Listing all stimulus spending by amount, in descending order. Return to National Aeronautics and Space Administration page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
ASRC AEROSPACE CORP | $8,523,844 | Contract | : Recovery - Mobile Launcher Element (MLE) Electrical Design (CLIN 009) The Mobile Launcher (ML) is a large platform with a tower used to transport, service, and launch the next generation launch vehicle and spacecraft (Ares I and Orion). This expenditure | National Aeronautics and Space Administration | 8/31/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $5,036,108 | Contract | : This effort develops the Next Generation Airborne Visible/Infrared Imaging Spectrometer (AVIRISng) to address the science measurement requirements to support both the NASA HyspIRI Decadal Survey Mission and the Research and Analysis Program of NASA Earth | National Aeronautics and Space Administration | 8/03/2009 |
COMPUTER SCIENCES CORPORATION | $4,850,000 | Contract | : The goal of this activity is to provide a needed augmentation to the simulation capacity, data storage capacity, and visualization capability in support of the climate and weather simulation communities in NASA. This activity will increase the high end co | National Aeronautics and Space Administration | 9/29/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $4,057 | Contract | : Task Order 15: Caulk Leaking Precast Exposed Aggregate Facing Panels | National Aeronautics and Space Administration | 7/23/2009 |
4W SOLUTIONS INC | $77,777 | Contract | : Blanket Purchase Agreement NNJ09JE25T (Call 13) support continues to procure administrative support services for the Office of Procurement in support of the placement and administration of construction contracts funded by the Recovery Act. Administrative | National Aeronautics and Space Administration | 6/15/2009 |
UNIVERSITY CORPORATION AT MONTEREY BAY | $1,300,000 | Grant | Science, Recovery Act: The purpose of this cooperative program is to conduct activities related to the NASA ARRA supported wildfire response and management project. NASA and the U.S. Forest Service developed the Wildfire-Collaborative Decision Environment (W-CDE) to provide a | National Aeronautics and Space Administration | 9/30/2009 |
EPITAXIAL TECHNOLOGIES, LLC | $600,000 | Contract | : Development and delivery of Time Delayed Integration APD/CCD sensor chips | National Aeronautics and Space Administration | 9/30/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $4,544 | Contract | : Task Order 17: Replace Washrack Hanger BD. E277A Ellington Field (CLIN 39) | National Aeronautics and Space Administration | 7/23/2009 |
ASRC AEROSPACE CORP | $8,126,478 | Contract | : Recovery - ML Fluid Systems (CLIN 008) The Mobile Launcher (ML) is a large platform with a tower used to transport, service, and launch the next generation launch vehicle and spacecraft (Ares I and Orion). This expenditure is to design the specialized flu | National Aeronautics and Space Administration | 8/31/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,950,000 | Contract | : The objective of this award is to establish the information infrastructure required to bring NASA instruments, observations and scientific and technical expertise to bear on water resource management needs in the drought-stricken American southwest. Water | National Aeronautics and Space Administration | 9/30/2009 |
ORBITAL SCIENCES CORPORATION | $16,000,000 | Contract | : Space Vehicle Components and Engineering Services (GLORY Program) | National Aeronautics and Space Administration | 8/14/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $8,564,000 | Contract | : The Aquarius project is being implemented jointly between NASA and the Aregentina Comision Nacional de Actividades Espaciales (CONAE) project Satelite de Aplicaciones Cientificas, flight D (SAC-D). This joint undertaking is referred to as the Acquarius/SA | National Aeronautics and Space Administration | 9/17/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $64,000,000 | Contract | : This effort is to establish preliminary designs for key elements of the Soil Moisture Active/Passive (SMAP) Project. SMAP is one of the NASA missions recommended by the 2007 National Research Council Earth Science Decadal Survey report for early implemen | National Aeronautics and Space Administration | 9/28/2009 |
LOCKHEED MARTIN CORPORATION | $165,900,000 | Contract | : ARRA awarded to Project Orion, part of NASA's Constellation Program, for the development of the Orion Crew Vehicle. Specifically to reduce risk for the design, development, test & evaluation of the Ground Test Article, Engineering Development Units, and | National Aeronautics and Space Administration | 8/19/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $74,100 | Contract | : Task Order 27: Base Bid and Options: Hurricane IKE Phase II - Roof Package #1 - Recovery Act (CLINS 9-16 and 17-23) | National Aeronautics and Space Administration | 7/17/2009 |
ALL AMERICAN BROTHERS COMPANY, LLC | $898,180 | Contract | : Replace 110 street, parking lot and sidewalk lights that sustained damage from Hurricane Ike or are no longer maintainable. | National Aeronautics and Space Administration | 8/12/2009 |
ADHERENT TECHNOLOGIES, INC. | $600,000 | Contract | : Develop process for lunar regolith stabilization | National Aeronautics and Space Administration | 9/30/2009 |
PARAGON SPACE DEVELOPMENT CORPORATION | $599,992 | Contract | : The continuation of concept development and test of a water-based, advanced Phase Change Material (PCM) heat sink is proposed. Utilizing a novel material choice for both an expansion diaphragm and the PCM case itself, the PCM can accommodate both the expa | National Aeronautics and Space Administration | 9/30/2009 |
KENT OPTRONICS INC | $599,990 | Contract | : This is SBIR Phase II contract to develop high fedality hyperspectral/multispectral sensor. The final deliverable is the sensor plus the technical report. Interim reports are the quarterly report. | National Aeronautics and Space Administration | 9/30/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,630,400 | Contract | : The Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) instrument is a pod-based L-band polarimetric syntheic aperture radar (SAR) that acquires airborne repeat track SAR data for differential interferometric measurements. This effort takes two | National Aeronautics and Space Administration | 8/17/2009 |
COMPUTER SCIENCES CORPORATION | $5,100,000 | Contract | : The goal of this task is to enhance the currently deployed high-end computational environment at NASA Ames Research Center to facilitate fundamental research and information dissemination in various aspects of climate, weather, and ecosystem simulation st | National Aeronautics and Space Administration | 9/04/2009 |
CSC APPLIED TECHNOLOGIES, LLC | $165,078 | Contract | : Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. | National Aeronautics and Space Administration | 8/25/2009 |
ANADARKO INDUSTRIES, L.L.C. | $382,121 | Contract | : Provide construction safety support for construction Roof Packages 1 and 2 and several other construction recovery packages. Roof Packages 1 and 2 include requirements for roof replacement and loggia ledge replacement on multiple facilities at the Johnson | National Aeronautics and Space Administration | 7/01/2009 |
NORTHROP GRUMMAN SPACE & MISSION SYSTEMS CORP. | $21,164,815 | Contract | : The CERES sensors provide accurate measurements of the EarthG??s reflected solar and EarthG??s emitted thermal radiation. These measurements are critical for understanding the EarthG??s total climate system and improving climate prediction models. Recov | National Aeronautics and Space Administration | 8/06/2009 |
ADVANCED SCIENCE AND NOVEL TECHNOLOGY | $599,924 | Contract | : The program is devoted for the development and fabrication of ultra-high speed ADC. | National Aeronautics and Space Administration | 9/30/2009 |
NLIGHT PHOTONICS CORPORATION | $599,562 | Contract | : Future NASA missions will require high-pulse power flash and scanning LIDAR systems. Such LIDAR systems offer the advantages of excellent spatial resolution, high efficiency, and high beam quality. nLIGHT will design and fabricate a resonantly pumped, pas | National Aeronautics and Space Administration | 9/30/2009 |
NORTHROP GRUMMAN SPACE & MISSION SYSTEMS CORP. | $65,000,000 | Contract | : Advance the James Webb Space Telescope project towards mission Critical Design Review. | National Aeronautics and Space Administration | 7/14/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $66,405 | Contract | : Task Order 28: Base Bid and Options: Hurricane IKE Phase II - Roof Package #2 - Recovery Act (CLINS 24-29 and 30-35) | National Aeronautics and Space Administration | 7/22/2009 |
W.A. ROBBINS CONSTRUCTION CO., INC | $3,985,607 | Contract | : CLEAN, SEAL AND CAULK ALL JOINTS ON THE PRE-CAST EXPOSED AGGREGATE FACED (PEAF)PANELS ON THE EXTERIOR OF BUILDINGS 9, 15, 30, 31, 45 AND 49 THAT REQUIRE MAINTENANCE AND SHOW PHYSICAL DAMAGE SUSTAINED DURING HURRICANE IKE IN 2008. | National Aeronautics and Space Administration | 9/29/2009 |
4W SOLUTIONS INC | $103,916 | Contract | : Blanket Purchase Agreement NNJ09JE56T (Call 14) support continues to provide services for the generation of metrics that will assess progress and quality of work on JSC construction projects being conducted under the Recovery Act. | National Aeronautics and Space Administration | 6/15/2009 |
RYCARS CONSTRUCTION, LLC | $10,040,523 | Contract | : Roof Replacement and LOGGIA ledge replacement on multiple facilities at the Johnson Space Center | National Aeronautics and Space Administration | 7/17/2009 |
SEQUOIA SCIENTIFIC, INC. | $599,502 | Contract | : This project will result in an instrument that measures the full volume scattering function of seawater, with attention to polarization. A single, polarized laser beam will enter water. Light scattered from this beam by particles in seawater is the primar | National Aeronautics and Space Administration | 9/30/2009 |
THE CUBE CORPORATION | $9,000,000 | Contract | : Construct Phase 1 of the new Horizontal Integration Facility (HIF) on Wallops Island in accordance with NASA Specification Number 09WRIZ and drawing numbers 15556 through 15624. Phase 1 is planned to include specificaiton sections 0, 1, 3, 5, 7-10-13, 21 | National Aeronautics and Space Administration | 9/22/2009 |
UNIVERSITY OF ARIZONA | $10,000,000 | Contract | : Advance the Near Infra-Red Camera development towards instrument engineering test unit delivery and flight unit assembly: The ARRA funding is being used to support the development and manufacture of the Near Infrared Camera (NIRCam) for NASA's James Webb | National Aeronautics and Space Administration | 7/30/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $14,894 | Contract | : Task Order 16: JSC Barge Dock Repair | National Aeronautics and Space Administration | 7/23/2009 |
SIA CONSTRUCTION INC | $1,834,946 | Contract | : Provide demolition, removal, repair controls and protection of Building 9 south (Shop Area) roofing systems that were damaged during Hurricane Ike in 2008. | National Aeronautics and Space Administration | 9/24/2009 |
DRI COMMERCIAL CORPORATION | $8,027,464 | Contract | : Roof replacement and loggia ledge replacement - package 1 - multiple facilities at the Johnson Space Center | National Aeronautics and Space Administration | 6/15/2009 |
COOLCAD ELECTRONICS | $564,327 | Contract | : CoolCAD Electronics LLC has been awarded a SBIR Phase II Contract by NASA to develop models and design methodologies for semiconductor devices and circuits operating at cryogenic temperatures and in radiation rich environments. CoolCAD Electronics LLC is | National Aeronautics and Space Administration | 9/30/2009 |
BROADBAND PHOTONICS | $599,950 | Contract | : For the NASA SBIR Phase 2 project, Broadband Photonics will develop a distributed fiber optic sensor for in-space hydrogen leak detection. Reliable and fast detection of hydrogen leaks is critical to both operational safety and maintenance of propellant q | National Aeronautics and Space Administration | 9/30/2009 |
DYNETICS, INC. | $599,994 | Contract | : Phase II proposal, number X9.03-8678 entitled Acoustic Ingiter | National Aeronautics and Space Administration | 9/30/2009 |
THE BOEING COMPANY | $15,000,000 | Contract | : In accordance with the Space Station Program Change Board (SSPCB) Change Directive 11885, ISS Common Docking Adapter (CDA) Project Phase II Support, the contractor shall perform the following tasks: (1) Baseline the CDA System Requirement document and dev | National Aeronautics and Space Administration | 9/24/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $2,694,085 | Contract | : Microwave Limb Sounder (MLS) is a major Principal Investigator experiment on the Earth Observing System (EOS) Aura Mission launched in July 2004.The EOS is a focal point of NASA's Earth Science Enterprise, designed to further the understanding of global c | National Aeronautics and Space Administration | 9/21/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $2,489,154 | Contract | : The objective of this award is to provide a new validated airborne facility instrument, called the Portable Remote Imaging Spectrometer (PRISM), to identify constituents and quantify properties of complex coastal ocean waters using spectroscopic measureme | National Aeronautics and Space Administration | 9/02/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $2,146,927 | Contract | : The Atmospheric Infrared Sounder (AIRS) is an instrument on the Earth Obesrving System Aqua spacecraft. AIRS and the Advanced Microwave Sounding Unit (AMSU) form the AIRS Sounding System. This system is designed to meet climate research needs and operatio | National Aeronautics and Space Administration | 9/10/2009 |
C J W CONSTRUCTION, INC. | $428,677 | Contract | : This project was initiated to create an onsite Life Support Area for the pilots at the Dryden Flight Research Center Bldg. #703. NASA is planning to bring additional planes to DFRC site and currently the only Life Support Area is located at Edwards Air Fo | National Aeronautics and Space Administration | 8/10/2009 |
BALL AEROSPACE & TECHNOLOGIES CORP. | $22,227,506 | Contract | : NATIONAL AERONAUTICAL & SPACE ADMINISTRATION (NASA) AND THE GODDARD SPACE FLIGHT CENTER (GSFC) HAS A REQUIREMENT FOR THE CONTINUATION OF THE GLOBAL PRECIPITATION MEASUREMENT (GPM) MICROWAVE IMAGER (GMI) INSTRUMENT. THE GMI INSTRUMENT IS A 13 CHANNEL RADIO | National Aeronautics and Space Administration | 8/31/2009 |
REGENTS OF THE UNIVERSITY OF COLORADO, THE | $26,307,665 | Contract | : TOTAL AND SPECTRAL IRRADIANCE SENSOR (TSIS) project: We will design, build, test, calibrate & deliver the TSIS instrument to Northrop Grumman Space Technology Corp., for inclusion on the National Polar-Orbiting Operational Environmental Satellite System | National Aeronautics and Space Administration | 8/31/2009 |
GEE CEE COMPANY OF LA, INC. THE | $2,883,758 | Contract | : Replace the windows and related gaskets that make up the existing aluminum windows wall system in Building 1 on floors 1-8 as a result of damage sustained by Hurricane Ike. | National Aeronautics and Space Administration | 8/07/2009 |
SPECPRO ENVIRONMENTAL SERVICES LLC | $3,739,890 | Contract | : Design and construct an open sided metal Hangar over the existing wash rack that shall also provide a covered area for limited aircraft maintenance and overhead protection for aircraft and Ground Support Equipment. The hangar is to replace the one destro | National Aeronautics and Space Administration | 9/18/2009 |
4W SOLUTIONS INC | $574,308 | Contract | : Blanket Purchase Agreement NNJ09JE24T (Call 12) support continues to procure administrative support services for the Office of Procurement in support of the placement and administration of construction contracts funded by the Recovery Act. Administrative | National Aeronautics and Space Administration | 6/15/2009 |
ASRC AEROSPACE CORP | $8,349,678 | Contract | : Recovery - ML Umbilicals, Access Systems and VSDS Design Support (CLIN 007) The Mobile Launcher (ML) is a large platform with a tower used to transport, service, and launch the next generation launch vehicle and spacecraft (Ares I and Orion). This expendi | National Aeronautics and Space Administration | 8/31/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $10,581 | Contract | : Task Order 19: Replace Roof Bluilding #9S | National Aeronautics and Space Administration | 7/23/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $6,507 | Contract | : Task Order 25: Repair Street, Parking Lot and Sidewalk Lights | National Aeronautics and Space Administration | 7/23/2009 |
