Listing all stimulus spending by amount, in descending order. Return to Bureau of Land Management page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
CXT INCORPORATED | $34,999 | Contract | : HUCKLEBERRY CG TOILET REPLACEMENT. | Interior, Department of / Bureau of Land Management | 3/17/2010 |
ERM-WEST, INC | $40,179 | Contract | : ERM to perform environmental investigation of the BLM Octave Mill Site in Yavapai County, Arizona. The investigation will include environmental sampling to determine the nature and extent of suspected soil contamination from the abandoned gold mine activ | Interior, Department of / Bureau of Land Management | 1/06/2010 |
STEVENSON INTERMOUNTAIN SEED | $46,158 | Contract | : To provide native seed for revegetation and reclamation of Sage Grouse habitat. | Interior, Department of / Bureau of Land Management | 2/11/2010 |
ECOLOGY AND ENVIRONMENT, INC. | $273,990 | Contract | : Preparation of an Environmental Evaluation/Cost Analysis (EE/CA) for the Helen mercury mine site. Perform historical document review, a limited site investigation which will include soil and groundwater sampling, preparation of a topographic map of the si | Interior, Department of / Bureau of Land Management | 2/10/2010 |
SUMMITT FORESTS INC | $17,908 | Contract | : FANDANGO MECHANICAL FUELS TREATMENT | Interior, Department of / Bureau of Land Management | 3/29/2010 |
S & L INDUSTRIAL | $544,684 | Contract | : Installing Aggregate Base, Hot Asphalt Concrete Paving, Chip & Fog Seal | Interior, Department of / Bureau of Land Management | 2/05/2010 |
WESTON SOLUTIONS, INC | $121,516 | Contract | : The project award is to conduct a remedial investigation and feasiblity study (RIFS) for a former manganese millsite located in Wickenburg, Arizona. The work is being peformed for the Bureau of Land Management (BLM) as the study area is located on BLM adm | Interior, Department of / Bureau of Land Management | 1/04/2010 |
GREAT BASIN INSTITUTE | $217,336 | Grant | Forests and Woodlands Resource Management: These projects are designed to improve forest health and support habitat restoration on public lands. For American Recovery and Reinvestment Act (ARRA) funded projects, in addition to the program objectives above, section 3 of the Recovery and Reinvestme | Interior, Department of / Bureau of Land Management | 2/16/2010 |
PREMIER DATA SERVICES, INC | $224,225 | Contract | : The Bureau of Land Management (BLM) has been compiling survey information and Global Positioning System (GPS) positions on survey monuments to accurately portray the Public Land Survey System (PLSS) in support of parcel based recording, analysis and displ | Interior, Department of / Bureau of Land Management | 3/30/2010 |
PREMIER DATA SERVICES, INC | $195,841 | Contract | : Under the American Recovery and Reinvestment Act (ARRA) of 2009, New Mexico BLM has been tasked with ensuring positional mapping accuracy of records and boundaries in support of renewable energy development. An export of ? Solar Energy Study Sites, ? Au | Interior, Department of / Bureau of Land Management | 1/07/2010 |
AGRARIAN RESEARCH AND MANAGEMENT COMPANY LTD. | $315,865 | Contract | : Fuels Management Monitoring project to support BLM Palm Springs - South Coast Field Office fuels management program for community protection and habitat improvement. Note: BLM modified award amt from original $313,364.00 to $315,865.00 with Mod 1. | Interior, Department of / Bureau of Land Management | 2/06/2009 |
ARCHITECTURAL & ENVIRONMENTAL ASSOCIATES INC | $150,000 | Contract | : Design and Install Pv Solar system on pole mounted tracking systems at four location with concrete pad and fence at each location | Interior, Department of / Bureau of Land Management | 3/30/2010 |
PEACEPIPE CONSTRUCTION FABRICATION INC | $109,287 | Contract | : PATB Seal Coating - DOI - Bureau of Land Management - Pocatello Air Attack Tanker Base - Pocatello, Power County, Idaho - Seal coat existing tarmac pavement and apply pavement markings. Site will require cracks in asphalt to be cleaned and filled. | Interior, Department of / Bureau of Land Management | 2/08/2010 |
SUMMITT FORESTS INC | $18,564 | Contract | : HR Gunnison Gorge Sage Grouse Habitat Restoration | Interior, Department of / Bureau of Land Management | 3/01/2010 |
RML INCORPORATED | $49,400 | Contract | : Trenched and buried two runs of 5200' of 2 Schedule 40 PVC. The utility line was ditched along St. Joe River Road along the highway from the nearest Verizon service pedestal. The overall purpose is to provide phone service for emergencies and other basic | Interior, Department of / Bureau of Land Management | 1/22/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $387,276 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 2 | Interior, Department of / Bureau of Land Management | 5/03/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $34,077 | Grant | Recreation Resource Management: The award funds services to the BLM Alaska Field Office for work located at Fort Egbert National Historic Landmark, provided by the Student Conservation Association's Conservation Crew program, which recruits and places qualified young people for environm | Interior, Department of / Bureau of Land Management | 4/29/2010 |
SUMMITT FORESTS INC | $106,128 | Contract | : CROOKED CRAB PRE-COMMERCIAL THINNING | Interior, Department of / Bureau of Land Management | 6/15/2010 |
GREGORY, THOMAS | $130,031 | Contract | : Sac River Bend irrigation pipline construction. Install 5400' of 8 irrigation line. | Interior, Department of / Bureau of Land Management | 6/01/2010 |
ABEGGLEN CONSTRUCTION INC | $118,600 | Contract | : Shoshone window and door replacement | Interior, Department of / Bureau of Land Management | 1/22/2010 |
USKH INC. | $30,596 | Contract | : Design task order for emergency generator design for Anchorage Field Office complex at CTF | Interior, Department of / Bureau of Land Management | 12/11/2009 |
PREMIER DATA SERVICES, INC | $412,796 | Contract | : The Bureau of Land Management (BLM) maintains vital records of public land ownership in Arizona in the form of Control Document Index (CDI) aperture cards. The BLM Arizona State Office has only one set of these aging microfilm aperture cards that are cumb | Interior, Department of / Bureau of Land Management | 2/05/2010 |
MANGI ENVIRONMENTAL GROUP, INC. | $72,735 | Contract | : Prepare an Environmental Assessment to analyze a potential impact for a Exotic Plant Control along the Dalton Highway. | Interior, Department of / Bureau of Land Management | 3/13/2010 |
OUTDOOR CREATIONS, INC. | $24,281 | Contract | : Manufacture and deliver 20 concerete trash cans and 20 concrete picnic tables | Interior, Department of / Bureau of Land Management | 2/26/2010 |
HONEY LAKE VLY.RES.CONSERV.DIST. | $303,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Dodge Reservoir Habitat Restoration Project. This project is part of the Conservation Strategy for Sage Brush and Sage Steppe Ecosystems within the Buffalo Skedaddle Population Management Unit. | Interior, Department of / Bureau of Land Management | 12/17/2009 |
S BROOKS & ASSOCIATES INC | $45,542 | Contract | : Staff Assistant Contracting | Interior, Department of / Bureau of Land Management | 12/14/2009 |
TETRA TECH EM, INC. | $26,956 | Contract | : Conduct a removal site investigation at Badger Hill Hydraulic Mine. | Interior, Department of / Bureau of Land Management | 2/18/2010 |
STANTEC CONSULTING SERVICES INC. | $187,360 | Contract | : BLM issued a task order against Contract No. L09PC00074 for Corner Recovery & GPS Measurement of Coordinate Positions within Idaho. | Interior, Department of / Bureau of Land Management | 3/31/2010 |
SOLLERS CONSTRUCTION, LLC | $59,990 | Contract | : ARAVAIPA UPLAND EROSION CONTROL PROJECT- Sollers Construction will locate and construct various types of check dams required to control erosion within the project site. This project is located in Graham & Pinal counties in Arizona and is subject to davis- | Interior, Department of / Bureau of Land Management | 4/02/2010 |
HIGH COUNTRY EQUIPMENT | $12,660 | Contract | : HR Gunnison Sage Grouse Habitat improvements. | Interior, Department of / Bureau of Land Management | 5/28/2010 |
SOUTHWEST CONSERVATION CORPS | $50,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: SCC will assist BLM by involving youth and young adults in habitat restoration conservation projects that promote leadership, teamwork, work skills, conflict resolution skills, environmental stewardship and personal responsibility, and that e enhance public... Show more | Interior, Department of / Bureau of Land Management | 3/18/2010 |
JACKSON, DANA W | $43,800 | Contract | : SKY ISLAND AND DESERT SEAS RESTORATION | Interior, Department of / Bureau of Land Management | 3/19/2010 |
PALEOWEST, L.L.C. | $10,101 | Contract | : Cultural assessment services to occur within the Las Cienegas National Conservation Area. | Interior, Department of / Bureau of Land Management | 9/22/2009 |
PREMIER DATA SERVICES, INC | $37,381 | Contract | : The Bureau of Land Management (BLM), Oregon State Office, Branch of Geographic Sciences, is responsible for the update and maintenance of BLM's official title, land, and mineral records. This includes tracking federal interest in both Oregon and Washingto | Interior, Department of / Bureau of Land Management | 3/25/2010 |
UTAH STATE UNIVERSITY | $150,000 | Grant | Recreation Resource Management: ARRA: Moab BLM 2010. $150,000. Complete travel management plan implementation projects. | Interior, Department of / Bureau of Land Management | 2/24/2010 |
CRYSTAL CLEAR MAINTENANCE, INC. | $39,525 | Contract | : Upper Aurora Canyon/Lower Summers Sagebrush Restoration Cut & Pile/Lop & Scatter Vegetation Treatment | Interior, Department of / Bureau of Land Management | 3/01/2010 |
ASM AFFILIATES INC | $14,707 | Contract | : Archaeological Monitoring for the Dos Palmas Tamarisk Removal Project. | Interior, Department of / Bureau of Land Management | 2/18/2010 |
CONSTRUCTION SERVICE CORPORATION | $323,958 | Contract | : Furnish labor, equipment, supplies and materials to change existing barbed wire fences to four strand wire fences to meet wildlife friendly specifications | Interior, Department of / Bureau of Land Management | 2/10/2010 |
CONSTRUCTION SERVICE CORPORATION | $76,231 | Contract | : Furnish labor, equipment, supplies and materials to change existing barbed wire fences to four strand wire fences to meet wildlife friendly specifications | Interior, Department of / Bureau of Land Management | 2/09/2010 |
LANTOS, TOM E | $34,840 | Contract | : Recovery- Turn Point Barn Roofing, Spokane District | Interior, Department of / Bureau of Land Management | 4/16/2010 |
HARWARD & REES, INC. | $225,637 | Contract | : Renovation of the Hancock Cabin on the Henry Mountains for the Bureau of Land Management | Interior, Department of / Bureau of Land Management | 5/05/2010 |
COPP CONTRACTING INC | $91,204 | Contract | : parking lot construction chipseal, labor and material | Interior, Department of / Bureau of Land Management | 11/09/2009 |
HKM ENGINEERING INC. | $121,332 | Contract | : Dam Conditions Assessment. Totally compete the provided Dam Condition Assessment Checklist. The non checklist portion (survey data and calculations) (page 1 through 4) of the form may be completed on a computer, with the deliverable portion of the form | Interior, Department of / Bureau of Land Management | 7/23/2009 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $232,264 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 11 | Interior, Department of / Bureau of Land Management | 5/03/2010 |
SWEAT LLC | $8,954 | Contract | : PURCHASE ORDER L10PX03285 FOR THE REMOVAL OF BLACK MUSTARD AND SHORT-POD MUSTARD. | Interior, Department of / Bureau of Land Management | 6/04/2010 |
CROP PRODUCTION SERVICES, INC. | $20,000 | Contract | : These funds will provide herbicide and related services for invasive species removal/treatment. | Interior, Department of / Bureau of Land Management | 3/23/2010 |
MARCHANT CONSTRUCTION, LLC | $143,225 | Contract | : We are going to excavate out for gabion baskets, lay fabric down place baskets and then fill with rock. | Interior, Department of / Bureau of Land Management | 4/22/2010 |
COOKS CONSTRUCTION LLC | $29,991 | Contract | : Building Roads and Camping Sites. Bladed roads, hauled gravel | Interior, Department of / Bureau of Land Management | 6/02/2010 |
PACIFIC EXCAVATION INC. | $1,601,631 | Contract | : STARVING WHITEHORSE CULVERT AND SURFACE REPLACEMENT | Interior, Department of / Bureau of Land Management | 4/27/2010 |
DEANDA CONSTRUCTION, INC. | $97,322 | Contract | : SAN PEDRO TRAILHEAD COMFORT STATIONS | Interior, Department of / Bureau of Land Management | 3/16/2010 |
LANCASTER JR, DAVID B | $99,500 | Contract | : Hyatt lake sewage upgrade | Interior, Department of / Bureau of Land Management | 5/27/2010 |
REFUGE BUILDERS LLC | $73,184 | Contract | : SAN PEDRO RIPARIAN NCA TRAILHEAD RECONSTRUCTION | Interior, Department of / Bureau of Land Management | 6/29/2010 |
ALL ROCK, LLC | $139,328 | Contract | : HAUL SUPPLY ROCK TO FOUR STOCK PILS SITES | Interior, Department of / Bureau of Land Management | 6/03/2010 |
GLOBAL FRONTLINE SOLUTIONS LLC | $228,030 | Contract | : Grassland Restoration Buckhorn Juniper. Slashing, lop, and scatter of juniper. 50 miles west of Artesia, NM. | Interior, Department of / Bureau of Land Management | 4/14/2010 |
SKIP HUSTON CONSTRUCTION INC | $791,926 | Contract | : Repairs and rehabilitation to various roads and trailheads in the Gunnison Gorge National Conservation Area, in Montrose and Delta Counties, Colorado. | Interior, Department of / Bureau of Land Management | 6/03/2010 |
