piling the resulting slash with a grapple excavator to be burnt later. | Agriculture, Department of / Forest Service | 12/29/2009 |
C. L. HEILMAN COMPANY, INC. | $330,660 | Contract | : remove an existing forest bridge and replace with a new precast structure with a 100' span. the new bridge is comprised of precast concrete girders set on precast concrete abutments. The bridge will have timber railing. Incidental work includes minor app | Agriculture, Department of / Forest Service | 7/09/2010 |
T.A.M. CONSTRUCTION, INC. | $741,270 | Contract | : Work includes but is not limited to the following activities: Grading, building of pond with geosynthetic clay liner, trail construction, seeding and various other items needed to complete abandoned coal mine remediation project. | Agriculture, Department of / Forest Service | 5/07/2010 |
R & R CONNER, INC | $48,794 | Contract | : CRUSHING AND STOCKPILING AGGREGATE | Agriculture, Department of / Forest Service | 12/22/2009 |
WOOD PRODUCT SIGNS/RECYCLE PLUS, INC. | $19,705 | Contract | : ROUTING SIGNS FOR THE US FOREST SERVICE, FOR CAMPGROUNDS, TRAILS, AND RECREATION SITES | Agriculture, Department of / Forest Service | 3/04/2010 |
AIELLO BROTHERS OIL & GAS, INC. | $195,608 | Contract | : Perform deferred road maintenance and watershed health on Brush Hollow Roads | Agriculture, Department of / Forest Service | 3/12/2010 |
BIG HILL LOGGING & RD BUILDING INC | $5,550 | Contract | : Pumping and demolition of toilet building at convict Flat campground | Agriculture, Department of / Forest Service | 9/22/2010 |
MOTLEY MOTLEY INC | $449,519 | Contract | : Palouse Ranger District Pavement Rehabilitation. We are patching and repairing old asphalt in several of the districts campgrounds. | Agriculture, Department of / Forest Service | 8/19/2010 |
NORTHSTAR TECHNOLOGY CORP | $385,296 | Contract | : CAPITAL IMPROVEMENT AND MAINTENANCE - INSPECTION SERVICES | Agriculture, Department of / Forest Service | 7/12/2010 |
JOHNSON ROCK PRODUCTS INC | $97,672 | Contract | : Camp Haul Route Reconstruction, road Contruction repairing numerous locations on the road | Agriculture, Department of / Forest Service | 12/30/2009 |
FUEL TANK MAINTENANCE COMPANY, L.L.C. | $266,146 | Contract | : Cabins Renovation, Pike San Isabel National Forest, CO | Agriculture, Department of / Forest Service | 9/07/2010 |
VALLEY COAST CONSTRUCTION, INC. | $423,084 | Contract | : San Juan Recreation Site Deferred maintenance. Contract includes various repairs and installations at San Juan NF sites Dolores, Pagosa, & Columbine Rd. Work to include: Repair well pumps, install new well pumps, install solar power, new water lines, wat | Agriculture, Department of / Forest Service | 8/12/2010 |
MARKO CONSTRUCTION GROUP, INC. | $241,684 | Contract | : HUME LAKE DAM VALVE REPLACEMENT. WORK CONSISTS OF FURNISHING ALL EQUIPMENT, LABOR, AND MATERIALS TO PLACE AND INSTALL A 36 DIAMETER KNIFEGATE ISOLATION VALVE WITH MANUAL CONTROLS UPSTREAM OF AND INLINE WITH AND EXISTING 36 DIAMETER OUTLET CONTROL BALL VA | Agriculture, Department of / Forest Service | 9/03/2010 |
AMERICAN SURVEYING & ENGINEERING, P.C. | $49,423 | Contract | : Midewin Culvert Design | Agriculture, Department of / Forest Service | 2/26/2010 |
ERICK AMMON INC | $377,170 | Contract | : Capital improvements at Bogard Work Station in Susanville, CA and Silviculture Laboratory in Redding, CA. Scope of work in Susanville included: removing and replacing siding, remove and reinstalling shutters, extending electrical outlets, caulking and pa | Agriculture, Department of / Forest Service | 7/09/2010 |
T. LARIVIERE EQUIPMENT & EXCAVATION, INC. | $731,575 | Contract | : Redoing Bridges and road ways that are existing currently but have been run down over time. | Agriculture, Department of / Forest Service | 3/16/2010 |
MOORE & HUECKMAN | $128,868 | Contract | : thinning and grapple piling and burning of 2 units | Agriculture, Department of / Forest Service | 2/16/2010 |
JAMES DEAN CONSTRUCTION CO | $316,032 | Contract | : road resurfacing | Agriculture, Department of / Forest Service | 7/19/2010 |
ANDRA L WENDT | $213,794 | Contract | : Machine roadside brushing and Slash removal of 415.39 miles of Forest Service Roads over two year period. (2010 & 2011) Seasonal work. | Agriculture, Department of / Forest Service | 4/06/2010 |
CUTTING EDGE FORESTRY, INC. | $37,895 | Contract | : KOOTENAI NATIONAL FOREST WHIITE PINE PRUNING FOR BLISTER RUST CONTROL TO IMPROVE THE OVERALL HEALTH AND CONDITION OF TREES | Agriculture, Department of / Forest Service | 8/23/2010 |
ENVIROCON, INC | $418,857 | Contract | : Environmental remediation of the CERCLA mine waste at Scotchman Mine on Kootenai National Forest in Sanders County Montana. | Agriculture, Department of / Forest Service | 11/11/2009 |
CBS CONTRACTING | $52,844 | Contract | : Campground maintenance | Agriculture, Department of / Forest Service | 4/19/2010 |
WOOD'S CRUSHING & HAULING INC | $3,174,805 | Contract | : Place culverts, reconstruct road, gravel placing, and repaving of 10 miles of road | Agriculture, Department of / Forest Service | 8/16/2010 |
ARMSTRONG GLEN, P.C. | $56,666 | Contract | : The award is for an engineering services contract for the survey, geotechnical investigation, design, preparation of plans and specifications for the removal and replacement of the Courthouse Creek single lane low water ford structure with a single lane b | Agriculture, Department of / Forest Service | 5/12/2010 |
MESQUITE INC | $488,179 | Contract | : Construction of paved road, concrete plazas and sidewalks, excavation and backfill and installation of metal picnic shelters. Construction ot tent pads, concrete edger and aggregate surfacing. Rebuild existing retaining wall, 10 car aggregate surfaced p | Agriculture, Department of / Forest Service | 9/22/2010 |
CXT INCORPORATED | $35,570 | Contract | : TAS::12 1102::TAS 2010 RECEOVERY FUNDS- one Prefabricated Double Rocky Mountain toilet building. Demo, gravel placement and additional mobilization. | Agriculture, Department of / Forest Service | 8/23/2010 |
SHUPE CLEARING & GRUBBING | $39,500 | Contract | : Demolition & Removal on 8 Tracts containing: Houses,Cabins,Barns, Cisterns, Trash,Debris and more. To Protect, Restore and put back to its Natural Appearance to the Appalachain Natural Scenic Trail in Bland County, Va. | Agriculture, Department of / Forest Service | 12/16/2009 |
COMPUMERIC ENGINEERING, INC. | $21,198 | Contract | : Manufacture and delivery of bear-proof trash containers for Stanislaus National Forest. Manufacturing process includes shearing, forming, punching, painting of products. | Agriculture, Department of / Forest Service | 4/29/2010 |
HASKINS EXCAVATING LLC | $99,315 | Contract | : Superior RD Trail Opening and Clearing with brushing and limbing. | Agriculture, Department of / Forest Service | 8/20/2010 |
ORANGE AND ROCKLAND UTILITIES INC | $10,013 | Contract | : Payment for work performed on Grey Towers National Park Milford PA. Signed agreement by Ellen M. Geis US Forestry Service. Fixing Utility per Ellen Geis's sign work agreement Request | Agriculture, Department of / Forest Service | 9/09/2010 |
S G ENTERPRISES INC | $79,555 | Contract | : THINNING & HANDPILING | Agriculture, Department of / Forest Service | 1/22/2010 |
QUALITY BUILT POLE BUILDINGS | $384,030 | Contract | : Camp Nesbit Improvements Ottawa National Forest | Agriculture, Department of / Forest Service | 6/30/2010 |
URBAN TRUCKING & EXCAVATION LLC | $51,558 | Contract | : Jemez Falls Campground toilet demolition and access installation | Agriculture, Department of / Forest Service | 2/10/2010 |
NORTH CENTRAL WILD FIRE LLC | $230,747 | Contract | : mechanical fuels reduction | Agriculture, Department of / Forest Service | 1/26/2010 |
WOOD'S CRUSHING & HAULING INC | $3,295,192 | Contract | : Rock crushing,stockpiling, gravel hauling and placing on forest service roads. Grading of gravel after placing on roads | Agriculture, Department of / Forest Service | 6/01/2010 |
LEUFKENS CONSTRUCTION INC. | $35,570 | Contract | : Snowmobile Trail Brushing in the Lolo National Forest. | Agriculture, Department of / Forest Service | 4/08/2010 |
P & M SIGNS, INC. | $139,839 | Contract | : Street and Road signs | Agriculture, Department of / Forest Service | 3/04/2010 |
KAUFFMAN ENTERPRISES LLC | $51,610 | Contract | : WUI Hazardous Fuels Reduction Project. Mechanical treatment of hazardous fuels on the Tonto National Forest, Payson Ranger District. | Agriculture, Department of / Forest Service | 9/23/2010 |
MP FORESTRY | $789,235 | Contract | : Hand pile and fuels reduction in forest areas. Fuels reduction is to cut forest debris to and pile them in order to avoid forest fires | Agriculture, Department of / Forest Service | 5/26/2010 |
CONTRERAS FORESTRY | $2,008 | Contract | : This award was given for the completion of boundary marking on tracts in Edgefield county. The boundary lines were marked with special paint to indicate where the property line runs separating the different properties. | Agriculture, Department of / Forest Service | 9/17/2010 |
MCALLISTER, MICHAEL L | $13,790 | Contract | : This project is to thin and prune the Tree Improvement Seed Orchard on the Wallowa Valley Ranger District of the Wallowa-Whitman National Forest. The result is only the best Cone producing trees remain and they are pruned up to make more fire resistent. | Agriculture, Department of / Forest Service | 3/18/2010 |
WESTERN COLORADO INTERPRETIVE ASSOCIATION | $111,195 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: Interpretive Exhibits and Brochure for the Alpine Tunnel Historic District located on the Gunnison National Forest | Agriculture, Department of / Forest Service | 4/02/2010 |
ONSITE CONSTRUCTION & ENGINEERING, INC. | $255,949 | Contract | : Wheeler Gorge Water System The work consisted of adding a new pump house, chlorinating system and removed one of the two pumps and replumbed the other one. This supplies water to the campground, station and visitors center in Ventura County, CA. No work | Agriculture, Department of / Forest Service | 8/18/2010 |
WESSLEN CONSTRUCTION, INC. | $187,480 | Contract | : Snyder Group Shelter - Built a new picnic shelter | Agriculture, Department of / Forest Service | 7/21/2010 |
FRANK'S SUPPLY COMPANY INC. (NSL) | $6,000 | Contract | : Carson National Forest rented a variety of construction equipment in April and May of 2010. | Agriculture, Department of / Forest Service | 9/15/2010 |
WARNER CREEK CO | $102,571 | Contract | : Wildlife habitat restoration for animals that need snags, downwood, and cavities. Treatments include creating live and dead snags through saw-topping and high girdling. All work was located in the Central Coast Range District of the Siuslaw National Fores | Agriculture, Department of / Forest Service | 2/23/2010 |
HOOPER, THOMAS WILEY | $20,786 | Contract | : The majority of the work was the restoration of four crossings of Rock Creek. It was necessary in some areas to install overlapping and rock riser stairways. Some sections are up to eight feet in width while other sectons have grown in with vegetation cr | Agriculture, Department of / Forest Service | 9/01/2010 |
THORNE BAY WOOD PRODUCTS ENTERPRISE | $12,082 | Contract | : Provide and deliver Lumber products & Hardware to Harris River Project. | Agriculture, Department of / Forest Service | 6/21/2010 |
CONTRERAS FORESTRY | $3,143 | Contract | : This award was given for the completion of boundary marking on tracts in long cane district. The boundary lines were marked with special paint to indicate where the property line runs separating the different properties. | Agriculture, Department of / Forest Service | 8/04/2010 |
WILLIAM KANAYAN CONSTRUCTION | $416,262 | Contract | : Road repairs on the Historic Old Ridge Route, Forest Service Road #8N04. The 16 mile segment of the road extends from the south entrance off Templin Highway, 16 miles to the North terminus at L.A. County road N2 Pine Canyon. The road is on the Santa Cla | Agriculture, Department of / Forest Service | 7/20/2010 |
LES SCHLEGEL ENTERPRISES, INC. | $106,264 | Contract | : Culvert replacement on the Flathead National Forest | Agriculture, Department of / Forest Service | 5/27/2010 |
MERLAN ASSOCIATES, LLC | $78,000 | Contract | : Archival research and report on selected portions of the Old Spanish Trail/Camino Real de Tierra Adentro. | Agriculture, Department of / Forest Service | 1/29/2010 |
GURNEY BROTHERS CONSTRUCTION INC | $236,300 | Contract | : Aquatic Passage Reconstruction Culvert Project To replace culvert | Agriculture, Department of / Forest Service | 5/03/2010 |
MOUNTAIN WEST BUILDING SUPPLY LLC | $8,404 | Contract | : PRESSURE TREATED LUMBER | Agriculture, Department of / Forest Service | 7/26/2010 |
FDC ENTERPRISES, INC | $23,985 | Contract | : Spot treatment of herbicide on undesirable woody species encroacing on prairie establishment | Agriculture, Department of / Forest Service | 7/30/2010 |
ROBERT OCHOA | $98,420 | Contract | : Hazardous Fuels Reduction including tree and brush thinning and piling of all materials. | Agriculture, Department of / Forest Service | 9/23/2010 |
NOBLE EXCAVATING, INC. | $413,187 | Contract | : Crushing and stockpile of gravel, road reconditiong, hauling and placement of gravel, and minor drainage work. | Agriculture, Department of / Forest Service | 9/02/2010 |
CRYSTAL CLEAR MAINTENANCE, INC. | $65,266 | Contract | : NEPA Hazardous Fuels Treatments for Taos County. | Agriculture, Department of / Forest Service | 4/14/2010 |
JOHNSON ROCK PRODUCTS INC | $262,260 | Contract | : Agness Road Phase 2 Reconstruction, Road construction, Repair numerould locations on road | Agriculture, Department of / Forest Service | 3/31/2010 |
