Listing all stimulus spending by amount, in descending order. Return to National Park Service page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
LEXINGTON CONTRACTING LLC | $1,777,780 | Contract | : LITTLE RIVER AND JAKES CREEK TRAILHEAD PARKING AREAS GATLINBURG TN | Interior, Department of / National Park Service | 4/07/2010 |
HD SUPPLY UTILITIES, LTD. | $38,876 | Contract | : SUPPLY 2500 KVA 3 PHASE PADMOUNT TRANSFORMER FOR MT RAINIER NATIONAL PARK | Interior, Department of / National Park Service | 5/07/2010 |
ATKINS NORTH AMERICA, INC | $184,810 | Contract | : CM Services Hamilton Grange National Memorial - Complete the Hamilton Grange Restoration | Interior, Department of / National Park Service | 5/11/2010 |
JOHN DEERE SHARED SERVICES, INC. | $152,490 | Contract | : John Deere 544K Loader | Interior, Department of / National Park Service | 9/18/2009 |
ALLIED INDUSTRIES INC. | $83,414 | Contract | : Painting Contract for Structure | Interior, Department of / National Park Service | 4/22/2010 |
SAF, INC. | $1,684,609 | Contract | : Cuyahoga Valley National Park Sanitary Sewer Collection & Constructed Wetland Treatment System at Boston Mills Historic District | Interior, Department of / National Park Service | 5/07/2010 |
BRIDGESTREET CORPORATE HOUSING WORLDWIDE | $35,702 | Contract | : Housing for NPS in Chattanooga,TN. | Interior, Department of / National Park Service | 4/19/2010 |
EINHORN YAFFEE PRESCOTT, ARCHITECTURE AND ENGINEERING, P.C. | $42,215 | Contract | : Quarterly work included participation in a value analysis process to determine the preferrered alternatives for ground source mechanical systems at two National Historic Sites: Longfellow and Frederick Law Olmsted. | Interior, Department of / National Park Service | 1/20/2010 |
AA ASPHALTING INC. | $38,582 | Contract | : Paving at Paradise, Mount Rainier National Park | Interior, Department of / National Park Service | 5/13/2010 |
SWANK ENTERPRISES | $1,000,760 | Contract | : Glacier National Park HVAC Renovation | Interior, Department of / National Park Service | 5/07/2010 |
ADVANCED SOLUTIONS GROUP, LLC | $13,484,995 | Contract | : Rehabilitate Moose Maintenance Building | Interior, Department of / National Park Service | 5/03/2010 |
HDR ENGINEERING, INC. | $78,600 | Contract | : CONSTRUCTION ADMINISTRATION SERVICES, RECONSTRUCT HISTORIC STONE GUARDWALLS, BLUE RIDGE PARKWAY | Interior, Department of / National Park Service | 5/05/2010 |
SYBRANT CONSTRUCTION, LLC | $205,809 | Contract | : Replace the wood shake roofs on 11 historic buildings in Yosemite National Park | Interior, Department of / National Park Service | 4/22/2010 |
BARGMANN HENDRIE & ARCHETYPE, INC. | $240,685 | Contract | : Rehabilitate Independence Hall Tower; Construction Administration services relating to Roofing, Windows, Structure, Clock, Lighting, etc. | Interior, Department of / National Park Service | 5/15/2010 |
AMERICAN CONSERVATION EXPERIENCE | $65,120 | Contract | : This project, completed in Quarter 3 of 2010, was a cooperative endeavor between Great Smoky Mountains National Park and ACE for trail rehabilitation along sections of the Sweat Heifer Trail (approximately 2 miles) and Grassy Branch Trail (approximately 1 | Interior, Department of / National Park Service | 5/07/2010 |
R. J. THOMAS MANUFACTURING COMPANY, INC. | $12,368 | Contract | : BROWN PLASTIC PLANKS - DRILLED & ROUTED | Interior, Department of / National Park Service | 4/28/2010 |
HEERY INTERNATIONAL, INC. | $113,439 | Contract | : Award - Energy Audits & Commissioning for VC at Death Valley National Park | Interior, Department of / National Park Service | 6/28/2010 |
PACIFIC STUDIO, INC. | $3,431,314 | Contract | : We will provide all design-build services including comprehensive reasearch and all necessary information for exhibit development, planning, design, production and installation of interpretive media. We will begin by redesigning the existing exhibit plan | Interior, Department of / National Park Service | 5/06/2010 |
SYGNOS, INC. | $525,000 | Contract | : INSTALL SAFETY CLOSURES AT ABANDONED MINE LOCATIONS TO PROTECT VISITORS AND PRESERVE RESOURCE HABITAT AT THE JOSHUA TREE NATIONAL PARK. | Interior, Department of / National Park Service | 4/02/2010 |
STEELCASE INC. | $93,103 | Contract | : Office Furniture - PWR ? HAVO Hawaii Volcanoes National Park | Interior, Department of / National Park Service | 5/14/2010 |
WILDWING | $35,570 | Contract | : Interpretive display development and installation | Interior, Department of / National Park Service | 5/10/2010 |
MACNAK CONSTRUCTION LLC | $115,786 | Contract | : REPLACE HVAC SYSTEM LAKE MEAD | Interior, Department of / National Park Service | 4/29/2010 |
THE CHRISTMAN COMPANY | $1,227,942 | Contract | : Stabilize the 16th Street High Retaining Wall in Area 3 with installation of 42 new tiebacks to supplement deadman tiebacks installed previously. The original decorative exposed aggregate concrete of the Meridian Hill Park is considered historically sign | Interior, Department of / National Park Service | 3/25/2010 |
SUNWIZE TECHNOLOGIES, INC. | $101,632 | Contract | : Installation of solar electric system Park. | Interior, Department of / National Park Service | 4/23/2010 |
URS GROUP, INC. | $208,217 | Contract | : Architectural / Engineering (A/E) Construction-Phase services for the Replace Two Failed Plugs (Dams) At Cape Sable Construction Project. The work under this task order is for title III Architect-Engineer services for the Replace Two Failed Plugs (Dams) A | Interior, Department of / National Park Service | 5/11/2010 |
CHARLES FABIAN INC | $602,863 | Contract | : Recovery Project Furnish and install new HVAC System for the Museum Auditorium at the Morristown National Historic Park Morristown NJ This is an 8(a) Set Aside between $250,000 and $500,000 | Interior, Department of / National Park Service | 5/11/2010 |
INTERNATIONAL MAPPING ASSOCIATES, INC. | $26,106 | Contract | : Creation of Solid Terrain Model of the Keweenaw Peninsula and the surround Lake Superior area | Interior, Department of / National Park Service | 5/11/2010 |
CRONIN CONSTRUCTION INC | $92,875 | Contract | : Fabrication and Instalation of Boardwalk Loop Trail. | Interior, Department of / National Park Service | 4/27/2010 |
ALWAYS CURRENT ELECTRIC | $163,123 | Contract | : Install (24) Solar Outdoor Parking Lot Lights and retrofit (14) existing solar outdoor parking lot lights. | Interior, Department of / National Park Service | 4/05/2010 |
MONTANA CONSERVATION CORP | $40,000 | Grant | Conservation Activities by Youth Service Organizations: MCC and NPS have a mutual interest in accomplishing needed conservation and environmental restoration projects within the landscape of Yellowstone National Park Trail System. The involvement of young adults in the care and enhancement of publicic resources... Show more | Interior, Department of / National Park Service | 4/27/2010 |
GABEL ASSOCIATES INC. | $248,543 | Contract | : Energy and Water Use Audits: Badlands National Park, Buffalo National Reserve, George Washington Carver National Monument, Isle Royale National Park, Lincoln Home National Historical Site, Ozark National Scenic Riverways, Sleeping Bear Dunes National Lake | Interior, Department of / National Park Service | 5/14/2010 |
