Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
MG-1005 LLC | $3,520,152 | Contract | : The Byron Rogers Federal Building is undergoing a major renovation. The regional Social Security Administration was a tenant in the building and had to be relocated while this work was being completed. They have signed a 3-year lease at 1001-17th Street | General Services Administration / Public Buildings Service | 3/13/2010 |
G. H. FORBES ASSOCIATES ARCHITECTS, P.C. | $41,026 | Contract | : Construction Management & Inspection (CM&I) Services including meetings, field inspection and contract modifications related to the replacement of a boiler heating system for the Kalamazoo Federal Building. The improvements in energy efficiency for this | General Services Administration / Public Buildings Service | 11/16/2010 |
RRC-HILLMANN JV | $1,275 | Contract | : Duch Shaft Sampling and Limited Asbestos Investigation and Lead Screening Services. | General Services Administration / Public Buildings Service | 11/18/2010 |
ACEPEX MANAGEMENT CORPORATION | $5,784 | Contract | : This contract is used to track labor hours in support of the Seattle Courthouse ARRA program. There are a total of 70 hours available overall; an estimated 45 hours regular time and 25 hours overtime. There are no subcontractors planned for this work. | General Services Administration / Public Buildings Service | 12/02/2010 |
FEDSERV INDUSTRIES, INC. | $52,535 | Contract | : Provide maintenance personnel to support the RAY ARRA Mech Project @ the Robert A. Young Federal Building, 1222 Spruce St., St. Louis, MO 63103. Construction work is being performed after hours. | General Services Administration / Public Buildings Service | 1/27/2011 |
SDC, INC. | $57,086 | Contract | : Provides Project Management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. Purpose of award is to provide administrative services to GSA in Denv | General Services Administration / Public Buildings Service | 12/17/2010 |
FTSS JOINT VENTURE | $28,141 | Contract | : removal of shrubs | General Services Administration / Public Buildings Service | 3/16/2011 |
CYNTERGY AEC, L.L.C. | $56,223 | Contract | : The overall purpose of the project Contract Management services for Tulsa Window Replacement is to ensure the replacement of existing windows with new blast resistant windows on the Tulsa Federal Building in Tulsa, Oklahoma is constructed according to pla | General Services Administration / Public Buildings Service | 3/03/2011 |
AT YOUR SERVICE HEATING & COOLING, LLC | $1,017,275 | Contract | : Provide all labor, material and equipment required to furnish and install one new revolving door in an existing aluminum store front system. Provide all labor, material and equipment to install Therm-O-Lite blast resistant window system - aluminum. Locate | General Services Administration / Public Buildings Service | 11/30/2010 |
WILSON 5 SERVICE COMPANY, INC. | $1,398 | Contract | : Provide 2 technician to shut down the winter steam and turn back on in coordination with the advance metering project from the region. Work was performed at the Moore head Federal building 1000 Liberty Ave.Pittsburgh PA. | General Services Administration / Public Buildings Service | 11/24/2010 |
GMC6 PROPERTIES LLC | $397,704 | Contract | : Tenant Improvements for Internal Revenue Service office located at 561 25 Road, Unit #C, Grand Junction CO 81505. | General Services Administration / Public Buildings Service | 7/08/2010 |
BAVINGTON, TIM STUDIO | $150,000 | Contract | : General Services Administration Art-in-Architecture program award to create a work of art for the Edith Green and Wendell Wyatt Federal Building in Portland, Oregon. | General Services Administration / Public Buildings Service | 10/09/2010 |
GEOSYNTEC CONSULTANTS INC | $5,010 | Contract | : Design review of design document for photovoltaic ground array project. Task 1 is the design review of construction documents for storm water management compliance with energey and independence security act. Task 2 stormwater pollution prevention plan rev | General Services Administration / Public Buildings Service | 11/18/2010 |
EXHIBIT ARTS LLC | $76,220 | Contract | : Provide a cost estimator personnel for government in Kansas City | General Services Administration / Public Buildings Service | 12/13/2010 |
KIEWIT BUILDING GROUP INC. | $100,000 | Contract | : Stipend for Phase Two Submittal. Recovery - New U.S. Federal Courthouse in Yuma, AZ. | General Services Administration / Public Buildings Service | 12/15/2010 |
RRC-HILLMANN JV | $2,071 | Contract | : Asbestos and Lead Survey Screening to include sampling and Project Monitoring for the Lafayette Plaza garage area entrance, and CIT Stairwell A. Deliverable to determine if and amount of lead or asbestos present. | General Services Administration / Public Buildings Service | 10/18/2010 |
BHS SERVICES, INC. | $31,741 | Contract | : Incorporate ARRA clauses to perform renovations at the Kenneth B. Keating Building, Rochester, NY. | General Services Administration / Public Buildings Service | 10/04/2010 |
MCKOWN BELANGER ASSOCIATES, P.C. | $6,973 | Contract | : Furnishings Inventory and reconfiguration plan for agency relocation. | General Services Administration / Public Buildings Service | 3/09/2011 |
ALION SCIENCE AND TECHNOLOGY CORPORATION | $175,721 | Contract | : Provide Construction Management Services for the installation of Cooling Towers at the Frances Perkins DOL building. | General Services Administration / Public Buildings Service | 9/29/2010 |
ALLIED BUILDING SERVICE COMPANY OF DETROIT, INC. | $4,250 | Contract | : Run electrical through raceway | General Services Administration / Public Buildings Service | 11/18/2010 |
JONAS AND ASSOCIATES INC. | $561,776 | Contract | : Project Name and Location: Energy Systems Upgrades, Foley Federal Building, 300 Las Vegas Blvd South, Las Vegas, Nevada 89101. Project Summary Description: The project includes but is not limited to all supervision, labor, material and equipment for the f | General Services Administration / Public Buildings Service | 11/30/2010 |
INTERFACE CONSTRUCTION CORPORATION | $2,616,033 | Contract | : Energy Efficient Lighting Replacement @ the Charles F Prevedel Federal Building, 9700 Page Ave, Overland, MO 63132. | General Services Administration / Public Buildings Service | 10/27/2010 |
ADT SECURITY SERVICES, INC. | $14,995 | Contract | : Install entry control security device package. | General Services Administration / Public Buildings Service | 3/15/2011 |
NORTHERN MANAGEMENT SERVICES, INC. | $2,940 | Contract | : Provide Operations and Maintenance (O&M) support services for ARRA projects as described in the Scope of Work (SOW) dated October 25, 2010. These projects are for multiple locations of Oroville Border Station, Wenatchee Federal Building, Spokane PO/Federa | General Services Administration / Public Buildings Service | 1/28/2011 |
CLARK CONSTRUCTION GROUP, LLC | $34,500,000 | Contract | : Contract No. GS11P09MKC0051.RWA, Modification PC05, effective January 15, 2010, to segregate American Reinvestment and Recovery Act funded activities for Security/IT/Electrical Upgrades in the design -build work to constrct the United States Coast Guard H | General Services Administration / Public Buildings Service | 1/15/2010 |
OCCU-TEC, INCORPORATED | $4,768 | Contract | : North Platte, NE, Federal office building and court house - Asbestos abatement air monitoring | General Services Administration / Public Buildings Service | 6/23/2011 |
