Bureau of Reclamation
Total Spending |
$878,020,771 |
Parent agency (Interior, Department of) | $3,459,715,017 |
State | Funding |
---|---|
Alabama | $29,922 |
Arizona | $62,051,652 |
Arkansas | $1,764,350 |
California | $474,488,492 |
Colorado | $29,095,972 |
Connecticut | $71,416 |
Florida | $2,583,499 |
Georgia | $44,119 |
Idaho | $5,277,896 |
Kansas | $93,370 |
Kentucky | $520,455 |
Maine | $166,325 |
Maryland | $3,611,101 |
Massachusetts | $278,660 |
Michigan | $583,151 |
Minnesota | $23,435 |
Missouri | $204,423 |
Montana | $74,402,428 |
Nebraska | $282,787 |
Nevada | $20,969,403 |
New Jersey | $68,166 |
New Mexico | $16,028,325 |
New York | $33,331 |
North Carolina | $1,405,635 |
North Dakota | $43,837,000 |
Ohio | $1,712,989 |
Oregon | $13,686,394 |
Pennsylvania | $393,728 |
South Carolina | $26,000 |
South Dakota | $117,542,595 |
Texas | $4,250,928 |
Utah | $14,920,293 |
Virginia | $422,470 |
Washington | $58,538,449 |
West Virginia | $60,624 |
Wisconsin | $3,697,944 |
Wyoming | $2,664,584 |
Showing only the top (by amount) 50 entries. Go here for the full list
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Federal Dept./Agency | Date |
---|---|---|---|---|
BALFOUR BEATTY INFRASTRUCTURE, INC. | $71,608,439 | Contract | Interior, Department of / Bureau of Reclamation | 5/11/2010 |
: Construction of a Fish Screen, Forebay and Pumping Plant for the Tehama Colusa Canal at Red Bluff, CA. | ||||
LEWIS & CLARK RURAL WATER SYSTEM INC | $59,190,925 | Grant | Interior, Department of / Bureau of Reclamation | 7/01/2009 |
Lewis and Clark Rural Water System: This project will accelerate completion of Phase 2 of the Lewis & Clark Water Treatment Plant that will result in addressing concerns regarding the low quality, contamination vulnerability, and insufficient supply of existing drinking water sources throug | ||||
FORT PECK ASSINIBOINE & SIOUX TRIBES INC | $45,681,000 | Grant | Interior, Department of / Bureau of Reclamation | 8/13/2009 |
Fort Peck Reservation Rural Water System: (a) Construction of a Phase II Water Treatment Plant; (b) Construction of a Raw Water Intake Extension Pipeline; (c) Construction of a Regional Transmission Pipeline from a Water Treatment Plant to the Community of Poplar, and Wolf Piont and a portion to | ||||
GILA RIVER INDIAN COMMUNITY | $36,236,380 | Grant | Interior, Department of / Bureau of Reclamation | 9/21/2009 |
Miscellaneous Public Law 93-638 Contracts, Grants, and Cooperative Agreements: American Recovery and Reinvestment Act funding enabled the Gila River Indian Community's (Community) Pima-Maricopa Irrigation Project) P-MIP) to accelerate construction of the 8.5 mile long Santan IC and Santan ID Phase IIII canal in District 4. This projec... Show more | ||||
GARRISON DIVERSION CONSERVANCY DISTRICT | $31,800,000 | Grant | Interior, Department of / Bureau of Reclamation | 7/06/2009 |
Garrison Diversion Unit: Construction of the Southwest Pipeline Project's Oliver, Mercer, North Dunn Water Treatment Plant (WTP) and South Central Regional Water District's (SCRWD) Emmons County Intake and WTP and the North Burleigh WTP Phase 2 Projects. The Southwest Pipeline P | ||||
MOWAT CONSTRUCTION COMPANY | $28,759,589 | Contract | Interior, Department of / Bureau of Reclamation | 9/30/2009 |
: INSTALLATION OF THE SECOND BARRELS OF THE WEBER BRANCH SIPHON AND THE WEBER COULEE SIPHON EAST LOW CANAL. | ||||
CHIPPEWA CREE CONSTRUCTION CORP | $27,526,000 | Grant | Interior, Department of / Bureau of Reclamation | 9/15/2009 |