CELIK ENGINEERING CORP | $312,000 | Contract | : Removal and replacement of the existing water main with a new one at Shotgun Creek Recreation Site. | Interior, Department of / Bureau of Land Management | 5/20/2010 |
OTAK, INC. | $575,171 | Contract | : LEED Replacement Fire Cache Facilities Design | Interior, Department of / Bureau of Land Management | 4/27/2010 |
CUDDY & ASSOCIATES | $44,261 | Contract | : GPS for GCDB Area 2 Corner Recovery & GPS Measurement of Coordinate Positions within Idaho, Area 2 | Interior, Department of / Bureau of Land Management | 5/03/2010 |
ADVANCED SOLUTIONS GROUP, LLC | $186,488 | Contract | : Big Water Visitor Center | Interior, Department of / Bureau of Land Management | 5/21/2010 |
MIKE LEMICH, INC. | $618,360 | Contract | : Recovery - North Antelope Stewardship, Ely District, Nevada Mechanical thinning project to reduce forest fire risk and provide biomass and fuelwood to the local community | Interior, Department of / Bureau of Land Management | 6/30/2010 |
SWEAT, ROBERT | $80,500 | Contract | : HAUSER MTN ROAD BRUSHING CHIP & REMOVE BIOMASS | Interior, Department of / Bureau of Land Management | 6/23/2010 |
TRAFFICGUARD DIRECT LLC | $6,330 | Contract | : To provide Bollards to the BLM | Interior, Department of / Bureau of Land Management | 6/11/2010 |
QUICKSILVER CONTRACTING COMPANY | $84,923 | Contract | : KLAMATH STEW TO#2 MANUAL JUNIPER CUT & SEEDING ROADS | Interior, Department of / Bureau of Land Management | 5/21/2010 |
C3 LIMITED LIABILITY COMPANY | $718,769 | Contract | : CONSTRUCTION OF MOHAVE DESERT FIRE STATION | Interior, Department of / Bureau of Land Management | 6/28/2010 |
BERRIGAN FORESTRY INC | $71,250 | Contract | : Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devastating wild fires. | Interior, Department of / Bureau of Land Management | 6/28/2010 |
GARDNER & PLATT FENCING | $40,030 | Contract | : sign bases | Interior, Department of / Bureau of Land Management | 4/15/2010 |
OAXACA REFORESTATION INC. | $408,855 | Contract | : Slashing, hand piling and cover | Interior, Department of / Bureau of Land Management | 4/15/2010 |
CXT INCORPORATED | $17,689 | Contract | : RECOVERY-SILVER CITY COMFORT STATION RJ TAS::14 1112::TAS | Interior, Department of / Bureau of Land Management | 4/15/2010 |
HIGH COUNTRY EQUIPMENT | $161,855 | Contract | : Safeguard mine sites by filling entrances to close the various mines in Southwestern Oregon.. | Interior, Department of / Bureau of Land Management | 6/03/2010 |
J.F.NEW & ASSOCIATES INC | $3,960 | Contract | : ARRA Funded Paleo #3 Rawlins and Kemmerer South Area. The purpose of the project is to provide the Bureau of Land Management - WY State Office with information about the paleontological resources in the Rawlins South Area so that the office can make mana | Interior, Department of / Bureau of Land Management | 4/15/2010 |
HATROCK EXCAVATION LLC | $29,965 | Contract | : THE JOB IN SHOSHONE IS TO REMOVE ALL EXSISTING CONCRETE WALK WAYS AND EXCAVATE OUT TO A DEPTH TO ALLOW IMPORT OF 3/4 ROED BASE OF A COMPACTED BASE OF 6 INCHES AT 95% COMPACTED. THAN POUR BACK OF NEW CONCRETE SIDEWALKS. | Interior, Department of / Bureau of Land Management | 1/22/2010 |
OKANOGAN TRAIL | $217,152 | Contract | : Arizona Scenic Trail Construction | Interior, Department of / Bureau of Land Management | 5/07/2010 |
MESQUITE INC | $180,000 | Contract | : Provide Campground Improvement Construction including preengineered shade structures with concrete pads, construct new campsites with graveled area parking, installation of picnic tables, firerings and concrete sidewalks. | Interior, Department of / Bureau of Land Management | 4/13/2010 |
WOCON LLC | $437,962 | Contract | : Chinese Peak Road | Interior, Department of / Bureau of Land Management | 6/08/2010 |
OTAK, INC. | $108,868 | Contract | : Camouflage demonstration and evaluation, Wyoming | Interior, Department of / Bureau of Land Management | 6/25/2010 |
A M J A | $37,038 | Contract | : provide material and construct 3.3 miles of barbed wire fence and all gates, panels, corners and drainage crossings. | Interior, Department of / Bureau of Land Management | 6/01/2010 |
J-U-B ENGINEERS, INC. | $8,192 | Contract | : This project was to provide a geotechnical investigation and report at Slate Creek Recreation Site. Five test holes were drilled and a geotechnical report was provided based on findings. | Interior, Department of / Bureau of Land Management | 5/25/2010 |
ROBISON LOGGING & EXCAVATION | $315,983 | Contract | : Delivery of 34915.21 yrds of pit-run to gravel a dirt road along a power line. | Interior, Department of / Bureau of Land Management | 11/30/2009 |
SPARK ELECTRIC CO., INC. | $528,196 | Contract | : Recovery-Sacramento River Rail Trail Paving | Interior, Department of / Bureau of Land Management | 3/10/2010 |
CENTURY COMPANIES, INC. | $671,185 | Contract | : Lewistown Paving & Retardent Containment Construciton. Demolition, salvage, excavation, grading, culvert installation, parking lot construction, taxiway construction and retardent containment area construction. The work is located at the Lewistown Munic | Interior, Department of / Bureau of Land Management | 4/07/2010 |
GEOTECH ENVIRONMENTAL SERVICES, INC. | $57,970 | Contract | : Solar/Wind Powered Water Treatment System | Interior, Department of / Bureau of Land Management | 4/13/2010 |
MARCHANT CONSTRUCTION, LLC | $55,236 | Contract | : Install culvert, lay and shape road base, finish paving wareyard and the road from the highway to wareyard. | Interior, Department of / Bureau of Land Management | 4/28/2010 |
SUMMITT FORESTS INC | $58,608 | Contract | : FREEMAN RESTORATION | Interior, Department of / Bureau of Land Management | 6/03/2010 |
NATIVE HARVEST SEED CO. INC. | $80,000 | Contract | : Seed Collection Carrizo Plain National Monument | Interior, Department of / Bureau of Land Management | 1/28/2010 |
S BROOKS & ASSOCIATES INC | $6,818 | Contract | : Project Inspection. | Interior, Department of / Bureau of Land Management | 4/29/2010 |
SMALL BUTTE CONSTRUCTION, INC | $42,243 | Contract | : Water line improvements | Interior, Department of / Bureau of Land Management | 4/02/2010 |
HUFFMAN & WRIGHT LOGGING CO | $1,058,555 | Contract | : Brushing, Culverts, and Surface replacement | Interior, Department of / Bureau of Land Management | 5/18/2010 |
CS CONSTRUCTION | $895,267 | Contract | : RECOVERY-GREEN MTN LOOKOUT REPLACEMENT TAS::14 1112::TAS | Interior, Department of / Bureau of Land Management | 6/01/2010 |
S & L INDUSTRIAL | $544,684 | Contract | : Red Cliffs Campground Rehab | Interior, Department of / Bureau of Land Management | 2/05/2010 |
GANEM/HOUSTON CONSTRUCTION, LLC | $47,119 | Contract | : Recovery award-Restoration Stewardship project-Mule Unit. | Interior, Department of / Bureau of Land Management | 4/16/2010 |
CKC CONSTRUCTION & MATERIALS, LLC | $216,477 | Contract | : The purpose of the work under this contract is to provide a maintenance-driven approach intended to mitigate deterioration of the original concrete surface, halt erosion of the toe of the spillway and stabilize erosion of earthen slopes. | Interior, Department of / Bureau of Land Management | 4/16/2010 |
NATURESERVE | $756,225 | Contract | : Rapid Ecoregional Assessment of the Central Basin and Range Ecoregion | Interior, Department of / Bureau of Land Management | 6/25/2010 |
BERRIGAN FORESTRY INC | $47,500 | Contract | : Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devestating wild fires. | Interior, Department of / Bureau of Land Management | 4/13/2010 |
C & E FENCE, L.L.C. | $77,437 | Contract | : RECOVERY - Furnishing labor and equipment to construct and/or recondition 34 riparian protection fences. Locations of projects are in Washoe, Lyon, Churchill and Douglas Counties, Nevada | Interior, Department of / Bureau of Land Management | 6/03/2010 |
XCAVATION CO., THE, INC. | $2,470 | Contract | : Recovery - Mary Nevada Mine (Hulapai Mountains) access Barrier Installation, Solicitation Number: L10PS01671. Description of Work: Fabricate and install bat friendly gate mine closure. Work consists of fabricating and installing bat gate made of steel bar | Interior, Department of / Bureau of Land Management | 2/20/2010 |
EDAW, INC. | $2,289,803 | Contract | : National Historic Trails Inventory | Interior, Department of / Bureau of Land Management | 5/14/2010 |
L T M INCORPORATED | $822,296 | Contract | : Warner Valley and Gerber Road Surfacing | Interior, Department of / Bureau of Land Management | 6/01/2010 |
SURIRAT DEVELOPMENT, INC. | $18,897 | Contract | : Eqipment w/operator | Interior, Department of / Bureau of Land Management | 3/03/2010 |
WESTWATER ENGINEERING, INC. | $75,000 | Contract | : T&E CLEARANCE IN AREA WITH POTENTIAL FOR COMMERCIAL SOLAR ENERGY FACILITY. | Interior, Department of / Bureau of Land Management | 4/27/2010 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $53,920 | Contract | : Las Cienegas National Conservation Area Recovery-Grassland Restoration Project. Mechanical Mesquite reduction for Maternity treatment unit, 176 acres. Method of Mesquite reduction by mechanically grubbing the Mesquite out of the ground with equipment, a | Interior, Department of / Bureau of Land Management | 4/15/2010 |
CAYMUS CORPORATION | $181,305 | Contract | : MINE CLOSURE-Provide all labor, equipment, and materials necessary to install 1 bat friendly gate, 9 cupolas and fill 9 test pits at Swansea Mine | Interior, Department of / Bureau of Land Management | 4/16/2010 |
KADRI INTERNATIONAL CO. | $966,907 | Contract | : Recovery contract work for georeferencing plats and conversion to AutoCAD format of approx. 2088 plats. | Interior, Department of / Bureau of Land Management | 4/23/2010 |
RMEC ENVIRONMENTAL INC | $85,505 | Contract | : Hancock Cabin Water Well | Interior, Department of / Bureau of Land Management | 4/14/2010 |
TRINIDAD A. ESCARENO | $134,858 | Contract | : Fuel Reduction, located 60 miles north of Albuquerque, New Mexico. Project encompasses approximately 425 acres, and will be marked with flagging. The Fuel Reduction project includes hand-thinning and eventual mulching of trees consisting of Ponderosa p | Interior, Department of / Bureau of Land Management | 4/14/2010 |
SYBRANT CONSTRUCTION, LLC | $247,800 | Contract | : 100% design of the Historic Bighorn Station Site Stabilization | Interior, Department of / Bureau of Land Management | 6/30/2010 |
A. PLEASANT CONSTRUCTION, INC. | $47,045 | Contract | : INSTALLATION OF ROAD DRAINAGE SYSTEM | Interior, Department of / Bureau of Land Management | 6/03/2010 |
LOMAKATSI ECOLOGICAL SERVICES, INC. | $264,416 | Contract | : This is Task order # 8 of the Deer Willy project which is part of the South Stew Stewardship contract IDIQ.This task order reduced hazardous fuels, through mechanical and hand treatments while collecting and utilizing commercial logs and Biomass.This task | Interior, Department of / Bureau of Land Management | 5/14/2010 |
X FIELD SERVICES LLC | $17,440 | Contract | : Watershed resoration | Interior, Department of / Bureau of Land Management | 4/02/2010 |
C3 LIMITED LIABILITY COMPANY | $352,317 | Contract | : BOQUILLAS ADMIN SITE MAINTENANCE BUILDING | Interior, Department of / Bureau of Land Management | 6/28/2010 |
OTAK, INC. | $72,394 | Contract | : Yaquina Head Outstanding Natural Area security system design | Interior, Department of / Bureau of Land Management | 5/28/2010 |
TYRHOLM BIG R, INC. | $24,834 | Contract | : Recovery-Burns 5 Creeks Fence Supplies | Interior, Department of / Bureau of Land Management | 5/05/2010 |
JERRY MORRISON, INC. | $237,050 | Contract | : Trail overlay at National Historical Oregon Trail Interpretive Center | Interior, Department of / Bureau of Land Management | 6/24/2010 |
ECOSYSTEM MANAGEMENT, INC. | $31,808 | Contract | : Lentic/Lotic Survey | Interior, Department of / Bureau of Land Management | 5/05/2010 |
CXT INCORPORATED | $136,661 | Contract | : ARRA - 5 CXT'S VAULT SINGLE UNITS TAS::14 1112::TAS Produce and deliver 5 precast concrete restroom buildings to the BLM in Hollister, CA. | Interior, Department of / Bureau of Land Management | 5/06/2010 |
GANEM/HOUSTON CONSTRUCTION, LLC | $35,242 | Contract | : Recovery Award-Restoration Stewardship Project-Bobcat Unit | Interior, Department of / Bureau of Land Management | 4/14/2010 |
MILLER TIMBER SERVICES INC | $434,474 | Contract | : Thin conifers over 1.5' tall and up to 7.9' DBH to a 15' x 15' spacing. Yard trees between 4' and 7.9' DBH. Whole tree treatment of material from trees 4' and 7.9' DBH and treatment of limbs adn tops from trees > 8' DBH which are < 5' in diameter. | Interior, Department of / Bureau of Land Management | 5/06/2010 |
XCAVATION CO., THE, INC. | $2,470 | Contract | : GIGI Girl Mine Access Barrier Installation, Solicitation Number: L10PS01665. Description of Work: Installation of one bat gate on an adit. Work consists of: fabricating and installing bat gate made of steel bars with an inset series of spaces to allow for | Interior, Department of / Bureau of Land Management | 2/17/2010 |
MEGAN ROBINSON | $53,200 | Contract | : Statewide species survey | Interior, Department of / Bureau of Land Management | 6/29/2010 |
CONSOLIDATED PAVING AND CONCRETE, INC. | $69,233 | Contract | : Construction of Salt Lake WHBC Parking Lot Paving and Crack & Chip Seal on the entrance road | Interior, Department of / Bureau of Land Management | 4/29/2010 |
SWEAT, ROBERT | $77,924 | Contract | : CERRO COMODRE HAND PILING OF SLASH AND BIOMASS | Interior, Department of / Bureau of Land Management | 4/14/2010 |
