Indian Affairs (Assistant Secretary)
Total Spending |
$942,082,957 |
Parent agency (Interior, Department of) | $3,459,715,017 |
State | Funding |
---|---|
Alabama | $614,398 |
Alaska | $54,649,842 |
Arizona | $289,551,114 |
California | $26,661,727 |
Colorado | $6,212,458 |
District of Columbia | $676,011 |
Florida | $529,460 |
Idaho | $5,183,706 |
Illinois | $890,665 |
Iowa | $1,667,871 |
Kansas | $4,539,720 |
Kentucky | $1,189,079 |
Louisiana | $1,781,334 |
Maine | $11,364,340 |
Maryland | $535,290 |
Massachusetts | $2,045,719 |
Michigan | $16,550,181 |
Minnesota | $30,896,406 |
Mississippi | $7,334,300 |
Missouri | $47,840 |
Montana | $32,675,963 |
Nebraska | $4,571,110 |
Nevada | $8,273,612 |
New Jersey | $25,200 |
New Mexico | $125,875,641 |
New York | $1,348,661 |
North Carolina | $4,031,245 |
North Dakota | $45,549,779 |
Ohio | $156,497 |
Oklahoma | $44,259,691 |
Oregon | $10,997,987 |
Pennsylvania | $47,250 |
Rhode Island | $360,875 |
South Dakota | $90,761,185 |
Tennessee | $397,051 |
Texas | $3,488,213 |
Utah | $50,630,290 |
Virginia | $275,693 |
Washington | $27,184,833 |
Wisconsin | $21,957,610 |
Wyoming | $7,165,241 |
Showing only the top (by amount) 50 entries. Go here for the full list
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Federal Dept./Agency | Date |
---|---|---|---|---|
ROUGH ROCK SCHOOL BOARD, INC. | $56,186,862 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 7/06/2009 |
Replacement and Repair of Indian Schools: Rough Rock Community School has received American Recovery and Reinvestment Act (Recovery Act) funds, and the project is 100% construction complete of education buildings and renovations, excluding summer work of fire doors, running track events striping, | ||||
ROUGH ROCK SCHOOL BOARD, INC. | $52,550,657 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 7/06/2009 |
School Improvement Grants, Recovery Act: The Rough Rock Community School has recieved funds from the American Recovery and Reinvestment Act (Recovery Act) and in the process of constructing, improving, and repairing education buildings and infrastructure. School project personnel, architect and | ||||
C3 LIMITED LIABILITY COMPANY | $41,224,703 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/25/2010 |
: DESIGN AND CONSTRUCTION OF KAIBETO BOARDING SCHOOL AND DORMITORY IN KAIBETO, AZ | ||||
GRANITE CONSTRUCTION COMPANY | $34,195,474 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/18/2010 |
: New Mexico Highway Road Project for various BIA Roads located n the Navajo Reservation. | ||||
INTERNATIONAL SURFACING SYSTEMS, INC. | $23,897,911 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/30/2010 |
: agenciesFurnish all labor, materials, and equipment necessary for the placement of asphalt rubberized surface treatment, fog seal, pavement markings, and miscellaneous construction in various agencies throughout the Navajo Nation in Arizona and New Mexico | ||||
ARVISO-OKLAND CONSTRUCTION JOINT VENTURE | $19,261,281 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 12/03/2009 |
: This award is for the Flandreau Indian School Improvement & Repair, Flandreau, South Dakota. The FIS project is an infrasctructure, repair, maintenance and ADA project that is inclusive of several buildings on BIA property. Major utility upgrades are sc | ||||
FANN CONTRACTING, INC. | $13,873,712 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/18/2010 |
: Arizona Highway project for various BIA roads on the Navajo Reservation | ||||
GRANITE CONSTRUCTION COMPANY | $12,357,323 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 8/26/2010 |
: Road/Bridge, Repair & Restoration, Consolidated No. 1. Project ID #s H6867405, H6360203, H6369603, H636960J, H5460903 | ||||
FLINTCO, LLC | $11,623,675 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/29/2009 |
: The proposed work consists of furnishing all labor, material, equipment, supervision and incidentals necessary for the imporvements of the site including mechanical, electrical, and various renovations in accordance with the specifications and design draw | ||||
FLINTCO, INC. | $9,311,000 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/24/2009 |
