Recovery Tracker

How Much Stimulus Funding is Going to Your County?

Listing all stimulus spending by amount, in descending order. Return to Bureau of Land Management page

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Type Description Federal Dept./Agency Date
CXT INCORPORATED $34,999 Contract : HUCKLEBERRY CG TOILET REPLACEMENT. Interior, Department of / Bureau of Land Management 3/17/2010
ERM-WEST, INC $40,179 Contract : ERM to perform environmental investigation of the BLM Octave Mill Site in Yavapai County, Arizona. The investigation will include environmental sampling to determine the nature and extent of suspected soil contamination from the abandoned gold mine activ Interior, Department of / Bureau of Land Management 1/06/2010
STEVENSON INTERMOUNTAIN SEED $46,158 Contract : To provide native seed for revegetation and reclamation of Sage Grouse habitat. Interior, Department of / Bureau of Land Management 2/11/2010
ECOLOGY AND ENVIRONMENT, INC. $273,990 Contract : Preparation of an Environmental Evaluation/Cost Analysis (EE/CA) for the Helen mercury mine site. Perform historical document review, a limited site investigation which will include soil and groundwater sampling, preparation of a topographic map of the si Interior, Department of / Bureau of Land Management 2/10/2010
SUMMITT FORESTS INC $17,908 Contract : FANDANGO MECHANICAL FUELS TREATMENT Interior, Department of / Bureau of Land Management 3/29/2010
S & L INDUSTRIAL $544,684 Contract : Installing Aggregate Base, Hot Asphalt Concrete Paving, Chip & Fog Seal Interior, Department of / Bureau of Land Management 2/05/2010
WESTON SOLUTIONS, INC $121,516 Contract : The project award is to conduct a remedial investigation and feasiblity study (RIFS) for a former manganese millsite located in Wickenburg, Arizona. The work is being peformed for the Bureau of Land Management (BLM) as the study area is located on BLM adm Interior, Department of / Bureau of Land Management 1/04/2010
GREAT BASIN INSTITUTE $217,336 Grant Forests and Woodlands Resource Management: These projects are designed to improve forest health and support habitat restoration on public lands. For American Recovery and Reinvestment Act (ARRA) funded projects, in addition to the program objectives above, section 3 of the Recovery and Reinvestme Interior, Department of / Bureau of Land Management 2/16/2010
PREMIER DATA SERVICES, INC $224,225 Contract : The Bureau of Land Management (BLM) has been compiling survey information and Global Positioning System (GPS) positions on survey monuments to accurately portray the Public Land Survey System (PLSS) in support of parcel based recording, analysis and displ Interior, Department of / Bureau of Land Management 3/30/2010
PREMIER DATA SERVICES, INC $195,841 Contract : Under the American Recovery and Reinvestment Act (ARRA) of 2009, New Mexico BLM has been tasked with ensuring positional mapping accuracy of records and boundaries in support of renewable energy development. An export of ? Solar Energy Study Sites, ? Au Interior, Department of / Bureau of Land Management 1/07/2010
AGRARIAN RESEARCH AND MANAGEMENT COMPANY LTD. $315,865 Contract : Fuels Management Monitoring project to support BLM Palm Springs - South Coast Field Office fuels management program for community protection and habitat improvement. Note: BLM modified award amt from original $313,364.00 to $315,865.00 with Mod 1. Interior, Department of / Bureau of Land Management 2/06/2009
ARCHITECTURAL & ENVIRONMENTAL ASSOCIATES INC $150,000 Contract : Design and Install Pv Solar system on pole mounted tracking systems at four location with concrete pad and fence at each location Interior, Department of / Bureau of Land Management 3/30/2010
PEACEPIPE CONSTRUCTION FABRICATION INC $109,287 Contract : PATB Seal Coating - DOI - Bureau of Land Management - Pocatello Air Attack Tanker Base - Pocatello, Power County, Idaho - Seal coat existing tarmac pavement and apply pavement markings. Site will require cracks in asphalt to be cleaned and filled. Interior, Department of / Bureau of Land Management 2/08/2010
SUMMITT FORESTS INC $18,564 Contract : HR Gunnison Gorge Sage Grouse Habitat Restoration Interior, Department of / Bureau of Land Management 3/01/2010
RML INCORPORATED $49,400 Contract : Trenched and buried two runs of 5200' of 2 Schedule 40 PVC. The utility line was ditched along St. Joe River Road along the highway from the nearest Verizon service pedestal. The overall purpose is to provide phone service for emergencies and other basic Interior, Department of / Bureau of Land Management 1/22/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $387,276 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 2 Interior, Department of / Bureau of Land Management 5/03/2010
THE STUDENT CONSERVATION ASSOCIATION INC $34,077 Grant Recreation Resource Management: The award funds services to the BLM Alaska Field Office for work located at Fort Egbert National Historic Landmark, provided by the Student Conservation Association's Conservation Crew program, which recruits and places qualified young people for environm Interior, Department of / Bureau of Land Management 4/29/2010
SUMMITT FORESTS INC $106,128 Contract : CROOKED CRAB PRE-COMMERCIAL THINNING Interior, Department of / Bureau of Land Management 6/15/2010
GREGORY, THOMAS $130,031 Contract : Sac River Bend irrigation pipline construction. Install 5400' of 8 irrigation line. Interior, Department of / Bureau of Land Management 6/01/2010
ABEGGLEN CONSTRUCTION INC $118,600 Contract : Shoshone window and door replacement Interior, Department of / Bureau of Land Management 1/22/2010
USKH INC. $30,596 Contract : Design task order for emergency generator design for Anchorage Field Office complex at CTF Interior, Department of / Bureau of Land Management 12/11/2009
PREMIER DATA SERVICES, INC $412,796 Contract : The Bureau of Land Management (BLM) maintains vital records of public land ownership in Arizona in the form of Control Document Index (CDI) aperture cards. The BLM Arizona State Office has only one set of these aging microfilm aperture cards that are cumb Interior, Department of / Bureau of Land Management 2/05/2010
MANGI ENVIRONMENTAL GROUP, INC. $72,735 Contract : Prepare an Environmental Assessment to analyze a potential impact for a Exotic Plant Control along the Dalton Highway. Interior, Department of / Bureau of Land Management 3/13/2010
OUTDOOR CREATIONS, INC. $24,281 Contract : Manufacture and deliver 20 concerete trash cans and 20 concrete picnic tables Interior, Department of / Bureau of Land Management 2/26/2010
HONEY LAKE VLY.RES.CONSERV.DIST. $303,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Dodge Reservoir Habitat Restoration Project. This project is part of the Conservation Strategy for Sage Brush and Sage Steppe Ecosystems within the Buffalo Skedaddle Population Management Unit. Interior, Department of / Bureau of Land Management 12/17/2009
S BROOKS & ASSOCIATES INC $45,542 Contract : Staff Assistant Contracting Interior, Department of / Bureau of Land Management 12/14/2009
TETRA TECH EM, INC. $26,956 Contract : Conduct a removal site investigation at Badger Hill Hydraulic Mine. Interior, Department of / Bureau of Land Management 2/18/2010
STANTEC CONSULTING SERVICES INC. $187,360 Contract : BLM issued a task order against Contract No. L09PC00074 for Corner Recovery & GPS Measurement of Coordinate Positions within Idaho. Interior, Department of / Bureau of Land Management 3/31/2010
SOLLERS CONSTRUCTION, LLC $59,990 Contract : ARAVAIPA UPLAND EROSION CONTROL PROJECT- Sollers Construction will locate and construct various types of check dams required to control erosion within the project site. This project is located in Graham & Pinal counties in Arizona and is subject to davis- Interior, Department of / Bureau of Land Management 4/02/2010
HIGH COUNTRY EQUIPMENT $12,660 Contract : HR Gunnison Sage Grouse Habitat improvements. Interior, Department of / Bureau of Land Management 5/28/2010
SOUTHWEST CONSERVATION CORPS $50,000 Grant Fish, Wildlife and Plant Conservation Resource Management: SCC will assist BLM by involving youth and young adults in habitat restoration conservation projects that promote leadership, teamwork, work skills, conflict resolution skills, environmental stewardship and personal responsibility, and that e... Show more Interior, Department of / Bureau of Land Management 3/18/2010
JACKSON, DANA W $43,800 Contract : SKY ISLAND AND DESERT SEAS RESTORATION Interior, Department of / Bureau of Land Management 3/19/2010
PALEOWEST, L.L.C. $10,101 Contract : Cultural assessment services to occur within the Las Cienegas National Conservation Area. Interior, Department of / Bureau of Land Management 9/22/2009
PREMIER DATA SERVICES, INC $37,381 Contract : The Bureau of Land Management (BLM), Oregon State Office, Branch of Geographic Sciences, is responsible for the update and maintenance of BLM's official title, land, and mineral records. This includes tracking federal interest in both Oregon and Washingto Interior, Department of / Bureau of Land Management 3/25/2010
UTAH STATE UNIVERSITY $150,000 Grant Recreation Resource Management: ARRA: Moab BLM 2010. $150,000. Complete travel management plan implementation projects. Interior, Department of / Bureau of Land Management 2/24/2010
CRYSTAL CLEAR MAINTENANCE, INC. $39,525 Contract : Upper Aurora Canyon/Lower Summers Sagebrush Restoration Cut & Pile/Lop & Scatter Vegetation Treatment Interior, Department of / Bureau of Land Management 3/01/2010
ASM AFFILIATES INC $14,707 Contract : Archaeological Monitoring for the Dos Palmas Tamarisk Removal Project. Interior, Department of / Bureau of Land Management 2/18/2010
CONSTRUCTION SERVICE CORPORATION $323,958 Contract : Furnish labor, equipment, supplies and materials to change existing barbed wire fences to four strand wire fences to meet wildlife friendly specifications Interior, Department of / Bureau of Land Management 2/10/2010
CONSTRUCTION SERVICE CORPORATION $76,231 Contract : Furnish labor, equipment, supplies and materials to change existing barbed wire fences to four strand wire fences to meet wildlife friendly specifications Interior, Department of / Bureau of Land Management 2/09/2010
LANTOS, TOM E $34,840 Contract : Recovery- Turn Point Barn Roofing, Spokane District Interior, Department of / Bureau of Land Management 4/16/2010
HARWARD & REES, INC. $225,637 Contract : Renovation of the Hancock Cabin on the Henry Mountains for the Bureau of Land Management Interior, Department of / Bureau of Land Management 5/05/2010
COPP CONTRACTING INC $91,204 Contract : parking lot construction chipseal, labor and material Interior, Department of / Bureau of Land Management 11/09/2009
HKM ENGINEERING INC. $121,332 Contract : Dam Conditions Assessment. Totally compete the provided Dam Condition Assessment Checklist. The non checklist portion (survey data and calculations) (page 1 through 4) of the form may be completed on a computer, with the deliverable portion of the form Interior, Department of / Bureau of Land Management 7/23/2009
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $232,264 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 11 Interior, Department of / Bureau of Land Management 5/03/2010
SWEAT LLC $8,954 Contract : PURCHASE ORDER L10PX03285 FOR THE REMOVAL OF BLACK MUSTARD AND SHORT-POD MUSTARD. Interior, Department of / Bureau of Land Management 6/04/2010
CROP PRODUCTION SERVICES, INC. $20,000 Contract : These funds will provide herbicide and related services for invasive species removal/treatment. Interior, Department of / Bureau of Land Management 3/23/2010
MARCHANT CONSTRUCTION, LLC $143,225 Contract : We are going to excavate out for gabion baskets, lay fabric down place baskets and then fill with rock. Interior, Department of / Bureau of Land Management 4/22/2010
COOKS CONSTRUCTION LLC $29,991 Contract : Building Roads and Camping Sites. Bladed roads, hauled gravel Interior, Department of / Bureau of Land Management 6/02/2010
PACIFIC EXCAVATION INC. $1,601,631 Contract : STARVING WHITEHORSE CULVERT AND SURFACE REPLACEMENT Interior, Department of / Bureau of Land Management 4/27/2010
DEANDA CONSTRUCTION, INC. $97,322 Contract : SAN PEDRO TRAILHEAD COMFORT STATIONS Interior, Department of / Bureau of Land Management 3/16/2010
LANCASTER JR, DAVID B $99,500 Contract : Hyatt lake sewage upgrade Interior, Department of / Bureau of Land Management 5/27/2010
REFUGE BUILDERS LLC $73,184 Contract : SAN PEDRO RIPARIAN NCA TRAILHEAD RECONSTRUCTION Interior, Department of / Bureau of Land Management 6/29/2010
ALL ROCK, LLC $139,328 Contract : HAUL SUPPLY ROCK TO FOUR STOCK PILS SITES Interior, Department of / Bureau of Land Management 6/03/2010
GLOBAL FRONTLINE SOLUTIONS LLC $228,030 Contract : Grassland Restoration Buckhorn Juniper. Slashing, lop, and scatter of juniper. 50 miles west of Artesia, NM. Interior, Department of / Bureau of Land Management 4/14/2010