EWING, TONY | $89,280 | Contract | : Watershed Restoration | Agriculture, Department of / Forest Service | 7/08/2010 |
BEAR CREEK OUTFITTERS LLC | $44,400 | Contract | : Recovery deferred trail maintance | Agriculture, Department of / Forest Service | 9/16/2010 |
DALE PETERSON | $74,925 | Contract | : MANUFACTURE, REMOVE AND INSTALL TYPE 1 PICNIC TABLES WHICH ARE ALL METAL AND PAINTED. WE FORMED AND WELDED EACH TOP, BENCH, AND SET OF LEGS PER SPECIFICATIONS OF USDA FOREST SERVICE. WE ALSO MANUFACTURED, REMOVED, AND INSTALLED TYPE 2 PICNIC TABLES, WHICH | Agriculture, Department of / Forest Service | 6/02/2010 |
A A A THUNDERDERBOLT FIRE SERVICE INC | $10,815 | Contract | : STAND DENSITY MANAGEMENT - PINE SPRINGS 207 & 209 THINNING AND PULLBACK OF CONIFERS | Agriculture, Department of / Forest Service | 8/11/2010 |
Y R U CONTRACTING INCORPORATED | $15,219 | Contract | : trail maintenance | Agriculture, Department of / Forest Service | 9/01/2010 |
SANTOS REFORESTATION INCORPORATED | $95,725 | Contract | : FIRE HAZERD REDUCTION IN THE MALHEUR NATIONAL FOREST | Agriculture, Department of / Forest Service | 6/02/2010 |
BOULDER CREEK ENGINEERING AND BRIDGE COMPANY, PC | $44,500 | Contract | : Engineering, manufacturing and delivery of precast concrete cattle guard support boxes. | Agriculture, Department of / Forest Service | 4/16/2010 |
PACIFIC TECH CONSTRUCTION, INC. | $1,683,015 | Contract | : Johnson Ridge Observatory Improvements in Toutle, WA. | Agriculture, Department of / Forest Service | 7/14/2010 |
CONSOLIDATED LAND SERVICES INC | $32,440 | Contract | : Pogue Springs survey Task order, a Dependent Resurvey of section 3 T15N R11W 5th P.M. Arkansas on the sylamore Ranger District | Agriculture, Department of / Forest Service | 8/12/2010 |
JOHNSON ROOFING & CONSTRUCTION, INC. | $190,302 | Contract | : Facilities Painting & Siding project San Jacinto Rd. | Agriculture, Department of / Forest Service | 7/23/2010 |
NEW VISTA DEVELOPMENT, INC. | $160,709 | Contract | : Non-ERFO Flood Repair East Side, Coeur D Alene River Ranger District. Repaired forest service roads damaged by flooding. | Agriculture, Department of / Forest Service | 7/15/2010 |
SUMMITT FORESTS INC. | $220,077 | Contract | : 2010 RECOVERY FUNDS-STIMULUS IAS LWT39E- SELECTIVE SLASHING/THINNNIG, YARD SLASH AND MECHANICAL PILE ON THE WIND RIVER R.D. OF THE SHOSHONE N.F. | Agriculture, Department of / Forest Service | 8/27/2010 |
BIG J CONSTRUCTION, INC. | $401,967 | Contract | : Pine Creek Lower Campground Redevelopment | Agriculture, Department of / Forest Service | 8/13/2010 |
WOOLSEY WELL SERVICES | $33,100 | Contract | : Recovery Act Project-Water supply well abandonment, Mark Twain, National Forest | Agriculture, Department of / Forest Service | 5/11/2010 |
GROAT BROS, INC. | $384,455 | Contract | : Demolition and removal of ten structures at the Pine Creek Work Center Compound. | Agriculture, Department of / Forest Service | 8/09/2010 |
LAUGHTER, SHANE | $315,334 | Contract | : Cradle of Forestry Trail Accessibility Improvements | Agriculture, Department of / Forest Service | 5/25/2010 |
QUICKSILVER CONTRACTING COMPANY | $126,711 | Contract | : LOOKOUT PROJECT AREA - MECHANICAL TREE THINNING. | Agriculture, Department of / Forest Service | 6/16/2010 |
PAYNE & STALCUP CONSTRUCTION COMPANY,INC | $49,500 | Contract | : Enoree Campground Repairs | Agriculture, Department of / Forest Service | 5/18/2010 |
OLSON, JAY | $39,183 | Contract | : Civil Engineering Tech to do inspection work on the Superior Ranger District of the Lolo Natl Forest. | Agriculture, Department of / Forest Service | 8/31/2010 |
ETOWAH GRADING INC | $36,273 | Contract | : WFM-0811-16HF Grandfather RD Hazardous Fuels Reduction FR 4071 Fuels Reduction Thunderhole Road Maintenance | Agriculture, Department of / Forest Service | 4/13/2010 |
K W EMERSON INC | $328,847 | Contract | : THIS PROJECT CONSISTS OF REPAIR AND REHABILITATION OF ROAD 5N14 IN TUOLUMNE COUNTY CA. INCLUDES POTHOLE REPAIR, ASPHALT CHIP SEAL, DRAINAGE RESTORATION AND PLACEMENT OF ROCK. | Agriculture, Department of / Forest Service | 9/07/2010 |
PERRY BARTSCH JR. CONSTRUCTION COMPANY | $175,750 | Contract | : Wayah Bald Observation Tower Stair Replacement and repointing of the existing tower and safety wall mortar joints. Demolish and install new timber cab cornerposts. Demolish and place 4 stone base and pave with 1 1/2 asphalt the entire paved entrance wal | Agriculture, Department of / Forest Service | 5/21/2010 |
L. H. C., INCORPORATED | $2,079,341 | Contract | : RECOVERY GRIFFIN CREEK FSRD# 538 REPAIR, PATCHING & PAVING PROJECT | Agriculture, Department of / Forest Service | 6/21/2010 |
GRAYBACK FORESTRY, INC. | $53,000 | Contract | : Provide RX crews and enginse for burning on La Grande Ranger district, construct fireline and burn areas for reforestation. | Agriculture, Department of / Forest Service | 8/31/2010 |
DOT CONSTRUCTION, INC. | $297,019 | Contract | : Located on the Croatan National Forest in North Carolina, this project consists of the removal of the existing wastewater treatment plant and the construction of two separate on-site septic systems for the existing bath-house and restroom building. Relate | Agriculture, Department of / Forest Service | 7/02/2010 |
RED RIVER FLOOR CARE LLC | $8,900 | Contract | : My company is to purchase and deliver tile. | Agriculture, Department of / Forest Service | 9/27/2010 |
SHAMROCK BUILDING MATERIALS INC. | $27,636 | Contract | : Planting Materials III | Agriculture, Department of / Forest Service | 7/22/2010 |
COMPUMERIC ENGINEERING, INC. | $58,780 | Contract | : Manufacture and delivery of bear-proof trash containers for US Forest Service | Agriculture, Department of / Forest Service | 9/14/2010 |
NORTHSTAR TECHNOLOGY CORP | $10,000 | Contract | : FACILITIES MAINTENANCE /RENOVATION INSPECTOR | Agriculture, Department of / Forest Service | 1/12/2010 |
LINDERS, EMILY COOKING | $14,025 | Contract | : Cook for California Conservation Corps Backcountry Trail Crew | Agriculture, Department of / Forest Service | 4/23/2010 |
COUNTRY CLASSIC, INC | $9,540 | Contract | : TRAIL SIGNS | Agriculture, Department of / Forest Service | 5/14/2010 |
GOMES CONSTRUCTION COMPANY | $140,981 | Contract | : TIMBERLINE LODGE WINDOW REPLACEMENT-Replace and repair original windows in Nat'l Historic Monument Timberline Lodge. Includes removing old windows, sashes, build and install new window sashes, install dual glazed window units, cords, weights, hardware, sa | Agriculture, Department of / Forest Service | 3/17/2010 |
TRI STATE SURVEYING LTD INC | $428,940 | Contract | : Dependant resurvey o ffederal lands under the jurisdiction of the USFS to determin, monument, mark and post the boundaries adjacent to private lands. | Agriculture, Department of / Forest Service | 7/22/2010 |
WASHINGTON COUNTY SERVICE AUTHORITY | $69,746 | Contract | : This project would provide water to approximately 27 residential connections, along TN Highway 133, that do not presently have access to public drinking water. The project consists of the installation of a pitless booster pump station, hydropneumatic sto | Agriculture, Department of / Forest Service | 8/03/2010 |
STOKEN LOGGING | $77,200 | Contract | : thinning of overgrown timber to allow for better future growth of all trees. logging of the dead trees or pine beetle infected trees(if any) to allow for better future growth of all existing plants and trees in this area | Agriculture, Department of / Forest Service | 5/06/2010 |
FORTUNE'S BULLDOZING & GRADING, LLC | $247,711 | Contract | : Reconstruction of a Forest Service road in the Darrington Ranger District. | Agriculture, Department of / Forest Service | 7/14/2010 |
ASCORP, INC. | $1,243,286 | Contract | : To widen and repair 2.1 miles of the Warren Wagon Road by mechanically stabilized earth walls, widening existing cut/fill sections and improving drainage measures. Work also includes surfacing 2.7 miles of road with an optional 3.2 miles of additional ro | Agriculture, Department of / Forest Service | 6/10/2010 |
BILLINGS FLYING SERVICE, INC. | $46,000 | Contract | : DESCRIPTION OF WORK - The project describes moving between 20,000 and 23,000 pounds of bridge materials (approximately 220 to 250 pieces) from the Meadow Creek Trailhead to the North approximately -' 8 nautical miles (NM) to site # 1 (Black Bear Pack Brid | Agriculture, Department of / Forest Service | 7/30/2010 |
MESCALERO APACHE HOUSING AUTHORITY | $197,600 | Contract | : Upper Sawmill Unit, Commercial and Service | Agriculture, Department of / Forest Service | 4/06/2010 |
BAILEY PAVING, INC. | $384,960 | Contract | : Road Resurfacing 4.5 miles of Davis Road at Klamath National Forest. The road resurfacing was 1/2 and 3/8 double chipseal. We routed and cracksealed the road surface. We applied a layer of oil and a layer of 1/2 crushed aggregate. We compacted and cur | Agriculture, Department of / Forest Service | 7/20/2010 |
APIFENCE INC | $8,039 | Contract | : Removal and replacement of old/rotten posts on Kuhn Ridge Orchard enclosure(s). Splice broken wires when needed. | Agriculture, Department of / Forest Service | 5/11/2010 |
JARVIS ROADS LLC | $134,071 | Contract | : Recovery-Road 16 Aggregate Resurface Deschutes National Forest | Agriculture, Department of / Forest Service | 6/03/2010 |
TANNER LOGGING, INC | $530,508 | Contract | : Removal of biomass and saw timber for reduction of fuel loads and fuel ladders in mixed forest stands. | Agriculture, Department of / Forest Service | 1/26/2010 |
WHITE OAK CONTRACTING INC | $251,687 | Contract | : Maintenance of bridges. Sandblasted old paint off bridges and repainted. Also did some other minor misc. work associated with bridges. | Agriculture, Department of / Forest Service | 4/23/2010 |
MACNAK CONSTRUCTION LLC | $131,301 | Contract | : resurface road 24 | Agriculture, Department of / Forest Service | 8/10/2010 |
KIRBY NAGELHOUT CONSTRUCTION CO. | $6,739,094 | Contract | : Construction of Bend Pine Administrative Site Phase I: 46,000 SF of office building, including full site deveolpement and associated public improvements. | Agriculture, Department of / Forest Service | 6/24/2010 |
OUTDOOR CREATIONS, INC. | $99,992 | Contract | : Manufacture, deliver and install 58 picnic tables and 44 firepits to 5 campgrounds. We also have (42) custom legs to produce. The project Is delayed due to customer and status of project has not changed. | Agriculture, Department of / Forest Service | 5/04/2010 |
R-V ASSOCIATES, INC. | $420,037 | Contract | : TRAIL DECOMMISION AND INSTALL 14000 TONS OF CRUSHED ROCK FOR PARKING LOT AT EVANS CREK ORV AREA ROADS ARRA RECOVERY PROJECT MT. BAKER-SNOQUALIMIE NATIONAL FOREST | Agriculture, Department of / Forest Service | 7/26/2010 |
UNDERWATER ENGINEERING SERVICES, INC. | $57,360 | Contract | : Rock Creek Dam gate repair in the Chattahoochee National Forest. | Agriculture, Department of / Forest Service | 5/10/2010 |
TUDOR'S EXTERIOR SERVICES LLC | $43,340 | Contract | : REWORKING HIKING TRAIL AT TURTLE TOWN FALLS TO BRING IT UP TO STANDARD . | Agriculture, Department of / Forest Service | 6/14/2010 |
DRP CONSTRUCTION COMPANY | $209,990 | Contract | : Paint forest bridge and replace deck | Agriculture, Department of / Forest Service | 6/25/2010 |
RESCOM OF GEORGIA, LLC | $229,087 | Contract | : Nantahala National Fire Towers North Carolina Albert Mountain Fire Towers Cowee Bald Fire Towers Joanna Bald Fire Towers | Agriculture, Department of / Forest Service | 5/26/2010 |
KITCHELL CORPORATION | $15,000 | Contract | : Stipend payment for Design-Build Los Padres National Forest Ranger Stations Phase II | Agriculture, Department of / Forest Service | 9/15/2010 |
HANSEN LOGGING, LLC | $225,000 | Contract | : This project entails mobilizing equipment and personnel to crush and stockpile base course aggregate at the Thomas Mt quarry, Tacoma Creek pit and the Tonata Creek pit on the Colville National Forest. Approximately 11,000 Ton to 15,000 Tons will be crushe | Agriculture, Department of / Forest Service | 2/23/2010 |
STONEHOUSE SIGNS, INC. | $3,422 | Contract | : We were asked to manufacture the following signs: 6 EACH 3 PART ARRA SIGNS 30 66 EACH 3 PART ARRA SIGNS 21 | Agriculture, Department of / Forest Service | 7/08/2010 |
COMPUMERIC ENGINEERING, INC. | $2,452 | Contract | : Manufacture and delivery of bear-proof trash containers | Agriculture, Department of / Forest Service | 6/24/2010 |
PIMA PAVING INC. | $106,819 | Contract | : Improve safety of staircases located at the Webb Peak and West Peak Lookout Towers by widening staircases and installing new landings, railing, and a lockable devise to deter public access. | Agriculture, Department of / Forest Service | 6/10/2010 |
MACNAK CONSTRUCTION LLC | $742,053 | Contract | : This project constructs a 3360 SF building addition, in between and attached to, two existing buildings on the Emigrant Creek Ranger District Administrative Site. Work includes all phases of construction for the addition, including but not limited to site | Agriculture, Department of / Forest Service | 7/29/2010 |
WESTERN RECLAMATION, LLC | $278,577 | Contract | : Recovery Osprey Public Water Hookup. Construction of Water Supply to Campground. | Agriculture, Department of / Forest Service | 7/28/2010 |
PROFESSIONAL ASBESTOS REMOVAL CORPORATION | $88,890 | Contract | : ARRA - LPNF Environmental Assessment for Forest-wide Facility Demolition @ Los Padres National Forest. | Agriculture, Department of / Forest Service | 7/09/2010 |
EARL'S LOGGING INC | $154,834 | Contract | : Nutrioso Wui-juniper removal | Agriculture, Department of / Forest Service | 4/15/2010 |