: Construction project to build new kitchen/dining of approximately 8,313 sf at Chinle Boarding School located in Many Farms, AZ. Work includes new construction, demolition of existing kitchen after new one is built, demolition of boarded up dormitory, and | ||||
HOPI JUNIOR/SENIOR HIGH SCHOOL, INC. | $8,444,074 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/15/2009 |
Replacement and Repair of Indian Schools: Facilities Improvements and Repairs using American Recovery and Reinvestment Act 2009 funds appropriated for project at Hopi Junior/Senior High School. The Hopi Junior/Senior High School will upgrade and replace worn and aged mechanical equipment; set up | ||||
STANDING ROCK COMMUNITY SCHOOL | $8,178,018 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/29/2009 |
: Standing Rock High School Major FI&R Renovation Project Fort Yates, ND | ||||
STANDING ROCK COMMUNITY SCHOOL | $8,178,018 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/01/2009 |
Replacement and Repair of Indian Schools: School Major Improvement & Repair | ||||
ARVISO-OKLAND CONSTRUCTION JOINT VENTURE | $7,864,457 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/30/2010 |
: Renovations, electrical system improvements, hardscape, temporary dining facility, etc for Cibecue Community School. | ||||
ARVISO-OKLAND CONSTRUCTION JOINT VENTURE | $7,761,337 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/30/2009 |
: This award is for the Facilities Improvement and Repair of the T'iis Naz Bas Community School located in Teec NosPos, AZ. The project is for the Bureau of Indian Affairs Navajo Regional Office, Division of Acquisitions. A brief description of work is remo | ||||
KAWERAK, INC. | $7,747,361 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 8/03/2010 |
Highway Planning and Construction: The Gambell Street Inprovements Project includes new roads with base and subbase throughout Gambell. This project will improve approximately 2.7 miles of roadway | ||||
SICANGU OYATE HO, INC. | $7,169,973 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 7/09/2010 |
Replacement and Repair of Indian Schools: ARRA funds for the construction of a 22,008 gross sq ft Gymnasium and 2,840 gross sq ft Serving Kitchen addition to the existing 7-12 St Francis Indian School High School building. | ||||
KAWERAK, INC. | $6,747,361 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 12/09/2009 |
: The Gambell Street Improvements Project includes new roads with base and subbase throughoutGambell. This project will improve approximately 2.7 miles of roadway. | ||||
FLINTCO, LLC | $6,491,291 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 5/28/2010 |
: Construction project to abate, demolition and renovate/rehabilitate High School Heating & Cooling system. | ||||
LEECH LAKE RESERVATION BUSINESS COMMITTEE INC | $6,056,189 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 10/15/2009 |
Highway Planning and Construction: There are 11 road construction projects on the Leech Lake Reservation that have been funded through this contract. | ||||
RAMAH NAVAJO SCHOOL BOARD INC | $5,761,841 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 2/17/2010 |
Indian Education Facilities, Operations, and Maintenance: To obtain architectural & engineering design services for the FI&R school improvement and repair projects for the Pine Hill Schools and provide construction/renovation services on the approved POR validation list. | ||||
JAYNES CORPORATION | $5,681,599 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/30/2010 |
: This project involves the renovation of 7 buildings on this campus and includes a new fire alarm system, new mechanical systems in some of the facilities, new windows in 3 of the buildings, some plumbing renovation mainly in the restrooms and showers, new | ||||
MUSCOGEE CREEK NATION | $5,381,560 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 2/18/2010 |
Highway Planning and Construction: The purpose is for the reconstruction of county roads for the Indian communities within the Muscogee (Creek) Nation jurisdiction. The outcome will provide better and safer travel for Muscogee (Creek) Nation citizens and other Indian people within our jur | ||||
SANTA FE INDIAN SCHOOL, INC. | $5,137,500 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 5/12/2010 |
