Listing all stimulus spending by amount, in descending order. Return to Bureau of Land Management page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
YOUTH EMPLOYMENT PROGRAM, INC | $40,000 | Grant | Recreation Resource Management: Working with youth to provide safe work and educate them in abondoned fence removal | Interior, Department of / Bureau of Land Management | 8/28/2009 |
OTAK, INC. | $1,483,470 | Contract | : Additional services have been added to do further work with the field offices on refining distance zones for visual resource inventories as per direction from the National Lead. | Interior, Department of / Bureau of Land Management | 8/14/2009 |
EDAW, INC. | $218,829 | Contract | : Jupiter Inlet Restoration, Landscape Architecture. | Interior, Department of / Bureau of Land Management | 8/27/2009 |
SUMMITT FORESTS INC | $8,888 | Contract | : LOWER HORSEFLY SLASHING TASK ORDER ON CONTRACT #L06PC90336 | Interior, Department of / Bureau of Land Management | 8/14/2009 |
ALVAREZ ENVIRONMENTAL, L.L.C. | $63,828 | Contract | : hand cutting, piling and pile cover. | Interior, Department of / Bureau of Land Management | 9/14/2009 |
AMERICAN CONSERVATION EXPERIENCE | $132,000 | Grant | Recreation Resource Management: Recovery Act - Trail Development and Maintenance, San Pedro National Conservation Area Trail Reconstruction and Arizona Strip Trail Repair. Including the original obligation of $43,200 as well as the $60,000 obligated on July 6, 2010, ACE has been grante | Interior, Department of / Bureau of Land Management | 9/22/2009 |
J-U-B ENGINEERS, INC. | $2,411 | Contract | : This project was to provide an electrical site design for the Ramsey Mountain Communications site, near Salmon Idaho. Work performed included sizing conductor, conduit and transformers for a branch line from the power providers transformer to the communi | Interior, Department of / Bureau of Land Management | 8/17/2009 |
SUNWIZE TECHNOLOGIES, INC. | $102,170 | Contract | : Solar electric system | Interior, Department of / Bureau of Land Management | 8/13/2009 |
TRIMBLE NAVIGATION LIMITED | $5,210 | Contract | : DRAFTING SURVEYING & MAPPING EQUIPMENT | Interior, Department of / Bureau of Land Management | 8/25/2009 |
JOHNSON LANE MATERIALS LLC | $7,438 | Contract | : DELIVERY OF GRAVEL | Interior, Department of / Bureau of Land Management | 7/14/2009 |
E T TECHTONICS, INC | $18,500 | Contract | : Fiberglass bridge - arra | Interior, Department of / Bureau of Land Management | 7/10/2009 |
CROP JET AVIATION, LLC | $34,955 | Contract | : Aerial spraying contract. | Interior, Department of / Bureau of Land Management | 8/31/2009 |
FARMERS FERTILIZER CO. | $7,160 | Contract | : RECOVERY- TRICLOPYR 4 AND BARK OIL FOR WEED ELIMINATION | Interior, Department of / Bureau of Land Management | 9/21/2009 |
FINCH FARMS INC. | $15,990 | Contract | : Wheat Field Restoration Project within the Crab Creek Sub-basin. | Interior, Department of / Bureau of Land Management | 9/08/2009 |
STRINGER CONSTRUCTION, LLC | $81,180 | Contract | : Thinning contract | Interior, Department of / Bureau of Land Management | 9/21/2009 |
BOSS TANKS, INC. | $10,090 | Contract | : CATTLE GUARDS, END WINGS AND BASES | Interior, Department of / Bureau of Land Management | 9/19/2009 |
TRINITY COUNTY RESOURCE CONSERVATION DISTRICT | $400,000 | Grant | Recreation Resource Management: Recreational opportunities and transportation management (associated with recreational activities) on BLM lands within Trinity County. | Interior, Department of / Bureau of Land Management | 9/12/2009 |
DUCKS UNLIMITED, INC. | $37,779 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Installation of irrigation measuring devices in 3 lateral ditches below the Alamo ditch on the USBLM Simpson Tract. | Interior, Department of / Bureau of Land Management | 9/19/2009 |
CARPENTER SELLERS DEL GATTO ARCHITECTS, PC | $411,757 | Contract | : Architectural and Engineering Services for the Black Rock Administration Facility | Interior, Department of / Bureau of Land Management | 9/22/2009 |
J-U-B ENGINEERS, INC. | $61,402 | Contract | : This project is to provide a solicitation ready package for constructing a Radio Shop building at the Boise District Office Complex located in Boise, ID. The project will include architectural, civil, structural, mechanical & electrical plans as well as | Interior, Department of / Bureau of Land Management | 6/29/2009 |
SUN, SAND & GRAVEL, INC. | $325,135 | Contract | : Roseburg area vault toliets | Interior, Department of / Bureau of Land Management | 9/22/2009 |
MILLER TIMBER SERVICES INC | $119,900 | Contract | : Slash removal from blowdown timber sale landings | Interior, Department of / Bureau of Land Management | 9/22/2009 |
CLEAR PACIFIC, INC. | $150,662 | Contract | : Reduce fuel load in the Rattlesnake Stewardship Area to minimize the potential for devastating wild fires. | Interior, Department of / Bureau of Land Management | 9/22/2009 |
E SCHAAF & ASSOCIATES INC | $300,103 | Contract | : AML CADASTRAL SURVEY ndc060018, Surveying the boundaries and corners for the specified Township. | Interior, Department of / Bureau of Land Management | 6/29/2009 |
PRO INC | $64,990 | Contract | : 115310 THIN & HANDPILE | Interior, Department of / Bureau of Land Management | 9/01/2009 |
SUMMITT FORESTS INC | $40,352 | Contract | : Freeman Creek Tree Thinning | Interior, Department of / Bureau of Land Management | 8/26/2009 |
EEL RIVER IMPROVEMENT GROUP | $46,561 | Grant | Recreation Resource Management: The project objective is to secure for the American people of present and future generations the benefits of an enduring resource of wilderness. The public expects this newly designated wilderness area to be protected from the sights and sounds of motori | Interior, Department of / Bureau of Land Management | 8/21/2009 |
CONSERVATION CORPS, CALIFORNIA | $125,000 | Grant | Forests and Woodlands Resource Management: To provide youth a safe education job experience, prepare them for entering the workforce by exposing them to a variety of work experience, basic skills training and a structured work environment. Lower fire hazard in the Keswick Basin by reducing fuels | Interior, Department of / Bureau of Land Management | 9/15/2009 |
SOUTHWEST CONSERVATION CORPS | $72,000 | Grant | Forests and Woodlands Resource Management: This agreement is made and entered into by the Department of the Interior, Bureau of Land Management, Colorado State Office and Southwest Conservation Corps for the purpose of controlling and preventing the spread of invasive and noxious weed species wtih | Interior, Department of / Bureau of Land Management | 9/22/2009 |
QUICKSILVER CONTRACTING COMPANY | $36,024 | Contract | : JUNIPER CUTTING FOR FUELS REDUCTION - SOUTH ZONE BURNS, OREGON DISTRICT | Interior, Department of / Bureau of Land Management | 7/29/2009 |
C X T INCORPORATED | $16,823 | Contract | : Manufacture, deliver and install prefabricated, precast concrete storage building at the Huckleberry Campground in St. Maries, ID. | Interior, Department of / Bureau of Land Management | 8/18/2009 |
OTAK, INC. | $144,813 | Contract | : Project work includes the design of replacement facilites for the exisitng Green Mountain fire lookout. Replacement facilities wil include a new lookout tower, living quarters for lookout personnel, a small building for communications equipment and batte | Interior, Department of / Bureau of Land Management | 9/21/2009 |
CNU CONTRACTING, INC. | $4,225 | Contract | : Recovery: Hatch Point Wood Sign Posts Treasury Account Symbol: 1409/101112 | Interior, Department of / Bureau of Land Management | 6/25/2009 |
CKI CONSTRUCTION | $71,185 | Contract | : Huckleberry Communications Building | Interior, Department of / Bureau of Land Management | 7/28/2009 |
BENSON FARMS, INC. | $28,299 | Contract | : Seed Purchase | Interior, Department of / Bureau of Land Management | 9/21/2009 |
DLT SOLUTIONS, LLC | $4,561 | Contract | : Software Subscription and Licences | Interior, Department of / Bureau of Land Management | 7/31/2009 |
NRC ENVIRONMENTAL SERVICES INC. | $4,576 | Contract | : Award to determine presence/significance of lead-based paint on a total of eight (8) buildings at the Turn Point Lighthouse on Stuart Island. BLM requested a licensed/certified lead-based paint inspector to perform a lead-based paint survey and provide re | Interior, Department of / Bureau of Land Management | 7/23/2009 |
COLORADO YOUTH CORPS ASSOCIATION | $60,000 | Grant | Recreation Resource Management: Youth corps to complete work projects related to trail management projects in the Gunnison Gorge National Conservation Area | Interior, Department of / Bureau of Land Management | 7/30/2009 |
UNIVERSITY OF IDAHO | $300,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The overarching goal of this project is to develop new biological control agents for invasive exotic plants as a means for the environmental protection of natural areas and lands and/or a more environmental means for the management of exotic c weeds. We ai... Show more | Interior, Department of / Bureau of Land Management | 9/17/2009 |
THE STUDENT CONSERVATION ASSOCIATION INC | $53,200 | Grant | Recreation Resource Management: The award funds services to the Department of Interior, Bureau of Land Management, Arizona State Office, incuding work at the Juan Bautista de Anza National Historic Trail, provided by the Student Conservation Association's Conservation Crew program, whic | Interior, Department of / Bureau of Land Management | 9/22/2009 |
GOVCON INC | $100,386 | Contract | : MOAB CRACK AND SLURRY SEAL | Interior, Department of / Bureau of Land Management | 10/16/2009 |
ASPHALT MAINTENANCE ASSOCIATES, INC. | $102,560 | Contract | : Recovery - Yaquina Head Outstanding Natural Area (YHONA) Slurry Seal and Marking | Interior, Department of / Bureau of Land Management | 9/02/2009 |
STONE ECOSURVEYS LLC | $12,066 | Contract | : Survey of non-vascular species on woodlands to be thinned. | Interior, Department of / Bureau of Land Management | 9/22/2009 |
FAR WESTERN ANTHROPOLOGICAL RESEARCH GROUP, INC. | $31,500 | Contract | : Project consists of a Class 3 cultural resources inventory of 1062 acres in the Desatoya Range of north central Nevada on Bureau of Land Management administered lands in preparation for wildland fire fuels mitigation activities. Inventory includes a Class | Interior, Department of / Bureau of Land Management | 9/19/2009 |
DESERT SPIRIT CONTRACTING, LLC | $56,170 | Contract | : Forestry Thinning | Interior, Department of / Bureau of Land Management | 9/21/2009 |
BLOOD, JOHN | $29,100 | Contract | : stewardship | Interior, Department of / Bureau of Land Management | 9/21/2009 |
TRIMBLE NAVIGATION LIMITED | $89,602 | Contract | : DRAFTING SURVEYING & MAPPING EQUIPMENT | Interior, Department of / Bureau of Land Management | 9/21/2009 |
SISKIYOU BIOSURVEY LLC | $45,751 | Contract | : Noxious Weed Botanical Survey IDIQ | Interior, Department of / Bureau of Land Management | 9/18/2009 |
YOUTH EMPLOYMENT PROGRAM, INC | $220,000 | Grant | Recreation Resource Management: Working with youth to provide education on road closures utilizing vertical, installing signing, improving surfaces on primary roads | Interior, Department of / Bureau of Land Management | 9/12/2009 |
OTAK, INC. | $55,730 | Contract | : At the Salem District Office the existing heating/domestic hot water system is 30 years old, is inefficient, and maintenance repairs and part replacements have become more frequent in recent years. This work includes anylising existing building, and desig | Interior, Department of / Bureau of Land Management | 9/22/2009 |
OTAK, INC. | $69,973 | Contract | : Recovery - Salem District Office window/skylight renovation | Interior, Department of / Bureau of Land Management | 9/22/2009 |
SWEAT, ROBERT | $124,500 | Contract | : WILDLAND FIRE HAZARD REDUCTION BY MECHANICALLY REMOVING/SHREDDING | Interior, Department of / Bureau of Land Management | 9/01/2009 |
MORGAN INDUSTRIES, INC. | $15,700 | Contract | : HATCH POINT CENTERLINE STRIPING | Interior, Department of / Bureau of Land Management | 7/29/2009 |
LIVEWIRE ELECTRIC | $64,859 | Contract | : Electrical upgrade | Interior, Department of / Bureau of Land Management | 8/18/2009 |
MOUNTAINLAND SUPPLY COMPANY | $73,152 | Contract | : SUPPLIES | Interior, Department of / Bureau of Land Management | 9/01/2009 |
HKM ENGINEERING INC. | $121,332 | Contract | : Dam Conditions Assessment. Totally compete the provided Dam Condition Assessment Checklist. The non checklist portion (survey data and calculations) (page 1 through 4) of the form may be completed on a computer, with the deliverable portion of the form | Interior, Department of / Bureau of Land Management | 6/29/2009 |
HKM ENGINEERING INC. | $6,427 | Contract | : Pompey Pillar Energy Improvement Project. A)Task A. Prepare a conceptual design for the istallation of a boiler to be included in the ground source loop to provide the deficit in heating capacity. Design to include class C estimate for installation co | Interior, Department of / Bureau of Land Management | 6/29/2009 |
NRC ENVIRONMENTAL SERVICES INC. | $4,576 | Contract | : Award to determine presence/significance of lead-based paint on a total of eight (8) buildings at the Turn Point Lighthouse on Stuart Island. BLM requested a licensed/certified lead-based paint inspector to perform a lead-based paint survey and provide re | Interior, Department of / Bureau of Land Management | 7/23/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $30,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mines that have been open. They will be closed so that the general public cannot enter the mine and be hurt or killed. Openings will be closed by backfilling, blasting or installing a grate to cover r the opening.... Show more | Interior, Department of / Bureau of Land Management | 9/15/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $3,750 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mines that have been open. They will be closed so that the general public cannot enter the mine and be hurt or killed. Openings will be closed by backfilling, blasting or installing a grate to cover r the opening.... Show more | Interior, Department of / Bureau of Land Management | 9/15/2009 |
HUECKMAN, TODD | $114,190 | Contract | : Burns Otis Valley and Bluebucket PCT, Cut, and Machine Pile. | Interior, Department of / Bureau of Land Management | 9/22/2009 |
S BROOKS & ASSOCIATES INC | $0 | Contract | : Engineeering Services | Interior, Department of / Bureau of Land Management | 7/31/2009 |
GOLDER ASSOCIATES LTD | $36,735 | Contract | : ARRA Pocatello Field Office Oregon/California National Historic Trails CLass III CRI. | Interior, Department of / Bureau of Land Management | 8/04/2009 |
TRIMBLE NAVIGATION LIMITED | $6,617 | Contract | : RADIO NAVIGATION EQ - EXCEPT AIR | Interior, Department of / Bureau of Land Management | 8/25/2009 |
SISKIYOU BIOSURVEY LLC | $6,952 | Contract | : Butte Falls Vascular Plant Surveys IDIQ. Note: this Task Order was originally written for $24,590.60 but most of that was not ARRA so the BLM modified the task order to include just the amount that is ARRA | Interior, Department of / Bureau of Land Management | 9/16/2009 |
K.C. EQUIPMENT, INC. | $187,777 | Contract | : RECOVERY - Chip seal parking areas & roads: Furnish all supervision, labor, material, equipment ant supplies necessary to chip seal roads and parking areas at Old and New Lucile, Skookumchuck, McKays Bend, and Pink House Recreation sites as well as the p | Interior, Department of / Bureau of Land Management | 8/19/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $30,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mines that have been open. They will be closed so that the general public cannot enter the mine and be hurt or killed. Openings will be closed by backfilling, blasting or installing a grate to cover r the opening.... Show more | Interior, Department of / Bureau of Land Management | 9/15/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $7,500 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mines that have been open. They will be closed so that the general public cannot enter the mine and be hurt or killed. Openings will be closed by backfilling, blasting or installing a grate to cover r the opening.... Show more | Interior, Department of / Bureau of Land Management | 9/15/2009 |
