Listing all stimulus spending by amount, in descending order. Return to U.S. and Mexico International Boundary and Water Commission page

Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.

Recipient Amount Type Description Federal Dept./Agency Date
S & B INFRASTRUCTURE, LTD $176,327 Contract : Bidding services and construction management services for the Banker Floodway North Levee Project; units of measure are estimated for 6 months at $29,387.83 per month; for the construction of rehabilitation improvements for 1.6 miles of levee to be comple State, Department of / U.S. and Mexico International Boundary and Water Commission 8/19/2009
S & B INFRASTRUCTURE, LTD $1,454,915 Contract : Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2009
S & B INFRASTRUCTURE, LTD $10,883,015 Contract : Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre State, Department of / U.S. and Mexico International Boundary and Water Commission 4/02/2009
INUIT SERVICES, INC. $1,060,187 Contract : Firm Fixed Price with adjustable amount via 15% difference in quantities - To provide all plant, labor and equipment for the rehabilitation of 2.9 miles of Banker Floodway North Levee, from South Bentsen Road (Sta67 + 00) to Spur 115 (Sta 253-06) in Hidal State, Department of / U.S. and Mexico International Boundary and Water Commission 7/24/2009
S & B INFRASTRUCTURE, LTD $7,585,918 Contract : Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47 State, Department of / U.S. and Mexico International Boundary and Water Commission 6/22/2009
CAMP DRESSER & MC KEE INTERNATIONAL INC $214,996 Contract : The Rio Grande Canalization Project (RGCP) consists of a narrow river corridor that extends 105.4 miles along the Rio Grande, from below Percha Dam in Sierra County, New Mexico to American Dam in El Paso, Texas. The RGCP, operated and maintained by the US State, Department of / U.S. and Mexico International Boundary and Water Commission 3/31/2009
S & B INFRASTRUCTURE, LTD $612,066 Contract : Scope of work including providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil strength paramet State, Department of / U.S. and Mexico International Boundary and Water Commission 4/23/2009
S & B INFRASTRUCTURE, LTD $658,661 Contract : The scope of work included providing personnel and equipment necessary to perform geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assessed slope stability, levee settlement, bearing capacity, soil strength pa State, Department of / U.S. and Mexico International Boundary and Water Commission 4/09/2009
S & B INFRASTRUCTURE, LTD $2,285,848 Contract : Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon State, Department of / U.S. and Mexico International Boundary and Water Commission 8/28/2009
LONGHORN EXCAVATORS, INC. $24,976,249 Contract : Main Floodway From 23rd Street to FM1015 A Lower Rio Grande Flood Control Project (LRGFCP) located in Hidalgo County. Furnish all labor, materials and equipment for the construction of the improvements of the Main Floodway. Includes preparation of right State, Department of / U.S. and Mexico International Boundary and Water Commission 8/21/2009
PARSONS INFRASTRUCTURE & TECHNOLOGY GROUP INC. $242,725 Contract : Parsons is under contract to assist the United States Section of the International Boundary and Water Commission (USIBWC) in the preparation of an Environmental Assessment (EA) with an accelerated schedule for the Arroyo Colorado Floodway (ACF). The ACF i State, Department of / U.S. and Mexico International Boundary and Water Commission 3/31/2009
S & B INFRASTRUCTURE, LTD $91,941 Contract : The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase II (previously designed under Task Order IBM07T0025), from the intersection of the Intake Channel adjacent to the Northbound Bridge of State, Department of / U.S. and Mexico International Boundary and Water Commission 4/02/2009
S & B INFRASTRUCTURE, LTD $145,646 Contract : Aerial Survey for Design of Rehabilitation Improvements for the Lateral A to Donna Pump to Retamal Dam Levee Reach Within the Lower Rio Grande Flood control project (LRGFCP). Qty.-1.00 Unit Price-$145,646.00 Total Cost-$145,646.00 State, Department of / U.S. and Mexico International Boundary and Water Commission 4/09/2009