Replacement and Repair of Indian Schools: Complete the construction of the Recreational portion of the Pueblo Pavilion Wellness Center | ||||
CHOCTAW NATION OF OKLAHOMA | $4,908,720 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 4/06/2010 |
Highway Planning and Construction: Repair road surfaces and install safety signage and clean and repair drainage systems for council house north between sections 10 and 30. Bia route 2926 | ||||
INTERNATIONAL SURFACING SYSTEMS, INC. | $4,792,550 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/17/2010 |
: rubberized surfacing treatment, fog seal, pavement markings,and miscellaneous construction in various agencies. | ||||
HO-CHUNK NATION | $4,469,823 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 2/23/2010 |
Highway Planning and Construction: The project will provide for reconstruction of the following projects identified in the bid/control schedule: PSE activities associated with surface renovation of CTH G, Route 5181; Brockway Road, Route 5499; West Bauer Road, Routes 5498 located on the H | ||||
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $4,236,868 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 12/03/2009 |
: Pine Ridg Dormitory and FI&R Phase 2 Proj.#y9A13, Facilities Improvemtn and Repair for Buildings 201A and 284. | ||||
JAYNES CORPORATION | $4,229,804 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/30/2010 |
: This project involves the renovation of 7 buildings on this campus and includes a new fire alarm system, new mechanical systems in some of the facilities, new windows in 3 of the buildings, some plumbing renovation mainly in the restrooms and showers, new | ||||
KRAUS-ANDERSON CONSTRUCTION COMPANY | $4,214,769 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/07/2010 |
: The contract includes miscellaneous renovations of six of the existing buildings on the school campus and exterior site improvements. The site improvements included replacing portions of waterlines, sanitary sewer, and storm sewer also included is some n | ||||
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $4,165,191 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 12/03/2009 |
Replacement and Repair of Indian Schools: Facilities Improvement and Repair Construciton projects for buildings 201A and 284 on the Pine Ridge School Campus, Pine Ridge, South Dakota. | ||||
ARVISO-OKLAND CONSTRUCTION JOINT VENTURE | $4,165,117 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 1/04/2010 |
: This award is for the Pueblo Pintado Dormitory II construction located in Pueblo Pintado, NM. The project is for the Bureau of Indian Affairs Navajo Regional Office, Division of Acquisitions. A brief description of work is new construction of an masonry s | ||||
ASSOCIATION OF VILLAGE COUNCIL PRESIDENTS, INC | $4,161,161 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 7/14/2010 |
Highway Planning and Construction: E00499A1 - Combination of construction and reconstruction of approximately 7360.6 linear ft. of boardwalk that includes a 363 ft composite mat route leading up to a 1900 square foot landing pad at the barge landing. All of the boardwalk is elevated eithe | ||||
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $4,149,149 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 12/03/2009 |
: Pine Ridge Dormitory and FI&R Phase 2, Project # Y9A13, Furnish all labor, materials, plant services and equipment to perform contract work in accordance with all applicable codes and construction standards and specifications, Fixed Price Contract, Comple | ||||
THE CHEROKEE NATION | $4,139,808 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/18/2009 |
ARRA Child Care and Development Block Grant: ARRA Supplemental Funding For the Child Care and Development Fund (CCDF) provides child care financial assistance to low-income working families and fund activities to improve the quality of child care. | ||||
ARVISO-OKLAND CONSTRUCTION JOINT VENTURE | $3,822,488 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/28/2010 |
: This award is for the Kickapoo Nations School for a 6,500 sf library addition to the Kickapoo Nation School. | ||||