GILBANE BUILDING COMPANY | $2,920,323 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 8/18/2009 |
COMPETITIVE CHOICE, INC. | $82,579 | Contract | : Replaced the carpet and cove base in various rooms of Bldg 2 South as a result of damage substain from Hurricane Ike. | National Aeronautics and Space Administration | 9/29/2009 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $1,431,820 | Contract | : Research and Development to Mature Airborne Self-Separation Algorithms and Concepts (Task 334) The NASA Langley Air Traffic Operations Laboratory (ATOL) houses a suite of complex, high-fidelity simulation systems dedicated to the research of advanced Air | National Aeronautics and Space Administration | 11/25/2009 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $853,881 | Contract | : Research and Development to Conduct Air-ground Functional Allocation Studies (Task 341) The NASA Next Generation Air Transportation System (NextGen) - Airspace Project, under the Airspace Systems Program (ASP), directly addresses the fundamental air traff | National Aeronautics and Space Administration | 12/10/2009 |
SIERRA LOBO, INC. | $655,758 | Contract | : Testing Support of the Rolls-Royce Highly Variable Cycle (HVC) Nozzle | National Aeronautics and Space Administration | 12/29/2009 |
WYLE LABORATORIES, INC. | $163,957 | Contract | : Commercial vehicles intended for human spaceflight need to apply human rating requirements to spacecraft design. This TDO supports the effort to ensure that human rating compliance is met by applying human systems integration within the systems engineeri | National Aeronautics and Space Administration | 10/22/2009 |
SIERRA LOBO, INC. | $200,251 | Contract | : Fabrication and Testing of 500¢ª C Integrated Electronic Capacitors for Wireless Sensing Applications | National Aeronautics and Space Administration | 12/29/2009 |
SIERRA LOBO, INC. | $749,996 | Contract | : Ultra High Bypass Drive Rig Refurbishment | National Aeronautics and Space Administration | 12/29/2009 |
GENERAL DYNAMICS ADVANCED INFORMATION SYSTEMS, INC. | $41,548,923 | Contract | : CLIN 04 FUNDS ARE IN SUPPORT OF THE FOLLOWING EFFORTS: CRITICAL DESIGN REVIEW - ENGINEERING PEER REVIEWS - MISSION CRITICAL DESIGN REVIEW - SPACECRAFT INTEGRATION READINESS REVIEW. CLIN 04 AWARDED 23 OCT 2009; $28,552,522. CLIN 05 FUNDS ARE IN SUPPORT O | National Aeronautics and Space Administration | 10/23/2009 |
THE CUBE CORPORATION | $9,000,000 | Contract | : Revision B: The scope of this task is being modified based on Revision B of the Recovery Act Project Plan, Wallops Flight Facility Launch Infrastructure Updates. Purchase and installation of blast wall is removed from the scope. Added to the scope are the | National Aeronautics and Space Administration | 9/22/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $1,800,000 | Contract | : The effort for the Earth Observing System (EOS) is a focal point of NASA's Earth Science Enterprise, designed to further the understanding of global climate change by providing a global observing system and a comprehensive range of measurements. The Trop | National Aeronautics and Space Administration | 10/28/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $500,000 | Contract | : Deformation, Ecosystem Structure, and Dynamics of Ice (DESDynI) mission was one of the missions recommended to NASA in supoort of the Earth Science and Applications from Space. The msision explicitly addresses the fundamental question for Earth Sciences | National Aeronautics and Space Administration | 11/23/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $244,631 | Contract | : The Joint Center for Satelllite Data Assimilation (JCSDA) will lead a task that will test a new transmittance algorithm, prepare the operational analysis software to assimilate radiance data from the Microwave Limb Sounder on Aura, and will prototype a po | National Aeronautics and Space Administration | 10/14/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $270,513 | Contract | : NASA has assigned Goddard Modeling and Analysis Office (GMAO) the task of developing and Integrated Earth System Analysis (IESA) In support of that effort, JPL will lead a team consisting of members from the Goddard Institute for Space Studies (GISS), G | National Aeronautics and Space Administration | 10/15/2009 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $600,000 | Contract | : The objective of this task is to enhance NASA's capability to communicate the results of NASA's Earth Science program and its relevance to today's scientific and social challenges, particularly in the area of global climate change. The result will be to | National Aeronautics and Space Administration | 10/29/2009 |
COMPUTER SCIENCES CORPORATION | $900,000 | Contract | : The goal of this task is procure storage and compute assets to host the Terrestrial Observation and Predication System (TOPS) Collaborative. TOPS will provide a major new collaboration platform for the Earth science community that will enable a new direc | National Aeronautics and Space Administration | 10/14/2009 |
SGT, INC. | $500,000 | Contract | : This task supports NASA Recovery Act work sponsored by the Science Mission Directorate and the Earth Science Research & Applications Program. NASA Earth Science program studies Earth from space to advance scientific understanding and meet societal needs. | National Aeronautics and Space Administration | 12/02/2009 |
JACOBS TECHNOLOGY INC. | $9,000,000 | Contract | : Reactivation of Mitsubishi Make-Up Air (MUA) system for Unitary Plan Wind Tunnels (UPWT) Operation under contract NNA09DB39C. | National Aeronautics and Space Administration | 10/14/2009 |
LOCKHEED MARTIN CORPORATION | $4,730,622 | Contract | : Perform research and development by conducting systems level experimental validations in support of NASA's research for an N+2 (N+2, denotes two generations beyond the current commercial transport fleet in the 2018-2020 timeframe) future supersonic commer | National Aeronautics and Space Administration | 12/02/2009 |
JACOBS TECHNOLOGY INC. | $3,257,235 | Contract | : (1) Lox Barge Shipyard Repairs to NASA owned Liquid oxygen (LOX) barge. Efforts include removal of technical systems in support of preparing for transfer to dry dock; refurbishing required technical systems and installation on LOX barge after shipyard rep | National Aeronautics and Space Administration | 12/04/2009 |
SIERRA LOBO, INC. | $732,087 | Contract | : Test Support of the Low-Boom External Compression Supersonic Inlet Test | National Aeronautics and Space Administration | 1/04/2010 |
AVCON INDUSTRIES INC | $936,100 | Contract | : Modification of King Air 200 for Special Mission | National Aeronautics and Space Administration | 10/28/2009 |
BALL AEROSPACE & TECHNOLOGIES CORP. | $9,772,494 | Contract | : NATIONAL AERONAUTICAL & SPACE ADMINISTRATION (NASA) AND THE GODDARD SPACE FLIGHT CENTER (GSFC) HAS A REQUIREMENT FOR THE CONTINUATION OF THE GLOBAL PRECIPITATION MEASUREMENT (GPM) MICROWAVE IMAGER (GMI) INSTRUMENT. THE GMI INSTRUMENT IS A 13 CHANNEL RADIO | National Aeronautics and Space Administration | 10/09/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $671,998 | Contract | : The task will support the Gobal Modeling and Assimilations Office's (GMAO?s) activities as part of the Recovery Act Plan. Particular focus areas are: (a) Progress towards an Integrated Earth System Analysis by undertaking simulations with the GEOS-5 mode | National Aeronautics and Space Administration | 12/11/2009 |
MANTECH SRS TECHNOLOGIES, INC. | $563,491 | Contract | : Provides overall Safety, Reliability and Mission Assurance support for the GSFC-built and managed Thermal Infrared Sensor (TIRS) instrument project. | National Aeronautics and Space Administration | 12/17/2009 |
BALL AEROSPACE & TECHNOLOGIES CORP. | $12,754,478 | Contract | : THIS PROCUREMENT IS FOR THE OLI INSTRUMENT FOR THE NEXT SPACECRAFT IN THE LANDSAT SERIES OF SATELLITES. THIS PROCUREMENT WILL RESULT IN THE AWARD OF A SINGLE COST-PLUS-AWARD-FEE (CPAF) CONTRACT WITH A PERFORMANCE INCENTIVE. LANDSAT SATELLITES HAVE PROVI | National Aeronautics and Space Administration | 10/15/2009 |
BALL AEROSPACE & TECHNOLOGIES CORP. | $4,125,000 | Contract | : PROVIDE ENGINEERING AND FLIGHT MODEL CRYOCOOLERS TO THE THERMAL INFRARED SENSOR (TIRS) PROJECT. ACCORDINGLY, THE CONTRACTOR WILL DELIVER THE FOLLOWING: ONE CRITICAL DESIGN REVIEW (CDR), ONE ENGINEERING MODEL (EM) CRYOCOOLER THERMO-MECHANICAL UNIT (TMU), | National Aeronautics and Space Administration | 11/12/2009 |
FIBERTEK, INC. | $1,262,605 | Contract | : Design, build and deliver three Compact, High PRF Laser Oscillator Breadboards. | National Aeronautics and Space Administration | 10/21/2009 |
FIBERTEK, INC. | $3,846,122 | Contract | : LSES Task 2: Laser Engineering Preliminary Design Evaluation. This task will support NASA's in-house ATLAS laser development effort and a Fibertek system level design effort for the ALTAS laser. | National Aeronautics and Space Administration | 11/13/2009 |
FIBERTEK, INC. | $2,159,110 | Contract | : LSES Task 3: MOPA Laser System Brassboard. Task Order 3 involves designing, building, demonstrating and delivering a complete, compact, high-repetition rate, wavelength-controlled micropulse Master Oscillator Power Amplifier (MOPA) laser system brassboa | National Aeronautics and Space Administration | 12/07/2009 |
FIBERTEK, INC. | $3,337,200 | Contract | : Task Order 4: Planar Waveguide MOPA Breadboard. TO4 will investigate and deliver a planar waveguide laser transmitter brassboard that has undergone sufficient technology development to credibly reach TRL 6 by the ATLAS Laser Preliminary Design Review. Thi | National Aeronautics and Space Administration | 12/08/2009 |
FIBERTEK, INC. | $3,335,287 | Contract | : Task Order 5: Fiber Laser MOPA. This task involves designing, building, demonstrating and delivering a complete, compact, high-repetition rate, wavelength-controlled micropulse master oscillator power amplifier (MOPA) laser system brassboard. This task w | National Aeronautics and Space Administration | 12/08/2009 |
FIBERTEK, INC. | $704,980 | Contract | : LSES Task 6: High PRF, Micropulse Laser System for Aircraft Instrument Use Development of an aircraft demonstrator/simulator instrument for the Ice, Cloud and Land Elevation Satellite 2 (ICESat-2) photon-counting instrument. The Project requires a lase | National Aeronautics and Space Administration | 12/07/2009 |
RAYTHEON COMPANY | $2,256,239 | Contract | : This Task Order provides for the technology refresh of the software and hardware of the Earth Orbiting Satellite Date Information System (ECS) Science Data Processing System (SDPS) and the ECS maintenance environment. It also provides for program manageme | National Aeronautics and Space Administration | 10/28/2009 |
RAYTHEON COMPANY | $5,239,804 | Contract | : This Task Order 1, Rev 2 provides for the continuation of Statement of Work activities established during Task Order 1 award. The purpose of Task Order 1, Rev 2 is to fund activities for the period of November 2, 2009 through March 5, 2009 with ARRA fundi | National Aeronautics and Space Administration | 11/02/2009 |
TELEDYNE SCIENTIFIC & IMAGING, LLC | $2,727,793 | Contract | : Initial award of the Thermal Infrared Sensor (TIRS) Program | National Aeronautics and Space Administration | 10/23/2009 |
FCN, INC. | $723,998 | Contract | : This Contract Action contains Recovery Act Funding towards the Purchase of MODIS Equipment: S2A 9900 Couplet- 8 x FC 8 Host Ports Active | National Aeronautics and Space Administration | 11/09/2009 |
CSC APPLIED TECHNOLOGIES, LLC | $3,050,882 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Project under Delivery Order's 928-934, 994-995, 1011 and Task Order 74. | National Aeronautics and Space Administration | 8/28/2009 |
CANAVERAL CONSTRUCTION CO., INC. | $1,200,000 | Contract | : Recovery Upgrades to Launch Complex 40: Provide all services, skills, expertise, labor and materials needed to construct, complete, and provide fully functional facilities, structures, systems or modifications as required to implement the requireme | National Aeronautics and Space Administration | 12/21/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $561,900 | Contract | : SAIC will provide technical expertise and adminstrative support to the NASA Science Support Office in the preparation for and during the evaluation of the Earth Venture-1 (EV-1) proposals (a maximum of 35 proposals). SAIC's technical support will include | National Aeronautics and Space Administration | 11/19/2009 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $500,000 | Contract | : This task order supports the Climate Absolute Radiance and Refractivity Observatory (CLARREO) Mission Concept study being conducted by NASA Langley Research Center in accordance with NASA Space Flight Program and Project Management Requirements (NPR) 7120 | National Aeronautics and Space Administration | 12/18/2009 |
BOEING COMPANY, THE | $2,796,179 | Contract | : NASA?s Supersonics Project is a broad-based effort designed to develop knowledge, capabilities and technologies that support vehicles that fly in the supersonic speed regime. A major focus of this effort is eliminating the efficiency, environmental and pe | National Aeronautics and Space Administration | 12/17/2009 |
FIBERTEK, INC. | $422,894 | Contract | : Development of a Single-Frequency Global Ozone Lidar Demonstrator (GOLD) /Ozone Differential Absorption Lidar (DIAL) Pump Laser Transmitter. | National Aeronautics and Space Administration | 12/09/2009 |
BOEING COMPANY, THE | $596,245 | Contract | : Integrated reasoning approaches to vehicle-level health management can ensure vehicle safety as well as timely and cost-effective maintenance to satisfy operational and business goals. However, the complexity of current and future air vehicle system arch | National Aeronautics and Space Administration | 12/17/2009 |
INTELLIGENT AUTOMATION, INC | $1,016,811 | Contract | : NASA's System Level Design, Analysis, and Simulation Tools (SLDAST) requires a lower-fidelity representation of the components of the Airborne Separation Assistance System (ASAS). This new representation can be used both in NAS-wide simulations for syste | National Aeronautics and Space Administration | 11/20/2009 |
PRATT & WHITNEY ROCKETDYNE, INC. | $48,900,000 | Contract | : American Recovery and Reinvestment Act Risk Mitigation: J-2X Rocket Engine Development Project implementation of the following tasks: 1) Program Management Tasks including Monthly Program Reviews to ensure complete coverage of statement of work, logical | National Aeronautics and Space Administration | 10/21/2009 |
APPLIED GEO TECHNOLOGIES, INC. | $30,795 | Contract | : Original award amount $38780.61 reduced by $7985.62. New total award amount is $30794.99. Laboratory Service Support at Stennis Space Center. Funding provided is designated for Calibration and Cleaning services by and through the AGT Laboratory of SSC for | National Aeronautics and Space Administration | 12/14/2009 |
JACOBS TECHNOLOGY INC. | $2,680,691 | Contract | : Provide engineering procurement packages, system preperations, shipyard transfers, repair verifications, and full operability tests to complete the tug boat and liquid oxygen (LOX) barge repairs. Purchase material and provide shop support for the installa | National Aeronautics and Space Administration | 12/04/2009 |
NOVAWAVE TECHNOLOGIES, INC. | $599,999 | Contract | : Compact Dual Channel Mid-Ir Laser Spectrometer | National Aeronautics and Space Administration | 11/12/2009 |
SAFEWARE ENGINEERING CORPORATION | $576,387 | Contract | : This is an ARRA SBIR Phase II Award. The proposal title is Automated Test Case Generation From Highly Reliable Systems Requirements Models. Software testing is a complex and expensive phase of the software development cycle. Effective software testing i | National Aeronautics and Space Administration | 11/13/2009 |
IMPACT TECHNOLOGIES LLC | $586,516 | Contract | : Impact Technologies, LLC is developing key enhancements to NASAG??s Hybrid Diagnostic Engine (HyDE) that represent valuable and, in some cases, critical features for Integrated System Health Management (ISHM) developers in NASA and non-NASA application do | National Aeronautics and Space Administration | 11/13/2009 |
