Listing all stimulus spending by amount, in descending order. Return to U.S. Army Corps of Engineers - civil program financing only page
Amount refers to both the amount of stimulus funding going toward the project and the face value of the loan.
Recipient | Amount | Type | Description | Federal Dept./Agency | Date |
---|---|---|---|---|---|
TAB CONSTRUCTION COMPANY, INC. | $51,255 | Contract | : Chinking Stone | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/21/2009 |
MACK INDUSTRIES, INC. | $108,814 | Contract | : Fairport, OH Concrete Block | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/21/2009 |
MACK INDUSTRIES, INC. | $18,354 | Contract | : Precast Concrete Slope Units Cleveland Concrete Stone | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
LUEDTKE ENGINEERING COMPANY | $989,988 | Contract | : FY09 MAINTENANCE DREDGING HURON HARBOR, HURON, OH | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/27/2009 |
UPSTATE CONSTRUCTION SERVICES, INC | $616,759 | Contract | : Clearing and Paving Mount Morris Dam Access Road | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
BIDCO MARINE GROUP INC. | $221,512 | Contract | : Replacement of Lock Sils - Lower Operating and Guard Gates, Black Rock Lock, Buffalo, NY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/28/2009 |
TIDEWATER CCEJV | $265,632 | Contract | : The contractor shall perform work as noted below to clear the entire limits of Cell 2 of the Toledo, OH CDF so that a topographic survey of the entire CDF can be prepared and trenching within the CDF can be performed. Existing vegetation shall be cut and | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
AVPOL INTERNATIONAL LLC | $99,351 | Contract | : Provide QAR Support Services. Modification P00001 awarded 09/25/2009 was for $35,000, and Modification P00003 awarded 11/23/2009 was for $5,000, and Modification P00004 awarded 3/15/2010 was for $158,000 for a total of $198,000. Modification P0005 awarde | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
AVPOL INTERNATIONAL LLC | $56,517 | Contract | : Labor services (Quality Assurance Representative III) to support the Kentecky Lock Resident office with the Kentucky Lock construction mission of the Nashville District U.S. Army Coprs of Engineers. To date, this contract is funded with 3135 funds ($15K) | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
INCA ENGINEERS INC | $106,170 | Contract | : Engineering services for plans and specifications for the approach wall for the Chickamauga Lock, Chattanooga, TN of the Nashville District US Army Corps pf Engineers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
INCA ENGINEERS INC | $140,300 | Contract | : Structural, mechanical, and electrical designs for new and ongoing navigation lock and dam projects at Chickamauga Lock, Kentucky Lock, and at possible other various locations. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
ELR PROJECTS SERVICES, L.L.C. | $77,903 | Contract | : paint cheatham power house crane | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
JOHN BOUCHARD & SONS CO. | $2,337,696 | Contract | : Replacement of Cooling Water Piping System at Wolf Creek Power Plant. Furnish all labor, equipment, tools, supplies and materials necessary to replace the existing generator cooling system in accordance with specifications and drawings. Total project is | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
JOHN BOUCHARD & SONS CO. | $397,272 | Contract | : Supply and deliver generator air coolers for the Center Hill Power Plant, Units One and Three, Nashville District U.S. Army Corps of Engineers, in accordance with specifications and drawings. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
WALTER A. WOOD SUPPLY CO., INC. | $53,930 | Contract | : Various materials.....pipe, valves and fittings.....misc. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
JEFFREY CHAIN, L.P. | $1,194,780 | Contract | : Hydro Electric Dam Gate Chain Replacement | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/23/2009 |
EMERALD RESOURCE, LLC | $3,439,510 | Contract | : Services for lock control systems rehabilitation of the Guntersville and Wilson Lock projects, of the Nashville District U.S. Army Corps of Engineers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
RL ALVAREZ CONSTRUCTION, LLC | $36,858 | Contract | : PRESSURE WASHING AND PAINTING OF BUILDINGS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
G & M ASSOCIATES | $173,257 | Contract | : Prepared (reshaping/removing, compacting, and resurfacing), paving, and striping of existing parking lot and gravel drive a three separate areas. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
A & H CONTRACTORS, INC. | $3,356,233 | Contract | : Four new mooring cells shall be constructed as replacements for existing cells that are no longer serviceable. Existing cells shall be removed by contractor prior to construction of new cells. New cells shall be constructed in the footprint of existing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
