Geological Survey
Total Spending |
$157,801,681 |
Parent agency (Interior, Department of) | $3,459,715,017 |
State | Funding |
---|---|
Alabama | $322,340 |
Alaska | $8,057,600 |
Arizona | $1,142,788 |
California | $23,305,569 |
Colorado | $5,185,729 |
Connecticut | $10,071 |
Florida | $2,845,448 |
Georgia | $3,584,909 |
Hawaii | $1,563,433 |
Idaho | $420,258 |
Illinois | $843,745 |
Indiana | $470,150 |
Iowa | $20,860 |
Kentucky | $2,783,783 |
Louisiana | $223,551 |
Maine | $81,846 |
Maryland | $11,686,682 |
Massachusetts | $2,675,818 |
Michigan | $2,144,143 |
Mississippi | $242,349 |
Missouri | $11,988,704 |
Montana | $636,461 |
Nebraska | $2,851,281 |
Nevada | $754,028 |
New Hampshire | $81,215 |
New Jersey | $271,546 |
New Mexico | $1,055,307 |
New York | $2,380,224 |
North Carolina | $254,153 |
Ohio | $10,707,995 |
Oklahoma | $38,438 |
Oregon | $2,275,618 |
Pennsylvania | $1,462,397 |
South Carolina | $1,904,557 |
South Dakota | $770,857 |
Tennessee | $433,979 |
Texas | $5,266,552 |
Utah | $7,265,881 |
Virginia | $13,349,933 |
Washington | $5,729,634 |
West Virginia | $1,615,096 |
Wisconsin | $15,203,202 |
Wyoming | $198,166 |
Guam | $35,151 |
Puerto Rico | $170,873 |
Showing only the top (by amount) 50 entries. Go here for the full list
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Federal Dept./Agency | Date |
---|---|---|---|---|
BLUESCOPE CONSTRUCTION, INC. | $10,084,998 | Contract | Interior, Department of / Geological Survey | 4/16/2010 |
: Award for turn-key Design/Build construction of the Columbia Environmental Reserch Center for the USGS in Columbia, MO. Work includes design, site work, site utilities, concrete, mechanical, electrical, casework, finishes, demolition of existing structur | ||||
GREAT LAKES TOWING COMPANY, THE | $8,589,496 | Contract | Interior, Department of / Geological Survey | 6/25/2010 |
: Two (2) New Research Vessels for the Great Lakes. | ||||
JOHNSON CONTROLS GOVERNMENT SYSTEMS LLC | $6,012,164 | Contract | Interior, Department of / Geological Survey | 3/24/2010 |
: Provide all labor, material, and capital to construct and implement Energy Conservation Measures (ECM) at USGS Facilities in Madison, WI: Boiler Plant improvements in main building Building controls istallation Replace Tight Isolation Building exhaust fan | ||||
DESIGN ANALYSIS ASSOCIATES, INC. | $5,244,414 | Contract | Interior, Department of / Geological Survey | 5/21/2009 |
: Provide Hydrological Instrumentation: High Data Rate (HDR) GOES Data Collection Platforms (DCP) with loggers and radios; Submersible Pressure Sensors; Non-submersible Pressure Sensors; Combination Non-Submersible Pressure Sensors, Gas Systems, and Data Lo | ||||
R. J. JUROWSKI CONSTRUCTION, INC. | $5,179,125 | Contract | Interior, Department of / Geological Survey | 6/30/2010 |
: In general, the project will involve the construction of a new 22,700 SF, 2-level building wing addition onto the south side of the existing Segment 'C' of the Upper Midwest Environmental Sciences Center located at 2630 Fanta Reed Road. The addition will | ||||
SUTRON CORPORATION | $3,684,407 | Contract | Interior, Department of / Geological Survey | 6/05/2009 |
: High Data Rate (HDR( GOES Data collection Platform (DCP) with Built-in Logger and Radio | ||||
SUTRON CORPORATION | $3,684,407 | Contract | Interior, Department of / Geological Survey | 6/05/2009 |
: High Data Rate (HDR( GOES Data collection Platform (DCP) with Built-in Logger and Radio | ||||
GANT BRUNNETT, ARCHITECTS, INC. | $3,636,965 | Contract | Interior, Department of / Geological Survey | 5/26/2010 |
: Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with | ||||
GANT BRUNNETT, ARCHITECTS, INC. | $3,636,965 | Contract | Interior, Department of / Geological Survey | 5/24/2010 |