ACCELOGIC, LLC | $600,000 | Contract | : Novel supercomputing approaches for high performance linear algebra using FPGAs --Supercomputing plays a major role in many areas of science and engineering, and it has had tremendous impact for decades in areas such as aerospace, defense, and energyG??to | National Aeronautics and Space Administration | 11/17/2009 |
ROLLING HILLS RESEARCH CORP | $600,000 | Contract | : This contract is a Phase 2 Small Business Innovative Research (SBIR) program that seeks to develop an innovative sensor system that can detect separated flow over a wide range of flight or ground test conditions. The Phase 1 program demonstrated the feas | National Aeronautics and Space Administration | 12/01/2009 |
AERODYNE RESEARCH, INC. | $599,845 | Contract | : Federally Awarded Contract | National Aeronautics and Space Administration | 12/03/2009 |
MATERIALS RESEARCH & DESIGN INC | $599,962 | Contract | : Extreme Environment Damage Index and Accumulation Model for CMC Laminate Fatigue Life Prediction | National Aeronautics and Space Administration | 11/10/2009 |
VISTA PHOTONICS, INC. | $600,000 | Contract | : NEW SENSOR TECHNOLOGY IS REQUIRED TO FACE THE CHALLENGING TASKS ASSOCIATED WITH FUTURE SPACE EXPLORATION INVOLVING MISSIONS TO THE MOON AND MARS. THE SAFETY AND WELL-BEING OF THE CREW CRITICALLY DEPENDS ON EARLY DETECTION OF THREATS AS WELL AS MAINTAINING | National Aeronautics and Space Administration | 12/06/2009 |
FLIGHT LANDATA, INC. | $599,909 | Contract | : Miniaturized Airborne Imaging Central Server System - Phase II | National Aeronautics and Space Administration | 10/29/2009 |
SPECTRA RESEARCH, INC. | $599,996 | Contract | : Investigate how the advances in antenna technology can be applied to develop, build, and test a prototype array for Hurricane Imaging Radiometer (HIRAD) applications. | National Aeronautics and Space Administration | 10/29/2009 |
TLC PRECISION WAFER TECHNOLOGY, INC. | $635,999 | Contract | : X-BAND TO W-BAND DOPPLER RADAR USING RECONFIGURABLE RF T/R MMIC SERIES | National Aeronautics and Space Administration | 12/28/2009 |
PIONEER ASTRONAUTICS | $599,990 | Contract | : Multi-Cell Thermal Battery, NASA SBIR | National Aeronautics and Space Administration | 10/13/2009 |
COHERENT TECHNICAL SERVICES, INC. | $599,948 | Contract | : Develop and deliver Avionics System for Remotely operated Vehicle. | National Aeronautics and Space Administration | 11/09/2009 |
PHYSICAL SCIENCES, INC. | $599,988 | Contract | : Design and analyze a lunar habitat wall system using ceramic material as the primary structural member. | National Aeronautics and Space Administration | 11/10/2009 |
SIENNA TECHNOLOGIES, INC. | $600,000 | Contract | : A RELIABLE ELECTRONIC PACKAGE FOR SPACE EXPLORATION | National Aeronautics and Space Administration | 11/10/2009 |
TRANSITION45 TECHNOLOGIES, INC. | $600,000 | Contract | : Small Business Innovative Research (SBIR) Program on Friction Stir Processing of Cast Superalloys. | National Aeronautics and Space Administration | 10/13/2009 |
ROLLING HILLS RESEARCH CORP | $600,000 | Contract | : This contract is a Phase 2 Small Business Technology Transfer (STTR) program that seeks to utilize expertise at California Polytechnic State University, San Luis Obispo, in rocket motor testing and a unique nitrous oxide cooling application, and combine i | National Aeronautics and Space Administration | 10/23/2009 |
BALCONES TECHNOLOGIES LLC | $599,949 | Contract | : In the project titled Active Vibration Isolation System for Mobile Launch Platform Ground Support Equipment, the Balcones Technologies and UT-Center for Electromechanics team will design, fabricate, and test first and second generation actuators used for | National Aeronautics and Space Administration | 10/22/2009 |
ICS LLC | $599,185 | Contract | : Flight Lossless Data Compression Electronics | National Aeronautics and Space Administration | 11/24/2009 |
EARTH RESOURCES TECHNOLOGY, INC. | $28,494 | Contract | : Task Order 38: Provide Environmental Support for West Re-Roof & Renovations at Building 3 Cafeteria at Johnson Space Center (JSC) | National Aeronautics and Space Administration | 12/04/2009 |
CREARE INCORPORATED | $99,533 | Contract | : Radioisotope Power Systems (RPS) are critical for future flagship exploration missions in space and on planetary surfaces. Small improvements in the RPS performance, weight, size, and/or reliability can have a dramatic effect on the scientific capability | National Aeronautics and Space Administration | 1/29/2010 |
JACOBS TECHNOLOGY INC. | $788,200 | Contract | : NNC10CA16C Mod 1 is to add temperature control loop to secondary loop piping | National Aeronautics and Space Administration | 3/25/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $760,000 | Contract | : This task will develop a modeling and simulation approach to gather data for unmanned aircraft systems (UAS) operations in the National Air Space (NAS) in both nominal and off-nominal conditions. Specifically, SAIC will initiate the development of a robus | National Aeronautics and Space Administration | 3/31/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $2,428,207 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Projects ubnder Delivery Order 1168. | National Aeronautics and Space Administration | 1/29/2010 |
NORTHROP GRUMMAN SYSTEMS CORPORATION | $2,147,931 | Contract | : This effort covers the design and fabrication of two Pod Attachment Assemblies for integration of the Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) Pods and the related engineering analysis, modification of the aircraft, and othe general in | National Aeronautics and Space Administration | 3/11/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $939,697 | Contract | : The NASA Next Generation Air Transportation System (NextGen) - Airspace Project, under the Airspace Systems Program (ASP), directly addresses the fundamental air traffic management (ATM) research needs for NextGen (www.jpdo.gov/nextgen.asp) by developing | National Aeronautics and Space Administration | 3/08/2010 |
NANOSCALE MATERIALS, INC. | $100,000 | Contract | : Odor Control in Spacecraft Waste Management. Development of a sorbent for destructive adsorption of malodorous compounds, in particular sulfides (e.g. hydrogen sulfide), volatile carboxylic acids (e.g. butyric acid), and amines (e.g. skatole, which is res | National Aeronautics and Space Administration | 1/29/2010 |
LW MICROSYSTEMS INC | $100,000 | Contract | : The objective of the project is to develop miniature bandpass RF frequency filter for SMAP, Aquarius follow-on, DESDynI, or Advanced L-band SAR and interferometers applications. The work includes: 1. Complete a detailed critical path work plan. 2. Desi | National Aeronautics and Space Administration | 1/29/2010 |
UNITED LAUNCH ALLIANCE, L.L.C. | $6,698,596 | Grant | Exploration, Recovery Act: The Space Act Agreement awarded to ULA is anticipated to make significant progress on commercial crew spaceflight long lead capabilities, technologies, and commercial crew risk mitigation tasks as well as accelerate and mature the design and development o | National Aeronautics and Space Administration | 1/30/2010 |
JACOBS TECHNOLOGY INC. | $4,965,903 | Contract | : Objective is to improve the technical capability of the NTF in providing high quality Reynolds number testing by upgrade of the existing Data Acquisition System (DAS). The upgrade will improve the NTF's technical viability in the form of advanced data co | National Aeronautics and Space Administration | 3/10/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $261,591 | Contract | : Task 23 ARRA Data Publication - The purpose of this task is to provide support to the NASA Center for Computational Sciences (NCCS) Data Publication activities in coordination with the Global Modeling & Assimilation Office (GMAO), Goddard Institute for Sp | National Aeronautics and Space Administration | 1/14/2010 |
PARAGON SPACE DEVELOPMENT CORPORATION | $1,443,600 | Grant | Exploration, Recovery Act: By December 2010, working in coordination with the vehicle developers and the NASA Commercial Crew and Cargo Program Office (C3PO), Paragon will complete development of a Commercial Crew Transport Air Revitalization System (CCT-ARS) through preliminary de | National Aeronautics and Space Administration | 1/30/2010 |
UNIVERSITY CORPORATION AT MONTEREY BAY | $1,950,000 | Grant | Science, Recovery Act: This cooperative applied research project is between NASA-Ames Research Center (ARC), Science Mission Directorate, Earth Science Division, Biospheric Science Branch and the University Corporation at Monterey Bay on behalf of California State University Mo | National Aeronautics and Space Administration | 2/26/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $216,097 | Contract | : This task supports NASA LaRCG??s unmanned aerial vehicle (UAV) airborne Global Ozone Lidar Demonstrator (GOLD) remote sensing program. Support includes the design and development of hardware; including mechanical systems, opto-mechanical systems, thermal | National Aeronautics and Space Administration | 1/15/2010 |
MASSTECH, INC. | $99,826 | Contract | : We propose to build a compact, rugged field-deployable laser photoacoustic spectrometric (LPAS) sensor for continuous, real-time measurements of multiple chemical components, and perform field tests to qualify it for dynamic monitoring of Water Vapor, C | National Aeronautics and Space Administration | 1/29/2010 |
EPIR TECHNOLOGIES INC | $99,998 | Contract | : A constant demand exists to improve the sensitivity of trace chemical species measurement systems, which is often limited by the performance of the infrared photon detector components. The significant cooling required to reduce dark currents and increase | National Aeronautics and Space Administration | 1/29/2010 |
FIREFLY TECHNOLOGIES | $99,975 | Contract | : Space missions to probe environments close to the sun will require photovoltaic cells capable of operating efficiently at high temperatures, under high light intensity, and high radiation conditions. Several missions are currently planned to study inner r | National Aeronautics and Space Administration | 1/29/2010 |
GENERAL ELECTRIC COMPANY | $6,486,900 | Contract | : The NASA N+2 Low Emission Combustor program develops improved technologies and prediction methods to meet NASA's technology goals for future (2020) subsonic aircraft. The NASA technology goals consist of a specific level of reduced noise, reduced fuel bu | National Aeronautics and Space Administration | 3/12/2010 |
FLIGHT RESEARCH ASSOCIATES, INC. | $70,428 | Contract | : Subject Matter Experts to support Surface Human In The Loop Simualation for Evaluation of Airportal Surface Scheduling Algorithms | National Aeronautics and Space Administration | 2/24/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $3,060,162 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects under Delivery Order 1201. | National Aeronautics and Space Administration | 2/22/2010 |
ATK SPACE SYSTEMS INC. | $88,027 | Contract | : Open Circuit Resonate Sensor for Composite Diagnosis | National Aeronautics and Space Administration | 2/22/2010 |
INTELLIGENT FIBER OPTIC SYSTEMS CORPORATION | $99,708 | Contract | : Intelligent Fiber Optic Systems Corporation (IFOS) and Auburn University are developing a Fiber Bragg Grating (FBG) integrated Structural Health Monitoring (SHM) sensor system capable of providing in-situ crack detection, location and quantification of da | National Aeronautics and Space Administration | 1/29/2010 |
SIERRA NEVADA CORPORATION | $20,000,000 | Grant | Exploration, Recovery Act: Sierra Nevada Corporation (SNC) is partnering with NASA to advance the development of a commercial crew space transportation system as part of the Commercial Crew Development (CCDev) program. CCDEv is funded by the American Recovery and Reinvestment Act | National Aeronautics and Space Administration | 1/30/2010 |
ATMOSPHERIC OBSERVING SYSTEMS, INC | $100,000 | Contract | : We are developing high altitude CO2 analyzer technology that can be deployed on the research aircraft of NASA's Airborne Science Program (ASP). The ultimate scientific goal is the calibration/validation of CO2 observations made from spacecraft. Two forms | National Aeronautics and Space Administration | 1/29/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $123,009 | Contract | : This task provides support to design, assemble, operate, and maintain the GOLD lidar system. This shall include optimizing opto-mechanical designs, performing optical alignments, and developing software and procedures for the laser and data acquisition sy | National Aeronautics and Space Administration | 1/15/2010 |
ATK SPACE SYSTEMS INC. | $127,936 | Contract | : Monitor and Assess the Effectiveness of Airframe Structural Damage | National Aeronautics and Space Administration | 3/04/2010 |
DB CONSULTING GROUP, INC. | $924,617 | Contract | : Recovery Act - Unmanned Aircraft Systems (UAS) in the NAS/NextGen Engineering Support. | National Aeronautics and Space Administration | 2/01/2010 |
OPTIMAL SYNTHESIS INC. | $175,391 | Contract | : Airspace simulations and modeling are important methods used for creating a future national airspace system. One of the existing tools that is used to develop and evaluate the impact and benefits of advanced air traffic management concepts is FACET or the | National Aeronautics and Space Administration | 2/05/2010 |
BLUE ORIGIN, LLC | $3,665,000 | Grant | Exploration, Recovery Act: Retiring Key Technology Risks for Orbital Space Flight: Two enabling technologies for the orbital Space Vehicle are the pusher escape system and composite pressure vessel cabin. Blue Origin proposes to use NASA co-funding to retire select development ris | National Aeronautics and Space Administration | 1/30/2010 |
ORBITAL TECHNOLOGIES CORPORATION | $100,000 | Contract | : Demonstrate the technical feasibility of the Advanced Carbothermal Electric Reactor concept to extract oxygen and other useful products from the extraterrestrial regolith (Moon, Mars, asteroids, etc.). | National Aeronautics and Space Administration | 1/29/2010 |
ASRC AEROSPACE CORP | $1,179,991 | Contract | : Recovery Act, Ultra HighBypass Turbine-Powered Simulator Fan Model | National Aeronautics and Space Administration | 3/03/2010 |
GLOBAL SCIENCE & TECHNOLOGY, INC. | $97,758 | Contract | : Systems and Services for Near Real Time Web Access to NPP | National Aeronautics and Space Administration | 1/29/2010 |
UNIVERSITY OF KANSAS CENTER FOR RESEARCH, INC. | $2,106,658 | Contract | : The Center for Remote Sensing of Ice Sheets (CReSIS) at the University of Kansas has deployed a radar package as part of the spring 2010 Operation Ice Bridge (OIB) mission to Greenland on the NASA P-3 and NASA DC-8 aircraft. The package consists of an adv | National Aeronautics and Space Administration | 3/24/2010 |
TOUCHSTONE RESEARCH LABORATORY LTD (INC) | $100,000 | Contract | : Touchstone will develop a process for producing thin MMC liners for Composite Overwrapped Pressure Vessels (COPVs) that will have enough strength to withstand tensile loading at maximum expected operating pressure (MEOP) and significantly retard crack gro | National Aeronautics and Space Administration | 1/29/2010 |
OPTIMAL, LLC | $96,792 | Contract | : The purpose of the contract is to develop a flexible geometry toolkit for shape parameterization and modification as required for design optimization. The outcomes will be software executables and libraries suitable for commercialization by our company an | National Aeronautics and Space Administration | 1/29/2010 |
ATK SPACE SYSTEMS INC. | $1,349,280 | Contract | : A Research & Development Plan for UAS Access to the Next Generation Air Tra | National Aeronautics and Space Administration | 1/28/2010 |
NANOSONIC INC. | $100,000 | Contract | : Radiation Resistant, Reconfigurable, Shape Memory Metal Rubber? Space Arrays The overall objective of NanoSonic?s Phase I NASA SBIR program entitled ?Radiation Resistant, Reconfigurable, Shape Memory Metal Rubber? Space Arrays? is to demonstrate highly e | National Aeronautics and Space Administration | 1/29/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $2,974,407 | Contract | : The key goals of this Recovery Act funding are to significantly improve the analytical capabilities of researchers studying the Earth and its climate. This project will provide design and systems engineering toward the development of a new airborne instru | National Aeronautics and Space Administration | 3/08/2010 |