AMERICAN RESTORATION, INC. | $1,766,000 | Contract | : This project funding allows installation of fire stopping required to achieve or exceed life safety standards of protection for the Sam M. Gibbons US Courthouse. | General Services Administration / Public Buildings Service | 3/01/2011 |
STRATUS CORPORATION | $10,400 | Contract | : Project Monitoring for Asbestos at 26 Federal Plaza New York, NY | General Services Administration / Public Buildings Service | 1/18/2011 |
PRICEWATERHOUSECOOPERS LLP | $4,954,257 | Contract | : Provide program management and reporting services to assist the General Services Administration, Public Buildings Service (PBS), Program Management Office (PMO) in meeting the goals and requirements of transparency and accountability in carrying out Presi | General Services Administration / Public Buildings Service | 3/16/2011 |
EATON CORPORATION | $22,209 | Contract | : Provide two (2) GE AK-2A-50 used circuit breakers in rebuildable condition and conduct Class 1 reconditioning of two (2) GE AK-1A-50 circuit breakers for the 911 Federal Building, Portland, OR. ACT/PDN No: PJ1L00111 | General Services Administration / Public Buildings Service | 2/14/2011 |
RRC-HILLMANN JV | $687 | Contract | : Lead screening survey to include sampling to determine if lead present at DHS Firing Range, 26 Federal Plaza, New York, NY. | General Services Administration / Public Buildings Service | 2/15/2011 |
APSI CONSTRUCTION MANAGEMENT | $272,020 | Contract | : Mechanical engineering support services to the Architectural and Engineering Services branch at Auburn, WA | General Services Administration / Public Buildings Service | 2/28/2011 |
VETERAN FOODSERVICE SOLUTIONS, LLC | $9,188 | Contract | : Status and location of the project. If Federal bldg, name the bldg. | General Services Administration / Public Buildings Service | 4/08/2011 |
GOVERNMENT SERVICES INTEGRATED PROCESS TEAM, LLC | $432,234 | Contract | : Electrical Engineer to support the space planning, design and alterations requirements to Department of Energy (DOE) American Recovery and Reinvestment Act Program located at the James Forrestal Building. Mechanical Engineer to support the space planning, | General Services Administration / Public Buildings Service | 9/28/2011 |
LCOR ASSET MANAGEMENT LTD | $36,048 | Contract | : Installation of carbon filters at 26 Federal Plaza to mitigate the odor emanating from the waterproofing project on the plaza . | General Services Administration / Public Buildings Service | 8/29/2011 |
CAZADOR APPAREL, LLC | $381,986 | Contract | : Procure and install furniture for the Mobility labs Project at One Constitution Square. | General Services Administration / Public Buildings Service | 9/21/2011 |
MILKE, JAMES | $8,800 | Contract | : Analysis of design. | General Services Administration / Public Buildings Service | 8/09/2011 |
MACTEC FEDERAL PROGRAMS, INC. | $671,859 | Contract | : Provide additional and unanticipated asbestos and lead abatement sampling, monitoring and testing services for Phase 2 of the Systems replacement project for the Department of Commerce-Herbert C. Hoover Building in Washington, DC. *******This project has | General Services Administration / Public Buildings Service | 1/26/2011 |
BBIX, LLC | $28,903 | Contract | : Post Contract Construction Services to include construction inspections for the lighting & roof projects at the Cleveland Federal Building and Rudman Court House | General Services Administration / Public Buildings Service | 3/01/2011 |
CAZADOR APPAREL, LLC | $199,761 | Contract | : Procure and install furniture for the 7TH & 4th HPGB Space buildout for the GSA Public Building Service, Washington, DC | General Services Administration / Public Buildings Service | 3/07/2011 |
ARCHITURA CORPORATION | $23,986 | Contract | : A/E design and inspections services for the replacement of a cooling tower on the Halleck Federal Building in Lafayette, IN. | General Services Administration / Public Buildings Service | 3/17/2011 |
M V M, INC. | $2,129 | Contract | : Provide Court Security Officers at MC Smith Federal Building in Bangor, ME | General Services Administration / Public Buildings Service | 1/10/2011 |
JACOBS PROJECT MANAGEMENT CO. | $157,289 | Contract | : Provide Building Commissioning for the building system modifications to meet NARA 2009 requirements for the Veteran's Administration (VA) file storage space located in Building 104 of Goodfellow Federal Complex. ARRA VA AT BLDG. 104, 4300 GOODFELLOW, ST. | General Services Administration / Public Buildings Service | 1/27/2011 |
CORPORATE SOURCE, INC., THE | $14,953 | Contract | : The Corporate Source provides services to accommodate this project. Provided services (such as electrical interruptions, sprinkler safety, fire safety) are provided after normal business hours on an overtime basis. | General Services Administration / Public Buildings Service | 3/04/2011 |
JACOBS PROJECT MANAGEMENT CO. | $52,935 | Contract | : Construction Management Services for building systems modification to provide for the replacement of new luminaries and occupancy sensors on floors 5, 4, 3, 2, 1, B1, B2 of the Prevedel Building at the Federal Record Center. Construction Management Servic | General Services Administration / Public Buildings Service | 1/26/2011 |
YOUNG & RUBICAM INC. | $7,802 | Contract | : AMERICAN REINVESTMENT AND RECOVERY ACT (ARRA) Researching Services to support site acquisition on behalf of the US Department of State, Bureau of Diplomatic Security (DS) Foreign Affairs Security Training Center (FASTC). | General Services Administration / Public Buildings Service | 3/24/2011 |
PAGE CONSERVATION, INC. | $15,777 | Contract | : GSA Task Order is for the conservation treatment of the Louise ronnebeck mural entitled: Harvest (FA 1033) in the Wayne Aspinall Federal Building and U.S. Courthouse, Grand Junction, CO. The assessment of this mural took place in October , 2010 and the | General Services Administration / Public Buildings Service | 3/29/2011 |
APARIQ INC | $74,516 | Contract | : Construction Management Services, Cost Estimating Support Services and Technical Support per attached Scope of Work during Pre and Post-Award phases for relocation of the Immigration and Customs Enforcement, Office of Detention and Removal (ICE DRO)into t | General Services Administration / Public Buildings Service | 6/21/2010 |
ST. ANDREWS CONSTRUCTION SERVICES CORP. | $5,486 | Contract | : Painting and Carpet Cleaning at the Byron Rogers Federal Courthouse | General Services Administration / Public Buildings Service | 3/04/2011 |
ADT SECURITY SERVICES, INC. | $8,501 | Contract | : Remove existing equipment and camera power supply from GSA office on main level to US Attorney's offices. Install equipment in the network room near intrusion control panel. Cabling for four existing cameras will be rerouted to this location and reconnect | General Services Administration / Public Buildings Service | 3/30/2011 |
CARDINAL ROOFING, INC. | $1,954,969 | Contract | : A design/build for roof restoration at the Federal Courthouse, 1133 N. Shoreline Blvd., Corpus Christi, TX 78401-2003 | General Services Administration / Public Buildings Service | 3/10/2011 |
WILSON 5 SERVICE COMPANY, INC. | $5,550 | Contract | : Rewind Rudman 25HP Cooling tower fan motors for Variable Frequency drive operations.Remove motors, transport to rewind shop. Rewind To Variable Frequency Drive specification, replace bearings, clean and paint housing,reinstall on cooling towers before sta | General Services Administration / Public Buildings Service | 3/08/2011 |