ADVANTAGE PAVING & EXCAVATING, INC. | $180,630 | Contract | : Repair approximately 6 miles of existing roadway near Klamath Falls Oregon. | Interior, Department of / Bureau of Land Management | 6/14/2010 |
H & S CONTRACTING INC | $228,825 | Contract | : The purpose of this contract is to cut and pile juniper trees on BLM land to reduce tree density and improve rangeland health. Payment will be made by completed acres. | Interior, Department of / Bureau of Land Management | 5/28/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $33,068 | Contract | : Remove old porch install ADA ramp at both entrances, remove old furnace install new furnace and duct work | Interior, Department of / Bureau of Land Management | 5/03/2010 |
RAINIER SEEDS, INC. | $17,700 | Contract | : 10,000 lbs Vavilov Siberian Wheatgrass | Interior, Department of / Bureau of Land Management | 1/26/2010 |
MARKS RANCH INC | $422,689 | Contract | : Forestry; Biomasss removal Item 7A- Level II, Item 7B- Level II, Item 7E- Level I , Item 8- Biomass Hauling, Item 12 Spray Application-herbicides | Interior, Department of / Bureau of Land Management | 4/29/2010 |
OTAK, INC. | $339,328 | Contract | : Rawlins - Rock Springs Visual Resource Inventory | Interior, Department of / Bureau of Land Management | 5/05/2010 |
NATURAL RESOURCES, COLORADO DEPARTMENT OF | $87,300 | Grant | Recreation Resource Management: Improve management strategies, focusing on improving annual census techniques while increasing population size and sustainability. | Interior, Department of / Bureau of Land Management | 4/29/2010 |
NORTHWEST FENCE & SUPPLY, INC | $27,096 | Contract | : (Qty-Ea) 189 Rolls Barbed Wire 12.5 ga 2-Pt Class I (Qty-Ea) 108 Rolls Barbless Wire 12.5 ga Class I (Qty-Ea) 3,400 Steel Fence Posts w/clips 5.5ft 1.33lbs/ft SPEC | Interior, Department of / Bureau of Land Management | 2/19/2010 |
CHEROKEE ENTERPRISES, INC. | $94,338 | Contract | : Recovery RFO Camino Well Water System | Interior, Department of / Bureau of Land Management | 6/25/2010 |
JIM YOUNG ENTERPRISES, LLC | $30,973 | Contract | : Recovery Sheep Creek Emergency Road Repair | Interior, Department of / Bureau of Land Management | 4/01/2010 |
SURIRAT DEVELOPMENT, INC. | $26,005 | Contract | : Roan plateau travel management | Interior, Department of / Bureau of Land Management | 6/01/2010 |
X FIELD SERVICES LLC | $7,185 | Contract | : Vegetation Enhancement - mule deer habitat | Interior, Department of / Bureau of Land Management | 1/19/2010 |
CPM DEVELOPMENT CORPORATION | $239,796 | Contract | : Interagency Site Paving, Lakeview District | Interior, Department of / Bureau of Land Management | 5/17/2010 |
CONSOLIDATED PAVING AND CONCRETE, INC. | $73,248 | Contract | : Place Roadbase, Asphalt and Asphalt Surface Treatments. | Interior, Department of / Bureau of Land Management | 4/29/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $330,055 | Contract | : Stabilize foundation on the BLM Administration Building in Montrose Colorado | Interior, Department of / Bureau of Land Management | 6/30/2010 |
A M J A | $133,601 | Contract | : rEPAIR 20 MILES OF 4-WIRE EXCLOSURE FENCE LINE, ASSOCIATED APPURTENANCES, GATES, PANELS AND DRAINAGE CROSSINGS. PART OF FENCE IN WILDERNESS STUDY AREA. | Interior, Department of / Bureau of Land Management | 6/03/2010 |
R E MILLER & SONS | $59,585 | Contract | : Beaverhead Road Repair | Interior, Department of / Bureau of Land Management | 6/11/2010 |
H CONSTRUCTION LLC | $49,500 | Contract | : The purpose of this contract is to perform trail maintenance in accordance with the terms and conditions for trail brushing,clearing, and marking on specified trail sections along approximately 24.3 miles of trails. | Interior, Department of / Bureau of Land Management | 5/27/2010 |
MARKS RANCH INC | $48,750 | Contract | : Chipping Level I Item 0005C 7500 Green Tons Unit costs $6.5/ton | Interior, Department of / Bureau of Land Management | 3/31/2010 |
LOPEZ ISLAND CONSERVATION CORPS | $12,000 | Grant | Recreation Resource Management: Performance of routine trail and trail head maintenance utilizing a youth corps crew with hand tools, to grub, brush, clear, and construct trails. | Interior, Department of / Bureau of Land Management | 3/30/2010 |
PRO-TECT SEALCOATING | $65,506 | Contract | : REPAIR AND SEAL PAVEMENT | Interior, Department of / Bureau of Land Management | 4/27/2010 |
ERICK AMMON INC | $264,187 | Contract | : Butler Building and Barn. This scope of work: stabilize two historic barns and to demolish and dispose of one intact metal building. | Interior, Department of / Bureau of Land Management | 3/29/2010 |
ROCKY MOUNTAIN ELK FOUNDATION, INC. | $89,334 | Grant | Forests and Woodlands Resource Management: This award is a cooperative agreement between Rocky Mountain Elk Foundation and the Bureau of Land Management on the Vale District to enhance and restore sage steppe and grasslands on BLM lands by removing previously cut juniper for biomass use, allowing | Interior, Department of / Bureau of Land Management | 4/30/2010 |
MILLER TIMBER SERVICES INC | $9,975 | Contract | : Slash removal from blowdown timber sale landings. | Interior, Department of / Bureau of Land Management | 2/25/2010 |
AABERG CULTURAL RESOURCE CONSULTING SERVICE | $49,137 | Contract | : Cultural resource inventory of the Upper Missouri River Breaks National Monument | Interior, Department of / Bureau of Land Management | 1/06/2010 |
SPECIALIZED STEEL CONTRACTORS INC | $221,194 | Contract | : DRIPPINGS SPRINGS RECREATION AREA RENOVATIONS CONTRACTOR SHALL FURNISH ALL SUPERVISION, LABOR, MATERIALS, EQUIPMENT AND SUPPLIES NECESSARY TO RENOVATE NINE(9) BUILDINGS | Interior, Department of / Bureau of Land Management | 5/18/2010 |
EDAW, INC. | $15,575 | Contract | : Jupiter Habitat Restoration Bridge Data | Interior, Department of / Bureau of Land Management | 6/24/2010 |
PINYON RANCH WOODWORX LLC | $121,121 | Contract | : Hazardous Fuels Reduction | Interior, Department of / Bureau of Land Management | 4/15/2010 |
MIKE KESLER ENTERPRISES, INC. | $34,940 | Contract | : Furnishing labor, equipment, supplies, and materials, excavate 4250 CY of earth, repain drainage culverts, and backfill and compact around culverts. | Interior, Department of / Bureau of Land Management | 3/25/2010 |
ACHA CONSTRUCTION, LLC | $52,407 | Contract | : RECOVERY - CALF CREEK WATER IMPROVEMENTS | Interior, Department of / Bureau of Land Management | 4/14/2010 |
QUICKSILVER CONTRACTING COMPANY | $467,525 | Contract | : KLAMATH STEW T.O. #1. YARDING, THINNING, ROAD MAINTENANCE | Interior, Department of / Bureau of Land Management | 5/21/2010 |
WALKING POINT FARMS LLC | $119,793 | Contract | : SEED FOR BURNS DIST OFFICE | Interior, Department of / Bureau of Land Management | 5/21/2010 |
SWEAT, ROBERT | $61,000 | Contract | : DESERT RESTORATION CUT AND SPOT APPLICATION OF HERBICIDE | Interior, Department of / Bureau of Land Management | 6/15/2010 |
FELLER ENTERPRISES, LLC | $36,845 | Contract | : bridge repair | Interior, Department of / Bureau of Land Management | 4/13/2010 |
JACOBSON GRENFELL INC | $15,500 | Contract | : Signage | Interior, Department of / Bureau of Land Management | 2/28/2010 |
PERKINS CONSTRUCTION, INC. | $510,694 | Contract | : Bureau of Land Management Radio Facility & Tower Construction | Interior, Department of / Bureau of Land Management | 4/21/2010 |
WEBER DRILLING | $108,664 | Contract | : Water wells for Scab Creek Trailhead. | Interior, Department of / Bureau of Land Management | 6/09/2010 |
PERFECT IMAGE INC | $223,500 | Contract | : Control Document Index Scanning | Interior, Department of / Bureau of Land Management | 9/22/2009 |
SUMMITT FORESTS INC | $83,062 | Contract | : MOOSE PROJECT-SLASHING, HAND PILE AND COVER | Interior, Department of / Bureau of Land Management | 4/01/2010 |
GRANITE NORTHWEST, INC. | $193,591 | Contract | : Chip Seal Parking Lots and Roads @ National Historic Oregon Trail Information Center. | Interior, Department of / Bureau of Land Management | 5/28/2010 |
COLORADO WOOD COMPANY | $122,247 | Contract | : Recovery - Royal Gorge Biomass Project, Buffalo Gulch Stewardship Project. This project consists of the thinning of conifer tree seedlings/saplings on 141 acres of BLM forest land to promote forest health and for fire prevention. All merchantable wood wil | Interior, Department of / Bureau of Land Management | 5/28/2010 |
BROWN BROTHERS CONSTRUCTION COMPANY | $55,460 | Contract | : Factory Butte Improvements | Interior, Department of / Bureau of Land Management | 4/09/2010 |
WEDGEWOOD DEVELOPMENT, INC. | $70,067 | Contract | : White Reef Trailhead | Interior, Department of / Bureau of Land Management | 4/16/2010 |
DYNAMAC CORPORATION | $693,738 | Contract | : COLORADO PLATEAU ECOREGIONAL ASSESSMENT | Interior, Department of / Bureau of Land Management | 6/29/2010 |
MARINE CO., INC. | $40,835 | Contract | : Furnishing labor, equipment, supplies, and materials to remove/replace the existing boat launch ramp at the Killarney Lake Recreation Site. Demolish and remove the existing concrete ramp and replace with a new design as shown in the plans and specificati | Interior, Department of / Bureau of Land Management | 4/02/2010 |
HIGH DESERT MICROIMAGING, INC. | $70,000 | Contract | : a. The purpose of this contract is to create a digital file image and archival film image of the Bureau of Land Management (BLM), Nevada State Office CDI aperture cards. The BLM estimates there are 40,000 CDI aperture cards. The Contractor will provide | Interior, Department of / Bureau of Land Management | 3/09/2010 |
BERNTSEN INTERNATIONAL, INC. | $12,792 | Contract | : Cadastral Monuments | Interior, Department of / Bureau of Land Management | 5/20/2010 |
FOREST REHAB, INC | $103,393 | Contract | : Mechanical Fuels Grinding/Top of The World Mastication, Est. 289 Acres | Interior, Department of / Bureau of Land Management | 4/14/2010 |
CHAPARRAL CONSTRUCTION LLC | $57,050 | Contract | : We furnished all labor, equipment, supplies, and materials for grading road and parking areas and installation of cushed aggregate(Midland, Turtle Rock and Cty Rd. 375 OHV Parking), installation of boulders for rack barriers (Midland), and installation of | Interior, Department of / Bureau of Land Management | 4/23/2010 |
COOKS CONSTRUCTION LLC | $50,622 | Contract | : Building Roads, bladed roads, hauled gravel, built campsites | Interior, Department of / Bureau of Land Management | 6/07/2010 |
GLOBAL SOURCE ONE INT, INC. | $41,148 | Contract | : Sol # L10PS02547 0010 8 Foot Cherry Tone Landscape Timber, Qty 2500 $ 8,625.00 0020 3/8 x 12 Galvanized Carriage Bolts, Qty 600 $ 1,800.00 0030 3/8 Galvanized Lock Washer, Qty 600 $ 174.00 0040 3/8 Galvanized Hex Nut, Qty 600 $ 261.60 0050 3/8 Galva | Interior, Department of / Bureau of Land Management | 6/02/2010 |
HEDGEROW FARMS | $48,123 | Contract | : Delivery of 2,000 lbs of Poa secunda seed from Carrizo. | Interior, Department of / Bureau of Land Management | 3/31/2010 |
S BROOKS & ASSOCIATES INC | $2,995 | Contract | : Facilitator: shall be on site at the Prineville BLM office to lead a multi-discipline team in value analyzing the schematic design of the Lamonta Fire Operatins Building. | Interior, Department of / Bureau of Land Management | 5/25/2010 |
BERRIGAN FORESTRY INC | $9,500 | Contract | : Lambert Cr. Fuel Reduction | Interior, Department of / Bureau of Land Management | 6/11/2010 |
PURGATORY FENCE COMPANY LLC | $98,409 | Contract | : Whites Creek fence replacement | Interior, Department of / Bureau of Land Management | 6/30/2010 |
SWEAT, ROBERT | $46,199 | Contract | : BUTTON BUTTE PROJECT - SLASHING, LOP AND SCATTER, AND FUEL MODIFICATION ZONE CONSTRUCTION - ALL TO REDUCE RISK OF WILDLAND FIRES WHILE IMPROVING FOREST AND RANGELAND HEALTH | Interior, Department of / Bureau of Land Management | 4/01/2010 |
FIRST CASCADE CORP. | $849,000 | Contract | : Salem Windows, Skylights and Entrance Replacement at the BLM District Office in Salem, Oregon | Interior, Department of / Bureau of Land Management | 6/22/2010 |
N & B FENCE CO LLC | $49,975 | Contract | : ISLANDS AND DESERT SEAS RESTORATION, PHASE II, FENCE REMOVAL AND INSTALLATION - This project includes removal and replacement of 34,670 linear feet of barbed-wire, Type C, fencing with four gates and corresponding hardware. There are four fence constructi | Interior, Department of / Bureau of Land Management | 3/31/2010 |
JTL GROUP, INC | $80,965 | Contract | : Pave parking area | Interior, Department of / Bureau of Land Management | 4/06/2010 |
SKYLINE CONSTRUCTION, LLC | $236,623 | Contract | : Macon Sheep Bridge Repair | Interior, Department of / Bureau of Land Management | 4/29/2010 |
BERRIGAN FORESTRY INC | $9,500 | Contract | : Lambert Cr. Fuels Reduction | Interior, Department of / Bureau of Land Management | 6/11/2010 |
GEOTECH ENVIRONMENTAL SERVICES, INC. | $53,950 | Contract | : WATER WELL | Interior, Department of / Bureau of Land Management | 5/27/2010 |
RED J ENVIRONMENTAL CORPORATION | $138,659 | Contract | : Old Wild Horse and Burro Hazmat Clean-up | Interior, Department of / Bureau of Land Management | 2/05/2010 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $45,780 | Contract | : Las Cienegas National Conservation Area Recovery-Grassland Restoration Project. Mechanical Mesquite reduction for Antelope treatment unit, 199 acres. Method of Mesquite reduction by mechanically grubbing the Mesquite out of the ground with equipment, an | Interior, Department of / Bureau of Land Management | 4/14/2010 |