NORTHROP GRUMMAN SYSTEMS CORPORATION | $454,333 | Contract | : This effort covers the engineering analysis and design of the GOLD instrument support structure and integration; engineering participation in the design modifications, fabrication support, flight approval of the 360-EASA Radome fairin, development and tec | National Aeronautics and Space Administration | 3/08/2010 |
VANILLA AIRCRAFT | $100,000 | Contract | : Currently, wide area coverage with manned aircraft, or existing UAS, requires expensive logistical operations and many flight sorties, which are made especially difficult if operating from remote airfields in inhospitable climates. There is currently a ne | National Aeronautics and Space Administration | 1/29/2010 |
NORTHROP GRUMMAN INFORMATION TECHNOLOGY INC | $349,997 | Contract | : to evaluate the suitability and benefit of the current generation of hardware 'accelerators- these are specialized computing processor that improve the performance of more general processors by offloading cetain computationally expensive operations. Of pa | National Aeronautics and Space Administration | 3/12/2010 |
ASRC AEROSPACE CORP | $83,474 | Contract | : Recovery Act - Artificial Ice Shape Design for Loss-of-Control Prevention and Mitigation Studies. | National Aeronautics and Space Administration | 3/22/2010 |
ASRC AEROSPACE CORP | $69,982 | Contract | : Recovery Act, Advanced Control System Support for Aerospace Propulsion | National Aeronautics and Space Administration | 3/23/2010 |
OPERATIONAL TECHNOLOGIES CORPORATION | $99,985 | Contract | : Handheld FRET-Aptamer Sensor for Water Safety X2.03 Spacecraft Environmental Monitoring &Control Technical Abstract: Operational Technologies Corporation (OpTech) proposes to expand its current NASA Phase 2 SBIR handheld fluorometer and bone marker fluore | National Aeronautics and Space Administration | 1/29/2010 |
PLASMA PROCESSES, LLC | $100,000 | Contract | : Small and micro-spacecrafts require efficient, micro-propulsion systems. Chemical micro-propulsion is best suited for use as primary thrust, orbital insertion and attitude control because of its high energy density. When grouped into arrays for larger t | National Aeronautics and Space Administration | 1/29/2010 |
ATK SPACE SYSTEMS INC. | $138,175 | Contract | : Develop and Expand Expertise in Metroplex Concept Definition and Integrated | National Aeronautics and Space Administration | 2/23/2010 |
LUNA INNOVATIONS INCORPORATED | $99,991 | Contract | : During Phase I, Luna will demonstrate the feasibility of high-speed fiber optic gamma flux sensors in a nuclear reactor. | National Aeronautics and Space Administration | 1/29/2010 |
BALCONES TECHNOLOGIES LLC | $99,992 | Contract | : In the project titled Active Electromechnanical Suspension for Planetary Rovers, Balcones Technologies LLC (BT) will investigate the use and effectiveness of electromechanical suspension for wheeled/tracked vehicles for an unmanned planetary rover. The B | National Aeronautics and Space Administration | 1/29/2010 |
SGT, INC. | $160,000 | Contract | : A major limitation to the operation of UAS within the NextGen is inability to control the vehicle in the case of an emergency such as of loss communications or loss of an engine. One way these concerns can be resolved is by providing greater vehicle auto | National Aeronautics and Space Administration | 1/27/2010 |
IMPACT TECHNOLOGIES LLC | $99,703 | Contract | : Traditional anomaly detection and reactive fault tolerant control or fault mitigation approaches for critical aircraft systems fail to provide optimal fault accommodation over a long enough period of time to guarantee the integrity and sustainment of the | National Aeronautics and Space Administration | 1/29/2010 |
MAKEL ENGINEERING, INC. | $99,837 | Contract | : The objective of this research is a highly sensitive spectrometer based on glow discharge emission for the detection/classification of gas and aerosol species in post-fire cleanup scenarios on spacecraft. This device would complement technology that is a | National Aeronautics and Space Administration | 1/29/2010 |
ANASPHERE, INC | $99,784 | Contract | : A scalable dropsonde launcher will be developed that will be able to fit a range of UAVs. Dropsondes for high-precision, high-density, and surface-based measurements will be developed. | National Aeronautics and Space Administration | 1/29/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $2,600,000 | Contract | : This task supports NASA Recovery Act work sponsored by the Science Mission Directorate and the Earth Science Research & Applications Program. NASA Earth Science program studies Earth from space to advance scientific understanding and meet societal needs. | National Aeronautics and Space Administration | 3/08/2010 |
JACOBS TECHNOLOGY INC. | $3,010,427 | Contract | : Upgrade the Tunnel Controls System for the National Transonic Facility (NTF). The objective is to improve the technical viability of the NTF in providing continued high quality high Reynolds number testing by installing a new tunnel controls sytem, repla | National Aeronautics and Space Administration | 3/05/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $701,269 | Contract | : The objectives of this task are provided in the following subtasks: Subtask 1: Airspace and Traffic Operations Simulation (ATOS) 4-Dimensional Flight Management System (4D-FMS) Integration with the Autonomous Operations Planner (AOP) Background: The NAS | National Aeronautics and Space Administration | 3/31/2010 |
ANADARKO INDUSTRIES, L.L.C. | $28,770 | Contract | : Provide construction safety support for construction Roof Package options 1 through 6 and Roof Package 2 Options. The Roof Package 2 Options shall support the roof replacement and loggia ledge replacement on multiple facilities at the Johnson Space Cente | National Aeronautics and Space Administration | 8/31/2010 |
4W SOLUTIONS INC | $39,938 | Contract | : Blanket Purchase Agreement NNJ09JC52T (Call 16) Project Manager Support that includes first level review of significant actions; tracking progress on products; ensuring timely follow through and completion on work products; developing project plans and sc | National Aeronautics and Space Administration | 2/11/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $97,000 | Contract | : The task will support the Goddard Mesoscale Dynamics and Modeling Group?s activities as part of its support to the aforementioned SMD program. . The particular focus areas are to: (a) Develop MERRA-related software utilities for CRM simulations. The G | National Aeronautics and Space Administration | 3/31/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $250,000 | Contract | : Development of FFC for Safe and Efficient Surace Operations Simulations. The Contractor will deliver upgrades to the Future Flight Central (FFC) simulation laboratory.The work will allow complex experiments to reduce air traffic congestion at airports an | National Aeronautics and Space Administration | 3/22/2010 |
SGT, INC. | $1,145,000 | Contract | : A major limitation to the operation of UAS within the NextGen is inability to control the vehicle in the case of an emergency such as of loss communications or loss of an engine. One way these concerns can be resolved is by providing greater vehicle auto | National Aeronautics and Space Administration | 2/17/2010 |
INVOCON, INC. | $99,837 | Contract | : Invocon proposes the Surface-borne Time-Of-Reception Measurements (STORM) system as a method to locate the position of lightning strikes on aerospace vehicles. The system is intended to provide accurate lightning strike location information giving flight | National Aeronautics and Space Administration | 1/29/2010 |
AMERICAN TANK & VESSEL, INC. | $7,873,935 | Contract | : Contractor shall provide modifications to the A3 Test Cell/Diffuser. Work to include furnishing and installing the bypass lines, components, and valves and fabricate, test, ship, handle, and install the moveable, fixed, and reducing diffuser sections in | National Aeronautics and Space Administration | 3/23/2010 |
SGT, INC. | $593,600 | Contract | : This task supports NASA Recovery Act work in the Aviation Safety Program (AvSP) sponsored by the Aeronautics Research Mission Directorate. Research funded by the Recovery Act within the Aviation Safety Program will focus on developing innovative tools, | National Aeronautics and Space Administration | 2/17/2010 |
APPLIED SENSOR RESEARCH & DEVELOPMENT CORP | $99,684 | Contract | : This contract is for the research and development needed to develop passive (no batteries) wireless surface acoustic wave (SAW) temperature sensors with high sensitvity and enhanced wireless operating range for NASA application to remote wireless sensing | National Aeronautics and Space Administration | 1/29/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $822,000 | Contract | : ACFS Upgrade Development: Phase 3 Integration. The Contractor shall develop and implement a plan to upgrade the Advanced Concepts Flight Simulator (ACFS). The results shall be, the ACFS lab will have updated simulation software that is fully integrated w | National Aeronautics and Space Administration | 3/22/2010 |
SCIENTIC, INC. | $99,988 | Contract | : Commercial batteries have been used extensively by NASA to provide portable power for space applications for more than four decades. The cells range in capacity from 0.75 Ah to about 100 Ah, with a wider range of capacities and voltages at the batte | National Aeronautics and Space Administration | 1/29/2010 |
COMPUTER SCIENCES CORPORATION | $29,773 | Contract | : GSA Task Order: GS00T99ALD0203/4THM80046006 Mod 206 The Contractor will have responsibility for developing system requirements document and development of operational and test plans. The contractor will support the requirements development, acquisition | National Aeronautics and Space Administration | 1/29/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $274,964 | Contract | : This task supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this task will focus on addressing the capacity challenges facing the US national airspace. It is fore | National Aeronautics and Space Administration | 3/19/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $695,703 | Contract | : This task supports the development of the Airspace Super Density Operations (ASDO) FY2010 Milestone AS3.6.03 Simulations entitled G?Evaluation of Single Airport Operations using Human-Centric Operations.G? The software applications used for this simulatio | National Aeronautics and Space Administration | 2/11/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $300,000 | Contract | : Voice Communications System (VCS) Upgrade for the N210 Air Traffic Management (ATM) Lab. Based on Government approval of the prosposed work plan, the Contractor shall implement and install a VCS and infrastructure upgrades. The VCS will allow the ATM lab | National Aeronautics and Space Administration | 3/22/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $231,995 | Contract | : This task supports the initial integration of third-party advanced trajectory synthesis tools for terminal trajectory generation into the Air Traffic Management Lab for Airspace Super Density Operations (ASDO) research. The software applications used for | National Aeronautics and Space Administration | 2/11/2010 |
UNIVERSITY CORPORATION AT MONTEREY BAY | $1,400,000 | Grant | Science, Recovery Act: This primary objective of this cooperative program is to deploy virtualization technologies to build a community-focused data and modeling collaborative based on the Terrestrial Observation and Prediction System (TOPS). Using hardware visualization, this | National Aeronautics and Space Administration | 3/15/2010 |
ASRC AEROSPACE CORP | $399,381 | Contract | : Recovery Act - Operational Requirements and Analysis Support for Unmanned Aircraft Systems Access in the NextGen | National Aeronautics and Space Administration | 1/27/2010 |
RAYTHEON COMPANY | $44,741 | Contract | : This Task Order 1, Rev 2(A) provided for the continuation of Statement of Work activities established during Task Order 1 award. The purpose of Task Order 1, Rev 2(A) was to fund activities for the period of March 31, 2010 through April 27, 2010 with ARR | National Aeronautics and Space Administration | 3/31/2010 |
NEVA RIDGE TECHNOLOGIES, INC. | $99,912 | Contract | : Accelerated Scientific InSAR Processing SBIR Phase 1 | National Aeronautics and Space Administration | 1/29/2010 |
ATK SPACE SYSTEMS INC. | $184,137 | Contract | : Research and Development to Conduct Air-ground Functional Allocation Studie | National Aeronautics and Space Administration | 12/03/2009 |
SOUTHWEST SCIENCES, INC. | $100,000 | Contract | : IMPROVED TRACE GAS SPECTROMETER | National Aeronautics and Space Administration | 1/29/2010 |
LOGIC EVOLVED TECHNOLOGIES | $784,849 | Contract | : The objective of this work is to develop an integrated system logic gate model for NEXTGEN ATS. The systems model will be used to evaluate the risk-benefit for advanced technologies and Decision Support Tools (DSTs). The work consists of four main task el | National Aeronautics and Space Administration | 3/12/2010 |
SPECPRO ENVIRONMENTAL SERVICES LLC | $627,511 | Contract | : Clean-up debris, replace, repair, and restore the JSC Barge Dock that was damaged during Hurricane Ike in 2008. | National Aeronautics and Space Administration | 1/27/2010 |
AVERY PARTNERS, LLC | $17,750 | Contract | : Engine Inspection on DC-8, Flying Lab | National Aeronautics and Space Administration | 2/04/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $76,165 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects under Delivery Order 1011 and 4 Change Orders and Delivery Order | National Aeronautics and Space Administration | 3/17/2010 |
SIGMA SPACE CORPORATION | $1,300,000 | Contract | : The Laser Vegetation Imaging Sensor (LVIS) is a medium/high-altitude wide-swath laser altimeter that has, for over a decade, demonstrated state-of-the-art performance in measuring vegetation structure, and topography of land, oceans, ice sheets, and sea i | National Aeronautics and Space Administration | 2/02/2010 |
WOLF ENGINEERING, LLC | $82,001 | Contract | : SBIR Funded research and development. The purpose of the project is to investigate the use of membranes as a water recovery device for spacecraft. Current designs for manned spacecraft use CO2 removal technologies that also remove water. The purpose of th | National Aeronautics and Space Administration | 1/29/2010 |
MOSAIC ATM, INC. | $299,993 | Contract | : firm fixed price; Re-Architecture of the Surface Operations Data Analysis and Adaptation (SODAA) Tool to Support Warehousing | National Aeronautics and Space Administration | 2/05/2010 |
JACOBS TECHNOLOGY INC. | $1,303,122 | Contract | : Provide engineering, craft support (welders, carpenters, painters, and heavy equipment), Project Management, and Construction Management support to install structural cross-bracing on the existing take-out structure at the E-1 Complex. Provide engineering | National Aeronautics and Space Administration | 2/05/2010 |
COMPUTER SCIENCES CORPORATION | $338,148 | Contract | : The goal of this project is to develop an NCCS Data Management System (DMS) that provides a data grid approach to integrated, next-generation Earth science data services for NASA. A data grid is software that allows for the management, sharing, searchin | National Aeronautics and Space Administration | 3/08/2010 |
DEVELOPMENT ONE, INC. | $24,120 | Contract | : DOAF Science Lab End State | National Aeronautics and Space Administration | 2/10/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $242,808 | Contract | : The objective of this task is to evaluate the current Airborne Precision Spacing (APS) concept with realistic winds and wind forecast errors, and ADS-B range limitations. Several previous studies have identified winds, wind forecast errors, and ADS-B rang | National Aeronautics and Space Administration | 3/31/2010 |
CU AEROSPACE L.L.C. | $100,000 | Contract | : The primary objective of CU Aerospace?s Phase I work will be to fabricate and test aromatic thermosetting copolyesters (ATSP) composites for use as ablatives in next generation spacecraft missions. The synthetic development of novel aromatic thermosetting | National Aeronautics and Space Administration | 1/29/2010 |