S & B INFRASTRUCTURE, LTD $33,158 Contract : The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase I (previously designed under Task Order IBM05T0021), from approximately 0.8 miles south of the Lower Rio Grande Flood Control Project State, Department of / U.S. and Mexico International Boundary and Water Commission 4/17/2009
S & B INFRASTRUCTURE, LTD $79,635 Contract : Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre State, Department of / U.S. and Mexico International Boundary and Water Commission 6/22/2009
S & B INFRASTRUCTURE, LTD $836,646 Contract : Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L State, Department of / U.S. and Mexico International Boundary and Water Commission 4/20/2009
BALLENGER CONSTRUCTION COMPANY $19,643,481 Contract : LOWER RIO GRAND FLOOD CONTROL PROJECT - INTERIOR FLOODWAYS. REHABILITAION OF NORTH FLOODWAY 1 AND ARROYO COLORADO 1 AND 2 FROM FM 1015 TO SOUTH RANCH RD. HIDALGO AND CAMERON COUNTIES, TEXAS State, Department of / U.S. and Mexico International Boundary and Water Commission 10/19/2009
SBBI, INC. $7,571,847 Contract : Lower Rio Grande Flood Control Project - Levee Improvements: Hidalgo Phase I & II State, Department of / U.S. and Mexico International Boundary and Water Commission 10/28/2009
LAKESHORE ENGINEERING SERVICES, INC. $26,167,084 Contract : Rehabiliation for the Rio Grande Canalization Protective Levve System, Mesilla Levee Segment - Phase 1, Dona Ana County, NM. State, Department of / U.S. and Mexico International Boundary and Water Commission 12/30/2009
MILESTONE EXCAVATION INC $5,642,817 Contract : Construction of the Upper Rio Grande Flood Control Project. Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System. Hatch Levee System, from Hatch Siphon to Bignell Arroyo State, Department of / U.S. and Mexico International Boundary and Water Commission 12/29/2009
MILESTONE EXCAVATION INC $19,314,445 Contract : Construction of Upper Rio Grande Flood Control Project. (URGFCP) Rehabilitation Improvements for Canutillo Levee System from Vado Bridge to Borderland Brigde. State, Department of / U.S. and Mexico International Boundary and Water Commission 12/30/2009
TETRA TECH, INC. $884,304 Contract : As part of TAS 19-1079-Construction management/assistance services during the rehabilitation of approximately 41.3 miles of main floodway levees located in the lower Rio Grande Valley, between McAllen and Weslaco, in Hidalgo County, Texas. The main functi State, Department of / U.S. and Mexico International Boundary and Water Commission 10/16/2009
MWH AMERICAS, INC. $77,093 Contract : Environmental sampling and testing on the Main Floodway in the Donna Main Canal Area. State, Department of / U.S. and Mexico International Boundary and Water Commission 10/27/2009
TETRA TECH, INC. $1,169,649 Contract : As part of TAS 19-1079-Construction Management Services for the Rehablitation of the North Floodway Levees Phase 1 & 2 and the Arroyo Colorado Floodway Levees Phase 1 & 1 in the Lower Rio Grande Flood Control Project. Tasks to be completed include: 1) Att State, Department of / U.S. and Mexico International Boundary and Water Commission 11/05/2009
URS GROUP, INC. $610,205 Contract : RECOVERY - Provide Construction Management/assistance services for Hidalgo Loop Levees, Phases I and II, Hidalgo County, TX. TAS::19 1079 790::TAS Construction management and inspection of levee rehabilitation. State, Department of / U.S. and Mexico International Boundary and Water Commission 12/01/2009
TRC ENVIRONMENTAL CORPORATION $174,580 Contract : Environmental Assessment and Cultural Resources Survey(s) of the levee rehabilitation project for Arroyo Colorado south levee in Cameron and Hidalgo Counties, TX. State, Department of / U.S. and Mexico International Boundary and Water Commission 1/29/2010
URS GROUP, INC. $577,377 Contract : RECOVERY - Construction Management and Inspection of Levee Rehabilitation of HW1 (Hatch Siphon to Bignell Arroyo). TAS::19 1079 790::TAS State, Department of / U.S. and Mexico International Boundary and Water Commission 2/09/2010
URS GROUP, INC. $622,379 Contract : RECOVERY - Construction Management Services during construction of Canutillo Levee. TAS::19 1079 790::TAS Construction management and inspection of levee rehabilitation. State, Department of / U.S. and Mexico International Boundary and Water Commission 2/09/2010