J-U-B ENGINEERS, INC. | $19,947 | Contract | : This project is to provide a solicitation ready package for HVAC system upgrades and replacement for an existing office building. The work to be performed includes on site verification of the existing systems, final design, drawings, specifications, and | Interior, Department of / Bureau of Land Management | 9/21/2009 |
WALKER'S EXCAVATION INC | $391,572 | Contract | : Replacement of rusted out culverts, seeding , mulching and placement of aggregate surfacing on various roads in East Glendale area. | Interior, Department of / Bureau of Land Management | 8/26/2009 |
S BROOKS & ASSOCIATES INC | $5,000 | Contract | : Engineering Inspection Services | Interior, Department of / Bureau of Land Management | 7/31/2009 |
OTAK, INC. | $137,509 | Contract | : For the BLM Roseburg District Office, conduct a comprehensive evaluation fo the existing HVAC system, develop a plan for the sytem retrofit, design and prepare construction contract drawings, specifications and cost estimates, and inspect the installation | Interior, Department of / Bureau of Land Management | 8/25/2009 |
A B C CONCRETE MFG. CO., INC. | $16,170 | Contract | : To build and deliver (3) 8'X14' Pipe Style Cattle Guards and (3) 8'X14' Tubing Style Cattle Guards | Interior, Department of / Bureau of Land Management | 9/12/2009 |
ADVANCED TELEMETRY SYSTEMS, INC. | $24,408 | Contract | : Sage grouse mortality research study. | Interior, Department of / Bureau of Land Management | 7/10/2009 |
COOPER CHASE CONSTRUCTION | $68,000 | Contract | : Merced WSR Road Rehab | Interior, Department of / Bureau of Land Management | 9/02/2009 |
CDT UNDERGROUND, L.L.C. | $15,795 | Contract | : RECOVERY-Carsonite Posts-LDTDF0690000 | Interior, Department of / Bureau of Land Management | 9/01/2009 |
H TIMBER CONTRACTING | $36,656 | Contract | : Thinning juniper trees , and machine piling of all the slash created in project area. | Interior, Department of / Bureau of Land Management | 9/22/2009 |
TRINITY COUNTY RESOURCE CONSERVATION DISTRICT | $450,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Projects include fish, wildlife and botanical survey and monitoring, a reservoir enhancement project, which includes dam stabilization, exotic species survey and control, and watershed restoration tasks to reduce sediment production in tribututaries by redu... Show more | Interior, Department of / Bureau of Land Management | 9/12/2009 |
BLAINE, COUNTY OF | $97,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The project allows for the continued implementation of a long term weed management plan for the Milk River. The Milk River is appoximately 520 miles long and flows through four counties, several federal agencies, several state agencies, two N Native America... Show more | Interior, Department of / Bureau of Land Management | 9/01/2009 |
QUICKSILVER CONTRACTING COMPANY | $27,998 | Contract | : GS 27 GERBER STEW HOGFUEL REMOVAL | Interior, Department of / Bureau of Land Management | 9/22/2009 |
QUICKSILVER CONTRACTING COMPANY | $172,654 | Contract | : GS 24 GERBER STEW BIOMASS REMOVAL | Interior, Department of / Bureau of Land Management | 9/22/2009 |
QUICKSILVER CONTRACTING COMPANY | $183,000 | Contract | : LS 17 BIOMASS REMOVAL - HOGFUEL | Interior, Department of / Bureau of Land Management | 7/15/2009 |
HKM ENGINEERING INC. | $22,076 | Contract | : Gysum Springs Crossing Repair Recovery Act Funded Project-Gary Elwell 1)Estimate quantities of materials and type of structure to be placed in low water area: a)Estimate quantities for cuts and fill to place appropriate structure. b)Design struc | Interior, Department of / Bureau of Land Management | 7/23/2009 |
SWEAT, ROBERT | $21,595 | Contract | : SUNRISE TREE THINNING | Interior, Department of / Bureau of Land Management | 9/16/2009 |
SUMMITT FORESTS INC | $62,556 | Contract | : Baseline Hieb Lop & Scatter | Interior, Department of / Bureau of Land Management | 7/07/2009 |
SWAGGART ENTERPRISES INC | $62,300 | Contract | : Knowlton Grinding Phase 3: 190 acres mechanical hazardous fuels reduction. | Interior, Department of / Bureau of Land Management | 8/21/2009 |
ALVAREZ ENVIRONMENTAL, L.L.C. | $24,696 | Contract | : sweetwater juniper reduction, reduce live juniper on approx. 108 acres. | Interior, Department of / Bureau of Land Management | 9/01/2009 |
FRAMING OUR COMMUNITY INC | $150,000 | Grant | Forests and Woodlands Resource Management: Thinning and pruning of forest vegetation on 54 acres in the Sweeny Hill project area of Elk City Township, removal of merchantable and non-merchantable material, piling of natural and fire activity fuels, temporary road construction and removal, and maxi | Interior, Department of / Bureau of Land Management | 9/18/2009 |
BRIAN FARM SERVICE INC | $21,216 | Contract | : steel post | Interior, Department of / Bureau of Land Management | 8/10/2009 |
JACKSON PROPERTY SERVICES P C | $4,860 | Contract | : Real Property Appraisal | Interior, Department of / Bureau of Land Management | 7/15/2009 |
TASH T DIAMOND POST & POLE INC | $12,180 | Contract | : 90 Treat Jackleg Sets 420 Treated Wood Brace Rails 320 Treated Gate Stays 640 Treated Posts 350 Treated Wood Rails | Interior, Department of / Bureau of Land Management | 8/10/2009 |
A2Z SUPPLY | $3,150 | Contract | : Recovery - DFO Stock Tank | Interior, Department of / Bureau of Land Management | 8/10/2009 |
CDT UNDERGROUND, L.L.C. | $10,409 | Contract | : RECOVERY -MT - Dillon HDPE PIPE | Interior, Department of / Bureau of Land Management | 8/10/2009 |
BRIAN FARM SERVICE INC | $20,589 | Contract | : fencing material | Interior, Department of / Bureau of Land Management | 8/11/2009 |
DEATLEY CRUSHING COMPANY | $1,512,716 | Contract | : Burns Steens Mt. Rock Crushing | Interior, Department of / Bureau of Land Management | 9/18/2009 |
ADVANCED TELEMETRY SYSTEMS, INC. | $4,268 | Contract | : Challenger Receiver w/ nylon case, Model R2000 Price includes shipping. 3 element folding Yagi Ant 162-166 Model 13863 | Interior, Department of / Bureau of Land Management | 9/21/2009 |
RAINIER SEEDS, INC. | $16,146 | Contract | : Spokane Seed Buy | Interior, Department of / Bureau of Land Management | 9/21/2006 |
DESERT SPIRIT CONTRACTING, LLC | $17,630 | Contract | : Stewardship Project | Interior, Department of / Bureau of Land Management | 9/21/2009 |
YOUTH EMPLOYMENT PROGRAM, INC | $20,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Providing youth with work experience and education in fence modification for wildlife. | Interior, Department of / Bureau of Land Management | 9/01/2009 |
HASCO LLC | $41,373 | Contract | : Remove and replace overhead doors at the BLM Shoshone and Burley FO. | Interior, Department of / Bureau of Land Management | 9/19/2009 |
S BROOKS & ASSOCIATES INC | $12,712 | Contract | : Engineering Services | Interior, Department of / Bureau of Land Management | 7/31/2009 |
SNOWY RANGE, INC. | $153,153 | Contract | : Columbia Bullhog | Interior, Department of / Bureau of Land Management | 9/12/2009 |
OTAK, INC. | $22,118 | Contract | : Assess existing Interpretive Center heating, ventilation and air conditioning (HVAC) system and determine feasibility of installing a ground source heat pump. Develop a written evaluation describing the feasibility of replacing the conventional split syst | Interior, Department of / Bureau of Land Management | 9/22/2009 |
A M J A | $40,542 | Contract | : REMOVE AND REPLACE 21,045 LINEAR FEET OF 4 STRAND LET DOWN BARBED WIRE FENCE, USING DAVISON CLIPS IN WILDERNESS AREA. ALL MATERIAL FOR JOB HAD TO BE PACKED IN AND OUT BY HAND. THIS INCLUDED DOING CLEARING AND GRUBBING OF FENCE LINE, BUILDING ROCK JACKS, J | Interior, Department of / Bureau of Land Management | 9/13/2009 |
KEVIN MOORE ELECTRIC, CO. | $18,144 | Contract | : Hanksville / Richfield Security Lighting Improvements Job consists of Furnishing all wire, conduit, miscellaneous materials, equipment, and labor to install: Hanksville Site: 10 - 70 W HPS type IV cut-off luminair manufactured by US Architectural lighting | Interior, Department of / Bureau of Land Management | 8/26/2009 |
NORTH IDAHO MARITIME, LLC | $85,225 | Contract | : Killarney Lake Boat Dock Replacement | Interior, Department of / Bureau of Land Management | 8/31/2009 |
MOUNTAIN VIEW CONTRACTING, INC. | $13,110 | Contract | : TRAVEL PLAN GRAVELING | Interior, Department of / Bureau of Land Management | 9/01/2009 |
THOMCO ENGINEERING, INC. | $65,577 | Contract | : Recovery - Stevens Trailhead | Interior, Department of / Bureau of Land Management | 9/04/2009 |
GSBS, P.C. | $172,418 | Contract | : GSBS and our electrical consultant are providing construction management services in support of the General Contractors and BLMs efforts to create a quality new BLM office in Fillmore, Utah. GSBS is providing documentation of construction activities, aidi | Interior, Department of / Bureau of Land Management | 8/26/2009 |
EDAW, INC. | $9,981 | Contract | : Jupiter Inlet Scoping Visit | Interior, Department of / Bureau of Land Management | 8/20/2009 |
TRI STATE SURVEYING LTD INC | $219,667 | Contract | : Tuscarora AML Cadastral Survey. The surveys to be executed under this Group are undertaken by requset from the field office, to identify the boundaries of the intermingled federal and private lands in T.40 N., R. 51E., Mount Diablo Meridian. | Interior, Department of / Bureau of Land Management | 6/30/2009 |
WEST RANGE RECLAMATION, LLC | $16,536 | Contract | : This contract is to treat fuels and restore the vegetative community with Lawson Aerator at a site in Northern Ouray County. | Interior, Department of / Bureau of Land Management | 8/17/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $30,000 | Grant | Environmental Quality and Protection Resource Management: Construction activites to close hazardous mine openings within the area of the BLM Gunnison field office. These openings pose the threat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 8/13/2009 |
CONSERVATION CORPS, CALIFORNIA | $50,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: To provide youth education and job experience, and to prepare them for entering the workforce while helping BLM meet natural resource challenges. The purpose of this is to respond to a 1 acre detection of invasion, non-native weed (cape ivy)y) with manual ... Show more | Interior, Department of / Bureau of Land Management | 9/10/2009 |
EXECUTIVE OFFICE OF THE STATE OF IDAHO | $38,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Implement Boise District travel management plan utilizing dissadvantaged youth. | Interior, Department of / Bureau of Land Management | 9/17/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $5,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mines that have been open. They will be closed so that the general public cannot enter the mine and be hurt or killed. Openings will be closed by backfilling, blasting or installing a grate to cover r the opening.... Show more | Interior, Department of / Bureau of Land Management | 9/21/2009 |
MARSH CREEK, LLC | $16,283,983 | Contract | : Drew Point Well Test # 1 Remediation | Interior, Department of / Bureau of Land Management | 9/22/2009 |
HUFFMAN & WRIGHT LOGGING CO | $520,517 | Contract | : Culvert Surface Replacement | Interior, Department of / Bureau of Land Management | 9/21/2009 |
LOMAKATSI ECOLOGICAL SERVICES, INC. | $509,010 | Contract | : The Deer Willy project task order number #6 is a 484 acre project that is part of the larger South stew stewardship IDIQ.Task order #6 is funded under ARRA to reduce hazardous fuels through mechanical thinning and utilization of commercial material and Bi | Interior, Department of / Bureau of Land Management | 7/20/2009 |
ANDERSON & WOOD CONSTRUCTION CO., INC. | $36,469 | Contract | : Bldg 100 Electrical Upgrade | Interior, Department of / Bureau of Land Management | 9/22/2009 |
M R PRIEST, INC | $7,475 | Contract | : Wilderness Signs and Decals | Interior, Department of / Bureau of Land Management | 9/11/2009 |
COCONINO, COUNTY OF | $237,000 | Grant | Recreation Resource Management: Coconino Rural Environment Corps will create and retain jobs, and provide job training and work skill development for American youth and young adults through the provision of recreational infrastructure improvement including trail repair, maintenance, res | Interior, Department of / Bureau of Land Management | 9/22/2009 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $7,000 | Contract | : Recovery Cebolla Creek Geotechnical Study for the Replacement of Railroad Car Bridge in Response to Request for Quotation No. 375469. | Interior, Department of / Bureau of Land Management | 8/06/2009 |
EATON CORPORATION | $5,338 | Contract | : Panelboard with specified circuit breakers | Interior, Department of / Bureau of Land Management | 8/28/2009 |
MARSH CREEK, LLC | $817,243 | Contract | : Red Devil, AK - furnish all personnel, equipment, supervision, transportation, supplies, and incidentals to perform: - treatment of existing stockpiled petroleum contaminated soil - conduct a site characterization of the petroleum release at former above | Interior, Department of / Bureau of Land Management | 9/22/2009 |
SUMMITT FORESTS INC | $60,282 | Contract | : Interlakes Thinning and Fuels Reduction, Shasta County | Interior, Department of / Bureau of Land Management | 8/10/2009 |
SALIDA AREA PARKS, OPEN SPACE AND TRAILS | $25,000 | Grant | Recreation Resource Management: Trail projects designed to close or rehabilitate unsustainable trails, and sign, map & maintain environmentally responsilbe non-motorized recreational trails in the Salida area. | Interior, Department of / Bureau of Land Management | 9/09/2009 |
J-U-B ENGINEERS, INC. | $4,728 | Contract | : This project was to update a solicitation ready package for rehabing and existing building for seismic deficiencies. The buiding is located at the National Interagency Fire Center in Boise, Idaho. | Interior, Department of / Bureau of Land Management | 7/06/2009 |
MINING & ENVIRONMENTAL SERVICES, LLC | $214,926 | Contract | : Alameda Adit | Interior, Department of / Bureau of Land Management | 8/27/2009 |
HENDERSON BUILDERS L.L.C. | $846,800 | Contract | : Single, firm fixed price contract to supply, deliver, spread, shape, water and compact 58,000 tones of 1 aggregate to approx 13 miles of aggregate surface road | Interior, Department of / Bureau of Land Management | 8/31/2009 |
S BROOKS & ASSOCIATES INC | $55,515 | Contract | : Engineering Services for the Steens Loop Road Reconstruction Project. | Interior, Department of / Bureau of Land Management | 7/23/2009 |
CXT INCORPORATED | $34,834 | Contract | : Manufacture, deliver and install prefabricated, precast concrete building at the Henry Mountains Field Station in Hanksville, UT. | Interior, Department of / Bureau of Land Management | 8/18/2009 |
OTAK, INC. | $148,055 | Contract | : Oregon/Washington Bureau of Land Management (OR/WA BLM) is in need of structural evaluations and corrective action recommendations for certain load rated vehicle bridges located in Western Oregon. The objective of this project is for each bridge to be eva | Interior, Department of / Bureau of Land Management | 8/21/2009 |
OTAK, INC. | $54,036 | Contract | : The A-E shall visit the National Historic Oregon Trail Interpretive Center (NHOTIC), meet with Bureau of Land Management (BLM) staff and review existing conditions necessary in achieving the goals of Executive Order (E.O.) 13423, section 2(f). The goal of | Interior, Department of / Bureau of Land Management | 9/22/2009 |