SKIP HUSTON CONSTRUCTION INC $791,926 Contract : Repairs and rehabilitation to various roads and trailheads in the Gunnison Gorge National Conservation Area, in Montrose and Delta Counties, Colorado. Interior, Department of / Bureau of Land Management 6/03/2010
CELIK ENGINEERING CORP $312,000 Contract : Removal and replacement of the existing water main with a new one at Shotgun Creek Recreation Site. Interior, Department of / Bureau of Land Management 5/20/2010
OTAK, INC. $575,171 Contract : LEED Replacement Fire Cache Facilities Design Interior, Department of / Bureau of Land Management 4/27/2010
CUDDY & ASSOCIATES $44,261 Contract : GPS for GCDB Area 2 Corner Recovery & GPS Measurement of Coordinate Positions within Idaho, Area 2 Interior, Department of / Bureau of Land Management 5/03/2010
ADVANCED SOLUTIONS GROUP, LLC $186,488 Contract : Big Water Visitor Center Interior, Department of / Bureau of Land Management 5/21/2010
MIKE LEMICH, INC. $618,360 Contract : Recovery - North Antelope Stewardship, Ely District, Nevada Mechanical thinning project to reduce forest fire risk and provide biomass and fuelwood to the local community Interior, Department of / Bureau of Land Management 6/30/2010
SWEAT, ROBERT $80,500 Contract : HAUSER MTN ROAD BRUSHING CHIP & REMOVE BIOMASS Interior, Department of / Bureau of Land Management 6/23/2010
TRAFFICGUARD DIRECT LLC $6,330 Contract : To provide Bollards to the BLM Interior, Department of / Bureau of Land Management 6/11/2010
QUICKSILVER CONTRACTING COMPANY $84,923 Contract : KLAMATH STEW TO#2 MANUAL JUNIPER CUT & SEEDING ROADS Interior, Department of / Bureau of Land Management 5/21/2010
C3 LIMITED LIABILITY COMPANY $718,769 Contract : CONSTRUCTION OF MOHAVE DESERT FIRE STATION Interior, Department of / Bureau of Land Management 6/28/2010
BERRIGAN FORESTRY INC $71,250 Contract : Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devastating wild fires. Interior, Department of / Bureau of Land Management 6/28/2010
GARDNER & PLATT FENCING $40,030 Contract : sign bases Interior, Department of / Bureau of Land Management 4/15/2010
OAXACA REFORESTATION INC. $408,855 Contract : Slashing, hand piling and cover Interior, Department of / Bureau of Land Management 4/15/2010
CXT INCORPORATED $17,689 Contract : RECOVERY-SILVER CITY COMFORT STATION RJ TAS::14 1112::TAS Interior, Department of / Bureau of Land Management 4/15/2010
HIGH COUNTRY EQUIPMENT $161,855 Contract : Safeguard mine sites by filling entrances to close the various mines in Southwestern Oregon.. Interior, Department of / Bureau of Land Management 6/03/2010
J.F.NEW & ASSOCIATES INC $3,960 Contract : ARRA Funded Paleo #3 Rawlins and Kemmerer South Area. The purpose of the project is to provide the Bureau of Land Management - WY State Office with information about the paleontological resources in the Rawlins South Area so that the office can make mana Interior, Department of / Bureau of Land Management 4/15/2010
HATROCK EXCAVATION LLC $29,965 Contract : THE JOB IN SHOSHONE IS TO REMOVE ALL EXSISTING CONCRETE WALK WAYS AND EXCAVATE OUT TO A DEPTH TO ALLOW IMPORT OF 3/4 ROED BASE OF A COMPACTED BASE OF 6 INCHES AT 95% COMPACTED. THAN POUR BACK OF NEW CONCRETE SIDEWALKS. Interior, Department of / Bureau of Land Management 1/22/2010
OKANOGAN TRAIL $217,152 Contract : Arizona Scenic Trail Construction Interior, Department of / Bureau of Land Management 5/07/2010
MESQUITE INC $180,000 Contract : Provide Campground Improvement Construction including preengineered shade structures with concrete pads, construct new campsites with graveled area parking, installation of picnic tables, firerings and concrete sidewalks. Interior, Department of / Bureau of Land Management 4/13/2010
WOCON LLC $437,962 Contract : Chinese Peak Road Interior, Department of / Bureau of Land Management 6/08/2010
OTAK, INC. $108,868 Contract : Camouflage demonstration and evaluation, Wyoming Interior, Department of / Bureau of Land Management 6/25/2010
A M J A $37,038 Contract : provide material and construct 3.3 miles of barbed wire fence and all gates, panels, corners and drainage crossings. Interior, Department of / Bureau of Land Management 6/01/2010
J-U-B ENGINEERS, INC. $8,192 Contract : This project was to provide a geotechnical investigation and report at Slate Creek Recreation Site. Five test holes were drilled and a geotechnical report was provided based on findings. Interior, Department of / Bureau of Land Management 5/25/2010
ROBISON LOGGING & EXCAVATION $315,983 Contract : Delivery of 34915.21 yrds of pit-run to gravel a dirt road along a power line. Interior, Department of / Bureau of Land Management 11/30/2009
SPARK ELECTRIC CO., INC. $528,196 Contract : Recovery-Sacramento River Rail Trail Paving Interior, Department of / Bureau of Land Management 3/10/2010
CENTURY COMPANIES, INC. $671,185 Contract : Lewistown Paving & Retardent Containment Construciton. Demolition, salvage, excavation, grading, culvert installation, parking lot construction, taxiway construction and retardent containment area construction. The work is located at the Lewistown Munic Interior, Department of / Bureau of Land Management 4/07/2010
GEOTECH ENVIRONMENTAL SERVICES, INC. $57,970 Contract : Solar/Wind Powered Water Treatment System Interior, Department of / Bureau of Land Management 4/13/2010
MARCHANT CONSTRUCTION, LLC $55,236 Contract : Install culvert, lay and shape road base, finish paving wareyard and the road from the highway to wareyard. Interior, Department of / Bureau of Land Management 4/28/2010
SUMMITT FORESTS INC $58,608 Contract : FREEMAN RESTORATION Interior, Department of / Bureau of Land Management 6/03/2010
NATIVE HARVEST SEED CO. INC. $80,000 Contract : Seed Collection Carrizo Plain National Monument Interior, Department of / Bureau of Land Management 1/28/2010
S BROOKS & ASSOCIATES INC $6,818 Contract : Project Inspection. Interior, Department of / Bureau of Land Management 4/29/2010
SMALL BUTTE CONSTRUCTION, INC $42,243 Contract : Water line improvements Interior, Department of / Bureau of Land Management 4/02/2010
HUFFMAN & WRIGHT LOGGING CO $1,058,555 Contract : Brushing, Culverts, and Surface replacement Interior, Department of / Bureau of Land Management 5/18/2010
CS CONSTRUCTION $895,267 Contract : RECOVERY-GREEN MTN LOOKOUT REPLACEMENT TAS::14 1112::TAS Interior, Department of / Bureau of Land Management 6/01/2010
S & L INDUSTRIAL $544,684 Contract : Red Cliffs Campground Rehab Interior, Department of / Bureau of Land Management 2/05/2010
GANEM/HOUSTON CONSTRUCTION, LLC $47,119 Contract : Recovery award-Restoration Stewardship project-Mule Unit. Interior, Department of / Bureau of Land Management 4/16/2010
CKC CONSTRUCTION & MATERIALS, LLC $216,477 Contract : The purpose of the work under this contract is to provide a maintenance-driven approach intended to mitigate deterioration of the original concrete surface, halt erosion of the toe of the spillway and stabilize erosion of earthen slopes. Interior, Department of / Bureau of Land Management 4/16/2010
NATURESERVE $756,225 Contract : Rapid Ecoregional Assessment of the Central Basin and Range Ecoregion Interior, Department of / Bureau of Land Management 6/25/2010
BERRIGAN FORESTRY INC $47,500 Contract : Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devestating wild fires. Interior, Department of / Bureau of Land Management 4/13/2010
C & E FENCE, L.L.C. $77,437 Contract : RECOVERY - Furnishing labor and equipment to construct and/or recondition 34 riparian protection fences. Locations of projects are in Washoe, Lyon, Churchill and Douglas Counties, Nevada Interior, Department of / Bureau of Land Management 6/03/2010
XCAVATION CO., THE, INC. $2,470 Contract : Recovery - Mary Nevada Mine (Hulapai Mountains) access Barrier Installation, Solicitation Number: L10PS01671. Description of Work: Fabricate and install bat friendly gate mine closure. Work consists of fabricating and installing bat gate made of steel bar Interior, Department of / Bureau of Land Management 2/20/2010
EDAW, INC. $2,289,803 Contract : National Historic Trails Inventory Interior, Department of / Bureau of Land Management 5/14/2010
L T M INCORPORATED $822,296 Contract : Warner Valley and Gerber Road Surfacing Interior, Department of / Bureau of Land Management 6/01/2010
SURIRAT DEVELOPMENT, INC. $18,897 Contract : Eqipment w/operator Interior, Department of / Bureau of Land Management 3/03/2010
WESTWATER ENGINEERING, INC. $75,000 Contract : T&E CLEARANCE IN AREA WITH POTENTIAL FOR COMMERCIAL SOLAR ENERGY FACILITY. Interior, Department of / Bureau of Land Management 4/27/2010
METROSCAPE LAND MANAGEMENT GROUP, LLC $53,920 Contract : Las Cienegas National Conservation Area Recovery-Grassland Restoration Project. Mechanical Mesquite reduction for Maternity treatment unit, 176 acres. Method of Mesquite reduction by mechanically grubbing the Mesquite out of the ground with equipment, a Interior, Department of / Bureau of Land Management 4/15/2010
CAYMUS CORPORATION $181,305 Contract : MINE CLOSURE-Provide all labor, equipment, and materials necessary to install 1 bat friendly gate, 9 cupolas and fill 9 test pits at Swansea Mine Interior, Department of / Bureau of Land Management 4/16/2010
KADRI INTERNATIONAL CO. $966,907 Contract : Recovery contract work for georeferencing plats and conversion to AutoCAD format of approx. 2088 plats. Interior, Department of / Bureau of Land Management 4/23/2010
RMEC ENVIRONMENTAL INC $85,505 Contract : Hancock Cabin Water Well Interior, Department of / Bureau of Land Management 4/14/2010
TRINIDAD A. ESCARENO $134,858 Contract : Fuel Reduction, located 60 miles north of Albuquerque, New Mexico. Project encompasses approximately 425 acres, and will be marked with flagging. The Fuel Reduction project includes hand-thinning and eventual mulching of trees consisting of Ponderosa p Interior, Department of / Bureau of Land Management 4/14/2010
SYBRANT CONSTRUCTION, LLC $247,800 Contract : 100% design of the Historic Bighorn Station Site Stabilization Interior, Department of / Bureau of Land Management 6/30/2010
A. PLEASANT CONSTRUCTION, INC. $47,045 Contract : INSTALLATION OF ROAD DRAINAGE SYSTEM Interior, Department of / Bureau of Land Management 6/03/2010
LOMAKATSI ECOLOGICAL SERVICES, INC. $264,416 Contract : This is Task order # 8 of the Deer Willy project which is part of the South Stew Stewardship contract IDIQ.This task order reduced hazardous fuels, through mechanical and hand treatments while collecting and utilizing commercial logs and Biomass.This task Interior, Department of / Bureau of Land Management 5/14/2010
X FIELD SERVICES LLC $17,440 Contract : Watershed resoration Interior, Department of / Bureau of Land Management 4/02/2010
C3 LIMITED LIABILITY COMPANY $352,317 Contract : BOQUILLAS ADMIN SITE MAINTENANCE BUILDING Interior, Department of / Bureau of Land Management 6/28/2010
OTAK, INC. $72,394 Contract : Yaquina Head Outstanding Natural Area security system design Interior, Department of / Bureau of Land Management 5/28/2010
TYRHOLM BIG R, INC. $24,834 Contract : Recovery-Burns 5 Creeks Fence Supplies Interior, Department of / Bureau of Land Management 5/05/2010
JERRY MORRISON, INC. $237,050 Contract : Trail overlay at National Historical Oregon Trail Interpretive Center Interior, Department of / Bureau of Land Management 6/24/2010
ECOSYSTEM MANAGEMENT, INC. $31,808 Contract : Lentic/Lotic Survey Interior, Department of / Bureau of Land Management 5/05/2010
CXT INCORPORATED $136,661 Contract : ARRA - 5 CXT'S VAULT SINGLE UNITS TAS::14 1112::TAS Produce and deliver 5 precast concrete restroom buildings to the BLM in Hollister, CA. Interior, Department of / Bureau of Land Management 5/06/2010
GANEM/HOUSTON CONSTRUCTION, LLC $35,242 Contract : Recovery Award-Restoration Stewardship Project-Bobcat Unit Interior, Department of / Bureau of Land Management 4/14/2010
MILLER TIMBER SERVICES INC $434,474 Contract : Thin conifers over 1.5' tall and up to 7.9' DBH to a 15' x 15' spacing. Yard trees between 4' and 7.9' DBH. Whole tree treatment of material from trees 4' and 7.9' DBH and treatment of limbs adn tops from trees > 8' DBH which are < 5' in diameter. Interior, Department of / Bureau of Land Management 5/06/2010
XCAVATION CO., THE, INC. $2,470 Contract : GIGI Girl Mine Access Barrier Installation, Solicitation Number: L10PS01665. Description of Work: Installation of one bat gate on an adit. Work consists of: fabricating and installing bat gate made of steel bars with an inset series of spaces to allow for Interior, Department of / Bureau of Land Management 2/17/2010
MEGAN ROBINSON $53,200 Contract : Statewide species survey Interior, Department of / Bureau of Land Management 6/29/2010
CONSOLIDATED PAVING AND CONCRETE, INC. $69,233 Contract : Construction of Salt Lake WHBC Parking Lot Paving and Crack & Chip Seal on the entrance road Interior, Department of / Bureau of Land Management 4/29/2010