URBAN SERVICES GROUP, INC. | $11,934 | Contract | : Building Support Services for ARRA Projects at the James R. Browning Courthouse, San Francisco, CA | General Services Administration / Public Buildings Service | 2/24/2011 |
FOUR SEASONS ENVIRONMENTAL, INC. | $9,838 | Contract | : For supplies and services for overtime hours in support of the Building Modernization ARRA Project at the John W. Peck Federal Building, Cincinnati, Ohio | General Services Administration / Public Buildings Service | 3/03/2011 |
COVAN WORLD-WIDE MOVING, INCORPORATED | $4,020 | Contract | : The purpose of the award was to relcoate office equipment and supplies within the USDA office in Hilo. A crew of 6 people (7 people on the secon day) moved miscellanous office equipment (including file cabinents, desks, printers and the like) from the 3rd | General Services Administration / Public Buildings Service | 12/28/2010 |
NHI/URBAN JOINT VENTURE | $6,212 | Contract | : Building Support Services for Site Coordination, Utility Outage, and Circuit Breaks at the Kefauver Federal Building and Kefauver Annex, Nashville, TN | General Services Administration / Public Buildings Service | 3/31/2011 |
CJW CONTRACTORS, INC. | $31,800 | Contract | : Fachet Interior Construction, Inc.: $2,500.00; MBJ Contracting, Inc.: $11,750.00; Carpet Fair Commercial Carpet: $2,682.40; Mona Electric Group, Inc.: $4,612.00 | General Services Administration / Public Buildings Service | 1/13/2011 |
HONEYWELL INTERNATIONAL INC. | $7,029,557 | Contract | : This task order provides for the implementation of Energy Conservation Measures (ECMs) at the facilities identified in the attached DOE (Department of Energy) RFP (request for proposal) dated 3/30/10. The contractor shall provide all necessary labor, mate | General Services Administration / Public Buildings Service | 3/30/2010 |
CATTAIL LODGE SPICE COMPANY INC. | $109,701 | Contract | : supply cafeteria equipment, Federal Building Los Angeles CA | General Services Administration / Public Buildings Service | 4/08/2011 |
M V M, INC. | $21,144 | Contract | : Provide Court Security Officers for MC Smith Federal Building in Bangor, Maine | General Services Administration / Public Buildings Service | 2/11/2011 |
BROOKS RANGE CONTRACT SERVICES, INC. | $19,984 | Contract | : Provide project support services (escort, equipment shutdowns, tie in of mechanical, fire alarm equipment) to 225 Cadman Plaza,Brooklyn, NY | General Services Administration / Public Buildings Service | 2/28/2011 |
SCHNEIDER ELECTRIC USA, INC. | $19,383 | Contract | : THE PURPOSES OF THIS CONTRACT ARE TO PROVIDE ELECTRIC, WATER, GAS, COOLING TOWER, AND STEAM ADVANCED METERING TIE IN INTEGRATIONS FOR BA04 PROJECTS FOR FEDERAL BUILDINGS, COURTHOUSES, AND US POST OFFICES IN GEORGIA, ALABAMA, FLORIDA, NORTH CAROLINA, SOUTH | General Services Administration / Public Buildings Service | 2/17/2011 |
BHS SERVICES, INC. | $5,399 | Contract | : Incorporate ARRA clauses to perform renovations at Bean Federal Building in Indianapolis, IN. | General Services Administration / Public Buildings Service | 3/16/2011 |
MELTECH CORPORATION, INC. | $877,152 | Contract | : Design/Build of the 7th and 4th Floor High Performance Greening Space Buildout at 301 7th St, Washington, DC 20407 | General Services Administration / Public Buildings Service | 3/09/2011 |
RRC-HILLMANN JV | $2,594 | Contract | : Asbestos and lead survey screening to include sampling for IRS Building, 140 Waverly Ave., Holtsville, NY. | General Services Administration / Public Buildings Service | 3/15/2011 |
STRATUS CORPORATION | $1,814 | Contract | : Lead in Air Monitoring at 26 Federal Plaza New York, NY (Garage) | General Services Administration / Public Buildings Service | 3/03/2011 |
CITY SIGN SERVICE, INC | $1,585 | Contract | : Fabricate / install directional / informational signage in first floor lobby area for Boggs Courthouse Wilmington, Delaware. | General Services Administration / Public Buildings Service | 2/25/2011 |
NORTHERN MANAGEMENT SERVICES, INC. | $14,796 | Contract | : Northern Management Services, Inc. (NMSI) shall provide all personnel and any equipment as necessary to perform Hydronic Water System Analysis and Balancing services at the Seattle Federal Office Building (FOB) located in Seattle, WA in accordance with th | General Services Administration / Public Buildings Service | 3/09/2011 |
KEVILLE ENTERPRISES, INC | $161,222 | Contract | : Provide Construction Management as Agent (CMa) services for the Heating Ventilation and Air Conditioning upgrades at the following two facilities: 1) AUTEC Building in West Palm Beach, FL; 2) Claude Pepper Federal Building and US Courthouse in Miami, FL. | General Services Administration / Public Buildings Service | 2/17/2011 |
ST LOUIS DESIGN & CONSTRUCTION, INC | $6,000 | Contract | : CONTRACTOR TO SUPPLY ALL LABOR , MATERIALS, SUPERVISION AND EPUIPMENT FOR CMc PRE-CONSTRUCTION SERVICES AT THE FEDERAL BUILDING/US COURTHOUSE, BENTON, ILLINOIS. | General Services Administration / Public Buildings Service | 9/17/2010 |
FACILITY DYNAMICS ENGINEERING CORPORATION | $12,000 | Contract | : Data gathering and inputting of data into a software program. Project location is 450 Golden Gate Avenue, San Francisco, CA 94102. | General Services Administration / Public Buildings Service | 3/07/2011 |
CMC & MAINTENANCE, INC. | $3,286 | Contract | : United states Courthouse and Federal Building, 200 west second street, dayton ohio 45202, Furnish and Install restroom signage for restroom renovations and upgrade project | General Services Administration / Public Buildings Service | 3/03/2011 |
EMCOR GOVERNMENT SERVICES, INC. | $22,000 | Contract | : Tip O'Neill Phase II Project for Construction Support Services to Install plywood over existing raised floor, demolition and installation of new carpet tile, electrical and Telephone Data and clean up for 1 PC temporary relocation to the first floor room | General Services Administration / Public Buildings Service | 1/11/2011 |
EC AMERICA, INC. | $21,696 | Contract | : profesional services fro gsa and veteran affairs at 425 eye st for furniture delivery and install coorindation | General Services Administration / Public Buildings Service | 3/14/2011 |
TRANSYSTEMS CORPORATION | $16,992 | Contract | : Aerial Photography services at the Fort Pickett Base, Nottoway County in Va for the US Departmen of Stae, Bureau of Diplomatic Security Foreign Affairs Security Training Center (FASTC) project. No processing of data is expected, however all images and da | General Services Administration / Public Buildings Service | 3/07/2011 |
SECURITY CONSTRUCTION SERVICES, INC. | $10,000 | Contract | : Provide support for ARRA projects at the Williams Coast Guard Building for escort and utility shut downs | General Services Administration / Public Buildings Service | 3/04/2011 |
GRAPHI TECH INC | $105,360 | Contract | : Provide Project Management services and oversight over and above existing contract hours alloted per the Real Estate Acquisition Group Contract. This includes after normal business hours and weekends. The work will be performed at both the lease location | General Services Administration / Public Buildings Service | 3/14/2011 |
JACOBS TECHNOLOGY INC. | $1,230,401 | Contract | : Task order for the second option year to assist the General Services Administration (GSA) Program Management Office (PMO) in the management and oversight of the American Reinvestment and Recovery Act (ARRA) projects under the Blanket Purchase Agreement (B | General Services Administration / Public Buildings Service | 3/16/2011 |