A R VENKATESH | $4,815 | Contract | : ARRA - HATCH PT RD DELINEATOR POST/SIGNS | Interior, Department of / Bureau of Land Management | 7/20/2009 |
T L PETERSON INC | $63,990 | Contract | : Briceburg Water Line Replacement | Interior, Department of / Bureau of Land Management | 9/10/2009 |
KOUNTZ FENCE AND DIRTWORK | $4,300 | Contract | : Bean Creek Culvert Replacement | Interior, Department of / Bureau of Land Management | 9/02/2009 |
HASCO LLC | $35,311 | Contract | : Remove and replace doors, frames, hardware, and windows at the Burley, Idaho FO. | Interior, Department of / Bureau of Land Management | 9/19/2009 |
NATURAL RESOURCES, UTAH DEPARTMENT OF | $1,396,500 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The purpose of the Utah Watershed Restoration Project is to maximize natural biodiversity through time, improve water quality and quantity, vegetative cover, vigor and composition to sustain consumptive and non-consumptive demands as well as s soil stabilit... Show more | Interior, Department of / Bureau of Land Management | 12/21/2009 |
YEH AND ASSOCIATES, INC | $6,511 | Contract | : Zapata Falls Campground Topographic Survey | Interior, Department of / Bureau of Land Management | 11/12/2009 |
SMITH ENVIRONMENTAL AND ENGINEERING | $5,920 | Contract | : Class III Archaeological Survey conducted on approximately 105 acre survey campground unit within the BLM McInnis Canyons National Conservation Area, located on BS Road west of Glade Park. | Interior, Department of / Bureau of Land Management | 7/06/2009 |
S BROOKS & ASSOCIATES INC | $2,500 | Contract | : ROME Shop Construction Inspection | Interior, Department of / Bureau of Land Management | 7/31/2009 |
USKH INC. | $123,000 | Contract | : Surveying, hydrology analysis, preliminary design, final design, and cost estimating services for the East Twin creek Culvert Crossing in Nome, Alaska. | Interior, Department of / Bureau of Land Management | 8/04/2009 |
USKH INC. | $123,000 | Contract | : We are providing the Bureau of Land Management in Fairbanks Alaska with surveying, hydrology analysis, preliminary design, final design, and cost estimating services for the West Twin Creek Culvert Crossing. | Interior, Department of / Bureau of Land Management | 8/04/2009 |
SUMMITT FORESTS INC | $62,566 | Contract | : LOP AND SCATTER FUELS REDUCTION TASK ORDER ON CONTRACT #L06PC90336 | Interior, Department of / Bureau of Land Management | 7/07/2009 |
USKH INC. | $127,688 | Contract | : USKH Inc. under an IDIQ contract with the BLM was retained to improve the Tangle Lakes Access Road to the Tangle Lakes camp ground located off of the Denali Highway 21 miles west of Paxson ALaska. The road is located next to the Delta River classified a s | Interior, Department of / Bureau of Land Management | 8/04/2009 |
GOLDER ASSOCIATES LTD | $36,735 | Contract | : ARRA Pocatello Field Office Oregon/California National Historic Trails CLass III CRI. | Interior, Department of / Bureau of Land Management | 8/04/2009 |
WILLIAM SELF ASSOCIATES, INC. | $8,126 | Contract | : The Bureau of Land Management (BLM) is implementing a grassland restoration project in the Las Cienegas National Conservation Area (LCNCA). One component of the project is mesquite reduction, the current method of which is to mechanically 'grub', or remov | Interior, Department of / Bureau of Land Management | 10/02/2009 |
WILLIAM SELF ASSOCIATES, INC. | $6,963 | Contract | : The Bureau of Land Management (BLM) is implementing a grassland restoration project in the Las Cienegas National Conservation Area (LCNCA). One component of the project is mesquite reduction, the current method of which is to mechanically 'grub', or remov | Interior, Department of / Bureau of Land Management | 10/02/2009 |
WILLIAM SELF ASSOCIATES, INC. | $18,986 | Contract | : The Bureau of Land Management (BLM) is implementing a grassland restoration project in the Las Cienegas National Conservation Area (LCNCA). One component of the project is mesquite reduction, the current method of which is to mechanically 'grub', or remov | Interior, Department of / Bureau of Land Management | 10/02/2009 |
PREMIER DATA SERVICES, INC | $893,067 | Contract | : Of the over 5,000 townships in both Oregon and Washington, contracted work on 2874 townships are eligible for ARRA funding. This contract award addresses post scanning support tasks required in ARRA townships to provide the indexed and accessible digital | Interior, Department of / Bureau of Land Management | 12/16/2009 |
CORNERS CONSTRUCTION | $289,081 | Contract | : ROAD PAVING | Interior, Department of / Bureau of Land Management | 9/18/2009 |
STRICTLY SPRINKLERS, INC. | $15,726 | Contract | : pirimids irrigation | Interior, Department of / Bureau of Land Management | 9/12/2009 |
K.C. EQUIPMENT, INC. | $77,770 | Contract | : RECOVERY: EL MIRAGE VISITOR CENTER ACCESS ROAD | Interior, Department of / Bureau of Land Management | 11/19/2009 |
OTAK, INC. | $70,877 | Contract | : Pollen lab replacement | Interior, Department of / Bureau of Land Management | 12/16/2009 |
YEH AND ASSOCIATES, INC | $36,014 | Contract | : Jupiter Inlet Light House. | Interior, Department of / Bureau of Land Management | 2/03/2010 |
NORTHWEST ARCTIC, BOROUGH OF | $120,380 | Grant | Fish, Wildlife and Plant Conservation Resource Management: This project will enhance public safety through marking remote winter trails used for inter-village travel across BLM-manged public lands and adjacent federal, state and private lands. | Interior, Department of / Bureau of Land Management | 12/31/2009 |
NATIVE VILLAGE OF KOYUK IRA COUNCIL | $58,488 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Mapping and Marking of Trails in village for winter safety. | Interior, Department of / Bureau of Land Management | 12/31/2009 |
R JOHNSON SERVICES, INC. | $164,982 | Contract | : THIS CONTRACT IS FOR THE PURPOSE OF CONSTRUCTING 4.5 MILES OF LOGGING ROAD TO LOG OUT AN AREA OF BLOW DOWN TREES. | Interior, Department of / Bureau of Land Management | 12/10/2009 |
BREITHAUPT, BRENT | $29,850 | Contract | : ARRA Funded Paleontological Resource Assistant - Provides technical assistance to the WY Regional Paleontologist. Researches and retrieves paleontological and geological information, identifies and assesses non-federal fossil repositories, performs field | Interior, Department of / Bureau of Land Management | 11/04/2009 |
HENDERSON BUILDERS L.L.C. | $126,456 | Contract | : Furnish Labor, Material & Supplies to surface and existing road with crushed aggregate. Modification of Contract #3 to add gravel in the amount of $16494.30 | Interior, Department of / Bureau of Land Management | 10/27/2009 |
PNK CONSTRUCTORS, LLC | $7,230,492 | Contract | : Little Sahara Recreation Area Road: furnish supervision, labor, material, equipment & supplies neessary to reconstruct approx. 14 miles of road within recration area | Interior, Department of / Bureau of Land Management | 11/06/2009 |
YEH AND ASSOCIATES, INC | $571,269 | Contract | : Planning, Design, and Engineering services for the Kanab Visitors Center. | Interior, Department of / Bureau of Land Management | 8/31/2009 |
YEH AND ASSOCIATES, INC | $57,734 | Contract | : Planning, layout, and design of the Zapata Falls Campground expansion | Interior, Department of / Bureau of Land Management | 11/12/2009 |
YEH AND ASSOCIATES, INC | $39,308 | Contract | : Bridge design for the replacement of the Cebolla Creek Bridge | Interior, Department of / Bureau of Land Management | 11/19/2009 |
YEH AND ASSOCIATES, INC | $31,129 | Contract | : Structural Analysis of the Big Horn Gas Station Structure. | Interior, Department of / Bureau of Land Management | 12/03/2009 |
CARTER & BURGESS, INC. | $158,323 | Contract | : Provide all equipment, labor, and technical expertise as a Project Inspector to ensure road construction is carried out according to BLM (Bureau of Land Management) specifications and standards. Project Inspector shall complete daily diaries and communica | Interior, Department of / Bureau of Land Management | 8/03/2009 |
ALVAREZ ENVIRONMENTAL, L.L.C. | $30,224 | Contract | : hazardous fuels reduction | Interior, Department of / Bureau of Land Management | 12/22/2009 |
METTLER AND ASSOCIATES, INC. | $43,268 | Contract | : Sand Wash OHV Class III | Interior, Department of / Bureau of Land Management | 9/04/2009 |
BICYCLE COLORADO | $55,000 | Grant | Recreation Resource Management: Recovery BLM-CO GGNCA Rehab of linear disturbances | Interior, Department of / Bureau of Land Management | 8/04/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $70,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mine openings within the area of the BLM Gunnison field office. These openings pose the threat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 12/10/2009 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $60,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mine openings within the area of the BLM Montrose County field office. These openings pose the threat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 12/22/2009 |
COCHRANE EXCAVATION LLC | $6,850 | Contract | : Huckleberry Stream bank stabalization | Interior, Department of / Bureau of Land Management | 9/11/2009 |
S BROOKS & ASSOCIATES INC | $35,542 | Contract | : Secretarial Duties, preparing files, sorting mail, verifying information | Interior, Department of / Bureau of Land Management | 12/14/2009 |
WALTON, INC. | $115,030 | Contract | : replace communication tower and building at Notch Butte in lincoln County, ID | Interior, Department of / Bureau of Land Management | 8/17/2009 |
A4 CONSTRUCTION COMPANY, INC. | $1,744,334 | Contract | : Construct a 10,000sf LEED Silver facility for the BLM. This project included all site work and utilities and a PV parking carport. | Interior, Department of / Bureau of Land Management | 9/01/2009 |
TUSCA II, INC. | $97,668 | Contract | : Remove and dispose of existing wood pole fence and construct a new wood pole fence around Mud Springs Campground. Additional work includes but is not limited to, removal and disposal of existing picnic tables, and furnishing and installing picnic tables. | Interior, Department of / Bureau of Land Management | 8/28/2009 |
RAASS BROTHERS INC. | $84,305 | Contract | : Contractor shall furnish all supervision, labor, material, equipment, and supplies necessary to complete the construction. The construction will be asphalt paving, removal, and replacement of the concrete sidewalk. | Interior, Department of / Bureau of Land Management | 11/05/2009 |
MARKS RANCH INC | $432,890 | Contract | : Work has started on unit one, masticating and timber removal, no hauling has started at this time. The purpose of this project is to decrease the fire danger that this area contains. The resulting outcomes from the work we have done is to decrease the po | Interior, Department of / Bureau of Land Management | 11/24/2009 |
POINT TO POINT INC | $418,654 | Contract | : RECOVERY- Wilson Creek | Interior, Department of / Bureau of Land Management | 9/22/2009 |
MILLER TIMBER SERVICES INC | $114,661 | Contract | : Thin conifers over 1.5' tall and up to 7.9 DBH to a 15' x 15' spacing. Yard trees between 4 and 7.9 DBH. Whole tree treatment of material from trees 4 and 7.9 DBH and treatment of limbs and tops from trees > 8 DBH which are <5 in diameter. | Interior, Department of / Bureau of Land Management | 12/30/2009 |
CITY OF FARMINGTON | $1,742,980 | Contract | : 12,000 LF Potable Water Extension AND 4,500 LF Sanitary Sewer Extension | Interior, Department of / Bureau of Land Management | 9/22/2009 |
YEH AND ASSOCIATES, INC | $28,974 | Contract | : Site analysis planning and design of two comfort stations and a maintenance building at the Boquillas Ranch Complex. | Interior, Department of / Bureau of Land Management | 12/03/2009 |
USKH INC. | $25,830 | Contract | : The scope of design services for this project is limited to: Design and Construction Document preparation for a bridge extension of the Campbell Tract Facility located in Anchorage, Alaska. Scope of Work for each discipline is as follows: Survey Survey t | Interior, Department of / Bureau of Land Management | 6/30/2009 |
BRUSHWACKER INC | $144,720 | Contract | : 536 acres treated for fuels reduction and vegetation imporovement by mechanical grinding (chopping) and herbicidal treatment. | Interior, Department of / Bureau of Land Management | 6/24/2009 |
ONAN CORPORATION | $58,817 | Contract | : Porvide to the Bureau of Land Management one, 250kw DQDAA Generator; one 800A Transfer Switch; and Startup/Commissioning of Delivered Product | Interior, Department of / Bureau of Land Management | 8/25/2009 |
ROBERT PECCIA & ASSOCIATES INC | $81,208 | Contract | : The Miles City Field Office has a 30 year old building that needs upgrading for energy efficiency and accessibility. The project includes the complete design of a new roof system, insulation for the entire building, and remodel for accessibility improvem | Interior, Department of / Bureau of Land Management | 8/25/2009 |
SUMMITT FORESTS INC | $40,352 | Contract | : FREEMAN CREEK TREE THINNING TASK ORDER ON CONTRACT #L06PC90336 | Interior, Department of / Bureau of Land Management | 8/26/2009 |
OAXACA REFORESTATION INC. | $27,711 | Contract | : Pre-commercial thinning and fuels reduction services | Interior, Department of / Bureau of Land Management | 8/31/2009 |
USKH INC. | $154,329 | Contract | : The scope of design services for this project is limited to: Planning, Design, and Construction Document preparation for development of new facilities at Nome Creek Administrative Site, Nome Creek, Alaska. Scope of Work for each discipline is as follows: | Interior, Department of / Bureau of Land Management | 9/08/2009 |
CXT INCORPORATED | $27,031 | Contract | : Manufacture, deliver and install 1 prefabricated, precast concrete restroom building at the North Fork Owyhee River Recreation Site. | Interior, Department of / Bureau of Land Management | 9/11/2009 |
SUMMITT FORESTS INC | $60,282 | Contract | : FRENCH GULCH THIN TASK ORDER ON CONTRACT #L07PC90147 | Interior, Department of / Bureau of Land Management | 8/10/2009 |
BLOOMIN RANCH SERVICE, LLC | $84,320 | Contract | : Tree thinning, Pinyon and Junipers, fuels reduction project. | Interior, Department of / Bureau of Land Management | 9/14/2009 |
DAKOTA PRAIRIE LANDSCAPES, L.L.C. | $11,640 | Contract | : Furnishing labor, equipment, supplies, and materials, to reconstruct a portion of the historic Centennial Trail. Trail was reconstructed to eliminate erosion, widen and clear path to allow for vehicle access in case of emergency or fire. | Interior, Department of / Bureau of Land Management | 8/06/2009 |
ADVANCED TELEMETRY SYSTEMS, INC. | $24,408 | Contract | : Radio Transmitters | Interior, Department of / Bureau of Land Management | 7/10/2009 |
COOPER CHASE CONSTRUCTION | $68,000 | Contract | : Install Culverts at Merced Road Rehab. | Interior, Department of / Bureau of Land Management | 9/02/2009 |
A M WELLES INC | $17,220 | Contract | : Supply and deliver 1100 yards of base course gravel to enhance Storey Creek Rd for a fishing access. Also included in the award was the laydown & compaction of said gravel | Interior, Department of / Bureau of Land Management | 9/24/2009 |
THE TIBERTI COMPANY | $38,329 | Contract | : Supply Green 1.33 T-Posts 1 LO | Interior, Department of / Bureau of Land Management | 9/12/2009 |
POWER COMM., INC. | $29,695 | Contract | : FDO Lighting Replacement at BLM-AK Office, 1150 University Avenue, Fairbanks, Alaska 99709 | Interior, Department of / Bureau of Land Management | 9/14/2009 |
BERNTSEN INTERNATIONAL, INC. | $30,360 | Contract | : Survey Monuments | Interior, Department of / Bureau of Land Management | 9/12/2009 |
GARDNER & PLATT FENCING | $36,058 | Contract | : gov. contract repairing riparian fences | Interior, Department of / Bureau of Land Management | 9/19/2009 |