: Provide architectural and engineering design services related to major renovations to the Gabrielson Lab building, the Coburn Lab Annex building, the Propagation lab shop building, the Propagation Lab building, and the Quanrantine building, together with | ||||
UNIVERSITY OF ALASKA FAIRBANKS | $2,000,000 | Grant | Interior, Department of / Geological Survey | 12/01/2009 |
Volcano Hazards Program Research and Monitoring.: The University of Alaska Fairbanks Geophysical Institute (UAFGI) plays a unique role in the Alaska Volcano Observatory (AVO). UAFGI was a co-founding member of AVO in 1988. UAFGI personnel have visited and worked all monitored Alaskan volcanoes, and h have ... Show more | ||||
University of Alaska | $2,000,000 | Grant | Interior, Department of / Geological Survey | 11/30/2009 |
U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Improvement of the Volcano and Other Monitoring Systems | ||||
KINEMETRICS, INC. | $1,961,763 | Contract | Interior, Department of / Geological Survey | 3/09/2010 |
: Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | ||||
BLUESCOPE CONSTRUCTION, INC. | $1,696,319 | Contract | Interior, Department of / Geological Survey | 4/30/2010 |
: Remove and Replace Roofing on 1. Fish Passage Complex -16,000 sq. ft. 2. Research Lab -16,000 sq. ft. 3. Vehicle Storage Bldg -4,000 sq. ft. Construct new Fish Lab Building- 3,000 sq.ft. | ||||
KINEMETRICS, INC. | $1,667,541 | Contract | Interior, Department of / Geological Survey | 3/12/2010 |
: Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | ||||
BLUESCOPE CONSTRUCTION, INC. | $1,626,255 | Contract | Interior, Department of / Geological Survey | 8/25/2010 |
: Renovation of 24 existing research ponds including excavation,grading, repairing and replacing kettles, water distribution, concrete and electrical work. | ||||
State of Alaska | $1,500,000 | Grant | Interior, Department of / Geological Survey | 11/20/2009 |
U.S. Geological Survey_ Research and Data Collection: ARRA 14 0803 Alaska Volcano Investigations and Information Dissemination | ||||
NATURAL RESOURCES, ALASKA DEPARTMENT OF | $1,500,000 | Grant | Interior, Department of / Geological Survey | 12/01/2009 |
Volcano Hazards Program Research and Monitoring.: Alaska volcano investigations and information dissemination. | ||||
LGS INNOVATIONS LLC | $1,478,971 | Contract | Interior, Department of / Geological Survey | 6/30/2010 |
: The USGS Northern California Seismic Network (NCSN) and Southern California Seismic Network (SCSN) have issued a comprehensive contract to LGS to provide all of the equipment and services needed to make these sites operational as part of the microwave net | ||||
G M R AERIAL SURVEYS, INC. | $1,410,513 | Contract | Interior, Department of / Geological Survey | 5/05/2010 |
: Photo Science is collecting and processing LiDAR data for approximately 5,085 square miles of the North East Coastal regions. This area is non-contiguous and covers the coastal regions of Connecticut, Massachusetts, Maine, New Hampshire, New York, and Rh | ||||
AMEC E&I, INC | $1,235,614 | Contract | Interior, Department of / Geological Survey | 6/28/2010 |
: Seismic upgrade/retrofit of USGS (United States Geological Survey) warehouse and storage facility. DM0031. | ||||
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,200,000 | Grant | Interior, Department of / Geological Survey | 9/15/2009 |
Earthquake Hazards Reduction Program: This proposal requests Government Furnished Equipment (GFE), funding for installing this equipment and other upgrades of the Southern California Seismographic Network (SCSN), a cooperative project of Caltech and the Pasadena office of the U. S. Geologic | ||||
KINEMETRICS, INC. | $1,147,862 | Contract | Interior, Department of / Geological Survey | 3/12/2010 |
: Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | ||||
TOPCON POSITIONING SYSTEMS, INC. | $1,083,054 | Contract | Interior, Department of / Geological Survey | 3/31/2010 |
