Recipient Amount Type Description Federal Dept./Agency Date
ACM SYSTEMS, INC. $25,150 Contract : Install an Automatic Building Controller on the Air Handler unit located in the basement of the West Los Angeles Federal Building in order to help manage energy consumption. General Services Administration / Public Buildings Service 8/31/2009
PYRAMID SERVICES, INC. $48,370 Contract : Contractor to provide material and labor for installing new, high efficiency PVC for the Cooling Towers at the West Los Angeles Federal Building. General Services Administration / Public Buildings Service 8/31/2009
BOWCON COMPANY INC $203,085 Contract : Water conservation project - remove & replace existing restroom fixtures with high efficiency restroom fixtures at the Phillip Burton Federal Building. General Services Administration / Public Buildings Service 1/04/2010
BOWCON COMPANY INC $244,125 Contract : Water conservation project - remove & replace existing restroom fixtures with high efficiency restroom fixtures at the Ronald Dellums Federal Building. General Services Administration / Public Buildings Service 1/04/2010
WOODHAMS CONSTRUCTION, INC. $584,615 Contract : This is a Design Build Project which requires General Contractor to furnish and install two (2) new centrifugal chiller variable frequency drives at the Phillip Barton Federal Buiding and Court House located in San Francisco, California. General Services Administration / Public Buildings Service 11/03/2009
MEYERS, ELISKA $5,949 Contract : Facilitator Services for the Team Building Session for the Kickoff of the RECOVERY PJKK CMc Services Project held at 450 Golden Gate Avenue in San Francisco, CA. Session held on December 4, 2009 from 8am-1pm with 15 project team members in attendance. Gra General Services Administration / Public Buildings Service 12/03/2009
SWINERTON BUILDERS $50,000 Contract : Design and Constructions Services as required for the Design/Build Construction of a New U.S. Federal Courthouse per the RFP Solicitation #GS-09P-09-KT-C-0077 General Services Administration / Public Buildings Service 12/16/2009
RUDOLPH & SLETTEN, INC. $50,000 Contract : Design Build Competition Stipend General Services Administration / Public Buildings Service 12/16/2009
GILBANE BUILDING COMPANY $50,000 Contract : Design and construction services as required for design build construction of a New US Federal Courthouse General Services Administration / Public Buildings Service 12/16/2009
MORLEY GROUP, INC. $50,000 Contract : $50,000 Stipend for GSA Bakersfield Courthouse RFP GS-09-09P-KT-C-0077 issued on August 25, 2009 General Services Administration / Public Buildings Service 12/22/2009
URS CORPORATION $380,890 Contract : Provide Construction Management Services for the Recovery/Repair, Alteration and Seismic Upgrades at the Federal Building and US Post Offices, 154 Waianuenue Avenue, Hilo, Hawaii. Modification issued to provide special inspection for steel and concrete. General Services Administration / Public Buildings Service 10/26/2009
JAVA PRODUCTIONS, INC. $198,460 Contract : The Project Information Portal (PIP) tracks/reports on prospectus level projects for project managers, customers, and PBS executives. In an effort to support the ARRA, a host of enhancements will need to be made to the PIP. These enhancements will provide General Services Administration / Public Buildings Service 1/08/2010
GEOSYNTEC CONSULTANTS INC $49,014 Contract : Geosyntec is providing technical assistance at the Denver Federal Center for Storm Water Management. Geosyntec is conducting technical reviews of proposed stormwater management facilities and modeling of hydrologic stormwater flows. Deliverables include t General Services Administration / Public Buildings Service 10/20/2009
MACTEC ENGINEERING AND CONSULTING, INC. (DE) $98,589 Contract : PERFORM THIRTY-ONE (31) PHASE I ENVIRONMENTAL SITE ASSESSMENTS(ESAS) AT VAN BUREN LAND PORT OF ENTRY, VAN BUREN, ME. General Services Administration / Public Buildings Service 10/23/2009
ENVIROSERVICES & TRAINING CENTERS LLC $18,050 Contract : Ensure safe work conditions and prevent release of asbestos and lead during renovation activities at the Federal Building and US Post Office, 154 Waianuenue Ave, Hilo, Hawaii. Mobilized to the island of Hawaii. Provided oversight of asbestos related work General Services Administration / Public Buildings Service 10/30/2009
GOVERNMENT CONTRACT SOLUTIONS INC $365,900 Contract : CONTRACTOR SHALL PROVIDE PROJECT MANAGER SERVICES TO THE PROJECT MANAGEMENT FOR OPERATIONS BRANCH, IN SUPPORT OF ARRA OF 2009. PERIOD OF PERFORMANCE 11/16/2009 THROUGH 09/30/2012 General Services Administration / Public Buildings Service 11/05/2009
CORNERSTONE ARCHITECTURAL GROUP, PS $87,771 Contract : PROVIDE LIGHTING REQUIREMENTS AS PART OF A FUTURE RELIGHTING PROJECT AT TWO FEDERAL FACILITIES. General Services Administration / Public Buildings Service 12/30/2009
CHEROKEE GENERAL CORPORATION $1,372,900 Contract : Design and construction services to include all labor, installation, tools, equipment and design-build services for new boiler system for Eugene Federal Building, Eugene, Oregon and replacement boiler system for James A. Redden Courthouse in Medford, Oreg General Services Administration / Public Buildings Service 11/16/2009
HOWARD S WRIGHT COMPANIES OREGON JOINT VENTURE $126,569,270 Contract : Edith Green - Wendell Wyatt Federal Building Modernization Project is being renovated to align with High Efficiency Green Building requirements; including renovation of the building fa+?ade, mechanical & electrical systems, elevators, security, blast and General Services Administration / Public Buildings Service 12/11/2009
JACOBS TECHNOLOGY INC. $131,840 Contract : Data collection services to determine the feasibility of Project Labor Agreements in two areas and the risk associated with each (San Francisco, CA and Honolulu, HI). The report will look at the utilization of Project Labor Agreements in high union densit General Services Administration / Public Buildings Service 10/08/2009
JACOBS TECHNOLOGY INC. $79,920 Contract : Provide Intergrated Planning Sessions with GSA staff managing the 17 High-Efficiency Limited Scope Projects in the New England Region (1). Identify key objectives, critical scheduling requirements, opportunities and constraints posed by the Region's 17 Li General Services Administration / Public Buildings Service 10/26/2009
JACOBS TECHNOLOGY INC. $502,760 Contract : Provide a Senior Project Manager for one calendar year to support ARRA Limited Scope projects in GSA's New England Region (1). Provide management oversight, guidance and assistance to the GSA Regional Recovery Executive, Service Center Manager and Branch General Services Administration / Public Buildings Service 11/09/2009
JACOBS TECHNOLOGY INC. $3,995,591 Contract : Verify building performance and reporting of high performance green building performance measures for 228 Federal Building projects. Track and plan reviews, provide evaluations and reviews of recommissioning projects, provide reviews of Limited Scope proj General Services Administration / Public Buildings Service 10/14/2009
HEERY INTERNATIONAL, INC. $1,059,077 Contract : Heery International is providing Construction Manager as Agent services for the Federal Bureau of Investigations (FBI) Office Consolidation Project for Construction Management Services for the Master Plan & Garage Design for a new Federal Employee Parking General Services Administration / Public Buildings Service 10/23/2009
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $0 Contract : Conservation cleaning treatment of Sol Lewitt wall art work at federal building in Chicago, IL. General Services Administration / Public Buildings Service 10/21/2009
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $6,104 Contract : Art Conservation Services - Inspect sculptures and propose treatment plans for sculptures at two federal buildings in Denver, CO. General Services Administration / Public Buildings Service 11/19/2009
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $3,897 Contract : Art conservation services General Services Administration / Public Buildings Service 12/15/2009
BROOKS RANGE CONTRACT SERVICES, INC. $16,409 Contract : Commisioning work at both Duberstien & Roosevelt Couthouses General Services Administration / Public Buildings Service 12/09/2009
BERGLUND CONSTRUCTION COMPANY $24,217,588 Contract : Chicago Federal Plaza Restoration: John C Klyczynski Federal Plaza (JCK), Everett M. Dirksen Federal Courthouse (EMD) General Services Administration / Public Buildings Service 12/17/2009
CTA INC. $54,575 Contract : Maint-Rep-Alt/office bldgs-Construction managment services Light emitting diode (LED) lighting retrofit Aberdeen Federal Office Building/Courthouse, SD General Services Administration / Public Buildings Service 11/04/2009
ALLIANCE ROOFING LLC $39,054 Contract : Provide an installation specification and coordination of removal of materials based on the buildings lagistics for materials being emoved from the rooftop and disposed of into dumpsteres on the street. General Services Administration / Public Buildings Service 12/30/2009
BRATSLAVSKY CONSULTING ENGINEERS, INC. $784,869 Contract : Construction Manager assist services directed at improving energy efficiency and producing a High Performance Green Building at Hurff Ackerman Sanders Federal Building. General Services Administration / Public Buildings Service 12/29/2009
MTFA ARCHITECTURE, INC. $339,248 Contract : Coordination with photovoltaic system specialist and development of conceptual designs for integration into the electrical infrastructures of the Theo. Roosevelt Bldg, GSA Regional Office Bldg, Advance Systems Center Bldg, and Veterans' Administration Bld General Services Administration / Public Buildings Service 12/02/2009
HELIX ARCHITECTURE + DESIGN $6,733,607 Contract : Professional Architectural and Engineering services related to the Procurement, Contract Administration and Construction Management for construction of Phase IV, the final phase of a four phase project to modernize the Richard Bolling Federal Building in General Services Administration / Public Buildings Service 10/28/2009
OLIN CONSERVATION INC $60,550 Contract : Murals Conservation General Services Administration / Public Buildings Service 11/27/2009
BOYD JONES CONSTRUCTION COMPANY $2,254,879 Contract : This contract award provides for preconstruction consultation services and for construction services for building energy upgrades at the Frank Carlson Federal Building in Topeka, Kansas. The physical scope of work includes replacement of four air handlin General Services Administration / Public Buildings Service 3/17/2010
HOWARD S WRIGHT COMPANIES, WASHINGTON JOINT VENTURE $39,786,615 Contract : The purpose of the project is to modernize the Jackson Federal Building in Seattle, WA by replacing and modifying major mechanical systems, electrical switchgear, lighting systems and glazing. The outcome of these improvements will be reduced energy cons General Services Administration / Public Buildings Service 3/08/2010
G. E. JOHNSON CONSTRUCTION COMPANY, INC. $36,633,971 Contract : Provide Design Build Services for the Cesar E. Chavez Memorial Office Building Modernization Project at 1244 Speer Blvd. in Denver, CO 80204. General Services Administration / Public Buildings Service 3/23/2010
C DESIGN INC $129,868 Contract : This project is to study options, and make recommendations, for a proposed photovoltaic system at the Strom Thurmond Federal Building & Courthouse in Columbia, SC. The complex consists of 15 above grade floors and one below grade in the federal building General Services Administration / Public Buildings Service 2/04/2010
TURNER CONSTRUCTION COMPANY $1,959,048 Contract : The work that falls under this award number pertains to the following: 1) We are installing EM Modules/Ties - 2nd Fl-27th Fl. 2) We are installing Elevator Lobby Lighting Switching Controls and lamps for downlights. 3) We are reworking lighting in privat General Services Administration / Public Buildings Service 3/30/2010
APSI CONSTRUCTION MANAGEMENT $158,774 Contract : Provide Construction Management as Agent (CMa)services for Energy Conservation Measures for the US Court of Appeals in San Francisco, CA General Services Administration / Public Buildings Service 3/11/2010
C-2 CONSTRUCTION INC $462,463 Contract : ARRA Cooling Tower Replacement Project McClure Federal Building and Courthouse, Boise, Idaho General Services Administration / Public Buildings Service 1/14/2010
BROOKS RANGE CONTRACT SERVICES, INC. $4,150 Contract : Operations & Maintenance Contractor Support Services for the recommissioning project - Claude Pepper FB. We will be performing support services as called for by the gov and will be reimbured on a hour by hour as needed basis with a not to exceed amount. General Services Administration / Public Buildings Service 2/17/2010
GERANIOS ENTERPRISES, INC $489,564 Contract : Construct a wind break and snow fence at the Opheim, MT land port of entry and construct a well at the Willow Creek, MT land port of entry. ModPS01-Extend well depth, WC. ModPS02-Added Repairs, Smart Meters, Bldg Auto Hardware General Services Administration / Public Buildings Service 10/19/2009
NHI/URBAN JOINT VENTURE $3,040 Contract : Re-commissioning at Greenville FBPOCT, Greenville, MS General Services Administration / Public Buildings Service 2/10/2010
NMIS-MEP DESIGN GROUP, LLC $1,651,608 Contract : Upgrade Chillers, Boilers, and High Efficiency Pumps & Motors. General Services Administration / Public Buildings Service 3/24/2010
BOWCON COMPANY INC $574,087 Contract : Water conservation project - remove & replace restroom fixtures with high efficiency restroom fixtures at the Roybal Federal Building. General Services Administration / Public Buildings Service 2/12/2010
PLANT ENGINEERING CONSULTANTS INC $63,571 Contract : Design of Energy Conservation Measures Fort Collins Federal Office Building. Award amount increased November 18, 2010 by $16,417.56. New items on scope of work include Test and Balance Load Calculations as well as Air Handling Unit 5 and 4 Pipe System Com General Services Administration / Public Buildings Service 12/10/2009
PLANT ENGINEERING CONSULTANTS INC $95,367 Contract : Design of Energy Conservation Measures for Joseph O'Mahoney Federal Building General Services Administration / Public Buildings Service 12/16/2009
CLARK CONSTRUCTION GROUP, LLC $206,947,093 Contract : The design build scope of work includes architectural, engineering, construction, security, commissioning and other related services necessary to construct the United States Coast Guard Headquarters Building, parking garages, and rehabilitate the central General Services Administration / Public Buildings Service 8/14/2009
FEDCAP REHABILITATION SERVICES, INC. $3,744 Contract : PROVIDE LABOR TO MOVE CABINETS AND EMPTY GUN CASES OUT OF FPS ROOM 1&2 ALSO CLEAN OUT OUT ROOM B-114B General Services Administration / Public Buildings Service 4/06/2010
MARATHON, INC. $203,950 Contract : Procurement and installation of funiture for the Recovery Act offices General Services Administration / Public Buildings Service 4/02/2009
ASSOCIATED BUILDERS, INC. $73,216 Contract : *PURPOSE: of this project was to provide all necessary labor, materials, equipment and supervision for emergency roofing replacement to repair leaks on the northeast corner of the Elijah Barrett Prettyman Courthouse. LOCATION: of this project is 333 Con General Services Administration / Public Buildings Service 3/30/2010
COLLABORATIVE DESIGN GROUP INC $6,709 Contract : The project involves management and observation of roofing renovation project. Project is approximately 30,000 square feet in size. Management and observation activities include review of shop drawings, attendance at pre-construction meeting, and site vis General Services Administration / Public Buildings Service 3/29/2010
MARBLE MECHANICAL SERVICE, L.L.C. $353,586 Contract : Boiler Heating System Upgrades Flint Federal Building in Flint, MI. A complete mechanical room renovation providing increased energy efficiency for the hot water heating system. General Services Administration / Public Buildings Service 3/29/2010
OMEGA SERVICE MAINTENANCE CORP. $35,597 Contract : Nix Lighting Retrofit project - Retrofit lighting in the loading dock, parking garage and the exit signs in several areas of the Robert N. Nix Post Office and Federal Building. General Services Administration / Public Buildings Service 1/11/2010
SOUTHWEST CONSTRUCTION & PROPERTY MANAGEMENT $766,737 Contract : The scope of this project is to implement energy saving measures to the existing mechanical systems and replace energy inefficient mechanical and electrical equipment with energy efficient equipment, which exceeds ASHRAE (American Society of Heating, Refr General Services Administration / Public Buildings Service 3/29/2010
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. $5,399,559 Contract : install 5 energy efficient electric chillers , 26 Federal Plaza, NY,NY, cost outcome =$3,346,333.00 using Americian Recovery Reinvestment Act Award General Services Administration / Public Buildings Service 1/21/2010
PREVENTIVE MAINTENANCE SERVICES COMPANY $3,343 Contract : Recommission study at AUTEC Building and light study for Paul Rogers Courthouse in West Palm, Fl General Services Administration / Public Buildings Service 4/07/2011
ALUTIIQ-MELE LLC $1,837,540 Contract : DESIGN BUILD RELIGHTING CONSTRUCTION SERVICES FOR THE CLIFFORD DAVIS ODELL HORTON FEDERAL BUILDING MEMPHIS, TENNESSEE. General Services Administration / Public Buildings Service 3/26/2010
WESTLAKE, REED, LESKOSKY, LTD. $13,477 Contract : The scope of this job is to review submittals and to assist the Contractor with issues that arise during the construction of Restroom Renovations in the Dayton Federal Building. One of the primary goals of the Renovation is to make the restroom accessible General Services Administration / Public Buildings Service 3/19/2010
STANGER INDUSTRIES INC. $573,385 Contract : To replace Replace chilled water plant at United States Post Office and United States Courthouse in Hannibal, MO. General Services Administration / Public Buildings Service 3/26/2010
INTEGRATED CONSTRUCTION ENTERPRISES, INC. $515,248 Contract : Perform Mechanical and Electrical Tune-up Revisions at the Alexander Hamilton Custom House, One Bowling Green, New York, New York General Services Administration / Public Buildings Service 3/29/2010