VALLEY TRUCK REPAIR INC | $15,557 | Contract | : (ARRA) STEEL SIGNS - 'DESIGNATED ROUTE' & 'ROUTE END' | Interior, Department of / Bureau of Land Management | 11/23/2009 |
KELLY JOHNSON | $39,926 | Contract | : Supply and install concrete slab and footings for shop/ Storage facility at Rome Launch site | Interior, Department of / Bureau of Land Management | 9/22/2009 |
CHICAGO HORTICULTURAL SOCIETY | $92,500 | Grant | Fish, Wildlife and Plant Conservation Resource Management: College graduates to gain hands-on experience in natural resource management, specifically in the areas of conservation biology, endangered species protection and management, conservation of sensitive species, and the management of public lanands.... Show more | Interior, Department of / Bureau of Land Management | 11/24/2009 |
NORTH CAL-NEVA RESOURCE CONSERVATION & DEVELOPMENT INC | $20,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The North Cal-Neva Resource Conservation and Development Council (RC&D) will work cooperatively with the Bureau of Land Management (BLM) Surprise Field Office Resource Area to collect local seed and propagate native species for restoration efefforts. This ... Show more | Interior, Department of / Bureau of Land Management | 11/25/2009 |
BEAVERHEAD COUNTY WEED DISTRICT | $166,900 | Grant | Fish, Wildlife and Plant Conservation Resource Management: To hire contractors and employees to treat noxious weeds. To hire up to nine people and to reduce the noxious weed population. | Interior, Department of / Bureau of Land Management | 12/17/2009 |
MADISON COUNTY (INC) | $135,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Control of invasive species on public lands managed by BLM | Interior, Department of / Bureau of Land Management | 12/17/2009 |
AGRICULTURE, IDAHO DEPARTMENT OF | $1,322,500 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The strategic emphasis of programs in all counties will be the removal of noxious weeds and invasive species determined to be negatively impacting the ecological stability of plant communities associated with BLM lands. The Department of Agrgricultures wil... Show more | Interior, Department of / Bureau of Land Management | 12/16/2009 |
CONSTRUCTION SERVICE CORPORATION | $300,082 | Contract | : Seismic Upgrades | Interior, Department of / Bureau of Land Management | 11/16/2009 |
ROMTEC, INC. | $20,378 | Contract | : PREFABRICATED TOILET WITHOUT VAULT FOR COEUR D'ALENE FIELD OFFICE | Interior, Department of / Bureau of Land Management | 12/15/2009 |
C X T INCORPORATED | $412,658 | Contract | : Manufacture, deliver and install 18 prefabricated, precast concrete restroom buildings at South Dune in Moreno Valley, CA. | Interior, Department of / Bureau of Land Management | 11/18/2009 |
ASM AFFILIATES INC | $9,440 | Contract | : Conduct record searches and surveys for and complete inventories of cultural resources and independently provide project-related cultural assessments/reports and impact analyses. We shall screen individual tamarisk removal treatments to determine the lev | Interior, Department of / Bureau of Land Management | 12/18/2009 |
CARPENTER SELLERS DEL GATTO ARCHITECTS, PC | $392,504 | Contract | : Architectural and Engineering Services for Solar Power Facilities | Interior, Department of / Bureau of Land Management | 12/02/2009 |
PREMIER DATA SERVICES, INC | $186,270 | Contract | : Provide support to the Bureau of Land Management (BLM), Oregon State Office (ORSO), Branch of Geographic Sciences, in consultation with the Branch of Land and Mineral Resources, for the update and maintenance of BLMG??s official title, land and mineral re | Interior, Department of / Bureau of Land Management | 12/16/2009 |
OAXACA REFORESTATION INC. | $24,967 | Contract | : Recovery Summit 1 Fuels Hazard Reduction Project | Interior, Department of / Bureau of Land Management | 10/19/2009 |
SWEAT, ROBERT | $80,100 | Contract | : HAND CUT, SPRAY, AND REMOVE TAMARISK | Interior, Department of / Bureau of Land Management | 10/23/2009 |
PREMIER DATA SERVICES, INC | $498,916 | Contract | : Under the American Recovery and Reinvestment Act (ARRA), the Bureau of Land Management (BLM) received funding to be used in Fiscal Years 2009 and 2010 to stimulate the U.S. economy, support job preservation and creation, encourage infrastructure investmen | Interior, Department of / Bureau of Land Management | 10/30/2009 |
FIRESTORM WILDLAND FIRE SUPPRESSION INC | $35,325 | Contract | : HAND CUT, CHIP AND BIOAMSS REMOVAL | Interior, Department of / Bureau of Land Management | 10/28/2009 |
HARRIS ENVIRONMENTAL GROUP | $31,800 | Contract | : A cultural Resources inventory of approximately 2,214 acres in the Los Posos project area within the Las Cienegas National Conservation ARea (LCNCA) | Interior, Department of / Bureau of Land Management | 11/06/2009 |
DL REFORESTATION INC | $130,260 | Contract | : Tuledad/Mahogany Fuel Reduction Project | Interior, Department of / Bureau of Land Management | 11/18/2009 |
DL REFORESTATION INC | $16,628 | Contract | : Tuledad/Upper Bare Creek Fuel Reduction project | Interior, Department of / Bureau of Land Management | 11/18/2009 |
DL REFORESTATION INC | $39,365 | Contract | : Tuledad/Little Hat Fuel Reduction Project | Interior, Department of / Bureau of Land Management | 11/18/2009 |
SWEAT, ROBERT | $80,000 | Contract | : HAND CUT AND APPLY HERBICIDE | Interior, Department of / Bureau of Land Management | 12/03/2009 |
PREMIER DATA SERVICES, INC | $487,258 | Contract | : Under the American Recovery and Reinvestment Act (ARRA), Wyoming BLM has been tasked with ensuring positional mapping accuracy of records and boundaries in support of renewable energy development. The contactor is providing cadastral data development and | Interior, Department of / Bureau of Land Management | 12/16/2009 |
BUNTING GRAPHICS INC | $15,590 | Contract | : weathering steel trail markers | Interior, Department of / Bureau of Land Management | 12/09/2009 |
PREMIER DATA SERVICES, INC | $1,073,044 | Contract | : Under the American Recovery and Reinvestment Act (ARRA) of 2009, the Arizona State Office of the Bureau of Land Management (BLM) has been tasked with ensuring positional mapping accuracy of land records and boundaries in support of renewable energy develo | Interior, Department of / Bureau of Land Management | 12/22/2009 |
PREMIER DATA SERVICES, INC | $21,200 | Contract | : The purpose of the contract is to provide contract support to the Bureau of Land Management (BLM), Oregon State Office (ORSO), Branch of Geographic Sciences, for creating official plats of survey. A Cartographic Technician/Draftsman is being provided to | Interior, Department of / Bureau of Land Management | 12/17/2009 |
PREMIER DATA SERVICES, INC | $23,681 | Contract | : Under the American Recovery and Reinvestment Act (ARRA) of 2009, the Arizona State Office of the Bureau of Land Management (BLM) has been tasked with ensuring positional mapping accuracy of land records and boundaries in support of renewable energy develo | Interior, Department of / Bureau of Land Management | 12/17/2009 |
ADVANCED RESOURCE SOLUTIONS, INC | $14,720 | Contract | : AZ Trail Condition Assessment | Interior, Department of / Bureau of Land Management | 12/18/2009 |
INTEGRATED AG SERVICES, INC | $38,850 | Contract | : Montana invasive species management | Interior, Department of / Bureau of Land Management | 12/11/2009 |
ROCK SOLID EXCAVATING, INC. | $88,309 | Contract | : Little Rockies Fire Station Water System | Interior, Department of / Bureau of Land Management | 12/18/2009 |
RENEWABLE TECHNOLOGIES, INC. | $47,593 | Contract | : The purpose of this contract is to complete an intensive Class III cultural resource inventory of Bureau of Land Management lands encompassing the Square Butte Area of Critical Environmental Concern in central Montana. This Class III field inventory will | Interior, Department of / Bureau of Land Management | 12/31/2009 |
SOUTHWEST SEED, INC | $4,000 | Contract | : GROW-OUT OF HAND COLLECTED NATIVE PLANT SPECIES FOR RESEARCH AND HOPEFUL SEED MULTIPLICATION. | Interior, Department of / Bureau of Land Management | 12/10/2009 |
ROCKART SIGNS & MARKERS | $4,056 | Contract | : Tree Huggers and weathering edge tape | Interior, Department of / Bureau of Land Management | 9/12/2009 |
COPP CONTRACTING INC | $91,204 | Contract | : parking lot construction, chip seal | Interior, Department of / Bureau of Land Management | 11/09/2009 |
KENT CREEK QUARRY, INC. | $999,026 | Contract | : crush and stockpile rock at designated stockpile areas | Interior, Department of / Bureau of Land Management | 11/23/2009 |
KENT CREEK QUARRY, INC. | $999,026 | Contract | : roseburg crushed rock supply and delivery | Interior, Department of / Bureau of Land Management | 11/23/2009 |
ALL ROCK, LLC | $831,123 | Contract | : haul rock to stockpile sites on blm roads | Interior, Department of / Bureau of Land Management | 11/24/2009 |
EAGLE PASS CONSTRUCTION LLC | $14,300 | Contract | : RECOVERY SOLICITATION | Interior, Department of / Bureau of Land Management | 12/09/2009 |
RIO RANCH WELDING L.L.C. | $6,480 | Contract | : HITCHING POST | Interior, Department of / Bureau of Land Management | 12/14/2009 |
PERSONNEL PLUS, INC | $84,182 | Contract | : GIS Technician to complete the following: 1. Correct (where possible) the corporate Idaho geospatial surface management agency data against the Master Title Plats and LR2000 for 600 of the townships containing BLM land and there is a pending fast track tr | Interior, Department of / Bureau of Land Management | 12/14/2009 |
DOYLE, DAN R | $8,136 | Contract | : Upper Bodie Creek Fence | Interior, Department of / Bureau of Land Management | 12/23/2009 |
PERSONNEL PLUS, INC | $44,889 | Contract | : Identify and document electronic images not meeting quality standards of the Statement of Work that has been executed by the unassociated CDI scanning contractor. Preparation of aperture cards for return shipment back to the un-scanned CDI scanning contr | Interior, Department of / Bureau of Land Management | 1/07/2010 |
RIVERS WEST CONSTRUCTION LLC | $22,925 | Contract | : Provide and install membrane roofing at the BLM Field Office located in Shoshone, ID. | Interior, Department of / Bureau of Land Management | 12/31/2009 |
RANCHO SANTA ANA BOTANIC GARDEN | $65,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The overall objective of this project is to further the conservation of sensitive public resources, through seed collecting and seed banking of Federally listed plant species on BLM lands. This will be achieved by establishing a mentoring prprogram at Ranc... Show more | Interior, Department of / Bureau of Land Management | 1/20/2010 |
SOUTHWEST CONSERVATION CORPS | $294,658 | Grant | Recreation Resource Management: This agreement is made and entered into by the Department of the Interior, Bureau of Land Management, Arizona State office (BLM) and the Southwest Conservation Corps (SCC) for the purpose of fostering coordinated trail development and maintenance programs | Interior, Department of / Bureau of Land Management | 9/22/2009 |
CROP PRODUCTION SERVICES, INC. | $175,998 | Contract | : These funds provided herbicides for vegetation management | Interior, Department of / Bureau of Land Management | 3/02/2010 |
NATIVE HARVEST SEED CO INC | $100,000 | Contract | : Native Harvest Seed has received this award to custom-collect native seeds on the Carrizo Plain National Monument. Seed will be harvested from the mnument, cleaned, processed and delivered back to the Monument. The seed will then be used to restore area | Interior, Department of / Bureau of Land Management | 1/28/2010 |
SNOW DEVELOPMENT LLC | $45,600 | Contract | : SKY ISLANDS, PHASEII, GILA WATERSHED VEGETATION TREATMENTS, GILA BOX SALT CEDAR REMOVAL | Interior, Department of / Bureau of Land Management | 3/18/2010 |
UNIVERSITY CORPORATION AT MONTEREY BAY | $20,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The purpose of this grant is to engage local communities to collect native seeds and propagate native plants for Fort Ord Public Lands. | Interior, Department of / Bureau of Land Management | 2/24/2010 |
CLEARWATER SEED LLC | $13,300 | Contract | : Grass seed for Recovery Tuscarora Sage Brush Restoration Seed | Interior, Department of / Bureau of Land Management | 2/11/2010 |
SUMMITT FORESTS INC. | $29,885 | Contract | : Hand cut, spray, and remove citrus trees BLM CA | Interior, Department of / Bureau of Land Management | 3/17/2010 |
AABERG CULTURAL RESOURCE CONSULTING SERVICE | $49,137 | Contract | : archaeological and historical survey of tracts in the Upper Missouri Breaks National Monument | Interior, Department of / Bureau of Land Management | 1/06/2010 |
ICON CONSULTING GROUP DEMOLITION SERVICES | $199,991 | Contract | : Complete abatement, demolition and removal of building 105. Approximately 29,000 GSF. | Interior, Department of / Bureau of Land Management | 3/26/2010 |
PARAMETRIX, INC. | $139,939 | Contract | : Survey of 2,240 acres in Eddy and Chavez Counties | Interior, Department of / Bureau of Land Management | 3/31/2010 |
ECOLOGY, WASHINGTON STATE DEPARTMENT OF | $112,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: This is an agreement entered into between the Department of Ecology - Washington Conservation Corps (WCC) and the Bureau of Land Management. The purpose of the agreement is to provide employment opportunities for youth crews in local communinities, complet... Show more | Interior, Department of / Bureau of Land Management | 3/12/2010 |
ENVIRONMENTAL QUALITY, MONTANA DEPARTMENT OF | $3,999,000 | Grant | Environmental Quality and Protection Resource Management: The Montana Department of Environmental Quality (DEQ) has received stimulus funding for the Zortman-Landusky reclamation site in Phillips County, Montana. These mines started as underground workings in the late 1880's. After many years of ininactivity, th... Show more | Interior, Department of / Bureau of Land Management | 1/22/2010 |
NATURAL RESOURCES & CONSERVATION, MONTANA DEPT OF | $250,000 | Grant | Forests and Woodlands Resource Management: Montana Fuels for Schools has provided grants to assist with installation of woody biomass boiler systems in western Montana since 2003. This ARRA grant will provide a new influx of funding for the program at a critical time. By providing funding for fuel | Interior, Department of / Bureau of Land Management | 1/22/2010 |
NORTHWEST YOUTH CORPS | $80,000 | Grant | Recreation Resource Management: 'NYC programs use an outdoor lifestyle and challenging projects to teach problem solving and positive living skills, promote a strong and productive work ethic, encourage learning, and build self-esteem. Youth in the program learn essential job skills a | Interior, Department of / Bureau of Land Management | 1/25/2010 |
WALTON, INC. | $236,365 | Contract | : replace communication tower and building at Ramsey Mountain in Salmon, ID | Interior, Department of / Bureau of Land Management | 1/22/2010 |
TETRA TECH EM, INC. | $744,100 | Contract | : Davis Mill Removal Action | Interior, Department of / Bureau of Land Management | 3/30/2010 |
COLORADO YOUTH CORPS ASSOCIATION | $55,000 | Contract | : Youth corps to complete work projects related to trail management projects in the Gunnison Gorge National Conservation Area | Interior, Department of / Bureau of Land Management | 3/15/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $423,983 | Contract | : Support for the development of Control Document Index Application as a new component of general Land Office Automation Records (GLORAS). this new application will need to be integrated with the current components in the support for the Document Conversion | Interior, Department of / Bureau of Land Management | 2/23/2010 |