VAUGHN & MELTON CONSULTING ENGINEERS, INC. | $158,556 | Contract | : Provide engineering and mapping services for Inland Electronic Navigational Charts (IENC) for tributaries of the Tennessee River. Work includes establishing survey control, feature location surveys and aireal mapping along a 20 mile reach of river. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/14/2009 |
URS GROUP, INC. | $985,308 | Contract | : Archaeological data recovery, pedestrian survey to identify previously recorded archaeological sites, artifact analysis, C-14 Accelerated Mass Spectrum Dating, geophysical survey. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/16/2009 |
T. MCDONALD CONSTRUCTION, INC. | $316,326 | Contract | : As part of Operation and Maintenance, Recovery Act on Project #74945, Upgrade utilities at various parks, Denison Dam, Texoma, Texas | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/01/2009 |
WATER MONITORING SOLUTIONS, INC. | $68,930 | Contract | : As part of TAS::96 3135:: TAS, Supply on Recovery - Project number 8990, Keystone Lake, Sand Springs, Oklahoma; project number 6000, Fort Gibson Lake, Fort Gibson, Oklahoma; and Project Number 5650, Eufaula Lake, Oklahoma for AE Contract to UPdate Forecas | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
ADVANCED INTEGRATION GROUP, INC. | $175,390 | Contract | : Robert Kerr Lock & Dam Automation Equipment | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
NAAB TECH LLC | $253,233 | Contract | : SUPPLY (3) THREE VERTICAL TURBINE PUMPS FOR BATEMAN PUMPING STATION | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 1/06/2010 |
POST BUCKLEY SCHUH & JERNIGAN INC | $111,744 | Contract | : ARRA funded work for marine archeological surveys for the Houston Ship Channel, Chambers County, Texas | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/30/2009 |
E A ENGINEERING | $664,453 | Contract | : The purpose of this project is to evaluate the quality of dredged material from the Federal navigation channels in Norfolk, Virginia region (Thimble Shoal Channel, Atlantic Ocean Channel, and Norfolk Harbor Channel Reaches) with respect to available place | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
J & S CONTRACTORS, INC. | $332,760 | Contract | : Maintenance of mooring buoys | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/06/2009 |
PARTNERS BUSINESS CONSULTING | $137,440 | Contract | : Provide reporting of recovery work to include daily reports, workload analysis, staff assistace, and auto-generation of data. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
PARTNERS BUSINESS CONSULTING | $45,300 | Contract | : Provide reporting of recovery work to include daily reports, workload analysis, staff assistace, and auto-generation of data. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/18/2009 |
AFFOLTER CONTRACTING COMPANY, INC. | $1,700,600 | Contract | : Modification #m3ctpirs09448 - Unrestricted Procurement, Corpus Ship Channel, Texas, LaQuinta Channel and Jewel Futon Canal in Nueces County, Texas - Pipeline dredging. The contract funded under ARRA will include Item #16 ARRA - Stripping 1 LS = $30,000, | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/02/2010 |
FUTURENET GROUP, INC. | $179,994 | Contract | : GREAT LAKES HABITAT AND SPECIES STRATEGIC PLANNING PROJECT in Support of the U.S. Army Corps of Engineers, Buffalo District. Prepare an outreach and information gathering plan (survey) that outlines how to engage stakeholders in the basin to obtain infor | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/25/2009 |
H2H ASSOCIATES, LLC | $235,391 | Contract | : The procurement was for records management, including the organization, identifying project file deficiencies, indexing, digitization, and assembling and making accessible a permanent record file and associated administrative record files (ARF) for the Ni | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/30/2009 |
KIMBRO OIL COMPANY INC | $58,811 | Contract | : Clean and Refill gear box at Cheatham Lock. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
KIMBRO OIL COMPANY INC | $40,765 | Contract | : Replacement of gearbox lubricants for KY lock. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/05/2009 |
HARLAN ELECTRIC COMPANY, INC. | $806,255 | Contract | : Kentucky Lock Electrical systems rehabilitation, Grand Rivers, KY of the Nashville District U. S. Army Corps of Engineers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
TINAA SERVICES, INC. | $158,557 | Contract | : Install a security system at the Cheatham Dam Power Plant in accordance with the scope of work. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |
MONTGOMERY ELECTRIC COMPANY | $211,829 | Contract | : Services to install waterline at Defeated Creek Campground, Cordell Hull project, Carthage, TN of the Nashville District U.S. Army Corps of Engineers. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
FEDERAL CONTRACTS CORP | $317,079 | Contract | : 30 Ton Telescopic Boom Rough Terrain Crane: Link Belt Crane - Model RTC8030 in support of Graham Burke Pumping Plant, Elaine, AR. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/02/2009 |