MESA ENERGY SYSTEMS, INC. $3,189,865 Contract : Mechanical and Building Automation System Improvements, SACRAMENTO, CA General Services Administration / Public Buildings Service 3/11/2010
COAST AND HARBOR ASSOCIATES, INCORPORATED $2,905,611 Contract : This award is for Construction Manager as Agent (CMa) services for the construction of the United States Land Port of Entry (LPOE) in Van Buren, Maine. The award is for the design stage and construction phase services. During the design phase the CMa pe General Services Administration / Public Buildings Service 1/26/2010
M.E.R.I.T. INVESTIGATIVE SERVICES, INC. $6,911,390 Contract : System Upgrade for Social Security Administration Building in Jamaica, NY. General Services Administration / Public Buildings Service 3/31/2010
SCHNEIDER ELECTRIC USA, INC. $260,725 Contract : Advanced Metering Integration into 45 Buildings within Great Lakes Region 5 General Services Administration / Public Buildings Service 3/29/2010
C3, LLC $1,045,346 Contract : RECOVERY - ARRA Windows Replacement and Repair Roof Parapet Coping, at Isaac C. Parker Federal Courthouse. This project includes a replacement of exterior windows which should be in character with the original historical fabric of the building and repair General Services Administration / Public Buildings Service 3/12/2010
HONEYWELL INC. $7,029,557 Contract : This task order provides for the implementation of Energy Conservation Measures at the facilities identified in the attached DOE RFP dated 3/30/10. The contractor shall provide all necessary labor, material and equipment necessary to implement the ECMs as General Services Administration / Public Buildings Service 3/30/2010
COLLABORATIVE DESIGN GROUP INC $74,328 Contract : Project involves working with Government hired contractor (CMc - Construction Manager as contractor) and their mechanical sub-contractors to review previously designed mechanical system for the purpose of identifying potential modification opportunities t General Services Administration / Public Buildings Service 3/12/2010
KCORP TECHNOLOGY SERVICES, INC. $191,967 Contract : Cooling Tower Treatment in Fresno California, Coyle United States Courthouse General Services Administration / Public Buildings Service 3/29/2010
PRO-MARK SERVICES, INC. $432,118 Contract : American Recovery and Reinvestment Act - Bismarck, ND Federal Building. Install ceiling mounted, dual technology, occupancy sensors in spaces such as offices, restrooms, corridors and stairwells. Install wall mounted sensors in more appropriate spaces su General Services Administration / Public Buildings Service 3/15/2010
WINDAMIR DEVELOPMENT INC. $811,958 Contract : Retro-Commissioning of five federal buildings in South Carolina General Services Administration / Public Buildings Service 3/26/2010
NTVI ENTERPRISES LLC $1,542,669 Contract : Purpose:ECM (Energy Conservation Measures as directed by GSA). Location:Asheville, NC. End Outcome:Renovate Electrical Lighting Systems to make buildings more engery efficient and in turn save money on energy costs. General Services Administration / Public Buildings Service 3/29/2010
PARSONS GOVERNMENT SERVICES INC. $404,342 Contract : Parsons will be providing Construction Project Management to several projects at the Coyle United States Courthouse (USCH), 2500 Tulares Street, Fresno, CA. Parsons will provide the overall planning, co-ordination and control of a project from inception t General Services Administration / Public Buildings Service 3/29/2010
BOWCON COMPANY INC $322,656 Contract : Water conservation project - remove & replace existing restroom fixtures with high efficiency restroom fixtures at the Chet Holifield Federal Building. General Services Administration / Public Buildings Service 2/25/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $6,512 Contract : Art Conservation Services for Sculpture. General Services Administration / Public Buildings Service 1/22/2010
CONTRACT FURNISHERS OF HAWAII, INC. $141,160 Contract : Contractor to provide all labor, materials and supervision to assist in the relocation of Government agency (Internal Revenue Service) from 300 Ala Moana Blvd. (Prince Jonah Kuhio Kalanianaole Federal Building) to Alii Place (#65533;i). The agency will b General Services Administration / Public Buildings Service 1/25/2010
NATIONAL BUILDING CONTRACTORS, INC. $2,629,868 Contract : ARRA-funded Sam Nunn Atlanta Federal Center 61 Forsyth St. Atlanta GA: replacement of the Historic Building and the Mid-Rise Building Roofs with vegetated roofs. General Services Administration / Public Buildings Service 2/08/2010
JACOBS PROJECT MANAGEMENT CO. $118,663 Contract : This project makes High Performance Green building improvements to this vacant building to match up with the Social Security Administrations (SSA) mission-driven, Congressionally-mandated, Recovery Act-related project. SSA needs to be up and running quick General Services Administration / Public Buildings Service 2/16/2010
SODJA CONSTRUCTION, INC. $242,490 Contract : Emergent Repairs at 4 LPOE's Group 2 - Opheim and Willow Creek, Montana & Fortuna and Northgate, North Dakota. Inventory of each piece of equipment (model, brand, serial number, age). Evaluation of equipment to determine presence of potential for defects General Services Administration / Public Buildings Service 2/02/2010
AAF-MCQUAY INC. $737,173 Contract : The purpose of this award is to update the existing building energy management system and water-cooled chillers within the heating ventilating and air conditioning system located at the Charles Halleck Federal Building in Lafayette, Indiana. General Services Administration / Public Buildings Service 3/30/2010
HUDSPETH & ASSOCIATES, INC $29,750 Contract : Provide CABI for oversight of excavtion activity. Dispose of soils and provide stormwater requirements. General Services Administration / Public Buildings Service 2/11/2010
CONSTRUCTION & TELECOMMUNICATION SERVICES, INC. $1,343,950 Contract : Replacing two antiquated boilers in the Tip Oneil federal building in Boston with four new state of the art high efficient boilers. Currently, this project has been completed in full. General Services Administration / Public Buildings Service 3/26/2010
LYDIG-MCKINSTRY , A JOINT VENTURE $40,573,396 Contract : Thomas S. Foley US Federal Courthouse Design-Build Modernization Project, Spokane, WA construction remodel General Services Administration / Public Buildings Service 3/22/2010
GLEN/MAR CONSTRUCTION, INC. $2,491,228 Contract : New weather-tite and energy efficient roofing systems adding decades of service life to building. General Services Administration / Public Buildings Service 3/01/2010
TRICORE, INC. $363,440 Contract : Location: John J. Moakley Courthouse Boston, MA Project consists of installing carbon dioxide sensors for each courtroom; providing low flow fixtures for lavatories, water closets and sinks; installing enthalpy control sensors to control the outsid General Services Administration / Public Buildings Service 3/12/2010
INNOVATIVE TECHNICAL SOLUTIONS, INC. $8,463,016 Contract : This project is for the design and construction of a new U.S. Land Port of Entry at Maida, ND. The contract includes a new main port building, construction of roadways and parking, and construction of water, sewer, security, electrical, and telecommunicat General Services Administration / Public Buildings Service 1/06/2010
APSI CONSTRUCTION MANAGEMENT $73,111 Contract : The purpose of the award is to provide construction management services for the energy upgrade construction project. The location of the award is the B.R. Thompson Federal Building in Reno, Nevada. The outcome of the award includes lighting system upgra General Services Administration / Public Buildings Service 3/26/2010
ORTIZ GROUP ENGINEERING AND CONSTRUCTION SERVICES CORP. $317,891 Contract : REPLACEMENT OF LIGHTING AND PLUMBING FIXTURES SYSTEM FOR ENERGY SAVING AT FEDERAL BUILDING AND COURTHOUSE RON DE LUGO AT ST. THOMAS, USVI General Services Administration / Public Buildings Service 3/29/2010
NTVI ENTERPRISES, LLC $1,325,363 Contract : Purpose:ECM (Energy Conservation Measures as directed by GSA). Location:Denver, CO. End Outcome:Rip off and replace roof on several GSA buildings to make buildings more engery efficient and in turn save money on energy costs. General Services Administration / Public Buildings Service 2/10/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $4,122 Contract : Art Conservation Services for Sculpture. General Services Administration / Public Buildings Service 12/28/2009
CLARK CONSTRUCTION GROUP, LLC $31,505,158 Contract : Provide the General Services Administration (GSA) with Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements - Phase 2 Project at the Patrick V. McNamara Federal Building in D General Services Administration / Public Buildings Service 2/26/2010
GASTINGER AND WALKER ARCHITECTS INC $46,767 Contract : We performed Construction Manager as Agent Services in Kansas City, Missouri. Construction is complete. General Services Administration / Public Buildings Service 2/23/2010
PERSAUD COMPANIES, INC. $3,090,092 Contract : Design build retro-commissoning (ReCx) Construction Services for the Claude Pepper Federal Building, Miami, FL; the AUtec Federal Building, West Palm Beach, FL; and the Paul G Rogers Federal Building, West Palm Beach, FL. General Services Administration / Public Buildings Service 3/26/2010
BREAKELL, INC. $400,033 Contract : Furnish and install new light fixtures in the Federal Building in Huntington, WV General Services Administration / Public Buildings Service 3/24/2010
RMA ARCHITECTS PSC $16,252 Contract : Energy Conservation Measures for Jose V. Toledo Federal Building and courthouse General Services Administration / Public Buildings Service 1/26/2010
APSI CONSTRUCTION MANAGEMENT $1,666,843 Contract : Provide Construction Management as Agent (CMa)services for the John F Kennedy Window Replacement Project in Boston, MA General Services Administration / Public Buildings Service 3/25/2010
C H M P INC $7,320 Contract : This award supports the chiller and cooling system upgrades at the Federal Building in Flint, Michigan by providing submittal review. The upgrades to the chiller and cooling systems will increase cost efficiency and energy conservation. General Services Administration / Public Buildings Service 3/30/2010
TECTA AMERICA CORP. $176,306 Contract : Recovery-Roof Replacement - Building 4(MI0507BC) at the Hart-Dole-Inouye Federal Center General Services Administration / Public Buildings Service 3/30/2010
HENSEL PHELPS CONSTRUCTION CO $130,901,718 Contract : Construction of the new Mariposa Land Port of Entry at Nogales, Arizona. This project will expand the capacity of the new existing port operations. The current port will remain in operation as the new buildings and facilities are brought on line in phases General Services Administration / Public Buildings Service 3/18/2010
PCL CONSTRUCTION SERVICES, INC $40,000 Contract : Stipend for unsuccessful pursuit of Federal Courthouse in Billings, MT. General Services Administration / Public Buildings Service 2/10/2010
RAND CONSTRUCTION COMPANY $809,231 Contract : HVAC modifications at US courthouse in Davenport, Iowa. General Services Administration / Public Buildings Service 3/02/2010
THOMAS, S.J. COMPANY, INC. $3,291,138 Contract : Completely renovate public restrooms. Remove and replace CMU walls, replace all plumbing piping, toilet carriers, sink carriers and urinal carriers. Install electric for automatic fuacets, flushometers and auto door operators. Replace CMU walls and ins General Services Administration / Public Buildings Service 3/23/2010
NTVI ENTERPRISES LLC $2,374,224 Contract : Purpose:ECM (Energy Conservation Measures as directed by GSA). Location:Asheville and Greensboro, NC. End Outcome:Renovate Mechanical Systems to make buildings more engery efficient and in turn save money on energy costs. General Services Administration / Public Buildings Service 3/29/2010
KODET ARCHITECTURAL GROUP LTD $134,230 Contract : The Architect - Engineer will perform all required professional services necessary for the planning and design of the Department of Justice Office Renovation in the Warren E. Burger Federal Building, St Paul, Minnesota. General Services Administration / Public Buildings Service 2/24/2010
TENG & ASSOCIATES, INC. $1,308,177 Contract : Provide Pre-Design Services to develop a concept for sanitary and storm sewer separation and detention to comply with Metropolitan Sewer District requirements. Scope to include related landscape work, architectural work to replace two building connectors General Services Administration / Public Buildings Service 1/21/2010
COOPER ZIETZ ENGINEERS, INC $438,505 Contract : Construction management services for construction of a new land port of entry at Noonan, ND. General Services Administration / Public Buildings Service 3/11/2010
BBIX, LLC $156,171 Contract : VRF Design John J. Moakley Federal Courthouse Boston, MA. General Services Administration / Public Buildings Service 2/01/2010
MUGEN CONSTRUCTION, INC. $53,747 Contract : The contract was to provide all labor, supervision, materials and equipment to provide new toilet, urinal and sink fixtures for bathrooms in the Charles Chamberlain Federal Building. The purpose of replacing the fixtures is to provide low flow fixtures an General Services Administration / Public Buildings Service 3/30/2010
KEPA SERVICES INC. $60,032 Contract : electrician project manager General Services Administration / Public Buildings Service 3/26/2010
K.O.O. CONSTRUCTION, INC. $589,264 Contract : Base award is for Design-build construction services to perform Energy Conservation Measure Number One for the replacement of existing lighting in the courthouse main lobby/atrium with induction lighting. Options awarded this quarter on March 26 in the a General Services Administration / Public Buildings Service 3/12/2010
ZIMMER GUNSUL FRASCA ARCHITECTS LLP $4,051,084 Contract : This project for design of facilities to house overall Department of Homeland Security (DHS) Consolidation (including Customs Border Patrol (CBP), Federal Emergency Management Agency (FEMA), Immigration and Customs Enforcement (ICE), Transportation and Se General Services Administration / Public Buildings Service 3/19/2010
JACOBS PROJECT MANAGEMENT CO. $1,011,999 Contract : This contract is an agency Construction Management contract providing services to augment GSA internal technical staff. Construction work packages for this project are being delivered under a separate contract with an at-risk Construction Manager who will General Services Administration / Public Buildings Service 3/26/2010
CINNOVAS DEVELOPMENT GROUP, LLC $164,505 Contract : Schedule analysis services for the GSA Headquarters Modernization project in Washington, DC General Services Administration / Public Buildings Service 1/21/2010
MA-CHIS LOWER CREEK INDIAN TRIBE ENTERPRISES, INC $2,709,785 Contract : ARRA- Design Build Retro-Commissioning Construction Services at the John A Campbell US Courthouse, Mobile, AL General Services Administration / Public Buildings Service 3/30/2010
HEERY INTERNATIONAL, INC. $7,703,475 Contract : The Mariposa Land Port of Entry is a full service port inspecting privately operated vehicles, buses, pedestrians, and commercial vehicles. The Port is in the City of Nogales, Arizona immediately north of Nogales, Sonora, Mexico. The Mariposa Land Port of General Services Administration / Public Buildings Service 3/29/2010
URS CORPORATION $389,862 Contract : TAS::47 4543::TAS IDIQ CONTRACT FOR CM SERVICES, RECOVERY-CONSTRUCTION MANAGEMENT FOR ENERGY IMPROVEMENT PROJECTS (HVAC, CONTROLS, PLUMBING, LIGHTING): SCHWARTZ FB & USCH, 880 FRONT STREET, SAN DIEGO, CA, General Services Administration / Public Buildings Service 3/30/2010
JACOBS TECHNOLOGY INC. $16,077 Contract : Estimating Services for the John F. Kennedy Federal Building Window Replacement Project. Services for the development of a computer generated estimate for the John F. Kennedy Window Replacement Project in Boston, Massachusetts. Estimates are to be prepare General Services Administration / Public Buildings Service 3/03/2010
OLGOONIK SPECIALTY CONTRACTORS, LLC $6,274,479 Contract : Juneau Federal Building Modernization Project : upgrade electrical, heating system and building lighting. Work to be performed in Juneau Alaska. General Services Administration / Public Buildings Service 3/30/2010
BIGWITCH & ASSOCIATES INC. $476,323 Contract : Relighitng of the Romano Mazzoli Federal Budiling in Louisville, KY General Services Administration / Public Buildings Service 3/26/2010
ALEUT FACILITIES SUPPORT SERVICES, LLC $35,289 Contract : Overtime labor for miscellaneous escort and other ARRA Project support services including energy upgrade projects at the Matsui U.S, Courthouse Building and 2800 Cottage Way Federal Building, both located in Sacramento, CA. General Services Administration / Public Buildings Service 3/31/2010
M.E. GROUP, INC. $1,144,389 Contract : COMMISSIONING & EXPERT SERVICES FOR THE FIRE ALARM & MECHANICAL UPGRADE FOR THE JCK BUILDING. The purpose of this project is to provide commisioning services and to verify the building systems meet the owners project requirements. The desired outcome of General Services Administration / Public Buildings Service 1/21/2010
CLIFF GARTEN & ASSOCIATES, INC. $397,292 Contract : ART IN ARCHITECTURE AWARD The goal of project is to create a publicly scaled and permanently installed artwork that facilitates a meaningful cultural dialogue between the American people and their government and heralds the contribution of free and creati General Services Administration / Public Buildings Service 3/30/2010
TRAININGCORE, INC $812,946 Contract : Design, repair, replacement, and improvement,thermal & moisture systems US Federal Courthouse, Gainesville, GA General Services Administration / Public Buildings Service 3/29/2010
ACME MECHANICAL CONTRACTORS, INC. $86,000 Contract : Project location: Matsui US Courthouse at 501 I Street, Sacramento, CA. Project to change specific plumbing fixtures to new, water saving fixtures. The end goal being user-friendly water conservancy. General Services Administration / Public Buildings Service 1/29/2010