PACIFIC GAS AND ELECTRIC COMPANY | $43,274 | Contract | : Commissioning services for lighting and HVAC improvements at the Browning USCH, San Francisco, CA (ARRA) | General Services Administration / Public Buildings Service | 3/30/2010 |
ENOVITY, INC. | $252,742 | Contract | : Alerton Migration for Lloyd George Federal Building and ALC Migration for Chet Holified Federal Building. Modification PS09 - adding the migration of BAS (Building Automation System) at the James Browning USCH (United States Courthouse) into GSA (General | General Services Administration / Public Buildings Service | 3/30/2011 |
TEC INC. | $46,246 | Contract | : Environmental Constraints Review on behalf of the US Department of State, Bureau of Diplomatic Security, Foreign Affairs Security Training Center Project at Letterkenny Army Depot, PA & Scotland School for Veterans Children | General Services Administration / Public Buildings Service | 3/03/2011 |
B & H FOTO & ELECTRONICS CORP. | $38,535 | Contract | : Order has not shipped yet. | General Services Administration / Public Buildings Service | 6/06/2011 |
F & L CONSTRUCTION, INC. | $7,996 | Contract | : weekly remove, empty and return all toters to their designated location Lafayette Building Washington DC | General Services Administration / Public Buildings Service | 4/14/2011 |
SDC, INC. | $405,622 | Contract | : Provides project management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. | General Services Administration / Public Buildings Service | 4/01/2011 |
PREVENTIVE MAINTENANCE SERVICES COMPANY | $4,582 | Contract | : Labor for escorting service mechanics in high security facility. | General Services Administration / Public Buildings Service | 4/28/2011 |
L B & B ASSOCIATES INC. | $2,441 | Contract | : This award is to provide mechanical assistance in support of the Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements Project at the Patrick V. McNamara Federal Building - Ph | General Services Administration / Public Buildings Service | 4/26/2011 |
L B & B ASSOCIATES INC. | $3,209 | Contract | : This award is to provide mechanical assistance in support of the Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements Project at the Patrick V. McNamara Federal Building - Ph | General Services Administration / Public Buildings Service | 4/29/2011 |
STRATUS CORPORATION | $9,189 | Contract | : Project Monitoring, air and wipe sampling for the duration of the lead cleaning of both firing ranges in 26 Federal Plaza | General Services Administration / Public Buildings Service | 4/21/2011 |
HENSEL PHELPS CONSTRUCTION CO | $4,889,168 | Contract | : Purpose: New East Southbound Pedestrian Crossing from the San Ysidro, CA, USA into Mexico Location: San Ysidro, CA Name of Project: San Ysidro - U.S. Land Port of Entry Phase 1c: East Southbound Pedestrian Crossing Project Status: Project awarded as of Ju | General Services Administration / Public Buildings Service | 6/30/2011 |
WILSON 5 SERVICE COMPANY, INC. | $3,310 | Contract | : To provide site coordination, utility outage and circuit breaker services for shot down work done at the Frank M Johnson federal building and courthouse Montgomery AL | General Services Administration / Public Buildings Service | 5/12/2011 |
ADT SECURITY SERVICES, INC. | $612,589 | Contract | : Install security equipment for the Office of Courthouse Management (OCM). | General Services Administration / Public Buildings Service | 5/31/2011 |
HEERY INTERNATIONAL, INC. | $13,206 | Contract | : Provide quality control (QC) inspections and testing of work performed by others in Portland, OR. Systems inspected and tested include lighting controls and HVAC controls. Heery's scope of work includes development of a testing plan, review of project | General Services Administration / Public Buildings Service | 5/06/2011 |
ENOVITY, INC. | $11,552 | Contract | : Siemens BAS (Building Automation Services) Integration at Ronald Dellums Federal Building, Oakland, CA. | General Services Administration / Public Buildings Service | 4/08/2011 |
BROOKS RANGE CONTRACT SERVICES, INC. | $132,193 | Contract | : Provide temporary chiller (chiller on a truck) to be parked on Tillary Street and piped into the Duberstein Courthouse Brooklyn NY. Modification 01 entended Chiller requirement to 5/24/2011 for an additional $34,100.00 | General Services Administration / Public Buildings Service | 4/06/2011 |
CVIJANOVIC, ADAM | $66,120 | Contract | : Commission for Art in Architecture | General Services Administration / Public Buildings Service | 6/30/2011 |
PAGE CONSERVATION, INC. | $15,777 | Contract | : The Louise Ronnebeck mural, Harvest from Grand Junction, CO have been assessed in-situ and authorized for removal, transport and conservation treatment. GSA anticipates re-installation of the mural to the renovated Aspinall Federal Building. Conservation | General Services Administration / Public Buildings Service | 3/29/2011 |
NORTHWESTERN CORPORATION | $23,016 | Contract | : This was a utility bill. | General Services Administration / Public Buildings Service | 1/14/2010 |
ADT SECURITY SERVICES, INC. | $320,122 | Contract | : Install security devices for United States Marshals Service (USMS) on the first floor expansion space in the new US Courthouse. | General Services Administration / Public Buildings Service | 6/06/2011 |
CHELSEA GROUP LTD | $5,448 | Contract | : This is a reimbursement to Chelsea Group, Ltd., for the filing and payment of the Green Building Certification Institute (GBCI) registration for LEED-NC v2009 Design Review of Prince Jonah Kuhio Kalaniana'ole US Courthouse., 300 Ala Moana Blvd., Honolulu, | General Services Administration / Public Buildings Service | 6/22/2011 |
KAMRAN AND COMPANY, INC. | $90,717 | Contract | : Furnish,deliver various food service equipments to Los Angeles Federal Building | General Services Administration / Public Buildings Service | 4/08/2011 |
SPACESAVER STORAGE SYSTEMS, INC. | $6,284 | Contract | : Provide and install lockers to the GSA Denver Federal Center. | General Services Administration / Public Buildings Service | 5/26/2011 |
KODET ARCHITECTURAL GROUP LTD | $1,072,340 | Contract | : Architect and Engineer Construction Management of Independent Testing Agency Services for the Mechanical Electrcal Pluming (MEP) Replacement at the Bishop H. Whipple Federal Building in Fort Snelling, Minnesota. | General Services Administration / Public Buildings Service | 4/07/2011 |
CENTURY ENVIRONMENTAL HYGIENE, LLC | $20,000 | Contract | : Assist the General Services Administration and General Contractor during renovation of Cesar Chavez Building, 1244 Speer Blvd, Denver. Tasks to complete: 1) Conduct sampling of suspect materials and determine extent of asbestos spill if applicable, aft | General Services Administration / Public Buildings Service | 6/07/2011 |
ENVIROHEALTH TECHNOLOGIES INC | $4,475 | Contract | : Provide sampling and analysis to determine total airborne concentration of dust and, if applicable, crystalline silica on the child care center's play deck at the Robert A. Young Federal Building, 1222 Spruce, St. Louis, MO. | General Services Administration / Public Buildings Service | 4/05/2011 |
GEORGE SOLLITT CONSTRUCTION COMPANY, THE | $1,296,238 | Contract | : Construction Phase Services Exterior Stabilization, Repair and Recladding Federal Archives and Records Center, 7358 S. Pulaski Rd, Chicago, IL | General Services Administration / Public Buildings Service | 4/19/2011 |
