U.S. Army Corps of Engineers - civil program financing only
Total Spending |
$4,988,200,623 |
Parent agency (U.S. Army Corps of Engineers) | $4,988,200,622 |
State | Funding |
---|---|
Alabama | $158,835,262 |
Alaska | $84,025,074 |
Arizona | $38,817,321 |
Arkansas | $171,120,551 |
California | $495,523,233 |
Colorado | $16,345,213 |
Connecticut | $16,219,768 |
Delaware | $9,724,945 |
District of Columbia | $3,096,798 |
Florida | $233,267,508 |
Georgia | $118,687,546 |
Hawaii | $1,418,270 |
Idaho | $25,254,920 |
Illinois | $339,659,661 |
Indiana | $18,291,219 |
Iowa | $37,109,969 |
Kansas | $87,544,088 |
Kentucky | $151,927,669 |
Louisiana | $242,155,482 |
Maine | $2,601,847 |
Maryland | $40,962,254 |
Massachusetts | $127,446,342 |
Michigan | $40,253,733 |
Minnesota | $74,872,096 |
Mississippi | $174,021,960 |
Missouri | $214,711,360 |
Montana | $42,711,154 |
Nebraska | $40,585,280 |
Nevada | $28,420,028 |
New Hampshire | $12,335,318 |
New Jersey | $266,346,204 |
New Mexico | $46,299,714 |
New York | $39,682,145 |
North Carolina | $41,342,180 |
North Dakota | $71,024,120 |
Ohio | $64,923,359 |
Oklahoma | $72,497,015 |
Oregon | $114,156,335 |
Pennsylvania | $202,105,437 |
Rhode Island | $10,468,498 |
South Carolina | $72,612,645 |
South Dakota | $18,148,184 |
Tennessee | $95,914,270 |
Texas | $425,725,325 |
Utah | $38,802,642 |
Vermont | $15,725,092 |
Virginia | $95,757,760 |
Washington | $124,159,719 |
West Virginia | $69,513,342 |
Wisconsin | $53,898,980 |
Wyoming | $194,264 |
Puerto Rico | $72,950,369 |
Showing only the top (by amount) 50 entries. Go here for the full list
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Federal Dept./Agency | Date |
---|---|---|---|---|
SUULUTAAQ, INC. | $62,303,732 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/26/2009 |
: The Napa Valley Wine Train Relocation project is a flood control job designed to minimize flooding of downtown Napa, CA. The existing railroad bridge over the Napa River is at an elevation that impedes the flow of the 100 year storm event. This backs up | ||||
THALLE CONSTRUCTION CO., INC. | $56,485,450 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 1/29/2010 |
: Construction of upstream lock monoliths for the Kentucky Lock Addition project, Grand Rivers, KY, of the Nashville District U.S. Army Corps of Engineers. | ||||
WESTON SOLUTIONS, INC. | $52,942,206 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/13/2009 |
: As part of maintenance on Houston-Galveston Navigation Channels project, the contract provides for design and construction for the rehabilitation and increased capacity of multiple existing sites along the Houston Ship Channel. These sites are used to co | ||||
SHAW ENVIRONMENTAL, INC. | $49,138,392 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/22/2009 |
: American Recovery & Reinvestment Act (ARRA) funding was obligated on USACE Kansas City District Contract No. DACW41-99-D-9001 for 'Maywood Chemical Superfund Site-Specific Environmental Remediation' as bilateral Modification No. 0004 under Task Order No. | ||||
DRAGADOS USA, INC. | $48,523,233 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/29/2010 |
: Rio Puerto Nuevo Flood Control Project, Margarita Channel Improvements and Misc. Features (CNT 2AR) San Juan, Puerto Rico | ||||
WALSH CONSTRUCTION COMPANY | $48,146,168 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
: Major Rehabilitation, Stage III, Canal Walls, Lockport Pool, Illinois Waterway, Lockport Lock: - This project consists of the installation of pre-cast panels on the water side of the existing perched canal wall to prevent seepage and to protect the histor | ||||
LODGE CONSTRUCTION, INC. | $44,125,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/24/2010 |
: Central and South Florida Site 1 Impoundment Project. Strengthen existing L40 Levee with borrow material and armor the top and banks with soil cement and turf reinforcement mat. Other activities include clearing and grubbing, borrow excavation site and | ||||
JACOBS - TETRA TECH EC JOINT VENTURE | $43,665,925 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/02/2009 |
: Continuation of Dredging Activities and Clean-Up for the New Bedford Harbor Superfund Site. The Jacobs-Tetra Tech Joint Venture (JV) was established to execute work under the US Army Corps of Engineers NAE Total Environmental Restoration Contract (TERC). | ||||
WEEKS MARINE, INC. | $41,889,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/26/2009 |