BBA CONSTRUCTION LLC $75,619 Contract : The project scope includes Variable Frequency Drives and Air Handling Unit control upgrades at the Robert W. Kastenmeier Federal Building in Madison, Wisconsin. General Services Administration / Public Buildings Service 3/29/2010
BOYD JONES CONSTRUCTION COMPANY $2,193,941 Contract : The contract provides for preconstruction consultation services and construction services for Heating, Ventilation, & Air Conditioning (HVAC) upgrades to the Sioux City Courthouse and Federal Building. The project will design and install energy efficient General Services Administration / Public Buildings Service 2/22/2010
CHEROKEE GENERAL CORPORATION $538,080 Contract : ARRA Recovery - Energy Conservation Upgrades Project at the Seattle Federal Office Building, Seattle, WA. Remove and replace all Fan Coil Control Modulating Valves. Remove and replace leaking outside air intake dampers and actuators. Replace and or cal General Services Administration / Public Buildings Service 3/22/2010
COLONIALWEBB CONTRACTORS COMPANY $1,466,669 Contract : Hoffman Energy Bundle/Boiler Replacement, Variable Frequency Drive (VFD) installation, and air handler unit replacement at the Hoffman Courthouse in Norfolk, Virginia. General Services Administration / Public Buildings Service 2/19/2010
ULTEIG ENGINEERS, INC. $221,851 Contract : We will provide construction management/project management for the Fargo, North Dakota Federal Building and Post Office and the Bismarck, North Dakota Federal Building and Post Office. In this quarter, the project was supported by American Recovery and R General Services Administration / Public Buildings Service 3/30/2010
CEEPCO CONTRACTING, LLC $341,884 Contract : The project consists of assisting GSA in the development of one Request For Proposals (RFP) for a design-build contract to complete upgrades for the Winder Building in Washington, DC General Services Administration / Public Buildings Service 1/19/2010
HARVEY, ELLEN $450,000 Contract : An Art in Architecture commission for artwork as part of the modernization project at the Internal Revenue Service Federal Building in Andover, Massachusetts General Services Administration / Public Buildings Service 3/09/2010
CLARK CONSTRUCTION GROUP, LLC $2,428,902 Contract : The purpose of this award is to provide the General Services Administration (GSA) with Preconstruction and Construction phase Services for the Lipinski Federal Building Lobby Renovation Project in Chicago, Illinois. The expected outcome of this contract General Services Administration / Public Buildings Service 2/05/2010
E LIGHT CENTERRE A JOINT VENTURE, LLC $20,973,495 Contract : Design build project at the Denver Federal Center. This project includes two large fields of Photovoltaic system ground arrays as well as several carports with roof mounted arrays. These panels will prevent the emission of thousands of pounds of carbon di General Services Administration / Public Buildings Service 3/15/2010
OLGOONIK SPECIALTY CONTRACTORS, LLC $2,037,464 Contract : Energy Conservation Upgrades Project for the Anchorage Federal Building and Courthouse General Services Administration / Public Buildings Service 3/18/2010
AT YOUR SERVICE HEATING & COOLING, LLC $36,258 Contract : After hours HazMat surveying General Services Administration / Public Buildings Service 1/27/2010
DANIEL J. KEATING CONSTRUCTION COMPANY, LLC $17,699,914 Contract : A.Project Location-Philadelphia, PA B.Project Description- Removal of thirty-two (32) constant volume Air Handling Units (AHUs) and replacement with twenty-eight (28) new variable volume (VAV) and four (4) constant volume (CV) units in the Green Federal B General Services Administration / Public Buildings Service 3/19/2010
TENG & ASSOCIATES, INC. $104,213 Contract : Create Bridging documents & Independent Government Estimate for energy projects at Roybal Federal Center. Deliverables include Statement of Work document and Opinion of Probable Cost document. Expected outcome is enough documentation to allow GSA to sol General Services Administration / Public Buildings Service 1/05/2010
BUILDING MECHANICAL SERVICES CORP $129,358 Contract : Lighting Controls and Temperature controls at Jose V. Toledo US Courthouse and Federal Building Office, Old San Juan, PR, and installation of electrical and water metering system General Services Administration / Public Buildings Service 3/16/2010
GWINN CONSTRUCTION, INC. $1,303,367 Contract : Energy upgrades Beuce R. Thompson Courthouse 400 S Virgina St. Reno NV. (GCI job #10-30002) General Services Administration / Public Buildings Service 3/24/2010
ALLEN BRADBURY CONSTRUCTION LLC $7,669,341 Contract : Provide/install: 911 Building, Portland, OR: Boiler 9, 905 Solomon Building, Portland, OR: Boiler and Domestic water heater. 911 Building: Portland, OR: Replacement Chillers, 905 Building: Portland, OR: Terrace Roof, 911 Fountain, 905 Bldg, Portland OR: General Services Administration / Public Buildings Service 3/26/2010
ERIE AFFILIATES INC $1,439,071 Contract : Upgrading the building's electrical and Heating,Ventalating Air Conditioning(HVAC) systems in Dayton, Ohio. General Services Administration / Public Buildings Service 12/16/2009
ALABAMA POWER COMPANY $1,450,569 Contract : Provide all labor, materials, equipment and supervision necessary for design and construction of relighting project at Johnson Annex, Montgomery, Alabama General Services Administration / Public Buildings Service 3/31/2010
CONSIGLI CONSTRUCTION CO INC. $40,387,487 Contract : The project will repair/replace Heating, Ventilating, and Air Conditioning systems, improve energy efficiency and provide exterior structural improvements including the replacement of windows. A new secure elevator will be added to improve Court safety. General Services Administration / Public Buildings Service 3/25/2010
C H M P INC $20,762 Contract : This award supports the boiler and heating system upgrades at the Federal Building in Flint, Michigan by providing construction management and inspection services and record documents. The upgrades to the heating and boiler systems will increase cost eff General Services Administration / Public Buildings Service 3/30/2010
ED A. WILSON INC. $369,975 Contract : DESIGN, BUILD, REPLACE AND RELOCATE AIR HANDLER UNITS AT U.S. COURTHOUSE General Services Administration / Public Buildings Service 1/11/2010
JOHNSON CONTROLS, INC. $614,538 Contract : Provide all labor, material and equipment to design and perform the replacement and relocation of air handling units at United States Courthouse in Harrisonburg, Virginia with American Recovery & Reinvestment Act funding, in accordance with the correspond General Services Administration / Public Buildings Service 3/03/2010
MAGNUM ENGINEERING, INC. $2,594,906 Contract : Design/Build Copper Scrim, US Federal Courthouse, El Paso, TX General Services Administration / Public Buildings Service 3/31/2010
GEORGIA POWER COMPANY $1,584,173 Contract : Provide all labor, materials, equipment and supervision necessary for design and construction of relighting project at IRS Annex-Chamblee, Georgia. General Services Administration / Public Buildings Service 3/31/2010
NORTHWEST TECHNOLOGIES, INC. $752,176 Contract : Energy Conservation Upgrades at the James A. McClure Federal Building/US Courthouse, Boise, Idaho. General Services Administration / Public Buildings Service 3/11/2010
RIO VISTA MANAGEMENT, L.L.C. $405,215 Contract : Recovery - Energy Improvements at the WF Bennett Building SLC, UT General Services Administration / Public Buildings Service 3/19/2010
ALUTIIQ-MELE LLC $2,044,572 Contract : Provide retro-commissioning design and implementation to increase building efficiencies. A defined scope of work will be developed for each project to modernize control of facility mechanical/electrical systems, within constraints of the budget allotted General Services Administration / Public Buildings Service 3/29/2010
RIOS ASSOCIATES INC $337,649 Contract : Sustainable site project General Services Administration / Public Buildings Service 1/28/2010
E-CORP. $2,759,057 Contract : Contractor shall furnish all labor, equipment, materials, supervision and transportation necessary to accomplish the IRS Service Center retro-commissioning. Contractor shall fix fan system deficiencies, furnish and install actuators, calibrate airflow & General Services Administration / Public Buildings Service 3/23/2010
NEUMANN BROTHERS, INC. $28,000,651 Contract : Preconstruction services are complete. We have received notice to proceed for early purchase of critial items for cooling towers, air handlers, and variable frequency drives, lighting and lighting controls. We have also received notice to proceed for coo General Services Administration / Public Buildings Service 3/15/2010
KMEA $63,752 Contract : The contractor will serve as the General Services Administration (Hawaii Field Office) coordinator for providing on-site support/interface with all stakeholders relating to the major multi-year renovation of the PJKK Federal Building & US Courthouse, 300 General Services Administration / Public Buildings Service 1/25/2010
C-2 CONSTRUCTION INC $727,668 Contract : Recovery: Energy Efficiency Upgrades, Wheeler Federal Office Building, Baker City, ORegon General Services Administration / Public Buildings Service 3/29/2010
POTOMAC-HUDSON ENGINEERING, INC. $34,723 Contract : GSA is funding a project that involves the construction and operation of a wind turbine at the Pembina Port of Entry located in Pembina County, North Dakota. The Pembina DOE intends to power its facility with an onsite government owned wind turbine syste General Services Administration / Public Buildings Service 2/24/2010
TOCCI/DRISCOLL $117,690,475 Contract : Design-Build Services for Peter W. Rodino Federal Building Modernization, Newark, NJ General Services Administration / Public Buildings Service 3/31/2010
MOCA SYSTEMS, INC. $161,728 Contract : Construction Scheduler Services for GSA Region 5 Category #3 construction projects. Scheduling services are included for the following construction projects: Minneapolis US Courthouse; Dayton Federal Building & US Courthouse; and all limited scope projec General Services Administration / Public Buildings Service 2/27/2010
AT YOUR SERVICE HEATING & COOLING, LLC $673,212 Contract : Energy upgrade - Replace exterior windows at the Carson City Federal Building, Carson City, NV General Services Administration / Public Buildings Service 3/12/2010
WHITING-TURNER CONTRACTING COMPANY, THE $2,012,731 Contract : Lobby Expansion/Energy Lighting Upgrades at J.Caleb Boggs U.S. Courthouse and Federal Building in Wilmington, Delaware including construction of a temporary security screening facility to be followed by selective demolition of existing main entrance. New General Services Administration / Public Buildings Service 3/05/2010
FLORIDA POWER & LIGHT COMPANY INC $28,061 Contract : Architectural and engineering for Lighting Study for the Paul Rogers Federal Building and Courthouse, West Palm Beach, Florida. This will improve the lighting energy efficiency in the facility. General Services Administration / Public Buildings Service 12/07/2009
INNOVATIVE FEDERAL OPERATIONS GROUP, L.L.C. $260,217 Contract : The purpose of this contract is for the installation of Water Conervative Bathroom fixtures to include low flow Solar powered Faucets, Wall mounted urinals and toilets with solar powered valves and shower heads through-out the 880 Front Street, (Schwartz General Services Administration / Public Buildings Service 2/12/2010
BAILEY EDWARD DESIGN, INC. $57,923 Contract : Bailey Edward architecture has been contracted to perform post construction award phase services including architectural and engineering construction management and inspection. General Services Administration / Public Buildings Service 2/11/2010
GASTINGER AND WALKER ARCHITECTS INC $64,543 Contract : Centennial Mall North Lincoln, Nebraska We performed Construction Manager as Agent Services. Construction work is 100%complete. General Services Administration / Public Buildings Service 2/24/2010
COLLABORATIVE DESIGN GROUP INC $22,680 Contract : Project involves Management and Observation of roofing renovation projects at four (4) locations in the state of Minnesota. Projects range from approximately 2,500 square feet to over 40,000 square feet in size. Management and Observation activities inclu General Services Administration / Public Buildings Service 3/02/2010
PRO-MARK SERVICES, INC. $585,325 Contract : American Recovery and Reinvestment Act - Fargo, ND Federal Building Courthouse. Install twenty-four new demand control ventilation aluminum dampers with rubber seals for intake/exhaust dampers.Provide and install eight new pneumatic transducers, connectin General Services Administration / Public Buildings Service 3/15/2010
ACME MECHANICAL CONTRACTORS, INC. $82,914 Contract : Project location: Federal Building at 2800 Cottage Way, Sacramento, CA. Project to change specific plumbing fixtures to new, water saving fixtures. The end goal being user-friendly water conservancy. General Services Administration / Public Buildings Service 2/05/2010
JACOBS TECHNOLOGY INC. $38,744 Contract : Margaret Chase Smith Federal Building Estimating Services Construction cost estimating services for phase 1 and phase 2 of the Margaret Chase Smith Federal Building in Bangor, Maine. Construction cost estimating services for phase 1 and phase 2 of the Mar General Services Administration / Public Buildings Service 3/19/2010
INTELLIGENT DECISIONS, INC. $954 Contract : Purchase of a Computer Server for Kansas City, Missouri - This order is 100% complete General Services Administration / Public Buildings Service 2/17/2010
JACOBS TECHNOLOGY INC. $4,911,458 Contract : Construction Management (Agency) Services for Design-Build (D-B) Renovations at the GT Mickey Leland Federal Office Building in Houston, TX. The Leland Building provides offices for many federal agencies and requires building system modernization, repairs General Services Administration / Public Buildings Service 3/30/2010
SCHNEIDER ELECTRIC USA, INC. $33,467 Contract : U.S. Custom House Purpose This project will integrate the water and gas meter data into the existing Schneider Electric ION7650 metering enclosure installed adjacent to the main switchgear in the U.S. Custom House in Philadelphia, PA. This includes confi General Services Administration / Public Buildings Service 3/24/2010
C H M P INC $10,324 Contract : This award supports the roof replacement at the Rosa Parks Federal Building in Detroit, Michigan by providing construction management and inspection services and record documents. The replacement of the roof with a new cool white roof and increased insul General Services Administration / Public Buildings Service 3/19/2010
APSI CONSTRUCTION MANAGEMENT $1,186,167 Contract : Provide Construction Management as Agent (CMa)services to four (4) buildings in Los Angeles, CA General Services Administration / Public Buildings Service 3/29/2010
OKLAHOMA ROOFING & SHEET METAL, LLC $2,875,323 Contract : Providing design build services for the Oklahoma Post Office and Federal Building roof replacement project. General Services Administration / Public Buildings Service 3/09/2010
PREMIER WEST CONTRACTORS, INC. $8,348 Contract : The award purpose is to install a 17 kw solar electric array at the Lloyd George United States Courthouse at 333 S. Las Vegas Blvd., Las Vegas, NV 89101. General Services Administration / Public Buildings Service 3/29/2010
HEERY INTERNATIONAL, INC. $1,004,007 Contract : Roof Inspections for various projects in the SE Region including: the Stephens Federal Building in Athens, GA; Athens Federal Courthouse in Athens, GA; Tomochichi Federal Courthouse in Savannah, GA; Scarlett Federal Building-Courthouse in Brunswick, GA; G General Services Administration / Public Buildings Service 3/30/2010
CHIMES DISTRICT OF COLUMBIA, INC. $11,049 Contract : Building Engineer and Maintenance Technician to provide building escort, technical assistance, operate MEP equipment and Building Automation System (BAS/EMS) during survey/testing by A&E (government contractor) per SOW written 10-22-2009. General Services Administration / Public Buildings Service 2/03/2010
COMPLETE QUALITY INSTALLATION SERVICES INC $18,754 Contract : 1 - Relocation of 8840 Square Feet at 517 East Wisconsin Ave, Milwaukee WI 53202 of contents and workstations from 1st floor to temporary space on 4th & 5th floors during renovation. 2 - Teardown & Install of 36 workstations. 3. Provide 6 electrical powe General Services Administration / Public Buildings Service 3/26/2010
NOBLIS, INC. $519,886 Contract : Noblis is building an online environment for the General Servise Administration Public Buildings Service (PBS) to: 1) provide information and resources to facilities managers, realty specialists, project managers from governmental agencies and private se General Services Administration / Public Buildings Service 1/29/2010
OLIN CONSERVATION INC $2,194 Contract : Five mural, Dept. of Interior assessment General Services Administration / Public Buildings Service 1/12/2010
SYNTHESIS INC $2,774,291 Contract : This is a pre-design, design-build, start-up and testing services energy efficiency project. The project includes engineering, equipment, supervision, material and labor to replace the building automation system front end located in the building's baseme General Services Administration / Public Buildings Service 3/29/2010
ENOVITY, INC. $46,910 Contract : Engineering Assessment and Specifications for Design-Build HVAC/BAS (Heating, Ventilation, Air Conditioning and Building Automation Services) Project at United States Courthouse, 312 N. Spring Street, Los Angeles, CA General Services Administration / Public Buildings Service 1/04/2010
OKLAHOMA ROOFING & SHEET METAL, LLC $851,868 Contract : Providing design build services for various roofing project locations in Laredo, TX. PS01 Modification for $54,337.00. General Services Administration / Public Buildings Service 3/30/2010
JACOBS PROJECT MANAGEMENT CO. $2,725,558 Contract : CMa Services for Department of State Facility in Denver Colorado Preconstruction, Construction and Closeout Phase Services in Denver Federal Center. 100,000 sf, $60 million facility will have expansion capabilities for future. Jacobs services include Desi General Services Administration / Public Buildings Service 2/09/2010