DWG & ASSOCIATES, INC. | $47,750 | Contract | : The primary work of this project consists of the design and construction of a solar security lighting system for the National Park Service, Old Santa Fe Trail building parking lots and surrounding areas. | Interior, Department of / National Park Service | 5/04/2010 |
LEETEX/HILL & WILKINSON IV LLC | $139,374 | Contract | : The primary work of this project consists of the upgrade and rehabilitation of the maintenance shop, and storage buildings at Chaco Culture National Historic Park. The work primarily entails upgrades and repairs to the electrical systems, HVAC, windows, | Interior, Department of / National Park Service | 5/07/2010 |
LUCAS, DAVID C | $66,900 | Contract | : Dismantle and Replace Fencing on the LBJ Ranch in Stonewall, Texas. | Interior, Department of / National Park Service | 8/21/2009 |
JACOBS TECHNOLOGY INC. | $443,034 | Contract | : NATIONAL PARK SERVICE, DENVER SERVICES DIVISION - Construction Management Support Services for ARRA Funded Projects Provide a Senior Construction Manager (Sr. CM) to provide guidance to NPS, DSC project teams on construction issues to enhance the quality | Interior, Department of / National Park Service | 6/02/2010 |
LOUIS BERGER GROUP, INC., THE | $145,874 | Contract | : Construction Management Services, Rehabilitate Washington's Headquarters - Phase 3 | Interior, Department of / National Park Service | 4/05/2010 |
ATKINS NORTH AMERICA, INC | $578,358 | Contract | : CM Services OLYM LEKT Wastewater Collection Project | Interior, Department of / National Park Service | 5/13/2010 |
REILLY CONSTRUCTION, INC | $164,733 | Contract | : Paint Administrative Buildings Paarkwide | Interior, Department of / National Park Service | 5/11/2010 |
LUMUS CONSTRUCTION, INC. | $1,806,770 | Contract | : HAGR Hamilton Grange National Monument. Interior and Exterior painting, plaster repair and replacement, electrical upgrades, display area/NPS offices upgrades. | Interior, Department of / National Park Service | 5/11/2010 |
COY FIRE PROTECTION LLC | $26,200 | Contract | : Recovery: Design and Install Fire Suppression System in Warner House, Sleeping Bear Dunes National Lakeshore | Interior, Department of / National Park Service | 11/17/2009 |
NAGAKI DESIGN - BUILD ASSOCIATES, INC. | $479,861 | Contract | : Nagaki Design Build Associates, Inc. has been selected to remodel 5 existing cabins located at the South Rim of the Grand Canyon National Park. | Interior, Department of / National Park Service | 5/04/2010 |
BARAJAS & ASSOCIATES, INC. | $288,697 | Contract | : National Park Service, Pinnacles National Monument, located in California, has a requirement for the construction of a pig exclusionary fence. The project consists of establishing a fence route corridor 8-10 feet wide and approximately 19,000 feet long cl | Interior, Department of / National Park Service | 1/21/2010 |
EAGLE ROCK SPECIALTIES LLC | $27,025 | Contract | : Henry Pratt Butterfly Valves with Actuators for Mommoth Hot Springs, Yellowstone National Park | Interior, Department of / National Park Service | 5/13/2010 |
JH CONTRACTING | $143,873 | Contract | : roofing and siding of headquarters building | Interior, Department of / National Park Service | 2/24/2010 |
INNOVAR ENVIRONMENTAL INC | $588,881 | Contract | : Install safety closures in various Death Valley/Keane Wonder Mine areas' abandoned mines to protect visitors and preserve resources. | Interior, Department of / National Park Service | 4/22/2010 |
HANFORD APPLIED RESTORATION & CONSERVATION | $375,192 | Contract | : Construction of trails, viewing areas and parking areas for Giacomini Watershed Restoration | Interior, Department of / National Park Service | 4/29/2010 |
CTA INC. | $84,611 | Contract | : Construct new micro-hydroelectric power plant. | Interior, Department of / National Park Service | 5/12/2010 |
CONSERVATION CORPS, CALIFORNIA | $85,000 | Grant | Conservation Activities by Youth Service Organizations: Project includes landscaping & grooming around campsites, picnic areas and comfort stations; repair & replace trail, trailhead & campground signs; restore hard surface of ADA compliant trail; repair or replace fire rings/grates, picnic tables anand BBQ pits... Show more | Interior, Department of / National Park Service | 4/12/2010 |
KRISTER OLMON, INC. | $48,201 | Contract | : Consulting supervision for exhibit production and installation of exhibits for Mammoth Cave National Park. Scope of services include review and approval of production, assist NPS contracting officer's representative, coordination between exhibit producer | Interior, Department of / National Park Service | 5/14/2010 |
AMEC E&I, INC | $387,177 | Contract | : Provide on-sight construction management services/field engineering services during the construction of the Front Country Wastewater Treatment system and Rehabilitate Collection System at Denali National Park and Preserve. | Interior, Department of / National Park Service | 4/01/2010 |
LOS ANGELES CONSERVATION CORPS | $114,135 | Grant | Conservation Activities by Youth Service Organizations: The purpose of this project is to rehabilitate a 1.4 mile section of the Backbone Trail System. | Interior, Department of / National Park Service | 5/04/2010 |
DAWSON CONSTRUCTION INC., | $8,140,651 | Contract | : General construction of an Emergency Services Fire Management Building and Annex including access road, parking areas and vehicle fueling facility, demolition of the existing vehicle fueling facility and the general rehabilitation of the utility systems i | Interior, Department of / National Park Service | 5/12/2010 |
PEARL BEACH CONSTRUCTION COMPANY | $46,322 | Contract | : Lead abatement/exterior painting for 47 structures at Sleeping Bear Dunes National Lakeshore, Empire, Michigan | Interior, Department of / National Park Service | 5/17/2010 |
ALL AMERICAN MID-WEST, INC | $60,309 | Contract | : painting the appomatox national courthouse | Interior, Department of / National Park Service | 2/25/2010 |
HDR ENGINEERING, INC. | $340,573 | Contract | : Provide construction management services during the installation of Photovoltaic, battery power storage, diesel generator electrical system, and the replacement of the roof of the Main Cellhouse Building on Alcatraz Island. | Interior, Department of / National Park Service | 5/06/2010 |
QUICKSILVER CONTRACTING COMPANY | $486,189 | Contract | : TO # 2 : REDUCTION OF FIRE HAZARD- CUT AND REMOVE TREES IN ROCKY MOUNTAIN NATIONAL PARK. | Interior, Department of / National Park Service | 4/06/2010 |
MILANI CONSTRUCTION, LLC | $5,865,177 | Contract | : Work includes milling and overlay 6.5 miles of road surface in Prince Georges County, Maryland, replacement of curb and gutter, full depth pavement patches, as well as drainage improvements along the parkway. | Interior, Department of / National Park Service | 4/16/2010 |
BARON + DOWDLE CONSTRUCTION, LLC | $1,192,205 | Contract | : Parking Lot and Interp Trail Meriwether Lewis Site on the Natchez Trace Parkway | Interior, Department of / National Park Service | 5/06/2010 |