: As a part of USACE ARRA program, this is the Design/Build Project for Deepening of the Texas City Channel from 40' to 45' with construction of dredged materials disposal areas in Galveston County, TX. | ||||
BRAYMAN CONSTRUCTION CORPORATION | $41,352,244 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/06/2009 |
: Construction services to include placement of anchors and rehabilitation of foundation drains to reduce the risk of failure of Bluestone Dam, Hinton WV. | ||||
HARRY PEPPER & ASSOCIATES, INC. | $39,752,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/30/2009 |
: The Picayune Strand Restoration Project, Merritt Pump Station and Levees, Canals and Roads is part of the Comprehensive Everglades Restoration Plan (CERP). The project will help to restore the area known formerly as the Southern Golden Gate Estates to its | ||||
WEEKS MARINE, INC. | $38,367,817 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 2/25/2010 |
: As part of the USACE ARRA Program on Recovery, Houston-Galveston Navigation Channels PA14 and PA15 Expansion with dredging Bayport to Morgans Point, Chambers County, TX | ||||
TREVIICOS SOUTH, INC. | $35,302,049 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/06/2009 |
: Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers (USACE) on the Big Blue River in north-east Kansas in 1930's. The dam is located in a seismic area. The USACE developed the final design for the seismic retrofit of the dam. The USACE de | ||||
CAYO, LP | $33,464,013 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
: Installation of Pile Dikes on the Southwest Pass of the Mississippi River to beneficially aid in hydrological aspects or river flow - which in turn helps to facilitate improved navigation on a key waterway which acts as a $40 billion conduit for area and | ||||
CONTI FEDERAL SERVICES, INC. | $33,426,549 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
: The Contractor shall perform all necessary work and services for the remediation of contaminated soil, waste and floating product within Operable Unit 3 of the Imperial Oil / Champion Chmeical Superfund Site located in Marlboro, Monmouth County, New Jerse | ||||
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $31,849,348 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/03/2009 |
: The award consists of construction dredging or excavation of 2.1 million cubic yards of unclassified material between Cut 50 and Lower Terminal Channel, including Cuts 54 and 55, of the Federal Channel in Jacksonville, FL. All material is to be disposed | ||||
VOITH HYDRO, INC. | $31,200,076 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 4/08/2010 |
: As a part of the U.S. Army Corps of Engineers - civil program financing only-Operation and Maintenance, Recovery Act on the Stockton Dam project, Voith Hydro has received a contract award for the supply and installation of Kaplan runner, and rehabilitati | ||||
C.J. MAHAN CONSTRUCTION COMPANY, LLC | $30,248,615 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
: Walls construction of the Upper and Lower Guard Walls at Charleroi Locks and Dam, Monongahela River, PA | ||||
SEVENSON ENVIRONMENTAL SERVICES, INC. | $30,000,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/26/2009 |
: Award provides for the following: Excavation of contaminated soil, on-site treatment of excavated soil via low temperature thermal desorption, backfilling of excavated areas with treated soil, installation of a multi-layer hardscape and complete landscap | ||||
STRAUB CONSTRUCTION, INC. | $29,629,127 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/30/2010 |
: Design and Construction of New Boulevard Border Patrol Station, Boulevard, San Diego County, California | ||||
J. E. MCAMIS, INC. | $29,009,695 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/16/2009 |
: Columbia River Channel Improvements - Rock Removal 2009 | ||||
KNIK CONSTRUCTION CO., INC. | $28,619,861 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 2/11/2010 |
: AS PART OF TAS::96 3134::TAS RECOVERYPROJECT#::10542::RP# ARRA NAVIGATION IMPROVEMENTS, AKUTAN, ALASKA THE BASE AND OPTION WORK INCLUDES CONSTRUCTION OF A MOORING BASIN, THE BREAKWATERS, AND AN ENTRANCE CHANNEL. WORK FOR THE BASE AND OPTIONS WORK INCLUDES | ||||
ANDRITZ HYDRO CORP. | $28,100,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
: TAS::96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::022480::RP#PROJECT DESCRIPTION: FULLY FUND REHABILITATION OF THE UNIT 1 TURBINE TO PROVIDE CLEAN, RENEWABLE ENERGY FOR THE NATION. | ||||
WASHINGTON GROUP/ALBERICI JOINT VENTURE | $27,941,413 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