WILDLIFE PROPERTIES ENHANCEMENT | $465,865 | Contract | : Wildland Fire Management Pinyon/Juniper Thinning & Mastication | Agriculture, Department of / Forest Service | 7/21/2010 |
TIMBERLINE CONTRACTING INC. | $107,406 | Contract | : Repalcing curbs, running planks,guardrail blocks, sill caps, guardrail hardware, object markers,mainwall posts,and wingwall posts on various bridges. | Agriculture, Department of / Forest Service | 8/05/2010 |
KARMA'S FOREST | $14,875 | Contract | : Restoration Services - Seed and Vegetation Collection. Mapping & Collecting Native Grasses and Forbs for restoration projects. | Agriculture, Department of / Forest Service | 8/02/2010 |
BIG J CONSTRUCTION, INC. | $85,639 | Contract | : Lake Almanor Flush Restrooms. Install new prefabricated restrooms. | Agriculture, Department of / Forest Service | 8/19/2010 |
CONCO CONCRETE SPECIALISTS, L.L.C. | $474,900 | Contract | : Water systems for forest service. | Agriculture, Department of / Forest Service | 6/29/2010 |
WINDY RIDGE CONTRUCTION INC. | $73,559 | Contract | : Replace Marten Creek failing culverts, Kootenai National Forest | Agriculture, Department of / Forest Service | 11/05/2009 |
SEA REACH LTD | $144,734 | Contract | : Interpretive displays for mt. st. helens national monument | Agriculture, Department of / Forest Service | 6/02/2010 |
PETERSEN MFG. CO. | $8,262 | Contract | : 8 - RTH84 precast concrete picnic tables and 4 - PB84 precast concrete benches | Agriculture, Department of / Forest Service | 5/18/2010 |
B C CONCRETE INC | $20,225 | Contract | : Build and deliver a precast concrete utility building for the USFS Musselshell work center. | Agriculture, Department of / Forest Service | 7/06/2010 |
AQUATIC CONTRACTING LLC | $15,797 | Contract | : This small project consists of minor hiking trail bridge repairs. The Cougar Creek Trail Bridge Repair project will include: mobilization, replacement of backing planks and sills, excavation for the placement of Geocell foundations, placement of 2G? minu | Agriculture, Department of / Forest Service | 5/17/2010 |
LAMINATED TIMBERS, INC. | $6,443 | Contract | : Laminated Timber: Industrial appearance manufactured with .60CCA treated Southern Yellow Pine & waterproof adhesive, 24F-V3 lay-up, 800' camber, double end trim & individually wrapped. Includes shipping | Agriculture, Department of / Forest Service | 8/25/2010 |
JOHNSON ROCK PRODUCTS INC | $85,994 | Contract | : Road 18 Shoulder Repair, road construction to repair road | Agriculture, Department of / Forest Service | 2/22/2010 |
DOWL, LLC | $4,318 | Contract | : DOWL HKM provided construction inspection for the MGVC Masonry Repair project | Agriculture, Department of / Forest Service | 7/07/2010 |
STONE RIDGE CONSTRUCTION, INC | $166,183 | Contract | : Two culverts will be removed and replaced with two bottomless arch culverts. This project includes, but is not limited to, placing construction stakes, constructing brush barriers, soil and erosion control, clearing and grubbing, roadway excavation and e | Agriculture, Department of / Forest Service | 4/26/2010 |
TUSCA KS, INC. | $136,714 | Contract | : Complete replacement of existing sewage lift station with a new packaged sewage lift station. Work includes demolition of existing wet-dry sewage lift station, valves, pumps, control panel, and basins; installation of new packaged lift station, including | Agriculture, Department of / Forest Service | 8/19/2010 |
M.E. AVILA CONSTRUCTION CORPORATION | $142,410 | Contract | : Window replacement and installation of power door | Agriculture, Department of / Forest Service | 6/16/2010 |
CINQUINI & PASSARINO, INC. | $20,000 | Contract | : Topographic Mapping of Gerle Creek Campground | Agriculture, Department of / Forest Service | 5/25/2010 |
J W BAMFORD INC | $63,705 | Contract | : CAP PLANTATION STEWARDSHIP USDA - FOREST SERVICE TAHOE NATIONAL FOREST Stewardship includes removal of sawtimber and biomass material to processing facility. | Agriculture, Department of / Forest Service | 7/22/2010 |
WARLICK, TERRI T | $136,870 | Contract | : kinser creek trail bridge crossings | Agriculture, Department of / Forest Service | 12/16/2009 |
COLLINS PINE COMPANY | $1,000 | Contract | : ARRA program reporting fees. No on-the-ground activities. Once again, this is a reporting fee only no on the ground activities are associated with this award. | Agriculture, Department of / Forest Service | 8/18/2010 |
KRUEGER & STEINFEST INC | $122,720 | Contract | : Resurfacing of forest road with gravel and replacement of culvert | Agriculture, Department of / Forest Service | 11/25/2009 |
VALHALLA BUILDERS & DEVELOPERS, INC. | $199,069 | Contract | : Reconditioning of forest roads including the following tasks: Clearing/Grubbing of tree tops, limbs and stumps, furrowing of ditches, drainage and excavation, rolling dips, water bars, roller compaction, remove or contruct berms, install corrugated metal | Agriculture, Department of / Forest Service | 6/23/2010 |
SUMMIT ENGINEERING CORPORATION | $306,000 | Contract | : Professional Surveying Services for the White Pine Mining District Cadastral Survey. | Agriculture, Department of / Forest Service | 7/27/2010 |
APEX CURB & TURF LLC | $43,105 | Contract | : WE WILL APPLY THE SUPPLIED SEED, TRACER MULCH, FERTILIZER AND THE ORGANIC TACKIFIER AS SPECIFIED TO THE 5 ACRES OF CUTS AND FILLS SLOPES NEXT TO THE OBLITERATED ROAD AS PER THE STATEMENT OF WORK. APPLY THE SUPPLIED SEED, THE 100% VIRGIN WOOD MULCH, FERTI | Agriculture, Department of / Forest Service | 9/09/2010 |
GLAHE & ASSOCIATES, INC | $293,994 | Contract | : CADASTRAL LAND SURVEYING | Agriculture, Department of / Forest Service | 3/12/2010 |
A & K CONSTRUCTION INC | $76,245 | Contract | : Replacement of siding and fascia on two bunkhouses and one wharehouse. Work included tear off of existing siding and fascia and replacement with fiber cement lap siding and miratec trim. | Agriculture, Department of / Forest Service | 7/12/2010 |
COLLINS PINE COMPANY | $39,846 | Contract | : Prepare forest roads, including clearing stumps and brush, installing drainage structures and hauling aggregate to reduce or eliminate surface erosion on forest roads. This work done in preparation for ecosystem enhancement work in the forest through har | Agriculture, Department of / Forest Service | 7/20/2010 |
DUMAN INC | $5,200 | Contract | : road decomissioning | Agriculture, Department of / Forest Service | 12/22/2009 |
DJ&A, P.C. | $4,369 | Contract | : This contract is to provide construction staking for the Taft Trailhead parking lot expansion on the Idaho Panhandle Nationa Forest. | Agriculture, Department of / Forest Service | 6/21/2010 |
MARTIN CONSTRUCTION, INC. | $74,023 | Contract | : THIS PROJECT IS FOR THE RECLAMATION OF 9 DAMS ON THE MCKENZIE AND MEDORA RANGER DISTRICS, DAKOTA PRAIRIE GRASSLANDS. THE SERVICES REQUIRED BY THIS CONTRACT ARE FOR FURNISHING ALL LABOR, EQUIPMENT, SUPERVISION, TRANSPORTATION, OPERATING SUPPLIES, AND INCID | Agriculture, Department of / Forest Service | 3/11/2010 |
ALLEN COMPANY, INC., THE | $89,665 | Contract | : RECOVERY: TAS::12 1102::TAS, CIM-0802-37R. Furnish, Haul and spread stone aggregate on Forest Service Roads located on the Daniel Boone National Forest, Kentucky. | Agriculture, Department of / Forest Service | 8/12/2010 |
DF ENTERPRISE, LLC | $39,725 | Contract | : Thnning/Biomass Phase 2, Indian Suite Hazard Fuels Reduction and Hazardous Fuels Mitigation | Agriculture, Department of / Forest Service | 7/20/2010 |
WAYNE'S PUMP SERVICE | $12,650 | Contract | : Recovery Grandview CG Long Draw CG and Chambers Lake CG Water System Maintenance on the Arapaho-Roosevelt National Forest and Pawnee National Grassland | Agriculture, Department of / Forest Service | 3/12/2010 |
STEVENS CORPORATION | $27,905 | Contract | : Porous Paving Product Sold- Trail reinforcement | Agriculture, Department of / Forest Service | 6/23/2010 |
DRP CONSTRUCTION COMPANY | $87,327 | Contract | : Repair two bridges on the PCT | Agriculture, Department of / Forest Service | 7/19/2010 |
TIDEWATER CONTRACTORS, INC. | $591,441 | Contract | : CHIP SEAL | Agriculture, Department of / Forest Service | 7/27/2010 |
STANDISH FARM SUPPLY INC | $3,330 | Contract | : supply contract/wood posts | Agriculture, Department of / Forest Service | 7/26/2010 |
LANG CONSTRUCTION, INC. | $65,100 | Contract | : This project includes but is not limited to: Kootenai National Forest Minton Peak Lookout Reconstruction. This project includes demolition of the existing lookout structure and replacing it with a new one. The existing lookout is an L-4 cabin on a 10' woo | Agriculture, Department of / Forest Service | 7/20/2010 |
D & H HAULING & EXCAVATION, LLC | $109,025 | Contract | : Hand slashing and Excavator piling. | Agriculture, Department of / Forest Service | 11/13/2009 |
ARMSTRONG BACKHOE | $95,095 | Contract | : Install 5 septic systems. Grade and pave road way. Pour concrete slab. | Agriculture, Department of / Forest Service | 7/09/2010 |
PIMA PAVING INC. | $251,211 | Contract | : Provide and install waterlines, ball valves, air release valves, drain valves, valve boxes, hydrants, yard hydrants, small potable water tanks, and host racks on the following sites throughout the Santa Catalina Ranger District in the Coronado National Fo | Agriculture, Department of / Forest Service | 6/30/2010 |
M.E. AVILA CONSTRUCTION CORPORATION | $190,520 | Contract | : REPLACE AND REPAIR EXISITNG CONCRETE WALKS, DECKS AND WALL CAPS | Agriculture, Department of / Forest Service | 6/25/2010 |
MARKO CONSTRUCTION GROUP, INC. | $266,095 | Contract | : DRILL WELLS A SEVERAL FOREST SITES IN LOS PADRES NATIONAL FOREST AND CONNECT WELLS TO ELECTRIC AND PUMP FACILITIES. | Agriculture, Department of / Forest Service | 9/09/2010 |
EASTERN OREGON ENVIRONMENTAL RECOVERY LLC | $63,746 | Contract | : Install new potable water system at Forest Service Guard station. | Agriculture, Department of / Forest Service | 6/08/2010 |
PLATEAU ARCHAEOLOGICAL INVESTIGATIONS LLC | $4,628 | Contract | : Eligibility evaluation of a Forest Service guard station and associated structures for inclusion on the National Register of Historic Places. | Agriculture, Department of / Forest Service | 5/25/2010 |
INTERNATIONAL DISTRICT HOUSING AND SOCIAL SERVICES | $32,000 | Contract | : ARRA- IDHA Job Training Development | Agriculture, Department of / Forest Service | 1/15/2010 |
ERIC'S TREE SERVICE | $60,330 | Contract | : This is a fuel reduction project for the forest service. This project is using chain saws to hand clear brush and trees between forest service selected trees. This is to reduce the fuel load to help reduce the chance of forest fires. | Agriculture, Department of / Forest Service | 12/17/2009 |
WEST, KURT F | $27,514 | Contract | : Krinklehorn Trailhead and Foundation Camp | Agriculture, Department of / Forest Service | 7/29/2010 |
CWR ENTERPRISES, LLC | $81,432 | Contract | : LAVERNE NO SHIRLEY. ATV TRAIL CONSRTUCTION. | Agriculture, Department of / Forest Service | 12/28/2009 |
RAY'S HEATING, PLUMBING, ELECTRIC INC | $236,690 | Contract | : Provide energy heat loss and heat gain analysis report. Provide professional mechanical engineering design and drafting, professional installation, balancing, testing, startup and independent commission of Water Source Heat Pumps system for the Powell Ran | Agriculture, Department of / Forest Service | 9/21/2010 |
MESCALERO APACHE HOUSING AUTHORITY | $457,863 | Contract | : Construction of 3.4 Miles Temporary Road, Perk-Grindstone Planning Unit | Agriculture, Department of / Forest Service | 4/10/2009 |
FRANCES CONSTRUCTION, INC. | $1,185,869 | Contract | : SJER Barracks Seismic Upgrade | Agriculture, Department of / Forest Service | 9/14/2010 |
ROSS BISHOP EXCAVATING | $8,100 | Contract | : signing | Agriculture, Department of / Forest Service | 6/04/2010 |
TUSCA II, INC. | $193,612 | Contract | : Historic building restoration: Notch Mountain Shelter, Tigiwon Community House, and Piney Guard Station. Work at Notch Mountain Shelter includes: remove existing roof finishes; inspect/replace roof decking and log framing as necessary; borate rod install | Agriculture, Department of / Forest Service | 5/12/2010 |
BUNTING GRAPHICS INC | $73,313 | Contract | : Signage | Agriculture, Department of / Forest Service | 12/12/2009 |
MACNAK CONSTRUCTION LLC | $309,337 | Contract | : UPPER NORTH FORK BRIDGE REPAIRS - This contract will consists of bridge repairs on three bridges Kelly Forks, Kelly Creek, and Lake Creek Bridges. Kelly Forks Bridge Repairs: This work will consists of removing log debri at bridge piers, placing riprap | Agriculture, Department of / Forest Service | 7/21/2010 |
T L PETERSON INC | $1,444,950 | Contract | : Barley Flat Nike Site Decommissioning | Agriculture, Department of / Forest Service | 8/03/2010 |
BC CONCRETE, INC. | $6,640 | Contract | : Build vault and floor slab for a vault toilet. | Agriculture, Department of / Forest Service | 8/03/2010 |
R T I FABRICATION INC | $586,593 | Contract | : 8-Modular Steel Bridges | Agriculture, Department of / Forest Service | 4/05/2010 |
NORTHSTAR TECHNOLOGY CORP | $29,423 | Contract | : SME FOR ARRA SUPPORT | Agriculture, Department of / Forest Service | 1/26/2010 |
POWER PRO, INC. | $354,634 | Contract | : Installing Lightening protection on Forest Service Lookout Towers. | Agriculture, Department of / Forest Service | 7/12/2010 |
KIRKLAND, RON | $36,152 | Contract | : USFS property line retracement. Locate and document existing property corners. If missing corners, re-establish and reset. Mark and post USFS property lines. | Agriculture, Department of / Forest Service | 10/26/2009 |