PDI - SHEETZ CONSTRUCTION CORPORATION | $97,796 | Contract | : Rolling Meadow Bridge Repair, Rock Creek Park, Washington, DC - The work of this contract includes providing all parts, materials, labor, and supervision necessary for repairing the east abutment of Rolling Meadow Bridge, rebuilding the adjacent stream ba | Interior, Department of / National Park Service | 4/27/2010 |
LOUIS BERGER GROUP, INC., THE | $126,596 | Contract | : Jean Lafitte NHP - Restoration of Canals | Interior, Department of / National Park Service | 5/14/2010 |
HF3 CONSTRUCTION INC. | $164,121 | Contract | : Painting, Lead Remediation, Window and Door Replacement. | Interior, Department of / National Park Service | 5/04/2010 |
RAAD CONSTRUCTION GROUP, LLC | $1,292,982 | Contract | : Replace Primary Switchgear at Floyd Bennett Field, NY Gateway National Rereation Area Gate 77297B | Interior, Department of / National Park Service | 4/21/2010 |
STEARNS, CONRAD AND SCHMIDT CONSULTING ENGINEERS, INC. | $95,734 | Contract | : Energy and Water Audits of Chesapeake & Ohio Canal National Park, George Washington Memorial Park, Prince William Forest Park,a dn Rock Creek Park | Interior, Department of / National Park Service | 5/27/2010 |
NFIRMC JOINT VENTURE | $952,981 | Contract | : DEVA Green Water & Multi Mines. Install Safety Closures at Abandoned Mines. | Interior, Department of / National Park Service | 4/08/2010 |
HORD, COPLAN, MACHT INC | $130,139 | Contract | : This contract is to produce Construction Administration Services for the DC War Memorial restoration. | Interior, Department of / National Park Service | 5/13/2010 |
CACHE VALLEY ELECTRIC COMPANY | $269,460 | Contract | : Natural Bridges National Monument Solar Power Inverter Replacement | Interior, Department of / National Park Service | 5/13/2010 |
C3 LIMITED LIABILITY COMPANY | $146,202 | Contract | : REPLACE BOARDWALK AT LINCOLN'S BIRTHPLACE | Interior, Department of / National Park Service | 4/26/2010 |
BELLSOUTH TELECOMMUNICATIONS, INC. | $27,841 | Contract | : ARRA PMIS #48183 Rehabilitate Meriwether Lewis Historical Site - Telephone line work. The work of this project is the removal and undergrounding of all aerial phone lines servicing the Meriwether Lewis Monument site within the Natchez Trace Parkway (Park | Interior, Department of / National Park Service | 5/14/2010 |
COMMUNITY TEAMWORK,INC. | $107,414 | Grant | Conservation Activities by Youth Service Organizations: Youth Project involvement to complete backlogged maintenance projects at the Lowell National Historical Park. | Interior, Department of / National Park Service | 5/04/2010 |
MC GRAW'S CUSTOM CONSTRUCTION INC | $541,785 | Contract | : Construct New Pre-Engineered Metal Building | Interior, Department of / National Park Service | 4/17/2010 |
SERVICE 24 ELECTRICAL & MAINTENANCE, L.L.C. | $79,922 | Contract | : Repair and Replace Storm-Damaged Park Assets(multiple projects) JELA146422 Jean Lafitte National Historic Park/Barataria | Interior, Department of / National Park Service | 5/12/2010 |
HDR ENGINEERING, INC. | $7,890 | Contract | : Review and Provide Evaluation of Asbestos Sampling and Testing Activities and Resultant Design Documents to Rehabilitate Lincoln Memorial Reflecting Pool (NAMA) | Interior, Department of / National Park Service | 7/09/2010 |
ANDERSON HALLAS ARCHITECTS, PC | $335,202 | Contract | : The elevator system at Carlsbad Caverns exist in two 750-foot vertical shafts, drilled and blasted through limestone rock, into the underground cavern space. The older and smaller shaft houses freight elevators 1and 2. The newer and larger shaft houses | Interior, Department of / National Park Service | 9/07/2010 |
GLUTH BROTHERS ROOFING CO., INC. | $58,575 | Contract | : Replace Roof Indiana Dunes National Lakeshore Building 102 | Interior, Department of / National Park Service | 12/28/2009 |
KPAUL PROPERTIES, LLC | $134,126 | Contract | : 5 Dell PowerEdge Servers | Interior, Department of / National Park Service | 5/14/2010 |
CUSTOM COPPER AND SLATE LTD. | $189,900 | Contract | : Install Green Roof Bldg 24A, Charlestown Navy Yard | Interior, Department of / National Park Service | 5/10/2010 |
PERRYMAN BUILDING AND CONSTRUCTION SERVICES, INC. | $843,634 | Contract | : Historic Maurice Stevens House: Valley Forge National Historical Park, King of Prussia, PA: General construction to rehabilitate and remedy historic building, Maurice Stephens House, of water and moisture damages and failure of overall structural integrit | Interior, Department of / National Park Service | 5/11/2010 |
NFIRMC JOINT VENTURE | $680,832 | Contract | : Install Safety Closures at Abandoned Mines to Protect Visitors and Preserve Resources. | Interior, Department of / National Park Service | 4/08/2010 |
WALTER THOMAS & ASSOCIATES | $449,804 | Contract | : Removal of non essential structures at Sacramento Landing and Cheda Ranch, Point Reyes National Seashore | Interior, Department of / National Park Service | 5/03/2010 |
EMPIRE ELECTRIC ASSOCIATION INC. | $71,417 | Contract | : REPLACE ELECTRICAL SERVICE @ MOORFIELD - MESA VEDE NATL PARK | Interior, Department of / National Park Service | 5/12/2010 |
B & P CONSORT, INC | $6,277 | Contract | : Meter main combination product only Mesa Verde National Park Mesa Verde, CO 81330 | Interior, Department of / National Park Service | 4/17/2010 |
ESPINA PAVING, INC. | $853,346 | Contract | : Provide all labor and equipment for Rehabilitation of Point of Rocks Boat Ramp, Frederick MD, Chesapeake and Ohio Canal | Interior, Department of / National Park Service | 5/11/2010 |
OTAK, INC. | $37,006 | Contract | : Acadia National Park - Title III services - rehabilitate roads, headwalls and culverts | Interior, Department of / National Park Service | 2/26/2010 |
K.J. CAIN COMPANY | $498,116 | Contract | : Demolition of the existing approximate 2000 sf wood-framed Chalone Creek Warehouse Building with loft storage space and the construction of a new approximate 2180 sf warehouse. | Interior, Department of / National Park Service | 2/12/2010 |
NFIRMC JOINT VENTURE | $853,895 | Contract | : DEVA Skidoo Install Safety Closures at Abandoned Mines | Interior, Department of / National Park Service | 4/08/2010 |
CITADELL CONSTRUCTION COMPANY, INC. | $101,394 | Contract | : Independence National Historical Park Cobblestone repairs | Interior, Department of / National Park Service | 5/10/2010 |
EN POINTE GOV INC | $48,133 | Contract | : Award for HP Switches | Interior, Department of / National Park Service | 4/14/2010 |
PERRYMAN BUILDING AND CONSTRUCTION SERVICES, INC. | $395,401 | Contract | : Historic Lloyd and Sping Houses at Hopewell Furnace National Historic Site, Elverson, PA: CCC Block Building, Building 98, and Tenant House 3: All labor materials, supervision for all concrete repairs, carpentry, and repairs steel doors and frames, vinyl | Interior, Department of / National Park Service | 5/13/2010 |
PRICE, EDDIE | $120,691 | Contract | : Task Order T8520090033. EUREKA FERRY - Encapsulated and painted all lead on wood & metal walls, inc. all windows & wood posts. | Interior, Department of / National Park Service | 9/25/2009 |
