BARNETT PAVING AND SEALING, LP
|
$3,064,886 |
Contract |
Air Mobility Command |
4/17/2009 |
: The work consist of furnishing all plant, labor and material in performing all opeations in connection with the construction, demolition alterration and repair of Taxiway F pavement (including shoulders). All work will be completed in strict accordance wi
|
BARNETT PAVING AND SEALING, LP
|
$3,039,695 |
Contract |
Air Mobility Command |
4/17/2009 |
: This work consist of furnishing all plant, labor and material in performing all operations in conncetion with the construction, demolition, alteration, and repair of the aircraft apron and shoulders from row J to row Z2. All work will be completed in stri
|
ROAD BUILDERS, INC.
|
$2,256,905 |
Contract |
Air Mobility Command |
5/29/2009 |
: REPAIR GAS MAINS - MAIN GATE
|
BARNETT PAVING AND SEALING, LP
|
$1,995,319 |
Contract |
Air Mobility Command |
4/17/2009 |
: This work consist of furnishing all plant, labor material in performing all operations in connection with the construction, demolition, alteration, and repair of the aircraft alert apron slabs, seals and spall in the airfield pavement.All work will be com
|
MI-TY TRUCKING & EXCAVATING
|
$999,997 |
Contract |
Air Mobility Command |
9/05/2008 |
: Repair Airfield Spalls & Joints. Airfield Spall & Joint Seal Repair JFSD 200821 at Grand Forks AFB ND
|
PRIDE INDUSTRIES
|
$786,725 |
Contract |
Air Mobility Command |
9/30/2009 |
: Painting of Exterior Buildings
|
YERBA BUENA ENGINEERING & CONSTRUCTION, INC.
|
$744,257 |
Contract |
Air Mobility Command |
6/24/2009 |
: RENOVATE DORM 1304
|
DIVERSIFIED MAINTENANCE SYSTEMS, INC
|
$689,119 |
Contract |
Air Mobility Command |
6/16/2009 |
: Repair building 1127 for SOAR. Abate Asbestos from building. Install new exit lights and pull stations at each exit. Install a smoke detector above the fire alarm panel. Upgrade the facility to meet the needs of the SOAR Mission.
|
ROAD BUILDERS, INC.
|
$549,458 |
Contract |
Air Mobility Command |
5/26/2009 |
: REPAIR GAS MAINS 1200 1ST STREET
|
HGL CONSTRUCTION INC
|
$545,459 |
Contract |
Air Mobility Command |
9/23/2009 |
: Repair Shower/Finishes Dorm772
|
VINTAGE PAVING CO., INC.
|
$544,314 |
Contract |
Air Mobility Command |
9/28/2009 |
: Airfield Markings
|
CHEROKEE CHAINLINK & CONSTRUCTION, INC.
|
$504,501 |
Contract |
Air Mobility Command |
7/19/2009 |
: Fire Suppression Building 1205
|
BARNETT PAVING AND SEALING, LP
|
$395,278 |
Contract |
Air Mobility Command |
4/17/2009 |
: This contract is a quanity of one and the unit is lump sum. The work shall consist of furnishing all plant, labor and material in performing all operations in connection with the work shown in drawings for NKAK09-1109, repair install AALZ AMP 3 lighting s
|
VINTAGE PAVING CO., INC.
|
$329,901 |
Contract |
Air Mobility Command |
9/23/2009 |
: Airfield Rubber Removal
|
FEDERAL CONSTRUCTION GROUP, INC.
|
$322,243 |
Contract |
Air Mobility Command |
3/05/2010 |
: Replace Outdated/Inoperative Fire Alarms
|
JACK MORGAN CONSTRUCTION COMPANY INC
|
$309,627 |
Contract |
Air Mobility Command |
4/28/2009 |
: Fire Sprinkler System
|
JACK MORGAN CONSTRUCTION COMPANY INC
|
$250,853 |
Contract |
Air Mobility Command |
4/17/2009 |
: Fire Sprinkler System B-1020
|
1CI, INC.
|
$196,447 |
Contract |
Air Mobility Command |
7/08/2009 |
: Install Fire Protection System at Building 247
|
JACK MORGAN CONSTRUCTION COMPANY INC
|
$136,664 |
Contract |
Air Mobility Command |
9/23/2009 |
: Repair roofs Bldgs 529,530 & 534
|
PROFESSIONAL MECHANICAL CONTRACTORS, INC.
|
$81,262 |
Contract |
Air Mobility Command |
6/22/2009 |
: Install ground source heat pumps B-1541,1501 & 1560 the principal items of work include, but are not limited to demolishing existing HVAC system at building 1560 and installing new ground source heat pumps
|
DIVERSIFIED MAINTENANCE SYSTEMS, INC
|
$35,162 |
Contract |
Air Mobility Command |
4/17/2009 |
: Repair Roof Seals, B/1115. Removed metal soffit on the outside of the facility, injected a low expansion foam material to seal gaps and voids between the bar joist and the bearing plate located on the exterior wall. Also, remove existing fascia on the N
|