DINE MODULAR CONSTRUCTION, LLC | $259,404 | Contract | : Construction of new Fuel Storage Building at W. G. Huxtable Pumping Station, Marianna, AR | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
CLARK BOAT CO., INC. | $68,450 | Contract | : Build Work Pontoon, Trailers with Motors | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
SEVENSON ENVIRONMENTAL SERVICES, INC. | $20,000,000 | Contract | : Award provides for the following: Construction of temporary stream diversion channels at the Vineland Chemical Superfund Site in the area of Phases III and IV, construction of temporary haul roads, staging areas and a trailer/personnel area as needed to | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/25/2009 |
CAPITAL SAND COMPANY, INC. | $209,625 | Contract | : Shot Rock Delivered to Barge | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
CAPITAL SAND COMPANY, INC. | $209,625 | Contract | : Shot Rock Delivered to Barge | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
OCCI, INC. | $830,176 | Contract | : Modification to existing Federal Contract for Replacement of spillway stair railings and Bridge Steel painting. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/02/2009 |
SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | $3,000,000 | Contract | : Performing remediation and monitoring of contaminated groundwater at the Monitor Devices Inc./Intercuits Superfund site located in Wall Township, NJ. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/03/2009 |
WESTERN AIR MAPS, INC. | $88,900 | Contract | : Navigation Charts | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
WESTERN AIR MAPS, INC. | $48,400 | Contract | : Topographic & Boundary Surveys for Pomme de Terre Lake Stilling Basin Area and Melvern Lake. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
DAVID MILLER & ASSOCIATES, INC. | $161,091 | Contract | : Description: 20060 WILSON LAKE, KS. Work consists of services for components of a feasibility level study for Wilson Lake Reallocation to conduct surveys to measure the amount of sediment in lakes. The work consists of evaluating readily available data/in | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
HNTB CORPORATION | $3,358,934 | Contract | : Project 324170. 30745 USACE Levee Safety Program. Type of work includes performing a levee safety Periodic Inspection (PI) on the levee systems. The levee systems to be inspected may consist of multiple segments and have multiple sponsors per system. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/29/2009 |
THE VICTOR L PHILLIPS COMPANY | $64,558 | Contract | : Loader Backhoe | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
W. A. ELLIS CONSTRUCTION CO | $174,750 | Contract | : To deliver rock to the contractor - provided loading dock or banks of the Missouri River and load onto government barges by means of a Governement trucks at the quarry as designated in the BPA call. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
W. A. ELLIS CONSTRUCTION CO | $102,599 | Contract | : To deliver rock to the contractors - providers loading dock or banks if the Missouri River and load onto governemnt barges by means of a Government provided loading dock or load Government trucks at the quarry as disgnated in the BPA call. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
GARDINE CONSTRUCTION | $10,500 | Contract | : ADA requirements for front entrance& bathroom remodel for ADA Code | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/14/2009 |
OUTLAND TECHNOLOGY INC | $120,916 | Contract | : ROV-1000, UNDERWATER REMOTELY OPERATED VEHICLE. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
HSMM / HOK BRAC | $545,427 | Contract | : The Seven Points Area Water Treatment Facility project is providing needed improvements to the existing drinking water treatment system at the Raystown Lake Project, an ongoing Civil Works Operation of the Baltimore District of the United States Army Corp | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
LEE, NORMAN REAL ESTATE APPRAISAL | $4,500 | Contract | : Appraisal | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
LAKE UNION DRYDOCK COMPANY | $616,467 | Contract | : As part of the maintenance of the navigation channels, repower the marine vessel Puget, complete associated work, and to complete some conditioning work. 323922 NAV ARRA PS&TW ASSETS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/04/2009 |
PETERS CONSTRUCTION INC | $15,300 | Contract | : As a part of construction on Lac qui Parle East Recreation Area, Watson. MN project. Construction of concrete walkway and garbage pads to provide an access path for general public and handicapped visitors along dwonstreatm embankment. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
ASPEN CONSTRUCTION COMPANY | $107,755 | Contract | : This project consists of installation of new 50AMP pedistals at campground sites. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