Rocky Boy's/North Central Montana Regional Water System: (a) Project Management, Design and Construction of the Intake Superstructure ; (b) Project Management, Design and Construction of the Core Pipeline Segments | ||||
STANDING ROCK SIOUX TRIBE | $26,075,000 | Grant | Interior, Department of / Bureau of Reclamation | 10/05/2009 |
Garrison Diversion Unit: The Standing Rock Sioux Tribe will construct the Standing Rock Water Treatment Plant, the Indian Memorial Intake Pump Station and a raw water pipeline between the water treatment plant and the intake pump station. | ||||
WEST BAY BUILDERS,INC. | $22,955,602 | Contract | Interior, Department of / Bureau of Reclamation | 12/21/2009 |
: Construction of the Red Bluff Pumping Plant and Fish Screen Canal, Siphon and Access Bridge located near Red Bluff Diversion Dam on the Sacramento River, approximately 2 miles southeast of the City of Red Bluff, California in Tehama County. Construction c | ||||
SUNNYSIDE DIVISION BOARD OF CONTROL | $21,400,000 | Grant | Interior, Department of / Bureau of Reclamation | 9/16/2009 |
Yakima River Basin Water Enhancement Project (YRBWEP): The Enclosed Lateral Improvement projects (ELIPS) is the conversion of seven open irrigation ditches/pipes and weir boxes to enclosed laterals and in line flow meters. Gravity pressure in most cases will allow landowners to eliminate pumps or r reduce pum... Show more | ||||
CITY OF OXNARD | $19,840,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
Water Reclamation and Reuse Program: The US Bureau of Reclamation Title 16 Cooperative Agreement is for Phase 1 of the City of Oxnard Groundwater Recovery Enhancement and Treatment (GREAT) Program. The GREAT Program is a water resources project that combines wastewater recycling and reuse; | ||||
WHITING-TURNER CONTRACTING COMPANY, THE | $17,811,044 | Contract | Interior, Department of / Bureau of Reclamation | 4/08/2010 |
: Overall purpose of this contract is to provide a Desing Build, LEED Platinum Certified offcie building for the Lower Colorado Division of the Burea of Reclamation in Boulder City, NV. Expected outcome would be to provide a quality office building meetin | ||||
KIEWIT INFRASTRUCTURE WEST CO. | $17,480,694 | Contract | Interior, Department of / Bureau of Reclamation | 3/27/2010 |
: 8 Radial tainter gate arm and trunnion reconstruction, pier passive tendon installation, pier reinforcing and pier bracing at existing concrete dam. Project expected duration is 2 years from NTP. | ||||
LAYNE CHRISTENSEN COMPANY | $16,202,640 | Contract | Interior, Department of / Bureau of Reclamation | 8/03/2010 |
: Drought Relief - Construction of New Wells | ||||
SHIMMICK CONSTRUCTION COMPANY, INC. | $15,313,773 | Contract | Interior, Department of / Bureau of Reclamation | 7/30/2010 |
: The Delta-Mendota Canal (DMC)- Calfornia Aqueduct (CA) Intertie Project (Intertie) involves construction of a pumping plant at Mile Post 7.2 of the DMC, two 108-in diameter underground discharge lines and a turnout structure located at MP 9.1 of the CA. T | ||||
FLATIRON WEST, INC. | $14,025,512 | Contract | Interior, Department of / Bureau of Reclamation | 5/06/2010 |
: Widen existing canal, construct fish screen structure and new irrigation pump system for local ranchers | ||||
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $12,708,000 | Grant | Interior, Department of / Bureau of Reclamation | 11/18/2009 |
Mni Wiconi Rural Water Supply Project: ? BIA School Water System Improvements ? The water systems for seven BIA schools on the Pine Ridge Reservation will be repaired or replaced under this ARRA project, including the repair or replacement of the deficient school yard piping and appurtenances, | ||||