SOUTHERN UTAH UNIVERSITY | $50,608 | Grant | Recreation Resource Management: The Grand Staircase-Escalante National Monument (GSENM) collaboration with the Intergovernmental Internship Cooperative (IIC) on the Wilderness Study Area (WSA) Protection and Rehabilitation Project, will augment objectives for resource restoration and pr | Interior, Department of / Bureau of Land Management | 3/04/2010 |
CKC CONSTRUCTION & MATERIALS, LLC | $105,210 | Contract | : Install thirty (30) 24 corrugated metal pipes (CMP) on Haekel Road, which is between US Hwy 70 and Bowie, AZ and approximately 10 miles east of Safford. Work to include pavement removal, install CMP's, excavating and backfilling, pavement repair, and di | Interior, Department of / Bureau of Land Management | 3/26/2010 |
RIVERS WEST CONSTRUCTION LLC | $22,925 | Contract | : Provide and install membrane roofing at the BLM Field Office located in Shoshone, ID. | Interior, Department of / Bureau of Land Management | 12/31/2009 |
PERFECT IMAGE INC | $410,000 | Contract | : Control Document Index Scanning | Interior, Department of / Bureau of Land Management | 9/22/2009 |
MARSH CREEK, LLC | $609,108 | Contract | : Red Devil Temporary Bridge Install | Interior, Department of / Bureau of Land Management | 2/01/2010 |
METAL BENDERS, INC. | $335,337 | Contract | : Building 105 Remediation | Interior, Department of / Bureau of Land Management | 3/17/2010 |
LOXAHATCHEE RIVER HISTORICAL SOCIETY | $487,950 | Grant | Recreation Resource Management: The purpose of the Jupiter inlet Lighthouse Outstanding Natural Area Heritage Preservation, Stabilization and Enhancement Project is to protect the nationally significant historic and cultural resources of the site; provide necessary infrastructure, ADA a | Interior, Department of / Bureau of Land Management | 3/05/2010 |
PREMIER DATA SERVICES, INC | $84,420 | Contract | : The Bureau of Land Management (BLM), Oregon State Office, Branch of Geographic Sciences, is responsible for the update and maintenance of BLM?s official title, land, and mineral records. This includes tracking federal interest in both Oregon and Washingt | Interior, Department of / Bureau of Land Management | 3/25/2010 |
DESERT SPIRIT CONTRACTING, LLC | $56,170 | Contract | : THINNING/FUEL REDUCTION | Interior, Department of / Bureau of Land Management | 9/21/2009 |
ERO RESOURCES CORPORATION | $88,000 | Contract | : Perform Class- 3 Cultural inventory, evaluate, and report for the Kash Katewe Tent Rocks National Monument area in New Mexico | Interior, Department of / Bureau of Land Management | 3/02/2010 |
PREMIER DATA SERVICES, INC | $505,594 | Contract | : This work will provide support services to the New Mexico BLM to enhance the positional accuracy of the Geographic Coordinate Data Base (GCDB) to ensure positional mapping accuracy of records and boundaries in support of renewable energy development. The | Interior, Department of / Bureau of Land Management | 3/30/2010 |
DEANDA CONSTRUCTION, INC. | $97,322 | Contract | : SAN PEDRO TRAILHEAD COMFORT STATIONS FOR BLM GILA DISTRICT OFFICE. | Interior, Department of / Bureau of Land Management | 3/17/2010 |
RECON ENVIRONMENTAL | $69,659 | Contract | : Habitat Restoration at Little Morongo Canyon Desert. Assessment of current conditions of the site, identifying existing plant species and seed sources for revegetation efforts, and monitoring. | Interior, Department of / Bureau of Land Management | 3/30/2010 |
SWEAT, ROBERT | $54,229 | Contract | : RECOVERY - HR PEACH VALLEY TAMARISK REMOVAL & RIPARIAN RESTORATION | Interior, Department of / Bureau of Land Management | 3/01/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $150,000 | Grant | Recreation Resource Management: This award funded services to the Department of Interior, Bureau of Land Management, New Mexico State Office from the Student Conservation Association's Conservation Corps program, which recruits and places qualified young people for environmental and con | Interior, Department of / Bureau of Land Management | 3/12/2010 |
PREMIER DATA SERVICES, INC | $202,484 | Contract | : The New Mexico State Office records management program, and the Carlsbad; Farmington, Las Cruces and Roswell Field Ofice renewable energy leasing efforts, necessitates the verification and validation of all land and mineral record data in the 1266 targete | Interior, Department of / Bureau of Land Management | 3/18/2010 |
MONTANA PRESERVATION ALLIANCE | $127,000 | Grant | Recreation Resource Management: Preservation and Rehabilitation of the Bureau of Land Management-owned Henneberry/Ney House in Montana. This project will provide documentation and stabilization of the Ney Ranch/Henneberry Homestead House in Beaverhead County, Montana. Expected outcome | Interior, Department of / Bureau of Land Management | 1/22/2010 |
ROBISON LOGGING & EXCAVATION | $12,981 | Contract | : 1330 cubic yards of 3/4 road mix | Interior, Department of / Bureau of Land Management | 3/17/2010 |
PREMIER DATA SERVICES, INC | $2,000,000 | Contract | : The BLM in Wyoming received funding under the American Recovery and Reinvestment Act of 2009 (ARRA) to provide accurate and accessible information to spur renewable energy development on public lands. The goal of this task is to provide a complete and acc | Interior, Department of / Bureau of Land Management | 3/31/2010 |
ENVIRONMENTAL QUALITY, WYOMING DEPARTMENT OF | $1,220,460 | Grant | Environmental Quality and Protection Resource Management: The ARRA grant will continue a long-term cooperative relationship between the Abandoned Mine Lands and BLM for carrying out abandoned mine land reclamation under the provisions of Tittle IV, Surface Mining Control and Reclalmation Act of 1977 7 through join... Show more | Interior, Department of / Bureau of Land Management | 2/01/2010 |
CALIFORNIA SURVEYING & DRAFTING SUPPLY, INC. | $8,277 | Contract | : 3 Trimble GPS Units | Interior, Department of / Bureau of Land Management | 2/11/2010 |
HIGH DESERT MICROIMAGING, INC. | $70,000 | Contract | : a. The purpose of this contract is to create a digital file image and archival film image of the Bureau of Land Management (BLM), Nevada State Office CDI aperture cards. The BLM estimates there are 40,000 CDI aperture cards. The Contractor will provide | Interior, Department of / Bureau of Land Management | 3/09/2010 |
SOUTHWEST GENERAL CONSTRUCTION, INC | $494,088 | Contract | : Recondition Aquirre Springs Road and improvement to parking areas. | Interior, Department of / Bureau of Land Management | 3/10/2010 |
YOUDERIAN CONSTRUCTION INC | $666,145 | Contract | : Duck Creek Dam Reconstruction will result in the existing earthern embankement being removed. A chimmney and blanket drain will be installed. New outlet works will also be installed. After the new embankement is in place, a stilling basin and upstream | Interior, Department of / Bureau of Land Management | 1/04/2010 |
E SCHAAF & ASSOCIATES INC | $275,608 | Contract | : AML CADASSTRALSURVEY ndc060018 | Interior, Department of / Bureau of Land Management | 6/29/2009 |
EAGLE FEATHER CONSTRUCTION, INC. | $10,110 | Contract | : Maple Grove Comfort Station Replacement - DOI - Bureau of Land Management - (Salmon Office) - Project Location: Preston, Idaho - The project consists of demolition and disposal of two vault toilets and the installation of two new vault toilets at the recr | Interior, Department of / Bureau of Land Management | 1/06/2010 |
QUICKSILVER CONTRACTING COMPANY | $92,378 | Contract | : TREE THINNING SERVICES | Interior, Department of / Bureau of Land Management | 3/25/2010 |
R. J. THOMAS MANUFACTURING COMPANY, INC. | $6,138 | Contract | : MILLCREEK CAMPGROUND SUPPLIES | Interior, Department of / Bureau of Land Management | 2/26/2010 |
CKC CONSTRUCTION & MATERIALS, LLC | $105,210 | Contract | : Install thirty (30) 24 corrugated metal pipes (CMP) on Haekel Road, which is between US Hwy 70 and Bowie, AZ and approximately 10 miles east of Safford. Work to include pavement removal, install CMP's, excavating and backfilling, pavement repair, and di | Interior, Department of / Bureau of Land Management | 3/26/2010 |
JERRY MORRISON, INC. | $71,280 | Contract | : Contract to repair and construct 13.5 miles of The Black Canyon National Recreation Trail. | Interior, Department of / Bureau of Land Management | 3/18/2010 |
USKH INC. | $28,010 | Contract | : Recovery funded Solar Design | Interior, Department of / Bureau of Land Management | 11/12/2009 |
GRANT SOIL & WATER CONSERVATION DISTRICT | $75,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The main objective of this project is to inventory, treat, and monitor the effectivenes of control of invasive noxious weed infestations withing and adjacent to federal wild and scenic river corridors. | Interior, Department of / Bureau of Land Management | 3/12/2010 |
SUMMITT FORESTS INC. | $37,036 | Contract | : Tintic Biomass Stewardship | Interior, Department of / Bureau of Land Management | 2/01/2010 |
GREAT BASIN INSTITUTE | $110,766 | Grant | Forests and Woodlands Resource Management: These projects are designed to improve forest health and support habitat restoration on public lands. For American Recovery and Reinvestment Act (ARRA) funded projects, in addition to the program objectives above, section 3 of the Recovery and Reinvestme | Interior, Department of / Bureau of Land Management | 2/12/2010 |
S BROOKS & ASSOCIATES INC | $24,270 | Contract | : Contract Specialist | Interior, Department of / Bureau of Land Management | 3/01/2010 |
PIEDMONT ENVIRONMENTAL SCIENCES, INC. | $64,570 | Contract | : 6 Water Well Drilling project at Cochise County, AZ. | Interior, Department of / Bureau of Land Management | 3/26/2010 |
ECOLOGY AND ENVIRONMENT, INC. | $256,777 | Contract | : (PHASE 1) Conduct Sampling and Testing at the site; (PHASE 2) Prepare and Finalize and EA; (PHASE 3) Prepare a cultural resources scoping strategy and draft an MOA between the Nevada State Historic Preservation Officer and the BLM. | Interior, Department of / Bureau of Land Management | 3/08/2010 |
BLOOMIN RANCH SERVICE, LLC | $84,320 | Contract | : Fuels reduction, forest health and wildlife habitat restoration of pinyon & juniper forests. | Interior, Department of / Bureau of Land Management | 9/21/2009 |
SOUTHWEST CONSERVATION CORPS | $90,000 | Grant | Recreation Resource Management: SCC will assist BLM by involving youth and young adults in conservation projects that promote leadership, teamwork, work skills, conflict resolution skills, environmental stewardship and personal responsibility, and that enhance public lands. The SCC wil | Interior, Department of / Bureau of Land Management | 3/15/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $158,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mine openings within the area of the BLM field office. These openings pose the treat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 1/29/2010 |
TLI SOLUTIONS, INC. | $39,004 | Contract | : Professional Technical Support to BLM to identify PRPs for the Ruth and Darwin Mines located in Inyo County, CA. | Interior, Department of / Bureau of Land Management | 3/12/2010 |
NATIONAL FACILITY SOLUTIONS, LLC | $6,959 | Contract | : Contract for supply of digital cameras with infrared technology, camoflauge decals, and compatible battery supply packs, including delivery to Arizona. | Interior, Department of / Bureau of Land Management | 2/05/2010 |
ASM AFFILIATES INC | $71,685 | Contract | : North Antelope Class III Cultural Resource Inventory | Interior, Department of / Bureau of Land Management | 3/31/2010 |
HOBSON FABRICATING CORP. | $232,688 | Contract | : BLDG 100 ENVIRONMENTAL SYSTEM REPLACEMENT: Replacement of three multi-zone units, associated ductwork in mechanical room, controls for multi-zone units and zone thermostats in Building 100. | Interior, Department of / Bureau of Land Management | 3/26/2010 |
NORTHWEST YOUTH CORPS | $16,000 | Grant | Recreation Resource Management: NYC programs use an outdoor lifestyle and challenging projects to teach problem solving and positive living skills, promote a strong and productive work ethic, encourage learning, and build self-esteem. Youth in the program learn essential job skills an | Interior, Department of / Bureau of Land Management | 3/09/2010 |
PREMIER DATA SERVICES, INC | $351,051 | Contract | : This proposed project is in support of renewable energy exploration and development of wind, solar, geothermal and electrical transmission line resources on Bureau of Land Management administered public land. It is an effort to upgrade and produce these r | Interior, Department of / Bureau of Land Management | 3/29/2010 |
SBRCD | $25,000 | Grant | Environmental Quality and Protection Resource Management: Partner with BLM to restore damaged or degraded watersheds, improve water quality, enhance species habitat, and respond to climate change. Objectives are implemented through the Endangered Species program for recovery of listed species and prorotection of c... Show more | Interior, Department of / Bureau of Land Management | 3/10/2010 |
NORTHWEST ARCTIC, BOROUGH OF | $120,380 | Contract | : Northwest Alaska Inter-village trails marking and mapping project | Interior, Department of / Bureau of Land Management | 12/31/2009 |
PARTNERSHIP FOR THE UMPQUA RIVERS INC | $415,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The objective of this project is to improve fish passage and other aquatic species access past culverts in streams in the Umpqua Basin on both public and private lands through the replacement of worn or otherwise undersized culverts. These rereplacement cul... Show more | Interior, Department of / Bureau of Land Management | 3/10/2010 |
ENVIRONMENTAL QUALITY, MONTANA DEPARTMENT OF | $325,000 | Grant | Environmental Quality and Protection Resource Management: Mine waste tailings will be removed at the Great Divide Ski Area to prevent run off of heavy metals that pose an environmental risk in Jennie's Fork, a tributary of Silver Creek. Cooperation between the Department of Interior Bureau of Land M Management (B... Show more | Interior, Department of / Bureau of Land Management | 3/16/2010 |
ENGINEERING/REMEDIATION RESOURCES GROUP, INC. | $74,473 | Contract | : Demolition and complete removal of all structures and improvements associated with the Selby Ranch Headquarters. This action includes the removal of six structures (main house, trailer house and deck, chicken coop, water tank, Barn #1, and Barn #2), tre | Interior, Department of / Bureau of Land Management | 3/31/2010 |
CXT INCORPORATED | $11,516 | Contract | : PRECAST VAULT TOILET, BLUE CREEK BAY | Interior, Department of / Bureau of Land Management | 12/15/2009 |
BLOOD, JOHN | $29,100 | Contract | : stewardship | Interior, Department of / Bureau of Land Management | 9/21/2009 |
LEWIS & CLARK, COUNTY OF | $94,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: This award will be used for the management of noxious weeds in the Spokane Hills, Lewis and Clark County. | Interior, Department of / Bureau of Land Management | 1/14/2010 |
S BROOKS & ASSOCIATES INC | $11,958 | Contract | : Engineering Services | Interior, Department of / Bureau of Land Management | 2/04/2010 |
MOUNTAINLAND SUPPLY COMPANY | $27,970 | Contract | : SUPPLIES | Interior, Department of / Bureau of Land Management | 2/02/2010 |
MEADE, COUNTY OF | $25,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Control of invasive species on public lands managed by the BLM within Meade County. | Interior, Department of / Bureau of Land Management | 1/14/2010 |
PALEOCULTURAL RESEARCH GROUP | $83,418 | Grant | Recreation Resource Management: This project had three main goals. The first was to migate the effects of surface erosion on highly significant archaeological deposits managed by the BLM. The second was to contribute to scientific understanding of the prehistoric occupation of the Sagua | Interior, Department of / Bureau of Land Management | 3/10/2010 |
HOLM, BERKLEE | $34,900 | Contract | : Contract to replace two existing concrete vault restrooms with new ADA concrete vault restrooms in Shoshone, ID | Interior, Department of / Bureau of Land Management | 1/22/2010 |