ASPEN CONSTRUCTION COMPANY | $99,650 | Contract | : This project consists of excavating lake sediment in the area of the existing beach and addition to the existing beach. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
HDR ENGINEERING, INC. | $530,202 | Contract | : Perform levee safety Periodic Inspection (PI) on the levee systems. The purpose of PIs is to verify proper operation and maintenance, evaluate operational adequacy and structural stability, review design criteria to identify changes in current design s | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/15/2009 |
WIN/ALL PRO, A JOINT VENTURE | $356,211 | Contract | : Installation of water, sewer and electrical lines. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
ABS SUPPORT SERVICES, INC. | $230,993 | Contract | : Repair of Stilling Basin at Pomme de Terre Lake. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
RYAN MOORE CONSTRUCTION | $25,000 | Contract | : Boundry Maintanance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/13/2009 |
CULLEN TREE MANAGEMENT, L.L.C. | $25,000 | Contract | : Cut and removed trees from specified area to restore native prairie. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/31/2009 |
CROUCH RECREATIONAL DESIGN INC | $24,719 | Contract | : 2 playground additions delivered to the 2 sites, and installation was provided by local volunteers. A supervisor was also provided | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/26/2009 |
BEAR CREEK ARCHEOLOGY INC | $30,387 | Contract | : Phase I archeological and geomorphoplogical investigation for the construction work limits of the proposed Rathbun Lake North Shore Trail. The project areas consisted of a trail corridor, two rectangulat trail heads, 10 irregularly shaped drainage crossi | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/07/2009 |
INDUSTRIAL SALES COMPANY, INC. | $4,623 | Contract | : Polyethylene pipe and fittings | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/02/2009 |
DINMAN GROUP, L.L.C. | $18,908 | Contract | : Remove and replace sidewalks | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
MISSOURI DOOR COMPANY, INC. | $10,934 | Contract | : As part of Construction on the Jerry Litton Visitor Center in Smithville, MO. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
TWIN VALLEYS PUBLIC POWER DISTRICT | $23,950 | Contract | : Tie into an existing 7200 volt power line and install 1900 feet of 4/0 underground power line. The trenched line will service one 100 kVA transformer and two 75 kVA transformers. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/15/2009 |
ASH GROVE AGGREGATES, INC | $24,576 | Contract | : Aggregate Material for City of Hermitage project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/29/2009 |
CENTRAL MISSOURI LANDWORX LLC | $12,953 | Contract | : As part of the contract W912DQ-09-P-0180 the duties included working the soil the depth of min. of 6 inches. Then preparing a firm seed bed, with fertilizer, and then drilling the wheat seed. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/31/2009 |
WIN CONSTRUCTION, INC. | $7,475 | Contract | : INSTALLED CEILING AND CHANGED LIGHT FIXTURES IN MAINTENANCE BUILDING AT CLINKTON KAE, LAWRENCE KS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
MCGIVERN, J F, INC | $26,400 | Contract | : Surface preparation and painting of the previously painted interior block wall surfaces of the Clinton Lake Hickory/Walnut Shower Building located in Lawrence, Kansas. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/18/2009 |
TECH MECH SUPPLY, LLC | $8,310 | Contract | : To provide six (6) ADA compliant water fountains to the Tuttle Creek Project Office near Manhattan, Kansas[p | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
RYAN BAILEY, INC. | $23,850 | Contract | : Maintenance shed for core of engineers. Located on the Bloomington side of Clinton Lake, in Lawrence, KS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
F.L.L.C., INC. | $7,750 | Contract | : skidmore observation platform harry s truman project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
KIDSTUFF PLAYSYSTEMS, INC. | $42,026 | Contract | : furnish and install playground equipment and safety surfacing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
BAYER CONSTRUCTION COMPANY, INC. | $22,230 | Contract | : Tuttle Creek Lake Access Road and Work Apron Resurfacing Project. Work provided the delivery of an estimated 6-inch layer of 1.5 inch road rock, delivered and tailgated to Tuttle Creek Lake, Manhattan, KS. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/26/2009 |
RMW SERVICES, L.L.C. | $13,800 | Contract | : Security fence 541' and a 24' tymetal gate remove and reinstall existing gate. Remove old material and disposal of it. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/18/2009 |
TALL GRASS MUSEUM SERVICES | $21,000 | Contract | : Fabricated water safety and invasive species exhibits at Hillsdale visitor center, Hillsdale Lake, Paola, Ks. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
AMERICANA BUILDING PRODUCTS, INC. | $33,393 | Contract | : Park Shelters | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