SWEAT, ROBERT $77,924 Contract : CERRO COMODRE HAND PILING OF SLASH AND BIOMASS Interior, Department of / Bureau of Land Management 4/14/2010
ADVANTAGE PAVING & EXCAVATING, INC. $180,630 Contract : Repair approximately 6 miles of existing roadway near Klamath Falls Oregon. Interior, Department of / Bureau of Land Management 6/14/2010
H & S CONTRACTING INC $228,825 Contract : The purpose of this contract is to cut and pile juniper trees on BLM land to reduce tree density and improve rangeland health. Payment will be made by completed acres. Interior, Department of / Bureau of Land Management 5/28/2010
RIDGWAY VALLEY ENTERPRISES, INC. $33,068 Contract : Remove old porch install ADA ramp at both entrances, remove old furnace install new furnace and duct work Interior, Department of / Bureau of Land Management 5/03/2010
RAINIER SEEDS, INC. $17,700 Contract : 10,000 lbs Vavilov Siberian Wheatgrass Interior, Department of / Bureau of Land Management 1/26/2010
MARKS RANCH INC $422,689 Contract : Forestry; Biomasss removal Item 7A- Level II, Item 7B- Level II, Item 7E- Level I , Item 8- Biomass Hauling, Item 12 Spray Application-herbicides Interior, Department of / Bureau of Land Management 4/29/2010
OTAK, INC. $339,328 Contract : Rawlins - Rock Springs Visual Resource Inventory Interior, Department of / Bureau of Land Management 5/05/2010
NATURAL RESOURCES, COLORADO DEPARTMENT OF $87,300 Grant Recreation Resource Management: Improve management strategies, focusing on improving annual census techniques while increasing population size and sustainability. Interior, Department of / Bureau of Land Management 4/29/2010
NORTHWEST FENCE & SUPPLY, INC $27,096 Contract : (Qty-Ea) 189 Rolls Barbed Wire 12.5 ga 2-Pt Class I (Qty-Ea) 108 Rolls Barbless Wire 12.5 ga Class I (Qty-Ea) 3,400 Steel Fence Posts w/clips 5.5ft 1.33lbs/ft SPEC Interior, Department of / Bureau of Land Management 2/19/2010
CHEROKEE ENTERPRISES, INC. $94,338 Contract : Recovery RFO Camino Well Water System Interior, Department of / Bureau of Land Management 6/25/2010
JIM YOUNG ENTERPRISES, LLC $30,973 Contract : Recovery Sheep Creek Emergency Road Repair Interior, Department of / Bureau of Land Management 4/01/2010
SURIRAT DEVELOPMENT, INC. $26,005 Contract : Roan plateau travel management Interior, Department of / Bureau of Land Management 6/01/2010
X FIELD SERVICES LLC $7,185 Contract : Vegetation Enhancement - mule deer habitat Interior, Department of / Bureau of Land Management 1/19/2010
CPM DEVELOPMENT CORPORATION $239,796 Contract : Interagency Site Paving, Lakeview District Interior, Department of / Bureau of Land Management 5/17/2010
CONSOLIDATED PAVING AND CONCRETE, INC. $73,248 Contract : Place Roadbase, Asphalt and Asphalt Surface Treatments. Interior, Department of / Bureau of Land Management 4/29/2010
RIDGWAY VALLEY ENTERPRISES, INC. $330,055 Contract : Stabilize foundation on the BLM Administration Building in Montrose Colorado Interior, Department of / Bureau of Land Management 6/30/2010
A M J A $133,601 Contract : rEPAIR 20 MILES OF 4-WIRE EXCLOSURE FENCE LINE, ASSOCIATED APPURTENANCES, GATES, PANELS AND DRAINAGE CROSSINGS. PART OF FENCE IN WILDERNESS STUDY AREA. Interior, Department of / Bureau of Land Management 6/03/2010
R E MILLER & SONS $59,585 Contract : Beaverhead Road Repair Interior, Department of / Bureau of Land Management 6/11/2010
H CONSTRUCTION LLC $49,500 Contract : The purpose of this contract is to perform trail maintenance in accordance with the terms and conditions for trail brushing,clearing, and marking on specified trail sections along approximately 24.3 miles of trails. Interior, Department of / Bureau of Land Management 5/27/2010
MARKS RANCH INC $48,750 Contract : Chipping Level I Item 0005C 7500 Green Tons Unit costs $6.5/ton Interior, Department of / Bureau of Land Management 3/31/2010
LOPEZ ISLAND CONSERVATION CORPS $12,000 Grant Recreation Resource Management: Performance of routine trail and trail head maintenance utilizing a youth corps crew with hand tools, to grub, brush, clear, and construct trails. Interior, Department of / Bureau of Land Management 3/30/2010
PRO-TECT SEALCOATING $65,506 Contract : REPAIR AND SEAL PAVEMENT Interior, Department of / Bureau of Land Management 4/27/2010
ERICK AMMON INC $264,187 Contract : Butler Building and Barn. This scope of work: stabilize two historic barns and to demolish and dispose of one intact metal building. Interior, Department of / Bureau of Land Management 3/29/2010
ROCKY MOUNTAIN ELK FOUNDATION, INC. $89,334 Grant Forests and Woodlands Resource Management: This award is a cooperative agreement between Rocky Mountain Elk Foundation and the Bureau of Land Management on the Vale District to enhance and restore sage steppe and grasslands on BLM lands by removing previously cut juniper for biomass use, allowing Interior, Department of / Bureau of Land Management 4/30/2010
MILLER TIMBER SERVICES INC $9,975 Contract : Slash removal from blowdown timber sale landings. Interior, Department of / Bureau of Land Management 2/25/2010
AABERG CULTURAL RESOURCE CONSULTING SERVICE $49,137 Contract : Cultural resource inventory of the Upper Missouri River Breaks National Monument Interior, Department of / Bureau of Land Management 1/06/2010
SPECIALIZED STEEL CONTRACTORS INC $221,194 Contract : DRIPPINGS SPRINGS RECREATION AREA RENOVATIONS CONTRACTOR SHALL FURNISH ALL SUPERVISION, LABOR, MATERIALS, EQUIPMENT AND SUPPLIES NECESSARY TO RENOVATE NINE(9) BUILDINGS Interior, Department of / Bureau of Land Management 5/18/2010
EDAW, INC. $15,575 Contract : Jupiter Habitat Restoration Bridge Data Interior, Department of / Bureau of Land Management 6/24/2010
PINYON RANCH WOODWORX LLC $121,121 Contract : Hazardous Fuels Reduction Interior, Department of / Bureau of Land Management 4/15/2010
MIKE KESLER ENTERPRISES, INC. $34,940 Contract : Furnishing labor, equipment, supplies, and materials, excavate 4250 CY of earth, repain drainage culverts, and backfill and compact around culverts. Interior, Department of / Bureau of Land Management 3/25/2010
ACHA CONSTRUCTION, LLC $52,407 Contract : RECOVERY - CALF CREEK WATER IMPROVEMENTS Interior, Department of / Bureau of Land Management 4/14/2010
QUICKSILVER CONTRACTING COMPANY $467,525 Contract : KLAMATH STEW T.O. #1. YARDING, THINNING, ROAD MAINTENANCE Interior, Department of / Bureau of Land Management 5/21/2010
WALKING POINT FARMS LLC $119,793 Contract : SEED FOR BURNS DIST OFFICE Interior, Department of / Bureau of Land Management 5/21/2010
SWEAT, ROBERT $61,000 Contract : DESERT RESTORATION CUT AND SPOT APPLICATION OF HERBICIDE Interior, Department of / Bureau of Land Management 6/15/2010
FELLER ENTERPRISES, LLC $36,845 Contract : bridge repair Interior, Department of / Bureau of Land Management 4/13/2010
JACOBSON GRENFELL INC $15,500 Contract : Signage Interior, Department of / Bureau of Land Management 2/28/2010
PERKINS CONSTRUCTION, INC. $510,694 Contract : Bureau of Land Management Radio Facility & Tower Construction Interior, Department of / Bureau of Land Management 4/21/2010
WEBER DRILLING $108,664 Contract : Water wells for Scab Creek Trailhead. Interior, Department of / Bureau of Land Management 6/09/2010
PERFECT IMAGE INC $223,500 Contract : Control Document Index Scanning Interior, Department of / Bureau of Land Management 9/22/2009
SUMMITT FORESTS INC $83,062 Contract : MOOSE PROJECT-SLASHING, HAND PILE AND COVER Interior, Department of / Bureau of Land Management 4/01/2010
GRANITE NORTHWEST, INC. $193,591 Contract : Chip Seal Parking Lots and Roads @ National Historic Oregon Trail Information Center. Interior, Department of / Bureau of Land Management 5/28/2010
COLORADO WOOD COMPANY $122,247 Contract : Recovery - Royal Gorge Biomass Project, Buffalo Gulch Stewardship Project. This project consists of the thinning of conifer tree seedlings/saplings on 141 acres of BLM forest land to promote forest health and for fire prevention. All merchantable wood wil Interior, Department of / Bureau of Land Management 5/28/2010
BROWN BROTHERS CONSTRUCTION COMPANY $55,460 Contract : Factory Butte Improvements Interior, Department of / Bureau of Land Management 4/09/2010
WEDGEWOOD DEVELOPMENT, INC. $70,067 Contract : White Reef Trailhead Interior, Department of / Bureau of Land Management 4/16/2010
DYNAMAC CORPORATION $693,738 Contract : COLORADO PLATEAU ECOREGIONAL ASSESSMENT Interior, Department of / Bureau of Land Management 6/29/2010
MARINE CO., INC. $40,835 Contract : Furnishing labor, equipment, supplies, and materials to remove/replace the existing boat launch ramp at the Killarney Lake Recreation Site. Demolish and remove the existing concrete ramp and replace with a new design as shown in the plans and specificati Interior, Department of / Bureau of Land Management 4/02/2010
HIGH DESERT MICROIMAGING, INC. $70,000 Contract : a. The purpose of this contract is to create a digital file image and archival film image of the Bureau of Land Management (BLM), Nevada State Office CDI aperture cards. The BLM estimates there are 40,000 CDI aperture cards. The Contractor will provide Interior, Department of / Bureau of Land Management 3/09/2010
BERNTSEN INTERNATIONAL, INC. $12,792 Contract : Cadastral Monuments Interior, Department of / Bureau of Land Management 5/20/2010
FOREST REHAB, INC $103,393 Contract : Mechanical Fuels Grinding/Top of The World Mastication, Est. 289 Acres Interior, Department of / Bureau of Land Management 4/14/2010
CHAPARRAL CONSTRUCTION LLC $57,050 Contract : We furnished all labor, equipment, supplies, and materials for grading road and parking areas and installation of cushed aggregate(Midland, Turtle Rock and Cty Rd. 375 OHV Parking), installation of boulders for rack barriers (Midland), and installation of Interior, Department of / Bureau of Land Management 4/23/2010
COOKS CONSTRUCTION LLC $50,622 Contract : Building Roads, bladed roads, hauled gravel, built campsites Interior, Department of / Bureau of Land Management 6/07/2010
GLOBAL SOURCE ONE INT, INC. $41,148 Contract : Sol # L10PS02547 0010 8 Foot Cherry Tone Landscape Timber, Qty 2500 $ 8,625.00 0020 3/8 x 12 Galvanized Carriage Bolts, Qty 600 $ 1,800.00 0030 3/8 Galvanized Lock Washer, Qty 600 $ 174.00 0040 3/8 Galvanized Hex Nut, Qty 600 $ 261.60 0050 3/8 Galva Interior, Department of / Bureau of Land Management 6/02/2010
HEDGEROW FARMS $48,123 Contract : Delivery of 2,000 lbs of Poa secunda seed from Carrizo. Interior, Department of / Bureau of Land Management 3/31/2010
S BROOKS & ASSOCIATES INC $2,995 Contract : Facilitator: shall be on site at the Prineville BLM office to lead a multi-discipline team in value analyzing the schematic design of the Lamonta Fire Operatins Building. Interior, Department of / Bureau of Land Management 5/25/2010
BERRIGAN FORESTRY INC $9,500 Contract : Lambert Cr. Fuel Reduction Interior, Department of / Bureau of Land Management 6/11/2010
PURGATORY FENCE COMPANY LLC $98,409 Contract : Whites Creek fence replacement Interior, Department of / Bureau of Land Management 6/30/2010
SWEAT, ROBERT $46,199 Contract : BUTTON BUTTE PROJECT - SLASHING, LOP AND SCATTER, AND FUEL MODIFICATION ZONE CONSTRUCTION - ALL TO REDUCE RISK OF WILDLAND FIRES WHILE IMPROVING FOREST AND RANGELAND HEALTH Interior, Department of / Bureau of Land Management 4/01/2010
FIRST CASCADE CORP. $849,000 Contract : Salem Windows, Skylights and Entrance Replacement at the BLM District Office in Salem, Oregon Interior, Department of / Bureau of Land Management 6/22/2010
N & B FENCE CO LLC $49,975 Contract : ISLANDS AND DESERT SEAS RESTORATION, PHASE II, FENCE REMOVAL AND INSTALLATION - This project includes removal and replacement of 34,670 linear feet of barbed-wire, Type C, fencing with four gates and corresponding hardware. There are four fence constructi Interior, Department of / Bureau of Land Management 3/31/2010
JTL GROUP, INC $80,965 Contract : Pave parking area Interior, Department of / Bureau of Land Management 4/06/2010
SKYLINE CONSTRUCTION, LLC $236,623 Contract : Macon Sheep Bridge Repair Interior, Department of / Bureau of Land Management 4/29/2010
BERRIGAN FORESTRY INC $9,500 Contract : Lambert Cr. Fuels Reduction Interior, Department of / Bureau of Land Management 6/11/2010
GEOTECH ENVIRONMENTAL SERVICES, INC. $53,950 Contract : WATER WELL Interior, Department of / Bureau of Land Management 5/27/2010
RED J ENVIRONMENTAL CORPORATION $138,659 Contract : Old Wild Horse and Burro Hazmat Clean-up Interior, Department of / Bureau of Land Management 2/05/2010
METROSCAPE LAND MANAGEMENT GROUP, LLC $45,780 Contract : Las Cienegas National Conservation Area Recovery-Grassland Restoration Project. Mechanical Mesquite reduction for Antelope treatment unit, 199 acres. Method of Mesquite reduction by mechanically grubbing the Mesquite out of the ground with equipment, an Interior, Department of / Bureau of Land Management 4/14/2010