CRAFTON, TULL & ASSOCIATES, INC. | $32,878 | Contract | : TAS Survey work for 11 miles of boundary and 41 corners maintained on the Big Piney District in T 12 and 13 N of R 20 W. | Agriculture, Department of / Forest Service | 8/03/2010 |
HUBZONE, CORP. | $369,180 | Contract | : Painting and Siding Repair/Replacement of 28 bulidings at the San Bernardino National Forest Mountain Top District. | Agriculture, Department of / Forest Service | 7/15/2010 |
RENEWABLE TECHNOLOGIES, INC. | $66,553 | Contract | : This contract is for the preparation of an historic overview covering the West Fork of Rock Creek drainage in the Beartooth Ranger District of the Custer National Forest, Montana. This work, scheduled in part as cultural resource mitigation for recent hi | Agriculture, Department of / Forest Service | 9/10/2010 |
SOUTHERN RESOURCE MANAGEMENT, L.L.C. | $47,970 | Contract | : Mechanical Midstory Control on the Croatan National Forest, North Carolina | Agriculture, Department of / Forest Service | 5/26/2010 |
LAMAY ELECTRIC, LLP | $97,356 | Contract | : VARIOUS ELECTRICAL SUPPLIES AS STATED ON ORDER NUMBER AG-9702-P-10-0076 | Agriculture, Department of / Forest Service | 5/17/2010 |
NORTH STAR CONSTRUCTION AND ENGINEERING, INC | $302,925 | Contract | : Oregon Creek Day Use Site Improvements, Tahoe National Forest. Remove and replace existing pavement, install rock barriers, install picnic sites, install concrete pathway, install new signage, install drainage swale. | Agriculture, Department of / Forest Service | 7/22/2010 |
FIRST CUT DEVELOPMENT INC | $15,542 | Contract | : Rebuild Fall Creek Bridge | Agriculture, Department of / Forest Service | 3/27/2010 |
GREAT WEST ENGINEERING, INC. | $38,500 | Contract | : Helena National Forest ARRA Construction Support Services | Agriculture, Department of / Forest Service | 5/29/2010 |
MCNEIL WEST CONSTRUCTION, INC. | $1,330,344 | Contract | : Lost Lake Camp Construction -Renovation. The camp includes three staff cabins, eight user cabins, dining hall, cooks cabin, lecture hall, womens and mens bathrooms, garage, utility building, water tower, wood shed and storage building. Work will include | Agriculture, Department of / Forest Service | 8/11/2010 |
FITZGERALD'S GENERAL CONTRACTING | $181,899 | Contract | : Install Davis Creek Bridge and Remove Johnson Creek Bridge. | Agriculture, Department of / Forest Service | 5/27/2010 |
BROWNING CONTRACTING, LLC | $74,055 | Contract | : Prairie City Ranger District Thin & Treat | Agriculture, Department of / Forest Service | 2/16/2010 |
MESQUITE INC | $1,070,495 | Contract | : Demolition and upgrade of an existing campground. Work includes demolition of existing camp units, replacement of waterlines and toilets, construction of camp units, installation of new and existing furnishings, and overlaying campground road and paving | Agriculture, Department of / Forest Service | 8/31/2010 |
TRAIL BLAZERS | $10,480 | Contract | : Services resulting from this contract requires performance of food handling and storage, menu preparation, kitchen maintenance, meal preparation, and cooking services for an estimated 18 person Backcountry California Conservation Corps (CCC) trail mainten | Agriculture, Department of / Forest Service | 5/20/2010 |
SIERRA NEVADA CONSTRUCTION, INC | $217,988 | Contract | : TAS Maintenance of the 73 Road (Mt. Waston Blvd) on the LTBMU in Placer County/ | Agriculture, Department of / Forest Service | 1/07/2010 |
CXT INCORPORATED | $83,288 | Contract | : TAS::12 1102::TAS Baldwin RD Toilet Project. Purchase 4 toilets for the following recreation areas :Cascadian Single Vault at Shelley Lake, Indian Lake, Twin Lake; Rock Mtn Single Vault at Diamond Point against the existing Blanket Purchase Agreement - C | Agriculture, Department of / Forest Service | 8/18/2010 |
VIITA'S EXCAVATING, INC. | $426,173 | Contract | : Reconstructing and repairing ATV trails | Agriculture, Department of / Forest Service | 5/27/2010 |
MRCI | $285,314 | Contract | : Facilities Painting and Siding, Front Country Rd, San Bernardino, CA | Agriculture, Department of / Forest Service | 7/21/2010 |
SETON CONSTRUCTION, INC. | $1,025,647 | Contract | : Road 23 Paving & Reconstruction, erosion control, asphalt paving, placement of aggregate | Agriculture, Department of / Forest Service | 7/13/2010 |
SOUTHWEST CM, LLC | $846,042 | Contract | : Rose Canyon Campground Toilet Replacement | Agriculture, Department of / Forest Service | 6/08/2010 |
C.A.M. CO | $128,238 | Contract | : Hazardous Fuels Reduction: ice storm debris / under growth removal to aid in wildfire prevention; clearing boundary line / fire roads in Big Piney and Sylamore Ranger Districts, Ozark St Francis National Forest | Agriculture, Department of / Forest Service | 5/28/2010 |
INLAND POTABLE SERVICES, INC. | $38,706 | Contract | : Purpose of the Contract: The objective of this contract is to inspect 19 of the potable water tanks in the Los Padres National Forest area in California. We anticipated that the tanks will all need to be cleaned and the cleaning will be conducted in acc | Agriculture, Department of / Forest Service | 4/13/2010 |
UPPER SAN JUAN WEED DISTRICT | $480,800 | Grant | Recovery Act of 2009: Wildland Fire Management: To inventory and teat noxious weeds iwthin 31 fuel reduction projects located onNational Forest Lands within Archuleta, Hinsdale,a nd Mineral Counties, CO. | Agriculture, Department of / Forest Service | 5/17/2010 |
NORTH STAR CONSTRUCTION AND ENGINEERING, INC | $739,745 | Contract | : Design/Build- Bald Mountain/Fish Meadow Aquatic Organism Passages. Design 5 and construct 3 aquatic organism passage road/stream crossings (culverts) that will involve replacement of the existing structure with 2 additional sites to design improvements wi | Agriculture, Department of / Forest Service | 7/28/2010 |
MCCONNELL, MIKE CONSTRUCTION | $18,672 | Contract | : BOULDER BARRIER & PLACEMENT | Agriculture, Department of / Forest Service | 3/26/2010 |
BURLEIGH CONSTRUCTION | $47,100 | Contract | : REPLACE LAUREL CREEK APPALACHIAN TRAIL BRIDGE - REPLACED OLD SALT TREATED TIMBER BRIDGE WITH NEW TIMBERS, FLOORING AND RAILS. | Agriculture, Department of / Forest Service | 12/23/2009 |
ALFREDSON BROTHERS CONSTRUCTION COMPANY | $591,819 | Contract | : Restoration of Historic Buildings at Franklin Lake Campground. Work to include stripping of paint/stain from logs structures, re-satining/sealing of logs, re-roofing buildings, renovation of bathroom facilities, remodeling of Caretakers Cabin. Masonry tu | Agriculture, Department of / Forest Service | 8/03/2010 |
DJ&A, P.C. | $3,998 | Contract | : This Task Order is to provide a topographic site survey for a stock pile located on the Lolo National Forest Superior Ranger District. | Agriculture, Department of / Forest Service | 8/03/2010 |
STONE, G. L. INC | $161,447 | Contract | : This project includes all work needed to remove previous roads and restore stream crossings to their natural condition within the project area. All areas that are disturbed are to be reseeded and mulched. Project consists of 10 miles road and 1 mile resee | Agriculture, Department of / Forest Service | 5/18/2010 |
HOOPER, THOMAS WILEY | $60,089 | Contract | : Restoration of trail to improve access to the waterfall by re-establishing the trailway. Trail restoration includes the following: clearing and grubbing,excavation and embankment, fill and borrow, brush cutting, logging out, slough and berm removal and ex | Agriculture, Department of / Forest Service | 6/14/2010 |
MONTANA NORTHWEST CO | $179,569 | Contract | : Mark, Post and Maintain boundary between private and NFSL. Marking and posting of National Forest Boundaries.Maintenance of previously marked boundary. | Agriculture, Department of / Forest Service | 8/13/2010 |
FLASH EXCAVATION, INC. | $71,268 | Contract | : Black Tail Restoration, Nez Perce National Forest, Idaho County, Idaho | Agriculture, Department of / Forest Service | 5/12/2010 |
UTILITY CONSTRUCTION COMPANY, INC. | $699,336 | Contract | : Upgrades to the water system at four locations for the Department of Forestry near Sierra Vista, AZ to include but not limited to installation and development of a water well, installation of well pumps, installation of masonry buildings to support pumps, | Agriculture, Department of / Forest Service | 7/19/2010 |
SIGNATURE UNDERWRITERS, INC. | $101,618 | Contract | : ARRA recovery funds for construction of potable water system and installation of propane tank for the Glade Guard Station | Agriculture, Department of / Forest Service | 3/24/2010 |
B F R ASSOCIATES | $412,450 | Contract | : Water well drilling for El Dorado Forest Service campgrounds, trenching, pump installation, tank installation | Agriculture, Department of / Forest Service | 8/25/2010 |
FORESTRY AND FIRE PROTECTION, CALIFORNIA DEPARTMENT OF | $23,085 | Contract | : Awarded a contract from the U.S. Forest Service to build 81 ADA-compliant picnic tables. | Agriculture, Department of / Forest Service | 7/27/2010 |
ACOSTA ENGINEERING P.S.C. | $1,241,874 | Contract | : I.I.T.F. HEADQUARTERS HISTORICAL BUILDING RESTORATION-PHASE II, GROUNDS AND COMMUNICATIONS We will provide all labor, materials, supplies, equipment, transportation, supervision, ancillary services, and all other necessary items for complete and usable pr | Agriculture, Department of / Forest Service | 9/22/2010 |
LASKEY-CLIFTON CORPORATION | $600,499 | Contract | : DEMOLITION AND REMOVAL OF EXISTING CULVERT, FILL, AND MOVE EXISTING BRIDGE TO TEMPORARY LOCATION. EXCAVATE NEW CREEK CHANNEL, PROVIDE AND INSTALL RIPRAP, CONSTRUCT 67' SPAN PRESTRESSED PRECAST CONCRETE BRIDGE, WITH WATER AND WASTEWATER LINES SUSPENDED ON | Agriculture, Department of / Forest Service | 5/17/2010 |
S H SMITH AND COMPANY INC | $47,818 | Contract | : CONTRACT NARATIVE: Provide engineering services to prepare Operation and Maintenance Manuals (O&M Manuals) for drinking water systems at Cobb Ridge, Sutton Bluff, Red Bluff, Silver Mines, and Chapel Hill campgrounds and wastewater treatment systems at Co | Agriculture, Department of / Forest Service | 4/21/2010 |
DOWELL, KURT S | $487,768 | Contract | : Blue mtn. Mechanical ARRA Stewardship Project thin and remove | Agriculture, Department of / Forest Service | 7/06/2010 |
OLD GOAT ENTERPRISES | $66,300 | Contract | : Trail brushing and maintenance in the Clearwater-Nez Perce National Forest. Names of trails to be worked are: Churchhill, Running Creek, Lynx Creek, Wounded Doe, Rapid Creek, and Cayuse-Monroe. | Agriculture, Department of / Forest Service | 9/16/2010 |
DOT CONSTRUCTION, INC. | $1,165,040 | Contract | : Contract was to Renovate kitchen and break-room, insulate executive conference room walls and ceiling, replace windows, replace existing carpet, pave and restripe driveway and parking lots, perform common area floor repairs, perform main conference room r | Agriculture, Department of / Forest Service | 5/11/2010 |
FLASH EXCAVATION, INC. | $135,585 | Contract | : Deadwood Road 522 Surfacing Project, Nez Perce National Forest, Idaho County, Idaho | Agriculture, Department of / Forest Service | 5/28/2010 |
DALE A BARGER | $187,123 | Contract | : Decommissioning 20 miles of canyon creek road and approximately ten to twelve miles of highline breaks road, turning the old roads back to natural landscape. | Agriculture, Department of / Forest Service | 4/26/2010 |
A & K CONSTRUCTION INC | $87,034 | Contract | : Remove and install Trail Bridge. | Agriculture, Department of / Forest Service | 8/17/2010 |
DICK ANDERSON CONSTRUCTION, INC. | $874,692 | Contract | : RECOVERY DOMINION CREEK TUNNEL AND TRESTLE REPAIRS - UNIT IM-EROC | Agriculture, Department of / Forest Service | 6/09/2010 |
KORNISH FOREST CONTRACTING INC | $379,079 | Contract | : Aspen Pre-commercial Thinning, Cut/skid,and Slash removal. | Agriculture, Department of / Forest Service | 6/24/2010 |
GRAYBACK FORESTRY, INC. | $138,395 | Contract | : Thinning and hand piling on the Malheur NF of trees and brush by cutting down with chainsaws to improve tree growth and reduce fire hazard | Agriculture, Department of / Forest Service | 9/10/2010 |
ONSITE CONSTRUCTION & ENGINEERING, INC. | $194,741 | Contract | : Wild Plum Campground - Water tank replacement at Wild Plum Campground. | Agriculture, Department of / Forest Service | 9/01/2010 |
GARCIA FOREST SERVICE LLC | $252,216 | Contract | : Mechanical Fuels Reduction on 744 Acres | Agriculture, Department of / Forest Service | 1/26/2010 |
WILLIAMS CONSTRUCTION & CABINETRY, INC. | $1,041,851 | Contract | : Tellico Trail Obliteration | Agriculture, Department of / Forest Service | 5/28/2010 |
GFP ENTERPRISES, INC. | $127,293 | Contract | : Shasta Lake Hazardous Fuels Fire Break: To create a wildfire containment break through fuels mitigation | Agriculture, Department of / Forest Service | 7/19/2010 |
RJS CONSTRUCTORS, INC. | $334,600 | Contract | : design and reconstruction of one (1) shelter and three (3) trail bridges; repair of the existing restroom;restoration of the pond and dam to retain water;renovations to the gazebo; tree removal and planting; site drainage; and installation of an outdoor f | Agriculture, Department of / Forest Service | 8/04/2010 |
SIMCON COMPANY, LLC | $100,730 | Contract | : Uwharrie/Badin Lake Group Restroom Expansion. Addition to existing shower and restroom facility. Set concrete prefab restroom building. | Agriculture, Department of / Forest Service | 5/14/2010 |
SIERRA RANGE CONSTRUCTION | $368,269 | Contract | : Construction of three 50'x50' concrete helipads incld lighting,utilities,site prep and asphalt surfacing with striping and symbols applied. | Agriculture, Department of / Forest Service | 8/09/2010 |