VERMEER GREAT PLAINS, INC. | $33,295 | Contract | : Vermeer TS44A Tree Spade Serial Number 1VRC161P391005581 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
LEGACY SHELTERS INC | $32,440 | Contract | : We procured and provided two park shelters for Clinton Lake in Lawrence, KS. The shelters consist of powder coated steel columns, laminated wood beams, 2 x 6 T&G wood decking and a 29 gauge ribbed metal roof. The shelters roof measure 30' x 35' and 40' | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
ASHWORTH PAVEMENT MAINTENANCE LLC | $8,846 | Contract | : Crack seal Bledsoe Ferry West/Dam, Harry S. Truman Project near Warsaw, MO | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
CENTRAL MISSOURI LANDWORX LLC | $23,416 | Contract | : As part of the maintencance on W912D09-P-0222 the removal of trees and limbs were done in the clean up project of Truman Lake Levee. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
DENNIS & DONNA NOBLITT | $26,600 | Contract | : Removal of brush and treatment of stumps with herbicide on boundary line | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/01/2009 |
MIDWAY FORD TRUCK CENTER, INC. | $96,304 | Contract | : Furnish one completed new heavy dump truck Missouri River Project US Corp Army Engineers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/02/2009 |
BIVENS, ROBERT | $25,350 | Contract | : REPLACEMENT OF TOILET PARTITIONS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
BELLA CORPORATION | $13,675 | Contract | : INSTALL MOTION GATE | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
US BOATWORKS INC | $5,132 | Contract | : Outboard Motor | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
WACONDA BOATS & MOTORS LLC | $12,965 | Contract | : Mercury 200 Hp Verado engine installed | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
CLARK BOAT CO., INC. | $68,450 | Contract | : Build Work pontoons, trailers with Motors | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
JIM'S GARDEN CENTER LLC | $13,000 | Contract | : Renew Landscaping at the Truman Visitors Center, Warsaw, MO. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
FLINT HILLS ENTERPRIZES, LLC | $6,599 | Contract | : BOUNDRY LINE CLEARING / SELECTIVE VEGITATION REMOVAL | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
R & R LIMITED | $24,950 | Contract | : GENERATOR SET | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
MURPHY TRACTOR & EQUIPMENT CO., INC. | $58,313 | Contract | : JOHN DEERE EQUIPMENT | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
GRANUBAND MACON, LLC | $25,000 | Contract | : Playground surface material as part of construction of Rathbun Lake Project . | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/16/2009 |
PRUDENT TECHNOLOGIES, INC. | $52,227 | Contract | : Removal of Underground Staorage Tanks and installation of above ground storage tanks at Hillsdale Lake and Clinton Lake Sites in Kansas | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
...OUT.....CHARITON VALLEY ELECTRIC COOPERATIVE INC | $10,270 | Contract | : Modification of electrical service lines in Island View and Buck Creek Parks public use areas at Rathbun Lake, Iowa. Contractor provided all labor, materilas and equipment required to perform the installations. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/12/2009 |
EVERETT QUARRIES CO., INC. | $24,950 | Contract | : To deliver crusher run for the maintenance of access points into Smithville Lake. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/18/2009 |
EVERETT QUARRIES CO., INC. | $24,950 | Contract | : Delivered crusher run to build new walking trails. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/18/2009 |
MISSOURI DOOR COMPANY, INC. | $23,909 | Contract | : As part of construction on the Jerry Litton Visitor Center in Smithville, MO. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/18/2009 |
PENCE HEATING & COOLING APPLIANCE SERVICE | $24,550 | Contract | : As part of maintenance on Corps of Engineers project we installed three HVAC systems | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/18/2009 |
VICTOR L. PHILLIPS COMPANY, THE | $77,975 | Contract | : Backhoe | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/14/2009 |
U. S. TOY CO., INC. | $24,700 | Contract | : Surfacing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/27/2009 |
JIRAK, JEFFREY LEE | $27,357 | Contract | : PICNIC SHELTER | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/24/2009 |
JIRAK, JEFFREY LEE | $48,300 | Contract | : MAINTANCE BUILDING | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/01/2009 |
NORRIS ASPHALT PAVING CO. | $3,460,758 | Contract | : 14880 RATHBUN LAKE, IA. Road repairs for Flood damaged roads. This work includes placing asphalt overlays on roads and lots in various parks around Rathbun Lake. Asphalt overlays will vary from two to four inch thickness. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/22/2009 |
MURPHY TRACTOR & EQUIPMENT CO., INC. | $182,127 | Contract | : John Deere Equipment | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/28/2009 |