SPECIALIZED STEEL CONTRACTORS INC $49,843 Contract : AGGREGATE PARKING AREA RECONDITION, CLEARING AND GRUBBING, EXCAVATION, CRUSHER FINES, PEA GRAVEL, RIP RAP, PAVEMENT SURFACE TREATMENT, CONCRETE Interior, Department of / Bureau of Land Management 4/13/2010
SHASTA-TEHAMA-TRINITY JOINT COMMUNITY COLLEGE DISTRICT $20,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Recipient with guidance from the BLM will collect selected plants/seeds for ecological restoration projects. Recipient will provide BLM botanist and biologist with assistance with restoration, seed collections and propagation of important spe... Show more Interior, Department of / Bureau of Land Management 11/25/2009
RIO VISTA MANAGEMENT, L.L.C. $597,717 Contract : Recovery-Fillmore Warehouse & Shop Remodel Interior, Department of / Bureau of Land Management 5/24/2010
FREEPORT-MCMORAN CORPORATION $79,400 Contract : Recovery award - sky islands & desert seas restoration, Phase II, Eagle Creek Access Barriers & Habitat Improvement Interior, Department of / Bureau of Land Management 4/27/2010
BREITHAUPT, BRENT $22,068 Contract : ARRA Funded Paleontological Resource Assistant - Provides technical assistance to the WY Regional Paleontologist. Researches and retrieves paleontological and geological information, identifies and assesses non-federal fossil repositories, performs field Interior, Department of / Bureau of Land Management 6/18/2010
DURHAM GRAVEL WORKS, INC. $75,200 Contract : Steck Boat Ramp Interior, Department of / Bureau of Land Management 6/07/2010
C BAR C CONSTRUCTION ENTERPRISES, INC. $63,000 Contract : Colorado-Montrose County-Monogram Mesa II Hazardous Fuels Reduction. The purpose of this contract was to thin hazardous fuels on 300 acres of BLM forest in the effort to improve wildlife habitat and to lessen the risk of possible forest fires. Interior, Department of / Bureau of Land Management 5/07/2010
TUSCA II, INC. $209,260 Contract : Construct crushed aggregate parking areas, steel fencing, steel kiosks, steel parking delineators and parking stops, OHV loading ramps, ADA concrete parking and walkways, and install two precast concrete toilet buildings. Interior, Department of / Bureau of Land Management 4/01/2010
RUE LOGGING $29,550 Contract : Sage Grouse and Deer Habitat Restoration Interior, Department of / Bureau of Land Management 5/18/2010
BERRIGAN FORESTRY INC $38,900 Contract : Reduce the fuel load in the Lambert Creek forest area to minimize the potential for devastating wild fires. Interior, Department of / Bureau of Land Management 9/21/2010
MAXTEK CONTRACTORS, INC. $360,931 Contract : CONSTRUCT AND REBUILD APPROXIMATELY 2 MILES OF ROAD, INCLUDING CLEAR & GRUBB, GRADING, IMPORT AND PLACING OF SURFACING MARTERIAL, DRAINAGE, FURROW DITCHES AND FINAL GRADING OF ROAD. ARCH SITE MONITORING Interior, Department of / Bureau of Land Management 6/30/2010
COUNTY OF MALHEUR $158,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Award purpose is the reduction or eradication of exotic plant species from Wild & Scenic portion of the Owyhee River in Malheur County Eastern Oregon. The W&S portion of the Owyhee River is still relatively pristine even though it has been gr... Show more Interior, Department of / Bureau of Land Management 4/20/2010
J.F.NEW & ASSOCIATES INC $3,960 Contract : ARRA Funded Paleo #3 Rawlins and Kemmerer South Area. The purpose of the project is to provide the Bureau of Land Management - WY State Office with information about the paleontological resources in the Rawlins South Area so that the office can make mana Interior, Department of / Bureau of Land Management 4/15/2010
CARTER ENGINEERING INC. $92,400 Contract : Dos Palmas Fence Project Interior, Department of / Bureau of Land Management 3/03/2010
RECON ENVIRONMENTAL $21,330 Contract : Conduct archaeological survey of approximately 301 acres of BLM-managed land at Hauser Mountain, California Interior, Department of / Bureau of Land Management 6/15/2010
SPECIALIZED STEEL CONTRACTORS INC $694,755 Contract : PHASE 1 PRE-ENGINEERED PICNIC SHELTERS, DEMOLISH SHELTERS, DEMOLISH VAULT-PHASE II POUR CONCRETE PADS, ERECT SHELTERS, CONSTRUCT ROCKWALL-PHASE III POUR CONCRETE PADS, ERECT SHELTERS, RELOCATE GRILL, FIRE RINGS, PHASE IV DEMOLISH SHELTER, INSTALL GOVERMEN Interior, Department of / Bureau of Land Management 5/12/2010
BUELL ENVIRONMENTAL $25,585 Contract : Recovery - HRB North Park Biomass Interior, Department of / Bureau of Land Management 5/19/2010
RAASS BROTHERS INC. $212,167 Contract : Construction a parking lot with state highway access Interior, Department of / Bureau of Land Management 6/28/2010
SUN SPOT SOLAR, LLC $59,637 Contract : Roan Cabin Solar - Supply labor, equipment and supplies to construct a photovoltaic system. Interior, Department of / Bureau of Land Management 6/25/2010
EDAW, INC. $454,811 Contract : Farmington Title III Construction RFI responses. Interior, Department of / Bureau of Land Management 5/03/2010
CHAMBERS GROUP, INC. $46,467 Contract : Black Rock Archaeological Cultural Inventory Interior, Department of / Bureau of Land Management 9/19/2009
K E & G CONSTRUCTION, INC. $317,555 Contract : Repair & reconstruction of fencing at trailhead in the San Pedro Riparian National Conservation Area Interior, Department of / Bureau of Land Management 4/16/2010
STANDARD REMEDIATION $40,000 Contract : Carrizo Oak Fencing Build a fence in the Carrizo Plain National Monument prtoecting Oaks Interior, Department of / Bureau of Land Management 4/16/2010
S BROOKS & ASSOCIATES INC $11,269 Contract : Contract Specialist Interior, Department of / Bureau of Land Management 2/16/2010
BERRIGAN FORESTRY INC $27,900 Contract : Lambert Cr. Fuels Reduction Interior, Department of / Bureau of Land Management 4/15/2010
OTAK, INC. $34,967 Contract : Green Mountain Lookout replacement construction management services continued this quarter. Interior, Department of / Bureau of Land Management 4/22/2010
UNIVERSITY OF UTAH, THE $58,970 Grant Fish, Wildlife and Plant Conservation Resource Management: The joint objective for BLM and the University of Utah is to offer opportunities for faculty and students to assist in the development of data critical to the management of the Utah portion of the eastern Great Basin. The project will create ... Show more Interior, Department of / Bureau of Land Management 5/21/2010
DONALD W THOMPSON INC $178,000 Contract : Door and Window Replacements at the BLM YHONA at Newport Oregon Interior, Department of / Bureau of Land Management 4/15/2010
ALASKA BIRD OBSERVATORY $82,854 Contract : The Alaska Bird Observatory (ABO) is pleased to submit this proposal to offer our services to assist the Bureau Land Management (BLM) with the inventory of landbirds on the areas identified in the BLM Request for Qualifications (RFQ). The areas listed in Interior, Department of / Bureau of Land Management 4/14/2010
C TRIANGLE COMPANIES $67,582 Contract : recovery stones bengard stewardship Interior, Department of / Bureau of Land Management 3/30/2010
XCAVATION CO., THE, INC. $4,250 Contract : Box Canyon Adit Closure: Description of Work: Backfill specified mine adit and connected mine shaft using soil and mine spoil materials in the immediate vicinity of the adit entrance. Interior, Department of / Bureau of Land Management 4/20/2010
ACHA CONSTRUCTION, LLC $47,061 Contract : 1050 FT FENCE WITH 2 GATES Interior, Department of / Bureau of Land Management 4/27/2010
XCAVATION CO., THE, INC. $18,606 Contract : Recovery - Great West Mine (Northern Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01723. Description of Work: Fabricate and installation of three bat gates and two cupolas. Work consists of fabricating and installing bat gate ma Interior, Department of / Bureau of Land Management 2/18/2010
HIGH COUNTRY EQUIPMENT $117,850 Contract : Safeguard mine sites by filling entrances to close various mines in Southwestern Ouregon. Interior, Department of / Bureau of Land Management 6/30/2010
HOLM, BERKLEE $55,034 Contract : Wilderness fencing install Interior, Department of / Bureau of Land Management 4/14/2010
COOKS CONSTRUCTION LLC $128,263 Contract : North Sand Hills Campground Interior, Department of / Bureau of Land Management 5/25/2010
MONTEZUMA, COUNTY OF $30,000 Contract : Invasive species and noxious weed control on public lands. Interior, Department of / Bureau of Land Management 3/18/2010
CHICAGO HORTICULTURAL SOCIETY $39,900 Grant Fish, Wildlife and Plant Conservation Resource Management: College graduates to gain hands-on experience in natural resource management, specifically in the areas of conservation biology, endangered species protection and management, conservation of sensitive species, and the management of public lan... Show more Interior, Department of / Bureau of Land Management 5/13/2010
TRIUNE CONSTRUCTION LLC $224,920 Contract : civil construction. Developed a lake side Day use recreation area with fully handicap accessable functions such as parking, restroom facility, BBQ area, picnic tables,boat docks. Interior, Department of / Bureau of Land Management 4/02/2010
YOUTH RESTORATION CORPS $182,650 Grant Recreation Resource Management: The purpose is to build 4 public safety cabins along the Iditarod trail and train rural Alaska youth in skilled trades which will benefit them and employ them in the future Interior, Department of / Bureau of Land Management 5/17/2010
WESTON SOLUTIONS, INC $134,798 Contract : The project award is to conduct a remedial investigation and feasiblity study (RIFS) for a former manganese millsite located in Wickenburg, Arizona. The work is being peformed for the Bureau of Land Management (BLM) as the study area is located on BLM adm Interior, Department of / Bureau of Land Management 1/04/2010
BRIGHAM YOUNG UNIVERSITY $103,180 Grant Fish, Wildlife and Plant Conservation Resource Management: FACTORS CONTRIBUTING TO THE EMERGENCE OF INVASIVE PLANT/FIRE CYCLES AND ITS IMPACT ON ECOSYSTEM FUNCTION IN MOJAVE DESERT SHRUBLANDS Project objectives 1. Examine how variation in precipitation patterns and fire behavior affects invasive annu... Show more Interior, Department of / Bureau of Land Management 5/19/2010
LE GRAND JOHNSON CONSTRUCTION CO $647,200 Contract : Hatch Point Road Chip Seal Contract Interior, Department of / Bureau of Land Management 5/19/2010
CKC CONSTRUCTION & MATERIALS, LLC $206,431 Contract : Furnish labor, equipment, supplies and materials to excavate, stockpile material, repair, backfill and compact embankment at two outlet works that are experiencing piping problems, namely, Underwood and Matthews Outlet Works. Furnish labor, equipment, sup Interior, Department of / Bureau of Land Management 4/27/2010
TRI-COUNTY COOPERATIVE WEED MANAGEMENT AREA $187,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Noxious Weed Survey & Control Northeastern Oregon Interior, Department of / Bureau of Land Management 4/01/2010
SOUTHWEST SEED, INC $27,259 Contract : Procure and provide native grass seed for the Canyon of the Ancients Habitat Improvement. Interior, Department of / Bureau of Land Management 6/01/2010
WENDT CONSTRUCTION CO, INC $106,303 Contract : grading roads, installing & compacting rock, installing filter fabric, installing culverts, watering, prep roads for paving, paving, install fog seal Interior, Department of / Bureau of Land Management 5/28/2010
DOYON PROJECT SERVICES LLC $529,800 Contract : Recovery-Wildwood Recreation Site Waterline Replacement, Salem District, Oregon. Replace 5800 lineal feet of water main and 5000 feet of branch lines using open cut trenching and horizontal boring. Interior, Department of / Bureau of Land Management 6/25/2010
S BROOKS & ASSOCIATES INC $14,120 Contract : Archeologist Technician: conducting the cultural resources file search, field survey, field documentation and prepare the survey report for the District Archeologist on new and replacement cattleguards locations in the Baker Malheur and Jordan Resource Ar Interior, Department of / Bureau of Land Management 4/27/2010
XCAVATION CO., THE, INC. $11,690 Contract : Recovery - Fire Mountain Mine (Northern Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01662. Description of Work: Fabricate and installation of inclined shaft using one cupola. Work consists of fabricating and installing wildlife Interior, Department of / Bureau of Land Management 2/18/2010
SISKIYOU BIOSURVEY LLC $10,670 Contract : Botanical Survey; Noxious Weeds, Rare Plants in proposed project area; prepare reports Interior, Department of / Bureau of Land Management 6/09/2010
JAMES TALCOTT CONSTRUCTION, INC. $838,050 Contract : Put boat ramp in at Holter Lake Interior, Department of / Bureau of Land Management 1/07/2010
HARRIS ENVIRONMENTAL GROUP $31,800 Contract : A cultural resources inventory of approximately 2,214 acres in the LosPosos project area withing the Las Cienegas National Conservation Area (LCNCA) Interior, Department of / Bureau of Land Management 11/06/2009
WEDGEWOOD DEVELOPMENT, INC. $66,533 Contract : Red Mountain Trailhead Interior, Department of / Bureau of Land Management 4/16/2010
