Recovery Tracker

How Much Stimulus Funding is Going to Your County?

U.S. and Mexico International Boundary and Water Commission

Total Spending

$244,830,068

Parent agency (State, Department of)

$472,012,489

StateFunding
Arizona $8,544,562
California $1,132,293
Colorado $98,086
Michigan $111,500
Minnesota $578,663
New Jersey $447,637
New Mexico $61,401,423
Oregon $1,373,075
Pennsylvania $272,580
Tennessee $44,552
Texas $172,356,986

Showing only the top (by amount) 50 entries. Go here for the full list

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Type Federal Dept./Agency Date
LAKESHORE ENGINEERING SERVICES, INC. $26,167,084 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 12/30/2009
: Rehabiliation for the Rio Grande Canalization Protective Levve System, Mesilla Levee Segment - Phase 1, Dona Ana County, NM.
LONGHORN EXCAVATORS, INC. $24,976,249 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 8/21/2009
: Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right
BALLENGER CONSTRUCTION COMPANY $19,643,481 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 10/19/2009
: LOWER RIO GRAND FLOOD CONTROL PROJECT - INTERIOR FLOODWAYS. REHABILITAION OF NORTH FLOODWAY 1 AND ARROYO COLORADO 1 AND 2 FROM FM 1015 TO SOUTH RANCH RD. HIDALGO AND CAMERON COUNTIES, TEXAS
MILESTONE EXCAVATION INC $19,314,445 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 12/30/2009
: Construction of Upper Rio Grande Flood Control Project. (URGFCP) Rehabilitation Improvements for Canutillo Levee System from Vado Bridge to Borderland Brigde.
SBBI, INC. $18,400,465 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 12/30/2009
: Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX.
BRISTON CONSTRUCTION, LLC $13,744,568 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/03/2010
: Complete the construction for Upper Rio Grande Flood Control Project (URGFCP), rehabilitation for the Rio Grande Canalization Protective Levee System-Mesilla Levee Segment-Phase II, Mesilla, Dona Ana county, NM.
S & B INFRASTRUCTURE, LTD $10,965,315 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 4/02/2009
: Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
S & B INFRASTRUCTURE, LTD $10,883,015 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 4/02/2009
: Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
ULTIMATE CONCRETE, L.L.C. $9,249,622 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/10/2010
: Sunland Park Levee improvements consist of 1) raising the top-of-the levee elevation, 2) providing seepage control structures as required, and 3) rehabilitationg existing pipeline/culvert structures and appurtenances located within the levees by modifying
ULTIMATE CONCRETE, L.L.C. $8,315,393 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 6/10/2010
: Ft. Hancock Reach-Preparation of right of way, remove/stockpile existing gravel and topsoil, erosion control, raising existing levee, construct a floodwall and a retaining wall, raising connecting access roads, vehicular gate installation, replacement and
S & B INFRASTRUCTURE, LTD $7,621,082 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 6/22/2009
: Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
S & B INFRASTRUCTURE, LTD $7,585,918 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 6/22/2009
: Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47
SBBI, INC. $7,571,847 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 10/28/2009
: Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II
MAGNUS PACIFIC CORPORATION $6,324,095 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 8/13/2010
: Levee Rehabilitation, Surfacing, Placement of Rip Rap, Install SB Slurry Wall (660,000 SF), Temp & Perm Toe Drain, Vegitation & Erosion Control
MILESTONE EXCAVATION INC $5,642,817 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 12/29/2009
: Construction of the Upper Rio Grande Flood Control Project. Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System. Hatch Levee System, from Hatch Siphon to Bignell Arroyo
MCALLEN CONSTRUCTION COMPANY $4,098,059 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 6/17/2010
: Provide all plant, labor & material for the construction of the Edinburg Pump Levee and Channel Crossing in Hidalgo County Texas
URS GROUP, INC. $4,071,347 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 6/16/2010
: Civil Redesign of North Floodway North and South Levees from FM 1425 in Hidalgo County, Texas, East 27 Miles to the End of Levee, including Geotechnical Investigation and Surveying Services.
TETRA TECH, INC. $4,041,171 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2010
: Weekly project meetings have been held every Wednesday morning, Coordination of flight permits, survey teams and flight crews for beginning of acquisition, Creation of Tiling Scheme for project AOI, Coordination with USGS and IBWC to determine common area
TAMEZ-PEARSON CONSTRUCTION INC $2,769,269 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/03/2010
: Mission Levee Improvements. (1) Improve levee, install retaining walls and furnish/install automatic flood gate at Bentsen Palm Drive: 1 ea automatic flood gate; 5790 cy soils; 278 cy concrete; 790 sy asphalt paving. (2) Improve levee and install new slui
S & B INFRASTRUCTURE, LTD $2,306,453 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 8/28/2009
: Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
S & B INFRASTRUCTURE, LTD $2,285,848 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 8/28/2009
: Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon
TETRA TECH, INC. $1,842,246 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 3/11/2010
: As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes
URS GROUP, INC. $1,536,600 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 6/16/2010
: Geotechnical investigation, analysis and civil design for earthen levee rehabilitation.
S & B INFRASTRUCTURE, LTD $1,515,509 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2009
: Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
S & B INFRASTRUCTURE, LTD $1,454,915 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2009
: Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre
URS GROUP, INC. $1,423,013 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 6/17/2010
: Hydraulic and hydrological design for earthen levee near El Paso, Texas.
URS GROUP, INC. $1,324,619 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/16/2010