CTA INC. $400,702 Contract : Construction management services for a new land port of entry to replace existing Port, along the Northern Border of the United States in Wildhorse, Montana General Services Administration / Public Buildings Service 2/26/2010
SCHNEIDER ELECTRIC USA, INC. $28,549 Contract : U.S. Custom House Purpose This project will integrate the water and gas meter data into the existing Schneider Electric ION7650 metering enclosure installed adjacent to the main switchgear in the U.S. Custom House in Philadelphia, PA. This includes confi General Services Administration / Public Buildings Service 3/23/2010
URS GROUP, INC. $562,431 Contract : CONSTRUCTION MANAGEMENT SERVICES FOR RETRO-COMMISSIONING AND ROOF REPLACEMENT PROJECT. General Services Administration / Public Buildings Service 3/18/2010
TECHFIRST, INC. $14,032 Contract : Cabling of Mary Switzer building, ste. 1323. General Services Administration / Public Buildings Service 3/16/2010
HEERY INTERNATIONAL, INC. $327,838 Contract : Heery International is providing retro-commissioning services for two adjacent buildings that share common Mechanical Electrical and Plumbing (MEP) infrastructure. The two buildings are the Roybal Federal Building in Los Angeles and the U.S. Courthouse a General Services Administration / Public Buildings Service 3/29/2010
JACOBS PROJECT MANAGEMENT CO. $1,262,304 Contract : ARRA GSA CM SERVICES FOR PROJECTS AT THE CENTER FOR MEDICARE & MEDICAID SERVICES COMPLEX. Work related to the Chillers, Boilers, and Lighting Replacement Project includes the following; removal and disposal of existing main ice storage plant and related p General Services Administration / Public Buildings Service 2/18/2010
HC BECK LTD $20,000 Contract : Stipend for submission of an alternate design for the Design/Build solicitation for the Renovations of the Leland Federal Building in Houston, TX. General Services Administration / Public Buildings Service 3/31/2010
COAST AND HARBOR ASSOCIATES, INCORPORATED $3,188,760 Contract : This award is for Construction Manager as Agent (CMa) services for the renovation of the Margaret Chase Smith Federal Building in Bangor, Maine. The CMa is responsible to ensure that the General Services Administration's (GSA) interests as the owner are General Services Administration / Public Buildings Service 3/29/2010
PREVENTIVE MAINTENANCE SERVICES COMPANY $5,560 Contract : Provide Operations and Maintenance Recomissioning Support Services for the Paul Rogers FBCT-FL0066AC Provide Operations & Maintenance Lighting Support Services for the Paul Rogers FBCT-FL0066AC General Services Administration / Public Buildings Service 2/01/2010
FEDSERV INDUSTRIES, INC. $3,564 Contract : Recommissioning Study at the Preyer Federal Bldg and the Greensboro Federal Bldg., Greensboro, NC General Services Administration / Public Buildings Service 1/10/2010
SEBESTA BLOMBERG & ASSOCIATES, INC. $2,122,954 Contract : Commissioning Agent for General Services Administration Great Lakes Region 5: will perform services necessary to verify and document compliance with the General Services Administration performance objectives throughout the various phases of design and con General Services Administration / Public Buildings Service 1/29/2010
MA-CHIS LOWER CREEK INDIAN TRIBE ENTERPRISES, INC $1,666,530 Contract : ARRA-Design Build Retro-Commissioning Construction Services at the John A. Campbell US Courthouse, Mobile, AL General Services Administration / Public Buildings Service 3/30/2010
WATERMARK ENVIRONMENTAL, INCORPORATED $31,176 Contract : Construction Inspection Services for the Cool Roof System for the Richard C Lee U.S. Courthouse General Services Administration / Public Buildings Service 1/27/2010
URS GROUP, INC. $99,805 Contract : Construction Management Services for the Seattle Federal Oddice Building HVAC Upgrades and the Auburn Energy Conservation Upgrade Projects. General Services Administration / Public Buildings Service 3/29/2010
URS GROUP, INC. $68,621 Contract : TAS :: 47 4543 ::TAS; Provide Construction Inspection Services for the public restrooms at the Dayton Federal Building. General Services Administration / Public Buildings Service 3/24/2010
AIRBORNE VETERANS SERVICES, INC. $14,919 Contract : RESTROOM FIXTURE REPLACEMENT General Services Administration / Public Buildings Service 1/29/2010
ROCHE CONSTRUCTORS, INC $893,751 Contract : Procurement of commercial additions, major renovations, tenant finishes, and repair and alteration work. Projects are based on a general statement of work further defined with each individual Task Order. General Services Administration / Public Buildings Service 3/15/2010
BROOKS RANGE CONTRACT SERVICES, INC. $197 Contract : Operations & Maintenance Contractor Escort Support Sevices for the roofing project at Timberlake Annex, Tampa, Fl FL0002AE. This a per hour as required by the gov with a not to exceed amount. General Services Administration / Public Buildings Service 1/22/2010
REDD ROOFING AND CONSTRUCTION COMPANY $2,297,462 Contract : Design/build project to remove and replace the roof system on the IRS Facility in Ogden, UT. General Services Administration / Public Buildings Service 2/24/2010
CONTRACT SOLUTIONS LLC $926,791 Contract : The purpose is to provide scheduling oversight services on GSA capital construction projects in Region 5 to ensure timely and accurate reporting of progress and to provide recommendations to improve timely execution of the works. Each month we will submi General Services Administration / Public Buildings Service 2/27/2010
RMA ARCHITECTS PSC $126,162 Contract : The project includes replacement of fixtures at the Courthouse public bathrooms to reduce water comsuption0 and minor improvement to the Air Conditioning System for additional energy savings. The project major scope includes the full evaluation of the US General Services Administration / Public Buildings Service 1/27/2010
TRICORE, INC. $1,293,609 Contract : Tenant Buildout Tenant: Social Security Administration Area: 20,896sf Base Bid Work: Install new Mechanical, Electrical and Fire protection System, plumbing for a new break area, apply new finishes to the floors and walls, install manual operable partit General Services Administration / Public Buildings Service 3/10/2010
PUBLIC SERVICE COMPANY OF COLORADO $49,912 Contract : Relocate main gas service to the Denver Federal Center General Services Administration / Public Buildings Service 2/02/2010
HEERY INTERNATIONAL, INC. $142,420 Contract : Heery International is the Construction Manager as Agent (CMa) for Commissioning Services in support of the design and new construction services for new and replacement boiler systems at the James A. Redden U.S. Courthouse in Medford, Oregon and the Eugen General Services Administration / Public Buildings Service 2/17/2010
FIDELITY TECHNOLOGIES CORPORATION $355,375 Contract : Location: James Hanley Federal Office bulding, Syracuse, NY Fidelity to provide all required labor, supervision, escort services, materials and equipment in support of the Retro-Commissioning project in accordance with the Performance Work Statement. General Services Administration / Public Buildings Service 3/11/2010
ACCO ENGINEERED SYSTEMS, INC. $748,362 Contract : ARRA (American Recovery Reinvestment Act) BAS (Building Automation System) Replacement at Chet Holifield Federal Building, Laguna Niguel, CA (California). Modification was given to incorporate the following: 1 - Reheat terminal unit (181) 2 - Double duct General Services Administration / Public Buildings Service 2/25/2010
ASSOCIATES ROOFING & CONSTRUCTION, INC. $754,555 Contract : John A Campbell Courthouse Mobile,Alabama Installation of new green roofing system, and miscellaneous roofing repairs. General Services Administration / Public Buildings Service 3/29/2010
ASSOCIATES ROOFING & CONSTRUCTION, INC. $1,236,038 Contract : Greenville Federal Courthouse Performed video scoping on all drains & provided reports and docuumentation of current conditions.Removed existing roof system down to structural concrete deck. Designed and installed new torch applied, LEED certified, cool r General Services Administration / Public Buildings Service 2/08/2010
CNV SERVICE COMPANY, L.L.C. $3,278 Contract : O&M contractor support for the recommissioning project. Davis/Horton FB, Memphis, TN. No work has been performed by CNV on this project to date. General Services Administration / Public Buildings Service 2/18/2010
NSTAR ELECTRIC COMPANY $726,773 Contract : A design-build contract for the Energy Conservation Measures identified in the report based on the Retro-Commissioning Study. Energy Conservation Measures include: replace Building automation system, lighting power conditioning, lighting occupancy sensor General Services Administration / Public Buildings Service 3/25/2010
JOHNSON CONTROLS FEDERAL SYSTEMS/ VERSAR JOINT VENTURE $982,611 Contract : Total Turnkey project including design, manufacturing, and installation services for the installation of a rooftop mounted utility-interactive minimum 115 kw DC photovoltaic system at the Robinson-Merhige US Courthouse, 701 E. Broad Street, Richmond, VA. General Services Administration / Public Buildings Service 1/25/2010
MARON CONSTRUCTION CO., INC. $370,831 Contract : The installation of energy efficient lighting and controls to make the heating ventilitating air condition energy efficient. General Services Administration / Public Buildings Service 3/19/2010
CARRIER CONSTRUCTION COMPANY $139,109 Contract : Contract Awarded for the following scope of work to be performed at Hart Dole Inouye Federal Center, located at 50 North Washington Street - Battle Creek Michigan: Remove and replace (6) swinging and (1) revolving doors and related hardware as specified i General Services Administration / Public Buildings Service 3/26/2010
MIDLAND MECHANICAL, INC. $126,320 Contract : Energy Improvement Design/Build at Federal Building in Bozeman, MT General Services Administration / Public Buildings Service 3/02/2010
ARAMIS CONSTRUCTION, INC. $20,768 Contract : Completed work to build and install walls to relocate custodial offices for storage space. Work completed timely without any complications. All work was scheduled in advance and approved. Workmanship was in accordance with the current federal codes and re General Services Administration / Public Buildings Service 8/19/2009
EHS-INTERNATIONAL, INC. $28,657 Contract : Project Monitoring for Boiler Installation Project James A. Redden US Court House, Medford, Oregon General Services Administration / Public Buildings Service 3/24/2010
SCHNEIDER ELECTRIC USA, INC. $42,637 Contract : Byrne-Green Building Purpose This project will integrate the water and gas meter data into the existing Schneider Electric ION7650 metering enclosure installed adjacent to the main switchgear in the Byrne Green Building in Philadelphia, PA. This includes General Services Administration / Public Buildings Service 3/09/2010
ROME MANAGEMENT ASSOCIATES, L. L. C. $3,500,698 Contract : 'Recovery' Design Building & Installation of Photovoltaic Energy System and New Cooling Roof @ Addabbo Federal Building in Queens, NY General Services Administration / Public Buildings Service 3/30/2010
RMA ARCHITECTS PSC $129,464 Contract : Provide peer review of design and construction documents and field observation for VA San Juan Regional Office relocation at Guaynabo,PR Outcome: Sustainable interior reform of 60,000 square feet for the new offices of the Veterans Administration General Services Administration / Public Buildings Service 2/03/2010
FEDCAP REHABILITATION SERVICES, INC. $12,788 Contract : Provide labor to dipsoe of furniture,cabinets, ETC out of room B-48, Sub-basement, INS & CIS rooms General Services Administration / Public Buildings Service 4/06/2010
NMIS-MEP DESIGN GROUP, LLC $1,134,449 Contract : Upgrade Chillers, Boilers, and High Efficiency Pumps & Motors. General Services Administration / Public Buildings Service 3/24/2010
H B A CONTRACTORS INC $20,561,938 Contract : New Federal Parking Garage, located in 150 Chardon Street, San Juan, Puerto Rico, 00918. The project includes but is not limited to the following work: 1. A new open 4 level parking structure with approximately 500 parking spaces, site work including new General Services Administration / Public Buildings Service 3/30/2010
KCORP TECHNOLOGY SERVICES, INC. $145,419 Contract : Provide Cooling Tower Water treatment at Lloyd George United States Courthouse General Services Administration / Public Buildings Service 3/29/2010
CUTTING EDGE GROUP, LLC $58,745 Contract : contractor is to perform preventative maintenance and Equipment inventory/condition assesment of mechanical and electrical sysytems at the Monticello, Maine land port of entry. General Services Administration / Public Buildings Service 2/02/2010
GERALD H. PHIPPS, INC. $3,552,127 Contract : Design-Build contract for the Recommissioning of Buildings 20 and 95 located on the Denver Federal Center, Lakewood, Colorado. General Services Administration / Public Buildings Service 12/29/2009
EMCOR GOVERNMENT SERVICES, INC. $93,700 Contract : Demolition of existing fan coil piping for the 10th floor fan coil units. Provide labor and materials necessary to repipe water feeds units within SSA renovation space work being done in Boston, MA. General Services Administration / Public Buildings Service 3/18/2010
ART ANDERSON ASSOCIATES, INC. $80,927 Contract : Construction Management Assist Services at the Gus J. Soloman U.S. Courthouse @ 620 S.W. Main Street Portland, Oregon 97205-3037 General Services Administration / Public Buildings Service 3/09/2010
KEDAR CORPORATION $456,383 Contract : pROJECT: lIGHTING SENSORORS AND SOFFIT LIGHTING RETROFIT AND INSTALLATION AT BYRNE COURTHOUSE/GREEN FEDERAL BUILDING, PHILADLEPHIA, PA. Instaall energy efficient lights and sensors General Services Administration / Public Buildings Service 2/01/2010
RICHARD D. KIMBALL CO. $47,384 Contract : Richard D. Kimball Co. has provided engineering design servcies for performance based statement of work and post construction services for energy conservation measures at the Providence Federal Building & Courthouse and the Pastore Federal Building, both General Services Administration / Public Buildings Service 1/27/2010
WILSON BUSINESS INTEGRATORS INC $217,504 Contract : US governement GSA , Public Buildings Service: Project Mangemetn for the New Orleans Operations Branch. TWG currently provides full time project management services for the GSA, New Orleans, Operations Branch, in support of the American Recovery and Reinv General Services Administration / Public Buildings Service 2/25/2010
MARON CONSTRUCTION CO., INC. $409,900 Contract : The installation of a new heating ventiliating air conditioning chiller and the caulking and painting of the exterior windows and frames. General Services Administration / Public Buildings Service 2/26/2010
KODET ARCHITECTURAL GROUP LTD $164,074 Contract : The Architect - Engineer perform Prefessional Servies for ARRA M&I Services for the Window Replacement contract for the Gerald W. Heaney Federal Building and U.S Courthouse, 515 West 1st Street, Duluth MN 55802. The Duluth Federal Building Window Replacem General Services Administration / Public Buildings Service 3/30/2010
BROOKS RANGE CONTRACT SERVICES, INC. $7,188 Contract : Operations & Maintenance Support Services for the lighting Study at the Chamblee IRS Annex building Chamblee, Georgia. This is a support function where we provide help on a 'as asked' basis with a not to exceed dollar amount. Final total for hours and wa General Services Administration / Public Buildings Service 2/19/2010
ORION ENVIRONMENTAL, INC. $10,375 Contract : Allowed empoyment of 3 persons for 2 weeks in addition to supply and equipment purchase. General Services Administration / Public Buildings Service 1/14/2010
RAAD CONSTRUCTION GROUP, LLC $1,097,001 Contract : System Upgrade & Energy Conservation Measures Project at Newark, NJ VA Federal Building General Services Administration / Public Buildings Service 3/25/2010
C H M P INC $7,245 Contract : This award supports the boiler and heating system upgrades at the Federal Building in Flint, Michigan by providing submittal review. The upgrades to the heating and boiler systems will increase cost efficiency and energy conservation. General Services Administration / Public Buildings Service 3/30/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $61,882 Contract : Art Conservation Services for Sculpture by Marshall M. Fredericks and a mosaic at Federal Building in Cincinnati, OH. General Services Administration / Public Buildings Service 3/31/2010
FIDELITY TECHNOLOGIES CORPORATION $3,552 Contract : To provide Operation and Maintenance Contractor Support Services for the Re-commissioning project at the Hayneworth and Russell Federal Office Building/Courthouse buildings in Greenville and Spartanburg South Carolina General Services Administration / Public Buildings Service 2/24/2010
IDENTIX INCORPORATED $12,449 Contract : Purchase and Installtion of Livescan Fingerprinting Equipment, sold to GSA, installed at 200 Chestnut Street, Suite 200, Philadelphia PA. Customer contact is Norman Jordan. General Services Administration / Public Buildings Service 3/24/2010
URS GROUP, INC. $0 Contract : WORK ORDER TO PROVIDE ASBESTOS AIR MONITORING FOR THE 3 PROJECTS AT THE DAYTON FEDERAL BUILDING AND US COURTHOUSE, 200 WEST SECOND STREET, DAYTON, OH. TAS::47 4543::TAS Provide Asbestos Monitoring services for the Dayton Recovery Project General Services Administration / Public Buildings Service 3/23/2010
GOVERNMENT CONTRACT SOLUTIONS INC $226,462 Contract : PROVIDE GSA, PBS, PROJECT MANAGEMENT FOR OPERATIONS (7POP), WITH CONTRACT PROJECT MANAGEMENT SUPPORT SERVICES ASSIGNED TO LITTLE ROCK, AR. FOR ARRA - POP 10/1/2010 TO 9/30/2011 General Services Administration / Public Buildings Service 3/16/2010
JBLANCO ENTERPRISES, INC. $2,504,189 Contract : Roof Replacement on Buildings 1A, 40, and 50 located at W.6th Ave & Kipling St. Denver, CO 80226. General Services Administration / Public Buildings Service 3/10/2010
GASTINGER AND WALKER ARCHITECTS INC $43,831 Contract : Construction Management as Agent General Services Administration / Public Buildings Service 2/23/2010
PDG INC. $365,043 Contract : Construction Management Agent and Commissioning Agent services for Galveston United States Post Office/Courthouse repairs & alterations. (TX0081ZZ located at 601 Rosenberg St., Galveston, TX 77550). Recovery & historic preservation of the Federal Office General Services Administration / Public Buildings Service 3/04/2010