TRINIDAD A. ESCARENO $209,049 Contract : Fuel Reduction project located just outside of Pinos Altos in Grant County, New Mexico. Project encompasses approximately 300 acres, and will be marked with flagging. The Fuel Reduction project includes hand-thinning and eventual mulching of rees consis Interior, Department of / Bureau of Land Management 4/14/2010
CARTER & BURGESS, INC. $35,009 Contract : Red Cliffs Road - Title III Management Services This project provides approximately 4 weeks of onsite construction inspection services and associated administrative support. Jacobs provides construction oversight and reports addressing construction progre Interior, Department of / Bureau of Land Management 3/10/2010
GARDNER & PLATT FENCING $73,000 Contract : Kaviah fence Interior, Department of / Bureau of Land Management 4/27/2010
RED ROCK EARTHMOVERS INC $70,928 Contract : CONTRACT FOR RECOVERY-FILLMORE BLM BUILDING DEMOLITION IN Fillmore UTAH. Interior, Department of / Bureau of Land Management 4/29/2010
PACIFIC MOBILE STRUCTURES, INC. $1,790,459 Contract : NIFC modular building construction pre-engineered modular building Interior, Department of / Bureau of Land Management 6/10/2010
FAR WESTERN ANTHROPOLOGICAL RESEARCH GROUP, INC. $53,425 Contract : Cultural resource. Interior, Department of / Bureau of Land Management 9/03/2009
ASSURED AGGREGATES COMPANY INC $193,375 Contract : Supply road base material delivered Interior, Department of / Bureau of Land Management 2/17/2010
O'BRIEN, TIMOTHY $39,960 Contract : Reclamation of routes and trails that lead to abandoned mine lands. Interior, Department of / Bureau of Land Management 4/19/2010
T L PETERSON INC $147,449 Contract : Merced WSR Road Rehab II Interior, Department of / Bureau of Land Management 6/09/2010
BAR SEVEN A COMPANIES, INC. $286,230 Contract : Sand Dunes Road Construction and Surfacing. Interior, Department of / Bureau of Land Management 5/21/2010
ALLIED GIS INC $180,000 Contract : The Contractor shall be responsible for providing comprehensive onsite GIS support at the BLM California State Office, Support Services - GCDB & Mapping Sciences. Under this contract, the contractor will independently provide GIS support services to satis Interior, Department of / Bureau of Land Management 4/06/2010
PINYON RANCH WOODWORX LLC $87,199 Contract : Goals for the project include removing hazardous fuels and breaking up the continuity of the canopy to prevent wildfire danger to the Blue Topaz Ranch Subdivision. Slash will be burned when dry by Socorro Field Office fire personnel. Interior, Department of / Bureau of Land Management 4/15/2010
SMITH ENVIRONMENTAL AND ENGINEERING $8,665 Contract : Abandoned mine lands Grand Junction field office mine closure and reclamation Class III Inventory Interior, Department of / Bureau of Land Management 3/30/2010
NATURESERVE $712,230 Contract : Rapid Ecoregional Assessment of the Mojave Basin and Range Ecoregion Interior, Department of / Bureau of Land Management 6/25/2010
SOUTHWEST GENERAL CONSTRUCTION, INC $577,391 Contract : Aguirre Springs Road Chip Seal, Dona Ana County, New Mexico. The purpose of this project is to recondition the Aguirre Springs Road and various parking areas, pullouts, and campgrounds roads and applying a multiple coarse chip seal to raods and parking a Interior, Department of / Bureau of Land Management 3/11/2010
BAIRCO CONSTRUCTION, INC. $213,853 Contract : The purpose of this project is to replace the Whistle Creek Bridge located 12 miles southeast of Powell, WY. The project includes design (excluding the bridge), excavation, footing construction, road and approach work and the installation of a prefabrica Interior, Department of / Bureau of Land Management 5/26/2010
XCAVATION CO., THE, INC. $2,450 Contract : Recovery - Thumb Butte Mine (Black Mountains) Access Barrier Installation, Solicitation Number: L10PS01664. Description of Work: Fabricate and installation of one bat gate. Work consists of fabricating and installing bat gate made of steel bars with an in Interior, Department of / Bureau of Land Management 2/17/2010
HUGHES BROS CONSTRUCTION CO $234,100 Contract : deliver aggregate to stockpile Interior, Department of / Bureau of Land Management 3/03/2010
RIDGWAY VALLEY ENTERPRISES, INC. $249,617 Contract : Exterior maintenance Interior, Department of / Bureau of Land Management 6/03/2010
URS GROUP, INC. $796,907 Contract : Conduct an inventory of abandoned mine lands, physical safety and environmental hazards. Task include: 1) Literature review, 2) Field inventory, 3) Temporarily securing physical safety hazards that present an immediate hazard, 4) Reclamation design, 5) Mi Interior, Department of / Bureau of Land Management 6/14/2010
STOTLAR, SHANE $39,475 Contract : wilderness area fencing 5.52 miles Interior, Department of / Bureau of Land Management 4/15/2010
SOUTHWEST SEED, INC $4,000 Contract : GROW-OUT OF HAND COLLECTED NATIVE PLANT SPECIES FOR RESEARCH AND HOPEFUL SEED MULTIPLICATION. Interior, Department of / Bureau of Land Management 12/10/2009
YTUARTE CONCRETE, INC. $23,205 Contract : Boise District Lighting Sensors Interior, Department of / Bureau of Land Management 6/03/2010
GLOBAL FRONTLINE SOLUTIONS LLC $299,724 Contract : Grassland Restoration Champion Canyon. Slash, hand pile, and cover juniper. 50 miles west of Artesia, NM. Interior, Department of / Bureau of Land Management 4/14/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $467,080 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 1 Interior, Department of / Bureau of Land Management 5/03/2010
NATURAL RESOURCES CONSULTING, INC. $98,983 Contract : BLM is planning a vegetation modification (fuels) project to achieve fire and fuels-related goals such as providing an area along roads to allow for safe passage of personnel during fires and providing areas along roads that can be used as control lines o Interior, Department of / Bureau of Land Management 2/26/2010
CLARKE & CO., INC. $159,317 Contract : Recovery-Gunnison Recreation Sites Interior, Department of / Bureau of Land Management 6/11/2010
TORNADO SOFT EXCAVATION $225,101 Contract : Alsea Falls Waterline Replacement, Salem District, Oregon Interior, Department of / Bureau of Land Management 6/17/2010
ROBCO INC $1,045,177 Contract : Culvert replacement and road restoration on Bureau of Land Management roads in the northern part of Josephine County Interior, Department of / Bureau of Land Management 4/28/2010
TETRA TECH, INC. $55,125 Contract : Solar Energy Site LiDAR for San Luis Valley. Tetra Tech will provide LiDAR point cloud and surface elevation products to assist with solar siting within the San Luis Valley. Interior, Department of / Bureau of Land Management 4/02/2010
QUICKSILVER CONTRACTING COMPANY $60,488 Contract : BURN JUNIPER TO #16 JUNIPER CUTTING Interior, Department of / Bureau of Land Management 4/13/2010
BUSINESS WORLD CONTRACTORS $26,450 Contract : Eugene Maintanence Shop Fence Repairs Interior, Department of / Bureau of Land Management 4/30/2010
A B C CONCRETE MFG. CO., INC. $106,950 Contract : Build and deliver 30 12'x8' BLM Style grids with cleanouts HS20 Loading, 30 12' Cattleguard Precast Foundation (pair) 36 Catleguard Wings (pair) Interior, Department of / Bureau of Land Management 3/10/2010
SOLLERS CONSTRUCTION, LLC $28,875 Contract : WILD HORSE AND BURRO REHABILITATION PHASE II- Sollers Construction will do the demolition and site remedation services of this said project located in Kingman,Arizona in Mohave county. Demolition includes the removal of identified underground infrastructu Interior, Department of / Bureau of Land Management 5/04/2010
COLORADO YOUTH CORPS ASSOCIATION $85,000 Grant Recreation Resource Management: To improve trail conditions and provide sustainable recreational opportunities throughout McInnis Canyons NCA. Interior, Department of / Bureau of Land Management 5/26/2010
GANEM/HOUSTON CONSTRUCTION, LLC $37,259 Contract : Recovery Award-Restoration Stewardship Project-Pipeline Unit. Interior, Department of / Bureau of Land Management 4/16/2010
DARK HORSE CONSTRUCTION, LLC $69,983 Contract : Historic Landscape Restoration Interior, Department of / Bureau of Land Management 6/01/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $71,580 Contract : LCGR Grasslands Restoration Project,Mechanical Mesquite Reduction, Middle Treatment Unit Interior, Department of / Bureau of Land Management 6/08/2010
WOCON LLC $437,170 Contract : Recovery, Chinese Peak Road Interior, Department of / Bureau of Land Management 9/20/2010
JADE EXCAVATION, INC $98,433 Contract : New Water tank and pump house, electric pump construction Interior, Department of / Bureau of Land Management 6/01/2010
ENVIRONMENTAL MANAGEMENT AND PLANNING SOLUTIONS, INC. $1,420,440 Contract : Revised and answered questions on the cultural resources report and analysis. Interior, Department of / Bureau of Land Management 6/17/2010
PATRICK F PEPIOT $168,387 Contract : Yhona Asphalt Trail Replacement Interior, Department of / Bureau of Land Management 5/26/2010
BLOOMIN RANCH SERVICE, LLC $34,000 Contract : Cut, pile and remove all Junipers from Hill Springs Stewardship Project area. Interior, Department of / Bureau of Land Management 4/16/2010
IDAHO SURVEY GROUP P C $129,878 Contract : GCDB-GPS survey for ID957 Area 6 for Township & Section Geographic Coordinate Data Base (GCDB) upgrade in State of Idaho for areas that have been identified by others to have alternative energy resource potential. Interior, Department of / Bureau of Land Management 4/01/2010
WARNER ENTERPRISES, INC $19,338 Contract : STEWARDSHIP CONTRACT INVOLVING FOREST RESTORATION WITH BIOMASS. Interior, Department of / Bureau of Land Management 3/31/2010
SNOW DEVELOPMENT LLC $45,600 Contract : gila watershed vegetation treatments, gila box salt cedar removal Interior, Department of / Bureau of Land Management 3/18/2010
BLOOMIN RANCH SERVICE, LLC $68,000 Contract : Cut, pile and remove all Junipers from Hill Springs Stewardship Project area. Interior, Department of / Bureau of Land Management 4/16/2010
CALIENTE FIREWOOD AND FUELS REDUCTION $34,507 Contract : Removal of pinion pine and pinion juniper within 50 feet of living ponderosas in the clover mountain range nevada to protect the mature trees from fire danger and allow new ponderosas to grow and provide space for future regeneration of the stand. Interior, Department of / Bureau of Land Management 6/23/2010
MICHIGAN TECHNOLOGICAL UNIVERSITY $497,982 Grant Environmental Quality and Protection Resource Management: This project will involve a collaborative partnership between the University of Alaska Anchorage and Michigan Technological University (the lead partner) on the documentation of abandoned mine hazards in the Fairbanks District for the Bureau o... Show more Interior, Department of / Bureau of Land Management 4/06/2010
BITTERROOT SERVICES & TECHNOLOGY LLC $22,270 Contract : prairie grass seeds Interior, Department of / Bureau of Land Management 6/01/2010
WOODS CANYON ARCHEAOLOGICAL CONSULTANTS INC $17,569 Contract : Canyons of the Ancients Invasive Weeds Treatment: Archaeological Inventory Dirk Hood and Murphy Parcels is a Class III archaeological inventory of two parcels of public land within the Canyons of the Ancients National Monument with an aggregate total of a Interior, Department of / Bureau of Land Management 3/17/2010
SEVIER HEATING & AIR CONDITIONING, INC. $100,479 Contract : RECOVERY-Hanksville HVAC Improvements Interior, Department of / Bureau of Land Management 4/26/2010
XCAVATION CO., THE, INC. $29,308 Contract : Porter Mine access Barrier Installation, L10PS01726 Description of Work: Three inclined shafts closed using bat cupolas. Work consists of fabricating and installing cupolas made of steel bars with an inset series of spaces to allow for bat ingress and egr Interior, Department of / Bureau of Land Management 2/17/2010
OTAK, INC. $69,671 Contract : Design and documentation for lead paint encapsulation. Interior, Department of / Bureau of Land Management 4/14/2010
TETRA TECH, INC. $41,381 Contract : Recovery HR South San Luis Lake Wetland Restoration SLVPLC LiDAR for South San Luis Lakes Interior, Department of / Bureau of Land Management 6/09/2010
ORE-CAL LAND DEVELOPMENT, LLC $371,690 Contract : This project is for forest and rangeland health treatments, density management, fuels hazard reduction, promotion of juniper and biomass utilization, road improvement and maintenance, habitat improvement, and commercial product removal. This project provi Interior, Department of / Bureau of Land Management 5/21/2010
TDT CONSTRUCTION, LLC $520,307 Contract : Miles City Field Office Improvements Interior, Department of / Bureau of Land Management 5/04/2010
C-2 CONSTRUCTION INC $36,760 Contract : Demo of 2 vault buildings and replace with new vault buildings Interior, Department of / Bureau of Land Management 6/08/2010