EHS-INTERNATIONAL, INC. | $12,029 | Contract | : Monitor and report on Hazardous Materials Removal in Porthill, Idaho. | General Services Administration / Public Buildings Service | 5/18/2011 |
KCORP TECHNOLOGY SERVICES, INC. | $14,274 | Contract | : Perform work on the lattices in courtrooms at the US Coyle Courthouse Fresno California. | General Services Administration / Public Buildings Service | 5/09/2011 |
FARRELLY BUILDING SERVICES, INC | $921 | Contract | : Repair to Exhaust fan 8-3. Wires were crossed. Federal Building Chicago Illinois | General Services Administration / Public Buildings Service | 6/14/2011 |
JACOBS PROJECT MANAGEMENT CO. | $150,000 | Contract | : ARRA SAM M. GIBBONS FED. CH, MEP UPGRADE ARRA SAM M. GIBBONS FED. CH, MEP UPGRADE | General Services Administration / Public Buildings Service | 5/23/2011 |
PARADIGM SOLUTIONS CORPORATION | $1,514 | Contract | : Building 103; Switchgear Modification: Add a second set of internal CT's and wiring to a separate shorting block for GSA use inside of the new main switchboards A and B. Contractor to provide a complete system to the shorting blocks. | General Services Administration / Public Buildings Service | 4/08/2011 |
QST, INC | $15,893 | Contract | : Provide Standy Service for move in Lafayette Building in Washington DC | General Services Administration / Public Buildings Service | 5/20/2011 |
ZIMMER GUNSUL FRASCA ARCHITECTS LLP | $19,377,641 | Contract | : This project for design of facilities to house overall Department of Homeland Security (DHS) Consolidation (including Customs Border Patrol (CBP), Federal Emergency Management Agency (FEMA), Immigration and Customs Enforcement (ICE), Transportation and Se | General Services Administration / Public Buildings Service | 3/30/2010 |
FEDSERV INDUSTRIES, INC. | $1,767 | Contract | : O&M Support Services for Utility Shutdowns for Spartanburg & Greenville, SC. | General Services Administration / Public Buildings Service | 4/08/2011 |
L B & B ASSOCIATES INC. | $6,490 | Contract | : this award is to provide mechanical assistance in support of the Preconstruction & Construction Services for the Federal Bureau of Investigation Field Office Build-out and Miscellaneous Improvements Project at the Patrick V. McNamara Federal Building - Ph | General Services Administration / Public Buildings Service | 6/15/2011 |
ADT SECURITY SERVICES, INC. | $4,138 | Contract | : Security device disconnect and reinstall services at the Birch Bayh U.S. Courthourse. | General Services Administration / Public Buildings Service | 9/22/2011 |
THE WALDINGER CORPORATION | $896,985 | Contract | : Replace rooftop units for federal building in Iowa City, IA | General Services Administration / Public Buildings Service | 6/20/2011 |
SDC, INC. | $49,842 | Contract | : Provides Project Management of multiple design and construction projects, including the design and construction of projects and renovation of government space within existing building. Purpose of award is to provide administrative services to GSA in Denve | General Services Administration / Public Buildings Service | 7/28/2011 |
LITTEKEN CONSTRUCTION COMPANY | $378,970 | Contract | : Kenneth Gray Federal Building - Benton, IL. This project includes the removal of an existing single-glazed CurtainWall system and the replacement of new double-glazed CurtainWall system (2 layers of 1/4' glass). The new CurtainWall system, approximately | General Services Administration / Public Buildings Service | 5/31/2011 |
RGBS ENTERPRISES, INC. | $9,532 | Contract | : FBI Cooling Tower at 26 Federal Plaza - Contract #GS-02P-11-PJ-P-0110 - Provide engineering, equipment, supervision, material and labor for the installation of one flow meter FBI (Federal Bureau of Investigations)Cooling Tower at 26 Federal Plaza and all | General Services Administration / Public Buildings Service | 6/13/2011 |
SEATTLE CITY LIGHT | $101,000 | Contract | : Seattle City Light provides services necessary to connect electrical power to Federal Center South Building 12021, located at 4735 E. Marginal Way, Seattle, WA. | General Services Administration / Public Buildings Service | 6/16/2011 |
CMARK CONSTRUCTION, INC. | $131,901 | Contract | : PROVIDE FURNITURE FOR LOS ANGELES FEDERAL BUILDING CAFETERIA REMODEL IN LOS ANGELES CALIFORNIA. | General Services Administration / Public Buildings Service | 4/08/2011 |
MILLER SELLERS HEROUX ARCHITECTS, INC. | $4,494 | Contract | : ARRA Independent Structural Evaluation & Analysis of Existing First Floor Exterior Walls Pierre Federal Building, Pierre, South Dakota | General Services Administration / Public Buildings Service | 6/27/2011 |
SIEMENS INDUSTRY, INC. | $339,422 | Contract | : DEN-ASB-Advanced Metering Service Support Provide service per the annual Service Contract agreement ending 9/29/2011 | General Services Administration / Public Buildings Service | 8/31/2010 |
RRC-HILLMANN JV | $48,559 | Contract | : Perform daily visual inspection of asbestos abated roof areas prior to new sections of roof installation for IRS Building on Waverly in Holtsville, NY. | General Services Administration / Public Buildings Service | 6/22/2011 |
URS GROUP, INC. | $131,774 | Contract | : Provide qualified fire protection to perform design reviews for multiple stages of design. | General Services Administration / Public Buildings Service | 6/30/2010 |
URS GROUP, INC. | $358,351 | Contract | : Construction Management services for the Southbound Pedestrian Crossing on the east side of the port at San Ysidor Land Port of Entry. | General Services Administration / Public Buildings Service | 8/22/2011 |
WATKINS MEEGAN LLC | $513,521 | Contract | : The construction project accounting firm (CPAF) will conduct, but not limited, to audits of project financial records and evaluate construction progress (actual percentage of completion, fixed price, time and material, lump sum, general conditions, direct | General Services Administration / Public Buildings Service | 8/29/2011 |
T3 RESOURCES, INC. | $51,922 | Contract | : Office relocation | General Services Administration / Public Buildings Service | 9/23/2011 |
ADT SECURITY SERVICES, INC. | $206,949 | Contract | : Furnish and install perimeter electronic security. | General Services Administration / Public Buildings Service | 8/24/2011 |
UNISTAR-SPARCO COMPUTERS, INC. | $3,207 | Contract | : 6 Xerox Color Printers | General Services Administration / Public Buildings Service | 9/30/2011 |
PRICEWATERHOUSECOOPERS LLP | $499,957 | Contract | : Redevelop and enhance the Recovery Act High-Performance Green Buildings Database system (RAHD) at the General Services Administration (GSA) Public Buildings Service (PBS). Contract provides support to PBS Office of Design and Construction to migrate the R | General Services Administration / Public Buildings Service | 9/27/2011 |
ADT SECURITY SERVICES, INC. | $8,018 | Contract | : Relocation and installation of duress buttons. | General Services Administration / Public Buildings Service | 9/02/2011 |
CHEROKEE CONSTRUCTION SERVICES, LLC | $96,139 | Contract | : Historical renovation of room 701 at Gus Solomon Courthouse, Portland, Oregon. | General Services Administration / Public Buildings Service | 6/29/2011 |
CONSERVATION OF SCULPTURE AND OBJECTS STUDIO INC | $2,000 | Contract | : Project completed. Repairs of holes in marble wall in South Bend Federal Courthouse guard station. | General Services Administration / Public Buildings Service | 9/13/2011 |
K R ENVIRONMENTAL SERVICES INC | $28,400 | Contract | : Asbestos abatement monitoring and consulting of the 1st and 2nd floor of the Federal Building where work will be performed to complete a kitchen and cafeteria. | General Services Administration / Public Buildings Service | 7/20/2011 |