MACTEC FEDERAL PROGRAMS, INC. $782,980 Contract : THE PURPOSE OF THIS ACQUISITION IS TO OBTAIN INDUSTRIAL HYGIENE MONITORING SERVICES FOR DEPARTMENT OF THE INTERIOR MODERNIZATION, 1849 C STREET, S.W., WASHINGTON, DC, USA. General Services Administration / Public Buildings Service 3/30/2010
COMPLETE QUALITY INSTALLATION SERVICES INC $60,373 Contract : The award for this project is to improve energy efficiency through the upgrade of lighting fixtures and controls. The scope of this work requires the temporary relocation of tenants from 10 current office spaces to enable the construction contractor to General Services Administration / Public Buildings Service 3/30/2010
ADT SECURITY SERVICES, INC. $90,483 Contract : Install security devices in the 5th floor swing space of the Birch Bayl Federal Building and U.S. Courthouse. General Services Administration / Public Buildings Service 3/19/2010
CNV SERVICE COMPANY, L.L.C. $1,960 Contract : O&M support services for the lighting study at the Davis Horton FB, Memphis, TN. No work has been performed by CNV on this project to date. General Services Administration / Public Buildings Service 2/18/2010
SYNTHESIS INC $2,469,112 Contract : Installed localized lighting controls for automatic lighting control in all common building areas and tenant spaces. Installed conduit, wiring, switches, timers, fixtures, sensors, override switches, remote power packs, and other required materials. General Services Administration / Public Buildings Service 3/29/2010
M. A. MORTENSON COMPANY $146,117,823 Contract : Our awarded contract is for the design and construction for the modernization of the Byron G Rogers Federal Office Building located at 1961 South Street in Denver, Colorado. The renovation of the 620,000 square foot building will include upgrades to the s General Services Administration / Public Buildings Service 2/17/2010
BBIX, LLC $40,622 Contract : Energy Conservation Measures at Gignoux CH, Portland ME and Burlington CH / Federal Building, Burlington, VT. In accordance with Design Criteria for MEP services Performance Specifications dated December 18, 2010. General Services Administration / Public Buildings Service 1/25/2010
M & H ARCHITECTURE & CONSTRUCTION CONSULTING $126,549 Contract : Provide Construction Management Services for the ARRA construction projects for Carson City Federal Building, Carson City, NV. Provide construction oversite and contract administration for ARRA funded construction projects General Services Administration / Public Buildings Service 3/25/2010
JANKI CONSTRUCTION, INC. $589,265 Contract : Tenant Improvement on the first floor of a Federal Building located in St. Alban's VT. Tenant Improvement is comprised of mechanical, electrical, drywall, painting, flooring, hardware, and bullet resistance work. General Services Administration / Public Buildings Service 3/19/2010
FIDELITY TECHNOLOGIES CORPORATION $75,720 Contract : Lighting Retrofit?.Provideservices to make repairs to the existing lighting systems to make them more energy efficient and meet GSA and IEC standards General Services Administration / Public Buildings Service 2/26/2010
WHITING-TURNER CONTRACTING COMPANY, THE $8,011,219 Contract : Replacement of Heating, Ventilation, and Air Conditioning (HVAC) and Lighting systems at the Centers for Medicare and Medicaid Services (CMS) Complex in Woodlawn, Maryland. This work includes the general house chillers and cooling towers, firetube boilers General Services Administration / Public Buildings Service 2/18/2010
JONES STUDIO INC $6,411,005 Contract : Architectural Design of buildings and structures for the Mariposa Land Port of Entry in Nogales, Arizona. This work will create an higher functioning more efficient land port of entry. General Services Administration / Public Buildings Service 3/22/2010
C DESIGN INC $99,948 Contract : This project is to study options and make recommendations for a photovoltaic system to be located at the IRS Service Center in Memphis, TN. This single level cement structure, built in 1996, contains approximately 905,000 gross square feet of space. The General Services Administration / Public Buildings Service 9/17/2009
SELLEN CONSTRUCTION CO., INC. $73,201,826 Contract : The project is a redevelopment/modernization of a portion of the existing 1202 Building Warehouse located at the Federal Center South - Seattle. The primary tenant will be the U.S. Army Corps of Engineers (USACE) Seattle District. The redeveloped/modern General Services Administration / Public Buildings Service 3/26/2010
CONSTRUCTION & TELECOMMUNICATION SERVICES, INC. $185,079 Contract : Project consisted of demolition of approximately 20,000 sq feet of office space. Demo included, rugs, VCT, acoustical ceiling, electrical, gypsum wall board, metal stud framing, doors and hardware, HVAC and plumbing. Repairs associated with contract inclu General Services Administration / Public Buildings Service 1/20/2010
JOHNSON ROOFING & CONSTRUCTION, INC. $139,930 Contract : Provide a complete solar photovaltac (PV) system on the upper roof on the Davenport US Courthouse . General Services Administration / Public Buildings Service 3/26/2010
TRANE U.S. INC. $633,739 Contract : Trane Chiller Rebuild at David Skaggs Research Center, Boulder, CO. General Services Administration / Public Buildings Service 2/16/2010
BAILEY EDWARD DESIGN, INC. $26,867 Contract : Bailey Edward architecture has been contracted to provide construction phase services for the commissioning of the Federal Building and US Courthouse in Urbana, IL. General Services Administration / Public Buildings Service 3/31/2010
ZIMMER GUNSUL FRASCA ARCHITECTS LLP $491,706 Contract : Award to provide all Labor, Materials, Equipment and Supervision to perform Pre-Design Architectural/ Engineering (A/E) Services for Federal Emergency Management Agency (FEMA) Program of Requirements for the Department of Homeland Security (DHS) Consolida General Services Administration / Public Buildings Service 7/01/2009
BHS SERVICES, INC. $10,000 Contract : Incorporate ARRA clauses to perform renovations at Minton Capehart Federal Building in Indianapolis, IN. General Services Administration / Public Buildings Service 2/23/2010
TECTA AMERICA CORP. $853,280 Contract : Re roofing for the base bid and option 1 at the Minneapolis Federal courthouse to include reroofing of Section L under the base bid and roof sections D, F, G, and H under Option 1. reroofing includes all labor, materials, equipment and supervision necessa General Services Administration / Public Buildings Service 3/29/2010
ALLIANCE ROOFING LLC $482,254 Contract : Reroof existing roof with cool roof system General Services Administration / Public Buildings Service 1/25/2010
CARDINAL ROOFING, INC. $4,178,147 Contract : A design build for roof and exterior restorations at the Customs House,Alliance Tower,Bob Casey and LaBranch FB,Houston, TX General Services Administration / Public Buildings Service 3/25/2010
WEBCO $219,892 Contract : ROOF REPAIRS FOR CHAMBERS USCH, PASADENA, CA (THIS FEDERAL COURT HOUSE IS A HISTORICAL LANDMARK BUILT IN THE 1880'S) RESTORE/REPAIR ROOF AND INSTALL NEW TITLE 24 COMPLIANT, WHITE COOL ROOF TO REDUCE HEAT GAIN AND PROVIDE 30 YEAR ROOF WARRANTY. General Services Administration / Public Buildings Service 3/29/2010
SYNTHESIS INC $924,940 Contract : High-performance lighting replacement project which will both decrease energy consumption and cost, and improve working conditions and productivity for building occupants. 1. Highly efficient overhead lighting fixtures. 2. Lower overhead lighting intensit General Services Administration / Public Buildings Service 3/30/2010
NSTAR ELECTRIC COMPANY $565,614 Contract : The project close out documents have been turned over to GSA for review/approval. The team will have project close out walk thru 7-8-11. This project will stay open because of the maintanance warranty contract. General Services Administration / Public Buildings Service 3/24/2010
CORT BUSINESS SERVICES CORPORATION $56,140 Contract : This order is to fulfill the requirement to provide office furniture rental for the Swing Chambers Project at Sam M. Gibbons CH (Bldg. No. FL0012ZZ/Project No. VFL01233) at 801 N. Florida Ave., Tampa, FL 33602-3849. General Services Administration / Public Buildings Service 2/24/2010
WEST COAST GENERAL CORPORATION $5,732,356 Contract : West Coast General competitively bid this project to General Services Administration and was awarded the contract based upon the Governments evaluation of best value. Work is scheduled to begin July 12th and continue for a year to a year and a half, proje General Services Administration / Public Buildings Service 3/26/2010
LIFE ENHANCEMENT INSTITUTE OF THE PACIFIC LLC $7,325 Contract : Provided place based, cultural based orientation and grounding seminar for PJKK Rennovatoin Project team members and stakeholders and shall include activities and exercise aimed at enhancing team building among participants. Services included a meeting fa General Services Administration / Public Buildings Service 2/05/2010
JACOBS TECHNOLOGY INC. $646,840 Contract : GSA REGION 4 ARRA ENGINEERING SUPPORT MECHANICAL AND ELECTRICAL ENGINEERING SUPPORT FOR GSA REGION 4 ARRA FUNDED PROJECTS. MECHANICAL AND ELECTRICAL ENGINEERING SUPPORT FOR GSA REGION 4 ARRA FUNDED PROJECTS. General Services Administration / Public Buildings Service 3/05/2010
PRESTIGE CORPORATE RELOCATION $8,181 Contract : Prestige shall perform all of the services required to remove the existing specified office furniture, equipment, and related supplies (hereinafter called ?property?) from the existing location, transport and set up the property at the designated areas wi General Services Administration / Public Buildings Service 3/19/2010
MOCA SYSTEMS, INC. $927,466 Contract : Construction Scheduler Services for Region 5, Chicago Category #1 projects. Construction projects include: Chicago Federal Center Plaza;Kluczynski FB & Loop USPO; 230 S. State Street; 536 S. Clark Street FB; Chicago Federal Center Loop USPO Station; US Cu General Services Administration / Public Buildings Service 2/27/2010
TISHMAN/AECOM, A JOINT VENTURE $2,904,952 Contract : Tishman/AECOM will provide Certified Quality Management Services over Security/IT/Electrical Upgrades at Saint Elizibeth Campous, Washington DC during the Moderization of Saint Elizibeth. General Services Administration / Public Buildings Service 11/06/2009
JAY SHAPIRO & ASSOCIATES INC. $1,910,669 Contract : Design Construction Quality Management (DCQM) Services in Cincinnati, OH General Services Administration / Public Buildings Service 1/07/2010
M. A. MORTENSON COMPANY $3,074,743 Contract : The work covered by this contract was awarded to our company on March 23, 2010. The first phase work scope included only Construction Manager as Constructor Preconstruction services for the Tenant Improvement in the existing Federal Office Building locat General Services Administration / Public Buildings Service 3/23/2010
FORRESTER CONSTRUCTION COMPANY $8,422,380 Contract : Forrester Construction will work on the Design Build Energy Retrofit of the Alcohol, Tobacco and Firearms Facility in Martinsburg, West Virginia. This project includes the addition of geo-thermal heating, ventilation and air conditioning systems and phot General Services Administration / Public Buildings Service 3/29/2010
CLASSIC SITE SOLUTIONS, INC. $476,237 Contract : Provide advanced energy metering systems at seven federal office buildings and U.S. Courthouses. Includes electrical power and water usage metering equipment and systems for gathering the information and linking it back to the GSA modem and internet back General Services Administration / Public Buildings Service 3/26/2010
ROUNTREE PLUMBING AND HEATING INC. $25,241 Contract : Water Conservation Plumbing, Restroom Fixtures Replacement General Services Administration / Public Buildings Service 2/12/2010
CITIZENS TITLE & TRUST $2,983 Contract : Escrow/Title Services General Services Administration / Public Buildings Service 3/04/2010
KGCI INC $765,444 Contract : Advanced Metering Eight federal buildings MA,NH,VT & ME. General Services Administration / Public Buildings Service 3/30/2010
C DESIGN INC $91,269 Contract : The project includes the design and installation of a complete flat roof self-ballasted photovoltaic system at the Terry Sanford Federal Building in Raleigh, North Carolina. The system includes: photovoltaic modules, mounting systems, data acquisition s General Services Administration / Public Buildings Service 3/22/2010
LAND ACQUISITIONS, INC. $2,370 Contract : Planning Meeting for Vanburen LPOE project General Services Administration / Public Buildings Service 2/22/2010
ASPHALT MAINTENANCE INC $23,468 Contract : Relocate an office from the first floor to the basement in the Boggs Courthouse. Wilmington, Deleware. General Services Administration / Public Buildings Service 2/09/2010
AT YOUR SERVICE HEATING & COOLING, LLC $982,096 Contract : Energy upgrades - Mechanical, Electrical & Plumbing upgrades at the Carson City Federal Building, Carson City, NV General Services Administration / Public Buildings Service 3/12/2010
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. $641,570 Contract : install lighting control system- 26 federal plaza, NY, NY-, cost of arra funding outcome is $0. no ivoices submitted General Services Administration / Public Buildings Service 1/29/2010
PAGE CONSERVATION, INC. $567,683 Contract : The project award is for conservation treatment of 26 of the 33 historic murals located in the Birch Bayh Federal Building and US Courthouse Indianapolis, IN. Conservation treatment commenced in mid- November 2010. Protection was provided for floors an General Services Administration / Public Buildings Service 3/31/2010
SOUTHWEST CONSTRUCTION & PROPERTY MANAGEMENT $3,328,647 Contract : The purpose of this project is to provide a roof system(s) that balances and meets the ARRA requirements, initial capital, sustainability, life costs, good stewardship, and historical preservation and performance for the Federal Center South Building 1201 General Services Administration / Public Buildings Service 3/19/2010
JACOBS TECHNOLOGY INC. $977,356 Contract : The contract scope of services for the Wayne Aspinall Federal Building includes Pre?Design Phase Services to assist, review and provide technical support during the procurement process. Specifically, the Construction Manager will compile and/or develop th General Services Administration / Public Buildings Service 3/23/2010
URS GROUP, INC $37,431 Contract : TAS::47 4543::TAS. CONSTRUCTION MANAGEMENT SERVICES FOR THE RESTROOM MODERNIZATION PROJECTS AT THE ELIZABETH KEE FEDERAL BUILDING IN BLUEFIELD, WV AND THE MT. HOPE FEDERAL BUILDING AND GARAGE IN MT. HOPE, WV. Provide quality assurance construction phase General Services Administration / Public Buildings Service 2/25/2009
OKE-THOMAS+ASSOCIATES, INC. $1,526,777 Contract : Design-Build project for roof replacement work at Sioux City Federal Courthouse in Sioux City, Iowa General Services Administration / Public Buildings Service 2/02/2010
MATSUO ENGINEERING CENTERRE CONSTRUCTION A JOINT VENTURE $26,202,874 Contract : Design/build award to protect and upgrade the existing 78 year old facility. Upgrades will include major heating, ventilation, air conditioning and electrical switchgear, plumbing, interior and exterior finishes. A complete package. Project Location, Den General Services Administration / Public Buildings Service 3/17/2010
APSI CONSTRUCTION MANAGEMENT $447,278 Contract : Provide Construction Management as Agent (CMa)services for the Land Port of entry in Loring, MT General Services Administration / Public Buildings Service 3/12/2010
JACOBS PROJECT MANAGEMENT CO. $501,071 Contract : ARRA RAY Mechanical Upgrades at the Robert A. Young Federal Building located on 1222 Spruce St., St. Louis, MO 63103. This project will make general modifications to the Mechanical Environmental Systems, Removal and replacement of computer room air condit General Services Administration / Public Buildings Service 3/08/2010
TENG & ASSOCIATES, INC. $333,188 Contract : Replace dampers and chilled water valves at the Air Handlers and Cooling Towers at the James Lawrence King Federal Justice Building. Dampers and valves to be wired and integrated into the new control system. General Services Administration / Public Buildings Service 3/26/2010
ALYSON SHOTZ STUDIO $225,000 Contract : The artist will be visiting the site in Andover, MA, on 4/5/10 for the purpose of proposing an artwork for the location. General Services Administration / Public Buildings Service 3/16/2010
CS TECHNOLOGY, INC. $506,476 Contract : Relocate IT / Data equipment consisting of servers, storage racks, misc. server support components from GSA's Central Office (CO) 1800 F Street, NW, Washington, DC to both GSA's Region 6 (R06) Office at 1550 East Bannister Road, Kansas City, MO 64131-3088 General Services Administration / Public Buildings Service 1/14/2010
ARCHITECTURE COMPANY, THE $9,163 Contract : Develop American Land Title Association (ALTA) Survey of Yuma, AZ courthouse. Supply draft ALTA Survey within 30 calendar days from General Services Administration's Notice to Proceed (dated March 18, 2010) to include seven copies and one copy in electron General Services Administration / Public Buildings Service 3/18/2010
ALABAMA POWER COMPANY $712,973 Contract : Provide all labor, materials, equipment and supervision necessary for design and construction of relighting project at John Campbell United States Court House, Mobile, Alabama. General Services Administration / Public Buildings Service 3/31/2010
ROBERT GIBB & SONS, INC. $3,512,961 Contract : Recovery - building improvements / alterations - federal building and Post Office - Fargo, North Dakota. The desired outcome of the project is to improve the efficiency of the Heating, Cooling, Ventilation, and Air Conditioning (HVAC) equipment in the bu General Services Administration / Public Buildings Service 2/26/2010
URS GROUP, INC. $583,382 Contract : RECOVERY - CONSTUCTION MANAGER (CM) SERVICES FOR A PRESSURE VACUUM (PV) SYSTEMS, DENVER FEDERAL CENTER, LAKEWOOD, CO General Services Administration / Public Buildings Service 3/30/2010