LANDSCAPES UNLIMITED, L.L.C. $634,900 Contract : Recovery - Fisherman's Bend Recreation Site Waterline Replacement. Furnishing labor, equipment, supplies and materials for the removal of existing waterlines, exposed fixtures and valve boxes, installation of new water lines and equipment as described in Interior, Department of / Bureau of Land Management 6/24/2010
QUICKSILVER CONTRACTING COMPANY $14,968 Contract : BURNS 2010 TO#1 - TREE THINNING TO REDUCE FIRE DANGER Interior, Department of / Bureau of Land Management 6/02/2010
HIGH COUNTRY PAVING INC $77,816 Contract : Paving Devil Elbow Campground Trail with 6916.7 sq. yds of hot bituminous concrete finishing with superior results. Interior, Department of / Bureau of Land Management 4/06/2010
BURGOS GROUP, LLC $657,773 Contract : Provide labor, equipment, supplies and materials to recondition the Dripping Springs and La Cueva Roads, various parking areas and pull-outs, and applying multiple coarse chip seal to portions of said roads and parking areas. Work also included re-strip Interior, Department of / Bureau of Land Management 4/16/2010
DRENNON CONSTRUCTION & CONSULTING, INC. $428,175 Contract : Tangle Lakes Access Road Improvements is a road rehabilitation project in the Tangle Lakes historical area of Alaska, close to Paxson, Alaska. Which will include surveying, engineering and construction of gabions, road excavation and landscaping. Interior, Department of / Bureau of Land Management 5/18/2010
K.C. EQUIPMENT, INC. $326,110 Contract : Amboy Access Road & Parking Lot Interior, Department of / Bureau of Land Management 5/18/2010
MARKS RANCH INC $432,890 Contract : Task order #2 Biomass removal Interior, Department of / Bureau of Land Management 11/24/2009
OTAK, INC. $856,561 Contract : Additional services have been added to do further work with the field offices on refining distance zones for visual resource inventories as per direction from the National Lead. Interior, Department of / Bureau of Land Management 5/27/2010
COUNTY OF JEFFERSON $25,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Wild and Scenic River in Jefferson Interior, Department of / Bureau of Land Management 3/12/2010
MESQUITE INC $88,280 Contract : FURNISHING ALL LABOR, EQUIPMENT, SUPPLIES, MATERIALS AND PERMITS NECESSARY TO INSTALL GOVERNMENT FURNISHED AGGREGATE SURFACING MATERIAL ON THE SMITHS FORK ROAD Interior, Department of / Bureau of Land Management 6/04/2010
LOMAKATSI ECOLOGICAL SERVICES, INC. $659,142 Contract : This task order # 7, part of the larger South Stew Stwardship IDIQ totals 626 acres of hazardous fuel reduction, Biomass extraction and commercial log removal activities. Interior, Department of / Bureau of Land Management 12/03/2009
EXTREME EXCAVATION $29,197 Contract : Trail Construction Interior, Department of / Bureau of Land Management 6/07/2010
SALIDA AREA PARKS, OPEN SPACE AND TRAILS $25,000 Grant Recreation Resource Management: Grant to facilitate volunteers & partners to rehabilitate trails on public lands in the Salida, CO area to preserve & enhance recreational opportunities. Interior, Department of / Bureau of Land Management 9/09/2009
GANEM/HOUSTON CONSTRUCTION, LLC $54,586 Contract : Recovery Award-Restoration Stewardship project-Coyote Unit Interior, Department of / Bureau of Land Management 4/16/2010
DOLORES SOIL CONSERVATION DISTRICT $40,000 Contract : Eradication of 300 acres of Tamarisk in the Canyon of the Ancients National Monument Interior, Department of / Bureau of Land Management 3/18/2010
ALLEN'S INC $277,200 Contract : MECHANICAL REMOVAL OF BIOMASS Interior, Department of / Bureau of Land Management 6/15/2010
LOUIS BERGER GROUP, INC., THE $70,527 Contract : The contractor will inventory (via NAIP 2009 aerial photography or GPS) and conduct field verification of the existing routes (rountes demonstrating some level of motorized use, current or historical) within the WRFO. The contractor will incorporate all v Interior, Department of / Bureau of Land Management 5/24/2010
COPPER RIVER INFORMATION TECHNOLOGY, LLC, $97,070 Contract : The award is for the design, construction, and installation of a bridge for the Wood Thrush Trail to cross Thompson Creek at the Meadowood Facility in Lorton, VA. Additionally, the project will cover the restoration of the stream where the former culvert Interior, Department of / Bureau of Land Management 4/28/2010
DARK HORSE CONSTRUCTION, LLC $74,000 Contract : Fuel Oil House Restoration Piedras Blancas Light Station Interior, Department of / Bureau of Land Management 5/14/2010
COUNTY OF, PALM BEACH $186,440 Grant Fish, Wildlife and Plant Conservation Resource Management: JILONA Shoreline Stabilization and Enhancement Project Interior, Department of / Bureau of Land Management 6/29/2010
IIF DATA SOLUTIONS, INC. $134,486 Contract : Provides technical reviews on all preliminary Information submitted by private parties for the site planning and construction of Renewable Power generation facilities. Review of independent engineering reviews performed by third parties for the contructi Interior, Department of / Bureau of Land Management 9/22/2009
FRANKIE FRIEND & ASSOCIATES, INC. $339,393 Contract : Finance and Accounting Support Services. Interior, Department of / Bureau of Land Management 7/01/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $43,460 Contract : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Javelina Treatment Unit Interior, Department of / Bureau of Land Management 8/20/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $82,180 Contract : LCGR Grasslands Restoration Project, Mechanical Mesquite Reduction, Spring Treatment Unit Interior, Department of / Bureau of Land Management 6/09/2010
HOLM, BERKLEE $73,860 Contract : Installation of new cattleguards and maintenance on some existing Interior, Department of / Bureau of Land Management 5/28/2010
BRONZE STAR INC. $186,312 Contract : MDI Desert Tortoise Fence Install Interior, Department of / Bureau of Land Management 6/02/2010
SWISS PRECISION ENTERPRISES, INC. $56,985 Contract : Trail Maintenance Interior, Department of / Bureau of Land Management 4/06/2010
INTERIOR WEST CONSULTING, LLC $55,722 Contract : Interior West was contracted to complete a Class III cultural resource inventory at the Warren Bridge Public Access Site, Sublette County, Wyoming. Interior, Department of / Bureau of Land Management 6/04/2010
ALLEN'S INC $44,000 Contract : MECHANICAL REMOVAL OF BIOMASS Interior, Department of / Bureau of Land Management 6/13/2010
GREEN RIVER GREENBELT TASK FORCE $95,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Killdeer Wetlands Restoration Construction of dam to divert 5 cfs to flood an old oxbox and braids of the Green River to restore a wetland that existed before the Fontenelle resevoir was created. Interior, Department of / Bureau of Land Management 4/22/2010
EWING TRUCKING AND CONSTRUCTION, LLC $27,757 Contract : Abrams Creek Culvert Interior, Department of / Bureau of Land Management 6/30/2010
SOUTHWEST SEED, INC $27,259 Contract : Procure and provide native grass seed for the Canyon of the Ancients Habitat Improvement. Interior, Department of / Bureau of Land Management 6/01/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $66,600 Contract : LCGR Grassland Restoration Project Mechanical Mesquite Reduction, Eagle Treatment Unit Interior, Department of / Bureau of Land Management 6/14/2010
SOGGY BOTTOM INC $27,616 Contract : Mica Bay Accessibility Improvements Interior, Department of / Bureau of Land Management 3/25/2010
GANEM/HOUSTON CONSTRUCTION, LLC $57,082 Contract : Recovery Award-Restoration Stewardship Project-Corral Unit Interior, Department of / Bureau of Land Management 4/16/2010
UTAH STATE UNIVERSITY $120,019 Grant Fish, Wildlife and Plant Conservation Resource Management: Research on the Greater sage grouse seasonal habitat use and movement across the landscape in southwest Utah in order to better manage lands that may be open to wind energy development in the future. (Mar 2011) Interior, Department of / Bureau of Land Management 5/14/2010
CATE LAND INDUSTRIES INC $150,059 Contract : Fell, Skid, Deck to thin stand Interior, Department of / Bureau of Land Management 5/21/2010
FRIENDS OF YAQUINA LIGHTHOUSES $95,000 Contract : Yaquina Head Outstanding Natural Area Waysides Exhibit Interior, Department of / Bureau of Land Management 4/30/2010
BLOOD, JOHN $29,100 Contract : stewardship - juniper release Interior, Department of / Bureau of Land Management 9/21/2009
DAYLIGHT VEGETATION MANAGEMENT, LLC $42,551 Contract : MECHANICAL FUELS TREATMENT GRINDING Interior, Department of / Bureau of Land Management 5/20/2010
S BROOKS & ASSOCIATES INC $24,635 Contract : Trail maintenance crew. Interior, Department of / Bureau of Land Management 9/10/2010
LAND-TECH MONTANA, INC. $39,479 Contract : Dillon Trail Maintenance.Construction of 2.5 miles of hiking trail and 1 trail bridge near Dillon, MT. Interior, Department of / Bureau of Land Management 7/07/2010
ARNESEN, GENE $20,000 Contract : Develop an implementation plan for trail maintenance for the trails within the McInnis Canyons National Conservation Area (MCNCA) including trails located in Rabbit Valley, Black Ridge Canyons Wilderness and the Front Country. This includes: evaluating a Interior, Department of / Bureau of Land Management 7/29/2010
CITY OF FARMINGTON $54,419 Contract : Electricity extension to new facility Interior, Department of / Bureau of Land Management 7/08/2010
NATURESERVE $1,249,867 Contract : Rapid Ecoregional Assessment for the Seward Peninsula, Nulato Hills, Kotzebue Lowlands, Alaska Ecoregion Interior, Department of / Bureau of Land Management 9/16/2010
DYNAMAC CORPORATION $699,348 Contract : SONORAN DESERT ECOREGIONAL ASSESSMENT Interior, Department of / Bureau of Land Management 6/29/2010
S BROOKS & ASSOCIATES INC $70,000 Contract : Conducting inventory and documentation of abandoned mine sites. Interior, Department of / Bureau of Land Management 8/27/2010
RIDGWAY VALLEY ENTERPRISES, INC. $68,777 Contract : Convert bathroom to ADA, change out flooring to be ADA compliant, change doors, hardware Interior, Department of / Bureau of Land Management 7/23/2010
LOWRY CONTRACTING INC $27,077 Contract : Recovery-Arkansas River Travel Plan Interior, Department of / Bureau of Land Management 5/21/2010
J.F.NEW & ASSOCIATES INC $3,960 Contract : ARRA Funded Paleo #3 Rawlins and Kemmerer South Area. The purpose of the project is to provide the Bureau of Land Management - WY State Office with information about the paleontological resources in the Rawlins South Area so that the office can make mana Interior, Department of / Bureau of Land Management 4/15/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $203,483 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 10 Interior, Department of / Bureau of Land Management 7/02/2010
WINZLER & KELLY $42,788 Contract : Design a new 25 space parking lot adjacent to the existing driveway access to the Visitor Center. Parking lot will provide ADA access from the Visitor Center parking lot and will have a trail head connection. Interior, Department of / Bureau of Land Management 7/30/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $312,383 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 7 Interior, Department of / Bureau of Land Management 9/21/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $19,790 Contract : Black Canyon Trail condition assessment. Interior, Department of / Bureau of Land Management 1/07/2010
AECOM, INC. $135,409 Contract : Noble Trail Management Plan Interior, Department of / Bureau of Land Management 4/20/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $315,953 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 4 Interior, Department of / Bureau of Land Management 9/17/2010
AFFILIATED CONSTRUCTION GROUP, INCORPORATED $359,188 Contract : Coal Banks Building & SIte Work Interior, Department of / Bureau of Land Management 9/16/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $64,820 Contract : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Lion Treatment Unit Interior, Department of / Bureau of Land Management 8/20/2010
KUNERT ELECTRIC LLC $69,196 Contract : Install solar and microhyrdo systems at the Rogue River Ranch Interior, Department of / Bureau of Land Management 8/11/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $21,680 Contract : Cultural Resource Inventory, Hummel House Project Interior, Department of / Bureau of Land Management 5/19/2010
TORNADO SOFT EXCAVATION $225,101 Contract : Alsea Falls Waterline Replacement Interior, Department of / Bureau of Land Management 6/17/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $542,639 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 5 Interior, Department of / Bureau of Land Management 9/17/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $20,117 Contract : Aldridge Survey Interior, Department of / Bureau of Land Management 4/02/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $304,585 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 9 Interior, Department of / Bureau of Land Management 9/21/2010