PICTURE COMPANY, THE | $6,000 | Contract | : REPRODUCTION & FRAMING OF WORKS PROGRESS ADMINISTRATION FOR THE RENOVATION OF THE FEDERAL BUILDING AT 50 UNITED NATIONS PLAZA, SAN FRANCISCO CALIFORNIA | General Services Administration / Public Buildings Service | 8/25/2011 |
HILL INTERNATIONAL, INC. | $2,890,364 | Contract | : The Award is for Construction Manager as Agent (CMa) to provide oversight and support in the management of the modernization and renovation effort at the Robert Smith Vance Federal Building and US Courthouse in Birmingham, Alabama. Additionally, the CMa w | General Services Administration / Public Buildings Service | 7/28/2009 |
JDD INC | $507,202 | Contract | : JDD is the construction management services company overseeing all construction management on site for the Nighthawk WA. border crossing station. | General Services Administration / Public Buildings Service | 9/20/2010 |
HENSEL PHELPS CONSTRUCTION CO | $191,596,000 | Contract | : Design-build services for the construction of the new Social Security Administration (SSA) National Service Center (NSC) in Urbana, MD. | General Services Administration / Public Buildings Service | 1/13/2012 |
THE WALDINGER CORPORATION | $896,985 | Contract | : Replace rooftop units for federal building in Iowa City, IA | General Services Administration / Public Buildings Service | 6/20/2011 |
EMCOR GOVERNMENT SERVICES, INC. | $15,760 | Contract | : Installing piping for three (3) new fan coil units. Contractor will drain down column to column In 3 locations on the 10th Floor of the building Install 3 connection tees and isolation ball valves at each tee. Pipe, hang, insulate and fire stop supply an | General Services Administration / Public Buildings Service | 3/29/2012 |
CLASSIC ENVIRONMENTAL, INC. | $7,105 | Contract | : AMBIENT AIR SAMPLING CONDUCTED BASEMENT ROOMS AS DESIGNATED IN CONTRACT OF 26 FEDERAL PLAZA AND 1 FEDERAL PLAZA | General Services Administration / Public Buildings Service | 1/17/2012 |
ELECTRONIC DISPLAYS INC. | $18,175 | Contract | : We will manufacture LED time zone displays that show times from around the world. These will be manufactured Addison, Illinois 60101. | General Services Administration / Public Buildings Service | 8/03/2011 |
ADT SECURITY SERVICES, INC. | $16,772 | Contract | : Provide relocation and installation of equipment to a new area. | General Services Administration / Public Buildings Service | 7/11/2011 |
K S A INTERIORS, INC. | $86,400 | Contract | : Provide interior design/space layout services for the acquisition of new furniture and the reconfiguration of existing furniture to pursue new workplace strategies at One Constitution Square, Washington, DC. The total space involved in this demonstration | General Services Administration / Public Buildings Service | 9/23/2011 |
TRANSYSTEMS CORPORATION | $444,631 | Contract | : ARRA for Boundary, Topographic and Utility Surveys for the US Department of State, Bureau of Diplomatic Security (DS) Foreighn Affairs Security Training Center (FASTC) and for two options for re-certification of the Survey as well as Building Staking at F | General Services Administration / Public Buildings Service | 8/11/2011 |
NVE, INC | $139,576 | Contract | : NVE, Inc. is to supply Construction Surveillance Technicians (CSTs) at the construction site for a Department of State Facility at the Denver Federal Center, Lakewood, Colorado. The general purpose of the CSTs is to detect unauthorized access to controlle | General Services Administration / Public Buildings Service | 8/05/2011 |
MC KAY LODGE FINE ARTS CONSERVATION LABORATORY INC | $20,155 | Contract | : Conservation cleaning of Sol Lewitt wall sculpture in Chicago, | General Services Administration / Public Buildings Service | 9/23/2011 |
CLASSIC ENVIRONMENTAL, INC. | $742 | Contract | : Industrial Hygienist services to perform air sampling at the IRS, Holtsville, New York | General Services Administration / Public Buildings Service | 9/21/2011 |
MEDIA PLUMBING & HEATING, INC. | $14,153 | Contract | : The project is to provide coverage during fire alamr outages during work periods and the expected outcome is that the fire alarm system will be monitored while it is out of service for other work in the facility. | General Services Administration / Public Buildings Service | 9/23/2011 |
MID ATLANTIC CASU | $36,589 | Contract | : Award was incorrectly intended to reimburse for administrative assistant services using ARRA funding. As confirmed by Cynthia Carroll, GSA Regional CFO, no ARRA funding was used and the correcting contract modification was signed on 10/5/11. | General Services Administration / Public Buildings Service | 9/02/2011 |
CARDNO TEC, INC. | $1,502,042 | Contract | : AMERICAN REINVESTMENT AND RECOVERY ACT ENVIRONMENTAL SERVICES TO ENSURE COMPLIANCE NATIONAL ENVIRONMENTAL POLICY ACT AND THE NATIONAL HISTORIC PRESERVATION ACT OF 1966 FOR THE US DEPARTMENT OF STATE, BUREAU OF DIPLOMATIC SECURITY FOREIGN AFFAIRS SECURITY | General Services Administration / Public Buildings Service | 8/09/2011 |
FEDCAP REHABILITATION SERVICES, INC. | $219,068 | Contract | : Operation and maintenance services related to the ARRA-funded modernization project at the Peter W. Rodino Federal Building located at 970 Broad Street, Newark, NJ 07102. Services include mechanical emergency overtime services, mechanical emergency call | General Services Administration / Public Buildings Service | 9/07/2011 |
ALEUT FACILITIES SUPPORT SERVICES, LLC | $6,031 | Contract | : Project in Progress. Providing operations and maintenance support for the ARRA Projects at the Foley Federal Building located in Las Vegas, NV | General Services Administration / Public Buildings Service | 8/25/2011 |
JOHNSON CONTROLS, INC. | $1,116,734 | Contract | : Installation of 14 variable frequency drives for 460V/3PH/60Hz fan motors with various horsepower ratings and control upgraded to increase efficiency of the heating, ventilation & air conditioning system at the Ariel Rios EPA Headquarters building in Wash | General Services Administration / Public Buildings Service | 9/08/2011 |
EHS-INTERNATIONAL, INC. | $33,440 | Contract | : Provide the preparation of Opinion Repsonse Plan, Planning meeting with DOE, Site Characterization Documentation, Vinyl Chloride Remediation Study, Devleop Site Cleanup standards, Develop Final Reponse Doucment and Sample existing groundwater monitoring w | General Services Administration / Public Buildings Service | 9/13/2011 |
ENGINEERING & SOFTWARE CONSULTANTS, INC. | $208,126 | Contract | : Providing all necessary labor, materials, equipment, and supervision to provide cooling to the IT room at RATB on the 7th floor of 1717 Pennsylvania Ave, NW Washington D.C. Additionally, furnishing and installing 2 Liebert chilled water precision cooling | General Services Administration / Public Buildings Service | 7/27/2011 |
BREAKELL, INC. | $14,079 | Contract | : On the 3rd floor we built a wall in the east lobby and installed door and frame. on the 5th floor we built walls, installed electrical to used for the Grad Jury area. Also installed 2 more smaller walls with 2 doors and 2 frames and associated hardware. | General Services Administration / Public Buildings Service | 9/01/2011 |
IMMIXTECHNOLOGY, INC. | $30,870 | Contract | : Software and Maintenance | General Services Administration / Public Buildings Service | 8/30/2011 |