SPECIALIZED STEEL CONTRACTORS INC | $49,843 | Contract | : AGGREGATE PARKING AREA RECONDITION, CLEARING AND GRUBBING, EXCAVATION, CRUSHER FINES, PEA GRAVEL, RIP RAP, PAVEMENT SURFACE TREATMENT, CONCRETE | Interior, Department of / Bureau of Land Management | 4/13/2010 |
SHASTA-TEHAMA-TRINITY JOINT COMMUNITY COLLEGE DISTRICT | $20,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Recipient with guidance from the BLM will collect selected plants/seeds for ecological restoration projects. Recipient will provide BLM botanist and biologist with assistance with restoration, seed collections and propagation of important spepecies for rest... Show more | Interior, Department of / Bureau of Land Management | 11/25/2009 |
RIO VISTA MANAGEMENT, L.L.C. | $597,717 | Contract | : Recovery-Fillmore Warehouse & Shop Remodel | Interior, Department of / Bureau of Land Management | 5/24/2010 |
FREEPORT-MCMORAN CORPORATION | $79,400 | Contract | : Recovery award - sky islands & desert seas restoration, Phase II, Eagle Creek Access Barriers & Habitat Improvement | Interior, Department of / Bureau of Land Management | 4/27/2010 |
BREITHAUPT, BRENT | $22,068 | Contract | : ARRA Funded Paleontological Resource Assistant - Provides technical assistance to the WY Regional Paleontologist. Researches and retrieves paleontological and geological information, identifies and assesses non-federal fossil repositories, performs field | Interior, Department of / Bureau of Land Management | 6/18/2010 |
DURHAM GRAVEL WORKS, INC. | $75,200 | Contract | : Steck Boat Ramp | Interior, Department of / Bureau of Land Management | 6/07/2010 |
C BAR C CONSTRUCTION ENTERPRISES, INC. | $63,000 | Contract | : Colorado-Montrose County-Monogram Mesa II Hazardous Fuels Reduction. The purpose of this contract was to thin hazardous fuels on 300 acres of BLM forest in the effort to improve wildlife habitat and to lessen the risk of possible forest fires. | Interior, Department of / Bureau of Land Management | 5/07/2010 |
TUSCA II, INC. | $209,260 | Contract | : Construct crushed aggregate parking areas, steel fencing, steel kiosks, steel parking delineators and parking stops, OHV loading ramps, ADA concrete parking and walkways, and install two precast concrete toilet buildings. | Interior, Department of / Bureau of Land Management | 4/01/2010 |
RUE LOGGING | $29,550 | Contract | : Sage Grouse and Deer Habitat Restoration | Interior, Department of / Bureau of Land Management | 5/18/2010 |
BERRIGAN FORESTRY INC | $38,900 | Contract | : Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devastating wild fires. | Interior, Department of / Bureau of Land Management | 9/21/2010 |
MAXTEK CONTRACTORS, INC. | $360,931 | Contract | : CONSTRUCT AND REBUILD APPROXIMATELY 2 MILES OF ROAD, INCLUDING CLEAR & GRUBB, GRADING, IMPORT AND PLACING OF SURFACING MARTERIAL, DRAINAGE, FURROW DITCHES AND FINAL GRADING OF ROAD. ARCH SITE MONITORING | Interior, Department of / Bureau of Land Management | 6/30/2010 |
COUNTY OF MALHEUR | $158,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Award purpose is the reduction or eradication of exotic plant species from Wild & Scenic portion of the Owyhee River in Malheur County Eastern Oregon. The W&S portion of the Owyhee River is still relatively pristine even though it has been grgrazed for over... Show more | Interior, Department of / Bureau of Land Management | 4/20/2010 |
J.F.NEW & ASSOCIATES INC | $3,960 | Contract | : ARRA Funded Paleo #3 Rawlins and Kemmerer South Area. The purpose of the project is to provide the Bureau of Land Management - WY State Office with information about the paleontological resources in the Rawlins South Area so that the office can make mana | Interior, Department of / Bureau of Land Management | 4/15/2010 |
CARTER ENGINEERING INC. | $92,400 | Contract | : Dos Palmas Fence Project | Interior, Department of / Bureau of Land Management | 3/03/2010 |
RECON ENVIRONMENTAL | $21,330 | Contract | : Conduct archaeological survey of approximately 301 acres of BLM-managed land at Hauser Mountain, California | Interior, Department of / Bureau of Land Management | 6/15/2010 |
SPECIALIZED STEEL CONTRACTORS INC | $694,755 | Contract | : PHASE 1 PRE-ENGINEERED PICNIC SHELTERS, DEMOLISH SHELTERS, DEMOLISH VAULT-PHASE II POUR CONCRETE PADS, ERECT SHELTERS, CONSTRUCT ROCKWALL-PHASE III POUR CONCRETE PADS, ERECT SHELTERS, RELOCATE GRILL, FIRE RINGS, PHASE IV DEMOLISH SHELTER, INSTALL GOVERMEN | Interior, Department of / Bureau of Land Management | 5/12/2010 |
BUELL ENVIRONMENTAL | $25,585 | Contract | : Recovery - HRB North Park Biomass | Interior, Department of / Bureau of Land Management | 5/19/2010 |
RAASS BROTHERS INC. | $212,167 | Contract | : Construction a parking lot with state highway access | Interior, Department of / Bureau of Land Management | 6/28/2010 |
SUN SPOT SOLAR, LLC | $59,637 | Contract | : Roan Cabin Solar - Supply labor, equipment and supplies to construct a photovoltaic system. | Interior, Department of / Bureau of Land Management | 6/25/2010 |
EDAW, INC. | $454,811 | Contract | : Farmington Title III Construction RFI responses. | Interior, Department of / Bureau of Land Management | 5/03/2010 |
CHAMBERS GROUP, INC. | $46,467 | Contract | : Black Rock Archaeological Cultural Inventory | Interior, Department of / Bureau of Land Management | 9/19/2009 |
K E & G CONSTRUCTION, INC. | $317,555 | Contract | : Repair & reconstruction of fencing at trailhead in the San Pedro Riparian National Conservation Area | Interior, Department of / Bureau of Land Management | 4/16/2010 |
STANDARD REMEDIATION | $40,000 | Contract | : Carrizo Oak Fencing Build a fence in the Carrizo Plain National Monument prtoecting Oaks | Interior, Department of / Bureau of Land Management | 4/16/2010 |
S BROOKS & ASSOCIATES INC | $11,269 | Contract | : Contract Specialist | Interior, Department of / Bureau of Land Management | 2/16/2010 |
BERRIGAN FORESTRY INC | $27,900 | Contract | : Lambert Cr. Fuels Reduction | Interior, Department of / Bureau of Land Management | 4/15/2010 |
OTAK, INC. | $34,967 | Contract | : Green Mountain Lookout replacement construction management services continued this quarter. | Interior, Department of / Bureau of Land Management | 4/22/2010 |
UNIVERSITY OF UTAH, THE | $58,970 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The joint objective for BLM and the University of Utah is to offer opportunities for faculty and students to assist in the development of data critical to the management of the Utah portion of the eastern Great Basin. The project will create e jobs and trai... Show more | Interior, Department of / Bureau of Land Management | 5/21/2010 |
DONALD W THOMPSON INC | $178,000 | Contract | : Door and Window Replacements at the BLM YHONA at Newport Oregon | Interior, Department of / Bureau of Land Management | 4/15/2010 |
ALASKA BIRD OBSERVATORY | $82,854 | Contract | : The Alaska Bird Observatory (ABO) is pleased to submit this proposal to offer our services to assist the Bureau Land Management (BLM) with the inventory of landbirds on the areas identified in the BLM Request for Qualifications (RFQ). The areas listed in | Interior, Department of / Bureau of Land Management | 4/14/2010 |
C TRIANGLE COMPANIES | $67,582 | Contract | : recovery stones bengard stewardship | Interior, Department of / Bureau of Land Management | 3/30/2010 |
XCAVATION CO., THE, INC. | $4,250 | Contract | : Box Canyon Adit Closure: Description of Work: Backfill specified mine adit and connected mine shaft using soil and mine spoil materials in the immediate vicinity of the adit entrance. | Interior, Department of / Bureau of Land Management | 4/20/2010 |
ACHA CONSTRUCTION, LLC | $47,061 | Contract | : 1050 FT FENCE WITH 2 GATES | Interior, Department of / Bureau of Land Management | 4/27/2010 |
XCAVATION CO., THE, INC. | $18,606 | Contract | : Recovery - Great West Mine (Northern Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01723. Description of Work: Fabricate and installation of three bat gates and two cupolas. Work consists of fabricating and installing bat gate ma | Interior, Department of / Bureau of Land Management | 2/18/2010 |
HIGH COUNTRY EQUIPMENT | $117,850 | Contract | : Safeguard mine sites by filling entrances to close various mines in Southwestern Ouregon. | Interior, Department of / Bureau of Land Management | 6/30/2010 |
HOLM, BERKLEE | $55,034 | Contract | : Wilderness fencing install | Interior, Department of / Bureau of Land Management | 4/14/2010 |
COOKS CONSTRUCTION LLC | $128,263 | Contract | : North Sand Hills Campground | Interior, Department of / Bureau of Land Management | 5/25/2010 |
MONTEZUMA, COUNTY OF | $30,000 | Contract | : Invasive species and noxious weed control on public lands. | Interior, Department of / Bureau of Land Management | 3/18/2010 |
CHICAGO HORTICULTURAL SOCIETY | $39,900 | Grant | Fish, Wildlife and Plant Conservation Resource Management: College graduates to gain hands-on experience in natural resource management, specifically in the areas of conservation biology, endangered species protection and management, conservation of sensitive species, and the management of public lanands.... Show more | Interior, Department of / Bureau of Land Management | 5/13/2010 |
TRIUNE CONSTRUCTION LLC | $224,920 | Contract | : civil construction. Developed a lake side Day use recreation area with fully handicap accessable functions such as parking, restroom facility, BBQ area, picnic tables,boat docks. | Interior, Department of / Bureau of Land Management | 4/02/2010 |
YOUTH RESTORATION CORPS | $182,650 | Grant | Recreation Resource Management: The purpose is to build 4 public safety cabins along the Iditarod trail and train rural Alaska youth in skilled trades which will benefit them and employ them in the future | Interior, Department of / Bureau of Land Management | 5/17/2010 |
WESTON SOLUTIONS, INC | $134,798 | Contract | : The project award is to conduct a remedial investigation and feasiblity study (RIFS) for a former manganese millsite located in Wickenburg, Arizona. The work is being peformed for the Bureau of Land Management (BLM) as the study area is located on BLM adm | Interior, Department of / Bureau of Land Management | 1/04/2010 |
BRIGHAM YOUNG UNIVERSITY | $103,180 | Grant | Fish, Wildlife and Plant Conservation Resource Management: FACTORS CONTRIBUTING TO THE EMERGENCE OF INVASIVE PLANT/FIRE CYCLES AND ITS IMPACT ON ECOSYSTEM FUNCTION IN MOJAVE DESERT SHRUBLANDS Project objectives 1. Examine how variation in precipitation patterns and fire behavior affects invasive annunual and native... Show more | Interior, Department of / Bureau of Land Management | 5/19/2010 |
LE GRAND JOHNSON CONSTRUCTION CO | $647,200 | Contract | : Hatch Point Road Chip Seal Contract | Interior, Department of / Bureau of Land Management | 5/19/2010 |
CKC CONSTRUCTION & MATERIALS, LLC | $206,431 | Contract | : Furnish labor, equipment, supplies and materials to excavate, stockpile material, repair, backfill and compact embankment at two outlet works that are experiencing piping problems, namely, Underwood and Matthews Outlet Works. Furnish labor, equipment, sup | Interior, Department of / Bureau of Land Management | 4/27/2010 |
TRI-COUNTY COOPERATIVE WEED MANAGEMENT AREA | $187,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Noxious Weed Survey & Control Northeastern Oregon | Interior, Department of / Bureau of Land Management | 4/01/2010 |
SOUTHWEST SEED, INC | $27,259 | Contract | : Procure and provide native grass seed for the Canyon of the Ancients Habitat Improvement. | Interior, Department of / Bureau of Land Management | 6/01/2010 |
WENDT CONSTRUCTION CO, INC | $106,303 | Contract | : grading roads, installing & compacting rock, installing filter fabric, installing culverts, watering, prep roads for paving, paving, install fog seal | Interior, Department of / Bureau of Land Management | 5/28/2010 |
DOYON PROJECT SERVICES LLC | $529,800 | Contract | : Recovery-Wildwood Recreation Site Waterline Replacement, Salem District, Oregon. Replace 5800 lineal feet of water main and 5000 feet of branch lines using open cut trenching and horizontal boring. | Interior, Department of / Bureau of Land Management | 6/25/2010 |
S BROOKS & ASSOCIATES INC | $14,120 | Contract | : Archeologist Technician: conducting the cultural resources file search, field survey, field documentation and prepare the survey report for the District Archeologist on new and replacement cattleguards locations in the Baker Malheur and Jordan Resource Ar | Interior, Department of / Bureau of Land Management | 4/27/2010 |
XCAVATION CO., THE, INC. | $11,690 | Contract | : Recovery - Fire Mountain Mine (Northern Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01662. Description of Work: Fabricate and installation of inclined shaft using one cupola. Work consists of fabricating and installing wildlife | Interior, Department of / Bureau of Land Management | 2/18/2010 |
SISKIYOU BIOSURVEY LLC | $10,670 | Contract | : Botanical Survey; Noxious Weeds, Rare Plants in proposed project area; prepare reports | Interior, Department of / Bureau of Land Management | 6/09/2010 |
JAMES TALCOTT CONSTRUCTION, INC. | $838,050 | Contract | : Put boat ramp in at Holter Lake | Interior, Department of / Bureau of Land Management | 1/07/2010 |
HARRIS ENVIRONMENTAL GROUP | $31,800 | Contract | : A cultural resources inventory of approximately 2,214 acres in the LosPosos project area withing the Las Cienegas National Conservation Area (LCNCA) | Interior, Department of / Bureau of Land Management | 11/06/2009 |
WEDGEWOOD DEVELOPMENT, INC. | $66,533 | Contract | : Red Mountain Trailhead | Interior, Department of / Bureau of Land Management | 4/16/2010 |