BURLESON CONSULTING, INC. $203,971 Contract : Technical Narrative for Longfellow Mill Site EE/CA and HERA, Tuolumne County, CA Interior, Department of / Bureau of Land Management 7/06/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $331,999 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 8 Interior, Department of / Bureau of Land Management 9/21/2010
URS GROUP, INC. $524,311 Contract : Conduct field validation of Abandoned Mine Lands (AML) sites in Arizona, Nevada and California. Key objectives are to locate and visit sites and their associated features. To complete or correct the data fields using a field computer/Global Positioning Sy Interior, Department of / Bureau of Land Management 7/15/2010
HUMAN INTERACTIVE PRODUCTS, INC. $35,550 Contract : Deliver 4,000 - cottonwood trees in 10 cubic inch containers, 400 cottonwood trees in 5 gallon pots, 100 cottonwood trees 10 gallon pots, and 10 cottonwood trees balled and burlapped. Interior, Department of / Bureau of Land Management 5/06/2010
QUALITY DRILLING FLUIDS ENGINEERING, INC. $377,000 Contract : RECOVERY- PARK CENTER WELL ABANDONMENT Interior, Department of / Bureau of Land Management 7/02/2010
UTAH STATE UNIVERSITY $36,000 Grant Recreation Resource Management: ARRA: Henry Mountain BLM 2010. Complete travel management implementation projects. Interior, Department of / Bureau of Land Management 3/10/2010
Z STEEL, L.L.C. $22,240 Contract : Erection of Pre-Engineered government furnished 30'x50' building Rome, Oregon. Interior, Department of / Bureau of Land Management 10/13/2010
ALTA CONSTRUCTION INC $42,685 Contract : Provide and install 1,320 lineal feet of 8 water main. Provide water service to recreational areas. Interior, Department of / Bureau of Land Management 6/07/2010
KEN'S WATER TENDER INC $767,440 Contract : Keswick Area Rail Trail Paving Interior, Department of / Bureau of Land Management 9/10/2010
CASEY JONES WELL DRILLING CO $26,580 Contract : Water well pump system install and filtration Interior, Department of / Bureau of Land Management 5/24/2010
PHOENIX ENVIRONMENTAL DESIGN INC. $9,240 Contract : Herbicide and Seed oil Interior, Department of / Bureau of Land Management 8/27/2010
INTERNATIONAL MOUNTAIN BICYCLING ASSOCIATION $250,000 Grant Recreation Resource Management: Recovery Act BLM CA Paradise Royale Mtn Bike Trail Skills Park Interior, Department of / Bureau of Land Management 3/04/2010
MIDDAKOTA VEGETATION MANAGEMEN $67,500 Contract : To collect GPS date on roads trails, and 2 track roads located on BLM lands located in SD. To submit GIS date for these areas to BLM Interior, Department of / Bureau of Land Management 4/20/2010
URS GROUP, INC. $174,588 Contract : Conduct site characterization activities, an Engineering Evaluation / Cost Analysis (EE/CA), a Human Health and Ecological Risk Assessment (HERA) and provide community support services. Interior, Department of / Bureau of Land Management 7/06/2010
PINEDA POST & POLES, INC. $40,417 Contract : Fence Construction Interior, Department of / Bureau of Land Management 5/06/2010
ADVANCED ENERGY SYSTEMS $447,490 Contract : This contract will design, engineer, procure, and construct a Solar Photovoltaic Parking Canopy of approximately 50kW DC. The parking canopy will cover an area of existing spaces and provide a degree of protection from the eliments. The electricity prod Interior, Department of / Bureau of Land Management 8/17/2010
BARNUM CONSTRUCTION SERVICES, LLC $34,882 Contract : Build and Install Artesian Well Heads Interior, Department of / Bureau of Land Management 5/25/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $67,860 Contract : LCNCA Grassland Restoration Project-Mechanical Mesquite Reduction, Hackberry Treatment Unit Interior, Department of / Bureau of Land Management 8/21/2010
EXTREME CONSTRUCTION CO. $50,710 Contract : Signifacant deliveries include a 55x3.5 underhung weathering steel bridge, and two precast abutments. Overall purpose is to improve existing trails in the Alpine Gulch area, with the expectations that this project will add to the beautification and safety Interior, Department of / Bureau of Land Management 7/02/2010
KENS WATER TENDER INC $238,431 Contract : Motion Creek stream Crossing Interior, Department of / Bureau of Land Management 7/23/2010
BERNTSEN INTERNATIONAL, INC. $31,688 Contract : Survey monuments Interior, Department of / Bureau of Land Management 8/17/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $79,260 Contract : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Rabbit Treatment Unit Interior, Department of / Bureau of Land Management 8/21/2010
C3 LIMITED LIABILITY COMPANY $7,069,529 Contract : KANAB OFFICE BUILDING Interior, Department of / Bureau of Land Management 9/16/2010
MIDNIGHT HARVESTING $370,235 Contract : The project entails mechanical removal of juniper trees on 2300 acres of BLM land. Juniper is bunched,skidded,chipped an hauled to a biomass power plant. Contractor will construct all roads, remove the juniper, and chainsaw/slash all stumps and small tree Interior, Department of / Bureau of Land Management 5/28/2010
MARSHALL'S ELECTRIC, INC $100,000 Contract : install solar panels Interior, Department of / Bureau of Land Management 5/24/2010
ENVIRONMENTAL EXCAVATION LLC $76,705 Contract : Gunnison Gorge NCA River Restoration Herbaceous weed Treatment and Tamarisk Russian olive controle Interior, Department of / Bureau of Land Management 3/30/2010
SPENCER, MARK $198,000 Contract : Stewardship Project Removal and use of biomass that needs to be thinned on the project. It is a trade for goods and services, but the services usually cost more. Interior, Department of / Bureau of Land Management 9/22/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $29,100 Contract : LCNCA Grassland Restoratioon Project - Mechanical Mesquite Reduction, Goulds Treatment Unit Interior, Department of / Bureau of Land Management 8/27/2010
WOOD MACKENZIE INC $53,500 Contract : delivery/subscription Interior, Department of / Bureau of Land Management 6/09/2010
SNOW DEVELOPMENT LLC $45,600 Contract : gila box salt cedar removal Interior, Department of / Bureau of Land Management 3/18/2010
WEBER DRILLING $108,664 Contract : Drill new wells for scab Crk. Campground, near Pinedale Wyoming Interior, Department of / Bureau of Land Management 6/09/2010
MARSH CREEK, LLC $221,858 Contract : Debris Removal and Disposal Create access for heavy equipment to remove overgrown vegetation surrounding the powderhouse structure before accessing and removing the remaining remnant of the powderhouse structure. Explosive Hazard Mitigation Perform an i Interior, Department of / Bureau of Land Management 8/18/2010
E SCHAAF & ASSOCIATES INC $236,873 Contract : RECOVERY: Goodsprings AML Cadastral Survey Interior, Department of / Bureau of Land Management 2/03/2010
HIGH COUNTRY EQUIPMENT $28,938 Contract : Safeguard mine sites by filling entrances to close various mines in Southwestern Oregon Interior, Department of / Bureau of Land Management 8/25/2010
SWEAT, ROBERT $95,850 Contract : RECOVERY ARRA ROAD BRUSHING Interior, Department of / Bureau of Land Management 8/19/2010
SCHAEFER FENCING, LLC $48,620 Contract : Swamp Creek Juniper Cut and Machine Pile, 143 Acres. Interior, Department of / Bureau of Land Management 7/21/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $203,223 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 6 Interior, Department of / Bureau of Land Management 9/22/2010
YEH AND ASSOCIATES, INC $338,817 Contract : Construction Administration, construction observation, and LEED Commissioning of the Kanab Office Building, Kanab, UT Interior, Department of / Bureau of Land Management 8/27/2010
CSC ELECTRIC LLC $65,969 Contract : Greenwood Communications sites improvement including electical, fencing and concrete work. Interior, Department of / Bureau of Land Management 3/25/2010
ALLIED GIS INC $180,000 Contract : The Contractor shall be responsible for providing comprehensive onsite GIS support at the BLM California State Office, Support Services - GCDB & Mapping Sciences. Under this contract, the contractor will independently provide GIS support services to satis Interior, Department of / Bureau of Land Management 4/06/2010
WHITNEY ENVIRONMENTAL CONSULTING, INC. $37,369 Contract : Upon final completion, the new interpretive trail facilities will replace or update similar facilities in the area that are outdated and inadequately designed. This recreation facility enhancement project will establish new intrepretive trail alignments Interior, Department of / Bureau of Land Management 7/20/2010
ROBINSON & OWEN HEAVY CONSTRUCTION, INC. $265,569 Contract : Burns Steens Loop Road Reconstruction, Burns District Segment 3 Interior, Department of / Bureau of Land Management 9/17/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $73,940 Contract : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Elk Treatment Unit Interior, Department of / Bureau of Land Management 8/21/2010
TRINIDAD A. ESCARENO $209,049 Contract : RECOVERY PINOS ALTOS FUEL REDUCTION Interior, Department of / Bureau of Land Management 4/28/2010
HYDRO RESOURCES - ROCKY MOUNTAIN, INC. $2,761,425 Contract : Recovery: Park Center WEll Interior, Department of / Bureau of Land Management 4/01/2010
SWCA, INCORPORATED $360,403 Contract : Ethnography for solar PEIS. 1. Conduct ethnographic research on the Tribes to provide more clarity on which group(s) inhabited the study areas during the late prehistoric period; characterize late prehistoric and early historic period Native American cult Interior, Department of / Bureau of Land Management 9/17/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $10,830 Contract : Cultural Survey, Bird Dog Project Interior, Department of / Bureau of Land Management 6/21/2010
COAL BED CREEK CONSTRUCTION INC $106,590 Contract : Recovery-Dolores Habitat Restoration Quakie Mowing Project Interior, Department of / Bureau of Land Management 6/01/2010
HOMESTEAD VINYL FENCE, INC. $77,600 Contract : San Pedro Riparian NCA Trailhead Reconstruction Interior, Department of / Bureau of Land Management 9/22/2010
E SCHAAF & ASSOCIATES INC $79,485 Contract : Spruce Mountain AML Cadastral Survey Interior, Department of / Bureau of Land Management 6/29/2010
YEH AND ASSOCIATES, INC $260,764 Contract : Ruby Mountain hot Shot CA Title III Services Interior, Department of / Bureau of Land Management 6/30/2010
BASIN TREE SERVICE & PEST CONTROL, INC. $62,080 Contract : LCNCA Grassland Restoration Project - Mechanical Mesquite Reduction, Jaguar Treatment Unit Interior, Department of / Bureau of Land Management 8/20/2010
FELLER ENTERPRISES, LLC $75,000 Contract : tree planting Interior, Department of / Bureau of Land Management 4/30/2010
BLOOMIN RANCH SERVICE, LLC $212,509 Contract : Fuels reduction, forest health and wildlife habitat restoration project in regards to pinyon & juniper forest. Interior, Department of / Bureau of Land Management 7/09/2010
AIRBORNE VETERANS SERVICES, INC. $64,000 Contract : INSTALLATION OF 6 SOLAR POWERED LIGHTS AT THE BOAT RAMP Interior, Department of / Bureau of Land Management 4/01/2010
ENVIRONMENTAL MANAGEMENT INC $216,787 Contract : Contracted to excavate and remove four UST's and 6 AST's coated with lead based paint. Working includings removing contents of tanks, interting, clearning, remvoing lead based paint and cutting the tanks. Field screeing, indentifications of POL contamin Interior, Department of / Bureau of Land Management 5/19/2010
NEW MEXICO GAS COMPANY, INC. $49,801 Contract : dISTRIBUTION GAS MAIN LINE EXTENSION FOR NEW blm BUILDING. Interior, Department of / Bureau of Land Management 9/08/2010
METROSCAPE LAND MANAGEMENT GROUP, LLC $81,892 Contract : Las Cienegas National Conservation Area Recovery Award for Restoration Stewardship project to perform mechanical Mesquite reduction for treatment unit Creek consisting of approx. 157 acres. Interior, Department of / Bureau of Land Management 9/14/2010
L AND I FENCE CONSTRUCTION, INC. $91,612 Contract : Fence Maint. and Repairs Interior, Department of / Bureau of Land Management 5/05/2010
E SCHAAF & ASSOCIATES INC $178,725 Contract : Table MTN - Goodsprings AML Survey Interior, Department of / Bureau of Land Management 6/28/2010
O.E.S., INC. $77,220 Contract : Abandonded mine site cleanup. Interior, Department of / Bureau of Land Management 6/02/2010
FREEPORT-MCMORAN CORPORATION $79,400 Contract : Recovery award - sky islands & desert seas restoration, Phase II, Eagle Creek Access Barriers& Habitat Improvement Interior, Department of / Bureau of Land Management 4/27/2010