ABHE & SVOBODA, INC. | $12,557,481 | Contract | Interior, Department of / Bureau of Reclamation | 12/22/2009 |
: Flatiron Powerplant, Recoating and Relining of Penstocks 1 and 2, Colorado-Big Thompson Project, Colorado. This contract was funded by the American Recovery and Reinvestment Act of 2009 | ||||
C J W CONSTRUCTION, INC. | $11,873,000 | Contract | Interior, Department of / Bureau of Reclamation | 12/08/2009 |
: Imperial Dam Dredging and Laguna Settling Basin, Yuma, AZ | ||||
IRVINE RANCH WATER DISTRICT | $11,602,000 | Grant | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
Water Reclamation and Reuse Program: The design and construction of Wells 21 and 22 Project. | ||||
MOJAVE WATER AGENCY | $11,265,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
Water Reclamation and Reuse Program: Construction of the Upper Mojave River Groundwater Regional Recharge and Recovery Project | ||||
EASTERN MUNICIPAL WATER DISTRICT | $10,793,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
Water Reclamation and Reuse Program: The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Longfellow Road | ||||
EASTERN MUNICIPAL WATER DISTRICT | $9,313,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/31/2009 |
Water Reclamation and Reuse Program: The design and construction of the Recycled Water System Pressurization and Expansion Project. The project includes the design and construction of Gibbel Road Recycled Water Tank and Pipeline, Benton Road Recycled Water Tank and pipeline, Leon Road Recyc | ||||
THREE AFFILIATED TRIBES | $8,382,000 | Grant | Interior, Department of / Bureau of Reclamation | 11/02/2009 |
Garrison Diversion Unit: * Four Bears Water Treatmrnt Plant Expansion. Phase I will include the addition of a new clearwell structure (159,000 gallons) adjacent to the existing clearwell in the Four Bears water treatment plant (WTP). The clearwell capacity will increase from 139 | ||||
CONTRA COSTA WATER DISTRICT | $8,350,000 | Grant | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
Central Valley Project Improvement Act, Title XXXIV: he construction of a fish screen will: 1. Minimize the entrainment of fish resources associated with the diversion of water at the Canal Rock Slough intake. 2. Reduce potential predation on target species in the Rock Slough intake. 3. Fulfill legalal requir... Show more | ||||
ABIDE INTERNATIONAL, INC. | $8,177,670 | Contract | Interior, Department of / Bureau of Reclamation | 3/05/2010 |
: Continued Rehabilitation of three fixed wheel gates and lifting cylinders. Furnish and install three new hydraulic systems with controls and electrical. | ||||
SANTA CLARA VALLEY WATER DISTRICT | $8,125,000 | Grant | Interior, Department of / Bureau of Reclamation | 5/17/2010 |
Water Reclamation and Reuse Program: Cooperative Agreement between the United States Bureau of Reclamation (USBR) and the Santa Clara Valley Water District (SCVWD) to construct the South Bay Advanced Recycled Water Treatment Facility (ARWTF) to treat secondary effluent from the San Jose/Sant | ||||
RTA CONSTRUCTION/RAY TONEY JV | $7,929,227 | Contract | Interior, Department of / Bureau of Reclamation | 6/05/2010 |
: Battle Creek Salmon and Steelhead Restoration Project - Hydropower Facility Modifications Stage I | ||||
INLAND EMPIRE UTILITIES AGENCY A MUNICIPAL WATER DISTRICT (INC) | $7,890,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/23/2009 |
Water Reclamation and Reuse Program: The design and construction of the Northwest Area Recycled Water Project, a component of the Inland Empire Utilities Agency Recycled Water Program. | ||||