: Implementation of a Document Management System and Web Services using ArcServer and Database Software to process and visualize data for the USIBWC.
URS GROUP, INC. $1,178,046 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2010
: Redesign of Courchesne Reach and NEMEXAS Reach.
TETRA TECH, INC. $1,169,649 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 11/05/2009
: As part of TAS 19-1079-Construction Management Services for the Rehablitation of the North Floodway Levees Phase 1 & 2 and the Arroyo Colorado Floodway Levees Phase 1 & 1 in the Lower Rio Grande Flood Control Project. Tasks to be completed include: 1) Att
INUIT SERVICES, INC. $1,060,187 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 7/24/2009
: Firm Fixed Price with adjustable amount via 15% difference in quantities - To provide all plant, labor and equipment for the rehabilitation of 2.9 miles of Banker Floodway North Levee, from South Bentsen Road (Sta67 + 00) to Spur 115 (Sta 253-06) in Hidal
GUZMAN & MUNOZ ENGINEERING AND SURVEYING, INC. $937,600 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/22/2010
: IBM10C0008-RCOVERY-STRUCTURE NO.172 ANDNO.413 AT ARROYO COLORADO FLOODWAY,SOUTH LEVEE IN HIDALGOCOUNTY TEXAS
S & B INFRASTRUCTURE, LTD $926,705 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 4/20/2009
: Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
TETRA TECH, INC. $884,304 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 10/16/2009
: As part of TAS 19-1079-Construction management/assistance services during the rehabilitation of approximately 41.3 miles of main floodway levees located in the lower Rio Grande Valley, between McAllen and Weslaco, in Hidalgo County, Texas. The main functi
MARTINEZ BROS. CONTRACTORS, LLC $879,195 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 8/13/2010
: The project requires the construction of the Canal Structure Improvements Project, of the US International Boundary & Water Commission, in accordance with Contract Documents
URS GROUP, INC. $849,417 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/10/2010
: Feasibility study and conceptual design at Paisano Phase II Reach located within the Upper Rio Grande Flood Control System Retrification Project in El Paso, Texas.
S & B INFRASTRUCTURE, LTD $836,646 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 4/20/2009
: Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L
TETRA TECH, INC. $731,665 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/08/2010
: As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES FOR CANUTILLO AND SUNLAND PARK LEVEE SEGMENTS) -The Sunland Park Canutillo Levee Segment is located in Dona Ana County, NM and El Paso County, Texas. Work covered under the construction contract co
TETRA TECH, INC. $673,370 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 1/21/2010
: As part of TAS 19-1079 (RECOVERY: CONSTRUCTION MANAGEMENT SERVICES FOR THE MESILLA LEVEE SEGMENTS - PHASE 1) Construction management/assistance services during the rehabilitation of approximately 30 miles of levees located in the lower Rio Grande Valley
S & B INFRASTRUCTURE, LTD $658,661 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 4/09/2009
: The scope of work included providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assessed slope stability, levee settlement, bearing capacity, soil strength pa
URS GROUP, INC. $622,379 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 2/09/2010
: RECOVERY - Construction Management Services during construction of Canutillo Levee. TAS::19 1079 790::TAS Construction management and inspection of levee rehabilitation.
S & B INFRASTRUCTURE, LTD $612,066 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 4/23/2009
: Scope of work including providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil strength paramet
URS GROUP, INC. $610,205 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 12/01/2009
: RECOVERY - Provide Construction Management/assistance services for Hidalgo Loop Levees, Phases I and II, Hidalgo County, TX. TAS::19 1079 790::TAS Construction management and inspection of levee rehabilitation.
TETRA TECH, INC. $605,269 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2010
: As part of TAS 19-1079 - RECOVERY - DESIGN OF REHAB IMPROVEMENTS FOR THE EAST LEVEE VADO SEGMENT, PS&E for Vado Segment encroaching on Railroad R/W within the Rio Grande Canalization Flood Control Project, NM
URS GROUP, INC. $577,377 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 2/09/2010
: RECOVERY - Construction Management and Inspection of Levee Rehabilitation of HW1 (Hatch Siphon to Bignell Arroyo). TAS::19 1079 790::TAS
TETRA TECH, INC. $570,585 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/09/2010
: As part of TAS:19 1079-RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE REHABILITATION IMPROVEMENTS FOR MESILLA PHASE II PROTECTIVE LEVEE SYSTEMTAS Tetra Tech will provide Construction Management Services for Rehabilitation Improvements for Mesilla Pha
TETRA TECH, INC. $569,430 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 1/19/2010
: As part of TAS 19-1079-Construction Management Services for Lateral A to Retamal Dam River Levee plus Retamal Dike-This proposed levee rehabilitation improvement project consists of: 1) Increasing top-of-levee elevations, maintaining minimum side slope, a
MWH AMERICAS, INC. $536,245 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 9/13/2010
: Recovery - GIS, Collection of Cross Sections for H/H Modeling. TAS: 19 1079
TETRA TECH, INC. $464,551 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 8/04/2010
: The proposed work for levee improvements consists of design of a retaining wall along the length of the landside of the levee for approximately 2.9 miles, to reestablish a ten foot maintenance road that adjoins the levee and the United Irriation District
TETRA TECH, INC. $458,689 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 7/15/2010
: As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING LEVEE REHABILITATION IMPROVEMENTS OF THE EDINBURG PUMP LEVEE AND CHANNEL CROSSING PROJECT) -The United States Section of the International Boundary and Water Commission (USIBWC) is in the pro
URS GROUP, INC. $450,741 Contract State, Department of / U.S. and Mexico International Boundary and Water Commission 7/09/2010
: Fabens construction inspection services for earthen levee rehabilitation.

Showing only the top (by amount) 50 entries. Go here for the full list