METROSCAPE LAND MANAGEMENT GROUP, LLC $73,984 Contract : Las Cienegas National Conservation Area Recovery Award for Restoration Stewardship project to perform mechanical Mesquite reduction for treatment unit Cottonwood consisting of approx. 139 acres Interior, Department of / Bureau of Land Management 9/14/2010
PREMIER DATA SERVICES, INC $376,558 Contract : The Bureau of Land Management (BLM) maintains vital records of public land ownership in New Mexico in the form of Control Document Index (CDI) aperture cards. The BLM New Mexico State Office has only one set of these aging microfilm aperture cards that a Interior, Department of / Bureau of Land Management 8/30/2010
METROSCAPE LAND MANAGEMENT GROUP, LLC $76,917 Contract : Las Cienegas National Conservation Area Recovery Award Restoration Stewardship project to perform mechanical Mesquite reduction to treatment unit Bear consisting of approx 147 acres Interior, Department of / Bureau of Land Management 9/14/2010
LESTER L BROCK CONSTRUCTION CO. $56,680 Contract : Eugene Roof replacement Interior, Department of / Bureau of Land Management 8/04/2010
EGS INC. $120,000 Contract : Contracting Officer Support Interior, Department of / Bureau of Land Management 6/28/2010
HIGH MOUNTIAN EXTREMES $27,500 Contract : Madison Road Repair, Axolotl Lakes Access Road #2623 Interior, Department of / Bureau of Land Management 7/07/2010
FELLER ENTERPRISES, LLC $163,000 Contract : water line Interior, Department of / Bureau of Land Management 7/20/2010
ENVIRONMENTAL MANAGEMENT INC $98,635 Contract : Lead paint abatement, surface preparation and painting at BLM Maintenance Shop Interior, Department of / Bureau of Land Management 6/02/2010
SNOW DEVELOPMENT LLC $45,600 Contract : salt cedar removal Interior, Department of / Bureau of Land Management 3/18/2010
SPANO, CHRISTOPHER $198,475 Contract : Validate and Upgrade Protracted Townships: Validate all protracted or partially protracted townships that meet the criteria stated in the overview of this document. This will include Amended Protraction Diagrams (APD). An initial query of the BLM?s Geo Interior, Department of / Bureau of Land Management 1/22/2010
STRATIFIED ENVIRONMENTAL AND ARCHAEOLOGICAL SERVICES, LLC $17,883 Contract : Dawson Draw 2 Class III Cultural Inventory: This is an intensive survey of 484.3 acres in 4 parcels identified by the BLM for habitat restoration for the Gunnison Sagegrouse and Desert Bighorn. The area will be intensively surveyed for cultural resource Interior, Department of / Bureau of Land Management 9/16/2010
PREMIER DATA SERVICES, INC $282,819 Contract : The purpose of this task addition is to increase the number of contract employees to facilitate the completion of the Control Document Index (CDI) support under the original (Non-ARRA) task order. Approximately 330,000 cards will be scanned and indexed Interior, Department of / Bureau of Land Management 8/26/2010
E SCHAAF & ASSOCIATES INC $139,282 Contract : Sandy Valley - Goodsprings AML Survey Interior, Department of / Bureau of Land Management 6/28/2010
CATE LAND INDUSTRIES INC $150,059 Contract : Skunk Creek Interior, Department of / Bureau of Land Management 5/21/2010
HATROCK EXCAVATION LLC $32,982 Contract : THE JOB IN SHOSHONE IS TO REMOVE ALL EXSISTING CONCRETE WALK WAYS AND EXCAVATE OUT TO A DEPTH TO ALLOW IMPORT OF 3/4 ROED BASE OF A COMPACTED BASE OF 6 INCHES AT 95% COMPACTED. THAN POUR BACK OF NEW CONCRETE SIDEWALKS. Interior, Department of / Bureau of Land Management 5/07/2010
E SCHAAF & ASSOCIATES INC $286,741 Contract : Fast Tracks Township GPS Collection Interior, Department of / Bureau of Land Management 6/28/2010
HEART OF OREGON CORPS, INC. $15,400 Grant Recreation Resource Management: To provide youth the opportunity to connect with the natural world through completion of natural resource project on Federal lands within Oregon. These projects will provide youth with positive work experiences, development of work skills, a sense of per Interior, Department of / Bureau of Land Management 6/24/2010
TIERRA RIGHT OF WAY SERVICES, LTD. $21,680 Contract : Cultural Survey, Empire Well Project Interior, Department of / Bureau of Land Management 6/23/2010
PALEOWEST, L.L.C. $10,750 Contract : Conduct a Class III cultural resource inventory of the project area, record all cultural resource properties and recommend NRHP eligibility. Interior, Department of / Bureau of Land Management 9/17/2009
TRINIDAD A. ESCARENO $134,858 Contract : treatment was done by hand-cutting( chainsaws )all cut material 4 inches was bucked into lengths of 4 to 6 feet and left on sites to allow for fuelwood sales Interior, Department of / Bureau of Land Management 4/14/2010
RIDGWAY VALLEY ENTERPRISES, INC. $68,777 Contract : Remodel bathroom into ADA compliant bath, remove carpet, install tile and plastic laminate flooring, Install concrete garage apron Interior, Department of / Bureau of Land Management 7/23/2010
SPECIALIZED STEEL CONTRACTORS INC $694,755 Contract : PHASE I PRE-ENGINEERED PICNIC SHELTERS, DEMOLISH SHELTERS, DEMOLIS VAULT-PHASE II POUR CONCRETE PADS, ERECT SHELTERS, RELOCATE GRILL, FIRE RINGS-PHSE IV DEMOLISH SHELTER, INSTALL GOVERMENT FURNISHED TABLE, CONSTRUCT ROCKWALL Interior, Department of / Bureau of Land Management 5/12/2010
HARWARD & REES, INC. $225,637 Contract : Construct new cabin for the BLM on the Henry Mountains Interior, Department of / Bureau of Land Management 5/05/2010
DOLORES SOIL CONSERVATION DISTRICT $40,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Eradication of 300 acres of Tamarisk in the Canyon of the Ancients National Monument Interior, Department of / Bureau of Land Management 3/18/2010
RIDGE ELECTRIC LLC $19,900 Contract : Recovery Low Gap Solar Project Interior, Department of / Bureau of Land Management 3/10/2010
SPECIALIZED STEEL CONTRACTORS INC $49,843 Contract : AGGREGATE PARKING AREA RECONDITION, CLEARING AND GRUBBING, EXCAVATION,CRUSHER FINES, PEA GRAVEL, RIP RAP,PAVEMENT SURFACE TREATMENT, CONRETE Interior, Department of / Bureau of Land Management 4/13/2010
CRYSTAL CLEAR MAINTENANCE, INC. $39,525 Contract : Upper Aurora Canyon Lowers Summer Sagebrush Restoration Cut& Pile/Lop & Scatter Interior, Department of / Bureau of Land Management 3/01/2010
PRIDEMORE CONSTRUCTION INC $60,486 Contract : FIVE POINTS RESTROOMS REPLACEMENT Interior, Department of / Bureau of Land Management 12/16/2009
G. R. WILCOX ENTERPRISES, INC. $386,011 Contract : REPAVING PARTS OF SHELTER COVE AND SLURRY SEALING CHEMISE MTN ROAD. EQUIPMENT USED: DUMP TRUCKS, ROLLER, PAVING MACHINE. Interior, Department of / Bureau of Land Management 6/07/2010
PALEOWEST, L.L.C. $7,500 Contract : The contract is to complete a Class III cultural resource inventory for the BLM Gila District Office. Interior, Department of / Bureau of Land Management 6/07/2010
EL AERO SERVICES, INC. $38,678 Contract : Tuscarora Aerial Seeding Interior, Department of / Bureau of Land Management 3/03/2010
TERRITORY NORTH CONSTRUCTORS, LLC $185,300 Contract : Remove 85' bridge and replace with a 115' bridge. Interior, Department of / Bureau of Land Management 3/30/2010
MONTEZUMA, COUNTY OF $30,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Invasive and Noxious Plant Management Interior, Department of / Bureau of Land Management 3/18/2010
PALEOWEST, L.L.C. $19,767 Contract : Contract was for a Class III cultural resource survey in the West End Project Area for the Safford Field Office. Interior, Department of / Bureau of Land Management 7/22/2010
COLORADO WOOD COMPANY $122,247 Contract : Recovery-Royal Gorge Biomass Project, Buffalo Gulch Stewardship Project. This project consists of the thinning of conifer tree seedlings/saplings on 141 acres of BLM forest land for forest health and fire prevention. All merchantable wood will be removed Interior, Department of / Bureau of Land Management 5/28/2010
CUDDY & ASSOCIATES $44,261 Contract : GPS for GCDB Area 2 Interior, Department of / Bureau of Land Management 5/03/2010
SPECIALIZED STEEL CONTRACTORS INC $221,194 Contract : CONTRACTOR SHALL FURNISH ALL SUPERVISOR, LABOR, MATERIALS, EQUIPMENT AND SUPPLIES NECESSARY TO RENOVATE NINE BUILDINGS Interior, Department of / Bureau of Land Management 5/18/2010
COLORADO YOUTH CORPS ASSOCIATION $55,000 Grant Recreation Resource Management: Youth corps to complete work projects related to trail management projects in the Gunnison Gorge National Conservation Area Interior, Department of / Bureau of Land Management 3/15/2010
LUCK STONE CORPORATION $76,230 Contract : VDOT 21A AGGREGATE VDOT CLASS 1 RIP RAP VDOT CLASS 2 RIP RAP VDOT 57 CRUSHED STONE VDOT GABION STONE Interior, Department of / Bureau of Land Management 8/26/2009
FRIENDS OF YAQUINA LIGHTHOUSES $95,000 Grant Recreation Resource Management: Yaquina Head Outstanding Natural Area Waysides Exhibit Interior, Department of / Bureau of Land Management 4/30/2010
C TRIANGLE COMPANIES $83,453 Contract : Recovery Stones Bengard Stewardship Interior, Department of / Bureau of Land Management 3/30/2010
WESTERN ECOSYSTEMS TECHNOLOGY, INC. $245,000 Grant Fish, Wildlife and Plant Conservation Resource Management: The purpose of the contract is to identify the habitat selection and distribution patterns of mule deer in the Jack Morrow Hills region of southwest Wyoming. Project will include capture and subsequent monitoring of approximately 40 GPS-colla... Show more Interior, Department of / Bureau of Land Management 2/16/2010
POEHLS CONSTRUCTION LLC $29,950 Contract : AFS Door Operators Interior, Department of / Bureau of Land Management 6/02/2010
EGS INC. $120,000 Contract : Provide non personal services of a contract specialist to acquisition branch of BLM. Requires extensive knowldge of pre-award effort, post award admin. and contract closeout Interior, Department of / Bureau of Land Management 7/01/2010
COUNTY OF DUNN $63,000 Grant Fish, Wildlife and Plant Conservation Resource Management: CHEMICAL TREATMENT OF NOXIOUS WEEDS Interior, Department of / Bureau of Land Management 2/04/2010
DAYLIGHT VEGETATION MANAGEMENT, LLC $45,310 Contract : fuels management Interior, Department of / Bureau of Land Management 6/01/2010
VERMILLION CHAPTER CAS $29,471 Grant Recreation Resource Management: Sand Wash Basin Survey Interior, Department of / Bureau of Land Management 3/17/2010
JOB COUNCIL, THE $80,000 Grant Recreation Resource Management: To provide qualified youth conservation corps employment opportunities for at risk youth, ages 16-24, to accomplish heavy duty trail maintenance. Interior, Department of / Bureau of Land Management 1/25/2010
SELLERS, JOHN H $7,425 Contract : Electric system install-Vale Interior, Department of / Bureau of Land Management 12/10/2010
MARINE CO., INC. $40,835 Contract : Furnish labor, equipment, supplies and materials to remove/replace the existing boat launch ramp at the Killarney Lake Recreation Site. Demolish and remove the existing concrete ramp and replace with a new design as shown in the plans and specifications. Interior, Department of / Bureau of Land Management 4/02/2010
SNOW DEVELOPMENT LLC $45,600 Contract : gila box salt cedar removal Interior, Department of / Bureau of Land Management 3/18/2010
EDL CONSTRUCTION, INC. $366,392 Contract : RECOVERY PICNIC SHELTERS AND TRIOSKS Interior, Department of / Bureau of Land Management 4/09/2010
MEGAN ROBINSON $52,300 Contract : 2 Plant species surveys. Interior, Department of / Bureau of Land Management 6/29/2010
NATURESERVE $25,134 Contract : Species Lists by HUC-10 Watersheds Interior, Department of / Bureau of Land Management 2/07/2011
HEDGEROW FARMS $7,681 Contract : Native Seed Interior, Department of / Bureau of Land Management 8/12/2010
MARTIN EXCAVATING LLC $109,500 Contract : Removing existing boat ramp and constructing new boat ramp. Excavating old material, using new material, surveying, grading, placing articulated concrete blocks Interior, Department of / Bureau of Land Management 3/24/2010
SLAYTON, LINDA M $26,825 Contract : Weed Spraying Interior, Department of / Bureau of Land Management 9/15/2011
HOBSON FABRICATING CORP. $232,688 Contract : BLDG 100 ENVIRONMENTAL SYSTEM REPLACEMENT: Replacement of three multi-zone units, associated ductwork in mechanical room, controls for multi-zone units and zone thermostats in Building 100 Interior, Department of / Bureau of Land Management 3/26/2010
BLOOD, JOHN $29,100 Contract : TSI/product removal Interior, Department of / Bureau of Land Management 9/21/2009
MONTEZUMA, COUNTY OF $30,000 Grant Fish, Wildlife and Plant Conservation Resource Management: Noxious weed control, inventory and monitoring within the Bureau of Land Management Canyon of the Ancients National Monument. Interior, Department of / Bureau of Land Management 3/18/2010
MADISON COUNTY (INC) $135,000 Grant Invasive and Noxious Plant Management: Invasive Species Management - ARRA Interior, Department of / Bureau of Land Management 12/17/2009
BEAVERHEAD COUNTY WEED DISTRICT $159,000 Grant Invasive and Noxious Plant Management: Invasive Species Managment - ARRA Interior, Department of / Bureau of Land Management 12/17/2009