JACOBS TECHNOLOGY INC. | $583,806 | Contract | : Enhancements to the Rotorcraft Test Cell at the 14 x 22 Foot Subsonic Wind Tunnel ay the NASA Langley Research Center. The objective of this work is to enhance the 14x22 Foot Subsonic Wind Tunnel complex Rotorcraft Test Cell control room, test equipment | National Aeronautics and Space Administration | 3/09/2010 |
QUEST PRODUCT DEVELOPMENT CORPORATION | $97,751 | Contract | : NASA contract to do research and development on new thermal insulation systems to insulate and preserve cryogenic propellants used in spacecraft, satellites and launch vehicles. Expected outcome is novel thermal insulation that is the best insulation yet | National Aeronautics and Space Administration | 1/29/2010 |
PRINCETON OPTRONICS, INC. | $99,993 | Contract | : Ultrastable, narrow linewidth, high reliability fiber laser sources at 1.5 or 2m are needed for high performance LIDARs for a number of NASA applications, including wind speed measurement, surface topography and earth and planetary atmosphere composition | National Aeronautics and Space Administration | 1/21/2010 |
ASRC AEROSPACE CORP | $1,070,630 | Contract | : Recovery Act, Advanced Subsonic Combustion Rig Plenum Redesign and Fabrication | National Aeronautics and Space Administration | 2/25/2010 |
CERALINK INC. | $99,817 | Contract | : In this ARRA funded SBIR Phase I project, Ceralink is demonstrating feasibility of microwave heating technologies for use in stabilizing dust on the surface of the moon (or Mars, etc.) to allow the preparation of solid landing and launch pads and roads. | National Aeronautics and Space Administration | 1/29/2010 |
UNITED TECHNOLOGIES CORPORATION | $7,354,981 | Contract | : This program is a 24 month effort to identify, design, and perform validation trials on combustor concepts that will meet NASA N+2 NOx emissions goal of 75% below CAEP/6. The combustor cycle conditions will be based on an engine cycle architecture and te | National Aeronautics and Space Administration | 2/11/2010 |
EDARCH-ERIE JV | $1,894,969 | Contract | : Install mechanical systems that represent a portion of the larger Engine Icing Capability Enhancement Project. The support systems include installation of equipment, piping, instrumentation, controls, power distribution and associated structural supports | National Aeronautics and Space Administration | 1/04/2010 |
JACOBS TECHNOLOGY INC. | $177,471 | Contract | : Operational Reliability Assessment for the National Transonic Facility (NTF). The objective of this task order is to improve the operational reliability of the NTF. To achieve this objective the Government is seeking a detailed operational reliability | National Aeronautics and Space Administration | 3/12/2010 |
GILBANE BUILDING COMPANY | $117,403 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS)services are comprised of the following: Oversight, inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and special | National Aeronautics and Space Administration | 12/04/2009 |
GILBANE BUILDING COMPANY | $44,827 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 3/04/2010 |
GILBANE BUILDING COMPANY | $19,946 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 3/04/2010 |
SIGMA SPACE CORPORATION | $583,200 | Contract | : The Laser Vegetation Imaging Sensor (LVIS) is a medium/high-altitude wide-swath laser altimeter that has, for over a decade, demonstrated state-of-the-art performance in measuring vegetation structure, and the topography of land, oceans, ice sheets, and s | National Aeronautics and Space Administration | 3/31/2010 |
KAITECH | $99,957 | Contract | : Kaitech in this Phase I project, to design a small singly deployable integrated water properties instrument that provides oceanographers with the abiity to measure the full visible band inherent and apparent optical properties of oceanic, coastal, and fre | National Aeronautics and Space Administration | 1/29/2010 |
THE BOEING COMPANY | $34,455,634 | Contract | : The contractor shall perform the following tasks: 1. Procure and deliver the Marshal | National Aeronautics and Space Administration | 3/15/2010 |
CORNERSTONE RESEARCH GROUP, INC | $99,999 | Contract | : Cornerstone Research Group, Inc. (CRG), is developing self-deploying, composite structures for lunar habitats, based on CRG's Veritex(TM) materials. These structures will provide a rigid, durable habitat that will reduce the risk of mechanical failure due | National Aeronautics and Space Administration | 1/29/2010 |
BOSTON APPLIED TECHNOLOGIES INCORPORATED | $99,981 | Contract | : SBIR Phase I: A Compact Self-Switching / Modulation 2 Micron Ceramic Laser | National Aeronautics and Space Administration | 1/29/2010 |
BOEING COMPANY, THE | $596,237 | Contract | : Task Order completed 12/16/2010. This effort is aimed at developing next-generation composite damage-arrest design principles that would be applicable to either a conventional tube-and-wing or a hybrid wing body aircraft, using the PRSEUS str | National Aeronautics and Space Administration | 2/18/2010 |
ATK SPACE SYSTEMS INC. | $333,949 | Contract | : AirSTAR Testbed Development and Support | National Aeronautics and Space Administration | 2/25/2010 |
MOSAIC ATM, INC. | $499,128 | Contract | : firm fixed price; translation and integration of weather data from the Localized Aviation MOS Program with FACET (LAMP) | National Aeronautics and Space Administration | 2/10/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $48,907 | Contract | : The purpose of this award is for the Prime Facility Support Services contractor to provide contruction support, as builting and all Maintenance activation for the Hurricane IKE Projects under Delivery 1011 Change #1. | National Aeronautics and Space Administration | 2/12/2010 |
ATK SPACE SYSTEMS INC. | $182,499 | Contract | : Research and Development to Mature Airborne Self-Separation Algorithms | National Aeronautics and Space Administration | 12/01/2009 |
VESCENT PHOTONICS, INC | $99,929 | Contract | : Precision Locking and Control of CW Lasers in Support of ASCENDS | National Aeronautics and Space Administration | 1/29/2010 |
JACOBS TECHNOLOGY INC. | $17,560,784 | Contract | : This project provides for the replacement of the existing refrigeration plant of the GRC Building No. 9 with a new refrigeration plant to be housed in a new building adjacent. The new building shall be known as GRC Building No. 170. The new refrigeratio | National Aeronautics and Space Administration | 3/05/2010 |
SGT, INC. | $600,000 | Contract | : This task supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this task will focus on addressing the capacity challenges facing the US national airspace. It is fo | National Aeronautics and Space Administration | 3/18/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $10,999 | Contract | : The purpose of thi saward is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The deliverables are Designs to Repair/Replace Roof s Damage by | National Aeronautics and Space Administration | 1/28/2010 |
BOEING COMPANY | $18,000,000 | Grant | Exploration, Recovery Act: NASA's Commercial Crew Development (CCDev) initiative provides a unique opportunity for the Boeing Company and Bigelow Aerospace to accelerate development of system concepts, key technologies, risk reductions, and procurement of long lead items. NASA's in | National Aeronautics and Space Administration | 1/30/2010 |
TLG AEROSPACE, LLC | $95,707 | Contract | : NASA SBIR A2.04-8692 Variable Fidelity Aeroelastic Toolkit - Structural Model | National Aeronautics and Space Administration | 1/29/2010 |
NUVOTRONICS, LLC | $99,976 | Contract | : SBIR Phase I R&D Contract | National Aeronautics and Space Administration | 1/29/2010 |
BOEING COMPANY, THE | $4,997,767 | Contract | : Task order completed 3/30/2011. For this task order, the Contarctor shall design, analyze, and fabricate tooling for a large-scale multi-bay test article that is capable of withstanding bending and internal pressure loadings | National Aeronautics and Space Administration | 2/18/2010 |
SGT, INC. | $494,000 | Contract | : This task supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Aviation Safety Program. Research funded by Recovery Act within the Aviation Safety Program will focus on developing innovative tools, concepts, | National Aeronautics and Space Administration | 3/10/2010 |
ZONA TECHNOLOGY, INC | $99,888 | Contract | : Multidisciplinary design, analysis, and optimization (MDAO) tools today possess limited disciplines with little multi-fidelity modeling capability. These tools are typically developed as a single large software application that performs analysis for all | National Aeronautics and Space Administration | 1/29/2010 |
OFFICE DESIGN GROUP, INC. | $44,142 | Contract | : CARPET, CONFERENCE FURNITURE, SEATING, AND INSTALLATION | National Aeronautics and Space Administration | 5/29/2010 |
NORTHROP GRUMMAN SYSTEMS CORPORATION | $25,617 | Contract | : Task covers the engineering analysis of the instrument-support structure and other general integration-related support necessary to accomadate the modifications of the ISS needed for the Land, Vegetation, and Ice Sensor (LVIS) and the mounting of the LVIS | National Aeronautics and Space Administration | 3/04/2010 |
ATK SPACE SYSTEMS INC. | $497,379 | Contract | : Research and Development for Integrated Air and Ground-based Concepts | National Aeronautics and Space Administration | 2/04/2010 |
ATK SPACE SYSTEMS INC. | $389,436 | Contract | : Develop and Expand Expertise in Metroplex Concept Definition and Integrated | National Aeronautics and Space Administration | 3/04/2010 |
EARTH RESOURCES TECHNOLOGY, INC. | $48,100 | Contract | : Task Order 41: Provide Environmental Support for Clean and Caulk PEAF Panels at various buildings | National Aeronautics and Space Administration | 1/08/2010 |
FIBERTEK, INC. | $778,496 | Contract | : This task involves building and delivering an autonomous data system that can be directly integrated with the airborne instrument. | National Aeronautics and Space Administration | 1/21/2010 |
GILBANE BUILDING COMPANY | $5,266 | Contract | : Consumables for Recovery Act requirement. | National Aeronautics and Space Administration | 8/24/2009 |
NORTHROP GRUMMAN INFORMATION TECHNOLOGY INC | $150,000 | Contract | : The purpose of this task is to evaluate the suitability of next-generation software versioning technologies for the Joint Center for Satellite Data Assimilation (JCSDA) and other modeling efforts under NASA's Modeling, Analysis, and Prediction (MAP) Progr | National Aeronautics and Space Administration | 3/31/2010 |
UNISYS CORPORATION | $265,213 | Contract | : The contractor shall perform the review, implementation, and operation of software in the AirSTAR flight control system and Generic Transport Model (GTM) simulation during the year 2010. During this year, three flight test campaigns are planned in order t | National Aeronautics and Space Administration | 2/26/2010 |
ASRC RESEARCH AND TECHNOLOGY SOLUTIONS, LLC | $310,070 | Contract | : Support the development and integration of the Thermal Infrared Sensor (TIRS) in-house instrument at the NASA Goddard Space Flight Center (GSFC). | National Aeronautics and Space Administration | 2/03/2010 |
ASRC AEROSPACE CORP | $299,993 | Contract | : Recovery Act, Advanced Subsonic Combuster Rig (ASCR) Alternate Fuels Design | National Aeronautics and Space Administration | 2/25/2010 |
JACOBS TECHNOLOGY INC. | $2,047,294 | Contract | : Fuel Supply and Purge Systems for the 14x22 Foot subsonic Wind Tunnel at the NASA Langley Research Center | National Aeronautics and Space Administration | 4/02/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $795,534 | Contract | : CLIN 013 WB-57 Aileron Project Phase I. Task Order NNJ10JB11T placed under Contract NNJ09JE44C to procure services in support of Phase One of a project to manufacture four sets of ailerons and associated hardware for the NASA's WB-57 high altitude researc | National Aeronautics and Space Administration | 1/14/2010 |
ATK SPACE SYSTEMS INC. | $647,356 | Contract | : Research and Development for Enhancement of 4-Dimensional Flight Management | National Aeronautics and Space Administration | 2/23/2010 |
NATIONAL INSTITUTE OF AEROSPACE ASSOCIATES | $662,400 | Contract | : Materials Research for Aircraft Aging & Durability | National Aeronautics and Space Administration | 3/30/2010 |
SGT, INC. | $500,000 | Contract | : This task supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this task will focus on addressing the capacity challenges facing the US national airspace. It is fo | National Aeronautics and Space Administration | 3/18/2010 |
REINTJES SERVICES, INC. | $644,575 | Contract | : Provide labor, materials, equipment to install new refractory materials on the Taurus II flame trench at E1 cell 3 | National Aeronautics and Space Administration | 3/31/2010 |
BOEING COMPANY, THE | $5,990,415 | Contract | : NASA intends to build upon research conducted under contract NNL04AA11B, previous Task Order NNL05AD23T, having developed and demonstrated the capabilities and expertise for propulsion airframe aeroacoustic integration experimentation of jet integration w | National Aeronautics and Space Administration | 1/28/2010 |
RAYTHEON TECHNICAL SERVICES COMPANY LLC | $131,779 | Contract | : Subtask 1: Development of a Graphical User Interface for the Flight Deck Research System with Integrated Setup/Configuration Functions Background: In order to make preflight setup more efficient and less prone to configuration errors, an integrated, compr | National Aeronautics and Space Administration | 3/24/2010 |
NANOSCALE MATERIALS, INC. | $100,000 | Contract | : Metal Oxide-Carbon Nanocomposites for Aqueous and Nonaqueous Supercapacitors. The project will be a joint effort on NanoScale Corporation and Battelle Memorial Institute. NanoScale?s role in the effort will be to synthesize nanocomposite materials, chara | National Aeronautics and Space Administration | 1/29/2010 |
EARTH RESOURCES TECHNOLOGY, INC. | $150,100 | Contract | : Task Order 40: Provide Environmental Support for Clean and Caulk PEAF Panels at various buildings | National Aeronautics and Space Administration | 2/24/2010 |
FIBERTEK, INC. | $3,337,200 | Contract | : Task 8 consists of compact, high PRF, wavelength-controlled micropulse MOPA with self-imaging planar waveguide. | National Aeronautics and Space Administration | 3/16/2010 |
GILBANE BUILDING COMPANY | $43,054 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 3/04/2010 |
GILBANE BUILDING COMPANY | $19,688 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 3/04/2010 |
GILBANE BUILDING COMPANY | $207,269 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 3/04/2010 |
RESEARCH FOUNDATION OF STATE UNIVERSITY OF NEW YORK, THE | $39,216 | Contract | : The contractor shall provide expert advice and scientific expertise in photogrammetric processing of the DMS camera data that was collected during the Antarctic 2009 (October-November, 2009) IceBridge campaign. The scope of this effort is limited to: 1. | National Aeronautics and Space Administration | 6/22/2010 |
NORTHROP GRUMMAN INFORMATION TECHNOLOGY INC | $699,636 | Contract | : The goals of the Desktop Supercomputing initiative are to (1) simplify the process of distributing NASA?s climate models and related science analysis tools to investigators, and (2) to provide a complete toolkit of climate research products for use by uni | National Aeronautics and Space Administration | 3/31/2010 |
LYNNTECH INC. | $100,000 | Contract | : Miniature, Low Power Vacuum Pump for Trace Contaminant Monitors | National Aeronautics and Space Administration | 1/29/2010 |
POLARONYX, INC. | $99,908 | Contract | : Optical comb generation for chemical sensing | National Aeronautics and Space Administration | 1/29/2010 |
BOEING COMPANY, THE | $198,641 | Contract | : The goal of this effort is to develop system-level concepts for implementing advanced capabilities to transport fuselage structures in real-world operational environments. The Contractor shall identify and assess system-level concepts that guide the inte | National Aeronautics and Space Administration | 6/14/2010 |
SGT, INC. | $1,800,000 | Contract | : This work supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this work will focus on addressing the capacity challenges facing the US national airspace. It is fo | National Aeronautics and Space Administration | 4/01/2010 |