TRINIDAD A. ESCARENO | $209,049 | Contract | : Fuel Reduction project located just outside of Pinos Altos in Grant County, New Mexico. Project encompasses approximately 300 acres, and will be marked with flagging. The Fuel Reduction project includes hand-thinning and eventual mulching of rees consis | Interior, Department of / Bureau of Land Management | 4/14/2010 |
CARTER & BURGESS, INC. | $35,009 | Contract | : Red Cliffs Road - Title III Management Services This project provides approximately 4 weeks of onsite construction inspection services and associated administrative support. Jacobs provides construction oversight and reports addressing construction progre | Interior, Department of / Bureau of Land Management | 3/10/2010 |
GARDNER & PLATT FENCING | $73,000 | Contract | : Kaviah fence | Interior, Department of / Bureau of Land Management | 4/27/2010 |
RED ROCK EARTHMOVERS INC | $70,928 | Contract | : CONTRACT FOR RECOVERY-FILLMORE BLM BUILDING DEMOLITION IN Fillmore UTAH. | Interior, Department of / Bureau of Land Management | 4/29/2010 |
PACIFIC MOBILE STRUCTURES, INC. | $1,790,459 | Contract | : NIFC modular building construction pre-engineered modular building | Interior, Department of / Bureau of Land Management | 6/10/2010 |
FAR WESTERN ANTHROPOLOGICAL RESEARCH GROUP, INC. | $53,425 | Contract | : Cultural resource. | Interior, Department of / Bureau of Land Management | 9/03/2009 |
ASSURED AGGREGATES COMPANY INC | $193,375 | Contract | : Supply road base material delivered | Interior, Department of / Bureau of Land Management | 2/17/2010 |
O'BRIEN, TIMOTHY | $39,960 | Contract | : Reclamation of routes and trails that lead to abandoned mine lands. | Interior, Department of / Bureau of Land Management | 4/19/2010 |
T L PETERSON INC | $147,449 | Contract | : Merced WSR Road Rehab II | Interior, Department of / Bureau of Land Management | 6/09/2010 |
BAR SEVEN A COMPANIES, INC. | $286,230 | Contract | : Sand Dunes Road Construction and Surfacing. | Interior, Department of / Bureau of Land Management | 5/21/2010 |
ALLIED GIS INC | $180,000 | Contract | : The Contractor shall be responsible for providing comprehensive onsite GIS support at the BLM California State Office, Support Services - GCDB & Mapping Sciences. Under this contract, the contractor will independently provide GIS support services to satis | Interior, Department of / Bureau of Land Management | 4/06/2010 |
PINYON RANCH WOODWORX LLC | $87,199 | Contract | : Goals for the project include removing hazardous fuels and breaking up the continuity of the canopy to prevent wildfire danger to the Blue Topaz Ranch Subdivision. Slash will be burned when dry by Socorro Field Office fire personnel. | Interior, Department of / Bureau of Land Management | 4/15/2010 |
SMITH ENVIRONMENTAL AND ENGINEERING | $8,665 | Contract | : Abandoned mine lands Grand Junction field office mine closure and reclamation Class III Inventory | Interior, Department of / Bureau of Land Management | 3/30/2010 |
NATURESERVE | $712,230 | Contract | : Rapid Ecoregional Assessment of the Mojave Basin and Range Ecoregion | Interior, Department of / Bureau of Land Management | 6/25/2010 |
SOUTHWEST GENERAL CONSTRUCTION, INC | $577,391 | Contract | : Aguirre Springs Road Chip Seal, Dona Ana County, New Mexico. The purpose of this project is to recondition the Aguirre Springs Road and various parking areas, pullouts, and campgrounds roads and applying a multiple coarse chip seal to raods and parking a | Interior, Department of / Bureau of Land Management | 3/11/2010 |
BAIRCO CONSTRUCTION, INC. | $213,853 | Contract | : The purpose of this project is to replace the Whistle Creek Bridge located 12 miles southeast of Powell, WY. The project includes design (excluding the bridge), excavation, footing construction, road and approach work and the installation of a prefabrica | Interior, Department of / Bureau of Land Management | 5/26/2010 |
XCAVATION CO., THE, INC. | $2,450 | Contract | : Recovery - Thumb Butte Mine (Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01664. Description of Work: Fabricate and installation of one bat gate. Work consists of fabricating and installing bat gate made of steel bars with an in | Interior, Department of / Bureau of Land Management | 2/17/2010 |
HUGHES BROS CONSTRUCTION CO | $234,100 | Contract | : deliver aggregate to stockpile | Interior, Department of / Bureau of Land Management | 3/03/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $249,617 | Contract | : Exterior maintenance | Interior, Department of / Bureau of Land Management | 6/03/2010 |
URS GROUP, INC. | $796,907 | Contract | : Conduct an inventory of abandoned mine lands, physical safety and environmental hazards. Task include: 1) Literature review, 2) Field inventory, 3) Temporarily securing physical safety hazards that present an immediate hazard, 4) Reclamation design, 5) Mi | Interior, Department of / Bureau of Land Management | 6/14/2010 |
STOTLAR, SHANE | $39,475 | Contract | : wilderness area fencing 5.52 miles | Interior, Department of / Bureau of Land Management | 4/15/2010 |
SOUTHWEST SEED, INC | $4,000 | Contract | : GROW-OUT OF HAND COLLECTED NATIVE PLANT SPECIES FOR RESEARCH AND HOPEFUL SEED MULTIPLICATION. | Interior, Department of / Bureau of Land Management | 12/10/2009 |
YTUARTE CONCRETE, INC. | $23,205 | Contract | : Boise District Lighting Sensors | Interior, Department of / Bureau of Land Management | 6/03/2010 |
GLOBAL FRONTLINE SOLUTIONS LLC | $299,724 | Contract | : Grassland Restoration Champion Canyon. Slash, hand pile, and cover juniper. 50 miles west of Artesia, NM. | Interior, Department of / Bureau of Land Management | 4/14/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $467,080 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 1 | Interior, Department of / Bureau of Land Management | 5/03/2010 |
NATURAL RESOURCES CONSULTING, INC. | $98,983 | Contract | : BLM is planning a vegetation modification (fuels) project to achieve fire and fuels-related goals such as providing an area along roads to allow for safe passage of personnel during fires and providing areas along roads that can be used as control lines o | Interior, Department of / Bureau of Land Management | 2/26/2010 |
CLARKE & CO., INC. | $159,317 | Contract | : Recovery-Gunnison Recreation Sites | Interior, Department of / Bureau of Land Management | 6/11/2010 |
TORNADO SOFT EXCAVATION | $225,101 | Contract | : Alsea Falls Waterline Replacement, Salem District, Oregon | Interior, Department of / Bureau of Land Management | 6/17/2010 |
ROBCO INC | $1,045,177 | Contract | : Culvert replacement and road restoration on Bureau of Land Management roads in the northern part of Josephine County | Interior, Department of / Bureau of Land Management | 4/28/2010 |
TETRA TECH, INC. | $55,125 | Contract | : Solar Energy Site LiDAR for San Luis Valley. Tetra Tech will provide LiDAR point cloud and surface elevation products to assist with solar siting within the San Luis Valley. | Interior, Department of / Bureau of Land Management | 4/02/2010 |
QUICKSILVER CONTRACTING COMPANY | $60,488 | Contract | : BURN JUNIPER TO #16 JUNIPER CUTTING | Interior, Department of / Bureau of Land Management | 4/13/2010 |
BUSINESS WORLD CONTRACTORS | $26,450 | Contract | : Eugene Maintanence Shop Fence Repairs | Interior, Department of / Bureau of Land Management | 4/30/2010 |
A B C CONCRETE MFG. CO., INC. | $106,950 | Contract | : Build and deliver 30 12'x8' BLM Style grids with cleanouts HS20 Loading, 30 12' Cattleguard Precast Foundation (pair) 36 Catleguard Wings (pair) | Interior, Department of / Bureau of Land Management | 3/10/2010 |
SOLLERS CONSTRUCTION, LLC | $28,875 | Contract | : WILD HORSE AND BURRO REHABILITATION PHASE II- Sollers Construction will do the demolition and site remedation services of this said project located in Kingman,Arizona in Mohave county. Demolition includes the removal of identified underground infrastructu | Interior, Department of / Bureau of Land Management | 5/04/2010 |
COLORADO YOUTH CORPS ASSOCIATION | $85,000 | Grant | Recreation Resource Management: To improve trail conditions and provide sustainable recreational opportunities throughout McInnis Canyons NCA. | Interior, Department of / Bureau of Land Management | 5/26/2010 |
GANEM/HOUSTON CONSTRUCTION, LLC | $37,259 | Contract | : Recovery Award-Restoration Stewardship Project-Pipeline Unit. | Interior, Department of / Bureau of Land Management | 4/16/2010 |
DARK HORSE CONSTRUCTION, LLC | $69,983 | Contract | : Historic Landscape Restoration | Interior, Department of / Bureau of Land Management | 6/01/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $71,580 | Contract | : LCGR Grasslands Restoration Project,Mechanical Mesquite Reduction, Middle Treatment Unit | Interior, Department of / Bureau of Land Management | 6/08/2010 |
WOCON LLC | $437,170 | Contract | : Recovery, Chinese Peak Road | Interior, Department of / Bureau of Land Management | 9/20/2010 |
JADE EXCAVATION, INC | $98,433 | Contract | : New Water tank and pump house, electric pump construction | Interior, Department of / Bureau of Land Management | 6/01/2010 |
ENVIRONMENTAL MANAGEMENT AND PLANNING SOLUTIONS, INC. | $1,420,440 | Contract | : Revised and answered questions on the cultural resources report and analysis. | Interior, Department of / Bureau of Land Management | 6/17/2010 |
PATRICK F PEPIOT | $168,387 | Contract | : Yhona Asphalt Trail Replacement | Interior, Department of / Bureau of Land Management | 5/26/2010 |
BLOOMIN RANCH SERVICE, LLC | $34,000 | Contract | : Cut, pile and remove all Junipers from Hill Springs Stewardship Project area. | Interior, Department of / Bureau of Land Management | 4/16/2010 |
IDAHO SURVEY GROUP P C | $129,878 | Contract | : GCDB-GPS survey for ID957 Area 6 for Township & Section Geographic Coordinate Data Base (GCDB) upgrade in State of Idaho for areas that have been identified by others to have alternative energy resource potential. | Interior, Department of / Bureau of Land Management | 4/01/2010 |
WARNER ENTERPRISES, INC | $19,338 | Contract | : STEWARDSHIP CONTRACT INVOLVING FOREST RESTORATION WITH BIOMASS. | Interior, Department of / Bureau of Land Management | 3/31/2010 |
SNOW DEVELOPMENT LLC | $45,600 | Contract | : gila watershed vegetation treatments, gila box salt cedar removal | Interior, Department of / Bureau of Land Management | 3/18/2010 |
BLOOMIN RANCH SERVICE, LLC | $68,000 | Contract | : Cut, pile and remove all Junipers from Hill Springs Stewardship Project area. | Interior, Department of / Bureau of Land Management | 4/16/2010 |
CALIENTE FIREWOOD AND FUELS REDUCTION | $34,507 | Contract | : Removal of pinion pine and pinion juniper within 50 feet of living ponderosas in the clover mountain range nevada to protect the mature trees from fire danger and allow new ponderosas to grow and provide space for future regeneration of the stand. | Interior, Department of / Bureau of Land Management | 6/23/2010 |
MICHIGAN TECHNOLOGICAL UNIVERSITY | $497,982 | Grant | Environmental Quality and Protection Resource Management: This project will involve a collaborative partnership between the University of Alaska Anchorage and Michigan Technological University (the lead partner) on the documentation of abandoned mine hazards in the Fairbanks District for the Bureau o of Land Manag... Show more | Interior, Department of / Bureau of Land Management | 4/06/2010 |
BITTERROOT SERVICES & TECHNOLOGY LLC | $22,270 | Contract | : prairie grass seeds | Interior, Department of / Bureau of Land Management | 6/01/2010 |
WOODS CANYON ARCHEAOLOGICAL CONSULTANTS INC | $17,569 | Contract | : Canyons of the Ancients Invasive Weeds Treatment: Archaeological Inventory Dirk Hood and Murphy Parcels is a Class III archaeological inventory of two parcels of public land within the Canyons of the Ancients National Monument with an aggregate total of a | Interior, Department of / Bureau of Land Management | 3/17/2010 |
SEVIER HEATING & AIR CONDITIONING, INC. | $100,479 | Contract | : RECOVERY-Hanksville HVAC Improvements | Interior, Department of / Bureau of Land Management | 4/26/2010 |
XCAVATION CO., THE, INC. | $29,308 | Contract | : Porter Mine access Barrier Installation, L10PS01726 Description of Work: Three inclined shafts closed using bat cupolas. Work consists of fabricating and installing cupolas made of steel bars with an inset series of spaces to allow for bat ingress and egr | Interior, Department of / Bureau of Land Management | 2/17/2010 |
OTAK, INC. | $69,671 | Contract | : Design and documentation for lead paint encapsulation. | Interior, Department of / Bureau of Land Management | 4/14/2010 |
TETRA TECH, INC. | $41,381 | Contract | : Recovery HR South San Luis Lake Wetland Restoration SLVPLC LiDAR for South San Luis Lakes | Interior, Department of / Bureau of Land Management | 6/09/2010 |
ORE-CAL LAND DEVELOPMENT, LLC | $371,690 | Contract | : This project is for forest and rangeland health treatments, density management, fuels hazard reduction, promotion of juniper and biomass utilization, road improvement and maintenance, habitat improvement, and commercial product removal. This project provi | Interior, Department of / Bureau of Land Management | 5/21/2010 |
TDT CONSTRUCTION, LLC | $520,307 | Contract | : Miles City Field Office Improvements | Interior, Department of / Bureau of Land Management | 5/04/2010 |
C-2 CONSTRUCTION INC | $36,760 | Contract | : Demo of 2 vault buildings and replace with new vault buildings | Interior, Department of / Bureau of Land Management | 6/08/2010 |