TETRA TECH, INC. $1,842,246 Contract : As part of TAS 19-1079-Design of Rehabilitation for the Arroyo Colorado South Levee from FM 1015 to Palm Blvd-This proposed levee rehabilitation improvement consist of 1) raising the top-of-levee elevation, 2) conducting geotechnical investigation and tes State, Department of / U.S. and Mexico International Boundary and Water Commission 3/11/2010
TETRA TECH, INC. $673,370 Contract : As part of TAS 19-1079 (RECOVERY: CONSTRUCTION MANAGEMENT SERVICES FOR THE MESILLA LEVEE SEGMENTS - PHASE 1) Construction management/assistance services during the rehabilitation of approximately 30 miles of levees located in the lower Rio Grande Valley State, Department of / U.S. and Mexico International Boundary and Water Commission 1/21/2010
TETRA TECH, INC. $569,430 Contract : As part of TAS 19-1079-Construction Management Services for Lateral A to Retamal Dam River Levee plus Retamal Dike-This proposed levee rehabilitation improvement project consists of: 1) Increasing top-of-levee elevations, maintaining minimum side slope, a State, Department of / U.S. and Mexico International Boundary and Water Commission 1/19/2010
TRC ENVIRONMENTAL CORPORATION $396,241 Contract : Rio Grande Canalization Project River Restoration Implementation Plan State, Department of / U.S. and Mexico International Boundary and Water Commission 5/20/2010
URS GROUP, INC. $1,423,013 Contract : Hydraulic and hydrological design for earthen levee near El Paso, Texas. State, Department of / U.S. and Mexico International Boundary and Water Commission 6/17/2010
ULTIMATE CONCRETE, L.L.C. $8,315,393 Contract : Ft. Hancock Reach-Preparation of right of way, remove/stockpile existing gravel and topsoil, erosion control, raising existing levee, construct a floodwall and a retaining wall, raising connecting access roads, vehicular gate installation, replacement and State, Department of / U.S. and Mexico International Boundary and Water Commission 6/10/2010
TRC ENVIRONMENTAL CORPORATION $16,086 Contract : ARRA Section 106 Consultation for floodwall and slurry trench for RGRP State, Department of / U.S. and Mexico International Boundary and Water Commission 6/10/2010
URS GROUP, INC. $4,071,347 Contract : Civil Redesign of North Floodway North and South Levees from FM 1425 in Hidalgo County, Texas, East 27 Miles to the End of Levee, including Geotechnical Investigation and Surveying Services. State, Department of / U.S. and Mexico International Boundary and Water Commission 6/16/2010
MCALLEN CONSTRUCTION COMPANY $4,098,059 Contract : Provide all plant, labor & material for the construction of the Edinburg Pump Levee and Channel Crossing in Hidalgo County Texas State, Department of / U.S. and Mexico International Boundary and Water Commission 6/17/2010
HDR ENVIRONMENTAL, OPERATIONS AND CONSTRUCTION, INC. $23,994 Contract : Soil sampling boring along the Rio Grande along the border of the previous McNutt Refinery site in Sunland Park, NM to test for potential lead and arsenic contamination. State, Department of / U.S. and Mexico International Boundary and Water Commission 6/15/2010
URS GROUP, INC. $1,536,600 Contract : Geotechnical investigation, analysis and civil design for earthen levee rehabilitation. State, Department of / U.S. and Mexico International Boundary and Water Commission 6/16/2010
HDR ENVIRONMENTAL, OPERATIONS AND CONSTRUCTION, INC. $74,092 Contract : Wetlands Delineation Permit Applications for the Rio Grande Canalization Project (Canutillo) State, Department of / U.S. and Mexico International Boundary and Water Commission 6/11/2010
SBBI, INC. $18,400,465 Contract : Recovery construct the Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike, Hidalgo County, TX. State, Department of / U.S. and Mexico International Boundary and Water Commission 12/30/2009
MWH AMERICAS, INC. $536,245 Contract : Recovery - GIS, Collection of Cross Sections for H/H Modeling. TAS: 19 1079 State, Department of / U.S. and Mexico International Boundary and Water Commission 9/13/2010