RML INCORPORATED | $552,868 | Contract | : Road #901 Gravel Resurfacing. | Agriculture, Department of / Forest Service | 8/26/2010 |
MARTIN CONSTRUCTION, INC. | $337,639 | Contract | : THIS PROJECT IS FOR THE REPAIR OF WILLIAMS DAM ON THE MEDORA RANGER DISTRICT, DAKOTA PRAIRIE GRASSLANDS. THE SERVICES REQUIRED BY THIS CONTRACT ARE FOR FURNISHING ALL LABOR, EQUIPMENT, SUPERVISION, TRANSPORTATION, OPERATING SUPPLIES, AND INCIDENTALS NECES | Agriculture, Department of / Forest Service | 8/27/2010 |
MAXTEK CONTRACTORS, INC. | $32,339 | Contract | : CEDRO TRAILHEAD IMPROVEMENTS | Agriculture, Department of / Forest Service | 8/23/2010 |
ERO RESOURCES CORPORATION | $36,427 | Contract | : Perform cultural resource survey for Columbine Ranger Distrit, San Juan National Forest. | Agriculture, Department of / Forest Service | 7/09/2010 |
DOWL, LLC | $158,000 | Contract | : Inspection and testing on the Clearwater National Forest | Agriculture, Department of / Forest Service | 5/21/2010 |
TRAFFIC AND PARKING CONTROL CO., INC. | $229,974 | Contract | : Traffic & Trail Signage for eleven different USDA Forest Service located in the Upper Midwest | Agriculture, Department of / Forest Service | 7/30/2010 |
HIGHLAND TRUCKING & EXCAVATION LLC | $118,872 | Contract | : Construction of erosion control and drainage structures and spot surfacing | Agriculture, Department of / Forest Service | 3/16/2010 |
STONE RIDGE CONSTRUCTION, INC | $193,123 | Contract | : This project includes removing and disposing of an existing culvert, structural excavation, roadway embankment, backfilling, compacting, furnishing and setting a precast concrete bridge, placing riprap, and hauling and placing aggregate surfacing. | Agriculture, Department of / Forest Service | 3/25/2010 |
MC GROUP, L.L.C. | $94,052 | Contract | : Virginia Creeper Trail Bridges | Agriculture, Department of / Forest Service | 12/28/2009 |
MARTIN BROTHERS CONSTRUCTION | $94,450 | Contract | : The work consists of bedding and installing of a liner membrane in the existing 25000 gallon steel tank at Minarents WC, furnishing and erect new 6500 gallon ployethylene resin tank for potable water at Dry Gulch CG, repairing cracks and furnishing and in | Agriculture, Department of / Forest Service | 8/25/2010 |
VAN DE WATER, LEE | $27,960 | Contract | : The award was given for the performance of deffered trail maintenance on the Nez Perce National Forest. This consists of re-opening existing trails that have become unusable due to the accumulation of vegetation and fallen trees. | Agriculture, Department of / Forest Service | 9/17/2010 |
PIT RIVER CONTRACTING, INC. | $32,310 | Contract | : TASK ORDER #14 ROAD MAINT | Agriculture, Department of / Forest Service | 8/06/2010 |
RANDY HOSTETTER EXCAVATING, LLC | $131,085 | Contract | : Culvert Crossing Replacement - Piney Branch & Downy Branch at the George Washington & Jefferson National Forest | Agriculture, Department of / Forest Service | 10/20/2009 |
TIMBERLINE CONTRACTING | $89,524 | Contract | : West zone bridge reapairs. Repair of 2 bridges on the west zone Lolo National forest. | Agriculture, Department of / Forest Service | 4/13/2010 |
ROBERT OCHOA | $26,166 | Contract | : TREE THINNING SERVICES | Agriculture, Department of / Forest Service | 7/10/2010 |
IAIDO DESIGN | $12,657 | Contract | : Design, fabricate and deliver three interpretive signs for the Pawnee National Grassland, U.S. Forest Service | Agriculture, Department of / Forest Service | 9/23/2010 |
HOOKER CREEK, INC. | $430,000 | Contract | : Work consists of removing existing lead paint from the girders on a steal bridge and repainting the bridge. Work also consists of the removal of the south-end crib retaining wall and replacing it with a Mechanically Stabilized Earth retaining wall, repav | Agriculture, Department of / Forest Service | 7/12/2010 |
WOODLAND CONSTRUCTORS, INC. | $9,450 | Contract | : NORWAY PASS PUMP RELACEMENT AND CONCRETE SLAB REPLACEMENT, | Agriculture, Department of / Forest Service | 3/01/2010 |
FOREST PEIFFER MAINTENANCE INC | $157,475 | Contract | : Road Decommissioning Lakeview Reed Job in Idaho | Agriculture, Department of / Forest Service | 7/14/2010 |
PARDEE EXCAVATING LIMITED LIABILITY CO | $143,671 | Contract | : Reconditioning and Resurfacing W.F. Pilgrim Creek Roads # 2744 & 419 | Agriculture, Department of / Forest Service | 5/17/2010 |
RUDY J JARAMILLO | $21,905 | Contract | : Hazardous Fuels reduction: This is thinning or cutting trees following a prescribed guideline so that excess and/or diseased/unhealthy trees are removed leaving healthy vigorous growing trees and reducing fuels for wildfire and protecting wildlife habit | Agriculture, Department of / Forest Service | 7/28/2010 |
MARKO CONSTRUCTION GROUP, INC. | $164,575 | Contract | : FORESTWIDE DEMOLITION BUILDING PROJECT SIERRA NATIONAL FOREST. CONSISTS OF DEMOLITION OF 18 STRUCTURES AT TRIMMER WORK CENTER, CLEARWATER WC, BATTERSON, AND MARIPOSA. TOTAL REMOVAL, DISPOSAL, AND SITE CLEANUP OF ALL STRUCTURES. | Agriculture, Department of / Forest Service | 8/06/2010 |
PROBUILD COMPANY LLC | $43,951 | Contract | : ROOF TRUSSES CARSON NATIONAL FOREST SERVICE PROJECT | Agriculture, Department of / Forest Service | 7/23/2010 |
SMALLEY CONSTRUCTION INC | $61,715 | Contract | : Road Maintenance and improvement activities on various roads across the Manistee National Forest to include vegetation and debris removal, tree removal, stump removal, mowing, grading, dust pallative treatment, providing and placing aggregate and clean fi | Agriculture, Department of / Forest Service | 8/16/2010 |
CR LOGGING INC | $372,438 | Contract | : Stewardship authority would assist in the removal of non-merchantable materials within the project area and accomplish goals of reducing hazardous fuels, reducing the risk of mountain pine beetle infestation, and providing a sustainable supply of commerci | Agriculture, Department of / Forest Service | 5/26/2010 |
RED RIVER SPECIALTIES, INC. | $19,371 | Contract | : Herbicide Sales | Agriculture, Department of / Forest Service | 5/11/2010 |
TRI STATE COMPANY INC | $43,363 | Contract | : Beard's Mtn Trail Bridge Deck & Handrail Replacement | Agriculture, Department of / Forest Service | 8/06/2010 |
ALLRIGHT CONSTRUCTION, INC. | $289,850 | Contract | : The project is located on the Stanislaus National Forest in California. Work consists of construction of a new ADA accessible parking space with associated accessible ramp and sidewalks, upgrade of electrical facilities in workshop to meet current electri | Agriculture, Department of / Forest Service | 6/28/2010 |
QUALITY HVAC INC | $51,730 | Contract | : remove and replace heat pump systems in Kooskia Office Building #2009, Fire Office Building #1007, Timber Office Building #1008 and Daycare/Residence Building #2012 | Agriculture, Department of / Forest Service | 8/16/2010 |
C & M CONTRACTORS, INC. | $259,590 | Contract | : Repair Existing Windows, Replace HVAC in lower level, Rewire lighting for energy savings, Repair Elevator, Replace Building Wrap, Siding and Trim, Paint Interior, Paint Exterior Trim & Gables, Repair Roofing, Install Draft Stop Walls | Agriculture, Department of / Forest Service | 7/19/2010 |
OUSSOREN EPPEL CORPORATION | $29,083 | Contract | : Fabricated signage for Bitterroot and shipped the signs to Bitterroot. | Agriculture, Department of / Forest Service | 8/20/2010 |
MRM CONSTRUCTION SERVICES, INC. | $530,200 | Contract | : Establish construction control points, design permanent bridge structure, complete hydraulic design, complete geotechnical investigation and report, and construct new bridge and bridge approaches. | Agriculture, Department of / Forest Service | 4/07/2010 |
ARDENT BUILDING CONTRACTORS, INC. | $21,526 | Contract | : Electrical Renovation at the Sawtooth Valley Work Center in Stanley Idaho | Agriculture, Department of / Forest Service | 4/16/2010 |
FORSMAN, WILLIAM F | $44,600 | Contract | : TRAIL MAINTENANCE, Trail Brushing and Clearing. Involves maintenance of Trails in Orofino. | Agriculture, Department of / Forest Service | 9/16/2010 |
NORTHWIND ENGINEERING, LLC | $279,723 | Contract | : The project includes rehabilitation of the four recreation sites designated. Construction work includes furnishing all labor, materials, equipment, tools, transportation, supplies, manufacture and or fabrication, storage, erection, and other incidentals r | Agriculture, Department of / Forest Service | 4/15/2010 |
DE LOS SANTOS CONSTRUCTION, INC. | $603,245 | Contract | : Replace damage sewer lines, reseal manholes, replace out data and unsafe transformers and sectionalizing cabinets. Work consist of Install two transformers and 2 sectionalizing cabinets. | Agriculture, Department of / Forest Service | 6/30/2010 |
AGRR CORPORATION | $289,732 | Contract | : This project includes the demolition of existing asphalt sidewalk and installation of approximately 1900 square feet of concrete sidewalk. In additon, a new observation deck will be constructed including all incidental grading demolition and signing for | Agriculture, Department of / Forest Service | 4/09/2010 |
COLWELL CONSTRUCTION COMPANY, INC. | $104,200 | Contract | : The repair of Brasstown Bald Trail | Agriculture, Department of / Forest Service | 5/12/2010 |
5 STAR FORESTRY LLC | $120,854 | Contract | : Recovery Deferred Trail Maintenance for the Clearwater National Forest | Agriculture, Department of / Forest Service | 4/15/2010 |
SMALL BUTTE CONSTRUCTION, INC | $25,069 | Contract | : road grading | Agriculture, Department of / Forest Service | 4/08/2010 |
PERSONNEL PLUS, INC | $50,931 | Contract | : The primary objective is to provide contractor services and deliverables through performance of Engineering Inspection for road maintenance, construction, and reconstruction contracts on the Payette National Forest in support of Forest Public Works and St | Agriculture, Department of / Forest Service | 9/17/2010 |
MARINE CO., INC. | $55,975 | Contract | : Supply and deliver prefabricated removable floating docks at four sites on Lake Koocanusa, Kootenai National Forest, Montana. | Agriculture, Department of / Forest Service | 5/06/2010 |
ONE STOP ENVIRONMENTAL LLC | $110,944 | Contract | : Stream Restoration on Shortcake Creek in Smelterville, Idaho | Agriculture, Department of / Forest Service | 7/23/2010 |
OLD GOAT ENTERPRISES | $92,335 | Contract | : Trail maintenance and brushing in the Clearwater National Forest. Trails to be worked are: Weitas Ridge, Lean To Point, Yokum Ridge, Liz Butte, Yokum Creek, Greenside Butte, Gold Hill, Indian Meadows, Cooperation, Mocus Point, Warm Springs, Pouliot, Ceda | Agriculture, Department of / Forest Service | 4/18/2010 |
WARNER CONTRACTING | $12,549 | Contract | : Clear logs and brush from forest service trails. | Agriculture, Department of / Forest Service | 3/19/2010 |
TRI-COUNTY BUILDERS CO INC | $1,530 | Contract | : Equipment rental - Vendor only Did not provide any employees on this project we only rented equipment to the local USDA office. | Agriculture, Department of / Forest Service | 7/15/2010 |
NORTHSTAR TECHNOLOGY CORP | $50,000 | Contract | : INSPECTIONS SERVICES | Agriculture, Department of / Forest Service | 9/16/2010 |
PENCE, KENNETH W | $66,000 | Contract | : Construction inspection and Contract administration services for eight road betterment projects. | Agriculture, Department of / Forest Service | 8/26/2010 |
C.E. KRAMER CRANE & CONTRACTING, INC. | $515,018 | Contract | : Kalispell Bay Boat Launch Facility | Agriculture, Department of / Forest Service | 9/18/2009 |
WITHERSPOON SURVEYING PLLC | $24,000 | Contract | : Resurvey and recovery of Poplar Boat Launch Area. Portions of USFS Tracts M-243a and U-23. The recovery of, perpetuation of and verification of USFS property corners as specified. Remarking of USFS boundary as specified. | Agriculture, Department of / Forest Service | 8/17/2010 |
GLOBAL FRONTLINE SOLUTIONS LLC | $36,714 | Contract | : Hazardous fuels reduction in form of manually thinning approximately 174 acres of primarily white fir, douglas fir, englemann spruce, cork bark, and ponderosa pine. | Agriculture, Department of / Forest Service | 8/09/2010 |
DUMAN INC | $5,800 | Contract | : road decomissioning | Agriculture, Department of / Forest Service | 12/29/2009 |
MARK A. TEMPLE CONSTRUCTION, INC. | $5,432 | Contract | : Fabrication and installation of bat compatible culvert gate to allow bat access but prevent human access for safety and habitat concerns but with removable bar to allow BLM access if needed. | Agriculture, Department of / Forest Service | 6/02/2010 |
GRAND JUNCTION CONCRETE PIPE CO. | $8,900 | Contract | : San Juan Nation Forest Trails and Bridges | Agriculture, Department of / Forest Service | 6/04/2010 |
GAHLSDORF LOGGING INC. | $695,349 | Contract | : This award is to thin trees by machine and/or hand on the Bend-Fort Rock district of the Deschutes National Forest in Central Oregon. Approx 1,000 Acres will be treated for fuel reduction to rreduce the risk of forest fires. | Agriculture, Department of / Forest Service | 7/23/2010 |
AINSWORTH-BENNING CONSTRUCTION, INCORPORATED | $2,867,870 | Contract | : Capital Improvement & Maintenance Camp Crook-Office reconstruction, residents reconstruction and Energy UP-grades and Siding Replacement throughout the Camp Crook Admin Site | Agriculture, Department of / Forest Service | 3/18/2010 |
COLORADO NETWORK STAFFING, INC. | $155,323 | Contract | : Provide Administrative Support Services to US Forest Service. | Agriculture, Department of / Forest Service | 7/22/2010 |
A A A THUNDERDERBOLT FIRE SERVICE INC | $3,880 | Contract | : Malheur National Forest, Blue Mountain Ranger District, Plantation Maintenance, Lower Middle Fork Thinning and Handpiling | Agriculture, Department of / Forest Service | 9/24/2010 |