LANDSCAPES UNLIMITED, L.L.C. | $634,900 | Contract | : Recovery - Fisherman's Bend Recreation Site Waterline Replacement. Furnishing labor, equipment, supplies and materials for the removal of existing waterlines, exposed fixtures and valve boxes, installation of new water lines and equipment as described in | Interior, Department of / Bureau of Land Management | 6/24/2010 |
QUICKSILVER CONTRACTING COMPANY | $14,968 | Contract | : BURNS 2010 TO#1 - TREE THINNING TO REDUCE FIRE DANGER | Interior, Department of / Bureau of Land Management | 6/02/2010 |
HIGH COUNTRY PAVING INC | $77,816 | Contract | : Paving Devil Elbow Campground Trail with 6916.7 sq. yds of hot bituminous concrete finishing with superior results. | Interior, Department of / Bureau of Land Management | 4/06/2010 |
BURGOS GROUP, LLC | $657,773 | Contract | : Provide labor, equipment, supplies and materials to recondition the Dripping Springs and La Cueva Roads, various parking areas and pull-outs, and applying multiple coarse chip seal to portions of said roads and parking areas. Work also included re-strip | Interior, Department of / Bureau of Land Management | 4/16/2010 |
DRENNON CONSTRUCTION & CONSULTING, INC. | $428,175 | Contract | : Tangle Lakes Access Road Improvements is a road rehabilitation project in the Tangle Lakes historical area of Alaska, close to Paxson, Alaska. Which will include surveying, engineering and construction of gabions, road excavation and landscaping. | Interior, Department of / Bureau of Land Management | 5/18/2010 |
K.C. EQUIPMENT, INC. | $326,110 | Contract | : Amboy Access Road & Parking Lot | Interior, Department of / Bureau of Land Management | 5/18/2010 |
MARKS RANCH INC | $432,890 | Contract | : Task order #2 Biomass removal | Interior, Department of / Bureau of Land Management | 11/24/2009 |
OTAK, INC. | $856,561 | Contract | : Additional services have been added to do further work with the field offices on refining distance zones for visual resource inventories as per direction from the National Lead. | Interior, Department of / Bureau of Land Management | 5/27/2010 |
COUNTY OF JEFFERSON | $25,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Wild and Scenic River in Jefferson | Interior, Department of / Bureau of Land Management | 3/12/2010 |
MESQUITE INC | $88,280 | Contract | : FURNISHING ALL LABOR, EQUIPMENT, SUPPLIES, MATERIALS AND PERMITS NECESSARY TO INSTALL GOVERNMENT FURNISHED AGGREGATE SURFACING MATERIAL ON THE SMITHS FORK ROAD | Interior, Department of / Bureau of Land Management | 6/04/2010 |
LOMAKATSI ECOLOGICAL SERVICES, INC. | $659,142 | Contract | : This task order # 7, part of the larger South Stew Stwardship IDIQ totals 626 acres of hazardous fuel reduction, Biomass extraction and commercial log removal activities. | Interior, Department of / Bureau of Land Management | 12/03/2009 |
EXTREME EXCAVATION | $29,197 | Contract | : Trail Construction | Interior, Department of / Bureau of Land Management | 6/07/2010 |
SALIDA AREA PARKS, OPEN SPACE AND TRAILS | $25,000 | Grant | Recreation Resource Management: Grant to facilitate volunteers & partners to rehabilitate trails on public lands in the Salida, CO area to preserve & enhance recreational opportunities. | Interior, Department of / Bureau of Land Management | 9/09/2009 |
GANEM/HOUSTON CONSTRUCTION, LLC | $54,586 | Contract | : Recovery Award-Restoration Stewardship project-Coyote Unit | Interior, Department of / Bureau of Land Management | 4/16/2010 |
DOLORES SOIL CONSERVATION DISTRICT | $40,000 | Contract | : Eradication of 300 acres of Tamarisk in the Canyon of the Ancients National Monument | Interior, Department of / Bureau of Land Management | 3/18/2010 |
ALLEN'S INC | $277,200 | Contract | : MECHANICAL REMOVAL OF BIOMASS | Interior, Department of / Bureau of Land Management | 6/15/2010 |
LOUIS BERGER GROUP, INC., THE | $70,527 | Contract | : The contractor will inventory (via NAIP 2009 aerial photography or GPS) and conduct field verification of the existing routes (rountes demonstrating some level of motorized use, current or historical) within the WRFO. The contractor will incorporate all v | Interior, Department of / Bureau of Land Management | 5/24/2010 |
COPPER RIVER INFORMATION TECHNOLOGY, LLC, | $97,070 | Contract | : The award is for the design, construction, and installation of a bridge for the Wood Thrush Trail to cross Thompson Creek at the Meadowood Facility in Lorton, VA. Additionally, the project will cover the restoration of the stream where the former culvert | Interior, Department of / Bureau of Land Management | 4/28/2010 |
DARK HORSE CONSTRUCTION, LLC | $74,000 | Contract | : Fuel Oil House Restoration Piedras Blancas Light Station | Interior, Department of / Bureau of Land Management | 5/14/2010 |
COUNTY OF, PALM BEACH | $186,440 | Grant | Fish, Wildlife and Plant Conservation Resource Management: JILONA Shoreline Stabilization and Enhancement Project | Interior, Department of / Bureau of Land Management | 6/29/2010 |
IIF DATA SOLUTIONS, INC. | $134,486 | Contract | : Provides technical reviews on all preliminary Information submitted by private parties for the site planning and construction of Renewable Power generation facilities. Review of independent engineering reviews performed by third parties for the contructi | Interior, Department of / Bureau of Land Management | 9/22/2009 |
FRANKIE FRIEND & ASSOCIATES, INC. | $339,393 | Contract | : Finance and Accounting Support Services. | Interior, Department of / Bureau of Land Management | 7/01/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $43,460 | Contract | : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Javelina Treatment Unit | Interior, Department of / Bureau of Land Management | 8/20/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $82,180 | Contract | : LCGR Grasslands Restoration Project, Mechanical Mesquite Reduction, Spring Treatment Unit | Interior, Department of / Bureau of Land Management | 6/09/2010 |
HOLM, BERKLEE | $73,860 | Contract | : Installation of new cattleguards and maintenance on some existing | Interior, Department of / Bureau of Land Management | 5/28/2010 |
BRONZE STAR INC. | $186,312 | Contract | : MDI Desert Tortoise Fence Install | Interior, Department of / Bureau of Land Management | 6/02/2010 |
SWISS PRECISION ENTERPRISES, INC. | $56,985 | Contract | : Trail Maintenance | Interior, Department of / Bureau of Land Management | 4/06/2010 |
INTERIOR WEST CONSULTING, LLC | $55,722 | Contract | : Interior West was contracted to complete a Class III cultural resource inventory at the Warren Bridge Public Access Site, Sublette County, Wyoming. | Interior, Department of / Bureau of Land Management | 6/04/2010 |
ALLEN'S INC | $44,000 | Contract | : MECHANICAL REMOVAL OF BIOMASS | Interior, Department of / Bureau of Land Management | 6/13/2010 |
GREEN RIVER GREENBELT TASK FORCE | $95,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Killdeer Wetlands Restoration Construction of dam to divert 5 cfs to flood an old oxbox and braids of the Green River to restore a wetland that existed before the Fontenelle resevoir was created. | Interior, Department of / Bureau of Land Management | 4/22/2010 |
EWING TRUCKING AND CONSTRUCTION, LLC | $27,757 | Contract | : Abrams Creek Culvert | Interior, Department of / Bureau of Land Management | 6/30/2010 |
SOUTHWEST SEED, INC | $27,259 | Contract | : Procure and provide native grass seed for the Canyon of the Ancients Habitat Improvement. | Interior, Department of / Bureau of Land Management | 6/01/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $66,600 | Contract | : LCGR Grassland Restoration Project Mechanical Mesquite Reduction, Eagle Treatment Unit | Interior, Department of / Bureau of Land Management | 6/14/2010 |
SOGGY BOTTOM INC | $27,616 | Contract | : Mica Bay Accessibility Improvements | Interior, Department of / Bureau of Land Management | 3/25/2010 |
GANEM/HOUSTON CONSTRUCTION, LLC | $57,082 | Contract | : Recovery Award-Restoration Stewardship Project-Corral Unit | Interior, Department of / Bureau of Land Management | 4/16/2010 |
UTAH STATE UNIVERSITY | $120,019 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Research on the Greater sage grouse seasonal habitat use and movement across the landscape in southwest Utah in order to better manage lands that may be open to wind energy development in the future. (Mar 2011) | Interior, Department of / Bureau of Land Management | 5/14/2010 |
CATE LAND INDUSTRIES INC | $150,059 | Contract | : Fell, Skid, Deck to thin stand | Interior, Department of / Bureau of Land Management | 5/21/2010 |
FRIENDS OF YAQUINA LIGHTHOUSES | $95,000 | Contract | : Yaquina Head Outstanding Natural Area Waysides Exhibit | Interior, Department of / Bureau of Land Management | 4/30/2010 |
BLOOD, JOHN | $29,100 | Contract | : stewardship - juniper release | Interior, Department of / Bureau of Land Management | 9/21/2009 |
DAYLIGHT VEGETATION MANAGEMENT, LLC | $42,551 | Contract | : MECHANICAL FUELS TREATMENT GRINDING | Interior, Department of / Bureau of Land Management | 5/20/2010 |
S BROOKS & ASSOCIATES INC | $24,635 | Contract | : Trail maintenance crew. | Interior, Department of / Bureau of Land Management | 9/10/2010 |
LAND-TECH MONTANA, INC. | $39,479 | Contract | : Dillon Trail Maintenance.Construction of 2.5 miles of hiking trail and 1 trail bridge near Dillon, MT. | Interior, Department of / Bureau of Land Management | 7/07/2010 |
ARNESEN, GENE | $20,000 | Contract | : Develop an implementation plan for trail maintenance for the trails within the McInnis Canyons National Conservation Area (MCNCA) including trails located in Rabbit Valley, Black Ridge Canyons Wilderness and the Front Country. This includes: evaluating a | Interior, Department of / Bureau of Land Management | 7/29/2010 |
CITY OF FARMINGTON | $54,419 | Contract | : Electricity extension to new facility | Interior, Department of / Bureau of Land Management | 7/08/2010 |
NATURESERVE | $1,249,867 | Contract | : Rapid Ecoregional Assessment for the Seward Peninsula, Nulato Hills, Kotzebue Lowlands, Alaska Ecoregion | Interior, Department of / Bureau of Land Management | 9/16/2010 |
DYNAMAC CORPORATION | $699,348 | Contract | : SONORAN DESERT ECOREGIONAL ASSESSMENT | Interior, Department of / Bureau of Land Management | 6/29/2010 |
S BROOKS & ASSOCIATES INC | $70,000 | Contract | : Conducting inventory and documentation of abandoned mine sites. | Interior, Department of / Bureau of Land Management | 8/27/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $68,777 | Contract | : Convert bathroom to ADA, change out flooring to be ADA compliant, change doors, hardware | Interior, Department of / Bureau of Land Management | 7/23/2010 |
LOWRY CONTRACTING INC | $27,077 | Contract | : Recovery-Arkansas River Travel Plan | Interior, Department of / Bureau of Land Management | 5/21/2010 |
J.F.NEW & ASSOCIATES INC | $3,960 | Contract | : ARRA Funded Paleo #3 Rawlins and Kemmerer South Area. The purpose of the project is to provide the Bureau of Land Management - WY State Office with information about the paleontological resources in the Rawlins South Area so that the office can make mana | Interior, Department of / Bureau of Land Management | 4/15/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $203,483 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 10 | Interior, Department of / Bureau of Land Management | 7/02/2010 |
WINZLER & KELLY | $42,788 | Contract | : Design a new 25 space parking lot adjacent to the existing driveway access to the Visitor Center. Parking lot will provide ADA access from the Visitor Center parking lot and will have a trail head connection. | Interior, Department of / Bureau of Land Management | 7/30/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $312,383 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 7 | Interior, Department of / Bureau of Land Management | 9/21/2010 |
TIERRA RIGHT OF WAY SERVICES, LTD. | $19,790 | Contract | : Black Canyon Trail condition assessment. | Interior, Department of / Bureau of Land Management | 1/07/2010 |
AECOM, INC. | $135,409 | Contract | : Noble Trail Management Plan | Interior, Department of / Bureau of Land Management | 4/20/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $315,953 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 4 | Interior, Department of / Bureau of Land Management | 9/17/2010 |
AFFILIATED CONSTRUCTION GROUP, INCORPORATED | $359,188 | Contract | : Coal Banks Building & SIte Work | Interior, Department of / Bureau of Land Management | 9/16/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $64,820 | Contract | : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Lion Treatment Unit | Interior, Department of / Bureau of Land Management | 8/20/2010 |
KUNERT ELECTRIC LLC | $69,196 | Contract | : Install solar and microhyrdo systems at the Rogue River Ranch | Interior, Department of / Bureau of Land Management | 8/11/2010 |
TIERRA RIGHT OF WAY SERVICES, LTD. | $21,680 | Contract | : Cultural Resource Inventory, Hummel House Project | Interior, Department of / Bureau of Land Management | 5/19/2010 |
TORNADO SOFT EXCAVATION | $225,101 | Contract | : Alsea Falls Waterline Replacement | Interior, Department of / Bureau of Land Management | 6/17/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $542,639 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 5 | Interior, Department of / Bureau of Land Management | 9/17/2010 |
TIERRA RIGHT OF WAY SERVICES, LTD. | $20,117 | Contract | : Aldridge Survey | Interior, Department of / Bureau of Land Management | 4/02/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $304,585 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 9 | Interior, Department of / Bureau of Land Management | 9/21/2010 |