MORRIS AG AIR AND SONS INC | $115,031 | Contract | : Apply Herbicide by Air. Contractor shall furnish all labor, equipment, supplies, tools, materials, chemical, supplies and incidentals including supervision to complete the aerial application as requested. | Interior, Department of / Bureau of Land Management | 3/04/2010 |
MONTEZUMA, COUNTY OF | $30,000 | Contract | : Invasive and Noxious Plant Management | Interior, Department of / Bureau of Land Management | 3/18/2010 |
SCHUCK DEVELOPMENT CORPORATION | $131,189 | Contract | : Construct a diversion structure and divert surface water flowing towards Red Knolls toward an area to be known as Red Knolls Amphitheater. | Interior, Department of / Bureau of Land Management | 3/26/2010 |
PREMIER DATA SERVICES, INC | $244,238 | Contract | : The Bureau of Land Management has been compiling survey, title, and legal land description infornlation to accurately portray the Public Land Survey System (PLSS) and title information in support of parcel based display of geographic information. The Geog | Interior, Department of / Bureau of Land Management | 3/15/2010 |
PREMIER DATA SERVICES, INC | $665,031 | Contract | : The goal of this project is to improve the processing of applications for renewable energy on public lands by providing complete, accurate, and easily accessible source documents, records, digital data and map products that would assist, restrict andior p | Interior, Department of / Bureau of Land Management | 3/18/2010 |
PREMIER DATA SERVICES, INC | $111,039 | Contract | : The Bureau of Land Management (BLM), Oregon State Office, Branch of Geographic Sciences, is responsible for the update and maintenance of BLM's official title, land, and mineral records. This includes tracking federal interest in both Oregon and Washingto | Interior, Department of / Bureau of Land Management | 3/25/2010 |
GHOST BEAR CONTRACTING INCORPORATED | $305,122 | Contract | : Fort Meade Byway Gravel & Slump Rehab 2009 Meade County SD | Interior, Department of / Bureau of Land Management | 3/17/2010 |
ROMTEC, INC. | $32,991 | Contract | : RECOVERY VAULT TOILETS | Interior, Department of / Bureau of Land Management | 3/25/2010 |
WILLIAM SELF ASSOCIATES, INC. | $23,322 | Contract | : Archaeological survey, site recording, sketch mapping, GPS, and reporting on 1,500 acres in Tooele County UT | Interior, Department of / Bureau of Land Management | 2/01/2010 |
L AND I FENCE CONSTRUCTION, INC. | $86,218 | Contract | : Protection fence and river crossing construction | Interior, Department of / Bureau of Land Management | 11/20/2009 |
EAGLE FEATHER CONSTRUCTION, INC. | $293,765 | Contract | : Milner & Lud Drexler Comfort Station - USDA Forest Service - (Burley Field Office) - Twin Falls County, Idaho - The project consists of demolition and disposal of six vault toilets and the installation of nine new vault toilets at the recreation sites. | Interior, Department of / Bureau of Land Management | 1/25/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $117,863 | Contract | : Grand Junction Air Center Solar Phase 2 | Interior, Department of / Bureau of Land Management | 11/24/2009 |
BD WATER TRUCK SERVICE, INC. | $99,400 | Contract | : Heavy equipment rental with operator | Interior, Department of / Bureau of Land Management | 3/24/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $259,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mine openings withing the BLM fiels office area. These openings pose the threat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 3/18/2010 |
TULLIS, INC. | $61,484 | Contract | : Recovery - Sac River Bend Area Paving | Interior, Department of / Bureau of Land Management | 4/02/2010 |
J-U-B ENGINEERS, INC. | $667 | Contract | : This project was to provide technical assistance to address construction issues encounted during construction of Building 410-A (Information Systems) at the National Interagency Fire Center. | Interior, Department of / Bureau of Land Management | 1/22/2010 |
AMERICAN CONSERVATION EXPERIENCE | $115,000 | Grant | Recreation Resource Management: The original award of $85,000 was modified to add $30,000 on June 17, 2010. The project funds the employment of ACE Interpretation Interns involved in a variety of tasks to help educate the public to the meaning, the unique diversity, and the natural, cu | Interior, Department of / Bureau of Land Management | 3/10/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $105,948 | Contract | : Columbia Hazardous Fuels Reduction Project. Mechanically removing/shredding green and dead Pinyon and Juniper trees from units 4 and 6. | Interior, Department of / Bureau of Land Management | 2/26/2010 |
ROCK SOLID EXCAVATING, INC. | $88,309 | Contract | : This project was for replacing an exsisting well for human consuption. The old well was changed for irragtion only. A new cistern was installed and hooked into Zortman water system. The new cistern is for potable water only. | Interior, Department of / Bureau of Land Management | 12/18/2009 |
QUICKSILVER CONTRACTING COMPANY | $22,376 | Contract | : SUMMIT HABITAT RESTORATION PHASE II - SLASHING | Interior, Department of / Bureau of Land Management | 3/29/2010 |
CXT INCORPORATED | $18,444 | Contract | : NEW VAULT TOILET MILL CREEK | Interior, Department of / Bureau of Land Management | 3/31/2010 |
CSC ELECTRIC LLC | $65,969 | Contract | : Greenwood Communications sites improvement including electrical, fencing and concrete work. | Interior, Department of / Bureau of Land Management | 3/25/2010 |
MARCHANT CONSTRUCTION, LLC | $127,029 | Contract | : Marchant Construction was awarded the Pompeys Pillar Road Reclamation & Paving Maintenance job on December 10 2009.Contract #L10PC00003 | Interior, Department of / Bureau of Land Management | 12/10/2009 |
PREMIER DATA SERVICES, INC | $95,980 | Contract | : The Bureau of Land Management has been compiling survey information and GPS positions to accurately portray the Public Land Survey System in support of parcel based recording, analysis and display of geographic information. This information is called the | Interior, Department of / Bureau of Land Management | 3/26/2010 |
FOUR CORNERS SCHOOL OUTDOOR EDUCATION | $246,000 | Grant | Recreation Resource Management: Through this funding the Canyon Country Youth Corps (CCYC) will send six youth crews (44 leaders plus members total) to complete needed travel management plan work in BLM?s Monticello Field Office area for total of 36 weeks from March to November 2010. CC | Interior, Department of / Bureau of Land Management | 2/22/2010 |
SMITH CONSTRUCTION MANAGEMENT, L.L.C. | $12,120,182 | Contract | : Construct new 36,000 square foot BLM Field Office and related site improvements | Interior, Department of / Bureau of Land Management | 3/23/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $260,000 | Grant | Recreation Resource Management: This award funds services to the Department of Interior, Bureau of Land Management, California Office, providing restoration and maintenance on the Pacific Crest Trail from the Student Conservation Association's Conservation Corps program. This SCA progr | Interior, Department of / Bureau of Land Management | 2/12/2010 |
MORGAN INDUSTRIES, INC. | $196,290 | Contract | : PAVING COLD SPRINGS ENTERANCE | Interior, Department of / Bureau of Land Management | 6/15/2010 |
PACIFIC CREST TRAIL ASSOCIATION | $100,000 | Grant | Recreation Resource Management: Recovery Pacific Crest Trail Maintenance Team - In this project, the Pacific Crest Trail Association (PCTA) completed trail maintenance, reconstruction and other trail projects on the segments of the Pacific Crest National Scenic Trail (PCNST) managed by | Interior, Department of / Bureau of Land Management | 2/12/2010 |
E SCHAAF & ASSOCIATES INC | $236,873 | Contract | : GOODSPRINGS aml CADASTRAL SURVEY | Interior, Department of / Bureau of Land Management | 2/03/2010 |
SPARK ELECTRIC CO., INC. | $514,275 | Contract | : Paving approximately 6.8 miles of trail complete with shoulder backing and striping. One 3 lift of hot asphalt concrete will be placed and compacted to a width of 8' over the entire length of the existing trail. Shoulder backing will be placed adjacent | Interior, Department of / Bureau of Land Management | 3/03/2010 |
CXT INCORPORATED | $74,236 | Contract | : CASPER VAULT TOILETS | Interior, Department of / Bureau of Land Management | 2/19/2010 |
CONSERVATION, CALIFORNIA DEPARTMENT OF | $1,516,000 | Grant | Environmental Quality and Protection Resource Management: The purpose of this award is to protect public safety and health on public lands where AML sites present severe physical safety hazards and which require mitigation/remediation. | Interior, Department of / Bureau of Land Management | 1/14/2010 |
CXT INCORPORATED | $38,310 | Contract | : MAPLE GROVE VAULT TOILETS | Interior, Department of / Bureau of Land Management | 1/06/2010 |
CROOK, COUNTY OF | $30,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Recovery Act-Crooked River Weed Treatment | Interior, Department of / Bureau of Land Management | 4/01/2010 |
UNITED FALLERS ORGANIZATION, LLC | $41,392 | Contract | : 5 creeks juniper cut and hand pile - Burns District | Interior, Department of / Bureau of Land Management | 1/28/2010 |
SUMMITT FORESTS INC | $124,334 | Contract | : DOS PALMAS PROJECT | Interior, Department of / Bureau of Land Management | 3/08/2010 |
SWCA, INCORPORATED | $133,184 | Contract | : Class II & Class III Cultural Inventory | Interior, Department of / Bureau of Land Management | 3/22/2010 |
BRUBAKKEN AND REINBOLD INC | $45,100 | Contract | : Grass Seed for Tuscarora Sage Brush Restoration | Interior, Department of / Bureau of Land Management | 2/11/2010 |
LOPEZ ISLAND CONSERVATION CORPS | $12,000 | Contract | : Recovery Act - Washingtion Trails Maintenance | Interior, Department of / Bureau of Land Management | 3/30/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $46,859 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mine openings within the BLM field office area. These openings pose the threat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 3/15/2010 |
OAXACA REFORESTATION INC. | $12,500 | Contract | : Slashing/Fuels Reduction Project - Juniper Removal | Interior, Department of / Bureau of Land Management | 10/08/2009 |
CHAMBERS GROUP, INC. | $46,467 | Contract | : The project consists of three major tasks; (1) (a) Literature search of existing previous cultural surveys and recorded cultural resources along 13 miles of Smokey Valley Road in Washoe County, NV; (b) cultural field surveys with metal detectors in some | Interior, Department of / Bureau of Land Management | 9/19/2009 |
PINEDA POST & POLES, INC. | $66,696 | Contract | : Horsetheif Grazzing Allotment Fence Project | Interior, Department of / Bureau of Land Management | 3/25/2010 |
STROLE'S TRI SERVICE INCORPORATED | $81,059 | Contract | : Turtle Mountain Wilderness Abandoned Mine Lands. | Interior, Department of / Bureau of Land Management | 3/29/2010 |
USKH INC. | $41,906 | Contract | : Design work for improvements to the Lower Birch Creek Wayside on the Steese Highway---amended amount from 30,424.51 to 41,906.40 for comfort station design | Interior, Department of / Bureau of Land Management | 12/04/2009 |
MARTIN EXCAVATING LLC | $109,500 | Contract | : Removing existing boat ramp and constructing new boat ramp. Excavating old material, using new material, surveying, grading, placing articulated concrete blocks. | Interior, Department of / Bureau of Land Management | 3/24/2010 |
UTAH STATE UNIVERSITY | $135,500 | Grant | Recreation Resource Management: ARRA: Kanab BLM 2010. $135,500. Complete travel management plan implementation projects. | Interior, Department of / Bureau of Land Management | 2/18/2010 |
USKH INC. | $164,519 | Contract | : PR for design work for Ak Harrison Creek Gold-Placer Mining restoration project. Field reviews, Survey & Design. | Interior, Department of / Bureau of Land Management | 12/04/2009 |
COUNTY OF POWELL | $40,950 | Grant | Fish, Wildlife and Plant Conservation Resource Management: BLM MT ARRA Invasive Species Managment | Interior, Department of / Bureau of Land Management | 1/14/2010 |
PREMIER DATA SERVICES, INC | $764,991 | Contract | : The Bureau of Land Management a set of records called the Control Document Index cards. It consists of 35mm microfilmed copies of patents and other documents which convey title to and fiom the United States. There are also copies of documents such as publ | Interior, Department of / Bureau of Land Management | 3/29/2010 |
M.L.D.C., INC. | $74,188 | Contract | : Description/overall purpose: Furnish labor, equipment, supplies, and materials, to install security fencing at BLM communications sites in Montana. There are 6 Sites in total with Approx 1012 linear feet of fence. Expected outcome: 6 fences will be b | Interior, Department of / Bureau of Land Management | 1/19/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $32,539 | Grant | Recreation Resource Management: This award funded services to the Bureau of Land Management Field Office in Vernal, Utah from the Student Conservation Association's Conservation Intern (CI) program, which recruits and places qualified young people for environmental and conservation serv | Interior, Department of / Bureau of Land Management | 2/11/2010 |
VOBECKY ENTERPRISES, INCORPORATED | $42,996 | Contract | : Archer Mine Soil remediation and Structure demoliton | Interior, Department of / Bureau of Land Management | 1/22/2010 |
HELENA SAND & GRAVEL, INC. | $47,806 | Contract | : holter lake campground chip seal | Interior, Department of / Bureau of Land Management | 2/24/2010 |
NATIVE VILLAGE OF UNALAKLEET | $73,668 | Grant | Fish, Wildlife and Plant Conservation Resource Management: ASsessment and management plan for non native invasiove plantgs in the Unalakleet river that will negative affect subsistence activities due to heir invasion of spawning habitat. Community and Student involvement. | Interior, Department of / Bureau of Land Management | 3/18/2010 |
GREAT BASIN INSTITUTE | $141,081 | Grant | Forests and Woodlands Resource Management: These projects are designed to improve forest health and support habitat restoration on public lands. For American Recovery and Reinvestment Act (ARRA) funded projects, in addition to the program objectives above, section 3 of the Recovery and Reinvestme | Interior, Department of / Bureau of Land Management | 2/12/2010 |
SWEAT, ROBERT | $13,500 | Contract | : RECOVERY NOXIOUS WEED TREATMENT AT OV | Interior, Department of / Bureau of Land Management | 3/30/2010 |
VICTOR CORPORATION | $35,829 | Contract | : To provide two new parking lots, 'Boundary Lot' and 'Hoodoo Trail Lot,' located along Cabezon RD, West of San Isidro, NM. The parking area shall have base course, and enclose with a steel pipe and cable fencing. | Interior, Department of / Bureau of Land Management | 2/25/2010 |
N & B FENCE CO LLC | $49,975 | Contract | : Remove and replace 6.55 miles of barbed wire fence at four locations in Graham county, AZ | Interior, Department of / Bureau of Land Management | 3/22/2010 |
PLS GROUP, INC. | $124,214 | Contract | : Construct approximately 15.3 miles of new barbed wire fence and remove approximately 9.3 miles of deteriorated fence. | Interior, Department of / Bureau of Land Management | 3/30/2010 |
CROOKED RIVER WEED MANAGEMENT AREA | $55,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Noxious weeds will be inventoried and GIS mapped on BLM lands along the Crooked River and Middle Deschutes. Eight monitoring plots will be established and data collected. Weeds will also be inventoried on lands east of redmond and Bend and nenear LaPine... Show more | Interior, Department of / Bureau of Land Management | 4/01/2010 |
PLUS & RANCH | $40,155 | Contract | : Work consists of pulling harrows over designated areas to cover seed with soil. | Interior, Department of / Bureau of Land Management | 3/31/2010 |