PARIS DUMP TRUCK SERVICE | $24,750 | Contract | : Transporting Crusher Run Material from St. Thomas to St. John for National Parks | Interior, Department of / National Park Service | 4/12/2010 |
T L PETERSON INC | $143,990 | Contract | : Lava Beds National Monument Realign Medicine Lake Road Intersection with main park road. Remove section of Gillem's Camp parking area and install concrete curbing, walks, and curb cut with minor asphalt patching. | Interior, Department of / National Park Service | 5/13/2010 |
BEAUMON INDUSTRIES, INC | $37,800 | Contract | : Boiler Replacement | Interior, Department of / National Park Service | 4/26/2010 |
F.M. SHEET METAL, INC. | $249,756 | Contract | : HVAC upgrades in 3 park buildings in Crater Lake National Park, OR | Interior, Department of / National Park Service | 5/12/2010 |
Z LOGGING, LLC | $287,302 | Contract | : The contractor shall furnish all labor, equipment, materials and incidentals, except as otherwise specified herein, necessary to comlete removal of a protion of the A141 and the remainder of the A400 and A140 roads at Redwood National and State Parks. Th | Interior, Department of / National Park Service | 4/29/2010 |
IODYNAMIX, INC. | $36,571 | Contract | : Overland Tape Library unit with associated hard drives, accessories and maintnence service. DELIVERY SITE: WASO-NISC National Information Systems Center 12795 W Alameda Pkwy Lakewood, CO 80228-2822 Attn: Ira Kopilow | Interior, Department of / National Park Service | 11/18/2009 |
IMMIXTECHNOLOGY, INC. | $3,749,025 | Contract | : ADP SOFTWARE AND SERVICES Golden Gate NRA, CA | Interior, Department of / National Park Service | 4/02/2010 |
E-CORP. | $26,053 | Contract | : Repair Picnic Area Comfort Station. | Interior, Department of / National Park Service | 4/17/2010 |
ELSWICK & ELSWICK INC. | $36,100 | Contract | : tree work Richmond National Battlefield | Interior, Department of / National Park Service | 4/21/2010 |
NOBLE SALES CO., INC. | $48,430 | Contract | : LUMBER AND BUILDING PRODUCTS FOR SAUGUS IRON WORKS | Interior, Department of / National Park Service | 4/22/2010 |
1220 EXHIBITS, INC | $31,083 | Contract | : 4 Exhibit Cases for National Park Service-Everglades National Park | Interior, Department of / National Park Service | 4/30/2010 |
DISABLED VETERANS SOLUTIONS CONSORTIUM INC. | $322,993 | Contract | : Upgrade Fire and Intrusion Detection | Interior, Department of / National Park Service | 4/06/2010 |
INDUSTRIAL METAL CLEANING CORPORATION, THE | $58,397 | Contract | : seat restoration for Paschaol Auditorium | Interior, Department of / National Park Service | 5/07/2010 |
OLSON ENTERPRISES INC | $31,200 | Contract | : Fencing material | Interior, Department of / National Park Service | 11/17/2009 |
OESCH CONTRACTING | $166,746 | Contract | : Chilton Boat Launch | Interior, Department of / National Park Service | 5/10/2010 |
B & P CONSORT, INC | $13,949 | Contract | : Close Cell Insulation part A and Part B | Interior, Department of / National Park Service | 6/15/2010 |
INTERMOUNTAIN AQUATICS, INC. | $87,975 | Contract | : Pinnacles National Park - Revegetation Services | Interior, Department of / National Park Service | 5/11/2010 |
GENERAL SUPPLY & SERVICES, INC. | $41,881 | Contract | : lithonia lighting updgrade-Everglades National Park | Interior, Department of / National Park Service | 4/21/2010 |
OTIS ELEVATOR COMPANY | $290,000 | Contract | : Rehabilitate Historic Vanderbiltel evator VAMA | Interior, Department of / National Park Service | 5/10/2010 |
LIBERTY LUMBER & SUPPLY COMPANY | $66,029 | Contract | : Awarded this contract for SUPPLY & DELIVERY ONLY to include the following:(739) TREK2x6x20'w.grey,(475)TREK5/4x6x16 w.grey,(54)1x12x12'w.grey,(31)4x10x16PT or Douglass#2 or better,(4)4x10x22PT or douglass #2 or better, (20)composite comp deck screw for si | Interior, Department of / National Park Service | 8/19/2010 |
GROUNDWORK USA, INC. | $214,738 | Contract | : Award is for hiring and training youth to assist in restoring the Nelson farm house at the Minute Man National Historic Park. | Interior, Department of / National Park Service | 12/04/2009 |
BOOZ ALLEN HAMILTON INC. | $64,221 | Contract | : Booz Allen will provide support to the National Park Service (NPS) by providing quality assurance, quality control, coordination, data analysis, and summaries needed to respond ARRA perfromance reporting requirements. The deliverables are quartley projec | Interior, Department of / National Park Service | 8/24/2010 |
CLASSIC SITE SOLUTIONS, INC. | $489,037 | Contract | : The Task Order requires the demolition and removal of the abandoned Cedar Ave. railroad bridge in its entirety at Steamtown National Park in Scranton, PA. it also includes the repair of the concrete bridge abuttments and the installation of a pedestrian | Interior, Department of / National Park Service | 9/01/2010 |
RIDGWAY VALLEY ENTERPRISES, INC. | $83,901 | Contract | : Saguaro Red Hills Visitor Center Reroof | Interior, Department of / National Park Service | 7/23/2010 |
HDR ENGINEERING, INC. | $196,974 | Contract | : CAVE-116245-Structural Repair and Lead Based Paint Abatement in Elevator Shaft at Carlsbad Caverns National Park, NM. Provide costruction management oversight for structural repoar and lead based paint abatement. | Interior, Department of / National Park Service | 8/26/2010 |
TELECOM SYSTEM SOLUTIONS INC | $28,802 | Contract | : National Park Service (NPS) ON-GOING MAINTENANCE CONTRACT FOR PBX'S | Interior, Department of / National Park Service | 3/11/2010 |
HDR ENGINEERING, INC. | $105,221 | Contract | : Provide Construction Management services for work being completed at Keweenaw National Historic Park, Calumet, MI. The primary role of the Cosntruction Management Representative is to inpsect the work of the construction contractor for progress, workmans | Interior, Department of / National Park Service | 9/17/2010 |
ONAN CORPORATION | $31,857 | Contract | : Award and Build of 50kw, Model DSFAC Generator | Interior, Department of / National Park Service | 5/12/2010 |
TETRA TECH, INC. | $422,921 | Contract | : Title III (Construction Phase Services) for the construction of a wastewater treatment plant at Madison Junction, Yellowstone National Park. | Interior, Department of / National Park Service | 2/26/2010 |
SOUTHWEST CONSERVATION CORPS | $164,997 | Grant | Conservation Activities by Youth Service Organizations: The SCC in partnership with our regional affiliate partner Montana Conservation Corps(hereinafter MCC) will facilitate the Grand Teton Trails Rehabilitation Program in the Intermountain Region of the National Park Service. The two MCC teams arere comprised... Show more | Interior, Department of / National Park Service | 9/28/2010 |
CARATOZZOLO ELECTRIC | $139,960 | Contract | : Installation of Energy Efficient Lighting at The Visitor Center, Women's Rights NHS | Interior, Department of / National Park Service | 9/15/2010 |
AIRBORNE VETERANS SERVICES, INC. | $3,688 | Contract | : Supply 4 windows | Interior, Department of / National Park Service | 9/22/2010 |
BERGMANN ASSOCIATES INC | $277,377 | Contract | : Construction Services, Valley Railway - Rail Rehabilitation | Interior, Department of / National Park Service | 9/08/2010 |