MODULAR SYSTEMS NETWORK, INC. | $2,975 | Contract | : Media Station for DAOF, Bldg 703, Executive Conference Room | National Aeronautics and Space Administration | 5/29/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $1,498,475 | Contract | : Research funded by this task will focus on addressing the capacity challenges facing the US national airspace. It is forecast that over the next 15 years, air traffic in the United States will double, far exceeding the countryG??s current capability to sa | National Aeronautics and Space Administration | 5/13/2010 |
HONEYWELL INTERNATIONAL INC. | $548,465 | Contract | : This contract supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Aviation Safety Program. Research funded by the Recovery Act within the Aviation Safety Program will focus on developing innovative tools, conc | National Aeronautics and Space Administration | 6/07/2010 |
SGT, INC. | $529,572 | Contract | : This task supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this task will focus on addressing the capacity challenges facing the US national airspace. It is fo | National Aeronautics and Space Administration | 4/01/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $4,943 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The project was executed under Delivery Order 1011-13 and 1011-1 | National Aeronautics and Space Administration | 5/10/2010 |
CONTINUUM DYNAMICS INC | $485,204 | Contract | : DEVELOPMENT OF A SHAPE MEMORY ALLOY VARIABLE NOZZLE | National Aeronautics and Space Administration | 4/19/2010 |
COASTAL AEROSPACE INC | $51,573 | Contract | : perform maintenance and inspection on a Garrett GTCP85-98CK Auxiliary Power Unit (APU) supporting the DC-8 flying laboratory. | National Aeronautics and Space Administration | 6/07/2010 |
ATK SPACE SYSTEMS INC. | $80,328 | Contract | : Research and Development to Increase maturity of concept, operations | National Aeronautics and Space Administration | 4/27/2010 |
MODERN TECHNOLOGY SOLUTIONS, INC. | $695,993 | Contract | : This contract supports the Integration Team for NASAG??s Recovery Act Unmanned Aircraft System (UAS) Project. Contract activities include system engineering, project and mission management, and partnership development. MTSI leads the Integration Team an | National Aeronautics and Space Administration | 4/23/2010 |
UNIVERSITIES SPACE RESEARCH ASSOCIATION | $293,144 | Grant | Science, Recovery Act: This project is a collaborative effort among Jet Propulsion Laboratory (JPL), NASA Ames Research Center (ARC) and NASA Marshall Space Flight Center (MSFC). The overall objective of this effort is to create prototype hardware/software infrastructure to im | National Aeronautics and Space Administration | 6/15/2010 |
MODULAR SYSTEMS NETWORK, INC. | $69,996 | Contract | : systems furniture for DAOF, Bldg 703, Package 6A | National Aeronautics and Space Administration | 5/29/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $749,992 | Contract | : The task shall assess the future operational capabilities, document the state of the art, identify technology gaps, and review draft versions of the NextGen CONOPS as it relates to airworthiness, separation assurance and collision avoidance. The result of | National Aeronautics and Space Administration | 6/16/2010 |
OPTIMAL SYNTHESIS INC. | $508,006 | Contract | : Trajectory-based operations constitute a key mechanism considered by the Joint Planning and Development Office (JPDO) for managing traffic in high-density or high-complexity airspace in the Next-Generation Air Transportation System. With this concept appl | National Aeronautics and Space Administration | 6/24/2010 |
BRYANT FUEL & POWER SYSTEMS, INC. | $298,227 | Contract | : 50,000 gallon Above Ground Fuel System with 300 gpm pump and filtration skid | National Aeronautics and Space Administration | 4/13/2010 |
BELL HELICOPTER TEXTRON INC. | $4,064,815 | Contract | : Large-Scale Proprotor for National Full-Scale Aerodynamics Complex (NFAC) Testing | National Aeronautics and Space Administration | 4/14/2010 |
OFFICE DESIGN GROUP, INC. | $43,851 | Contract | : WORKSTATIONS AND SEATING, INCLUDES DESIGN, PROJECT MANAGEMENT, AND INSTALLATION | National Aeronautics and Space Administration | 5/29/2010 |
PACIFIC INSTRUMENTS, INC. | $2,751,970 | Contract | : Delivery of a High and Low speed, integrated signal conditioning and data acquisition system to NASA Marshall Space Flight center to support NASA Test Programs. System will consist of hardware, software & training for use in propulsion testing. | National Aeronautics and Space Administration | 6/02/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $815,125 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The project was executed under Delivery Order 1398. | National Aeronautics and Space Administration | 5/26/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $448,008 | Contract | : This task supports the development and testing of new aircraft performance models for the Center-TRACON Automation System (CTAS) suite of tools. CTAS is software developed by NASA Ames that is used to simulate and test advanced air traffic management conc | National Aeronautics and Space Administration | 5/18/2010 |
UNISYS CORPORATION | $449,676 | Contract | : The contractor shall provide design, development, implementation, testing, operation, and maintenance support for IIFD project simulation tasks. This work supports IIFD by developing simulations and supporting equipment and technologies for human-in-the- | National Aeronautics and Space Administration | 5/27/2010 |
WYLE LABORATORIES, INC. | $407,138 | Contract | : Develop a total of 3 Sonic Boom Focus Research Software Codes (capable of traditional and conceptual low-boom aircraft analysis), and design and assist in the execution of a flight experiment under a range of realistic atmosphereic conditions to validate | National Aeronautics and Space Administration | 6/21/2010 |
SILICON GRAPHICS FEDERAL, INC. | $49,877 | Contract | : SATA Drives | National Aeronautics and Space Administration | 6/11/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $1,962,408 | Contract | : CLIN 014 WB-57 Aileron Project Phase II. Task Order NNJ10JD03T placed under Contract NNJ09JE44C to procure services in support of Phase Two of a project to manufacture four sets of ailerons and associated hardware for the NASA's WB-57 high altitude resear | National Aeronautics and Space Administration | 5/12/2010 |
GENERAL ELECTRIC COMPANY | $156,200 | Contract | : NASA in interested in characterizing the ability of a recently developed protective coating for turbine engine components from the environmental damage, which accumulates throughout the life of turbine engines powering commercial aircraft. Higher operati | National Aeronautics and Space Administration | 6/30/2010 |
UNIVERSITY OF WASHINGTON | $249,207 | Contract | : This proposal is a request for support to serve as the Temporary Science Team Leader (TSTL) for the ad hoc IceBridge Science Definition Team (IST) in 2010. IceBridge is the name for the aircraft missions that are designed to fill the gap in laser coverage | National Aeronautics and Space Administration | 5/26/2010 |
OFFICE DESIGN GROUP, INC. | $19,065 | Contract | : Workstations and seating, includes design, project management and installation. | National Aeronautics and Space Administration | 5/29/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $5,099 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The project was executed under Delivery Order 1011-9, 1011-10 an | National Aeronautics and Space Administration | 4/21/2010 |
M & D MECHANICAL CONTRACTORS INC | $6,038,019 | Contract | : A3 Test Stand Industrial Water and Steam Piping Task Order: Procurement of Industrial Water and Steam Piping materials for the A3 Test Stand. The work includes the mobilization of the project including design, handling, procurements of materials, fabric | National Aeronautics and Space Administration | 4/12/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $722,007 | Contract | : The focus of this task is to derive and document functional requirements for NASAG??s Trajectory-Based Automation System for Enroute & Transition airspace. This prototype system represents the evolution of 20 years of NASA research in ground-based air tra | National Aeronautics and Space Administration | 5/21/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $252,831 | Contract | : Award for the Installation of Custom Full Services ViTS Room at Dryden Aircraft Operations Facility. | National Aeronautics and Space Administration | 6/15/2010 |
UNIVERSITY OF ALASKA FAIRBANKS | $321,434 | Contract | : Alaskan and adjoining Canadian glaciers represent the largest area of ice cover outside of the Polar Regions. Since 1993, the Geophysical Institute at the University of Alaska (UAF) has performed light aircraft laser altimetry surveys of over 200 glaciers | National Aeronautics and Space Administration | 7/01/2010 |
UNIVERSITY OF ALABAMA IN HUNTSVILLE | $206,786 | Grant | Science, Recovery Act: Water management within the San Joaquin portion of California?s Central Valley is a balancing act between temporally and spatially limited sources and competitive needs which can often exceed the supply. At this time there is not a single system which in | National Aeronautics and Space Administration | 6/14/2010 |
HONEYWELL TECHNOLOGY SOLUTIONS INC. | $750,000 | Contract | : Honeywell is tasked to evaluate, recommend, acquire, install, and test new and upgraded systems and technology to create visualizations for advanced public outreach displays such as: 1) Projection and flat screen stereoscopic (3D) displays; 2) Spherical | National Aeronautics and Space Administration | 5/01/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $663,557 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The project was executed under Delivery Order 1397. | National Aeronautics and Space Administration | 5/26/2010 |
JACOBS TECHNOLOGY INC. | $485,423 | Contract | : Combined Loads Test System (COLTS) Upgrades for the Environmentally Responsible Aviation (ERA) Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) Test at NASA Langley Research Center (LaRC) Objective of the project is to upgrade the facility al | National Aeronautics and Space Administration | 6/16/2010 |
TRANS-GULF CONSTRUCTORS, INC. | $1,382,832 | Contract | : A2 Test stand piping replacement | National Aeronautics and Space Administration | 6/06/2010 |
D3 AVIATION, INC | $323,347 | Contract | : One time overhaul of DC-8 Flight Control Surfaces. | National Aeronautics and Space Administration | 5/27/2010 |
MODULAR SYSTEMS NETWORK, INC. | $82,381 | Contract | : Systems Furniture for DAOF Bldg 703, Pilot's Offices | National Aeronautics and Space Administration | 6/01/2010 |
CLEAR 4 TAKE OFF, L.L.C. | $8,725 | Contract | : inspect and refurbish dc-8-72 cabin windows | National Aeronautics and Space Administration | 5/26/2010 |
SGT, INC. | $580,000 | Contract | : This task supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this task will focus on addressing the capacity challenges facing the US national airspace. It is for | National Aeronautics and Space Administration | 6/08/2010 |
CAMERON INTERNATIONAL CORPORATION | $409,389 | Contract | : CLIN 0001 Recovery C7-HA Compressor Refurbishment -$274,389.10 + Modification -install of new ball bearings and stator leads on the motor and additional work on the compressor cylinders, components and heat exchangers $135,000 | National Aeronautics and Space Administration | 6/24/2010 |
SIERRA LOBO, INC. | $74,925 | Contract | : The PSL Engine Icing project has the objective of making modifications to the existing test cell PSL-3 located in Building 125 to add capabilities to perform icing tests in this test cell. | National Aeronautics and Space Administration | 5/18/2010 |
ATHENA ENGINEERING, INC. | $125,502 | Contract | : Remodel Offices, Building B703 - South Third Floor | National Aeronautics and Space Administration | 4/06/2010 |
THE TRUSTEES OF COLUMBIA UNIVERSITY IN THE CITY OF NEW YORK INC | $1,207,172 | Contract | : NASA Goddard Space Flight Center (GSFC) has a need to obtain support in achieving the goals of Operation Ice Bridge. Operation Ice Bridge is a data gap filler project between ICESat-1 (Ice, Cloud and Land Elevation Satellite 1) and ICESat-2 (Ice, Cloud an | National Aeronautics and Space Administration | 4/02/2010 |
BELL HELICOPTER TEXTRON INC. | $5,531,391 | Contract | : Tiltrotor Test Rig Development and Delivery | National Aeronautics and Space Administration | 4/14/2010 |
PURDUE UNIVERSITY | $465,949 | Contract | : The objective of this research is to determine if a nontraditional flight plan option that airlines can file when their destination airport is a crowded Metroplex (a region with two or more close airports sharing resources) has future operational value. T | National Aeronautics and Space Administration | 6/25/2010 |
HEXCO INTERNATIONAL | $181,526 | Contract | : Liquid Oxygen (LOX) service centrifugal pumps in accordance with the main contract's CLIN 0001 | National Aeronautics and Space Administration | 5/12/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $18,000,000 | Contract | : NASA will fund the OCO replacement mission--named OCO-2 with $18M under the American Recovery and Reinvestment Act to make progress towards the earliest possible launch date for the replacement mission. The OCO-2 replacement is called out as a line item | National Aeronautics and Space Administration | 5/01/2010 |
GEORGIA TECH RESEARCH CORPORATION | $496,943 | Contract | : The objective of this work is to investigate, formulate, develop models, and analyze an operational concept that mitigates issues specific to the metroplex or that takes advantage of unique characteristics of metroplex airports to improve efficiencies. T | National Aeronautics and Space Administration | 6/08/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $104,381 | Contract | : The purpose of thi saward is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The deliverables are Designs to Repair/Replace Roof s Damage by | National Aeronautics and Space Administration | 4/29/2010 |
KESTREL TECHNOLOGY LLC | $525,150 | Contract | : The Safety Case Workbench project aims to build a collection of interacting software tools for the production of safety case arguments. The project intends to gather needs the aerospace community's needs for these arguments particularly for the presentat | National Aeronautics and Space Administration | 6/10/2010 |
NORTH FLORIDA SHIPYARDS, INC. | $2,438,044 | Contract | : Refurbishment of NASA Pushboat CLERMONT II and Liquid Oxygen Barge LOX 1 | National Aeronautics and Space Administration | 5/25/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $250,000 | Contract | : This task quantifies the impacts of contrails on climate. In this study, satellite data are used to derive the contrail climatology based on 2 years of data. The contrail climatology describes the temporal and spatial coverage. A radiative forcing calc | National Aeronautics and Space Administration | 6/15/2010 |
A M KINNEY INC | $562,300 | Contract | : PSL Engine Icing Capabilities Engineering and Final Design | National Aeronautics and Space Administration | 5/13/2010 |
HONEYWELL INTERNATIONAL INC. | $167,249 | Contract | : Title: Model Durability of Coated Superalloy Disk Material, Base Program Year 1 Task - Mechanical Property Evaluation | National Aeronautics and Space Administration | 6/24/2010 |
VANTAGE SYSTEMS, INC. | $324,617 | Contract | : ?Provide an I&T Test Conductor whose duties will include staffing and managing the TIRS I&T Team, planning and implementing the Functional Performance Model (FPM) testing, setting up the Work Order Authorization process, monitoring I&T performance with pa | National Aeronautics and Space Administration | 5/12/2010 |
TYBRIN CORPORATION | $120,072 | Contract | : Facilities Engineering and Asset Management Office Support: TYBRIN will provide a systems engineering appoach to the identification, documentation and lifecycle management of speciified facility project requirements at the Dryden Aircraft OperationsFacil | National Aeronautics and Space Administration | 6/18/2010 |
UNIVERSITY OF CALIFORNIA, SANTA CRUZ | $253,060 | Contract | : Research funded by Recovery Act within the Aviation Safety Program will focus on developing innovative tools, concepts, methods, and technologies that will improve the intrinsic safety attributes of current and future aircraft and of aviation operations. | National Aeronautics and Space Administration | 4/19/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $256,550 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The project was executed under Delivery Order 1011-12. | National Aeronautics and Space Administration | 5/10/2010 |