: IDIQ CONTRACT FOR MULTIPLE GPS/GNSS SYSTEMS CONFIGURATIONS | ||||
ROWE DRILLING COMPANY, INC. | $1,081,825 | Contract | Interior, Department of / Geological Survey | 3/19/2010 |
: LOCATE AND ABANDON MONITORING WELLS | ||||
YSI INCORPORATED | $1,074,199 | Contract | Interior, Department of / Geological Survey | 3/30/2010 |
: Acoustic Doppler instruments used to measure water flow: 4 Flowtrackers, 32 RiverSurveyor M9 and power communication modules, 1 RiverSurveyor S5 and power communication module | ||||
ALION SCIENCE AND TECHNOLOGY CORPORATION | $1,034,444 | Contract | Interior, Department of / Geological Survey | 12/08/2009 |
: Technical and production management services during the detail design and construction for the vessels upon the successful award of a contract for contract drawings, detail design and a two vessel construction contract. This effort will include review an | ||||
DEWBERRY & DAVIS LLC | $999,995 | Contract | Interior, Department of / Geological Survey | 5/18/2010 |
: Alaska IFSAR elevation data and derivative products. Elevation data are used for cost-effective analyses of vegetation, flood hazards, effects of sea level change, hydrologic and hydraulic modeling, and diverse land/resource management applications. | ||||
DEWBERRY & DAVIS LLC | $975,273 | Contract | Interior, Department of / Geological Survey | 4/02/2010 |
: LiDAR elevation data and derivative products. Elevation data are used for cost-effective analyses of vegetation, flood hazards, effects of sea level change, hydrologic and hydraulic modeling, and diverse land/resource management applications. | ||||
WOOLPERT, INC. | $946,094 | Contract | Interior, Department of / Geological Survey | 9/17/2010 |
: Louisiana Region 1 & 2 LiDAR collection. | ||||
HONEYWELL TECHNOLOGY SOLUTIONS INC. | $942,665 | Contract | Interior, Department of / Geological Survey | 8/26/2009 |
: Non-Personal Services for the Deployment, Operation, Maintenance, Repair, and Support of the US Geological Survey's Global Seismograph Systems. Provide upgrade services of 20-23 Global Seismological Network sites between 15 July 2009 and 30 September 201 | ||||
GEOLOGY AND MINERAL INDUSTRIES, OREGON DEPARTMENT OF | $931,000 | Grant | Interior, Department of / Geological Survey | 11/13/2009 |
Volcano Hazards Program Research and Monitoring.: This award provides funds to Oregon Lidar Consortium administered by OR Department of Geology and Mineral Industries (DOGAMI) to collect very accurate elevation data for active volcanoes in the Cascade Range in California, Oregon, and Washington. Thehe dat... Show more | ||||
KINEMETRICS, INC. | $920,951 | Contract | Interior, Department of / Geological Survey | 7/23/2009 |
: Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | ||||
ALION SCIENCE AND TECHNOLOGY CORPORATION | $912,821 | Contract | Interior, Department of / Geological Survey | 12/08/2009 |
: Technical and production management services during the detail design and construction for the vessels upon the successful award of a contract for contract drawings, detail design and a two vessel construction contract. This effort will include review an | ||||
PERINI MANAGEMENT SERVICES INC | $901,461 | Contract | Interior, Department of / Geological Survey | 4/30/2010 |
: Construction Services to repair/Replace Electrical Distribution System at Great Lakes Science Center, Ann Arbor, MI | ||||
TACOMA PUMP AND DRILLING CO. INC. | $847,000 | Contract | Interior, Department of / Geological Survey | 3/19/2010 |
: locate or decommission monitor wells in Washington State no longer in use | ||||
SUTRON CORPORATION | $844,226 | Contract | Interior, Department of / Geological Survey | 4/08/2010 |
: HIGH DATA RATE GOES DATA COLLECTION PLATFORM EQUIPMENT | ||||
UNAVCO, INC | $802,913 | Grant | Interior, Department of / Geological Survey | 1/29/2010 |