BIG-D CONSTRUCTION CORP. | $6,847,593 | Contract | : Establish Interagency Visitor Center at King Gillette Ranch, Santa Monica Mountains National Recreation Area, California Design Build Net Zero | Interior, Department of / National Park Service | 7/14/2010 |
HYDROTECH, INC. | $19,250 | Contract | : Clean and Video Inspect Sewer Linies, Lassen Volcanic National Park | Interior, Department of / National Park Service | 5/17/2010 |
DEVINE BROTHERS INC | $348,200 | Contract | : DBI WILL MONITOR AND ANALYZE THE CURRENT USAGE OF ENERY IN THE PARK BLDGS TO ALL FUTURE REDUCTION OF COST. INSTALL ELEC KILOWATT HOUR SUBMETER IN PARK BLDGS, AUTOMATICE METER READING SOFTWARE THAT IS INSTALLED IN PARK SERVER. TO MONITOR AND TRACK ENERGY | Interior, Department of / National Park Service | 5/06/2010 |
L & J CONSTRUCTION INC | $27,343 | Contract | : Maintenance shop security fence at Gila Cliff Dwellings National Monument | Interior, Department of / National Park Service | 4/05/2010 |
DURABLE PLASTIC DESIGNS, LLC | $39,296 | Contract | : 2x6 Composite recycled plastic lumber | Interior, Department of / National Park Service | 4/07/2010 |
URS GROUP, INC. | $48,467 | Contract | : Recovery vegitation mitigation monitoring services related to the 'Replace Failing Plugs (Dams) at Cape Sable' Construction Project, Everglades National Park, Florida, NPS PMIS # EVER-152464 | Interior, Department of / National Park Service | 9/21/2010 |
FOGG TOWING & MARINE, LLC | $47,000 | Contract | : Ruble removal on South Manitou Island | Interior, Department of / National Park Service | 8/28/2010 |
VECELLIO & GROGAN, INC. | $436,243 | Contract | : Deep patching, pavement reconstruction, crack filling, spot leveling with hot bituminous pavement for the Guilford Courthouse NMP Tour Road. | Interior, Department of / National Park Service | 1/21/2010 |
LOUIS BERGER GROUP, INC., THE | $788,533 | Contract | : Construction Management services. Architecture/Engineering Services during construction (Title III) Linclon Reflecting Pool | Interior, Department of / National Park Service | 9/20/2010 |
FEDERAL CONTRACTS CORP | $66,591 | Contract | : Brush Chippers for the Grand Canyon National Park. Vermeer BC600XL and Vermeer BC1800XL | Interior, Department of / National Park Service | 8/30/2010 |
LCC-MZT TEAM II | $8,311,705 | Contract | : Olympic National Park, Lower Elwha Klallam Tribe LEKT) Wastewater Treatment System, Port Angeles, WA | Interior, Department of / National Park Service | 9/02/2010 |
GABEL ASSOCIATES INC. | $59,619 | Contract | : Energy and Water Audits: Hot Springs National Park, Jefferson National Expansion Memorial and Mount Rushmore National Memorial | Interior, Department of / National Park Service | 2/23/2010 |
NFIRMC JOINT VENTURE | $395,501 | Contract | : Coronado/ Organ Pipe Install safety closures at abandoned mines to protect visitors and preserve resources. | Interior, Department of / National Park Service | 9/17/2010 |
HOWELL-OREGON ELECTRIC COOPERATIVE, INC. | $1,178,355 | Contract | : Contract award to replace primary underground wire in Alley Spring and Round Spring Parks. | Interior, Department of / National Park Service | 5/15/2010 |
KRISTER OLMON, INC. | $48,021 | Contract | : Consulting supervision for exhibit production and installation of exhibits for Mammoth Cave National Park. Scope of services include review and approval of production, assist NPS contracting officer's representative, coordination between exhibit producer | Interior, Department of / National Park Service | 5/14/2010 |
WOLVERINE SUPPLY, INC. | $2,440,000 | Contract | : Construct approx. 3,200S.F., clear-span, pre-engineered metal building to be used as a 4 bay maintenance shop, an attached covered storage structure off the main structure, foundation system/slab, underground utilities, demolition and site work. | Interior, Department of / National Park Service | 8/26/2010 |
POWER PLUS ELECTRIC, L.L.C. | $75,600 | Contract | : Renewable energy installation at Badlands National Park. | Interior, Department of / National Park Service | 8/04/2010 |
GILMAN CORPORATION THE | $39,598 | Contract | : BUCK ISLAND REEF NATIONAL MONUMENT, ST CROIX, VI BUOYS | Interior, Department of / National Park Service | 2/26/2010 |
LANE CONSTRUCTION CORPORATION, THE | $2,935,602 | Contract | : Shenandoah National park Roadway Rehabilitation | Interior, Department of / National Park Service | 9/09/2010 |
SOUTHERN CUSTOM EXHIBITS OF ALABAMA, INC. | $549,522 | Contract | : Provide the NPS with labor, materials, services and facilities and travel necessary to detail, fabricate transport to the site and install all exhibit elements for the Visitor Center at Dinosaur National Monument, Jensen, UT | Interior, Department of / National Park Service | 9/09/2010 |
MUSEUM OF AFRICAN AMERICAN HISTORY, INCORPORATED | $4,138,000 | Grant | Boston African-American National Historic Site Cooperative Agreement with the Museum of African American History: Restore and Rehabilitate African Meeting House Boston | Interior, Department of / National Park Service | 9/14/2010 |
NUAXIS LLC | $101,182 | Contract | : NuAxis is fulfilling the NPS OCIO NISC's requirement for a help desk technician. | Interior, Department of / National Park Service | 9/24/2010 |
GREENING YOUTH FOUNDATION, INC | $299,557 | Grant | Conservation Activities by Youth Service Organizations: GYF in partnership with NPS IMR to manage the Recruitment training and implementation of student corps member for the GREEN Project in Arizona and New Mexico National Parks. | Interior, Department of / National Park Service | 9/15/2010 |
PHOENIX MARINE CO. INC. | $19,912,573 | Contract | : Stabilize Ellis Island Seawall | Interior, Department of / National Park Service | 5/07/2010 |
WORCESTER EISENBRANDT, INC. | $955,592 | Contract | : RECOVERY - Stabilize Historic Culvert 182 | Interior, Department of / National Park Service | 4/30/2010 |
TARGET APPLICATORS, INC. | $29,000 | Contract | : olant 73 trees on pea tidge military park | Interior, Department of / National Park Service | 8/08/2009 |
GLUTH BROTHERS ROOFING CO., INC. | $102,026 | Contract | : Recovery, Install Green Roof at Indiana Dunes National Lakeshore Building 112 | Interior, Department of / National Park Service | 3/15/2010 |
ECOLOGY, WASHINGTON STATE DEPARTMENT OF | $200,000 | Grant | Conservation Activities by Youth Service Organizations: This is an agreement entered into between the Department of Ecology-Washington Conservation Corps (WCC) and the US Department of Interior, National Park Service. The purpose of the agreement is to complete trail construction and maintenance andnd restorati... Show more | Interior, Department of / National Park Service | 5/12/2010 |
GAME AND FISH, ARIZONA DEPT OF | $121,675 | Contract | : WILDLIFE SURVEY AND REMOVAL AND POST-CLOSURE AT ABONDONED MINES IN CORONADO MATIONAL MEMORIAL | Interior, Department of / National Park Service | 9/16/2010 |
LANE CONSTRUCTION CORPORATION, THE | $2,254,000 | Contract | : Shenendoah National Park roadway rehabilitation | Interior, Department of / National Park Service | 9/09/2010 |