BURLESON CONSULTING, INC. | $203,971 | Contract | : Technical Narrative for Longfellow Mill Site EE/CA and HERA, Tuolumne County, CA | Interior, Department of / Bureau of Land Management | 7/06/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $331,999 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 8 | Interior, Department of / Bureau of Land Management | 9/21/2010 |
URS GROUP, INC. | $524,311 | Contract | : Conduct field validation of Abandoned Mine Lands (AML) sites in Arizona, Nevada and California. Key objectives are to locate and visit sites and their associated features. To complete or correct the data fields using a field computer/Global Positioning Sy | Interior, Department of / Bureau of Land Management | 7/15/2010 |
HUMAN INTERACTIVE PRODUCTS, INC. | $35,550 | Contract | : Deliver 4,000 - cottonwood trees in 10 cubic inch containers, 400 cottonwood trees in 5 gallon pots, 100 cottonwood trees 10 gallon pots, and 10 cottonwood trees balled and burlapped. | Interior, Department of / Bureau of Land Management | 5/06/2010 |
QUALITY DRILLING FLUIDS ENGINEERING, INC. | $377,000 | Contract | : RECOVERY- PARK CENTER WELL ABANDONMENT | Interior, Department of / Bureau of Land Management | 7/02/2010 |
UTAH STATE UNIVERSITY | $36,000 | Grant | Recreation Resource Management: ARRA: Henry Mountain BLM 2010. Complete travel management implementation projects. | Interior, Department of / Bureau of Land Management | 3/10/2010 |
Z STEEL, L.L.C. | $22,240 | Contract | : Erection of Pre-Engineered government furnished 30'x50' building Rome, Oregon. | Interior, Department of / Bureau of Land Management | 10/13/2010 |
ALTA CONSTRUCTION INC | $42,685 | Contract | : Provide and install 1,320 lineal feet of 8 water main. Provide water service to recreational areas. | Interior, Department of / Bureau of Land Management | 6/07/2010 |
KEN'S WATER TENDER INC | $767,440 | Contract | : Keswick Area Rail Trail Paving | Interior, Department of / Bureau of Land Management | 9/10/2010 |
CASEY JONES WELL DRILLING CO | $26,580 | Contract | : Water well pump system install and filtration | Interior, Department of / Bureau of Land Management | 5/24/2010 |
PHOENIX ENVIRONMENTAL DESIGN INC. | $9,240 | Contract | : Herbicide and Seed oil | Interior, Department of / Bureau of Land Management | 8/27/2010 |
INTERNATIONAL MOUNTAIN BICYCLING ASSOCIATION | $250,000 | Grant | Recreation Resource Management: Recovery Act BLM CA Paradise Royale Mtn Bike Trail Skills Park | Interior, Department of / Bureau of Land Management | 3/04/2010 |
MIDDAKOTA VEGETATION MANAGEMEN | $67,500 | Contract | : To collect GPS date on roads trails, and 2 track roads located on BLM lands located in SD. To submit GIS date for these areas to BLM | Interior, Department of / Bureau of Land Management | 4/20/2010 |
URS GROUP, INC. | $174,588 | Contract | : Conduct site characterization activities, an Engineering Evaluation / Cost Analysis (EE/CA), a Human Health and Ecological Risk Assessment (HERA) and provide community support services. | Interior, Department of / Bureau of Land Management | 7/06/2010 |
PINEDA POST & POLES, INC. | $40,417 | Contract | : Fence Construction | Interior, Department of / Bureau of Land Management | 5/06/2010 |
ADVANCED ENERGY SYSTEMS | $447,490 | Contract | : This contract will design, engineer, procure, and construct a Solar Photovoltaic Parking Canopy of approximately 50kW DC. The parking canopy will cover an area of existing spaces and provide a degree of protection from the eliments. The electricity prod | Interior, Department of / Bureau of Land Management | 8/17/2010 |
BARNUM CONSTRUCTION SERVICES, LLC | $34,882 | Contract | : Build and Install Artesian Well Heads | Interior, Department of / Bureau of Land Management | 5/25/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $67,860 | Contract | : LCNCA Grassland Restoration Project-Mechanical Mesquite Reduction, Hackberry Treatment Unit | Interior, Department of / Bureau of Land Management | 8/21/2010 |
EXTREME CONSTRUCTION CO. | $50,710 | Contract | : Signifacant deliveries include a 55x3.5 underhung weathering steel bridge, and two precast abutments. Overall purpose is to improve existing trails in the Alpine Gulch area, with the expectations that this project will add to the beautification and safety | Interior, Department of / Bureau of Land Management | 7/02/2010 |
KENS WATER TENDER INC | $238,431 | Contract | : Motion Creek stream Crossing | Interior, Department of / Bureau of Land Management | 7/23/2010 |
BERNTSEN INTERNATIONAL, INC. | $31,688 | Contract | : Survey monuments | Interior, Department of / Bureau of Land Management | 8/17/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $79,260 | Contract | : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Rabbit Treatment Unit | Interior, Department of / Bureau of Land Management | 8/21/2010 |
C3 LIMITED LIABILITY COMPANY | $7,069,529 | Contract | : KANAB OFFICE BUILDING | Interior, Department of / Bureau of Land Management | 9/16/2010 |
MIDNIGHT HARVESTING | $370,235 | Contract | : The project entails mechanical removal of juniper trees on 2300 acres of BLM land. Juniper is bunched,skidded,chipped an hauled to a biomass power plant. Contractor will construct all roads, remove the juniper, and chainsaw/slash all stumps and small tree | Interior, Department of / Bureau of Land Management | 5/28/2010 |
MARSHALL'S ELECTRIC, INC | $100,000 | Contract | : install solar panels | Interior, Department of / Bureau of Land Management | 5/24/2010 |
ENVIRONMENTAL EXCAVATION LLC | $76,705 | Contract | : Gunnison Gorge NCA River Restoration Herbaceous weed Treatment and Tamarisk Russian olive controle | Interior, Department of / Bureau of Land Management | 3/30/2010 |
SPENCER, MARK | $198,000 | Contract | : Stewardship Project Removal and use of biomass that needs to be thinned on the project. It is a trade for goods and services, but the services usually cost more. | Interior, Department of / Bureau of Land Management | 9/22/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $29,100 | Contract | : LCNCA Grassland Restoratioon Project - Mechanical Mesquite Reduction, Goulds Treatment Unit | Interior, Department of / Bureau of Land Management | 8/27/2010 |
WOOD MACKENZIE INC | $53,500 | Contract | : delivery/subscription | Interior, Department of / Bureau of Land Management | 6/09/2010 |
SNOW DEVELOPMENT LLC | $45,600 | Contract | : gila box salt cedar removal | Interior, Department of / Bureau of Land Management | 3/18/2010 |
WEBER DRILLING | $108,664 | Contract | : Drill new wells for scab Crk. Campground, near Pinedale Wyoming | Interior, Department of / Bureau of Land Management | 6/09/2010 |
MARSH CREEK, LLC | $221,858 | Contract | : Debris Removal and Disposal Create access for heavy equipment to remove overgrown vegetation surrounding the powderhouse structure before accessing and removing the remaining remnant of the powderhouse structure. Explosive Hazard Mitigation Perform an i | Interior, Department of / Bureau of Land Management | 8/18/2010 |
E SCHAAF & ASSOCIATES INC | $236,873 | Contract | : RECOVERY: Goodsprings AML Cadastral Survey | Interior, Department of / Bureau of Land Management | 2/03/2010 |
HIGH COUNTRY EQUIPMENT | $28,938 | Contract | : Safeguard mine sites by filling entrances to close various mines in Southwestern Oregon | Interior, Department of / Bureau of Land Management | 8/25/2010 |
SWEAT, ROBERT | $95,850 | Contract | : RECOVERY ARRA ROAD BRUSHING | Interior, Department of / Bureau of Land Management | 8/19/2010 |
SCHAEFER FENCING, LLC | $48,620 | Contract | : Swamp Creek Juniper Cut and Machine Pile, 143 Acres. | Interior, Department of / Bureau of Land Management | 7/21/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $203,223 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 6 | Interior, Department of / Bureau of Land Management | 9/22/2010 |
YEH AND ASSOCIATES, INC | $338,817 | Contract | : Construction Administration, construction observation, and LEED Commissioning of the Kanab Office Building, Kanab, UT | Interior, Department of / Bureau of Land Management | 8/27/2010 |
CSC ELECTRIC LLC | $65,969 | Contract | : Greenwood Communications sites improvement including electical, fencing and concrete work. | Interior, Department of / Bureau of Land Management | 3/25/2010 |
ALLIED GIS INC | $180,000 | Contract | : The Contractor shall be responsible for providing comprehensive onsite GIS support at the BLM California State Office, Support Services - GCDB & Mapping Sciences. Under this contract, the contractor will independently provide GIS support services to satis | Interior, Department of / Bureau of Land Management | 4/06/2010 |
WHITNEY ENVIRONMENTAL CONSULTING, INC. | $37,369 | Contract | : Upon final completion, the new interpretive trail facilities will replace or update similar facilities in the area that are outdated and inadequately designed. This recreation facility enhancement project will establish new intrepretive trail alignments | Interior, Department of / Bureau of Land Management | 7/20/2010 |
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. | $265,569 | Contract | : Burns Steens Loop Road Reconstruction, Burns District Segment 3 | Interior, Department of / Bureau of Land Management | 9/17/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $73,940 | Contract | : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Elk Treatment Unit | Interior, Department of / Bureau of Land Management | 8/21/2010 |
TRINIDAD A. ESCARENO | $209,049 | Contract | : RECOVERY PINOS ALTOS FUEL REDUCTION | Interior, Department of / Bureau of Land Management | 4/28/2010 |
HYDRO RESOURCES - ROCKY MOUNTAIN, INC. | $2,761,425 | Contract | : Recovery: Park Center WEll | Interior, Department of / Bureau of Land Management | 4/01/2010 |
SWCA, INCORPORATED | $360,403 | Contract | : Ethnography for solar PEIS. 1. Conduct ethnographic research on the Tribes to provide more clarity on which group(s) inhabited the study areas during the late prehistoric period; characterize late prehistoric and early historic period Native American cult | Interior, Department of / Bureau of Land Management | 9/17/2010 |
TIERRA RIGHT OF WAY SERVICES, LTD. | $10,830 | Contract | : Cultural Survey, Bird Dog Project | Interior, Department of / Bureau of Land Management | 6/21/2010 |
COAL BED CREEK CONSTRUCTION INC | $106,590 | Contract | : Recovery-Dolores Habitat Restoration Quakie Mowing Project | Interior, Department of / Bureau of Land Management | 6/01/2010 |
HOMESTEAD VINYL FENCE, INC. | $77,600 | Contract | : San Pedro Riparian NCA Trailhead Reconstruction | Interior, Department of / Bureau of Land Management | 9/22/2010 |
E SCHAAF & ASSOCIATES INC | $79,485 | Contract | : Spruce Mountain AML Cadastral Survey | Interior, Department of / Bureau of Land Management | 6/29/2010 |
YEH AND ASSOCIATES, INC | $260,764 | Contract | : Ruby Mountain hot Shot CA Title III Services | Interior, Department of / Bureau of Land Management | 6/30/2010 |
BASIN TREE SERVICE & PEST CONTROL, INC. | $62,080 | Contract | : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Jaguar Treatment Unit | Interior, Department of / Bureau of Land Management | 8/20/2010 |
FELLER ENTERPRISES, LLC | $75,000 | Contract | : tree planting | Interior, Department of / Bureau of Land Management | 4/30/2010 |
BLOOMIN RANCH SERVICE, LLC | $212,509 | Contract | : Fuels reduction, forest health and wildlife habitat restoration project in regards to pinyon & juniper forest. | Interior, Department of / Bureau of Land Management | 7/09/2010 |
AIRBORNE VETERANS SERVICES, INC. | $64,000 | Contract | : INSTALLATION OF 6 SOLAR POWERED LIGHTS AT THE BOAT RAMP | Interior, Department of / Bureau of Land Management | 4/01/2010 |
ENVIRONMENTAL MANAGEMENT INC | $216,787 | Contract | : Contracted to excavate and remove four UST's and 6 AST's coated with lead based paint. Working includings removing contents of tanks, interting, clearning, remvoing lead based paint and cutting the tanks. Field screeing, indentifications of POL contamin | Interior, Department of / Bureau of Land Management | 5/19/2010 |
NEW MEXICO GAS COMPANY, INC. | $49,801 | Contract | : dISTRIBUTION GAS MAIN LINE EXTENSION FOR NEW blm BUILDING. | Interior, Department of / Bureau of Land Management | 9/08/2010 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $81,892 | Contract | : Las Cienegas National Conservation Area Recovery Award for Restoration Stewardship project to perform mechanical Mesquite reduction for treatment unit Creek consisting of approx. 157 acres. | Interior, Department of / Bureau of Land Management | 9/14/2010 |
L AND I FENCE CONSTRUCTION, INC. | $91,612 | Contract | : Fence Maint. and Repairs | Interior, Department of / Bureau of Land Management | 5/05/2010 |
E SCHAAF & ASSOCIATES INC | $178,725 | Contract | : Table MTN - Goodsprings AML Survey | Interior, Department of / Bureau of Land Management | 6/28/2010 |
O.E.S., INC. | $77,220 | Contract | : Abandonded mine site cleanup. | Interior, Department of / Bureau of Land Management | 6/02/2010 |
FREEPORT-MCMORAN CORPORATION | $79,400 | Contract | : Recovery award - sky islands & desert seas restoration, Phase II, Eagle Creek Access Barriers& Habitat Improvement | Interior, Department of / Bureau of Land Management | 4/27/2010 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $73,984 | Contract | : Las Cienegas National Conservation Area Recovery Award for Restoration Stewardship project to perform mechanical Mesquite reduction for treatment unit Cottonwood consisting of approx. 139 acres | Interior, Department of / Bureau of Land Management | 9/14/2010 |