: Transport, set on the pre-prepared foundation, and tremie in place two (2) precast dam elements(precast elements will be previously constructed) designated as SS-1 ( 3700 Tons )and SBS-1 (4000 Tons) during the first river season which begins 1 June 2010. | ||||
EDWARD KRAEMER & SONS, INC. | $27,578,216 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 |
: This project is part of the lock and dam 3, Mississippi River MN project number 76200. As a part of construction on Lock and Dam # 3 Navigational Improvements project the work consists of extending the existing guidewall and placing rip rap in the channe | ||||
TRUMBULL CORPORATION | $27,182,577 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 4/01/2010 |
: Recovery Project#::71458::RP# Emsworth Locks and Dam, Ohio River, PA Back Channel Scour Protection and Left Abutment Stabilization | ||||
SEVENSON ENVIRONMENTAL SERVICES, INC. | $27,000,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
: Award provides for the following: Excavation of contaminated sediments, on-site placement of excavated sediments, and shoreline stabilazation with geo-fabric and revetment stone. Also included is the backfilling of excavated areas and the restoration of | ||||
ADVANCED CONSTRUCTION TECHNIQUES LTD | $26,768,233 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/06/2009 |
: Original Contract was awarded August 30, 2007: Contract was for the completion of foundation drilling and grouting at the Clearwater Dam in Piedmont, Missouri. This work is a continuation of Phase I which was completed Oct 15, 2007. The scope of this con | ||||
ENVIRONMENTAL CHEMICAL CORPORATION | $26,432,080 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
: HIGHWAY, STREET, AND BRIDGE CONSTRUCTION/CONSTRUCTION OF DAMS: Construction and dam embankment repairs including placement of 219,608 tons of rip rap material at Granger Lake dam, Belton Lake dam and Navarro Mills Lake dam, located in central Texas. | ||||
TRUMBULL CORP & BRAYMAN CONSTRUCTION CORP JOINT VENTURE | $26,389,527 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/29/2009 |
: RECOVERY PROJECT # ::010286::RP# LOCKS AND DAM 2,3,AND 4, MONONGAHELA RIVER PA, VICTORY HOLLOW SEDIMENT POND CLEANING IN SUPPORT OF THE CONSTRUCTION OF THE CHARLEROI RIVER WALL. P00036 FULLY FUNDED THE BALANCE OF THE CONTRACT WITH ARRA FUNDS AND P00037 | ||||
MANSON CONSTRUCTION CO. | $26,127,692 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/29/2009 |
: Capital (deepening) dredging at the Port of Anchorage. As a part of TAS 96-3135 - program number Operation & Maintenance, Recovery Act, modification 02 to contract for 2009-11 Transitional and Maintenance Dredging, Port of Anchorage, is for increase the | ||||
ARCHER WESTERN CONTRACTORS, LTD. | $24,825,295 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/20/2010 |
: Project #: 104781 consists of the construction of a 460 MGD (million gallons per day) In-plant Secondary Effluent Pump Station. Related key element of this IPSEPS include: approach channels, wet well, appurtenances, 84' diameter force mains (piping syst | ||||
HARPER CONTRACTING, INC. | $24,249,343 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
: Project No. 104779, Temporarily re-align the Santa Ana River. Reconstruct the existing washed away river banks and armor them with rip rap and make minor alignment adjustments. Restore the original to the original alignment. Re-align the golf course a | ||||
ZACHRY CONSTRUCTION CORPORATION | $23,534,095 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/21/2009 |
: Construction Channel Improvement Project, Mission Reach, Phase 2a, San Antonio, Texas. | ||||
CONSTRUCCIONES JOSE CARRO S E | $22,530,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/23/2010 |
: The work includes approximately 380,345 cubic meters of channel excavation, approximately 267,393 cubic meters of levee construction, including chimney and finger drains, excavated material, temporary depot areas, material disposal areas, wetland mitigati | ||||
R & D MAINTENANCE SERVICES, INC. | $22,170,079 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/21/2009 |
: AWARD: Following awards are for Operation and Maintenance of Government Owned Facilities and Equipment, on Black Warrior and Tombigbee/Alabama Coosa Project, Tuscaloosa, Alabama. 72-Close, Dewater, Inspect and Repair Bankhead and Selden Locks. 73-Paint | ||||
SEVENSON ENVIRONMENTAL SERVICES, INC. | $22,000,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/17/2009 |