CDM FEDERAL PROGRAMS CORPORATION | $7,621,124 | Contract | Interior, Department of / Bureau of Reclamation | 3/31/2010 |
: AWARD DESCRIPTION: COMPLETE 1) AN ENVIRONMENTAL REVIEW SUBJECT TO THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) AND CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) OF THE KLAMATH HYDROELECTRICAL SETTLEMENT AGREEMENT (KHSA), INCLUDING THE SECRETARY OF THE INTER | ||||
PERKINS COUNTY RURAL WATER SYSTEM, INC. | $7,537,900 | Grant | Interior, Department of / Bureau of Reclamation | 7/14/2009 |
Perkins County Rural Water System: Planning and Construction of the Perkins County Rural Water System, Phase VI and Phase VII Distribution System. The public purpose is to accelerate completion of projects that will result in serving more people who have poor quality water or have to haul | ||||
SONOMA COUNTY WATER AGENCY | $7,203,000 | Grant | Interior, Department of / Bureau of Reclamation | 9/16/2010 |
Water Reclamation and Reuse Program: This Project consists of the planning, design, and construction of multi-county activities that will provide recycled water for agricultural, urban, and environmental uses and to expand the recycled water system in the North Bay region. The Project will i | ||||
MWI CORPORATION | $6,963,398 | Contract | Interior, Department of / Bureau of Reclamation | 1/16/2010 |
: AS PART OF THE LARGEST DEPARTMENT OF INTERIOR STIMULUS PROJECT IN THE COUNTRY, MWI CORPORATION WILL BE PROVIDING PUMPS AND MOTORS FOR A NEW PUMP AND FISH PASSAGE PROJECT TO REPLACE THE RED BLUFF DIVERSION DAM IN NORTHERN CALIFORNIA | ||||
BUILDING SOLUTIONS, INC. | $6,753,706 | Contract | Interior, Department of / Bureau of Reclamation | 8/03/2010 |
: 22000sf metal building for civil maintenance | ||||
SAN JOSE, CITY OF | $6,335,000 | Grant | Interior, Department of / Bureau of Reclamation | 4/30/2010 |
Water Reclamation and Reuse Program: The award of Recovery Act grant funds by the U.S. Bureau of Reclamation allows the City of San Jose and its tributary partners in the South Bay Water Recycling (SBWR) Program to invest in new water recycling facilities with an estimated total cost of $14. | ||||
INLAND EMPIRE UTILITIES AGENCY A MUNICIPAL WATER DISTRICT (INC) | $5,938,454 | Grant | Interior, Department of / Bureau of Reclamation | 12/22/2009 |
Water Reclamation and Reuse Program: The design and construction of the Northeast Area Recycled Water Project, a component of the Inland Empire Utilities Agency Recycled Water Program | ||||
NAVAJO ENGINEERING & CONSTRUCTION AUTHORITY | $5,794,196 | Grant | Interior, Department of / Bureau of Reclamation | 9/30/2009 |
Colorado Ute Indian Water Rights Settlement Act: The principal components of work to be performed under this ARRA modification includes the furnishing, storing and delivery of approximately 21 miles of 24-inch PVC and Steel pipe and valves, and 1 each 1 million gallon water tank for the Navajo Nationon Mu... Show more | ||||
CENTRAL BASIN MUNICIPAL WATER DISTRICT FINANCING CORPORATION | $5,545,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/23/2009 |
Water Reclamation and Reuse Program: The Southeast Water Reliability Project Phase 1 consists of the following three phases: 30-inch Pipeline, Pico Rivera Recycled Water Pipeline, and Pico Rivera Recycled Water Pipeline. | ||||
TEHAMA COLUSA CANAL AUTHORITY | $5,250,000 | Grant | Interior, Department of / Bureau of Reclamation | 6/30/2009 |
Central Valley Project Improvement Act, Title XXXIV: Construction of 500 CFS Screened Pumping Facility on Sacramento River to provide irrigation water to 150,000 acre service area while providing great benefits to endangered fish species in accord with NMFS Bioligical Opinion for the CVP OCAP | ||||