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $3,688,757 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 2/16/2010 |
Road Maintenance_Indian Roads: ARRA Road Repair and Restoration | ||||
OGLALA SIOUX TRIBE OF PINE RIDGE INDIAN RESERVATION | $3,688,757 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 12/31/2009 |
Road Maintenance_Indian Roads: ARRA Road Repair and Restoration | ||||
DOMSON INCORPORATED | $3,545,850 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/29/2010 |
: Little Wound Sewer & Water Main Replacement, Kyle, South Dakota | ||||
FLINTCO, INC. | $3,487,582 | Contract | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/30/2010 |
: Cheyenne Eagle Butte School Roof repair. The project consists of repairing and replacing roofing for the Eagle Butte High School in Eagle Butte, South Dakota. The school was built in 1950 and has gone through a number of roof replacements. The previous wo | ||||
MISSISSIPPI BAND OF CHOCTAW INDIANS | $3,144,400 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 11/13/2009 |
Title I Grants to Local Educational Agencies, Recovery Act: This award will be used to fund multiple projects throughout the Choctaw Tribal School District that will improve teaching and learning for students most at risk of failing to meet State academic achievement standards. Priority one projectsts will assist t... Show more | ||||
COLORADO RIVER INDIAN TRIBE | $3,062,209 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/25/2010 |
Road Maintenance_Indian Roads: Road and Bridge Repair and Restoration on various Roads and Bridges on the Colorado River Indian Reservation in Arizona and California. | ||||
JICARILLA APACHE TRIBE (INC) | $3,019,755 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/11/2010 |
Road Maintenance_Indian Roads: Repair & Restoration of J Roads and Bridge Maintenance | ||||
CROW TRIBE OF INDIANS | $3,007,005 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 8/31/2009 |
Highway Planning and Construction: Estimated project cost is $3,007,005. This project is 44.1 miles long. There is a considerable amount of crack sealing to be completed on this project as well as substantial repair to the aged right-of-way fencing. The safety improvement portion of the | ||||
ASSOCIATION OF VILLAGE COUNCIL PRESIDENTS, INC | $2,944,421 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/30/2010 |
Indian Housing Assistance: Provide funding for ARRA HIP Funds for AVCP for 13 new homes in 11 villages. | ||||
CHOCTAW NATION OF OKLAHOMA | $2,732,311 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 4/06/2010 |
Highway Planning and Construction: Repair road surfaces, install safety signage and clean and repair drainage systems for Bentley Road between sections 10 and 60, Bia route 3043. | ||||
SALT RIVER PIMA-MARICOPA INDIAN COMMUNITY SOCIAL SERVICE, TH | $2,727,503 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 6/15/2010 |
Highway Planning and Construction: Purpose of the project is to resurface existing roadways in order to extend their life. And to widen Pima Road from 2 to 4 lanes, H55A0700. | ||||
RED LAKE BAND OF CHIPPEWA INDIANS | $2,713,283 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 9/09/2009 |
Highway Planning and Construction: The Project will provide for the surface renovation of approximately 14.8 miles of Indian Service Route 18, the Ponemah Road, from Minnesota Trunk Highway No. 1 North to Sucker Creek near the village of Ponemah, Minnesota and 0.3 miles of Indian Service R | ||||
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON | $2,577,383 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/18/2010 |
Road Maintenance_Indian Roads: PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a | ||||
CONFEDERATED TRIBES OF WARM SPRINGS RESERVATION OF OREGON | $2,577,383 | Grant | Interior, Department of / Indian Affairs (Assistant Secretary) | 3/18/2010 |
Road Maintenance_Indian Roads: PL 93-638 ARRA Road Repair and Restoration Project, for Reconstruction Projects, Chip Seal, Aggregate Replacement and Roadside Brushing all on the Warm Springs Indian Reservation, Oregon. The Level of Service (LOS) rated gravel roads in Charlie Canyon a |
Showing only the top (by amount) 50 entries. Go here for the full list