ROBERT OCHOA | $32,400 | Contract | : Tree Thinning Services | Agriculture, Department of / Forest Service | 7/09/2010 |
BUILDING SOLUTIONS, INC. | $1,562,244 | Contract | : This project consists of the renovation of the existing Forest Fire Laboratory Buildings 1,2 and 3 as shown on contract documents, dated June 9, 2010. The purpose of this project is to improve the energy efficiency and upgrade the entry accessibility of t | Agriculture, Department of / Forest Service | 8/06/2010 |
BIG VALLEY FORD INC | $4,200 | Contract | : FIREFIGHTER INTERN RENTAL VEHICLE | Agriculture, Department of / Forest Service | 3/29/2010 |
TFAB GROUND SYSTEMS, LLC | $479,286 | Contract | : RECOVERY-DISCOVERY CENTER DEFFERRED MAINTENANCE; Design, furnish and construct deferred Maintenance as follows: theater air conditioner design and equipment installation, clean outside supply air louvers (2), repair multiple exterior Sidewalk/Ramp, replac | Agriculture, Department of / Forest Service | 9/16/2010 |
KRUEGER & STEINFEST INC | $196,304 | Contract | : Little Popple North Stream Culvert Replacement | Agriculture, Department of / Forest Service | 5/26/2010 |
HOOPER, THOMAS WILEY | $67,003 | Contract | : Maintenance was performed on 27 miles of existing single-track mountain biking and equestrian trails to bring them up to current USDA Forest Service trail standards. Work included, but may not be limited to, restoration of the trail tread, cleaning/restor | Agriculture, Department of / Forest Service | 5/19/2010 |
DOWELL, KURT S | $142,557 | Contract | : Lost Sunton ARRA Stewardship tree Thinning and removal | Agriculture, Department of / Forest Service | 7/08/2010 |
STONE ECOSURVEYS LLC | $56,362 | Contract | : Expected outcome is a complete species list for several project areas in Malheur National Forest. | Agriculture, Department of / Forest Service | 8/10/2010 |
JOHN S. OLYNICK, INC. | $1,133,854 | Contract | : Chequamegon-Nicolet National Forest-Chippewa Campground Wastewater Project-Replacement of wastewater treatment plant for campsites to reflect todays standards. | Agriculture, Department of / Forest Service | 8/03/2010 |
WEST RANGE RECLAMATION, LLC | $433,118 | Contract | : FUELS REDUCTION--this project tasks us with the removal of timber to thin the forest and reduce the risk of fire | Agriculture, Department of / Forest Service | 12/29/2009 |
PACIFIC COAST CONTRACTING, INC. | $16,817 | Contract | : Burning of slash piles in the woods. | Agriculture, Department of / Forest Service | 7/15/2010 |
ALPHA SERVICES, LLC | $127,839 | Contract | : Mechanical Vegetation Treatment/Fuel Reduction | Agriculture, Department of / Forest Service | 5/19/2010 |
TRAIL ACE CONSTRUCTION | $48,220 | Contract | : Clearing and grubbing, constructing rock waterbars and native waterbars, constructing switchbacks and climbing turns. | Agriculture, Department of / Forest Service | 7/19/2010 |
J RAYMOND FORESTRY INC | $191,335 | Contract | : gp contract | Agriculture, Department of / Forest Service | 5/26/2010 |
CONSTRUCTION UNLIMITED INC | $443,610 | Contract | : Service contract to provide road maintenance of National Forest System roads on the Mt. Baker-shoqualmie National Forest (Mt. Baker and Darrington Ranger Districts). With locations in Skagit, Whatcom and Snohomish counties. Includes ditch cleaning, roads | Agriculture, Department of / Forest Service | 6/29/2010 |
LENNY BERTAGNOLLI PAVING CONTRACTOR | $183,675 | Contract | : Merril-Davies Watershed Road Improvements, Tahoe National Forest | Agriculture, Department of / Forest Service | 7/22/2010 |
5 STAR FORESTRY LLC | $49,080 | Contract | : Recovery Nez Perce and Clearwater National Forest Deferred Trail Maintenance. | Agriculture, Department of / Forest Service | 9/21/2010 |
SIERRA PACIFIC INDUSTRIES | $737,974 | Contract | : Last Chance Stewardship Project. Work includes mechanized forest thinning, forest fuels reduction work, road maintenance and road decommissioning. The project area encompasses about 1,300 acres on the Tahoe National Forest. | Agriculture, Department of / Forest Service | 9/14/2010 |
SUMMITT FORESTS INC | $20,440 | Contract | : JONES CREEK FUELS MAINTENANCE PROJECT | Agriculture, Department of / Forest Service | 9/09/2010 |
CLEARWAY SERVICES LLC | $28,985 | Contract | : North West Montana counties trail maintenance and reconstruction | Agriculture, Department of / Forest Service | 8/06/2010 |
WALTER R. SCOTT, INC. | $266,728 | Contract | : Big Creek Plantation Thinning. Mecahnical Fuel reduction in Sierra National Forest | Agriculture, Department of / Forest Service | 9/08/2010 |
UMPQUA VALLEY FORESTRY INC | $603,000 | Contract | : Timber Marking using Orange paint. selecting leave trees for retention. Southwestern Region, Apache-Sitgreaves National Forest | Agriculture, Department of / Forest Service | 8/12/2010 |
NATIONAL WILD TURKEY FEDERATION, INC., THE | $48,284 | Grant | Recovery Act of 2009: Wildland Fire Management: Work will be performed in the Pace Gap area of the Cherokee National Forest Ocoee Ranger District. 142 acres of midstory thinning and removal. | Agriculture, Department of / Forest Service | 8/19/2010 |
ARMSTRONG BACKHOE | $92,058 | Contract | : Asphalt installation, ADA parking stall, stripping, seal coating, railing installation and concrete walkway. | Agriculture, Department of / Forest Service | 6/08/2010 |
SNOWDEN, INC. | $480,250 | Contract | : AOP Watershed Restoration East Branch Tahquamenon River Timber Bridge. Replace metal culvert with laminated wood bridge and related road way approach work. | Agriculture, Department of / Forest Service | 5/05/2010 |
INTERNATIONAL MASONRY INSTITUTE | $4,500 | Contract | : Grey Towers Masonry Project | Agriculture, Department of / Forest Service | 5/25/2010 |
GAGE IT CONSTRUCTION LLC | $330,367 | Contract | : Recovery Forest-Wide Regulatory Sign Replacement | Agriculture, Department of / Forest Service | 3/19/2010 |
CHIMAYO YOUTH CONSERVATION CORPS | $31,642 | Contract | : Tree thinning, lop, and slash pile 78 acres of NEPA ready forest in Taos, New Mexico North Shady Brook WUI. Carson National Forest. Forest treatment in accordance with statement of work, contract terms and conditions. | Agriculture, Department of / Forest Service | 7/10/2010 |
SWEAT LLC | $39,383 | Contract | : CARSON NATIONAL FOREST CAPULIN TREE THINNING | Agriculture, Department of / Forest Service | 8/12/2010 |
JOHNSON, K CONSTRUCTION INC | $73,167 | Contract | : Sather Campground and Whitetail Picnic Area Renovation | Agriculture, Department of / Forest Service | 8/23/2010 |
DENEAU COMPANY | $26,580 | Contract | : DECOMMISSION OF BIG FLAT GUARD STATION | Agriculture, Department of / Forest Service | 5/11/2010 |
REMINGTON ROLL FORMING INC | $7,750 | Contract | : Boundary Sign Posts | Agriculture, Department of / Forest Service | 8/17/2010 |
MUSICK CONSTRUCTION, INC. | $25,118 | Contract | : Campground historic toilet restoration. Cleaned and re-lined concrete vaults, painted iterior of stalls, installed new panels and doors, replaced roof vent. | Agriculture, Department of / Forest Service | 7/08/2010 |
TRAFFIC AND PARKING CONTROL CO., INC. | $109,987 | Contract | : Various posts & hardware ordered for 12 different USDA Forest Service locations in the upper Midwest. | Agriculture, Department of / Forest Service | 7/09/2010 |
BACKHOE SERVICES LLC | $99,842 | Contract | : The scope of the contract is to provide and install underground electrical infrastructure including conduit, pull boxes, and meter pedestals in order to prepare host sites at Lynx Lake Recreational Area near Precott, Arizona for receiving electrical servi | Agriculture, Department of / Forest Service | 8/30/2010 |
AIELLO BROTHERS OIL & GAS, INC. | $67,274 | Contract | : Parking Lot Resurfacing Project | Agriculture, Department of / Forest Service | 6/07/2010 |
CMEC, INCORPORATED | $51,995 | Contract | : Replace roof, upgrade electrical and repair windows | Agriculture, Department of / Forest Service | 5/11/2010 |
HAWK ENTERPRISES | $79,950 | Contract | : mill creek trail restoration on the ochoco nf of prineville, oregon. three trails are involved. | Agriculture, Department of / Forest Service | 5/17/2010 |
PACIFIC COAST CONTRACTING, INC. | $292,336 | Contract | : thinning of trees in the woods and hand piling | Agriculture, Department of / Forest Service | 3/30/2010 |
LEAVCO INC. | $105,601 | Contract | : Road decommissioning of forest service roads in the montana area. To bring road back to oringinal slope | Agriculture, Department of / Forest Service | 7/30/2010 |
WARM SPRINGS GEO VISIONS | $123,732 | Contract | : Conduct cultural survey of 892 acres, record 26 new sites and 24 new isolates on the Soda Bear site and record 50 new sites on Antelope/Upper Pine/Elk 16 sites and record 43 new isolates on Antelope/Upper Pine/Elk 16 sites. Provide session reports, fiel | Agriculture, Department of / Forest Service | 8/27/2010 |
DELTA COUNTY ROAD COMMISSION | $439,486 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: Removal and Replacement of three culverts on FDR 2233 in 42N 20W in Northern Delta County | Agriculture, Department of / Forest Service | 7/29/2010 |
KOMADA, LLC | $2,299,905 | Contract | : Design/Build Scott Valley Helibase | Agriculture, Department of / Forest Service | 8/18/2010 |
DAVIDSON, JONATHAN | $12,125 | Contract | : Forest tree and fuels inventory. Measure tree height and age, Record brush and down fuel data. | Agriculture, Department of / Forest Service | 6/10/2010 |
HENNEBERY EDDY ARCHITECTS, INC. | $99,983 | Contract | : Complete the design of the Climber's Register, performed under an earlier Pro Bono effort, and to initiate the design of a new Welcome Plaza. The contract includes the completion of Construction Documents (drawings and specifications) for the Forest Serv | Agriculture, Department of / Forest Service | 4/06/2010 |
ERICK AMMON INC | $4,883,000 | Contract | : Upgrade to the Eagle Lake Waste Water Treatment Plant. Extension of the pond liner including the construction of an anchor trench for the liner. | Agriculture, Department of / Forest Service | 9/07/2010 |
HERBACK GENERAL ENGINEERING, LLC | $627,718 | Contract | : ECC WASTEWATER DISPOSAL IMPROVEMENTS-including demolition of a building, pipeline, trenching, 8000 gallon septic tank, infiltrator units, grading, paving & lift station | Agriculture, Department of / Forest Service | 9/07/2010 |
CRYSTAL CLEAR MAINTENANCE, INC. | $210,068 | Contract | : Reconstruct portions of Yuba Pass Campground and Upper Little Truckee Campground. | Agriculture, Department of / Forest Service | 8/23/2010 |
MCALLISTER, MICHAEL L | $14,480 | Contract | : This project is to thin and prune the Tree Improvement Seed Orchard on the LaGrande Ranger District of the Wallowa-Whitman National Forest. Result is only the best one out of nine trees remains at each position. All trees are limbed up to be fire resite | Agriculture, Department of / Forest Service | 3/18/2010 |
ECKLUND EXCAVATION & DEVE | $152,546 | Contract | : Recovery- Road 31 Repair and Culvert Replacement | Agriculture, Department of / Forest Service | 5/11/2010 |
JAMESTOWN ADVANCED PRODUCTS, CORP. | $25,356 | Contract | : Provide campground equipment fo rthe Monongahela National Forest. | Agriculture, Department of / Forest Service | 4/23/2010 |
KORPELA CONSTRUCTION | $240,000 | Contract | : construction of a 90ftlong x 5ftwide trail bridge over Fish Creek. Plus construction of 700ft of gravel trail, 72 ft of new gravel trail and installation of 130ft of boardwalk on Titan Trail. | Agriculture, Department of / Forest Service | 5/25/2010 |
LEONARD COLLINS & SONS | $106,145 | Contract | : road decommissioning for upper clackamas river drainage | Agriculture, Department of / Forest Service | 12/18/2009 |
K.C. EQUIPMENT, INC. | $107,770 | Contract | : San Bernardino NF Road Decommissioning & Restoration Project | Agriculture, Department of / Forest Service | 8/26/2010 |
ALLEGIANCE GROUP, LLC | $25,813 | Contract | : Project includes an Historic American buildings Survey/Historic American engineering Record, Research and Complete Level II HABS Documentation. Includes: ? Gathering documentation according to the Secretary of Interior?s Standards and Guidelines for Arch | Agriculture, Department of / Forest Service | 6/16/2010 |
WATERSHED PROFESSIONALS NETWORK, LLC | $92,800 | Contract | : Botanical surveys of Sensitive Plant and Lichen species throughout selected areas on the Malheur Naational Forest. | Agriculture, Department of / Forest Service | 7/06/2010 |
DCP FORESTRY | $16,200 | Contract | : Installation of road signs. | Agriculture, Department of / Forest Service | 5/17/2010 |
SUMMITT FORESTS INC. | $105,426 | Contract | : 2010 RECOVERY FUNDS-STIMULUS IAS UWF6-MASTICATION/CHIPPING-TIMBER STAND EXAMS, YARD SLASH AND MECHANICAL PILE ON THE WIND RIVER R.D. OF THE SHOSHONE N.F. | Agriculture, Department of / Forest Service | 8/27/2010 |
VISION, INC. | $11,359 | Contract | : 210 ea 40x22 varied maps and 80 ea 40x26 varied interpretive posters. Digitally printed on vinyl with EcoSol UV resistant ink and laminated. The information presented on these maps & interpretive posters included. Maps - (70x) North Selway-Bitterroot Wild | Agriculture, Department of / Forest Service | 9/09/2010 |
HOOPER, THOMAS WILEY | $60,089 | Contract | : Restoration of trail to improve access to the waterfall by re-establishing the trailway. Trail restoration includes the following: clearing and grubbing,excavation and embankment, fill and borrow, brush cutting, logging out, slough and berm removal and ex | Agriculture, Department of / Forest Service | 6/14/2010 |