TS CONSTRUCTION GENERAL CONTRACTORS, INC. | $104,550 | Contract | : sewer lift station rehab | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/02/2009 |
WEST CENTRAL CONTRACTORS, INC. | $2,017,990 | Contract | : ARRA Road Work at Missouri Lakes. Truman Lake, Long Branch Lake, Longview and Blue Springs Lakes. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/11/2009 |
ESI CONTRACTING, CORP. | $979,747 | Contract | : Road Work at Missouri Lakes, Smithville Lake, Smithville MO | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
SWIFT CONSTRUCTION COMPANY, INC. | $2,337,297 | Contract | : Road Work for missouri lakes | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
BETTIS ASPHALT & CONSTRUCTION, INC. | $4,734,365 | Contract | : ROAD RECONSTRUCTION AND RESURFACING | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
SHILLING CONSTRUCTION COMPANY, INC | $1,150,887 | Contract | : ARRA OVERLAYS AT KANSAS LAKES. TUTTLE CREEK, KS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
KONZA CONSTR. CO., INC. | $899,158 | Contract | : Asphalt overlay of existing roads at Milford Lake, Kansas. We have received one change order increasing the contract from $840,334.50 to $907,849.50. Of this amount, $899,157.92 was ARRA funded. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
WERNER CONSTRUCTION, INC. | $3,690,557 | Contract | : Harlan County Lake Road Repairs | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
ANCHOR QEA, LLC | $153,432 | Contract | : As a part of Construction in support of Seahurst Park Restoration Phase 2, complete plan formulation, conduct a Cost Effectiveness/Incremental Cost Analysis (CE/ICA), identify the National Ecosystem Restoration Plan (NER), complete NEPA and ESA compliance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/30/2009 |
MACTEC ENGINEERING AND CONSULTING, INC. | $50,400 | Contract | : CLIN 2052AG PROFESSIONAL SERVICES- Provide Construction Quality Assurance (QA) for the John H. Kerr Rehabilitation project in Boydton, VA. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/18/2009 |
JAVIER E BIDOT & ASSOCIATES PSC | $105,927 | Contract | : Provide all personnel, plant, equipment, transportation and materials necessary to perform and deliver all data in connection with Puerto Nuevo Topographic and Hydrographic Survey 09-081, San Juan,Puerto Rico. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/30/2009 |
JAVIER E BIDOT & ASSOCIATES PSC | $89,908 | Contract | : Provide all personnel, plant, equipment, transportation and materials necessary to perform and deliver all data in connection with Survey 09-168 Rio de la Plata Topographic Survey, Dorado, Puerto Rico. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/23/2009 |
ENVIROTEMPS, INC. | $4,736 | Contract | : Civil Engineering Support | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
MULTI MEDIA MARKETING ASSOCIATES INC | $187,720 | Contract | : Phase One and Two of the Lake Okeechobee and Okeechobee Waterway Visitor Centers; specifically to provide interpretive information to the visiting public about the Corps, it's mission, the project and facilities, natural and cultural resource management, | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
MULTI MEDIA MARKETING ASSOCIATES, INC. | $1,803,580 | Contract | : The USACE Lake Okeechobee and Okeechobee Waterway Project Visitor Centers will each have an exhibit unique to its area, while bringing together interpretive information to the visiting public about the Corps, it's mission, the project and facilities, loca | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
MULTI MEDIA MARKETING ASSOCIATES INC | $16,000 | Contract | : Design, creation and fabrication of two large floor displays with full graphics, lighting, and shipping case; and design creation and fabrication of four table top displays with full graphics (body and header) that converts into a briefcase. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/27/2009 |
MULTI MEDIA MARKETING ASSOCIATES, INC. | $176,414 | Contract | : Develop a training module for the USACE Regulatory Division. This National training module will be geared towards individuals who need to fill out the USACE ENG4345 Permit Application Form. The module will be fully interactive and have an animated chara | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/04/2009 |
DE GROVE SURVEYORS INC | $258,930 | Contract | : Survey 09-095 EDEN (WCA) Benchmark Monumentation Miami-Dade and Monroe Counties, Florida - Complete a Specific Purpose Survey for setting 6 new Class B monuments or Class C monuments if Class B requirements cannot be made and observing 8 existing control | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/01/2009 |
J.D. ABRAMS, L.P. | $6,206,598 | Contract | : As part of the USACE ARRA Program, these funds will allow for Placement Area 8 to accommodate additional dredge material removed for ship channel traffic. The funds will also repair the existing perimeter roadway for local fisherman. Specifically, the pe | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/04/2009 |