PEOPLES CANAL COMPANY, THE | $5,012,364 | Grant | Interior, Department of / Bureau of Reclamation | 8/21/2009 |
Colorado River Basin Salinity Control Program: Peoples Pipeline Project in accordance with the Colorado River Basin Salinity Control Act. | ||||
UPPER SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT | $4,969,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
Water Reclamation and Reuse Program: The Recipient shall design and construct the following facilities: * The Project includes about 12.4 miles of recycled water distribution pipelines, varying from 6 to 24 inches in diameter, installed in existing streets. The proposed alignment will cross | ||||
SACRAMENTO SUBURBAN WATER DISTRICT | $4,949,000 | Grant | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
Water 2025: This is a collaborative project between five water supply agencies in the Sacramento, CA region, with Sacramento Suburban Water District acting as the prime recipient. The project will install an additional 4,164 water meters on an accelerated schedule t | ||||
NORTH KERN WATER STORAGE DISTRICT | $4,945,552 | Grant | Interior, Department of / Bureau of Reclamation | 9/28/2009 |
Water 2025: Calloway Canal to Lerdo Canal Intertie: Construct improvements to existing water conveyance infrastructure which will increase flexibility in managing available water supplies and thereby improve water supply reliability. Improvements primarily consist | ||||
SEMITROPIC ROSAMOND WATER BANK AUTHORITY | $4,943,782 | Grant | Interior, Department of / Bureau of Reclamation | 9/22/2009 |
Water 2025: Water Use Efficiency Grant: Challange Grant Water Bank?Water Markets | ||||
SANSONE COMPANY, INC. | $4,939,224 | Contract | Interior, Department of / Bureau of Reclamation | 5/14/2010 |
: Construction of Goundwater wells at wildlife refuges. | ||||
CALLEGUAS MUNICIPAL WATER DISTRICT PUBLIC FACILITIES CORPORA | $4,928,000 | Grant | Interior, Department of / Bureau of Reclamation | 9/29/2009 |
Water Reclamation and Reuse Program: The Brine Line consists of a pipeline to collect concentrate from demineralization of brackish groundwater for municipal, industrial, and agricultural purposes; concentrate from demineralization of potable water for high-tech industrial purposes; and exce | ||||
KOONTZ ELECTRIC COMPANY, INCORPORATED | $4,739,713 | Contract | Interior, Department of / Bureau of Reclamation | 8/04/2009 |
: Folsom Powerplant Transformers K1A and K2A Replacements | ||||
YUCAIPA VALLEY WATER DISTRICT | $4,146,000 | Grant | Interior, Department of / Bureau of Reclamation | 3/29/2010 |
Water Reclamation and Reuse Program: Phases I, II and III of the Yucaipa Valley Regional Brineline, a component of the Yucaipa Valley Regional Water Supply Renewal Project. Phase I includes approximately 4.3 miles of 12-inch pipeline, and Phase II includes approximately 4.5 miles of 16-inch | ||||
RANCHO CALIFORNIA WATER DISTRICT | $4,129,000 | Grant | Interior, Department of / Bureau of Reclamation | 12/11/2009 |
Water Reclamation and Reuse Program: The Vail Lake Water Storage Pipeline and Pump Station Project is a component of the Rancho California Water District's (RCWD) Demineralization and Non-Potable Water Conversion Project, which when completed will increase water storage by 10,000 acre feet p | ||||
ELLICOTT DREDGES, LLC | $4,094,400 | Contract | Interior, Department of / Bureau of Reclamation | 6/29/2010 |
: Purchase of a Hydraulic Dredge -YUMA |
Showing only the top (by amount) 50 entries. Go here for the full list