CXT INCORPORATED | $18,615 | Contract | : TAS::12 1102::TAS for Capital Improvement & Maintenance Cascadian Toilet Big Springs Picinic Grounds Supply and delivery precast concrete restroom building to the Rio Grande NF. | Agriculture, Department of / Forest Service | 7/29/2010 |
WOOD PRODUCT SIGNS/RECYCLE PLUS, INC. | $34,186 | Contract | : ROUTED US FOREST SERVICE SIGNS, FOR CAMPGROUNDS, ROADS, AND TRAILS, POSTS | Agriculture, Department of / Forest Service | 8/09/2010 |
ACCESS PERSONNEL SERVICES, INC. | $31,578 | Contract | : PILOT SERVICES; PILOT-IN-COMMAND FOR A KING AIR A100 TURBOPROP AIRCRAST, N127Z, FOR FLIGHT AS SPECIFIED IN EXISTING ARRA PROJECTS. | Agriculture, Department of / Forest Service | 8/11/2010 |
ILLINI ASPHALT CORPORATION | $249,390 | Contract | : Oil and Chip roadways and base rock work | Agriculture, Department of / Forest Service | 5/26/2010 |
WHITNEY-STONE, INC. | $180,395 | Contract | : This project involves the replacement Of the deck on the Little Grass Valley Half-Bridge, work includes removing the existing deck, replacein the existing deck, and replacing the running planks, steel structure painting. | Agriculture, Department of / Forest Service | 7/29/2010 |
PIEDMONT ENVIRONMENTAL SCIENCES, INC. | $65,262 | Contract | : Water System Improvements at Wildgoose and Apgar Campground Idaho County, ID Installation of new water line, water hydrants and valve & valve boxes. | Agriculture, Department of / Forest Service | 8/09/2010 |
T A HUDSON CONSTRUCTION CO INC | $34,866 | Contract | : PINK BED ENTRANCE AND PICNIC SHELTER REPAIRS | Agriculture, Department of / Forest Service | 5/26/2010 |
PLATEAU ARCHAEOLOGICAL INVESTIGATIONS LLC | $9,560 | Contract | : Evaluation of three camp kitchens for elibgiblity for inclusion on the National Register of Historic Places. The kitchens were built by the Civilian Convservation Corps, and include the Tucannon Campground kitchen in Washington and the Woodward and Godma | Agriculture, Department of / Forest Service | 5/29/2010 |
MOUNTAINEERS FIRE CREW, LLC | $101,692 | Contract | : The Shasta Lake Hazardous Fuels Roadside Clearance project enhanced public access to and safety within the designated areas of the Shasta-Trinity National Forest. In addition, the work performed increased the effectiveness of fire suppression efforts by | Agriculture, Department of / Forest Service | 7/27/2010 |
STOVEN CONSTRUCTION, INC. | $2,437,966 | Contract | : Rehabilitation and maintenance of Forest Road 150. This work consists of installing and removing cattle guards, culverts, reconditioning roadway ditches, and placing borrow. Surfacing will be placed in specified locations. | Agriculture, Department of / Forest Service | 7/07/2010 |
OUSSOREN EPPEL CORPORATION | $41,092 | Contract | : Fabricate and deliver wayfinding signs for Gifford Pinchot National Forest | Agriculture, Department of / Forest Service | 5/11/2010 |
SUNBELT ENVIRONMENTAL SERVICES, INC. | $117,343 | Contract | : Greer Crossing Recreation Area Water System Rehabilitation | Agriculture, Department of / Forest Service | 5/26/2010 |
THE NESTAVAL CORPORATION | $304,725 | Contract | : Road decommissioning and road conversion to trails. | Agriculture, Department of / Forest Service | 7/01/2010 |
AXNER EXCAVATING INC | $20,439 | Contract | : 110,000 lbs. FLAT LAVA STONE DELIVERED ONSITE ON PALLETS | Agriculture, Department of / Forest Service | 4/27/2010 |
KANAYAN, WILLIAM CONSTRUCTION | $456,530 | Contract | : Contract award is for the construction of approximately 55,290 Sq. Ft. of paved parking lot at the Eastern Sierra Inter-Agency Visitor Center in the Inyo National Forest and includes the following: 3 inch hot mix asphalt with sub-grade structure, surface | Agriculture, Department of / Forest Service | 8/03/2010 |
ALERT INC | $232,899 | Contract | : Columbine Deferred maintenance | Agriculture, Department of / Forest Service | 6/30/2010 |
3B'S FORESTRY, INCORPORATED | $254,678 | Contract | : Precommercial Thinning: Pre-commercial thinning is performed before trees reach merchantable size, which is typically around 4.5 to 8 inches dbh (diameter at breast height, measured at 4.5 ft. above the ground). The objective of a pre-commercial thinnin | Agriculture, Department of / Forest Service | 1/25/2010 |
NORTHSTAR TECHNOLOGY CORP | $106,570 | Contract | : CONTRACT ADMINISTRATION AND INSPECTION SERVICES | Agriculture, Department of / Forest Service | 9/13/2010 |
ONAN CORPORATION | $3,060 | Contract | : Contract Award to build and supply two (2) Model HGJAE-2145 Generators to the US Forest Service | Agriculture, Department of / Forest Service | 3/25/2010 |
OSMOSE RAILROAD SERVICES, INC | $906,582 | Contract | : RECOVERY - Stabilization of the Lincoln National Forest Mexican Canyon Trestle (MCT) -Phase II | Agriculture, Department of / Forest Service | 6/25/2010 |
TURKEY CREEK FORESTRY SERVICES INC | $33,055 | Contract | : THINNING OF SMALL DIAMETER TREES WITH HAD HELD CHAINSAWS | Agriculture, Department of / Forest Service | 1/29/2010 |
RESOURCE DATA, INC. | $12,200 | Contract | : Botanical Survey for rare Federally listed, Region 8 sensitive, and Croatan NF locally rareplant species within proposed hazardous fuel reduction activity area. --> Modification: Increase the survey area by 248 acres--modifications to be completed by 9/2 | Agriculture, Department of / Forest Service | 4/15/2010 |
KORNISH FOREST CONTRACTING INC | $139,871 | Contract | : Mastication / Hazardous Fuels Reduction Project | Agriculture, Department of / Forest Service | 5/26/2010 |
HUECKMAN, TODD | $10,395 | Contract | : Thinning and Chipping of resulting slash in a Ponderosa Pine and Douglas Fir seed orchard. | Agriculture, Department of / Forest Service | 5/27/2010 |
QUALITY CONSTRUCTION AND MAINTENANCE L.L.C. | $25,920 | Contract | : 16 campground fee posts and installation | Agriculture, Department of / Forest Service | 2/16/2010 |
T.J. DE WITT AND CO., INC. | $16,525 | Contract | : Part 1: Infrared Heaters Part 2: Parking Lot Lighting | Agriculture, Department of / Forest Service | 3/01/2010 |
HYDRO CONSTRUCTION COMPANY INC. | $228,449 | Contract | : Construction contract to replace water system and pipeline and to construct a new treatment building at Brainard Lake, Pawnee Campground | Agriculture, Department of / Forest Service | 8/04/2010 |
SOUTHERN CUSTOM APPLICATORS, LLC | $1,397,488 | Contract | : Provide all labor, materials,permits,licenses and equipment for Kudzu eradication as prescribed. | Agriculture, Department of / Forest Service | 12/22/2009 |
S & S GENERAL CONTRACTORS & EQUIPMENT RENTAL, INC. | $472,305 | Contract | : Install two government supplied bridges on USFS roads in Southeast Alaska, furnish and place crushed gravel surfacing, perform landslide removal | Agriculture, Department of / Forest Service | 4/30/2009 |
HEMLOCK HEALERS, INC. | $31,424 | Contract | : Treatment of Eastern hemlocks for Hemlock Woolly Adelgid in 3 GA districts for the USFS | Agriculture, Department of / Forest Service | 3/20/2010 |
NEW HAMPSHIRE BORING, INC. | $29,300 | Contract | : Seal 10 unused wells | Agriculture, Department of / Forest Service | 12/30/2009 |
ROGNLIN'S, INC. | $275,641 | Contract | : Fir Creek Aquatic Organism Passage & Bridge Construction | Agriculture, Department of / Forest Service | 4/23/2010 |
BRINK BROTHERS INC. | $9,625 | Contract | : The purpose of the award was to receate lost Roosevelt Elk habitat. This entailed the irradication of invasive species and small saplings on site and the widening of meadows by mulching both of these items and leaving the area in a pasture for elk. The g | Agriculture, Department of / Forest Service | 4/06/2010 |
AKRE, DEAN R | $46,888 | Contract | : ROADSIDE BRUSHING ON FOREST SERVICE ROADS | Agriculture, Department of / Forest Service | 12/01/2009 |
PATRICIA E BROWN DR | $3,500 | Contract | : Bat Surveys for Portals on the Seymore Mine | Agriculture, Department of / Forest Service | 6/16/2010 |
TRI-PRO CEDAR PRODUCTS, INC. | $13,920 | Contract | : 200 pieces of 3x12x16' Cedar #2&Btr bridge planking | Agriculture, Department of / Forest Service | 5/17/2010 |
BENCHMARK ENGINEERING INC | $1,048,573 | Contract | : Supply the services of a Minnesota licensed land surveyor to The United States Department of Agriculture (USDA) Forest Service in order to provide boundary line surveys of rural class property to recover, restore and mark the property boundary of National | Agriculture, Department of / Forest Service | 7/13/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $52,591 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: This award provided funding for a Student Conservation Association (SCA) youth conservation service program to assist with repairing and improving public trails in Payette National Forest in McCall, Idaho. In this multi-year program, SCA Traiail Wilderness ... Show more | Agriculture, Department of / Forest Service | 2/02/2010 |
CLEVENGER CONTRACTING INC. | $170,615 | Contract | : Clay Butte Look out Tower remodel | Agriculture, Department of / Forest Service | 7/30/2010 |
MACAULEY CONSTRUCTION | $324,054 | Contract | : This work includes grading and shaping of existing native surface road, haul and placement of 2500 cy of borrow, installation of reinforced concrete box culvert and corrugated metal pipes, placement of agg base with optional ac paving on the Sherman Canyo | Agriculture, Department of / Forest Service | 8/02/2010 |
POWER PRO INC | $97,174 | Contract | : Communications Project to install new upgraded phone lines. | Agriculture, Department of / Forest Service | 6/23/2010 |
VALLEY TIMBER RESOURCE INC | $82,744 | Contract | : Sparky Hazard Tree Felling | Agriculture, Department of / Forest Service | 7/14/2010 |
COFFMAN EXCAVATION LLC | $550,183 | Contract | : Recovery Timberline Parking Lot Improvements | Agriculture, Department of / Forest Service | 2/10/2010 |
CHRISTEN & ASSOCIATES INC | $84,744 | Contract | : Excavate and backfill for vault toilet installation. | Agriculture, Department of / Forest Service | 3/01/2010 |
MACNAK CONSTRUCTION LLC | $98,060 | Contract | : This project is to reconstruct/repair approximately 990 square facial feet (sff) of existing stone retaining wall, add 1,208 1f of colored concrete cap (20 x 3) to this wall, add 112 1f of colored concrete cap (24 X 3) to the existing low seating wall at | Agriculture, Department of / Forest Service | 8/20/2010 |
UP FRONT CONSTRUCTION LLC | $37,283 | Contract | : Powell Ranger Station Window and door replacement | Agriculture, Department of / Forest Service | 8/11/2010 |
STONE RIDGE CONSTRUCTION, INC | $229,838 | Contract | : The Powell Water Supply Line Replacement project consists of approximately 4,770 LF of new 6 water main construction, upgrades to the spring box, upgrades to the reservoir, and a highway crossing. This work will also include all other labor, materials an | Agriculture, Department of / Forest Service | 8/23/2010 |
PINE WEST REFORESTATION | $227,902 | Contract | : Reforestation services, pre-commercial thinning, hand pile, prunning in rural forest areas | Agriculture, Department of / Forest Service | 4/20/2010 |
JOHN JUMP TRUCKING INC | $93,895 | Contract | : Biomass Pile Grinding, Kootenai National Forest - Grinding of remaining logging slash piles into hogfuel (biomass) and removing the biomass materials from the jobsite and taking it to area mills. | Agriculture, Department of / Forest Service | 12/10/2009 |
CUTTING EDGE EXCAVATING, INC. | $67,020 | Contract | : CCRD Dune Restoration European Grass Removal Using D65 dozer to remove european beach grass for restoration of dunes method used push to ocean and/or scalp and bury | Agriculture, Department of / Forest Service | 6/08/2010 |
CATENA GROUP INC | $353,442 | Contract | : This project is for a multi-year aquatic monitoring on the Upper Tellico and Upper Snowbird Creek Watersheds in the Tusquitee and Cheoah Ranger Districts of the Nantahala National Forest. The contractor will use the Basinwide Visual Estimation Technique ( | Agriculture, Department of / Forest Service | 6/01/2010 |
PRICE CONTRACTING, INC. | $259,582 | Contract | : Remove and replace existing treated timber bridge over Logan Creek Road No. 2895 on the Flathead National Forest. Structure is located on the Tally Lake Ranger District in Section 30, T31N, R23W, Flathead County, MT. | Agriculture, Department of / Forest Service | 8/03/2010 |
COLLINS PINE COMPANY | $1,000 | Contract | : ARRA program reporting fees. No on-the-ground activities. | Agriculture, Department of / Forest Service | 8/18/2010 |
HAMMITT, MERNE | $102,347 | Contract | : Upgrade Water System, Buffalo Gap Campground, USDA Forest Service, Near Medora, ND | Agriculture, Department of / Forest Service | 8/23/2010 |
QUICKSILVER CONTRACTING COMPANY | $72,527 | Contract | : OP PCT - PRECOMMERCIAL TREE THINNING AND SLASH TREATMENT | Agriculture, Department of / Forest Service | 6/29/2010 |
FANT, JERRY | $356,475 | Contract | : Closure of Abandoned Mines in the North Phoenix area. The Closures included Bat Gates, Polyurethane Foam Plugs, and Backfills to prtotect public from harm | Agriculture, Department of / Forest Service | 7/15/2010 |
WOODRING BROTHERS | $24,994 | Contract | : Stanton trailhead reconstruction | Agriculture, Department of / Forest Service | 7/12/2010 |
PAYNE & STALCUP CONSTRUCTION COMPANY,INC | $185,698 | Contract | : Recreational Facility Maintenance onthe Chattooga River Ranger District | Agriculture, Department of / Forest Service | 8/16/2010 |
COUNTRY CLASSIC, INC | $9,500 | Contract | : TRAIL SGNS | Agriculture, Department of / Forest Service | 5/14/2010 |
COUNTRY CLASSIC, INC | $3,970 | Contract | : TRAIL SIGNS | Agriculture, Department of / Forest Service | 5/13/2010 |