SIEMENS INDUSTRY INC. $4,932,548 Contract : upgrade building automation system (including but not limited to demand control ventalation, variable flow devices on hot water pumps, install VFD on chiller #10, variable air flow controller replacement, air balance at air handlers, install energy meters General Services Administration / Public Buildings Service 3/29/2010
PARSONS GOVERNMENT SERVICES INC. $4,894,613 Contract : Construction management services for energy improvement projects conducted within 23 major federal buildings in downtown Washington, DC. Strategic renovations include solar energy solutions, high efficiency equipment and lighting upgrades, and the instal General Services Administration / Public Buildings Service 3/31/2010
JACOBS TECHNOLOGY INC. $434,276 Contract : Provide services to prepare a scope of work and estimate package for the solicitation of design / build contracts for six federal buildings in Region 2. The contractor will attend a kick-off meeting, review reports and other relative background informatio General Services Administration / Public Buildings Service 2/19/2010
GRUNLEY CONSTRUCTION CO., INC. $25,450,759 Contract : This project consists primarily the exterior facade renovation of the US Custom House building in Philadelphia, Pennsylvania. Work consists of replacement of the operable window sashes, window lead paint removal, window repairing, terra cotta repairs and General Services Administration / Public Buildings Service 3/10/2010
BROOKS RANGE CONTRACT SERVICES, INC. $17,469 Contract : Operations & Maintenance Support for Recommissioning Services at the Sam Gibbons USCT - Tampa, Fl - FL0012ZZ. This support is based on gov needs on a hour by hour basis with a not to exceed amount. Final amount and hour can't be determined till main rec General Services Administration / Public Buildings Service 2/10/2010
BSA/LB&B JOINT VENTURE $12,397 Contract : O&M Support for the Re-commissioning services at Covington, KY General Services Administration / Public Buildings Service 2/18/2010
MUGEN CONSTRUCTION, INC. $187,104 Contract : Modernization project for Energy Conservation Measures at G.R.Ford Federal Building & U.S. Courthouse, Grand Rapids, MI General Services Administration / Public Buildings Service 12/16/2009
PEPPER CONSTRUCTION GROUP LLC $12,767,403 Contract : The current overall purpose of the award is to upgrade and modernize the John W. Peck Federal building's existing ceilings and lighting, Renovation of the North tower restrooms, installation of stairway markings, Fire Alarm and sprinkler upgrades, Elect General Services Administration / Public Buildings Service 3/25/2010
FIRST WORLD ARCHITECTS STUDIO, PSC $955,147 Contract : Providing Owner Construction Representative Services and administration on site at US Joseph P Kinneary Courthouse Project, in Columbus, Ohio to assist in the management of General Contractor and sub contracting companies through the fulfillment of their General Services Administration / Public Buildings Service 3/29/2010
WESTERN ALLIED MECHANICAL, INC. $2,882,244 Contract : Heating, Ventilation and Air Conditioning improvements at Phillip Burton Federal Building General Services Administration / Public Buildings Service 3/11/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $10,488 Contract : Art Conservation Services for Sculpture. General Services Administration / Public Buildings Service 1/06/2010
JIM COOLEY CONSTRUCTION, INC. $5,632,481 Contract : HURRICANE IKE DAMAGE - REPAIR AND ALTERATIONS TO USPO/COURTHOUSE IN GALVESTON TX General Services Administration / Public Buildings Service 1/28/2010
ENVIRONMETEO SERVICES INC $914,750 Contract : *RECOVERY*Third Party Industrial Hygiene Oversight and Monitoring Services in support of the Repair and Alteration of the Prince Jonah Kuhio Kalanianaole U.S. Courthouse (Part I) located at 300 Ala Moana Boulevard, Honolulu, Hawaii General Services Administration / Public Buildings Service 3/25/2010
JOHNSON ROOFING & CONSTRUCTION, INC. $794,745 Contract : This award amount is modification to the contract. Remove all of the existing ballasted EPDM membrane, existing rigid insulation, and existing gypsum fill, down to the existing deck General Services Administration / Public Buildings Service 3/29/2010
URBAN SERVICES GROUP, INC. $34,306 Contract : To provide site coordination, utility outage and circuit breaks services for shutdowns for Federal Buildings in Gadsden, MS, Jacksonville, FL, Columbia, SC, Birmingham, AL, and Knoxville, TN General Services Administration / Public Buildings Service 4/05/2011
ACCO ENGINEERED SYSTEMS, INC. $250,927 Contract : ARRA (American Recovery and Reinvestment Act) - HVAC (Heating Ventilation and Air-Conditioning) / Mechanical Improvement at Chet Holifield Federal Building, Laguna Niguel, CA General Services Administration / Public Buildings Service 3/26/2010
BALFOUR BEATTY CONSTRUCTION, LLC $20,000 Contract : Purchase Order to pay stipend for alternative design proposed for the solicitation for the design/build renovations at the Leland Federal Building in Houston, TX General Services Administration / Public Buildings Service 3/31/2010
URS GROUP, INC $1,729,635 Contract : Lighting Retrofits - The GSA seeks to complete lighting retrofits on multiple federal courthouses and federal buildings throughout the Sunbelt Region. The lighting retrofits will utilize the latest lighting practices and equipment to enhance energy effici General Services Administration / Public Buildings Service 3/30/2010
WESTERN ALLIED MECHANICAL, INC. $6,274,589 Contract : Heating, Ventilation and Air Conditioning/Mechanical renovations to USGS Buildings at 345 Middlefield Rd in Menlo Park, CA General Services Administration / Public Buildings Service 3/26/2010
STOUTAMIRE WALKER INFORMATION TECHNOLOGY SERVICES INC $2,322,251 Contract : Modernizing building systems for energy conservation measures at the IRS Annex, Chamblee, GA. and Richard B. Russell Federal Building and U.S. Courthouse, Atlanta, GA. General Services Administration / Public Buildings Service 3/29/2010
BROOKS RANGE CONTRACT SERVICES, INC. $20,196 Contract : Operation & Maintenance Support Services for Recommissioning Services at the Richard B Russell FBCT Atlanta, Georgia - GA0121ZZ. This is a support function type job on a hour by hour basis to support others in the recommisssioning effort with a not to ex General Services Administration / Public Buildings Service 2/11/2010
AT YOUR SERVICE HEATING & COOLING, LLC $815,958 Contract : Provide individual escorting service for various subcontractors providing service for 'Recovery' Repairs and Alterations at PJKK Federal Building & Courthouse in Honolulu, HI General Services Administration / Public Buildings Service 3/25/2010
STANDARD SOLAR, INC. $3,302,610 Contract : Design and installation of polycrystalline silicon solar panels on the roof of the Terry Sanford Federal Building. This includes photovoltaic panels, mounting systems and associated electrical work for a complete turn-key project. The goal of the projec General Services Administration / Public Buildings Service 3/02/2010
ULTEIG ENGINEERS, INC. $49,087 Contract : We will provide construction management/project management for the Bozeman, Montana Federal Building. In this quarter, the project was supported by American Recovery and Reinvestment Act funds. General Services Administration / Public Buildings Service 3/29/2010
SMITH ENVIRONMENTAL AND ENGINEERING $13,484 Contract : DENVER FEDERAL CENTER WILDLIFE MANAGEMENT General Services Administration / Public Buildings Service 2/12/2010
FEDSERV INDUSTRIES, INC. $13,147 Contract : O&M Support Services for Utility Shutdowns, Greensboro, NC General Services Administration / Public Buildings Service 2/22/2010
C H M P INC $21,138 Contract : This award supports the chller and cooling system upgrades at the Federal Building in Flint, Michigan by providing construction management and inspection services and record documents. the upgrades to the chiller and cooling suystem will increase cost ef General Services Administration / Public Buildings Service 3/30/2010
ROBLES AND SONS, INC. $42,722 Contract : ARRA Emergent Repairs, Falcon Dam, TX. Electrical, plumbing and HVAC inspections, repairs and preventative maintenance General Services Administration / Public Buildings Service 2/02/2010
ULTEIG ENGINEERS, INC. $402,539 Contract : We will provide construction management services for the Antler, North Dakota Border Station site. In this quarter, the project was supported by American Recovery and Reinvestment Act funds. General Services Administration / Public Buildings Service 3/11/2010
PREMIER WEST CONTRACTORS, INC. $84,678 Contract : The award purpose is the induction of lamps for lighting in the parking lot at the Lloyd George United States Courthouse at 333 S. Las Vegas Blvd., Las Vegas, NV 89101. General Services Administration / Public Buildings Service 3/29/2010
ANDERSON HALLAS ARCHITECTS, PC $268,964 Contract : Services required to implement Energy Conservation Measures as identified in the Design Documents for the David Skaggs Research Center Energy conservation projects plans and specifications dated February 16, 2010 and Chiller Rebuild Specification dated Ja General Services Administration / Public Buildings Service 3/26/2010
COOPER ZIETZ ENGINEERS, INC $470,590 Contract : Construction management services for construction of a new land port of entry at Frontier, WA. General Services Administration / Public Buildings Service 3/11/2010
ARS MECHANICAL, LLC $200,548 Contract : DESIGN BUILD BOILER REPLACEMENT Federal Courthouse/Post Office Athens, GA General Services Administration / Public Buildings Service 3/26/2010
TISSA ENTERPRISES, INC. $27,712 Contract : Provide and install two new electric meters for the Motor Control Center 'MCC-CP-1-LL' and Distribution Panel 'DP-CP-1'. The new meters shall be intergrated into the power monitoring system for a new energy and billing report for data center energy consum General Services Administration / Public Buildings Service 3/17/2010
VISIONARY INTEGRATION PROFESSIONALS LLC $227,132 Contract : In Fort Worth, Texas, Project Management services will be in support of projects funded by the American Recovery and Reinvestment Act (ARRA) with the goal of decreasing the energy consumption and increasing the value of General Services Administration (GS General Services Administration / Public Buildings Service 3/03/2010
PRO-MARK SERVICES, INC. $424,469 Contract : Projects at Lancaster and Roseau Minnesota Land Port of Entrys. Inventory existing mechanical and electrical equipment, evaluate equipment condition and suitablitiy for long term use, perform preventative maintenance and minor repairs to deteriated or non General Services Administration / Public Buildings Service 2/02/2010
ENOVITY, INC. $89,424 Contract : ARRA (American Recovery and Reinvestment Act) - BAS (Building Automation Services) Reprogramming Project at Phillip Burton Federal Building and United States Courthouse, 450 Golden Gate Avenue, San Francisco, CA General Services Administration / Public Buildings Service 1/04/2010
PREVENTIVE MAINTENANCE SERVICES COMPANY $1,206,779 Contract : Apply Cool Roof Coating to existing roof membranes for Buildings 41 and 25 located on the Denver Federal Center, Lakewood Colorado General Services Administration / Public Buildings Service 3/20/2010
RANGEL CONSTRUCTION COMPANY LLC $562,617 Contract : Design/build to provide alterations/improvements to the Federal Building/Courthouse in Rapid City, South Dakota General Services Administration / Public Buildings Service 2/26/2010
NMIS-MEP DESIGN GROUP, LLC $2,973,371 Contract : Upgrade Chiller, Boilers, and High Efficiency Pumps & Motors. General Services Administration / Public Buildings Service 3/24/2010
ONSITE CONSTRUCTION & ENGINEERING, INC. $103,925 Contract : Plumbing - Replacement of 36 Urinal Plumbing Fixtures at Coyle U.S. Courthouse, 2500 Tulare St., FRESNO, CA No work on the 4th quarter. Waiting for mod from Government. 2nd quarter received deductive Mod changing the contract total to $109,925.17. General Services Administration / Public Buildings Service 2/21/2010
URS GROUP, INC $843,469 Contract : TAS::47 4543 ::TAS CONSTRUCTION MANAGEMENT SERVICES FOR THE GREEN/BRYNE FEDERAL COMPLEX. Provide on-site Inspection of Restroom Renovation on 23 floors. General Services Administration / Public Buildings Service 3/19/2010
HAYRE MCELROY & ASSOCIATES LLC $1,345,450 Contract : Provide Quality Assurance Management and Inspection/Testing for renovation and expansion of the Prince Jonah Kuhio Kalanianaole Federal Building and US Courthouse, Honolulu, Hawaii. Outcome is to ensure proper construction of the Federal Building and US C General Services Administration / Public Buildings Service 3/18/2010
PAGE CONSERVATION, INC. $11,369 Contract : Conservation assessment of five murals at the Department of the Interior Building Washington DC. Assessment of the murals was submitted to GSA. General Services Administration / Public Buildings Service 1/12/2010
KMEA $392,760 Contract : This position is for a person to perform the duties of Construction Coordinator including coordination of Building Tenants, Maintenance & Operations Contractor, Federal Protective Service, General Services Administration Project Management, the GSA Contra General Services Administration / Public Buildings Service 3/25/2010
ST. ANDREWS CONSTRUCTION SERVICES CORP. $1,508,314 Contract : The ECM recommissioning project consists of numerous elements throughout the building in order to conserve energy. The Project is located at the Byron White Courthouse in Denver, CO. General Services Administration / Public Buildings Service 3/05/2010
NORTHWESTERN CORPORATION $4,848 Contract : monthly utility charges General Services Administration / Public Buildings Service 1/14/2010
TABCON, INC. $1,304,806 Contract : Work will consist of replacing 20 American Blower air handlers that are at the end of their useful life with 20 new air handling units. All air-cooled condensing units associated with the air handlers will be replaced. Ductwork from the new mechanical e General Services Administration / Public Buildings Service 3/25/2010
RAAD CONSTRUCTION GROUP, LLC $286,399 Contract : Provide Services for the complete design and installation of a new roof top Heating Ventilation and Air Conditioning unit at the Robert Roe Federal Building in Paterson, NJ General Services Administration / Public Buildings Service 5/27/2010
JACOBS TECHNOLOGY INC. $16,791 Contract : Thomas P. O'NeiII Federal Building Estimating Services for Phase III - Eleventh Floor Renovations - Boston MA. Project scope includes cost estimating for the O'Neill Phase III renovation; PBS Permanent Location. The Project will total approximately 54,000 General Services Administration / Public Buildings Service 4/06/2010
DIVERSIFIED MECHANICAL LIMITED $12,081 Contract : Operations and Maintenance support for recommissioning and lighting studies at Buildings NC0005AE and NC0002AE in Asheville NC. Lighting study is an energy efficiency test. Recommissioning study is to determine where there can be cutbacks on the cost of l General Services Administration / Public Buildings Service 2/17/2010
BRASFIELD & GORRIE, L.L.C. $20,000 Contract : PROVIDE SCHEMATIC DESIGN STIPEND FOR PHASE II DESIGN SOLICITATION - GT MICKEY LELAND FEDERAL BUILDING REPAIRS AND ALTERATIONS. General Services Administration / Public Buildings Service 3/31/2010
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. $1,909 Contract : Post Construction Contract Services (PCCS) related to the addition of insulation, replacement of doors and replacement of sealants. This project's primary goal is to help reduce energy usage through improved insulation values in strategic areas. The lar General Services Administration / Public Buildings Service 3/25/2010
ENOVITY, INC. $124,584 Contract : ARRA (American Recovery and Reinvestment Act) - Engineering Assessment and Specifications for Design-Build HVAC/BAS (Heating, Ventilation, Air Conditioning and Building Automation Services) Project at Lloyd George United States Courthouse, Las Vegas, NV. General Services Administration / Public Buildings Service 1/04/2010
M.E.R.I.T. INVESTIGATIVE SERVICES, INC. $753,184 Contract : Design and Implement Energy Conservation Measures at the U.S. Courthouse lcated at 500 Pearl Street, NY,NY. General Services Administration / Public Buildings Service 3/30/2010
JOHNSON AND WOOD, LLC $256,531 Contract : Chiller System Upgrades at the Flint Federal Building in Flint, Michigan. Interior work consists of removal of existing chilled water piping, chillers, and water pumps in the basement level mechanical room. New construction includes the installation of ne General Services Administration / Public Buildings Service 3/29/2010
C H M P INC $99,176 Contract : This award supports the upgrades to the lighting and building automation systems at the Federal Building and U.S. Courthouse in Ann Arbor, Michigan by providing construction management and inspection services. The upgrades to the Heating, Ventilation, Ai General Services Administration / Public Buildings Service 3/25/2010
PCL CONSTRUCTION SERVICES, INC $1,232,541 Contract : This contract amount was awarded for realignment and removal of exisitng undergraound utilities to accommodate future construction under separate contract at the Denver Federal Center. Utilities to be realigned include water, telecom, electrical, irregati General Services Administration / Public Buildings Service 3/30/2010
BHS SERVICES, INC. $10,000 Contract : Incorporate ARRA clauses to perform renovations at Birch Bayh Federal Building in Indianapolis, IN. General Services Administration / Public Buildings Service 2/23/2010
ECOGREEN SERVICES, LLC $132,874 Contract : Water Conservation Project - Restroom Fixtures Replacement for Federal Buliding - Will update plumbing fixtures and Conserve Water resources and reduce maintenance of restroom fixtures General Services Administration / Public Buildings Service 3/11/2010
GRAYCOR CONSTRUCTION COMPANY INC. $2,554,109 Contract : The main objective of the project is to provide a controlled high quality indoor environment that is acceptable to the occupants using the space while increasing the energy efficiency of the building. For this project the issues that will be addressed in General Services Administration / Public Buildings Service 3/29/2010