BRISTON CONSTRUCTION, LLC $13,744,568 Contract : Complete the construction for Upper Rio Grande Flood Control Project (URGFCP), rehabilitation for the Rio Grande Canalization Protective Levee System-Mesilla Levee Segment-Phase II, Mesilla, Dona Ana county, NM. State, Department of / U.S. and Mexico International Boundary and Water Commission 9/03/2010
TETRA TECH, INC. $464,551 Contract : The proposed work for levee improvements consists of design of a retaining wall along the length of the landside of the levee for approximately 2.9 miles, to reestablish a ten foot maintenance road that adjoins the levee and the United Irriation District State, Department of / U.S. and Mexico International Boundary and Water Commission 8/04/2010
TETRA TECH, INC. $458,689 Contract : As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING LEVEE REHABILITATION IMPROVEMENTS OF THE EDINBURG PUMP LEVEE AND CHANNEL CROSSING PROJECT) -The United States Section of the International Boundary and Water Commission (USIBWC) is in the pro State, Department of / U.S. and Mexico International Boundary and Water Commission 7/15/2010
TAMEZ-PEARSON CONSTRUCTION INC $2,769,269 Contract : Mission Levee Improvements. (1) Improve levee, install retaining walls and furnish/install automatic flood gate at Bentsen Palm Drive: 1 ea automatic flood gate; 5790 cy soils; 278 cy concrete; 790 sy asphalt paving. (2) Improve levee and install new slui State, Department of / U.S. and Mexico International Boundary and Water Commission 9/03/2010
S & B INFRASTRUCTURE, LTD $10,965,315 Contract : Scope of work included providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre State, Department of / U.S. and Mexico International Boundary and Water Commission 4/02/2009
MARTINEZ BROS. CONTRACTORS, LLC $879,195 Contract : The project requires the construction of the Canal Structure Improvements Project, of the US International Boundary & Water Commission, in accordance with Contract Documents State, Department of / U.S. and Mexico International Boundary and Water Commission 8/13/2010
S & B INFRASTRUCTURE, LTD $926,705 Contract : Scope of work included providing personnel and equipment necessary to perform engineering; final design; and preparation of construction documents for the rehabilitation improvments of the Lower Rio Grande Flood Control Project - Lateral A to Donna Pump L State, Department of / U.S. and Mexico International Boundary and Water Commission 4/20/2009
URS GROUP, INC. $450,741 Contract : Fabens construction inspection services for earthen levee rehabilitation. State, Department of / U.S. and Mexico International Boundary and Water Commission 7/09/2010
S & B INFRASTRUCTURE, LTD $1,515,509 Contract : Scope of work includes providing personnel and equipment necessary to perform engineering; geotechnical investigations and engineering evaluations (sealed by a licensed engineer), which assess slope stability, levee settlement, bearing capacity, soil stre State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2009
URS GROUP, INC. $1,324,619 Contract : Implementation of a Document Management System and Web Services using ArcServer and Database Software to process and visualize data for the USIBWC. State, Department of / U.S. and Mexico International Boundary and Water Commission 9/16/2010
TETRA TECH, INC. $248,733 Contract : As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING THE CONSTRUCTION OF THE URBAN LEVEE REMEDIATION AT RIO GRANDE AND CIBOLO CREEK, PRESIDIO, TX)-The Urban Levee Improvements at Rio Grande and Cibolo Creek consist of an approximate 8.4 miles o State, Department of / U.S. and Mexico International Boundary and Water Commission 8/31/2010
TETRA TECH, INC. $731,665 Contract : As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES FOR CANUTILLO AND SUNLAND PARK LEVEE SEGMENTS) -The Sunland Park Canutillo Levee Segment is located in Dona Ana County, NM and El Paso County, Texas. Work covered under the construction contract co State, Department of / U.S. and Mexico International Boundary and Water Commission 9/08/2010
S & B INFRASTRUCTURE, LTD $91,721 Contract : The proposed work was for the re-design of the Lower Rio Grande Flood Control Project - Hidalgo Protective Levee - Phase II (previously designed under Task Order IBM07T0025), from the intersection of the Intake Channel adjacent to the Northbound Bridge of State, Department of / U.S. and Mexico International Boundary and Water Commission 4/02/2009