COLOR-AD INC | $1,445,147 | Contract | : DESIGN-BUILD EXHIBIT SERVICES FOR SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA | Interior, Department of / National Park Service | 8/10/2010 |
ZEAGER BROS., INC. | $18,043 | Contract | : supply Bonded WoodCarpet materials for a trail at Wolf Trap National Park. | Interior, Department of / National Park Service | 8/31/2010 |
ARCHITECTURAL RESOURCES GROUP, INC. | $60,563 | Contract | : Point Reyes Youth Hostel Title III Construction Management Services | Interior, Department of / National Park Service | 7/15/2010 |
LANE CONSTRUCTION CORPORATION, THE | $9,735 | Contract | : 1.5 inch HMA overlay, Route 209, from MM0.75 to MM.8 only at the Delaware Water Gap National Recreation Area (Bushkill PA-NJ) | Interior, Department of / National Park Service | 9/24/2010 |
MARCUM EXCAVATING, INC. | $178,000 | Contract | : MINE AND CAVE CLOSINGS FOR THE PROTECTION OF WILDLIFE AND PARK VISITORS IN THE BLUE HERON AREA OF BIG SOUTH FORK RIVER AND RECREATION AREA | Interior, Department of / National Park Service | 5/13/2010 |
LIQUID WASTE TECHNOLOGY, LLC | $75,229 | Contract | : Dredge for waste water lagoon at the Yellowstone National Park, Mammoth Springs location | Interior, Department of / National Park Service | 5/11/2010 |
SKUTUMPAH ENTERPRISES, LLC | $30,000 | Contract | : Supply 1000 Tons of grushed shale | Interior, Department of / National Park Service | 8/18/2010 |
SCHNABEL FOUNDATION COMPANY INC | $1,694,205 | Contract | : Stablization of Mint Springs Bluff at the Vicksburg Military Park in Vicksburg, MS. The repair involves installing a soil nail wall with a permanent reinforced 8 inch facing. The overall scope includes the installation of a 18 inch DIP drainage pipe, rein | Interior, Department of / National Park Service | 4/26/2010 |
QUICKSILVER CONTRACTING COMPANY | $202,019 | Contract | : TREE THINNING IN THE CHICKASAW NATIONAL RECREATION AREA. | Interior, Department of / National Park Service | 8/30/2010 |
RIM ARCHITECTS AK LLC | $74,250 | Contract | : Katmai National Park and Preserve. This project will provide funding to allow RIM Architects and our design team to provide Construction Administration and Commissioning Services for the construction of the King Salmon Maintenance Building for the NPS. | Interior, Department of / National Park Service | 8/31/2010 |
ENVIROTEMPS, INC. | $207,447 | Contract | : Procurement Services | Interior, Department of / National Park Service | 8/12/2010 |
ANDERSON HALLAS ARCHITECTS, PC | $58,934 | Contract | : This project is for construction administration services for the installation of interpretive exhibits in both the Quarry Visitor Center and the lower level of the Quarry Exhibit Hall; outdoor exhibits at the visitor center; three interpretive exhibits in | Interior, Department of / National Park Service | 9/13/2010 |
IRVING BURTON ASSOCIATES, INC. | $114,325 | Contract | : Provide Contract Support Specialist II Services for the WASO WCP Office. | Interior, Department of / National Park Service | 9/21/2010 |
ENVIROTEMPS, INC. | $6,183 | Contract | : Roofing Specialist | Interior, Department of / National Park Service | 6/03/2010 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $67,700 | Contract | : Alpha Corporation was awarded a modification to a contact for construction management services for a Wastewater Treatment Plant. This modification (mod) is funded with Stimulus funds. The project involves replacing the existing aerated lagoon wastewater | Interior, Department of / National Park Service | 7/29/2010 |
PLANET TECHNOLOGIES, INC | $359,280 | Contract | : Sharepoint Administration, Sharepoint Development and user support for Sharepoint products | Interior, Department of / National Park Service | 9/16/2010 |
THE STUDENT CONSERVATION ASSOCIATION INC | $25,862 | Grant | Conservation Activities by Youth Service Organizations: This award funded services to the National Park Service Southeast Exotic Plant Management Team in Asheville, NC, from the Student Conservation Association's youth conservation service programs. SCA Interns are serving to assist the agency in conontrolling i... Show more | Interior, Department of / National Park Service | 3/03/2010 |
AMBER ENTERPRISES, INC. | $290,269 | Contract | : Install energy efficient lights located at the Wolf Trap National Park | Interior, Department of / National Park Service | 9/23/2010 |
LS GALLEGOS & ASSOCIATES INC | $56,736 | Contract | : Contract Administration | Interior, Department of / National Park Service | 8/16/2010 |
NATIONAL SUPPLY & INSTALLATION | $127,250 | Contract | : Plugging Oil/Gas Wells in Cuyahoga Valley National Park | Interior, Department of / National Park Service | 7/15/2010 |
H. F. LENZ CO. | $45,960 | Contract | : Construction Administration Services for Fort Necessity National Battlefield and Johnstown Flood Museum Geothermal Projects | Interior, Department of / National Park Service | 8/05/2010 |
ATKINS NORTH AMERICA, INC | $367,504 | Contract | : Interagency Visitor Center at King Gillette Ranch at Santa Monica Mountains NRA, Thousand Oaks, CA | Interior, Department of / National Park Service | 8/09/2010 |
HDR ENGINEERING, INC. | $192,398 | Contract | : Provide support services to promote migration of project specific construction eletronic and hardcopy information, files, and documents into DSC's new Sharepoint Construction website. | Interior, Department of / National Park Service | 9/08/2010 |
ANDERSON HALLAS ARCHITECTS, PC | $115,067 | Contract | : This project will abate dangerous working conditions, restore lost structural integrity and extend the service life of a critical 53 year-old passenger elevator system. These elevators are the primary means for visitors at Carlsbad Caverns National Park | Interior, Department of / National Park Service | 9/03/2010 |
HDR ENGINEERING, INC. | $58,043 | Contract | : Perform the following services for the construction of waste water outfall from the Nippo Paper Industries (NPI) paper mill's water treatment plan: on-site inspections; special inspections; administration of the construction contract; office services; an | Interior, Department of / National Park Service | 7/08/2010 |
LANE & CO., INC. | $10,542 | Contract | : Supplies only: Water Meters with hot rods and wire 1) 6 4) 4 6) 1x1 | Interior, Department of / National Park Service | 9/15/2010 |
MICAH GROUP ENVIRONMENTAL CONTRACTORS, INC | $250,245 | Contract | : Replace HVAC Components located at the National Mall and Memorial Parks, Washington D.C. The work is located in numerous buildings and structure throughout NAMA. Locations include West Potomac Park, Eat Potomac Park, National Mall, East Potomac and Brent | Interior, Department of / National Park Service | 8/06/2010 |
BERGMANN ASSOCIATES INC | $284,337 | Contract | : Contract Administration & CI Tinkers Creek Aqueduct - Phase 2 | Interior, Department of / National Park Service | 9/01/2010 |
MACTEC ENGINEERING AND CONSULTING, INC. | $44,921 | Contract | : Construction Management Services for Pinnacles National Monument Chalone Creek Warehouse in San Benito County, CA., PMIS #5435. The proposed project will replace a deteriorated maintenance warehouse with a new wood framed structure. | Interior, Department of / National Park Service | 7/19/2010 |