Earthquake Hazards Reduction Program: Procure and install two tensor strainmeter instruments in California. This project includes the procurement of the instruments, reconnaissance and permitting of sites, drilling and construction, and delivery of data through September 15, 2011. These strai | ||||
DELAWARE CORNERSTONE BUILDERS, INC. | $794,539 | Contract | Interior, Department of / Geological Survey | 4/21/2010 |
: Renovate Owl/Kestrel Pen Areas | ||||
KINEMETRICS, INC. | $760,733 | Contract | Interior, Department of / Geological Survey | 6/29/2009 |
: Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | ||||
DONE DEAL GENERAL CONSTRUCTION AND ELECTRICAL INCORPORATED | $741,856 | Contract | Interior, Department of / Geological Survey | 5/26/2010 |
: Electrical & Lighting upgrades. | ||||
AERO-METRIC, INC | $733,615 | Contract | Interior, Department of / Geological Survey | 9/17/2010 |
: This task order is for Planning,Acquisition, processing, and derivative products of lidar data to be collected at a nominal pulse spacing (NPS) of 2.0 meters. This task is for lidar for three (3) counties in Southern Texas, Calhoun, Willacy, and Neuces. T | ||||
SONTEK/YSI INC | $732,251 | Contract | Interior, Department of / Geological Survey | 6/05/2009 |
: Acoustic Doppler Hand-held Portable Water Velocity / Flow Measurement System. 81 Handheld Flowtrackers; 15 Shallow Water Acoustic Dopplers; 3 Acoustic Doppler Profilers; Side Looking Doppler Current Meter 17 pcs + 4 pcs + 6 pcs= 27 pcs with different samp | ||||
BLUESCOPE CONSTRUCTION, INC. | $724,034 | Contract | Interior, Department of / Geological Survey | 3/29/2010 |
: Install new fire alarm sprinkler for Upper R & D, Lower R & D, and Maintennace Building; install fire sprinkler for Upper R & D including site piping. located at Tunison Labratory of Aquatic Science, Courtland, NY. In addition, install fire sprinkler sys | ||||
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | $721,000 | Grant | Interior, Department of / Geological Survey | 9/15/2009 |
Earthquake Hazards Reduction Program: Earthquakes are a hazard in most parts of California. In northern California, the Berkeley Seismological Laboratory (BSL) and the USGS Menlo Park collaborate closely to provide timely and reliable earthquake information to the federal, state, and local go | ||||
CENTRAL WASHINGTON UNIVERSITY INC | $694,350 | Grant | Interior, Department of / Geological Survey | 1/28/2010 |
Earthquake Hazards Reduction Program: The Pacific Northwest Geodetic Array (PANGA) is comprised of 134 continuously operating, high-sample rate GPS receivers whose data is telemetered in real-time to Central Washington University. These receivers straddle the Cascadia megathrust forearc and | ||||
PACIFIC WIRELESS COMMUNICATIONS LLC | $682,695 | Contract | Interior, Department of / Geological Survey | 5/28/2010 |
: To design and install a backbone telemetry network on the Island of Hawaii for the USGS Hawaiian Volcano Observatory (HVO). The creation of this backbone will provide a single, higher performing, and more robust path for HVO to receive data from existing | ||||
TELEDYNE R D INSTRUMENTS INC | $658,070 | Contract | Interior, Department of / Geological Survey | 6/05/2009 |
: Acoustic Doppler Current Profiler, Streampro and Workhorse Rio | ||||
KINEMETRICS, INC. | $651,199 | Contract | Interior, Department of / Geological Survey | 6/29/2009 |
: Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). | ||||
SUTRON CORPORATION | $650,566 | Contract | Interior, Department of / Geological Survey | 6/29/2010 |
: HIGH DATA RATE GOES DATA COLLECTION PLATFORMS | ||||
KINEMETRICS, INC. | $626,850 | Contract | Interior, Department of / Geological Survey | 9/18/2009 |
: Supply accelerometer and other earthquake monitoring equipment to modernize the Advanced National Seismic System (ANSS). |
Showing only the top (by amount) 50 entries. Go here for the full list