: Award provides for the following: Remediation of radiological waste and restoration of the subject property. This encompasses the excavation of radiological materials and soils, which are then transported off-site for proper disposal. Restoration inclu | ||||
HARRY PEPPER & ASSOCIATES, INC. | $20,222,152 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/27/2010 |
: Water levels in the underground alluvial aquifer, source of irrigation water in the region, have been dropping at approximately a foot each year. At the current rate, researchers have said it could be depleted and completely lost by 2015. The Bayou Meto P | ||||
SEVENSON ENVIRONMENTAL SERVICES, INC. | $20,000,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/25/2009 |
: Award provides for the following: Construction of temporary stream diversion channels at the Vineland Chemical Superfund Site in the area of Phases III and IV, construction of temporary haul roads, staging areas and a trailer/personnel area as needed to | ||||
EDWARD KRAEMER & SONS, INC. | $19,824,329 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 2/12/2010 |
: As a part of the lock and dam 3, Mississippi River MN project number 76200 this is a Firm-fixed-price Design Build Contract to design and construct safety improvements on the Mississippi River along the Lower Embankments at Lock and Dam 3 near Red Wing MN | ||||
ARCHER WESTERN CONTRACTORS, LTD. | $19,387,307 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 4/01/2010 |
: Project #104781: began as a continuing clause contract with an allocated funding of 9.9 million dollars. The total cost of the project to date is over 32 million. Without the ARRA funding the project would not have been able to continue and probably wou | ||||
DAVID BOLAND, INC. | $18,192,993 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/02/2009 |
: As part of the USACE ARRA Program this is the Recovery - Colorado River and Tributaries Texas, Mouth of Colorado in Matagorda County project. Deliverables include 13,000 Ton Filler Stone; 33,011.09 Ton Blanket Stone; 57,981.17 Ton Core Stone; 46,109.71 T | ||||
MARATHON, CITY OF | $18,126,280 | Grant | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/23/2009 |
Florida Keys Water Quality Improvement Program (Section 109) - ARRA: The purpose of the Marathon Wastewater Project is to eliminate septic tanks and illegal cesspits within the City of Marathon to restore the health and economic vitality of its nearshore waters. | ||||
TREVIICOS SOLETANCHE JV | $18,000,000 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/08/2009 |
: The award is for partially fund a Firm Fixed Price Construction Contract for the US Army Corps of Engineers, Nashville District to provide a Cut Off Wall at the Wolf Creek Dam, near Jamestown, Kentucky. Wolf Creek Dam is on the Cumberland River system. Th | ||||
DONJON MARINE CO., INC. | $17,943,010 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2010 |
: As part of - Construction, Recovery Act for the Deepening of Anchorage channel project to benefit New York and New Jersey | ||||
STEWARD MACHINE CO., INC. | $17,163,750 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
: Supply miter gates, bulkheads, and components to the Chickamauga Lock, Chattanooga, TN, of the Nashville District U.S. Army Corps of Engineers. | ||||
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $16,502,208 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
: This award for this new work project consists of dredging 2.7 million cubic yards from the Mobile Harbor Turning Basin and widening a portion of the Mobile Harbor Bay Channel with disposal of dredge materials in either offshore or upland disposal areas. | ||||
MWH AMERICAS, INC. | $15,806,663 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 4/15/2010 |
: As part of the Environmental Protection Agency Hazardous Substance Superfund, Recovery Act, this work is Groundwater Treatment Plant Construction and Remediation for Price's Pit Landfill Remediation, Pleasantville, New Jersey | ||||
JAMES MC HUGH CONSTRUCTION CO. | $15,713,130 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/15/2009 |
: Provide all necessary plant, facilities, labor, transportation, ,materials, and equipment to fabricate and install 4 new curved structural steel sector gate leafs and associated hydraulic operating machinery to replace 4 existing structural steel sector g | ||||
MANSON CONSTRUCTION CO. | $15,377,194 | Contract | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/11/2010 |
: Dredging in Alabama, Mississippi and Florida. Task order # 0002 |
Showing only the top (by amount) 50 entries. Go here for the full list