LS GALLEGOS & ASSOCIATES INC | $231,110 | Contract | : Procurement Assistants, processing invoices Final - total invoiced $231,109.86. contract deobligated to $231,109.86 | Interior, Department of / National Park Service | 8/13/2010 |
N-POWELL COMPANY, INC. | $351,024 | Contract | : Replace Thorton Gap W aterline, Shenandoh National Park, VA | Interior, Department of / National Park Service | 9/29/2010 |
CORMAN CONSTRUCTION, INC. | $34,470,346 | Contract | : Lincoln Memorial Reflecting Pool Rehabilitation | Interior, Department of / National Park Service | 8/19/2010 |
ALPHA CONSTRUCTION AND ENGINEERING CORPORATION | $130,798 | Contract | : On-site construction management services required for the repair of damaged and failing stone masonry of historic Culvert 182 and install a water barrier at the C&O Canal National Park. | Interior, Department of / National Park Service | 4/05/2010 |
NATALIE LARSON | $36,240 | Contract | : Rehabilitation of Hamilton Grange, NPS: New Curtains | Interior, Department of / National Park Service | 5/03/2010 |
DURABLE PLASTIC DESIGNS, LLC | $45,994 | Contract | : Composite 2x6 structural lumber. | Interior, Department of / National Park Service | 9/16/2010 |
LOUIS BERGER GROUP, INC., THE | $1,349,381 | Contract | : Lincoln Memorial Reflecting Pool and Grounds Rehabilitation | Interior, Department of / National Park Service | 9/16/2010 |
CAPITOL SUPPLY, INC. | $44,390 | Contract | : Removal and Installation of old and new Refrigerators for multiple government housing units. | Interior, Department of / National Park Service | 4/14/2010 |
HARRIS ENVIRONMENTAL GROUP | $128,470 | Contract | : Work involves performing project management to ensure compliance of the NPS?s construction contract for the construction of closures at AMLs in Coronado National Memorial,Grand Canyon Nation Park AML and ORgan Pipe National Monument AML. Work under this | Interior, Department of / National Park Service | 9/16/2010 |
MUELLER,GLENN | $57,275 | Contract | : Install Wheelchair Lift | Interior, Department of / National Park Service | 3/16/2010 |
JC MILLBANK CONSTRUCTION CO INC | $1,118,089 | Contract | : Rehabilitaion of the Carriage House and Laundry buildings at the Franklin D. Roosevelt Home in Hyde Park, NY. Work to be done includes masonry, paver and cement work, roofing and siding, painting, electrical, plumbing and extensive crpentry repairs. | Interior, Department of / National Park Service | 4/27/2010 |
GRAVES AND GRAVES CONSTRUCTION COMPANY, INC. | $123,773 | Contract | : REPLACE THE COMFORT STATION AT THE COLBERT FERRY BEACH AREA | Interior, Department of / National Park Service | 8/09/2010 |
ALFONSO GALLEGOS INC | $330,086 | Contract | : Redwood National Park - Tree Thinning | Interior, Department of / National Park Service | 11/18/2009 |
QUALITY BUILT POLE BUILDINGS | $43,806 | Contract | : 30 x 100 storage building | Interior, Department of / National Park Service | 4/13/2010 |
STEWART'S PROFESSIONAL TREE SERVICE & LANDSCAPING, INC. | $73,672 | Contract | : Fire Line Construction at Buffalo National River Park | Interior, Department of / National Park Service | 9/24/2010 |
B&M CONSTRUCTION, INC. | $561,084 | Contract | : Furniture design and move services | Interior, Department of / National Park Service | 9/22/2010 |
MDL INNOVATIVE SERVICES INCORPORATED | $121,382 | Contract | : Administrative Management & General Management Consulting Services | Interior, Department of / National Park Service | 9/13/2010 |
H. F. LENZ CO. | $35,000 | Contract | : Catoctin Mountain Park Electrical On-Site Construction Inspection | Interior, Department of / National Park Service | 7/22/2010 |
EYP, INC. | $34,994 | Contract | : Quarterly work included participation in a value analysis process to determine the preferrered alternatives for ground source mechanical systems at two National Historic Sites: Longfellow and Frederick Law Olmsted. | Interior, Department of / National Park Service | 9/23/2010 |
COLUMBIA CASCADE COMPANY | $44,267 | Contract | : Heavy duty benches for Fort Dupont Park, Washington, DC | Interior, Department of / National Park Service | 9/27/2010 |
WOLVERINE SUPPLY, INC. | $2,541,074 | Contract | : Construct 3,200S.F., clear-span, pre-engineered metal building to be used as a 4 bay maintenance shop, an attached covered storage structure off the main structure, foundation system/slab, underground utilities, demolition and site work in Katmai National | Interior, Department of / National Park Service | 8/26/2010 |
LS GALLEGOS & ASSOCIATES INC | $56,736 | Contract | : Contract Administration | Interior, Department of / National Park Service | 8/16/2010 |
SVR DESIGN COMPANY | $13,722,689 | Contract | : Title I and Title II Design Services for Rehabilitation of Septic System at the Hoh Visitor Center | Interior, Department of / National Park Service | 8/04/2009 |
SVR DESIGN COMPANY | $17,123 | Contract | : Title I Design Services for Installation of Photovoltic System at Park Headquarters, Craters of the Moon National Monument, Idaho | Interior, Department of / National Park Service | 8/26/2009 |
KPI #2 INC. | $60,518 | Contract | : Roofing Replacement - Charcoal House | Interior, Department of / National Park Service | 1/28/2010 |
FAGER, R. F. COMPANY | $52,851 | Contract | : BOILER EQUIPMENT DELIVERED TO GETTYSBURG NATIONAL MILITARY PARK | Interior, Department of / National Park Service | 4/29/2010 |
DANIEL J. KEATING COMPANY | $4,924,438 | Contract | : Rehabilitate Independence Hall Tower | Interior, Department of / National Park Service | 5/04/2010 |
DURABLE PLASTIC DESIGNS, LLC | $45,994 | Contract | : composite 2x6 structural lumber | Interior, Department of / National Park Service | 9/16/2010 |
CENTURYTEL OF MICHIGAN, INC. | $28,993 | Contract | : ARRA PMIS #197355 Stabilize and rehabilitate buildings in Sleeping Bear Dunes (Glen Haven Village Historical District). | Interior, Department of / National Park Service | 9/08/2010 |
FEDERAL CONTRACTORS INC | $199,656 | Contract | : Upgrade Sanitary Sewer Lift Stations,Turkey Run Park, George Washington Memorial Parkway, Arlington, VA | Interior, Department of / National Park Service | 5/07/2010 |
SCHINDLER ELEVATOR CORPORATION | $338,893 | Contract | : Perry Monument Elevator Renovation | Interior, Department of / National Park Service | 8/12/2009 |
CREATIVE ENERGIES LLC | $492,674 | Contract | : Design and construction of Photovoltaic Systems at Water Treatment Plant at Mesa Verde National Park, CO. | Interior, Department of / National Park Service | 1/19/2010 |
MUELLER,GLENN | $57,275 | Contract | : Wheelchair Lift | Interior, Department of / National Park Service | 3/16/2010 |
ATLANTIC COAST DOCK BUILDING CORP | $2,674,620 | Contract | : Approximately 2,000 ft. of bulkhead reconstruction | Interior, Department of / National Park Service | 5/05/2010 |
KNOLL, INC. | $568,043 | Contract | : Manufacture and install office furniture for Grand Teton National Park. | Interior, Department of / National Park Service | 11/22/2010 |
HDR ENGINEERING, INC. | $192,398 | Contract | : Provide support services to promote migration of project specific construction eletronic and hardcopy information, files, and documents into DSC's new Sharepoint Construction website. | Interior, Department of / National Park Service | 9/08/2010 |