PRICEWATERHOUSECOOPERS LLP | $998,315 | Contract | : Provide program management and reporting services to assist the General Services Administration, Public Buildings Service (PBS), Program Management Office (PMO) in meeting the goals and requirements of transparency and accountability in carrying out Presi | General Services Administration / Public Buildings Service | 7/26/2011 |
TENG CONSTRUCTION L.L.C. | $7,785,981 | Contract | : Provide design build services required to complete the following scope of work: - install high efficiency inverter rated motors and variable frequency drives to (9)cooling towers - upgrade (32) air handlers with new premium efficiency inverter motors and | General Services Administration / Public Buildings Service | 8/18/2011 |
ORACLE AMERICA, INC. | $3,315 | Contract | : Software Maintenance for Primavera P6 Enterprise Project Portfolio Management - Application User Perpetual | General Services Administration / Public Buildings Service | 6/22/2011 |
MILLER SELLERS HEROUX ARCHITECTS, INC. | $23,228 | Contract | : SD - Provide consulting services to prepare design documents for replacement of lighting and lighting controls to increase energy conservation. The project is located at the Pierre Federal Building in Pierre, South Dakota. | General Services Administration / Public Buildings Service | 9/30/2011 |
DJB CONTRACTING, INCORPORATED | $133,736 | Contract | : Provide Structural damage survey to the Blair House Complex, Jackson Place Complex, and Winder Building due to recent earthquake, Washington, DC | General Services Administration / Public Buildings Service | 9/27/2011 |
OCCU-TEC, INCORPORATED | $5,787 | Contract | : Souix City, IA, Federal office building and courthouse - Asbestos abatement air monitoring | General Services Administration / Public Buildings Service | 6/23/2011 |
AIC GENERAL CONTRACTORS, INC. | $2,837,131 | Contract | : Project located in Albuquerque, NM | General Services Administration / Public Buildings Service | 9/29/2011 |
EHS-INTERNATIONAL, INC. | $8,054 | Contract | : Provided professional environmental and hazardous materials pre-demolition abatement construction administration consulting services. Review and respond to the abatement contractor's work plan and submittals and evaluate compliance with regulatory requir | General Services Administration / Public Buildings Service | 8/04/2011 |
ED A. WILSON INC. | $51,800 | Contract | : We will be replacing 55 light fixtures at the Pharr, TX Land Port of Entry. | General Services Administration / Public Buildings Service | 9/29/2011 |
ENOVITY, INC. | $19,775 | Contract | : ARRA - Establish wireless communications to circuit monitors, Otay Mesa Land Port of Entry, San Diego, CA. | General Services Administration / Public Buildings Service | 9/23/2011 |
STEELCASE INC. | $257,150 | Contract | : Furniture, delivery and installation in accordance with all aspects of the project Scope of Work dates 1 June 2011 and Franklin Interiors proposal dated 27 June 2011. This order is invoiced and paid. | General Services Administration / Public Buildings Service | 8/31/2011 |
CLASSIC ENVIRONMENTAL, INC. | $10,971 | Contract | : Project monitoring and sampling for asbestos pipe elbow insulation removal in garage of 26 Federal Plaza, New York, New York | General Services Administration / Public Buildings Service | 9/26/2011 |
MIE, INC. | $59,084 | Contract | : USMS Swing Space Renovation - 8th Floor Timberlake Bldg, Tampa, FL | General Services Administration / Public Buildings Service | 9/22/2011 |
YOUNG & RUBICAM INC. | $92,476 | Contract | : Research and Training Services to support site acquisition on behalf of the US Department of State, Buereau of Diplomatic Security (DS) Foreigh Affairs Security Training Center (FASTC.) Tasks include: 4.1 Public Engagement Plan; Task 4.2 Stakeholder Educa | General Services Administration / Public Buildings Service | 9/20/2011 |
42/40 ARCHITECTURE INC. | $150,000 | Contract | : The American Recovery and Reinvestment Act of 2009 (ARRA) has allocated funding to study the level of effectiveness of project team integration of the eleven major modernizations funded under the Act. To do this, 4240 will work with a university level re | General Services Administration / Public Buildings Service | 9/30/2011 |
FINDLAY TELECOM LIMITED LLC | $15,417 | Contract | : TELECOMMUNICATION SERVICES FOR ICE HIS RELOCATION AT THE PATRICK V NCNAMARA FEDERAL BUILDING, 477 MICHIGAN AVENUE, DEROIT, MICHIGANPLUS AMMENDMENT ONE RELOCATE UP TO 100 CURRENT HSI PERSONNEL TELEPHONES FROM THE 24TH FL TO THE 15TH FL. ALL HORIZONTAL | General Services Administration / Public Buildings Service | 8/26/2011 |
BROCK CONSTRUCTION INC | $6,653 | Contract | : Furnish and install one monetary switch on the west side of the building and wire it via a 2 conductor 16gauge plenum cable to the lighting control box (brain) in the east electrical closet. This is on the 6th, 7th, 9th, and 10th floors in Chicago, IL. | General Services Administration / Public Buildings Service | 9/28/2011 |
DPR-GRUNLEY JOINT VENTURE | $50,000 | Contract | : Social Security Administration National Support Center(Design/Build) stipend for the preparation of a technical proposal including design concept paid to all Phase 2 Offerors | General Services Administration / Public Buildings Service | 12/28/2011 |
ABM ENGINEERING SERVICES COMPANY | $50,000 | Contract | : Replacement work at 300 N LA building. | General Services Administration / Public Buildings Service | 12/28/2011 |
CARTER GROUP, INC., THE | $37,032 | Contract | : Move management and related services associated with the New Rockford Courthouse project, Rockford, IL. | General Services Administration / Public Buildings Service | 9/06/2011 |
HENTSCHEL REAL ESTATE SERVICES | $41,500 | Contract | : PROJECTCOMPLETE | General Services Administration / Public Buildings Service | 12/21/2011 |
ENOVITY, INC. | $6,723 | Contract | : Southern California Commissioning, Retro-commissioning, Building Automation Engineering. Ad-hoc Engineering Assistance for Pasadena Roof Photovoltaic. | General Services Administration / Public Buildings Service | 9/30/2011 |
500 WOODWARD LLC | $3,632,825 | Contract | : 81,413 square feet leased to GSA at 500 Woodward Avenue in Detroit Michigan provided by ARRA fund. | General Services Administration / Public Buildings Service | 8/10/2010 |
MONO MACHINES LLC | $2,120 | Contract | : Customer purchased an SEM 2226cc/3 high security paper shredder - Order 29613. FINANCIAL SERVICES DIVISION PO BOX 17181 PO GS-P-11-11-YT-0132 FORT WORTH, Texas, 76102-0181 United States T: 202-273-4796 | General Services Administration / Public Buildings Service | 4/26/2011 |
COMMISSIONING & GREEN BUILDING SOLUTIONS, INC. | $65,443 | Contract | : CAMPBELL Courthouse: Independent Commissioning Services Serve as the Commissioning (Cx) Agent for the ARRA Re-Commissioning project at Campbell CH, Mobile Al- and provide industry-standard commissioning services for implementation of project scope: contro | General Services Administration / Public Buildings Service | 9/29/2011 |
TURNER CONSTRUCTION COMPANY | $50,000 | Contract | : Stipend for reimbursement of proposal costs. | General Services Administration / Public Buildings Service | 12/28/2011 |
HUGHES ASSOCIATES, INC. | $52,500 | Contract | : Provide fire protection engineering support services to the General Services Administration (GSA) Safety, Environment and Fire Protection Engineering Branch (Washington, DC) including suppression and detection system design reviews of submitted design pro | General Services Administration / Public Buildings Service | 9/27/2011 |