ALL ROCK, LLC | $235,639 | Contract | : DELIVERY OF CRUSHED ROCK TO GASSY CREEK ROAD | Interior, Department of / Bureau of Land Management | 3/04/2010 |
MARINE CO., INC. | $94,900 | Contract | : Killarney Picnic Site & Popcorn Dock and Comfort Stations Replacement. Removal of existing wood docks, wood piling, gangways, and replacement with Contractor designed and furnished docks, concrete bulkheads, aluminum gangways, steel pilings, and floating | Interior, Department of / Bureau of Land Management | 3/25/2010 |
CENTRAL PIPELINE, INC. | $114,155 | Contract | : RECOVERY - ROAD SURFACING, KLAMATH FALLS RESOURCE AREA, LAKEVIEW DISTRICT, OREGON | Interior, Department of / Bureau of Land Management | 3/01/2010 |
USKH INC. | $77,538 | Contract | : Design for paving, re-paving by AFS buildings at Fort Wainright in Fairbanks, Alaska. | Interior, Department of / Bureau of Land Management | 11/12/2009 |
CHICAGO HORTICULTURAL SOCIETY | $1,250,000 | Contract | : The Bureau of Land Management (BLM) is entering into this contract with the Chicago Horticultural Society, doing business as Chicago Botanic Garden (CBG, contractor) for the purpose of obtaining trained native seed collection interns at BLM locations. | Interior, Department of / Bureau of Land Management | 3/01/2010 |
YEH AND ASSOCIATES, INC | $36,014 | Contract | : Jupiter Inlet Light House. | Interior, Department of / Bureau of Land Management | 2/03/2010 |
PREMIER DATA SERVICES, INC | $80,118 | Contract | : The Bureau of Land Management has been compiling survey information and GPS positions to accurately portray the Public Land Survey System (PLSS) in support of parcel based recording, analysis and display of geographic information. This information is call | Interior, Department of / Bureau of Land Management | 3/26/2010 |
UNIVERSITY OF IDAHO | $93,602 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The Central Yukon Field Office of the Bureau of Land Management (BLM) has requested assistance with the analysis of VHF and GPS telemetry data to better understand space use of caribou, moose, and Dall?s sheep in the Utility Corridor Managemement Area. The... Show more | Interior, Department of / Bureau of Land Management | 2/02/2010 |
PREMIER DATA SERVICES, INC | $653,869 | Contract | : Under the American Recovery and Reinvestment Act (ARRA), the Bureau of Land Management (BLM) received funding to be used in Fiscal Years 2009 and 2010 to stimulate the U.S. economy, support job preservation and creation, encourage infastructure investment | Interior, Department of / Bureau of Land Management | 3/18/2010 |
GREAT BASIN INSTITUTE | $74,987 | Grant | Recreation Resource Management: This Recovery Act project will create 4 jobs during the spring and summer of 2010 and will employ local residents in Nevada. This project would implement the route designations identified in the Black Rock Desert ? High Rock Canyon Emigrant Trails Nationa | Interior, Department of / Bureau of Land Management | 2/22/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $56,106 | Grant | Recreation Resource Management: The award funds services to the Department of Interior, Oregon/Washington Bureau of Land Management, and provides work opportunities for youth crews within the BLM's Medford district in Oregon through the Student Conservation Association's youth conservat | Interior, Department of / Bureau of Land Management | 2/04/2010 |
GREAT BASIN INSTITUTE | $94,380 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The purpose of this project is to create 4 to 10 jobs during the spring and summer of 2010 and provide benefit to the environment by reducing route density in the Duck Creek Basin thus increasing wildlife habitat. This project will contributete to the manag... Show more | Interior, Department of / Bureau of Land Management | 2/16/2010 |
OTAK, INC. | $65,164 | Contract | : Recovery - heating/domestic hot water system retrofit, Salem District Oregon | Interior, Department of / Bureau of Land Management | 9/22/2009 |
SMITH ENVIRONMENTAL AND ENGINEERING | $56,288 | Contract | : CULTURAL CLEARANCE IN AREA WITH POTENTIAL FOR COMMERCIAL SOLAR ENERGY FACILITY, RENEWABLE CLASS III SURVEY | Interior, Department of / Bureau of Land Management | 3/26/2010 |
UTAH STATE UNIVERSITY | $60,000 | Grant | Recreation Resource Management: ARRA: Richfield BLM 2010. Letter of Guarantee. Complete travel management plan implementation projects. | Interior, Department of / Bureau of Land Management | 3/01/2010 |
LUCK STONE CORPORATION | $54,730 | Contract | : VDOT 21A AGGREGATE VDOT CLASS 1 RIP RAP VDOT CLASS 2 RIP RAP VDOT #57 CRUSHED STONE VDOT GABION STONE | Interior, Department of / Bureau of Land Management | 8/26/2009 |
WESTON SOLUTIONS, INC | $47,718 | Contract | : The purpose of this project is to conduct a Removal Site Investigation (RSI). The overall purpose of the RSI is to determine the presence and extent of heavy metal contamination in a portion of Deer Creek, located in Nevada County, CA. The specific object | Interior, Department of / Bureau of Land Management | 2/23/2010 |
UNIVERSITY OF CALIFORNIA, DAVIS | $169,000 | Grant | Environmental Quality and Protection Resource Management: The overall purpose of the project is to reduce erosion of sediment (including chromium, manganese, nickel and asbestiform fibers) into drinking water aquifers by revegetating and stabilizing a historically barren, erosive site. Deliverableses include ste... Show more | Interior, Department of / Bureau of Land Management | 2/18/2010 |
GRANITE, COUNTY OF | $36,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Weed Management funding for weed infestations on BLM lands | Interior, Department of / Bureau of Land Management | 1/14/2010 |
ERICK AMMON INC | $251,933 | Contract | : Butler Building and Barn | Interior, Department of / Bureau of Land Management | 3/29/2010 |
BERRIGAN FORESTRY INC | $0 | Contract | : no jobs due to weather | Interior, Department of / Bureau of Land Management | 10/29/2009 |
SAFETY SUPPLY & SIGN COMPANY, INC. | $28,653 | Contract | : 1,480 galvanized posts and anchors | Interior, Department of / Bureau of Land Management | 2/02/2010 |
UNIVERSITY OF NEVADA, RENO | $492,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Bootstraps is a job creation, life skills and natural resource enhancement program designed to teach life/job skills to young men and women ages 18-25, not working and not in school. Natural Resource project work is centered upon sage grouse e nesting and b... Show more | Interior, Department of / Bureau of Land Management | 3/08/2010 |
POWER COMM., INC. | $29,695 | Contract | : FDO Lighting Replacement at BLM-AK Office, 1150 University Avenue, Fairbanks, Alaska 99709 | Interior, Department of / Bureau of Land Management | 9/14/2009 |
PENNY RUCKS ETHNOGRAPHIC SERVICES | $142,500 | Contract | : The overall purpose of the project is to conduct an ethnographic study of Native Americans associated with the southern, western and eastern sectors of the Eagle Lake Field Office (ELFO) area, namely of Maidu, Northern Paiute, and Washoe people, in order | Interior, Department of / Bureau of Land Management | 2/05/2010 |
PREMIER DATA SERVICES, INC | $644,440 | Contract | : This Bureau of Land Management (BLM), Colorado State Office, American Recovery and Reinvestment Act (ARRA) task will improve the quality for GCDB, LR2000 and MTP data. The result of this work will increase the spatial accuracy of GCDB, thereby giving BLM | Interior, Department of / Bureau of Land Management | 3/15/2010 |
YEH AND ASSOCIATES, INC | $39,156 | Contract | : Big Horn Gas Station Task II scope of services. | Interior, Department of / Bureau of Land Management | 1/27/2010 |
PREMIER DATA SERVICES, INC | $590,136 | Contract | : Under the American Recovery and Reinvestment Act (ARRA) of 2009, the New Mexico BLM bas been tasked with ensuring positional mapping accuracy of records and boundaries in support of renewable energy development. The Bureau of Land Management has been comp | Interior, Department of / Bureau of Land Management | 1/11/2010 |
SHASTA-TEHAMA-TRINITY JOINT COMMUNITY COLLEGE DISTRICT | $20,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Recipient with guidance from the BLM will collect selected plants/seeds for ecological restoration projects. Recipient will provide BLM botanists and biologist with assistance with resrotation. College students will be employeed to propagatete and care for... Show more | Interior, Department of / Bureau of Land Management | 11/25/2009 |
GENERAL DYNAMICS INFORMATION TECHNOLOGY, INC. | $110,808 | Contract | : GDIT to provide Bureau of Land Management -Sacramento CA with Master Title Plats clipping and geo-referencing to include 1) project administration and application development 2)clipping and geo-referencing: MTP Image Reg. and Clipping; 3) Clipping and Geo | Interior, Department of / Bureau of Land Management | 3/31/2010 |
COUNTY OF JEFFERSON | $25,000 | Contract | : Fish Wildlife Plant Con.Mgmt. | Interior, Department of / Bureau of Land Management | 3/12/2010 |
JNJ ENGINEERING CONSTRUCTION, INC. | $83,552 | Contract | : Purpose of this project is to improve the Virgin River Canyon Campground facilities which will bring better facilites to vistors to the area | Interior, Department of / Bureau of Land Management | 3/30/2010 |
ALL ROCK, LLC | $229,142 | Contract | : haul crushed rock to stokpiles | Interior, Department of / Bureau of Land Management | 3/06/2010 |
PREMIER DATA SERVICES, INC | $732,000 | Contract | : The BLM maintains thousands of historic vital records of public land ownership in Colorado. These records contain copies of original documents that have been microfilmed and are currently stored as a collection of microfilm aperture cards referred to as t | Interior, Department of / Bureau of Land Management | 3/10/2010 |
SUN SPOT SOLAR, LLC | $47,120 | Contract | : Whitewater Photovoltiac System. Furnish labor, equipment, supplies and materials to construct a photovoltiac solar system and associated appurtenances. | Interior, Department of / Bureau of Land Management | 2/08/2010 |
SUMMITT FORESTS INC | $50,840 | Contract | : Manual Slashing and Piling 460 acres BLM CA | Interior, Department of / Bureau of Land Management | 2/04/2010 |
USKH INC. | $30,420 | Contract | : Project for deferred maintenance work on two BLM buildings in Kotzebue, Alaska | Interior, Department of / Bureau of Land Management | 12/04/2009 |
PREMIER DATA SERVICES, INC | $2,064,138 | Contract | : The Bureau of Land Management (BLM) maintains vital records of public land ownership in Montana and the Dakotas in the form of Control Document Index (CDI) aperture cards. The BLM Montana State Office has only one set of these aging microfilm aperture car | Interior, Department of / Bureau of Land Management | 3/25/2010 |
MJK SALES & FEED, INC. | $18,180 | Contract | : ELKO FENCE MATERIAL | Interior, Department of / Bureau of Land Management | 2/04/2010 |
A M WELLES INC | $117,409 | Contract | : Warm Springs fishing access parking lot paving and drain installation | Interior, Department of / Bureau of Land Management | 2/18/2010 |
USKH INC. | $29,699 | Contract | : Design task order for the Campbell Creek Science Center-Biomass upgrade-Garn wood furnace heating system | Interior, Department of / Bureau of Land Management | 11/12/2009 |
CXT INCORPORATED | $25,714 | Contract | : BLUTCHER CREEK SAFETY STRUCTURES | Interior, Department of / Bureau of Land Management | 2/16/2010 |
ECOLOGY, WASHINGTON STATE DEPARTMENT OF | $82,000 | Grant | Recreation Resource Management: The jobs created by this award are Washington Conservation Corps (WCC) Crew Supervisor positions that oversee a crew of 5 AmeriCorps members working in general labor positions aimed at providing the necessary resources for trail and trailhead maintenance | Interior, Department of / Bureau of Land Management | 3/12/2010 |
SOUTHWEST CONSERVATION CORPS | $48,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: SCC will assist BLM by involving youth and young adults in habitat restoration conservation projects that promote leadership, teamwork, work skills, conflict resolution skills, environmental stewardship and personal responsibility, and that e enhance public... Show more | Interior, Department of / Bureau of Land Management | 2/12/2010 |
MJK SALES & FEED, INC. | $13,586 | Contract | : RIPARIAN MAINTENANCE FENCE MATERIALS | Interior, Department of / Bureau of Land Management | 2/19/2010 |
GREAT BASIN INSTITUTE | $133,212 | Grant | Forests and Woodlands Resource Management: These projects are designed to improve forest health and support habitat restoration on public lands. For American Recovery and Reinvestment Act (ARRA) funded projects, in addition to the program objectives above, section 3 of the Recovery and Reinvestme | Interior, Department of / Bureau of Land Management | 2/12/2010 |
MARSH DEVELOPMENT, INC. | $125,974 | Contract | : HOT WELL HABITAT IMPROVEMENT | Interior, Department of / Bureau of Land Management | 3/30/2010 |
EDL CONSTRUCTION, INC. | $375,334 | Contract | : RECOVERY PICNIC SHELTERS AND TRIOSKS | Interior, Department of / Bureau of Land Management | 4/09/2010 |
SPECTRUM ENGINEERING, INC. | $45,000 | Contract | : Inventory and assess hazards of underground phosphate mines in the Maiden Rock area of western Montana. The outcome will provide the Bureau of Land Management with the engineering evaluation necessary to made closure decisions. | Interior, Department of / Bureau of Land Management | 12/24/2009 |
SOUTHWEST CONSERVATION CORPS | $24,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: SCC will assist BLM by involving youth and young adults in habitat restoration conservation projects that promote leadership, teamwork, work skills, conflict resolution skills, environmental stewardship and personal responsibility, and that e enhance public... Show more | Interior, Department of / Bureau of Land Management | 3/15/2010 |
WESTON SOLUTIONS, INC | $46,260 | Contract | : The purpose of this project is to conduct a Removal Site Investigation (RSI). The overall purpose of the RSI is to determine the presence and extent of heavy metal contamination in a portion of at the Longfellow Mill site, located in Big Oak Flat, Tuolumn | Interior, Department of / Bureau of Land Management | 2/24/2010 |
MILLER TIMBER SERVICES INC | $672,240 | Contract | : Thin conifers over 1.5' tall and up to 7.9' DBH to a 15' x 15' spacing. Yard trees between 4' and 7.9' DBH. Whole tree treatment of material from trees 4' and 7.9' DBH and treatement of limbs and tops from trees >8 DBH which are < 5' in diameter. | Interior, Department of / Bureau of Land Management | 4/01/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $38,000 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close hazardous mine openings within the area of the BLM field office. These openings pose the threat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 1/04/2010 |
SOUTHWEST CONSERVATION CORPS | $48,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: SCC will assist BLM by involving youth and young adults in habitat restoration conservation projects that promote leadership, teamwork, work skills, conflict resolution skills, environmental stewardship and personal responsibility, and that e enhance public... Show more | Interior, Department of / Bureau of Land Management | 3/15/2010 |
YOUR RECRUITING COMPANY, INC. | $283,455 | Contract | : This requirement is to provide temporary acquisition and contract administration support in support of the Bureau of Land Management performing a wide variety of acquisition activities from procurement planning, solicitation, evaluation and award. | Interior, Department of / Bureau of Land Management | 2/12/2010 |