ALLEN UNIVERSITY (INC) | $1,040,000 | Grant | Preservation of Historic Structures on the Campuses of Historically Black Colleges and Universities (HBCUs).: There are extensive interior and exterior renovations that need to be done to Chappelle Auditorium. The purpose of this project is to repair/replace the windows, roof, and doors, repoint thehe exterior masonry, install a new HVAC system and fire protection... Show more | Interior, Department of / National Park Service | 10/23/2009 |
SVR DESIGN COMPANY | $6,489 | Contract | : The contractor shall perform the work in accordance with that attached scope of work. The Contractor's fee proposal dated 8/25/2009 is hereby incorporated by reference and made a part of the order. Funding for this project is provided pursuant to the Am | Interior, Department of / National Park Service | 8/26/2009 |
LAFARGE MID-ATLANTIC LLC | $353,679 | Contract | : tow path material to be delivered to C&o canal | Interior, Department of / National Park Service | 9/23/2010 |
SVR DESIGN COMPANY | $138,227 | Contract | : The Contractor shall perform the work in accordance with the attached scope of work. The Contractor's revised fee proposal dated 7/21/09 is hereby incorporated by reference and made a part of the order. | Interior, Department of / National Park Service | 8/04/2009 |
CHESTER KING | $783,000 | Contract | : archaeological studies related to construction of visitor center at King Gillette Ranch | Interior, Department of / National Park Service | 4/16/2010 |
CREATIVE TIMES DAYSCHOOL, INC. | $328,466 | Contract | : Replace Quarry Visitor Center Waterlines and Headquarters Housing Area Waterlines at Dinosaur National Mounument. | Interior, Department of / National Park Service | 4/16/2010 |
TARGET APPLICATORS, INC. | $29,000 | Contract | : planting trees at pea ridge military park | Interior, Department of / National Park Service | 8/08/2009 |
ENGINEERING/REMEDIATION RESOURCES GROUP, INC. | $26,608 | Contract | : ERRG was contractedby the National Park Service (NPS) to characterize lead concentrations in soils around the perimeter of buildings 438, 490, 666, 690 Camino del Canyon Rd.; Bettencourt Ranger House, and Capehart Quarters in the Golden Gate National Re | Interior, Department of / National Park Service | 10/25/2010 |
WILDLANDS INC | $605,775 | Contract | : Excavation and earthwork to fill in contaminated fish ponds and soil stabilization and revegetation of disturbed areas at Great Sand Dunes National Park. | Interior, Department of / National Park Service | 5/05/2010 |
SVI, INC | $408,622 | Contract | : Open Air Trams, two (2) Power Cars & two (2) Trailing Units | Interior, Department of / National Park Service | 9/30/2010 |
MICHAEL L. FOSTER & ASSOCIATES, INC. | $308,535 | Contract | : Replace King Salmon maintenance building | Interior, Department of / National Park Service | 5/20/2010 |
LOWER ELWHA TRIBE COMMUNITY COUNCIL | $1,044,997 | Contract | : The project has several different activities occurring that include the following: Acct 155: Paving Elwha Valley Road from station 41+00 to Station 70+00. and installation of the forcemain pipe from station 41+00 to 86+00. THIS WORK HAS BEEN COMPLETED. | Interior, Department of / National Park Service | 5/07/2010 |
IRVING BURTON ASSOCIATES, INC. | $49,257 | Contract | : This action for a Procurement Technician/Analyst which will support the quality control of FPDS-NG Recovery Act action iaw sow. | Interior, Department of / National Park Service | 6/09/2010 |
FORRESTER CONSTRUCTION COMPANY | $4,599,084 | Contract | : Rehabilitation of Stone Walls and Pavement at Sixteen Historic Overlooks along Skyline Drive. | Interior, Department of / National Park Service | 11/10/2009 |
TARGET APPLICATORS, INC. | $29,000 | Contract | : tree planting | Interior, Department of / National Park Service | 8/08/2009 |
KUNKEL CONSTRUCTION, INC. | $75,719 | Contract | : concrete blocks to rocky mountain national park--Estes Park, Colorado | Interior, Department of / National Park Service | 2/12/2010 |
BIG-D CONSTRUCTION CORP. | $6,847,593 | Contract | : Establish Interagency Visitor Center at King Gillette Ranch, Santa Monica Mountains National Recreation Area, California Design Build Net Zero | Interior, Department of / National Park Service | 7/14/2010 |
GAME AND FISH, ARIZONA DEPT OF | $121,675 | Contract | : WILDLIFE SURVEY AND REMOVAL AND POST-CLOSURE AT ABONDONED MINES IN CORONADO MATIONAL MEMORIAL | Interior, Department of / National Park Service | 9/16/2010 |
WILDLANDS INC | $949,609 | Contract | : Revegetation Services to stabilize actively eroding areas at the Crystal Creek Quarry, Whiskeytown National Recreation Area, CA | Interior, Department of / National Park Service | 5/07/2010 |
LOUIS BERGER GROUP, INC., THE | $309,112 | Contract | : This Call Order shall consist of on-site inspection, administration of the construction contract, ofiice services, and site visits. All work shall be performed under a single contract. All work performed on the facilities shall be undertaken with the utmo | Interior, Department of / National Park Service | 9/17/2009 |
KAPEL CONSTRUCTION INC. | $1,224,621 | Contract | : Upgrade/repair 7.9 miles of existing, native-surfaced roads within Redwood National and State Parks located near the town of Orick, CA. Entrails clearing vegetation; salvaging berms of road fill material to rebuild surface elevations and road shape, inst | Interior, Department of / National Park Service | 5/13/2010 |
LOWER ELWHA TRIBE COMMUNITY COUNCIL | $1,044,997 | Grant | Environmental Quality and Protection Resource Management: The project has several different activities that are funded, they include the following: Acct 155) Paving Elwha Valey Road from station 41+00 to Station 70+00 and installation of the forcemain pipe from station 41+00 to station 86+00 (Completeted). Acct ... Show more | Interior, Department of / National Park Service | 5/07/2010 |
TQM GROUP LLC | $241,692 | Contract | : Glenmont House painting | Interior, Department of / National Park Service | 2/02/2010 |
TQM GROUP LLC | $295,400 | Contract | : Original Contractis for $168,700.00. The additional contract awarded in Spetember 2011 for $126,700.00 | Interior, Department of / National Park Service | 2/02/2010 |
INTERMOUNTAIN AQUATICS, INC. | $87,713 | Contract | : Revegetation Services | Interior, Department of / National Park Service | 5/11/2010 |
MILLS AND SCHNOERING ARCHITECTS LLC | $208,899 | Contract | : Construction observation services to reconstruct and stabilize Big Slackwater Historic Stone Wall path. | Interior, Department of / National Park Service | 5/13/2010 |
City of Port Angeles | $1,620,100 | Grant | Rivers, Trails and Conservation Assistance: ARRA 14 1041 OLYM PMIS # 005375 Restore Elwha River Ecosystems and Fisheries Program | Interior, Department of / National Park Service | 5/05/2010 |
City of Port Angeles | $150,786 | Grant | Rivers, Trails and Conservation Assistance: ARRA 14 1041 OLYM PMIS # 005375 Restore Elwha River Ecosystems and Fisheries Program | Interior, Department of / National Park Service | 3/10/2010 |