TRUSTON TECHNOLOGIES, INC. | $2,035,475 | Contract | : TAS::963135::TAS PURCHASE 100bTRADITIONAL STYLE MOORING SYSTEM.Manufacture all labor, tools, equipment, materials, supplies, and personnel necessary to manufacture 88 Mooring Systems to be delivered to the Gulf Intracoastal Water way, Texas in Brazos Rive | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/20/2009 |
TRUSTON TECHNOLOGIES, INC. | $837,733 | Contract | : TAS::963135::TAS ARRA-FLOATING ANVIL MOORING, Labor, tools, equipment, materials, supplies and delivery of fifty Floating Anvil Mooring Buoys, Thirty Anvil Type Mooring Devices, thirty Bail Type Mooring Devices and 60 Chain Links for Morning Devices at th | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/20/2009 |
RLB CONTRACTING, INC. | $932,373 | Contract | : As part of the USACE ARRA program this is the Corpus Christi Ship Channel, TX LaQuinta Channel Extension, PA #14 Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
VERSAR, INC. | $21,707 | Contract | : Benthic invertebrate sampling for a offshore sand borrow site needed for a beach renourishment project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
U. S. TOY CO., INC. | $32,190 | Contract | : Playground Surfacing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/16/2009 |
VANGUARD INSTRUMENTS CO,INC | $17,125 | Contract | : Model EZCT-2000B Transformer Test Set | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/01/2009 |
PALMETTO PROCUREMENT COMPANY LLC | $27,342 | Contract | : Magnetrol Flow Switches | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/23/2009 |
CRIQUI CONSTRUCTION, INC. | $16,835 | Contract | : Furnish and deliver 475 tons of 24rip rap and 820 tons of shot rock to Outlet Park at Melvern Lake Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/13/2009 |
DIVERSIFIED SECURITY CORPORATION | $13,009 | Contract | : Construct 26 sign posts hot dipped Galvanized and set in concrete on 6 jetties, 3 per jettie. Deliver excess sign posts to Corp for stock. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/16/2009 |
BERRY COMPANIES, INC. | $56,913 | Contract | : BOBCAT A300, 80 BUCKET, PALLET FRAME & FORKS AND BELSH GOOSENECK TRAILER | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/08/2009 |
SOUTHERN SUPPLY COMPANY, INC | $18,180 | Contract | : WAS AWARDED CONTRACT FOR SUPPLYING MERCOID/DWYER PRESSURE SWITCHES. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/23/2009 |
PRICE BROS. EQUIPMENT CO. | $12,634 | Contract | : KASCO 3-POINT NO-TILL GRASS DRILL | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/15/2009 |
INTERNATIONAL SUPPLIERS, INC. | $4,348 | Contract | : Purchase and Delivery of Horizontal Band Saw | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/13/2009 |
NORTH AMERICAN MARINE INDUSTRIES, INC. | $51,400 | Contract | : Collective Modular Support System (PSC Code: 5419) | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/13/2009 |
HBR CONSTRUCTION, L.L.C. | $46,478 | Contract | : fee booth and camppad constuction | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/14/2009 |
UNITED PROCUREMENT, L.P. | $18,684 | Contract | : DELIVERY OF A WATER SAFETY INTERPRETIVE TRAILER. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/23/2009 |
WORTHINGTON PRODUCTS LLC | $11,896 | Contract | : TUTTLE CREEK LAKE - CONTROL TOWER BUOY MATERIALS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/19/2009 |
WESCON SOLUTIONS | $22,451 | Contract | : Construct 30X45 shelter house with a 35x65 concrete pad. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/23/2009 |
DELTA FUEL COMPANY, INC. | $50,150 | Contract | : Mobil DTE Heavy Oil delivered to the Harry S Tuman Power Plant near Warsaw, Mo | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/05/2009 |
EVERETT QUARRIES CO., INC. | $24,950 | Contract | : Maintain current access points to Smithville Lake | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/03/2009 |
ROARK HEATING & AIR CONDITIONING, L.L.C. | $9,620 | Contract | : Supplied and installed XLI20 heatpump system | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/18/2009 |
PRUDENT TECHNOLOGIES, INC. | $27,308 | Contract | : Demolition of Old Gate Attendant Fee Booths and Consturction of new Fee Booths at Tally Bend and Thibeaut Point Recreational Areas at the Harry S Truman Dam Site and Reservoir Project in Warsaw, Missouri | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 |
DESIGN BUILD SERVICES LLC | $80,083 | Contract | : Removed and installing new shelter house with amenities at Overlook Park and installing new shelter house at Rockhaven Park, Clinton Lake, Lawrence, KS. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
R & D CRANE SERVICE, INC. | $1,120 | Contract | : Crane Rental Services | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/23/2009 |
NELSON & STREETER CONSTRUCTION COMPANY, INC. | $99,975 | Contract | : Replacement of Asphalt at the Knoll Camping Loop and Boat Launch at Lawrenceville, Tioga County, PA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
GEO-TECHNOLOGY ASSOCIATES, INC. | $129,550 | Contract | : Preventative maintenance of 34 relief wells | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