TRINITY SOUTHWEST CONTRACTORS LLC | $210,314 | Contract | : Maintenance of NFSR 100 - also known as Upper Sabino canyon Road | Agriculture, Department of / Forest Service | 9/07/2010 |
HELMICH INDUSTRIES, INC. | $580,740 | Contract | : The contract awarded is to begin implementation of the Vegetation Management Plan for the core area of the Brundage Mountain Ski Resort near McCall, Idaho. Treatments will be undertaken to assure the long-term health and visual objectives within the ski | Agriculture, Department of / Forest Service | 6/22/2010 |
TROY MANAGEMENT GROUP, LLC | $803,047 | Contract | : Mt. Rose Camground-Removal of existing asphalt camping spurs, asphalt curbs, site furniture, comfort stations, pump house, water storage tank, utilities, and other existing structures. Realignment and reconstruction of existing camping spurs and roadways. | Agriculture, Department of / Forest Service | 6/28/2010 |
WESTERN MOUNTAIN POWER CONSTRUCTION, INC. | $169,472 | Contract | : Evaluate, recommend and install alternative power generation at two Guard Stations in Malheur national forest, Oregon that will replace the existing propane generator and serve as the primary source of power Approved Change order for $25,831.86 | Agriculture, Department of / Forest Service | 8/30/2010 |
RYE TREE SERVICE INC | $148,323 | Contract | : vegetation plots | Agriculture, Department of / Forest Service | 7/28/2010 |
WAGON WHEEL TRUCKING AND ROLLOFFS, LLC | $121,988 | Contract | : pump and haul old vault toilets to land fill. Haul and place 3/4' aggregate from Alpine pit to back fill vault toilets and concrete sidewalks/pads, place concrete sidewalks/pads for accessibility as staked by forest service | Agriculture, Department of / Forest Service | 5/20/2010 |
MARTIN CONSTRUCTION, INC. | $56,770 | Contract | : This project is for the repair of dams on the McKenzie & Medora Ranger Districts, Dakota Prairie Grasslands. The services required by this contract are for furnishing all labor, equipment, supervision, transportation, operating supplies and incidentals ne | Agriculture, Department of / Forest Service | 3/10/2010 |
SWEAT LLC | $40,098 | Contract | : MIDSTORY CONTROL OCONEE NATL FOREST | Agriculture, Department of / Forest Service | 7/15/2010 |
ABATEMENT CONTRACTORS OF MONTANA, LLC. | $10,840 | Contract | : Asbestos abatement of Sylvanite Ranger Station - Kootenai National Forest | Agriculture, Department of / Forest Service | 9/17/2010 |
CONSOLIDATED LAND SERVICES INC | $31,200 | Contract | : Survey work for 13.75 miles of boundary line maintenance and maintenance of 49 corners on the Sylamore District in T16N R11W, T16N R12W, and T17N R11W. | Agriculture, Department of / Forest Service | 7/30/2010 |
BIG J CONSTRUCTION, INC. | $728,856 | Contract | : Design/build 9 fish passages | Agriculture, Department of / Forest Service | 7/27/2010 |
PROBUILD COMPANY LLC | $24,550 | Contract | : FLOOR TRUSSES CARSON NATIONAL FOREST PROJECT | Agriculture, Department of / Forest Service | 7/01/2010 |
KEN'S WATER TENDER INC | $680,807 | Contract | : Mill Luther Phase 1 Stormproofing, Klamath National Forest | Agriculture, Department of / Forest Service | 8/30/2010 |
RESTORATION SOLUTIONS LLC | $75,849 | Contract | : Corral Thinning ARRA Project - Cut, Skid and Deck 124 acres in the Cibola National Forest. | Agriculture, Department of / Forest Service | 3/17/2010 |
COUNTY OF CLARK | $245,000 | Grant | Recovery Act of 2009: Capital Improvement and Maintenance: Cottonwood Loop Project - Road Recontruction | Agriculture, Department of / Forest Service | 3/17/2009 |
M L ALBRIGHT & SONS, INC. | $157,795 | Contract | : This work consists of removing existing bridge rail and curb,resealing bridge expansion joints, patching bridge deck, installing new T101 bridge rail, and installing new bridge approach rail. This work will also include all other labor, materials and supp | Agriculture, Department of / Forest Service | 8/12/2010 |
SMITH PAVING, INC. | $218,414 | Contract | : The scope of this project was to replace a culvert in Imp Creek located in Gogebic County, Michigan. Work included removal and disposal of the existing culvert structure. Then replacement of the culvert with a 20 ft span X 8 ft rise precast arch culvert | Agriculture, Department of / Forest Service | 12/29/2009 |
CXT INCORPORATED | $172,709 | Contract | : ARRA Hunter Campground toilet Supply and deliver precast concrete restroom buildings to the Rio Grande NF & Pike San Isabel NF. | Agriculture, Department of / Forest Service | 9/07/2010 |
MOUNT SAINT HELENS REFORESTATION INC | $299,584 | Contract | : Eagle Roost Thin/Hand Pile/Burn--tree branch pickup by hand | Agriculture, Department of / Forest Service | 2/10/2010 |
TAC CONSTRUCTION SOLUTIONS, INC. | $17,400 | Contract | : DEMO AND SITE PREP TO INSTALL NEW TOILET BUILDINGS | Agriculture, Department of / Forest Service | 12/22/2009 |
SNOWDEN, INC. | $785,788 | Contract | : Remove and replace the existing culvert with a concrete box girder bridge | Agriculture, Department of / Forest Service | 5/27/2010 |
NORTHWOODS LUMBER COMPANY | $5,274 | Contract | : LUMBER AND TIMBERS | Agriculture, Department of / Forest Service | 3/29/2010 |
COOK & SON CONSTRUCTION | $275,543 | Contract | : RECOVERY Kelly Mountain Road 394 Surfacing project | Agriculture, Department of / Forest Service | 7/22/2010 |
ARROWHEAD STARR COMPANY | $92,990 | Contract | : Forestry-Crop Tree Release | Agriculture, Department of / Forest Service | 4/19/2010 |
DAVIDSON CONSTRUCTION INC | $712,374 | Contract | : The project consists of a structural upgrade / repair and miscellaneous repairs to the existing 3360 s.f. visitor center and the adjacent 880 s.f. warming hut. Ten years after completion, the log structure has undergone unacceptable levels of settlement a | Agriculture, Department of / Forest Service | 9/10/2010 |
MARCIEL WELL DRILLING & PUMPS | $62,710 | Contract | : Malheur National Forest - Drill new domestic water wells at Crane Prairie and Crow Flat Guard Stations | Agriculture, Department of / Forest Service | 5/18/2010 |
DL REFORESTATION INC | $54,918 | Contract | : Fuel Reduction: Hand Pile and Cover | Agriculture, Department of / Forest Service | 7/23/2010 |
OAXACA REFORESTATION INC. | $28,070 | Contract | : Lawrence Mountain 2011 Hand Tree Planting on the Kootenai National Forest. | Agriculture, Department of / Forest Service | 7/26/2010 |
RMC CONSULTANTS, INC. | $119,850 | Contract | : Prescott AML Remediation. Contractor to provide all labor, material, equipment, and transportation to perform remediation services of 27 mine features on Prescott Abandoned Mine Lands in accordance with the terms and conditions of the parent IDIQ contrac | Agriculture, Department of / Forest Service | 8/05/2010 |
FENCE FACTORY | $4,616 | Contract | : Tools and supplies needed to complete Red Reef Trail Project for a 1000 foot crib wall. | Agriculture, Department of / Forest Service | 9/24/2010 |
MILLER CONSTRUCTION COMPANY, LTD. | $11,100 | Contract | : Yanmar C30R track truck, Yanmar VIO35 excavator and Marooka MST800 track truck rentals plus six equipment moves | Agriculture, Department of / Forest Service | 8/11/2010 |
WESTERN RECLAMATION, LLC | $632,900 | Contract | : Reconstruct Existing Gravel Road | Agriculture, Department of / Forest Service | 3/15/2010 |
NELSON PAINT COMPANY INC | $1,842 | Contract | : Tree Marking Paint | Agriculture, Department of / Forest Service | 9/16/2010 |
R & R CONNER, INC | $154,057 | Contract | : GRAVEL CRUSH AND STOCKPILE IN | Agriculture, Department of / Forest Service | 6/17/2010 |
WAGON WHEEL TRUCKING AND ROLLOFFS, LLC | $411,611 | Contract | : Demolish and dipose of 9 existing flush toilets, prepare aggregate pads and utilities for install of precast flush buildings, construct concrete sidewalks, pads, hydrants | Agriculture, Department of / Forest Service | 7/09/2010 |
WINSTON CORPORATION | $87,000 | Contract | : Painting of Historical Builings in Mahleur National Forest | Agriculture, Department of / Forest Service | 6/14/2010 |
ALPINE EXCAVATION AND CONSTRUCTION COMPA | $16,950 | Contract | : Provide 1030 CY of 3/4 ' Aggregrate encluding loader to load vehicles at pit. | Agriculture, Department of / Forest Service | 5/20/2010 |
JOSEPH MURPHY CONSTRUCTION, INC. | $2,177,723 | Contract | : Forest-wide facilities decommisiong. This includes demolition and removal of facilities on the Los Padres National Forest. Remediation services and hazardous waste collection. | Agriculture, Department of / Forest Service | 8/16/2010 |
HAWK ENTERPRISES | $42,174 | Contract | : ARRA Trails, Lookout Mtn trail restoration. | Agriculture, Department of / Forest Service | 5/25/2010 |
CROP PRODUCTION SERVICES, INC. | $3,070 | Contract | : Chemicals | Agriculture, Department of / Forest Service | 9/20/2010 |
HOLMAN CONSULTING ENGINEERS, P.C. | $3,200 | Contract | : Gravel crushing support services | Agriculture, Department of / Forest Service | 7/12/2010 |
HOLM, BERKLEE | $36,800 | Contract | : Installation of 6 fishing piers and trail construction to the piers | Agriculture, Department of / Forest Service | 6/14/2010 |
ENGINEERING/REMEDIATION RESOURCES GROUP, INC. | $12,447,704 | Contract | : The Blue Ledge Mine is an inactive underground copper mine, dating back to 1898. ERRG has been contracted to conduct a removal action to address the ongoing release of hazardous substances from the mine site that has been demonstrated to be harmful to th | Agriculture, Department of / Forest Service | 5/28/2010 |
K & K DIRT WORKS | $13,438 | Contract | : The prupose of this project is to decrease the impact of soil and water degradation of fifty seven dispersed recreation sites on the Brownstown ranger district. This project will also restrict travel beyond the designated site thus further elimenating exc | Agriculture, Department of / Forest Service | 8/10/2010 |
TRIPLE TREE, INC. | $291,306 | Contract | : Re-establish cushion material to specified depth on native surface roads, using mobile rock milling equiptment. The intent is to restore the road to its original native surface character without disturbing any ground other than the roadway and drainage d | Agriculture, Department of / Forest Service | 6/17/2010 |
REVA MURPHY ASSOCIATES, INC. | $300,115 | Contract | : Angeles Forest Wide Roofing Project. Roof for Engine Garage and part of Residence at Bear Divide. Roof for Visitor's Center at Grassy Hollow and part of Big Pine Barracks. Roof for Engine Bay at San Franicsquito. Fascia Removal and Replacement. Part | Agriculture, Department of / Forest Service | 6/02/2010 |
FREYS LANDCARE & SNOWPLOWING | $33,400 | Contract | : Vegetation Management Barren/Savannah Restoration | Agriculture, Department of / Forest Service | 3/04/2010 |
PEAK SAND & GRAVEL, INC | $219,850 | Contract | : OLD MILWAUKEE GRAVEL CRUSHING | Agriculture, Department of / Forest Service | 7/29/2010 |
WHITE SHIELD, INC. | $420,012 | Contract | : Lead based paint abatement and painting project at Mahleur National Forest Building Sites | Agriculture, Department of / Forest Service | 7/02/2010 |
PIZZO & ASSOCIATES LTD | $62,990 | Contract | : MIDEWIN NATIONAL TALLGRASS PRAIRIE, TASK 17 HAZARDOUS FUELS REDUCTION- reduction of existing Phragmites invasive species-147 acres of land covered. | Agriculture, Department of / Forest Service | 5/06/2010 |
MCMAHAN & ASSOCIATES, P.A. | $10,942 | Contract | : Re-surveying,marking,signing, and painting U.S. Forest Service boundary lines. | Agriculture, Department of / Forest Service | 8/09/2010 |
CHESTNUT RIDGE FORESTRY | $69,359 | Contract | : Our foresters are conducting a wild land - urban interface (WUI) around an approximate 2 mile radius of the town of Ely, MN. WUI marking is conducted to reduce the amount of wildfire fuels near private population centers. They will remove the trees that | Agriculture, Department of / Forest Service | 5/20/2010 |
CASTLE-ROSE, INC. | $56,538 | Contract | : Contract to remove and replace decking and railing materials at the Coldwater Lake boardwalk. | Agriculture, Department of / Forest Service | 8/16/2010 |
DJ&A, P.C. | $51,833 | Contract | : This contract furnished qualified personnel and necessary equipment and materials to provide construction support and inspection services for the Gov't for projects as specified by the Forest. | Agriculture, Department of / Forest Service | 7/12/2010 |
TUCKER, TERRY | $127,623 | Contract | : Trail maintenance work consisting of clearing, brushing, removal of hazard trees, installing trail markers, placement and repair of waterbars, tread restoration and drainage structure maintenance, and resurfacing with stone within the administrative bound | Agriculture, Department of / Forest Service | 5/21/2010 |
BOHNA RANCH | $27,462 | Contract | : Fall all designated biomass and sawlog trees, limb logs, skid biomass and sawlogs to a landing, deck sawlogs for future deck sale and remove the biomass material from the contract site | Agriculture, Department of / Forest Service | 6/10/2010 |
JONES VEGETATION MANAGEMENT, INC | $65,745 | Contract | : Removal of understory hazardous fuels by mechanical brushcutting/mulching in order to reduce the risk of wildfires. Also applied herbicide to border areas to prevent regrowth near private lands. | Agriculture, Department of / Forest Service | 5/11/2010 |
MATRIARCH CONSTRUCTION INC | $600,482 | Contract | : THE CONSTRUCTION OF A NEW CAMPGROUND & ENTRANCE ROAD TO PROVIDE A FACILITY FOR THE GENERAL PUBLIC. THE FACILITY HAS A PARKING AREA AND 11 CAMPING SPURS ALONG WITH CORRALS AND MISC. ITEMS FOR HORSES,THIS CAMPGROUND WILL PROVIDE ACCESS TO FOREST LANDS FOR H | Agriculture, Department of / Forest Service | 7/26/2010 |