EMCOR GOVERNMENT SERVICES, INC. $10,000 Contract : Installation of two dedicated circuits for the 1PC copier and 1PC shredder General Services Administration / Public Buildings Service 1/31/2010
ENOVITY, INC. $109,243 Contract : ARRA (American Recovery and Reinvestment Act) - Engineering Assessment and Specifications for Design-Build HVAC/BAS (Heating, Ventilation, Air Conditioning and Building Automation Systems) Project at Chet Holified Federal Building, Laguna Niguel, CA General Services Administration / Public Buildings Service 1/04/2010
ALLEN BRADBURY CONSTRUCTION LLC $777,576 Contract : Award includes design-build construction services at the GSA Region 10 Administration Building in Auburn, WA, for the building energy upgrades to the Heating Venting & Air-conditioning (replacement of boiler and chiller, conversion of existing constant vo General Services Administration / Public Buildings Service 3/25/2010
MASSACHUSETTS ELECTRIC COMPANY $100,000 Contract : Lighting upgrade project consisting of three proposals for upgrade of 864 fixtures. The lighting upgrade project was implemented at the GSA?s courthouse facility at Worcester, MA. The project was 100% installed and signed off by the facility manager in D General Services Administration / Public Buildings Service 3/23/2010
CMC & MAINTENANCE, INC. $17,032 Contract : escort for recommissioning project and lighting study at the US Federal Building in Mobile ALABAMA, General Services Administration / Public Buildings Service 2/23/2010
GEORGIA POWER COMPANY $1,912,684 Contract : Provide all labor, equipment, materials and supervision necessary for relighting project at Atlanta Federal Center in Atlanta, Georgia, as noted below in the place of primary performance. General Services Administration / Public Buildings Service 3/15/2010
JOPPA MAINTENANCE CO., INC. $48,269 Contract : FURNISH ALL MATERIALS, LABOR, EQUIPMENT AND SUPERVISION NECESSARY TO REMOVE EXISTING TREES ON THE NORTHEAST CORNER OF THE DFC AS DIRECTED BY THE SCOPE OF WORK General Services Administration / Public Buildings Service 1/07/2010
M.E. GROUP, INC. $796,900 Contract : Commissioning services for the Chavez Memorial Building, U.S. Custom House Modernization, and Byron White Courthouse. The purpose of this project is to perform a detailed retro commissioning study on said facility and provide energy conservation measures General Services Administration / Public Buildings Service 3/21/2010
CTA INC. $629,449 Contract : Construction management services for Design and Construction of a new land port of entry along the Northern Border of the United States in Scobey Montana. General Services Administration / Public Buildings Service 2/26/2010
FEDSERV INDUSTRIES, INC. $778 Contract : Recommissioning and Lighting Study at the FM Johnson Federal Bldg/Courthouse in Montgomery, AL General Services Administration / Public Buildings Service 3/10/2010
SWANK ENTERPRISES $40,000 Contract : Billings MT Courthouse Stipend General Services Administration / Public Buildings Service 4/01/2010
PARK TOWER METRO VIEW MANAGEMENT, L.P. $7,771 Contract : BUILDING TUNE UP General Services Administration / Public Buildings Service 1/04/2010
VE CSIE JV $299,056 Contract : The purpose of this project is to provide construction administration (CA) services for the CMS complex Energy Project for 16 months. General Services Administration / Public Buildings Service 2/19/2010
GHAFARI ASSOCIATES, L.L.C. $195,213 Contract : The work is the preparation of drawings and specification for the in place abandonment of the existing steam perimeter system heating and piping system and the installation of new variable air volume (VAV) units. The variable air volume units will include General Services Administration / Public Buildings Service 3/31/2010
URS GROUP, INC. $95,605 Contract : Design services, Post Construction Award Contract Services, Construction Inspection Services, Record Docs for Interior Lighting Direct Digital Control System Project at the Seiberling Courthouse; POST CONSTRUCTION CONTRACT SERVICES (PCCS), MANAGEMENT AND General Services Administration / Public Buildings Service 9/14/2009
AT YOUR SERVICE HEATING & COOLING, LLC $38,509 Contract : Bring existing HazMat surveys in compliance General Services Administration / Public Buildings Service 2/18/2010
WILLIAM LOWE & SONS CORP. $24,375 Contract : Provided the labor, trucks, equipment and materials necessary to remove excess from various areas on the 10th & 11th floors at the Tip O'Neill Building in Boston using American Recovery Reinvestment Act funds. General Services Administration / Public Buildings Service 6/23/2010
ENOVITY, INC. $84,006 Contract : ARRA (American Recovery and Reinvestment Act) - Engineering Assessment and Specifications for Design-Build HVAC/BAS (Heating, Ventilation, Air Conditioning and Building Automation Services) at Edward J. Schwartz Federal Building & United States Courthouse General Services Administration / Public Buildings Service 1/05/2010
FIRE AND SECURITY, INC. $661,769 Contract : Installation of Fire Alarm Devices Government Funded/Awarded-at various buildings throughout the SouthEast Sunbelt Region General Services Administration / Public Buildings Service 3/31/2010
HCBECK LTD $14,347,332 Contract : Design Build modernization of the Wayne Aspinall Federal Building located in Grand Junction, Colorado General Services Administration / Public Buildings Service 6/28/2010
J. E. NOVACK CONSTRUCTION CO. $10,312,343 Contract : This award includes Construction Manager as Constructor (CMc) Services for the Robert A. Young American Recovery and Reinvestment Act Mechanical Project at the Federal Building. CMc services for this project include attending design review meetings at the General Services Administration / Public Buildings Service 3/26/2009
HONEYWELL INC. $7,029,557 Contract : This task order provides for the implementation of Energy Conservation Measures at the facilities identified in the attached DOE (Department of Energy) RFP (request for proposal) dated 3/30/10. The contractor shall provide all necessary labor, material an General Services Administration / Public Buildings Service 3/30/2010
CLARK CONSTRUCTION GROUP-CALIFORNIA, LP $40,000 Contract : Funds were issued as a stipend to unsuccessful offerors. No subcontracts were issued as a result of this stipend. General Services Administration / Public Buildings Service 1/28/2010
ALUTIIQ MANUFACTURING CONTRACTORS, LLC $29,398,788 Contract : The project consists of the exterior removal of existing punched windows and curtainwall on two twenty- four floor high rise tower and one four floor low rise tower. All work consists of removing the windows from the exterior during night time hours and General Services Administration / Public Buildings Service 3/29/2010
OCCU-TEC, INCORPORATED $14,788 Contract : N. Platte, NE, FOB and USPO - Asbstos abatement air monitoring. General Services Administration / Public Buildings Service 5/11/2010
SKIDMORE, OWINGS & MERRILL LLP $40,442 Contract : The design team will review the lighting study dated December 11, 2009 by Ghafari & Associates as in relates to the EM Dirksen project. The design team will coordinate with the GSA to determine the appropriate light levels for the EMD lobby; this will inc General Services Administration / Public Buildings Service 6/01/2010
INDUSTRIAL ROOFING CO. $1,899,948 Contract : Replace and Re-Roof the Rudman and Cleveland Federal Buildings. Install a Complete Photovoltaic system on the Cleveland building Roof and install an Extensive Vegation System on Rudman Roof General Services Administration / Public Buildings Service 6/04/2010
I. H. I. $28,962 Contract : To provide hazardous materials testing services for the Federal Building, 50 United Nations Plaza, San Francisco. Provide design phase on-site monitoring for hazardous materials, obtain samples when professionally indicated, and report results of analysi General Services Administration / Public Buildings Service 5/07/2010
TURTLE ASSOCIATES LLC $6,710,726 Contract : This energy conservation and renewable energy conservation project is located in Brooklyn, NY. Along with the base contract, which includes a mechanical upgrade of removing old chillers and boilers and replacing with new, there will be work completed on General Services Administration / Public Buildings Service 3/31/2010
TURTLE ASSOCIATES LLC $25,896,738 Contract : Design Build Energy Conservation Measures Construction project. General Services Administration / Public Buildings Service 3/31/2010
L B & B ASSOCIATES INC. $45,957 Contract : After Hours to Escort, Assist and monitor contractors for the ARRA Energy projects at the Bruce R. Thompson U.S. Federal Courthouse General Services Administration / Public Buildings Service 3/25/2010
JPE, INCORPORATED $248,607 Contract : US Marshal Build-Out, Bldg 67 Furnish all materials, labor, equipment and superviison necessary to build-out Room 112 of B 67. General Services Administration / Public Buildings Service 6/29/2010
ERIE AFFILIATES INC $1,383,127 Contract : Installing a Direct Digital Control lighting system to the building. Installing energy saving lightfixture to be controled by the new Direct Digital Control System in Akron, Ohio. (DDC system). General Services Administration / Public Buildings Service 3/25/2010
MADISON SERVICES, INC. $190,648 Contract : TO CREATE A TEMPORARY WORK SPACE FOR THE US BANKRUPTCY COURT. General Services Administration / Public Buildings Service 2/18/2010
TABCON, INC. $1,448,488 Contract : Remove existing roof system, insulation, sheet metal, and other related components/accessories. Install new high thermal resistance value insulation, cool energy star rated roof system, sheet metal and other related components/accessories. Remove deteri General Services Administration / Public Buildings Service 5/14/2010
SCHNEIDER ELECTRIC USA, INC $5,111 Contract : Schneider Electric to provide services to connect the four advanced electrical meters on the two incoming 480volt services and two lighting sub-panels in the J Caleb Courthouse and Federal Building in Wilmington DE and display data on the main Square D/Sc General Services Administration / Public Buildings Service 5/26/2010
DESIGN BUILD CONTRACTORS, LLC $4,121,147 Contract : Replace existing roof on 4 GSA buildings. Overall goals are to bring up to code, help buildings become more green, General Services Administration / Public Buildings Service 5/20/2010
GEORGIA POWER COMPANY $350,275 Contract : Provide all labor and materials to complete relamping project at Richard B Russell Federal Building in Atlanta, Georgia as noted in the place of primary performance section. General Services Administration / Public Buildings Service 3/31/2010
JACOBS PROJECT MANAGEMENT CO. $47,736 Contract : This ARRA project is Design-Build and will replace the stone coping and the roofs on Buildings 10SL, lO5F, lO5E, 141C, 108A, 122B and 108B of the Goodfellow federal complex.The project is for approximately 12 months of construction management which will i General Services Administration / Public Buildings Service 4/12/2010
JACOBS PROJECT MANAGEMENT CO. $25,908 Contract : This ARRA project is Design-Build and will provide necessary masonry repairs and tuckpointing on the buildings of 103F, 102E, 103E and 105L of the Goodfellow federal complex.The project is for approximately 4 months of construction management which will i General Services Administration / Public Buildings Service 4/12/2010
D.E.W. CONSTRUCTION CORP. $3,800,109 Contract : Upgrade the Lighting Systems and Building Automation and Energy Management Systems at the Cleveland and Rudman Federal Buildings in Concord, NH. Perform a complete lighting fixture replacement with energy efficient units General Services Administration / Public Buildings Service 5/28/2010
TURTLE ASSOCIATES LLC $12,626,705 Contract : IRS Customer Service Center located in Holtsville, NY is a design build project. Along with the the design documents, the work to be completed on this project includes a mechanical upgrade,a base control upgrade and a lighting control upgrade. In additi General Services Administration / Public Buildings Service 5/28/2010
ENOVITY, INC. $217,501 Contract : ARRA (American Recovery and Reinvestment Act) Retro-Commissioning of the Schwartz Federal Building & United States Courthouse, San Diego, CA. PS01 ($5,417) - Analysis of Economics of Retrofitting of the Chiller Plant. General Services Administration / Public Buildings Service 3/29/2010
BAILEY EDWARD DESIGN, INC. $67,987 Contract : Bailey Edward has been contracted to perform architectural and engineering construction management and inspection services for the Energy Management System and Lighting Upgrades at the E. Ross Adair Federal Building and US Courthouse in Ft. Wayne, Indiana General Services Administration / Public Buildings Service 4/15/2010
SOLUTION ENGINEERING HAWAII , INC. $29,223 Contract : IRS Antenna Move from the Kuhio Federal Building to One Waterfront Tower. General Services Administration / Public Buildings Service 6/15/2010
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. $18,455 Contract : Post Construction Contract Services (PCCS) and Construction Management & Inspection Services (CM&I) related to the removal and replacement of a roof for Building #4 at the Hart-Dole-Inouye Federal Center. The improvements made under this project reduce e General Services Administration / Public Buildings Service 5/27/2010
GARLAND COMPANY INC, THE $626,491 Contract : Restore roof at Jeffersonville Federal Center in Jeffersonville, IN General Services Administration / Public Buildings Service 3/31/2010
GASTINGER AND WALKER ARCHITECTS INC $129,570 Contract : We performed Construction Manager as Agent services on this project in Sioux City Iowa. Construction work is now 100% complete. General Services Administration / Public Buildings Service 3/31/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $11,355 Contract : Testing and reserach for temporary removing sculpture at Federal Building for building rennovations. General Services Administration / Public Buildings Service 6/18/2010
PRESTIGE CORPORATE RELOCATION $561,870 Contract : Prestige shall perform all of the services required to remove the existing specified office furniture, equipment, and related supplies (hereinafter called ?property?) from the existing locations, transport and set up the property at the designated areas w General Services Administration / Public Buildings Service 5/26/2010
GHAFARI ASSOCIATES, L.L.C. $221,540 Contract : The Project is the restoration of the Chicago Federal Center (CFC) Plaza. The plaza is surrounded by the Dirksen Federal Courthouse, Kluczynski Federal Building and the United States Postal Service Loop Station. The three buildings and plaza were designed General Services Administration / Public Buildings Service 5/14/2010
PROGRESSIVE SERVICES, INC. $805,717 Contract : ROOF REPLACEMENT FEDERAL BUILDING & US COURTHOUSE, PEORIA, IL General Services Administration / Public Buildings Service 3/30/2010
MESA ENERGY SYSTEMS, INC. $1,719,560 Contract : HVAC/Mechanical Improvement at Roybal Federal Building, 255 E. Temple, Los Angeles, CA 90012: implement mechanical and building automation system (BAS) improvements including: Task 1-condenser water variable frequency drives (VFDs); Task 2-primary loop ch General Services Administration / Public Buildings Service 3/26/2010
SMI SIGN SYSTEMS, INC. $12,240 Contract : Design, manufacture and deliver digitally printed acrylic posters to be displayed in lobby of GSA Buildings announcing renovations in progress. SMI to include display easels for posters General Services Administration / Public Buildings Service 5/25/2010
CARDINAL ROOFING, INC. $1,889,767 Contract : A design build for roof replacement and exterior restoration at A. Maceo Smith Federal Building, Dallas, TX. General Services Administration / Public Buildings Service 3/30/2010
HILLDRUP COMPANIES, INC. $80,810 Contract : 1. Packing, loading, and relocate 185 employees and approximately 67,000 files to the new location at the El Nuevo Dia Bldg. a. Includes: i. All packing materials ii. Equipment & resources iii. Complete packing and loading and assembly of the files. General Services Administration / Public Buildings Service 6/29/2010
MCKINSTRY ESSENTION, INC. $1,534,318 Contract : ARRA 2009 funded Contract Award under Building Services to install Advanced Metering for Water, Steam, Gas, Fuel/Oil and/or Electrical based on the site specific utilities for GSA owned properties within GSA Region 10 for compliance with the Energy Indep General Services Administration / Public Buildings Service 3/31/2010
NORTHERN MANAGEMENT SERVICES, INC. $2,855 Contract : Furnish all labor, materials and equipment to extend copper refrigerant lines, suction lines and electrical connections for the roof top condenser units at the Lee Federal Courthouse, 141 Church St., New Haven, CT. General Services Administration / Public Buildings Service 5/26/2010
URS GROUP, INC. $117,054 Contract : Construction Management Assist and Commissioning Services for the Spokane Federal Building / US Post Office Building Upgrades Project. General Services Administration / Public Buildings Service 6/03/2010
CTI AND ASSOCIATES, INC. $2,974 Contract : Asbestos Testing - Chiller Project - Flint Federal Building General Services Administration / Public Buildings Service 6/15/2010
JAY SHAPIRO & ASSOCIATES INC. $627,257 Contract : Construction Management Services for Building Systems Project at IRS Brookhaven Customer Service Center in Holtsville, NY. General Services Administration / Public Buildings Service 6/23/2010
SHEEHY CONSTRUCTION COMPANY $7,655,673 Contract : The purpose of the Pierre Federal Building project is to modernize the building by replacing the existing curtain wall system, mitigate water infiltration issues and repair stone soffit panel connections while updating the architectural appeal of the buil General Services Administration / Public Buildings Service 3/19/2010
PAGE CONSERVATION, INC. $18,409 Contract : Assess conservation needs for paintings, provide recommendations for removal and storage of work during a construction project and reinstallation at a new location. Provide conservation treatment. The painting affected by this work is Boxcar Grand by Sam General Services Administration / Public Buildings Service 3/31/2010