JACOBS TECHNOLOGY INC. | $2,361,751 | Contract | : Acoustic Phased Array Traverse Mechanism for the 14x22 Foot Subsonic Wind Tunnel at the NASA Langley Research Center | National Aeronautics and Space Administration | 4/23/2010 |
HOH AERONAUTICS, INC. | $29,999 | Contract | : Take, reduce, and analyze the flight data gathered from the flight experiments to be flown on an F-16 Variable Stability In-Flight Simulator Test Aircraft and provide NASA with a final report. | National Aeronautics and Space Administration | 5/13/2010 |
UNIVERSITY OF ILLINOIS | $254,355 | Contract | : Composite sandwich structures are used extensively in aerospace applications that require high bending stiffness without a weight penalty. Commercial transports rely on sandwich structures for many of the aircraft control surfaces including ailerons, rudd | National Aeronautics and Space Administration | 6/29/2010 |
SIGMA SPACE PARTNERS, LLC | $180,000 | Contract | : The Contractor will deliver (a) the monthly mean gridded anomaly fields and the software for creating similar fields in the models by 04/30/2010; (b) the multi-year database of 3-hourly weather state classifications by 05/30/2010; and (c) the sampled 3-D | National Aeronautics and Space Administration | 4/30/2010 |
TRI MODELS, INC. | $415,550 | Contract | : Services in support of the project DESIGN AND FABRICATION OF THE INTEGRATION HIGH SPEED MODEL CRUISE WING in accordance with attached statement of work and contractor's proposal dated May 11,2010 (Job No. 10399-004). | National Aeronautics and Space Administration | 5/27/2010 |
TOTAL AIRCRAFT SERVICES, INC. | $592,102 | Contract | : Fabrication of an Externally Mounted Pod on a Gulfstream G-III Aircraft To House a Synthetic Aperture Radar and Supporting Hardware. | National Aeronautics and Space Administration | 5/27/2010 |
TRIUMPH AEROSPACE SYSTEMS - NEWPORT NEWS, INC. | $87,184 | Contract | : Services in support of the project Calibration of MC-110-27.5A Semi-Span Force Balance | National Aeronautics and Space Administration | 5/25/2010 |
VANTAGE SYSTEMS, INC. | $620,740 | Contract | : The Contractor shall develop specific components of the TIRS FPE as defined below in accordance with the TIRS FPE specification (TIRS-SE-SPEC-0009) and procedures known as the Goddard GOLD Rules (document GSFC-STD-1000). | National Aeronautics and Space Administration | 5/12/2010 |
JACOBS TECHNOLOGY INC. | $1,650,000 | Contract | : Evaluation of Sonic Boom measurement test techniques under contract NNA09DB39C. | National Aeronautics and Space Administration | 4/09/2010 |
ATK SPACE SYSTEMS INC. | $1,699,137 | Contract | : Research and Development to Mature Airborne Self-Separation Algorithms | National Aeronautics and Space Administration | 6/03/2010 |
VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIVERSITY | $204,128 | Contract | : The Supersonics Project is aligned with the Aeronautics Research Mission Directorate principles of maintaining intellectual stewardship of aeronautical core competencies for the nation in supersonic flight technologies and research appropriate to NASA's u | National Aeronautics and Space Administration | 5/21/2010 |
MOSAIC ATM, INC. | $486,982 | Contract | : follow-up to studies conducted under a 2006 NRA Metroplex Operations, which was designed to increase understanding of the metroplex; under this project Mosaic ATM will develop Dynamic Big Airspace Design methodologies for dynamically generating the effici | National Aeronautics and Space Administration | 6/21/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $71,488 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects. The project was executed under Delivery Order 1011-7 and 1011-8. | National Aeronautics and Space Administration | 3/17/2010 |
AERSALE, INC. | $2,175,001 | Contract | : The sale and delivery of three CFM56-2 engines with records and stands, as well as a lift of parts from the airframe of one McDonnell Douglas DC-8-73F Aircraft. | National Aeronautics and Space Administration | 6/10/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $10,503 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide A&E Desgn Services and Temporary Utilities for Trailers to support the Renovation of Bldg 3 Cafeteria. These projects were executed under Delivery Order 995. | National Aeronautics and Space Administration | 6/08/2010 |
HEXCO INTERNATIONAL | $820,104 | Contract | : Liquid Oxygen (LOX) service centrifugal pumps in accordance with the main contract's CLIN 0001 | National Aeronautics and Space Administration | 5/12/2010 |
HONEYWELL INTERNATIONAL INC. | $180,781 | Contract | : Title- Assessing the Impact that Software Health Management Technology will have on Qualifying and Certifying Flight-Critical Aeronautics Software. This research investigates the changes and updates to the current regulatory framework and supporting guid | National Aeronautics and Space Administration | 6/09/2010 |
N&R ENGNERING MGT SUPPORT SVCS | $97,980 | Contract | : Development of Turbofan engine simulations and controlers in the MATLAB/Simulink environment | National Aeronautics and Space Administration | 4/19/2010 |
MODULAR SYSTEMS NETWORK, INC. | $33,986 | Contract | : systems furniture for DAOF, Bldg 703, Avionics Office | National Aeronautics and Space Administration | 6/01/2010 |
VANTAGE SYSTEMS, INC. | $254,415 | Contract | : The Contractor shall lead the on-site development and integration of the High-Fidelity Mass Simulator for the TIRS instrument, and ensure its completion and acceptability for Mission Simulation needs | National Aeronautics and Space Administration | 5/17/2010 |
NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,081,830 | Contract | : Provide DFRC with a fully functional Common System Architecture (CSA) and associated software that will be installed in the Global Hawk Mobile Operational Facility (GHMOF). | National Aeronautics and Space Administration | 6/18/2010 |
FIDELL ASSOCIATES INC | $263,911 | Contract | : The Supersonics Project is aligned with the ARMD principles of maintaining intellectual stewardship of aeronautical core competencies for the nation in the supersonic flight regime and of focusing research in areas that are appropriate to NASA?s unique ca | National Aeronautics and Space Administration | 6/07/2010 |
BOOZ ALLEN HAMILTON INC. | $331,678 | Contract | : Booz Allen will provide commercial crew development assessment services for Commercial Crew and Cargo Program Office (C3PO). | National Aeronautics and Space Administration | 5/04/2010 |
JACOBS TECHNOLOGY INC. | $50,023 | Contract | : written report detailing the findings of the the Folded HX design | National Aeronautics and Space Administration | 4/13/2010 |
OFFICE DESIGN GROUP, INC. | $18,016 | Contract | : CARPET, LOCKERS, BENCHES, AND INSTALLATION LABOR FOR PILOT'S LOCKER ROOM | National Aeronautics and Space Administration | 5/29/2010 |
GEORGE MASON UNIVERSITY | $427,411 | Contract | : The objective of this research is to develop the optimization model of airline and airport operations to enable analysis of metroplex operations and strategy scenarios under economic and regulatory constraints. The overal benefits will reduce airline dela | National Aeronautics and Space Administration | 6/10/2010 |
STUART C. IRBY COMPANY | $195,960 | Contract | : DELIVERED 14 VFD0 | National Aeronautics and Space Administration | 4/19/2010 |
NORTHROP GRUMMAN INFORMATION TECHNOLOGY INC | $264,997 | Contract | : Climate in a Box? (CIB) is intended to simplify the process of distributing NASAs climate models and related science analysis tools to investigators. At present the software associated with such tools is complex and does not easily execute on non-NASA sys | National Aeronautics and Space Administration | 4/23/2010 |
FIBERTEK, INC. | $1,739,000 | Contract | : Task 9 InGaAsP Intensified Photodiode (IPD) Detector System for Near-Infrared (1064) Wavelength Light. Objective is to mature 1um detector technology that meets the ATLAS performance indicated in the SOW yielding high sensitivity, low noise, high speed, | National Aeronautics and Space Administration | 5/20/2010 |
EDARCH-ERIE JV | $2,698,415 | Contract | : Install mechanical and controls systems for Phase 2 of the Engine Icing Capability Enhancement Project. The Phase 2 Scope of Work shall include: Construction and modification of PSL-3 plenum structure; fabrication and installation of a plenum transition a | National Aeronautics and Space Administration | 1/04/2010 |
EARTH RESOURCES TECHNOLOGY, INC. | $3,261 | Contract | : Task Order 16 R1: JSC Barge Dock Repair | National Aeronautics and Space Administration | 5/04/2010 |
DEVELOPMENT ONE, INC. | $40,925 | Contract | : Remodel B703 for Conference Room and Multi-Purpose Science Lab | National Aeronautics and Space Administration | 5/18/2010 |
GILBANE BUILDING COMPANY | $72,988 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 5/06/2010 |
GILBANE BUILDING COMPANY | $72,213 | Contract | : The Facilities Project Management and Engineering Support services Contract (FPMESS) services are comprised of the following: Oversight, Inspection, and Field Support Services for projects of varying magnitude and complexity, requiring services and spec | National Aeronautics and Space Administration | 6/18/2010 |
NORTHROP GRUMMAN INFORMATION TECHNOLOGY INC | $145,970 | Contract | : This work will help NASA scientists understand the importance of links between atmospheric aerosols and chemical composition. By incorporating the physical links between these processes in computer models and evaluating the simulations with NASA?s observa | National Aeronautics and Space Administration | 4/23/2010 |
NORTHROP GRUMMAN INFORMATION TECHNOLOGY INC | $149,994 | Contract | : The goal of this task is to support scientists in their efforts to simulate the impact of current and projected global commercial aviation emissions on climate. In particular, the sensitivity of atmospheric ozone, methane, and the atmospheric thermal rad | National Aeronautics and Space Administration | 6/22/2010 |
NORTHROP GRUMMAN INFORMATION TECHNOLOGY INC | $249,999 | Contract | : This Task Order requires the Contractor to assist NASA GSFC in creating images and movies of NASAs Earth Science data for special displays, such as planetariums and 3D theaters. It also requires the Contractor to identify and resolve problem issues with | National Aeronautics and Space Administration | 5/03/2010 |
WYLE LABORATORIES, INC. | $572,993 | Contract | : This Task Delivery Order (TDO) provides technical expertise in support of the Space Life Sciences Directorate's contributions to NASA's Commercial Crew and Cargo Program Office (C3PO). The mission of C3PO is to stimulate efforts within the private sector | National Aeronautics and Space Administration | 4/07/2010 |
DEVELOPMENT ONE, INC. | $64,556 | Contract | : REMODEL B703 HALLWAYS 2ND AND 3RD FLOOR NORTH | National Aeronautics and Space Administration | 5/26/2010 |
LOCKHEED MARTIN CORPORATION | $1,855,172 | Contract | : NASA is exploring advanced composite materials and processes to reduce the overall cost and weight of liquid hydrogen (LH2) cryotanks. Composites are materials that are combinations of two or more organic or inorganic components. One material serves as a | National Aeronautics and Space Administration | 9/28/2010 |
FLATIRONS SOLUTIONS CORPORATION | $214,063 | Contract | : Development of NAS Adaptation Server for Air Traffic Management Decision Support Tools | National Aeronautics and Space Administration | 7/01/2010 |
NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,822,400 | Contract | : Composite Cryotank Technologies and Demonstration (CCTD) Design, Analysis and Testing for Composite LH2 Cryotanks | National Aeronautics and Space Administration | 9/28/2010 |
JACOBS TECHNOLOGY INC. | $322,243 | Contract | : A-2 Liquid Oxygen and Liquid Hydrogen Transfer Line Repair/Replacement Project - Safety and quality support to the project for document and process review. Clarification of the completion of the design and fabrication of special test equipment, procedures | National Aeronautics and Space Administration | 9/23/2010 |
RECTOR & VISITORS OF THE UNIVERSITY OF VIRGINIA | $844,062 | Contract | : This research supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Aviation Safety Program. The goal of the Verification and Validation of Flight-Critical Systems (VVFCS) project is to deveop verification and | National Aeronautics and Space Administration | 7/30/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $173,000 | Contract | : JPL will support the Hurricane and Severe Storm Sentinel (HS3) project by operating the High Altitude MMIC Sounding Radiometer (HAMSR) on the Global Hawk aircraft during all planned 2011 test flights. The HAMSR instrument was developed by NASA on a previ | National Aeronautics and Space Administration | 8/30/2010 |
RC ELECTRONICS INC. | $600,162 | Contract | : Low Spped Data Acquisition System (LSDAS): DTX-RMC/SSC; DTX-15R/SSC; PCI-1750, DTX-1750; DTX-IRIG; DTX-5017SSC/R; DTX-5192; DTX-5017LE/R; DTX-5500; DTX-MON/KVM; Extended Warranty | National Aeronautics and Space Administration | 7/01/2010 |
TONY VACCA CONSTRUCTION INC. | $697,057 | Contract | : Remodel Multi Purpose Lab/Kitchen South Second Floor | National Aeronautics and Space Administration | 9/30/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $3,293 | Contract | : The purpose of this award is for the Prime Facility Support Services Contract to provide A&E Desgn Services and Temporary Utilities for Trailers to support the Renovation of Bldg 3 Cafeteria. These projects were executed under Delivery Order 995 Change O | National Aeronautics and Space Administration | 6/23/2010 |
STUART C. IRBY COMPANY | $27,993 | Contract | : DELIVERED 2 VFDS | National Aeronautics and Space Administration | 4/19/2010 |
L-3 COMMUNICATIONS CORPORATION | $806,105 | Contract | : NASA Dryden Flight Research Center (DFRC) is implementing the National Aeronautics and Space Administration (NASA) Jet Propulsion Laboratory (JPL) and DFRC developed Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) Pod for use on the NASA Glob | National Aeronautics and Space Administration | 9/30/2010 |
SENSIS CORPORATION | $700,405 | Contract | : This effort supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Under this effort, NASA is funding work to conduct Concept & Technologies (C&T) research to enable capacity, efficienc | National Aeronautics and Space Administration | 7/30/2010 |
JACOBS TECHNOLOGY INC. | $331,276 | Contract | : Sonic boom test hardware development under contract NNA09DB39C. | National Aeronautics and Space Administration | 9/08/2010 |
SHERYCK, LLC | $150,000 | Contract | : Development of a Risk Assessment Framework for Detecting, Predicting, and Mitigating Aircraft Material Inspection. | National Aeronautics and Space Administration | 7/01/2010 |
OPTIMAL SYNTHESIS INC. | $508,006 | Contract | : Trajectory-based operations constitute a key mechanism considered by the Joint Planning and Development Office (JPDO) for managing traffic in high-density or high-complexity airspace in the Next-Generation Air Transportation System. With this concept appl | National Aeronautics and Space Administration | 6/24/2010 |
SAAB SENSIS CORPORATION | $499,987 | Contract | : The contractor shall develop conflict detection and resolution (CD&R) concepts and requirements for safety improvements in airport surface traffic. Additionally, they shall develop algorithms which reflect these concepts, performance metrics for algorith | National Aeronautics and Space Administration | 7/22/2010 |
RC ELECTRONICS INC. | $331,080 | Contract | : Low Speed Data Acquisition System (LSDAS): DTX-5192; DTX-CFG592; Extended Warranty | National Aeronautics and Space Administration | 9/15/2010 |
TONY VACCA CONSTRUCTION INC. | $621,559 | Contract | : Remodel Science Lab South First Floor | National Aeronautics and Space Administration | 9/30/2010 |
WVHTC FOUNDATION | $300,816 | Contract | : WVHTC Foundation was awarded this contract for Flight Test Engineering and Held Requirement Development for the Integrated Resilient Control Project. The objective of this task is to increase the capability of the airborne research test system (ARTS IV) | National Aeronautics and Space Administration | 9/29/2010 |