ABM ENGINEERING SERVICES COMPANY | $4,967 | Contract | : Provide support and escort services to assist Veterans Construction on the build out of the LEED Cafeteria. | General Services Administration / Public Buildings Service | 12/28/2011 |
EATON ENERGY SOLUTIONS, INC. | $46,045 | Contract | : Work includes the improvements of the existing Heating Ventitlation Air Conditioner system and the Building Automation System including sequenace of operation, improved setpoints, hardware replacement and Heating Ventitlation Air Conditioner equipment rep | General Services Administration / Public Buildings Service | 9/15/2011 |
NATIONAL ESCROW | $661,769 | Contract | : We received government contract funds to install fire alarm devices at various buildings throughout southeast sunbelt region. | General Services Administration / Public Buildings Service | 3/31/2010 |
HENSEL PHELPS CONSTRUCTION CO | $50,000 | Contract | : SSA National Support Center - Urbana, MD. Proposal Stipend | General Services Administration / Public Buildings Service | 12/28/2011 |
NATIONAL ESCROW | $402,060 | Contract | : We received government contract funds to install fire alarm devices in various buildings throughout the southeast sunbelt region. | General Services Administration / Public Buildings Service | 3/25/2010 |
CREATIVE SIGN SERVICE, INC. | $6,512 | Contract | : (22) 8'h x 12'w x 1/8' bronze etched plaques with raised copy/border, black background, satin finish, and 16 point Garamond font. All copies to be centered horizontally. Copy for plaques provided by client. Plaques to be mounted with tape and silicone. | General Services Administration / Public Buildings Service | 9/30/2011 |
NATIONAL ESCROW | $976,907 | Contract | : Installation of electrical sub metering in various locations/buildings throughout the southeast region. | General Services Administration / Public Buildings Service | 9/30/2010 |
AMERICON, INC. | $114,500 | Contract | : Installation of Advanced Metering at Robert Roe Federal Building, 200 Federal Plaza, Paterson, New Jersey | General Services Administration / Public Buildings Service | 9/23/2010 |
CLASSIC ENVIRONMENTAL, INC. | $19,190 | Contract | : PROJECT MONITORING/AIR SAMPLING FOR THE ABATEMENT OF 10 ELECTRICAL CLOSETS AT 26 FEDERAL PLAZA, NY, NY | General Services Administration / Public Buildings Service | 12/14/2011 |
REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE | $75,000 | Contract | : The purpose of this Agreement is to support GSA's project delivery of a new energy efficient data center. The project is titled 'Social Security Administration National Support Center', also referred to as the SSA NSC project. In pursuit of GSA's goal of | General Services Administration / Public Buildings Service | 3/21/2012 |
CARDNO TEC, INC. | $1,606 | Contract | : Site Visit with Preliminary wetlands & threatened & endangered habitat assessment for LRA parcel 10 | General Services Administration / Public Buildings Service | 2/06/2012 |
UPTIME INSTITUTE PROFESSIONAL SERVICES, LLC | $197,400 | Contract | : Uptime Institute design certification and construction certification for SSA NSC Project. | General Services Administration / Public Buildings Service | 1/31/2012 |
MBP-AECOM | $1,894,190 | Contract | : SCOPE OVERVIEW: The CM firm shall provide a team of professionals to assist the Government Project Team (GSA/NOAA) with the critical support of the design & construction, commissioning, move and post-occupancy phases of the project. The intent of the proj | General Services Administration / Public Buildings Service | 7/28/2010 |
MBP-AECOM | $92,332 | Contract | : MBP will provide on-site CM Services for the GSA Hoffman Courthouse Energy Bundle Renovation project in Norfolk, VA. CM Services will include, but not be limited to - tracking and updating the project schedule, providing advice on technical matters, analy | General Services Administration / Public Buildings Service | 4/07/2010 |
CONCOURSE FEDERAL GROUP | $29,913 | Contract | : n/a | General Services Administration / Public Buildings Service | 1/26/2012 |
HCBECK LTD | $37,885 | Contract | : Additional Security Modifications for FBI Tenant Space | General Services Administration / Public Buildings Service | 1/04/2012 |
CARDNO TEC, INC. | $168,153 | Contract | : environmental consulting services to incorporate LRA parcel 10 into the overall DOS FASTC environmental Impact Statement and histporic property analysis for US Dept of state, bureau of diplomatic security foreign affairs security training center | General Services Administration / Public Buildings Service | 2/06/2012 |
CARDNO TEC, INC. | $58,005 | Contract | : Detailed socio-economic impact assessment for the US dept of state, bureau of diplomatic security foreign affairs security training center | General Services Administration / Public Buildings Service | 3/05/2012 |
CARDNO TEC, INC. | $1,682 | Contract | : Provide mapping for the 60-70 additional acres of wetlands for the US dept of state, bureau of diplomatic security foreign affairs security training center | General Services Administration / Public Buildings Service | 3/29/2012 |
ARCANUM GROUP, INC., THE | $14,352 | Contract | : Project Manager I providing oversight on General Contractor rehabilitation of Byron Rogers Federal Building and Byron White Courthouse | General Services Administration / Public Buildings Service | 4/01/2012 |
FOUR SEASONS ENVIRONMENTAL, INC. | $9,989 | Contract | : For supplies and services for overtime hours in support of the Building Modernization ARRA Project at the John W. Peck Federal Building, Cincinnati, Ohio | General Services Administration / Public Buildings Service | 1/09/2012 |
NATIONAL ESCROW | $417,744 | Contract | : We received government contract funds to install fire alarm devices in various buildings throughout southeast sunbelt region. | General Services Administration / Public Buildings Service | 3/25/2010 |
ADT SECURITY SERVICES, INC. | $283,590 | Contract | : Provide Engineering Services and Furnishing and Installing Security Equipment for the Robert S. Vance Federal Courthouse, Biringham, AL | General Services Administration / Public Buildings Service | 5/03/2012 |
HATHAWAY DINWIDDIE CONSTRUCTION COMPANY | $109,508,892 | Contract | : The renovation of the Federal Building at 50 United Natiions Plaza in San Francisco, will include siesmic structural upgrade, hazardous materials abatement, roof replacement, implementing sustainable features to achieve LEED certification; refurbishing of | General Services Administration / Public Buildings Service | 12/17/2009 |
TENG & ASSOCIATES, INC. | $158,257 | Contract | : Professional design charrette services for the future development of the Prevedel Federal Building and the Page Campus. | General Services Administration / Public Buildings Service | 6/29/2012 |
CARDNO TEC, INC. | $102,315 | Contract | : environmental consulting services to incorporate PHASE II ARCHAEOLOGICAL INVESTIGATIONS ON SITES 44NT2018 AND 44NT0207 into the overall DOS FASTC environmental Impact Statement and histporic property analysis for US Dept of state, bureau of diplomatic sec | General Services Administration / Public Buildings Service | 2/06/2012 |
CARDNO TEC, INC. | $56,816 | Contract | : environmental consulting services to incorporate Grid Parcel into the overall DOS FASTC environmental Impact Statement and histporic property analysis for US Dept of state, bureau of diplomatic security foreign affairs security training center | General Services Administration / Public Buildings Service | 6/01/2012 |