PREMIER DATA SERVICES, INC | $376,558 | Contract | : The Bureau of Land Management (BLM) maintains vital records of public land ownership in New Mexico in the form of Control Document Index (CDI) aperture cards. The BLM New Mexico State Office has only one set of these aging microfilm aperture cards that a | Interior, Department of / Bureau of Land Management | 8/30/2010 |
METROSCAPE LAND MANAGEMENT GROUP, LLC | $76,917 | Contract | : Las Cienegas National Conservation Area Recovery Award Restoration Stewardship project to perform mechanical Mesquite reduction to treatment unit Bear consisting of approx 147 acres | Interior, Department of / Bureau of Land Management | 9/14/2010 |
LESTER L BROCK CONSTRUCTION CO. | $56,680 | Contract | : Eugene Roof replacement | Interior, Department of / Bureau of Land Management | 8/04/2010 |
EGS INC. | $120,000 | Contract | : Contracting Officer Support | Interior, Department of / Bureau of Land Management | 6/28/2010 |
HIGH MOUNTIAN EXTREMES | $27,500 | Contract | : Madison Road Repair, Axolotl Lakes Access Road #2623 | Interior, Department of / Bureau of Land Management | 7/07/2010 |
FELLER ENTERPRISES, LLC | $163,000 | Contract | : water line | Interior, Department of / Bureau of Land Management | 7/20/2010 |
ENVIRONMENTAL MANAGEMENT INC | $98,635 | Contract | : Lead paint abatement, surface preparation and painting at BLM Maintenance Shop | Interior, Department of / Bureau of Land Management | 6/02/2010 |
SNOW DEVELOPMENT LLC | $45,600 | Contract | : salt cedar removal | Interior, Department of / Bureau of Land Management | 3/18/2010 |
SPANO, CHRISTOPHER | $198,475 | Contract | : Validate and Upgrade Protracted Townships: Validate all protracted or partially protracted townships that meet the criteria stated in the overview of this document. This will include Amended Protraction Diagrams (APD). An initial query of the BLM?s Geo | Interior, Department of / Bureau of Land Management | 1/22/2010 |
STRATIFIED ENVIRONMENTAL AND ARCHAEOLOGICAL SERVICES, LLC | $17,883 | Contract | : Dawson Draw 2 Class III Cultural Inventory: This is an intensive survey of 484.3 acres in 4 parcels identified by the BLM for habitat restoration for the Gunnison Sagegrouse and Desert Bighorn. The area will be intensively surveyed for cultural resource | Interior, Department of / Bureau of Land Management | 9/16/2010 |
PREMIER DATA SERVICES, INC | $282,819 | Contract | : The purpose of this task addition is to increase the number of contract employees to facilitate the completion of the Control Document Index (CDI) support under the original (Non-ARRA) task order. Approximately 330,000 cards will be scanned and indexed | Interior, Department of / Bureau of Land Management | 8/26/2010 |
E SCHAAF & ASSOCIATES INC | $139,282 | Contract | : Sandy Valley - Goodsprings AML Survey | Interior, Department of / Bureau of Land Management | 6/28/2010 |
CATE LAND INDUSTRIES INC | $150,059 | Contract | : Skunk Creek | Interior, Department of / Bureau of Land Management | 5/21/2010 |
HATROCK EXCAVATION LLC | $32,982 | Contract | : THE JOB IN SHOSHONE IS TO REMOVE ALL EXSISTING CONCRETE WALK WAYS AND EXCAVATE OUT TO A DEPTH TO ALLOW IMPORT OF 3/4 ROED BASE OF A COMPACTED BASE OF 6 INCHES AT 95% COMPACTED. THAN POUR BACK OF NEW CONCRETE SIDEWALKS. | Interior, Department of / Bureau of Land Management | 5/07/2010 |
E SCHAAF & ASSOCIATES INC | $286,741 | Contract | : Fast Tracks Township GPS Collection | Interior, Department of / Bureau of Land Management | 6/28/2010 |
HEART OF OREGON CORPS, INC. | $15,400 | Grant | Recreation Resource Management: To provide youth the opportunity to connect with the natural world through completion of natural resource project on Federal lands within Oregon. These projects will provide youth with positive work experiences, development of work skills, a sense of per | Interior, Department of / Bureau of Land Management | 6/24/2010 |
TIERRA RIGHT OF WAY SERVICES, LTD. | $21,680 | Contract | : Cultural Survey, Empire Well Project | Interior, Department of / Bureau of Land Management | 6/23/2010 |
PALEOWEST, L.L.C. | $10,750 | Contract | : Conduct a Class III cultural resource inventory of the project area, record all cultural resource properties and recommend NRHP eligibility. | Interior, Department of / Bureau of Land Management | 9/17/2009 |
TRINIDAD A. ESCARENO | $134,858 | Contract | : treatment was done by hand-cutting( chainsaws )all cut material 4 inches was bucked into lengths of 4 to 6 feet and left on sites to allow for fuelwood sales | Interior, Department of / Bureau of Land Management | 4/14/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $68,777 | Contract | : Remodel bathroom into ADA compliant bath, remove carpet, install tile and plastic laminate flooring, Install concrete garage apron | Interior, Department of / Bureau of Land Management | 7/23/2010 |
SPECIALIZED STEEL CONTRACTORS INC | $694,755 | Contract | : PHASE I PRE-ENGINEERED PICNIC SHELTERS, DEMOLISH SHELTERS, DEMOLIS VAULT-PHASE II POUR CONCRETE PADS, ERECT SHELTERS, RELOCATE GRILL, FIRE RINGS-PHSE IV DEMOLISH SHELTER, INSTALL GOVERMENT FURNISHED TABLE, CONSTRUCT ROCKWALL | Interior, Department of / Bureau of Land Management | 5/12/2010 |
HARWARD & REES, INC. | $225,637 | Contract | : Construct new cabin for the BLM on the Henry Mountains | Interior, Department of / Bureau of Land Management | 5/05/2010 |
DOLORES SOIL CONSERVATION DISTRICT | $40,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Eradication of 300 acres of Tamarisk in the Canyon of the Ancients National Monument | Interior, Department of / Bureau of Land Management | 3/18/2010 |
RIDGE ELECTRIC LLC | $19,900 | Contract | : Recovery Low Gap Solar Project | Interior, Department of / Bureau of Land Management | 3/10/2010 |
SPECIALIZED STEEL CONTRACTORS INC | $49,843 | Contract | : AGGREGATE PARKING AREA RECONDITION, CLEARING AND GRUBBING, EXCAVATION,CRUSHER FINES, PEA GRAVEL, RIP RAP,PAVEMENT SURFACE TREATMENT, CONRETE | Interior, Department of / Bureau of Land Management | 4/13/2010 |
CRYSTAL CLEAR MAINTENANCE, INC. | $39,525 | Contract | : Upper Aurora Canyon Lowers Summer Sagebrush Restoration Cut& Pile/Lop & Scatter | Interior, Department of / Bureau of Land Management | 3/01/2010 |
PRIDEMORE CONSTRUCTION INC | $60,486 | Contract | : FIVE POINTS RESTROOMS REPLACEMENT | Interior, Department of / Bureau of Land Management | 12/16/2009 |
G. R. WILCOX ENTERPRISES, INC. | $386,011 | Contract | : REPAVING PARTS OF SHELTER COVE AND SLURRY SEALING CHEMISE MTN ROAD. EQUIPMENT USED: DUMP TRUCKS, ROLLER, PAVING MACHINE. | Interior, Department of / Bureau of Land Management | 6/07/2010 |
PALEOWEST, L.L.C. | $7,500 | Contract | : The contract is to complete a Class III cultural resource inventory for the BLM Gila District Office. | Interior, Department of / Bureau of Land Management | 6/07/2010 |
EL AERO SERVICES, INC. | $38,678 | Contract | : Tuscarora Aerial Seeding | Interior, Department of / Bureau of Land Management | 3/03/2010 |
TERRITORY NORTH CONSTRUCTORS, LLC | $185,300 | Contract | : Remove 85' bridge and replace with a 115' bridge. | Interior, Department of / Bureau of Land Management | 3/30/2010 |
MONTEZUMA, COUNTY OF | $30,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Invasive and Noxious Plant Management | Interior, Department of / Bureau of Land Management | 3/18/2010 |
PALEOWEST, L.L.C. | $19,767 | Contract | : Contract was for a Class III cultural resource survey in the West End Project Area for the Safford Field Office. | Interior, Department of / Bureau of Land Management | 7/22/2010 |
COLORADO WOOD COMPANY | $122,247 | Contract | : Recovery-Royal Gorge Biomass Project, Buffalo Gulch Stewardship Project. This project consists of the thinning of conifer tree seedlings/saplings on 141 acres of BLM forest land for forest health and fire prevention. All merchantable wood will be removed | Interior, Department of / Bureau of Land Management | 5/28/2010 |
CUDDY & ASSOCIATES | $44,261 | Contract | : GPS for GCDB Area 2 | Interior, Department of / Bureau of Land Management | 5/03/2010 |
SPECIALIZED STEEL CONTRACTORS INC | $221,194 | Contract | : CONTRACTOR SHALL FURNISH ALL SUPERVISOR, LABOR, MATERIALS, EQUIPMENT AND SUPPLIES NECESSARY TO RENOVATE NINE BUILDINGS | Interior, Department of / Bureau of Land Management | 5/18/2010 |
COLORADO YOUTH CORPS ASSOCIATION | $55,000 | Grant | Recreation Resource Management: Youth corps to complete work projects related to trail management projects in the Gunnison Gorge National Conservation Area | Interior, Department of / Bureau of Land Management | 3/15/2010 |
LUCK STONE CORPORATION | $76,230 | Contract | : VDOT 21A AGGREGATE VDOT CLASS 1 RIP RAP VDOT CLASS 2 RIP RAP VDOT 57 CRUSHED STONE VDOT GABION STONE | Interior, Department of / Bureau of Land Management | 8/26/2009 |
FRIENDS OF YAQUINA LIGHTHOUSES | $95,000 | Grant | Recreation Resource Management: Yaquina Head Outstanding Natural Area Waysides Exhibit | Interior, Department of / Bureau of Land Management | 4/30/2010 |
C TRIANGLE COMPANIES | $83,453 | Contract | : Recovery Stones Bengard Stewardship | Interior, Department of / Bureau of Land Management | 3/30/2010 |
WESTERN ECOSYSTEMS TECHNOLOGY, INC. | $245,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: The purpose of the contract is to identify the habitat selection and distribution patterns of mule deer in the Jack Morrow Hills region of southwest Wyoming. Project will include capture and subsequent monitoring of approximately 40 GPS-collalared mule deer... Show more | Interior, Department of / Bureau of Land Management | 2/16/2010 |
POEHLS CONSTRUCTION LLC | $29,950 | Contract | : AFS Door Operators | Interior, Department of / Bureau of Land Management | 6/02/2010 |
EGS INC. | $120,000 | Contract | : Provide non personal services of a contract specialist to acquisition branch of BLM. Requires extensive knowldge of pre-award effort, post award admin. and contract closeout | Interior, Department of / Bureau of Land Management | 7/01/2010 |
COUNTY OF DUNN | $63,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: CHEMICAL TREATMENT OF NOXIOUS WEEDS | Interior, Department of / Bureau of Land Management | 2/04/2010 |
DAYLIGHT VEGETATION MANAGEMENT, LLC | $45,310 | Contract | : fuels management | Interior, Department of / Bureau of Land Management | 6/01/2010 |
VERMILLION CHAPTER CAS | $29,471 | Grant | Recreation Resource Management: Sand Wash Basin Survey | Interior, Department of / Bureau of Land Management | 3/17/2010 |
JOB COUNCIL, THE | $80,000 | Grant | Recreation Resource Management: To provide qualified youth conservation corps employment opportunities for at risk youth, ages 16-24, to accomplish heavy duty trail maintenance. | Interior, Department of / Bureau of Land Management | 1/25/2010 |
SELLERS, JOHN H | $7,425 | Contract | : Electric system install-Vale | Interior, Department of / Bureau of Land Management | 12/10/2010 |
MARINE CO., INC. | $40,835 | Contract | : Furnish labor, equipment, supplies and materials to remove/replace the existing boat launch ramp at the Killarney Lake Recreation Site. Demolish and remove the existing concrete ramp and replace with a new design as shown in the plans and specifications. | Interior, Department of / Bureau of Land Management | 4/02/2010 |
SNOW DEVELOPMENT LLC | $45,600 | Contract | : gila box salt cedar removal | Interior, Department of / Bureau of Land Management | 3/18/2010 |
EDL CONSTRUCTION, INC. | $366,392 | Contract | : RECOVERY PICNIC SHELTERS AND TRIOSKS | Interior, Department of / Bureau of Land Management | 4/09/2010 |
MEGAN ROBINSON | $52,300 | Contract | : 2 Plant species surveys. | Interior, Department of / Bureau of Land Management | 6/29/2010 |
NATURESERVE | $25,134 | Contract | : Species Lists by HUC-10 Watersheds | Interior, Department of / Bureau of Land Management | 2/07/2011 |
HEDGEROW FARMS | $7,681 | Contract | : Native Seed | Interior, Department of / Bureau of Land Management | 8/12/2010 |
MARTIN EXCAVATING LLC | $109,500 | Contract | : Removing existing boat ramp and constructing new boat ramp. Excavating old material, using new material, surveying, grading, placing articulated concrete blocks | Interior, Department of / Bureau of Land Management | 3/24/2010 |
SLAYTON, LINDA M | $26,825 | Contract | : Weed Spraying | Interior, Department of / Bureau of Land Management | 9/15/2011 |
HOBSON FABRICATING CORP. | $232,688 | Contract | : BLDG 100 ENVIRONMENTAL SYSTEM REPLACEMENT: Replacement of three multi-zone units, associated ductwork in mechanical room, controls for multi-zone units and zone thermostats in Building 100 | Interior, Department of / Bureau of Land Management | 3/26/2010 |
BLOOD, JOHN | $29,100 | Contract | : TSI/product removal | Interior, Department of / Bureau of Land Management | 9/21/2009 |
MONTEZUMA, COUNTY OF | $30,000 | Grant | Fish, Wildlife and Plant Conservation Resource Management: Noxious weed control, inventory and monitoring within the Bureau of Land Management Canyon of the Ancients National Monument. | Interior, Department of / Bureau of Land Management | 3/18/2010 |
MADISON COUNTY (INC) | $135,000 | Grant | Invasive and Noxious Plant Management: Invasive Species Management - ARRA | Interior, Department of / Bureau of Land Management | 12/17/2009 |
BEAVERHEAD COUNTY WEED DISTRICT | $159,000 | Grant | Invasive and Noxious Plant Management: Invasive Species Managment - ARRA | Interior, Department of / Bureau of Land Management | 12/17/2009 |