MADISON SERVICES, INC. $1,822,747 Contract : REPLACE HEATING AND COOLING SYSTEMS, REPLACEMENT AND/OR MODIFICATION OF SELECTED AHU'S, LIGHTING/ELECTRICAL UPGRADES AND INSTALLATION OF VARIOUS SYSTEMS COMPONENTS FOR USE AS PART OF FUTURE TENANT HVAC INSTALLATIONS. MINOR WALL/CEILING CONSTRUCTION AND P General Services Administration / Public Buildings Service 3/11/2010
HUGHES ASSOCIATES, INC. $147,150 Contract : Provide fire protection engineering support services to the General Services Administration (GSA) Safety, Environment and Fire Protection Engineering Branch (Washington, DC) including suppression and detection system design reviews of submitted design pro General Services Administration / Public Buildings Service 6/23/2010
PCL CONSTRUCTION SERVICES, INC $2,346,489 Contract : This project is to change out the mechanical and electrical systems in the building to achieve greater energy efficiency using Recovery Act Funds. Located in Boulder,CO General Services Administration / Public Buildings Service 3/17/2010
JOHNSON CONTROLS, INC. $382,630 Contract : American Recovery & Reinvestment Act Cooling Tower Water Treatment Project 1 Federal Building 2800 Cottage Way, SACRAMENTO, California Project 2 Matsui United States Courthouse 501 I Street, SACRAMENTO, California General Services Administration / Public Buildings Service 3/31/2010
HBRA ARCHITECTS INCORPORATED $201,845 Contract : Professional services for the construction phase of the Lipinski Federal Building Lobby Renovation (Chicago, IL). General Services Administration / Public Buildings Service 3/26/2010
LANPACIFIC, INC. $302,268 Contract : Project Support for Edith Green Wendell Wyatt Modernization. While building out new tenant spaces, various scope gaps have been identified. The purpose of this contract is to fill those scope gaps. This may include and is not limited to total or partia General Services Administration / Public Buildings Service 9/29/2010
TUNISTA SERVICES, LLC $59,750 Contract : The contractor is expected to provide adequate materials, labor, supervision, supplies and equipment necessary to relocate the Federal Bureau of Investigation/Small Business Administration/United States Coast Guard offices from Prince Jonah Kuhio Federal General Services Administration / Public Buildings Service 6/04/2010
CCI GROUP, LLC $4,408,926 Contract : DESIGN BUILD RETRO-COMMISSIONING (RECX) CONSTRUCTION SERVICES AT THE FRANK JOHNSON US COURT HOUSE ANNEX, MONTGOMERY, AL General Services Administration / Public Buildings Service 3/26/2010
FIRE AND SECURITY, INC. $417,744 Contract : INSTALLATION OF FIRE ALARM DEVICES .WE RECEIVED GOVERNMENT CONTRACT FUNDS at various buildings throughout southeast sunbelt region General Services Administration / Public Buildings Service 3/25/2010
BAILEY EDWARD DESIGN, INC. $18,053 Contract : Bailey Edward architecture has been contracted to perform architecture and engineering post construction contract award services for the Energy Management System Upgrade and Lighting at the E Ross Adair Federal Building and United States Courthouse in Ft. General Services Administration / Public Buildings Service 4/15/2010
ROTH, MICHAEL & ASSOCIATES ARCHITECTS & PLANNERS, INC. $65,204 Contract : Under the American Recovery and Reinvestment Act (ARRA) of 2009, funding has been released to improve energy efficiency and sustainability in existing federal buildings. The work to be delivered under this task order includes, but is not limited to: The General Services Administration / Public Buildings Service 6/14/2010
APPLIED ENVIRONMENTAL, INC. $433,796 Contract : GSA Modernization Project - Monitor hazardous material abatement (asbestos and lead based paint) activities. Indoor Air Quality screenings will be conducted to verify adequate enginneering controls are being utilized to prevent dust/odor from constructi General Services Administration / Public Buildings Service 6/09/2010
APSI CONSTRUCTION MANAGEMENT $87,232 Contract : Provide Construction Management as Agent (CMa) and Commissioning Services (CMx) for the FDA Building in Bothell, WA General Services Administration / Public Buildings Service 5/06/2010
BBIX, LLC $71,731 Contract : This project involves providing Construction Inspection Services and contract administration of the Moakley FCH VRF project. General Services Administration / Public Buildings Service 5/17/2010
CHEROKEE GENERAL CORPORATION $336,088 Contract : Hatfield Federal Courthouse Portland, Oregon. Upgrade or replace the existing Lighting Controls System and the Building Automation System (BAS), including system presentation and installation of the new components/equipmentmaterials, including labor and s General Services Administration / Public Buildings Service 6/30/2010
GASTINGER AND WALKER ARCHITECTS INC $117,010 Contract : Carlson Federal Building & Courthouse, Topeka, KS We performed Construction Manager as Agent services on this project in Topeka, Kansas including construction review. Project is complete. General Services Administration / Public Buildings Service 4/08/2010
BBIX, LLC $624 Contract : Fire Protection Engineering Services Regarding the Garage Lighting at the J. Moakley Courthouse Boston, MA General Services Administration / Public Buildings Service 6/30/2010
SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC. $325,368 Contract : The project includes but is not limited to the following Work: Removal of existing light fixtures indicated on Drawings and replace ductwork to support the new air handling unit. Replace EMS system serving the entire building. General Services Administration / Public Buildings Service 3/31/2010
CARTER GROUP, INC., THE $547,678 Contract : Move Management and Related Services associated with the Patrick V. McNamara ARRA project, Detroit, MI General Services Administration / Public Buildings Service 3/12/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $22,499 Contract : Conservation treatment of sculpture at the Federal Building in Puerto Rico. General Services Administration / Public Buildings Service 6/15/2010
MARTEC CONSTRUCTION, INC $66,485 Contract : Replacement of economizer dampers General Services Administration / Public Buildings Service 3/31/2010
HILL INTERNATIONAL, INC. $171,670 Contract : To provide Construction Management Administration and Commissioning services for both the cooling tower project and the energy conservation upgrade projects located at the James A. McClure Federal Building and Court House in Boise, Idaho. General Services Administration / Public Buildings Service 3/04/2010
APSI CONSTRUCTION MANAGEMENT $74,560 Contract : Provide Construction Management as Agent (CMa) services for the Lighting Upgrades Project in US Courthouse, Seattle, WA General Services Administration / Public Buildings Service 5/04/2010
ED A. WILSON INC. $5,208 Contract : relocate card access system from 6th floor to basement General Services Administration / Public Buildings Service 5/12/2010
MELWOOD HORTICULTURAL TRAINING CENTER, INC. $8,404 Contract : Provide labor and materials to assist Siemens Building Technologies commissioning team. The work is to include: (1) Verify all control sequences current set points to original design intent: (2) Conduct a thorough trend logging of all occupancies and va General Services Administration / Public Buildings Service 2/25/2010
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC $92,582 Contract : Conservation treatment of sculpture at the Federal Building in Newark, NJ. General Services Administration / Public Buildings Service 6/11/2010
MIDDLEBROOK, JASON $260,122 Contract : Art work commissioned for Federal Courthouse in Billings Montana. Artwork will be installed in two locations in front of the building and on the side of the building. Artwork material will range from steeel to stone and local companies will be evolved in General Services Administration / Public Buildings Service 4/05/2010
OUDENS & KNOOP ARCHITECTS, P.C. $52,524 Contract : Site Survey for future NSC Sites on forthcoming Design Build Bid projects. The team was tasked to survey multiple sites in Maryland, whose locations were to remain descrete until after bid and award. General Services Administration / Public Buildings Service 6/10/2010
JACOBS TECHNOLOGY INC. $475,605 Contract : The goal of this project is to identify Energy Conservation Measures (ECMs) that reduce energy consumption, develop scopes of work, then develop construction documentation, and implement the opportunities that will provide an energy savings. The final ste General Services Administration / Public Buildings Service 6/07/2010
ENOVITY, INC. $503,438 Contract : *Recovery* Building Commissioning Services at the PJKK United States Courthouse, Honolulu, Hawaii. General Services Administration / Public Buildings Service 3/31/2010
EMCOR GOVERNMENT SERVICES, INC. $19,962 Contract : Provide support for an energy study for BBIX for the Retro-Commissioning study. EMCOR will provide personnel, building automation system and boiler technician and air balancer General Services Administration / Public Buildings Service 3/24/2010
ROOFING RESOURCES INC $85,260 Contract : Construction Administration Services - Design Review, Project Oversight and Inspection Services. Byrd Courthouse Roof Replacement Charleston, WV General Services Administration / Public Buildings Service 6/09/2010
OAC SERVICES, INC. $4,703,183 Contract : Construction Manager as Agent Services for the Design and construction of the U.S. Federal Courthouse Billings, Montana General Services Administration / Public Buildings Service 12/17/2009
NEDERLAND REFRIGERATION, AIR CONDITIONING, AND HEATING CORPORATION $878,990 Contract : Commissioning of Byron Rogers Federal Office Building and Court House General Services Administration / Public Buildings Service 3/29/2010
HIW-KC ORLANDO, LLC $1,369,010 Contract : Government to lease existing office space for 4-year term in Seaside Plaza Building in Orlando, FL. General Services Administration / Public Buildings Service 9/10/2009
PAGE CONSERVATION, INC. $22,718 Contract : The project has been awarded to perform full conservation treatment for the mural entitled - Autumn Expansion by artist Yvonne Jacquette. The mural is located at the Margaret C. Smith Federal Building Bangor, ME. This federal building is undergoing reno General Services Administration / Public Buildings Service 6/09/2010
PCL CONSTRUCTION SERVICES, INC $1,489,382 Contract : This project consists of electrical and mechanical upgrades to the building to achieve greater energy efficiency using Recovery Act funds. Project is located in Cheyenne, WY. General Services Administration / Public Buildings Service 3/19/2010
WESTON EID INC $128,354 Contract : Provide seismic design for the Track Shed side of Building 110. The design will provide columns to independently support the track shed from the basement floor through the dock/basement roof structure. Provide mechanical design for the Track Shed side of General Services Administration / Public Buildings Service 4/26/2010
M.E. GROUP, INC. $226,100 Contract : COMMISSIONING SERVICES FOR THE WAYNE ASPINALL FEDERAL BUILDING IN GRAND JUNCTION, CO. THE COMMISSIONING SERVICES WILL INCLUDE, BUT ARE NOT LIMITED TO REVIEW OF ALL CONSTRUCTION DOCUMETNS, DESING/BUILD DOCUMENTS, CONSTRUCTION OBSERVATION, EQUIPMENT TESTIN General Services Administration / Public Buildings Service 6/17/2010
L B & B ASSOCIATES INC. $9,796 Contract : Miscellaneous projects at Moynihan Building General Services Administration / Public Buildings Service 4/13/2010
JACOBS PROJECT MANAGEMENT CO. $47,736 Contract : ARRA Repair of Copings and Roofs at Goodfellow Federal Complex. This ARRA project is Design-Build and will replace the stone coping and the roofs on Buildings BI02E, 103E, 104F and 106 of the Goodfellow federal complex. The project is for approximately 12 General Services Administration / Public Buildings Service 4/09/2010
AMERICON, INC. $3,626,636 Contract : ARRA - Design-Build Tune Up (Mechanical & Electrical System Revisions). Provide Design-Build services to implement energy conservation measures at the Theodore Roosevelt U.S. Courthouse, Brooklyn, NY that were identified in the retro-commissioning report General Services Administration / Public Buildings Service 5/27/2010
GEO-MARINE, INC. $4,113,097 Contract : Advance metering installation for 45 buildings in GSA Region V: IL0032ZZ CUSTOMHOUSE 610 S Canal St Chicago IL 60607 IL0054ZZ FEDERAL BLDG 536 Clark St Chicago IL 60605 IL0069EF USCH 750 Missouri Ave E. St. Louis IL 62201 IL0154ZZ FED BLDG & USCH 100 N.E. General Services Administration / Public Buildings Service 3/29/2010
CCB, INC. $2,532,865 Contract : Furnish and install a new variable refrigerant flow system on the 9th and 10th floors of the Moakley Courthouse. General Services Administration / Public Buildings Service 7/02/2010
ARTISAN CONSTRUCTION ENTERPRISES, INC. $53,595 Contract : Recommissioning Project at the Paul Finley Federal Building & United States Court House, 600 E. Monroe, Springfield, IL General Services Administration / Public Buildings Service 12/15/2009
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. $12,762 Contract : Construction Management & Inspection Services (CM&I) related to the installation of additional insulation, replacement of doors and replacement of exterior sealant. This project's primary goal is to help reduce energy usage through improved insulation va General Services Administration / Public Buildings Service 3/25/2010
URS CORPORATION $271,164 Contract : Construction management for energy improvement projects (HVAC, controls, plumbing, lighting, PV and revolving doors). General Services Administration / Public Buildings Service 3/29/2010
TK SERVICES, INC. $129,128 Contract : Provide escorting and technical assistance to the FOB 6 in Washington DC. General Services Administration / Public Buildings Service 4/30/2010
EPSILON SYSTEMS SOLUTIONS, INC. $348,009 Contract : Provide professional services to administer and complete three major scope services in accordance with the statement of work: 1. Big Four Decision Points. Passive Optical Network, Management Services, Operations and Management Time period and moving of ex General Services Administration / Public Buildings Service 4/29/2010
CITY OF BILLINGS $984 Contract : Provide water utility services during transition period for new federal courthouse to be built at 2nd Ave N and N 26th Street Billings, MT 59101 General Services Administration / Public Buildings Service 1/14/2010
ROOFING RESOURCES INC $58,800 Contract : Construction Administration Services - Bluefield West Virginia Courthouse Roof Replacement. Design Review, Inspection Services and Project Oversight. General Services Administration / Public Buildings Service 4/30/2010
STYLO CONSTRUCTION CORPORATION $2,460 Contract : To construct a new wall. Prime and paint the wall. Install new cove base. General Services Administration / Public Buildings Service 4/12/2010
CI INTERNATIONAL, INC. $5,828 Contract : Provide Executive Organizing Consulting to Senior Leaders. The consulting is designed to improve job performance and in turn produce business results. Services provided to GSA 18&F St NW Washington DC 20405. General Services Administration / Public Buildings Service 5/25/2010
COMMERCIAL FACILITIES MANAGEMENT, INC. $34,697 Contract : Controls Project to control and maintain chiller General Services Administration / Public Buildings Service 3/31/2010
EMCOR GOVERNMENT SERVICES, INC. $75,000 Contract : To provide escorts for the Tip O'Neill Federal Building Project Support for the 9, 10, and 11 floors. For the mechanical rooms, system shut downs and sprinkler drain downs.Escorts for Fire Alarm Technician services associated with GSA contruction work and General Services Administration / Public Buildings Service 5/27/2010
SCHNEIDER ELECTRIC USA, INC. $125,483 Contract : ADVANCED METERING EQUIPMENT AND INSTALLATION SERVICES FOR THE REAGAN FEDERAL BUILDING/COURTHOUSE IN HARRISBURG, PA AND THE NEALON COURTHOUSE AND ANNEX IN SCRANTON, PA. General Services Administration / Public Buildings Service 6/08/2010
GILBANE BUILDING COMPANY $86,043,846 Contract : Design/Build repairs and alterations to the Leland Federal Building in Houston, TX to include the following: Replacement of the building exterior fa+?ade, including upgrade of related structural supporting components; upgrades to the lighting systems for General Services Administration / Public Buildings Service 3/30/2010
AGL RESOURCES INC. $677,780 Contract : Remove Atmospheric Boilers approximately 40 years old and replacing with >95% efficient condensing boiler by using funds provided by the Recovery act. General Services Administration / Public Buildings Service 3/22/2010
MERRY, CARNELL, SCHLECHT, INC. $17,040 Contract : Field work and provision of Geotechnical Study Report for the New Federal Courthouse in Yuma, Arizona. General Services Administration / Public Buildings Service 3/17/2010
SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC. $16,288,821 Contract : Energy Saving performance contract with implementation of energy Conservation measures in federally owned buildings throughout Texas General Services Administration / Public Buildings Service 3/30/2010
BHS SERVICES, INC. $206,520 Contract : Incorporate ARRA clauses to perform renovations at the Kenneth B. Keating Building, Rochester, NY. General Services Administration / Public Buildings Service 3/31/2010
ALLIANCE TO SAVE ENERGY $22,000 Contract : The General Services Administration (GSA) Office of Federal High-Performance Green Buildings and the Alliance to Save Energy, with co-sponsorship of the American Institute of Architects (AIA) and the American Society of Heating, Refrigerating, and Air-Con General Services Administration / Public Buildings Service 5/19/2010
MACBRIDE, JAMES H $12,748 Contract : CM Office-Construction (3rd fl., Wm. J. Green Federal Building). General Services Administration / Public Buildings Service 4/21/2010
ORTIZ GROUP ENGINEERING AND CONSTRUCTION SERVICES CORP. $1,219,417 Contract : The contractor shall provide a total 'turnkey' project including design, manufacturing and installation services for the installation of rooftop mounted utility interactive photovoltaic systems at the Ron de Lugo FOB in USVI General Services Administration / Public Buildings Service 2/07/2011
CRS-CORPORTE RELOCATION SYSTEMS INC $4,921 Contract : Move stored items from 26 Federal Plaza - Room B48 to 201 Varick Street. General Services Administration / Public Buildings Service 4/16/2010