RECON ENVIRONMENTAL | $62,965 | Contract | : Border Habitat Restoration which includes habitat assessment for Quino Checkerspot Butterfly (QCB) within the project area and preparation of a Site Conditions Report | Interior, Department of / Bureau of Land Management | 3/12/2010 |
UNIVERSITY OF WASHINGTON | $115,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The objective of this project is to contribute field and lab information on restoration techniques and research that leads to more successful restoration projects and an increased availability of restoration materials crucial to the restoratition of shrub-s... Show more | Interior, Department of / Bureau of Land Management | 1/27/2010 |
NORTH FORK JOHN DAY WATERSHED COUNCIL | $35,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The North Fork John Day Watershed Council (NFJDWC) will survey, inventory, and monitor the presence of noxious weeds and the effectiveness of weed treatments in the North Fork John Day River corridor. The infestations are detrimental to the v values of the ... Show more | Interior, Department of / Bureau of Land Management | 3/12/2010 |
EL AERO SERVICES, INC. | $38,678 | Contract | : Tuscarora Aerial Seeding | Interior, Department of / Bureau of Land Management | 3/03/2010 |
MONTANA CONSERVATION CORP | $12,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Montana Conservation Corps (MCC) crews will work with BLM personnel to restore riparian areas treated for russian olive control. Planting in these treated areas with native shrubs will help to control, reduce the spread of, and prevent the f further invasi... Show more | Interior, Department of / Bureau of Land Management | 3/16/2010 |
ALVAREZ ENVIRONMENTAL, L.L.C. | $436,800 | Contract | : russian olive tree removal by handcutting and then applying herbicide to cut stump. | Interior, Department of / Bureau of Land Management | 3/19/2010 |
QUICKSILVER CONTRACTING COMPANY | $3,811 | Contract | : TREE THINNING SERVICES | Interior, Department of / Bureau of Land Management | 3/19/2010 |
ICF INCORPORATED, L.L.C. | $73,618 | Contract | : This contract is to conduct public scoping meetings and produce a scoping report for the Environmental Impact Statement for this project in accordance with applicable Council on Environmental Quality (CEQ) regulations at 40 CFR 1500 - 1508, and DO1 and B | Interior, Department of / Bureau of Land Management | 11/12/2009 |
AMERICAN CONSERVATION EXPERIENCE | $70,000 | Grant | Recreation Resource Management: American Conservation Experience is providing Youth Corps crews to restore campground facilities located throughout the Hollister Field Office of the Bureau of Land Management. The lack of formal campgrounds and day-use areas currently has adverse impacts | Interior, Department of / Bureau of Land Management | 3/15/2010 |
WOODS CANYON ARCHEAOLOGICAL CONSULTANTS INC | $135,224 | Contract | : The McInnis Canyons National Conservation Area Trails Project is a Class III cultural resource survey of existing and proposed new trails throughout the McInnis Canyons National Conservation Area (MCNCA) on public lands managed by the BLM Grand Junction F | Interior, Department of / Bureau of Land Management | 3/17/2010 |
RECON ENVIRONMENTAL | $38,569 | Contract | : Habitat Assessment of approximately 4000 acres including the development of a restoration plan, identifying existing plant/wildlife species, and seed collection. | Interior, Department of / Bureau of Land Management | 4/01/2010 |
PREMIER DATA SERVICES, INC | $984,309 | Contract | : This specific ARRA project is related to the development of renewable energy on public lands that will assist the United States strive for energy independence. These renewable energy sources consist of wind, solar and geothermal possibilities.The goal of | Interior, Department of / Bureau of Land Management | 3/30/2010 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $7,000 | Contract | : Recovery Cebolla Creek Geotechnical Study for the Replacement of Railroad Car Bridge in Response to Request for Quotation No. 375469. | Interior, Department of / Bureau of Land Management | 8/06/2009 |
PLUS & RANCH | $35,423 | Contract | : Restoration seeding of Seed mixes consisting of grasses, forbs and shrub seed. | Interior, Department of / Bureau of Land Management | 3/31/2010 |
WESTERN ECOSYSTEMS TECHNOLOGY, INC. | $245,000 | Contract | : The purpose of the contract is to identify the habitat selection and distribution patterns of mule deer in the Jack Morrow Hills region of southwest Wyoming. Project will include capture and subsequent monitoring of approximately 40 GPS-collared mule deer | Interior, Department of / Bureau of Land Management | 2/16/2010 |
OAXACA REFORESTATION INC. | $40,812 | Contract | : Thinning/slashing and hand pile vegetation | Interior, Department of / Bureau of Land Management | 2/24/2010 |
BAIRCO CONSTRUCTION, INC. | $199,063 | Contract | : Install Tri-Deck Prestressed Concrete Bridge over Springs Crossing that is often washed out. | Interior, Department of / Bureau of Land Management | 12/10/2009 |
SKYLINE RECLAMATION, INC. | $123,500 | Contract | : Bull hog 740 acres of pinion juniper in New Harmony | Interior, Department of / Bureau of Land Management | 1/22/2010 |
COUNTY OF LANDER | $98,000 | Grant | Environmental Quality and Protection Resource Management: Lander County Post Mining Site Utilization for Renewable Energy Study | Interior, Department of / Bureau of Land Management | 3/11/2010 |
MARK SWITZER EXCAVATING | $310,000 | Contract | : Furnishing labor, equipment, supplies and materials, to place aggregate base over multiple sections of road covering approximately 4.6 miles of the Selby Road on a prepared sub-grade. | Interior, Department of / Bureau of Land Management | 3/15/2010 |
RED J ENVIRONMENTAL CORPORATION | $138,659 | Contract | : Old Wild Horse and Burro HAZMAT Clean-up | Interior, Department of / Bureau of Land Management | 2/05/2010 |
HOLM, BERKLEE | $53,768 | Contract | : Campground solar power installation - This project has been Cancelled | Interior, Department of / Bureau of Land Management | 3/30/2010 |
PREMIER DATA SERVICES, INC | $255,686 | Contract | : The Bureau of Land Management has been compiling survey information and GPS positions to accurately portray the Public Land Survey System in support of parcel based recording, analysis and display of geographic information. This information called the Geo | Interior, Department of / Bureau of Land Management | 3/29/2010 |
COUNTY OF DUNN | $55,000 | Contract | : Contract for chemical control of noxious weeds on BLM land. | Interior, Department of / Bureau of Land Management | 2/04/2010 |
PRECISION PLUMBING AND HEATING, INC. | $46,012 | Contract | : Furnish and install a LP gas fired condensing boiler and two ceiling mounted architectural ceiling fans into the existing building ground source heating loop. | Interior, Department of / Bureau of Land Management | 1/20/2010 |
SLAYTON, LINDA M | $48,070 | Contract | : weed spraying | Interior, Department of / Bureau of Land Management | 3/15/2010 |
CXT INCORPORATED | $58,712 | Contract | : PROVIDE PRECAST CONCRETE VAULT TOILETS FOR THE AGUIRRE SPRINGS CAMPGROUND. | Interior, Department of / Bureau of Land Management | 2/25/2010 |
EDUCATIONAL SERVICE DISTRICT 112 | $28,700 | Grant | Recreation Resource Management: Recreational Trail Management in Medford, OR District | Interior, Department of / Bureau of Land Management | 3/09/2010 |
UNIVERSITY OF ALASKA ANCHORAGE | $24,990 | Grant | Fish, Wildlife and Plant Conservation Resource Management: This agreement is made for the purpose of providing education and employment to local youths from Nome and Unalakleet, Alaska as stimulus to an economically depressed region, as well as developing invasive plant management plans and stewardshship ethic for ... Show more | Interior, Department of / Bureau of Land Management | 3/12/2010 |
PREMIER DATA SERVICES, INC | $878,165 | Contract | : The Bureau of Land Management (BLM) maintains vital records of public land ownership in California in the form of Control Document Index (CDI) aperture cards. The BLM California State Office has only one set of these aging microfilm aperture cards that ar | Interior, Department of / Bureau of Land Management | 3/18/2010 |
PREMIER DATA SERVICES, INC | $781,149 | Contract | : Under the American Recovery and Reinvestment Act (ARRA), the BLM received funding to be used in Fiscal Years (FY) 2009 and 2010 to stimulate the U.S. economy, support job preservation and creation, encourage irhastructure investment, promote energy effici | Interior, Department of / Bureau of Land Management | 3/01/2010 |
SUMMITT FORESTS INC | $42,230 | Contract | : Manual Slashing and Piling BLM CA | Interior, Department of / Bureau of Land Management | 2/04/2010 |
C TRIANGLE COMPANIES | $67,582 | Contract | : Recovery Stones Bengard (S.Grasshopper) | Interior, Department of / Bureau of Land Management | 3/30/2010 |
INTERNATIONAL MOUNTAIN BICYCLING ASSOCIATION | $250,000 | Contract | : Recovery Act BLM CA Paradise Royale Mtn Bike Trail Skills Park | Interior, Department of / Bureau of Land Management | 3/04/2010 |
ST. CLAIR CONSTRUCTION, INC. | $841,799 | Contract | : Single fixed-price contract to renovate an existing day use area, boat ramp and campground. Work includes site grading, excavating, backfilling and compacting, pipe plowing, installing concrete toilets, pump house, slabs, and pin downs, hydrants, plumbing | Interior, Department of / Bureau of Land Management | 3/04/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $36,177 | Grant | Environmental Quality and Protection Resource Management: Construction activities to close harardous mine openings within the area of the BLM field office. These openings pose the treat of injury or death to visitors on public land. | Interior, Department of / Bureau of Land Management | 1/04/2010 |
UTAH STATE UNIVERSITY | $40,000 | Grant | Recreation Resource Management: ARRA: Monticello BLM 2010. $40,000. Complete travel management plan implementation projects. | Interior, Department of / Bureau of Land Management | 2/23/2010 |
ASSURED AGGREGATES COMPANY INC | $213,800 | Contract | : Supply base rock delivered to various locations in Ft Ord, Marina, Ca. | Interior, Department of / Bureau of Land Management | 2/17/2010 |
ELK CREEK WATERSHED COUNCIL | $85,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: This project will remove two (2) failing, undersized culverts and replace them with a concrete bridge. This will improve passage for anadromous fish, primarily coho salmon, and other aquatic species. | Interior, Department of / Bureau of Land Management | 3/16/2010 |
KAWERAK INC | $10,988 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Invasive Plant Assessment and Management Plan, employing rural youth. | Interior, Department of / Bureau of Land Management | 3/15/2010 |
CXT INCORPORATED | $63,466 | Contract | : WH&B FLUSH BUILDING | Interior, Department of / Bureau of Land Management | 2/03/2010 |
JOB COUNCIL, THE | $80,000 | Contract | : To provide qualified youth conservation corps employment opportunities for at risk youth, ages 16-24, to accomplish heavy recreational trail maintenance on BLM land in Oregon. | Interior, Department of / Bureau of Land Management | 1/25/2010 |
ASM AFFILIATES INC | $18,926 | Contract | : South Coast Archaeological Surveys for Road Brushing. | Interior, Department of / Bureau of Land Management | 2/17/2010 |
BERKMAN, LOUIS COMPANY, THE (INC) | $82,075 | Contract | : Recovery - Stock Boat Docks and Ramps | Interior, Department of / Bureau of Land Management | 2/16/2010 |
LOXAHATCHEE RIVER HISTORICAL SOCIETY | $208,000 | Grant | Recreation Resource Management: The purpose of the Jupiter Inlet Lighthouse Restoration Project is to provide long-term preservation of the historic fabric of the Jupiter Inlet lighthouse tower, including the bricks masonry, wooden windows, and all exterior metal components, provide sup | Interior, Department of / Bureau of Land Management | 3/05/2010 |
AIRBORNE VETERANS SERVICES, INC. | $64,000 | Contract | : INSTALLATION OF 6 SOLAR POWERED LIGHTS AT THE BOAT RAMP | Interior, Department of / Bureau of Land Management | 4/01/2010 |
EAGLE FEATHER CONSTRUCTION, INC. | $197,229 | Contract | : Scab Creek Campground - DOI - Bureau of Land Management - (National Operations Center) - Sublette County, NE of Boulder, Wyoming - The project consists of clearing & grubbing, lineal grading, contructing turnouts and loop roads, and installation of the fo | Interior, Department of / Bureau of Land Management | 11/10/2009 |
BOOZ ALLEN HAMILTON INC. | $898,425 | Contract | : The U.S. Department of the Interior, Bureau of Land Management (BLM) requires contractor support services to complete an RMP and EIS/EA for the Rawlins, Pinedale, Kemmerer, Casper, Newcastle and Rock Springs Field Offices. The BLM will use an enviromenta | Interior, Department of / Bureau of Land Management | 3/31/2010 |
EDAW, INC. | $530,415 | Contract | : WY Trails Inventory | Interior, Department of / Bureau of Land Management | 3/10/2010 |
CASEY JONES WELL DRILLING CO | $34,706 | Contract | : supplied labor, equipment, supplies and materials to construct and develop a potable water well to approximately 400 feet and to produce 3 gallons per minute. Drilling went to 385 feet and only supplied 1.3 gallons per minute with high salinity. A second | Interior, Department of / Bureau of Land Management | 2/17/2010 |
PEACEPIPE CONSTRUCTION FABRICATION INC | $221,255 | Contract | : IFD Seal Coating - DOI - Bureau of Land Management - Various Recreation Sites and Fire Stations, Idaho Falls, Idaho District - Seal coat existing pavement and apply pavement markings. Site will require cracks in asphalt to be cleaned and filled. | Interior, Department of / Bureau of Land Management | 2/19/2010 |
REFORESTATION SERVICES, INC. | $12,080 | Contract | : PURCHASE OF GLYPHOSATE | Interior, Department of / Bureau of Land Management | 8/10/2009 |
SAWTOOTH SHEET METAL | $51,987 | Contract | : Heating and Air Conditioning to Building | Interior, Department of / Bureau of Land Management | 10/09/2009 |
ASPEN THINNING LLC | $32,578 | Contract | : Deep Planting of native plant species along Orilla Verde, Rio Grande River, near Taos, NM. | Interior, Department of / Bureau of Land Management | 3/23/2010 |
JOHNSON CONTROLS GOVERNMENT SYSTEMS LLC | $17,355,200 | Contract | : The purpose of this ESPC is to support and modernize BLM's overall facilities infrastructure, install Renewable Energy measures to lower greenhouse gases/carbon emissions and support BLM's overall mission. Ultimately, this ESPC will provide energy saving | Interior, Department of / Bureau of Land Management | 3/31/2010 |
EAGLE FEATHER CONSTRUCTION, INC. | $25,498 | Contract | : Wild Horse Holding Facility - DOI - Bureau of Land Management - (Cheyenne Wyoming Office) - Rock Spring, Sweetwater County, Wyoming at the High Desert District Office - The project consists of installing erosion control blankets and sediment wattles, seed | Interior, Department of / Bureau of Land Management | 12/23/2009 |
ALVAREZ ENVIRONMENTAL, L.L.C. | $35,999 | Contract | : felling, limbing, bucking, and piling of live douglas-fir trees to reduce stand density. | Interior, Department of / Bureau of Land Management | 2/16/2010 |
MAUGHAN SEED COMPANY | $12,650 | Contract | : BIG SAGEBRUSH (WYOMING), BUYING 5000 POUNDS, DELIVERED COST | Interior, Department of / Bureau of Land Management | 2/11/2010 |
NORTH WIND, INC. | $107,622 | Contract | : Environmental Assessment for Grasshopper and Mormon Cricket Suppression in Wyoming | Interior, Department of / Bureau of Land Management | 3/05/2010 |
ECOLOGY AND ENVIRONMENT, INC. | $456,049 | Contract | : Preparation of an Environmental Evaluation/Cost Analysis (EE/CA) for the Sonoma mercury mine site. Perform historical document review, a limited site investigation which will include soil and groundwater sampling, preparation of a topographic map of the s | Interior, Department of / Bureau of Land Management | 2/10/2010 |