CARNEGIE MELLON UNIVERSITY | $556,476 | Contract | : The goal of the Verification and Validation of Flight-Critical Systems (VVFCS) project is to develop verification and validation tools and algorithms for complex flight critical systems. A flight critical system (FCS) is one that directly controls th | National Aeronautics and Space Administration | 8/26/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $4,040,000 | Contract | : The objective of the Carbon in Arctic Reservoirs Vulnerability Experiment (CARVE) is to quantify correlations between atmospheric and surface state variables for the Alaskan terrestrial ecosystems through intensive seasonal aircraft campaigns, ground-base | National Aeronautics and Space Administration | 8/24/2010 |
THE BOEING COMPANY | $1,448,165 | Contract | : Feasibility Study of Alternate Tankage Configuration. The contractor shall conduct an engineering study of an alternate configuration that replaces the common bulkhead with separate propellant tanks and replaces the composite interstage with a metallic st | National Aeronautics and Space Administration | 8/09/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $23,860 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects under Delivery Order 1011-15. | National Aeronautics and Space Administration | 7/26/2010 |
QUALITY ASSURANCE AND RISK MANAGEMENT SERVICES, INC. | $262,673 | Contract | : Develop Human Rating Handbook in support of NASA Policy NPR 8705.2B. The objective of this work is to develop a practical how to (but not prescriptive) draft handbook on the implementation of Human-Rating requirements in NASA Procedural Requirement (NPR) | National Aeronautics and Space Administration | 9/01/2010 |
WVHTC FOUNDATION | $736,879 | Contract | : WVHTC Foundation was awarded this contract to build the Assessment Environment. The design will be based on a contemporary type of flight system known as Integrated Modular Avionics (IMA) architecture. This type of system archtecture is currently being | National Aeronautics and Space Administration | 9/29/2010 |
METRON AVIATION, INC. | $500,000 | Contract | : Research funded by the Recovery Act within the Airspace Systems Program will directly address the Air Traffic Management (ATM) research needs of the Next Generation Air Transportation Systems (NextGen) initiative as defined by the Joint Planning and Devel | National Aeronautics and Space Administration | 7/28/2010 |
MASSACHUSETTS INSTITUTE OF TECHNOLOGY | $561,103 | Contract | : In this collaborative research between MIT and Honeywell, an innovative approach to hazard analysis and safety assurance based on systems and control theory will be demonstrated, evaluated, and compared to more traditional approaches. The applications us | National Aeronautics and Space Administration | 8/12/2010 |
BRYANT FUEL & POWER SYSTEMS, INC. | $298,227 | Contract | : 50,000 gallon Above Ground Fuel System with 300 gpm pump and filtration skid | National Aeronautics and Space Administration | 9/01/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $261,548 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide Repair Roof Bldg 9 for Hurricane IKE Roofing Projects under Delivery Order1519. | National Aeronautics and Space Administration | 8/09/2010 |
HONEYWELL INTERNATIONAL INC. | $1,287,541 | Contract | : Title- Validation and Verification of Safety Critical Integrated Distributed Systems The objective for this program is to create models, methods, tool extensions, and an integration infrastructure that design engineers can easily use for validation and v | National Aeronautics and Space Administration | 9/08/2010 |
YARDNEY TECHNICAL PRODUCTS, INC. | $309,924 | Contract | : ACQUISITION OF 4 EACH 24 VDC LITHIUM ION BATTERIES P/N: 3671213e08017-1 | National Aeronautics and Space Administration | 9/23/2010 |
SGT, INC. | $455,456 | Contract | : The Aeronautics Research Mission Directorate (ARMD) is responsible for achieving NASA Strategic Goal 3E, G?Advance knowledge in the fundamental disciplines of aeronautics and develop technologies for safer aircraft and higher capacity airspace systems.G? | National Aeronautics and Space Administration | 8/09/2010 |
BOEING COMPANY, THE | $592,623 | Contract | : NASA will provide to Boeing a shipset of F/A-18 FCCs (2 dual FCC boxes) that has the 1750A RFCS processors. NASA requests that Boeing upgrade the RFCS from a 1750A computer chip to a 68040 computer chip build, test, document, and deliver a production supp | National Aeronautics and Space Administration | 9/01/2010 |
SIGMA SPACE CORPORATION | $1,190,424 | Contract | : NASA Goddard Space Flight Center (GSFC) has a need to obtain support in achieving the goals of Operation IceBridge. Operation IceBridge is a data gap filler project between ICESat-1 (Ice, Cloud and Land Elevation Satellite) and ICESat-2 (Ice, Cloud and L | National Aeronautics and Space Administration | 7/19/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $6,263 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects under Delivery Order 1011-19. | National Aeronautics and Space Administration | 9/27/2010 |
BOEING COMPANY, THE | $2,042,060 | Contract | : In fiscal year 2011, NASA plans to begin a program that focuses on innovative ideas enabling new capabilities or radically altering our current approaches to space systems. Game Changing Development Projects (GCDP) are intended to be capability-oriented | National Aeronautics and Space Administration | 9/28/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $5,371 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects under Delivery Order 1011-18. | National Aeronautics and Space Administration | 9/14/2010 |
UNIVERSITY OF TEXAS AT AUSTIN | $1,127,304 | Contract | : The East Antarctic Ice Sheet (EAIS) holds the bulk of Earth's ice. While most of the EAIS is grounded above sea level, significant portions are grounded below sea level and may be sensitive to marine ice sheet instabilities. The Wilkes Subglacial Basin (W | National Aeronautics and Space Administration | 7/27/2010 |
SCIENCE SYSTEMS AND APPLICATIONS, INC. | $225,000 | Contract | : SSAI will provide the technical staff and work processes to accomplish the requirements specified in the Task Order. Responsiveness will be an important metric for task performance. SSAI will keep the government informed of all activities, such as work su | National Aeronautics and Space Administration | 7/12/2010 |
SGT, INC. | $200,000 | Contract | : This task supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this task will focus on addressing the capacity challenges facing the US national airspace. It is fo | National Aeronautics and Space Administration | 7/26/2010 |
CHIPPEWA AEROSPACE, INC. | $385,900 | Contract | : The purpose of this contract is to upgrade the aircraft avionics in a NASA owned T-34 aircraft to validate and verify research and development requirements which will guide how future unmanned aircraft systems (UAS) can safely operate in the national airs | National Aeronautics and Space Administration | 8/11/2010 |
JACOBS TECHNOLOGY INC. | $845,598 | Contract | : Testing of a Generic Circulation Control Semi-Span Model in the NASA Langley Research Center (LaRC) National Transonic Facility (NTF) | National Aeronautics and Space Administration | 7/27/2010 |
ANADARKO INDUSTRIES, L.L.C. | $5,728 | Contract | : Verify Recovery Act construction operations meet applicable federal, state, local, NASA, and JSC requirements throughout the construction phase. This includes site inspections, review of redline drawings, and safety guidance. Perform pre-construction act | National Aeronautics and Space Administration | 8/11/2010 |
ASRC RESEARCH AND TECHNOLOGY SOLUTIONS, LLC | $63,546 | Contract | : This project will develop a set of instrument procurement specifications derived from the NASA Ocean Color Protocol Documents and from Current literature. Criteria for deployment and data processing will also be developed. Bids will be solicited for mul | National Aeronautics and Space Administration | 7/29/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $6,857 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects under Delivery Order 1168-2. | National Aeronautics and Space Administration | 9/14/2010 |
BELL HELICOPTER TEXTRON INC. | $4,064,815 | Contract | : Large-Scale Proprotor for National Full-Scale Aerodynamics Complex (NFAC) Testing | National Aeronautics and Space Administration | 4/14/2010 |
CHAMPION AEROSPACE LLC | $33,056 | Contract | : Quantity of 2 part number 28VS240Y-34 | National Aeronautics and Space Administration | 9/22/2010 |
ATK SPACE SYSTEMS INC. | $730,327 | Contract | : The scope of this effort is to perform equivalency testing to the following requirements set forth by NASA: a. Obtain material property data for out-of-autoclave materials and processes at cryogenic temperatures, approximately -423 degrees Fahrenheit. O | National Aeronautics and Space Administration | 9/28/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $1,745,910 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide Repair Roof Bldg 32 and 48 for Hurricane IKE Roofing Projects under Delivery Order's 1498 and 1499. | National Aeronautics and Space Administration | 8/09/2010 |
ANADARKO INDUSTRIES, L.L.C. | $14,344 | Contract | : Verify Recovery Act construction operations meet applicable federal, state, local, NASA, and JSC requirements throughout the construction phase. This includes site inspections, review of redline drawings, and safety guide. Perform pre-construction activi | National Aeronautics and Space Administration | 7/01/2010 |
NORTHROP GRUMMAN SYSTEMS CORPORATION | $106,985 | Contract | : LCS for Alternate Radome Configuration | National Aeronautics and Space Administration | 9/27/2010 |
HEXCO INTERNATIONAL | $102,513 | Contract | : Liquid Oxygen (LOX) service centrifugal pumps in accordance with the main contract's CLIN 0001 | National Aeronautics and Space Administration | 9/28/2010 |
THE BOEING COMPANY | $34,455,634 | Contract | : The contractor shall perform the following tasks: 1. Procure and deliver the Marshal | National Aeronautics and Space Administration | 3/15/2010 |
MONTEREY TECHNOLOGIES, INC. | $1,454,960 | Contract | : Tiltrotor Test Rig Calibration Rig | National Aeronautics and Space Administration | 7/22/2010 |
METRON AVIATION, INC. | $582,620 | Contract | : NASA's NextGen Airspace project seeks to develop new concepts and technologies that will improve strategic planning for the operation of commercial air traffic in the national airspace system (NAS). In support of this research, NASA is conducting human-in | National Aeronautics and Space Administration | 7/28/2010 |
JACOBS TECHNOLOGY INC. | $1,173,338 | Contract | : National Transonic Facility (NTF) Reliability Enhancements: Task Order Part 2 - Implementation of Recommendations for Facility Reliability Improvement | National Aeronautics and Space Administration | 8/30/2010 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $276,131 | Contract | : Developed and implemented a simulated fly-by-wire augmented flight control system for a commercial transport aircraft. Integrated model of the commercial transport aircraft, including the fly-by-wire augmented flight control systems model, into the Advanc | National Aeronautics and Space Administration | 7/29/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $44,323 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to provide construction support, as builting and all maintenance activation for Hurricane IKE Roofing Projects under Delivery Order 1011-16 and 17. | National Aeronautics and Space Administration | 9/14/2010 |
NATIONAL INSTITUTE OF AEROSPACE ASSOCIATES | $520,539 | Contract | : This effort is aimed at addressing the need for quantification in system safety assessment of new concepts in the presence of inherent complexities, and laying a foundation for robust design of novel systems (robust meaning insensitive to variations in th | National Aeronautics and Space Administration | 7/30/2010 |
SILICON GRAPHICS FEDERAL, INC. | $68,050 | Contract | : Desktop Supercomputer Nodes | National Aeronautics and Space Administration | 9/24/2010 |
BELL HELICOPTER TEXTRON INC. | $5,531,391 | Contract | : Tiltrotor Test Rig Development and Delivery | National Aeronautics and Space Administration | 4/14/2010 |
CALIFORNIA INSTITUTE OF TECHNOLOGY | $5,469,000 | Contract | : The objective of the Airborne Microwave Observatory of Subcanopy and Subsurface (AirMOSS) project is to significantly minimize the current uncertainty in net ecosystem carbon exchange (NEE) estimates over North America. Uncertaity in root-zone soil moist | National Aeronautics and Space Administration | 8/26/2010 |
LOGISTICS MANAGEMENT INSTITUTE | $786,228 | Contract | : Air traffic in the U.S. is predicted to increase significantly by 2025. The current air traffic management system will not be able to handle this growth. The objectives of this work are to evaluate the costs and benefits of NASA Concepts and Technologies | National Aeronautics and Space Administration | 7/21/2010 |
L-3 COMMUNICATIONS CORPORATION | $3,952,910 | Contract | : NASAG??s Mobile Operations Facility (MOF) will permit NASA Global Hawk (GH) flight operations to begin and end at deployment locations. Three examples of potential deployment locations and the scientific data gathering capabilities these locations will en | National Aeronautics and Space Administration | 7/01/2010 |
SENSIS CORPORATION | $217,151 | Contract | : This effort supports NASA Recovery Act work sponsored by the Aeronautics Research Mission Directorate and the Airspace Systems Program. Research funded by this work will focus on addressing the capacity challenges facing the US national airspace. It is f | National Aeronautics and Space Administration | 7/23/2010 |
WESTERN ENVIRONMENTAL TECHNOLOGY LABORATORIES, INC. | $206,563 | Contract | : Low-Cost In-Situ Optical Instrument Suite for Rapid, Short-Term Deployment | National Aeronautics and Space Administration | 8/31/2010 |
EARTH RESOURCES TECHNOLOGY, INC. | $13,978 | Contract | : Task Order 41: JSC Building 16E and 48 Roof Replacement | National Aeronautics and Space Administration | 6/28/2010 |
WYLE LABORATORIES, INC. | $298,702 | Contract | : Low Boom Community Response Pilot Program. The Supersonics Project is developing technologies that will potentially lower a sonic boom to levels acceptable to teh general community. | National Aeronautics and Space Administration | 7/09/2010 |
BOEING COMPANY, THE | $592,623 | Contract | : NASA will provide to Boeing a shipset of F/A-18 FCCs (2 dual FCC boxes) that has the 1750A RFCS processors along with spare flight computer cards from NASA aircraft number 837. NASA requests that Boeing upgrade the RFCS from a 1750A computer chip to a 68 | National Aeronautics and Space Administration | 9/01/2010 |
OPTIMAL SYNTHESIS INC. | $175,391 | Contract | : Airspace simulations and modeling are important methods used for creating a future national airspace system. One of the existing tools that is used to develop and evaluate the impact and benefits of advanced air traffic management concepts is FACET or the | National Aeronautics and Space Administration | 2/05/2010 |
CSC APPLIED TECHNOLOGIES, LLC | $7,639 | Contract | : The purpose of this award is for the Prime Facility Support Services Contractor to Replace Exhaust Fans Bldg 32 for Hurricane IKE Roofing Projects under Delivery Order 1498-1. | National Aeronautics and Space Administration | 12/21/2010 |
A M KINNEY INC | $568,300 | Contract | : PSL Engine Icing Capabilities Engineering and Final Design | National Aeronautics and Space Administration | 5/13/2010 |
MONTEREY TECHNOLOGIES, INC. | $1,454,960 | Contract | : Tiltrotor Test Rig Calibration Rig | National Aeronautics and Space Administration | 7/20/2010 |
UNIVERSITY CORPORATION AT MONTEREY BAY | -$90,000 | Grant | Science: TAS::80 0119::TAS. Integration of NASA Earth Science Information into A Wildfire Collaborative Decision Environment (W-CDE) This proposal will enhanc | National Aeronautics and Space Administration | 12/07/2009 |
UNIVERSITY CORPORATION AT MONTEREY BAY | $0 | Grant | Science: This proposal outlines a cooperative applied research project between NASA-Ames ResearchCenter (ARC) Science Mission Directorate Earth Science Div | National Aeronautics and Space Administration | 9/16/2010 |
UNIVERSITY CORPORATION AT MONTEREY BAY | $0 | Grant | Science: This proposal outlines a cooperative applied research project between NASA-Ames Research Center (ARC) Science Mission Directorate Earth Science Div | National Aeronautics and Space Administration | 9/29/2010 |