ULTIMATE CONCRETE, L.L.C. $9,249,622 Contract : Sunland Park Levee improvements consist of 1) raising the top-of-the levee elevation, 2) providing seepage control structures as required, and 3) rehabilitationg existing pipeline/culvert structures and appurtenances located within the levees by modifying State, Department of / U.S. and Mexico International Boundary and Water Commission 9/10/2010
S & B INFRASTRUCTURE, LTD $2,306,453 Contract : Scope of work is for the aerial and design survey for the design of rehabiliatation improvements for the Upper Rio Grande Project - Canalization and Rectification Levees. Specific activities included establishing field surveyed control points for horizon State, Department of / U.S. and Mexico International Boundary and Water Commission 8/28/2009
S & B INFRASTRUCTURE, LTD $176,327 Contract : Bidding services and construction management services for the Banker Floodway North Levee Project; units of measure are estimated for 6 months at $29,387.83 per month; for the construction of rehabilitation improvements for 1.6 miles of levee to be comple State, Department of / U.S. and Mexico International Boundary and Water Commission 8/19/2009
S & B INFRASTRUCTURE, LTD $7,621,082 Contract : Design Services for the Rehabilitation Improvements for the Rio Grande Canalization Protective Levee System Located within the Upper Rio Grande Flood Control Project; estimated quantity is 6 months at unit price of $1,079,424.83 per month, totalling $6,47 State, Department of / U.S. and Mexico International Boundary and Water Commission 6/22/2009
MAGNUS PACIFIC CORPORATION $6,324,095 Contract : Levee Rehabilitation, Surfacing, Placement of Rip Rap, Install SB Slurry Wall (660,000 SF), Temp & Perm Toe Drain, Vegitation & Erosion Control State, Department of / U.S. and Mexico International Boundary and Water Commission 8/13/2010
URS GROUP, INC. $330,995 Contract : Mission Levee construction inspection services for earthen levee. State, Department of / U.S. and Mexico International Boundary and Water Commission 9/01/2010
TETRA TECH, INC. $298,354 Contract : As part of TAS 19-1079 (CONSTRUCTION MANAGEMENT SERVICES DURING THE CONSTRUCTION OF THE RIVERSIDE WASTEWAY I, UPPER RIO GRANDE FLOOD CONTROL PROJECT)-The proposed project is located in City of El Paso, El Paso County, Texas, on the south corner of Rio Bos State, Department of / U.S. and Mexico International Boundary and Water Commission 8/27/2010
URS GROUP, INC. $1,178,046 Contract : Redesign of Courchesne Reach and NEMEXAS Reach. State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2010
TETRA TECH, INC. $570,585 Contract : As part of TAS:19 1079-RECOVERY - CONSTRUCTION MANAGEMENT SERVICES FOR THE REHABILITATION IMPROVEMENTS FOR MESILLA PHASE II PROTECTIVE LEVEE SYSTEMTAS Tetra Tech will provide Construction Management Services for Rehabilitation Improvements for Mesilla Pha State, Department of / U.S. and Mexico International Boundary and Water Commission 9/09/2010
URS GROUP, INC. $849,417 Contract : Feasibility study and conceptual design at Paisano Phase II Reach located within the Upper Rio Grande Flood Control System Retrification Project in El Paso, Texas. State, Department of / U.S. and Mexico International Boundary and Water Commission 9/10/2010
GUZMAN & MUNOZ ENGINEERING AND SURVEYING, INC. $937,600 Contract : IBM10C0008-RCOVERY-STRUCTURE NO.172 ANDNO.413 AT ARROYO COLORADO FLOODWAY,SOUTH LEVEE IN HIDALGOCOUNTY TEXAS State, Department of / U.S. and Mexico International Boundary and Water Commission 9/22/2010
TETRA TECH, INC. $4,041,171 Contract : Weekly project meetings have been held every Wednesday morning, Coordination of flight permits, survey teams and flight crews for beginning of acquisition, Creation of Tiling Scheme for project AOI, Coordination with USGS and IBWC to determine common area State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2010
TETRA TECH, INC. $605,269 Contract : As part of TAS 19-1079 - RECOVERY - DESIGN OF REHAB IMPROVEMENTS FOR THE EAST LEVEE VADO SEGMENT, PS&E for Vado Segment encroaching on Railroad R/W within the Rio Grande Canalization Flood Control Project, NM State, Department of / U.S. and Mexico International Boundary and Water Commission 9/17/2010