GEO-TECHNOLOGY ASSOCIATES, INC. | $129,550 | Contract | : Preventative maintenance of 34 relief wells | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
MCMULLEN, BRIAN | $17,280 | Contract | : Construct a total of 7,200 lineal feet of woven wire deer fence and 4 walk through man gates are specified in the enclosed scope of work at Raystown Lake, Hesston, PA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
AQUATIC SCIENCES, LP | $21,086 | Contract | : Hydrographic survey of Sandy Hook Bay | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/23/2009 |
AQUATIC SCIENCES, LP | $43,969 | Contract | : Topographic mapping for flood risk management in Tuckahoe, NY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/07/2009 |
STV-URS JOINT VENTURE | $3,067,176 | Contract | : Design and preparation of plans and specifications for the Sebrings Mills Road Bridge Raisings and partial segment B floodwall/levee/pump station. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
RETRO ELECTRICAL & MECHANICAL CORP. | $54,795 | Contract | : LOAD SENSING SYSTEMS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/20/2009 |
ANCHOR QEA, LLC | $179,225 | Contract | : As part of construction of the Duwamish / Green River Upper Springbrook Creek, provide design and specification services for the Upper Springbrook Creek (USC) project located in Renton, Washington. The nature of this work includes the design of a fish hab | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/13/2009 |
ANCHOR QEA, LLC | $20,087 | Contract | : In support of fish studies, perform adult Coho salmon and steelhead radio telemetry monitoring, green river Seattle, Washington. The contractor must: analyze and report on radio telemetry monitoring of adult Coho salmon released above Howard Hanson Dam, W | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
BOART LONGYEAR COMPANY | $121,350 | Contract | : Geotechnical drill exploration | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/22/2009 |
HICKEY MARINE ENTERPRISES, INC. | $1,754,000 | Contract | : As part of a maintenance of the navigation channels for grays harbor, WA. Perform FY2009 inner crossover channel maintenance dredging, grays harbor, Washington. Clamshell maintenance dredging of approximately 175,000 cubic yards of material form inner c | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/26/2009 |
SHANNON & WILSON, INC. | $286,480 | Contract | : In support of the Skagit river investigation (GI). Provide background investigation of previous geotechnical investigations of levees within the Skagit river basin in support of the GI levee failure analysis. 107023 ARRA geotechnical studies contract. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/28/2009 |
SHANNON & WILSON, INC. | $106,060 | Contract | : As part of maintenance for Howard Hanson Dam, WA, provide geotechnical services for the intake tower crack survey, seepage repair design report and bid package | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
SHANNON & WILSON, INC. | $17,769 | Contract | : As part of maintenance for Howard Hanson Dam, WA, relocate earthquake sensors HHD right abutment. 324675 HHD ARRA Earthquake Sensors. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
SHANNON & WILSON, INC. | $74,962 | Contract | : As part of maintenance for Howard Hanson Dam, WA, provide design services for geotechnical exploration program, right abutment integrity project, Howard Hanson Dam, WA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/13/2009 |
SHANNON & WILSON, INC. | $69,654 | Contract | : As a part of a DSAC interim risk reduction plan effort at Lucky Peak Dam, ARRA funds are being used to assess the dam's safety. The geotechnical engineering work is being performed by Shannon-Wilson, Inc. in Seattle, WA under the direction of the US Corps | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
KONNOWAC, LLC | $234,429 | Contract | : Pave and stripe Brandt's Landing park at Chief Joseph Dam in Bridgeport,WA. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
CHEROKEE CONSTRUCTION SERVICES, LLC | $170,736 | Contract | : As part of maintenance for the Hiram M. Chittenden Locks and Lake Washington Ship Canal, provide LWSC boiler replacement. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/26/2009 |
A P S SURVEY & MAPPING LLC | $13,954 | Contract | : As part of maintenance for Albeni Falls Dam, Oldtown, ID. provide Riley Creek Stabilization | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/30/2009 |
STABBERT MARITIME YACHT & SHIP, LLC | $128,420 | Contract | : As part of the maintenance of the navigation channnels provide shipyard work on debris barge, vendor to pickup barge from Hiram M. Chittenden locks , Seattle, WA and move to facility for repair. Upon completion of repairs, vendor to re-float barge and r | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/19/2009 |
PUGET SOUND PIPE AND SUPPLY COMPANY | $59,537 | Contract | : As part of maintenance for Howard Hansen Dam, WA, provide HHD stilling basin materials: gate valve, flanges and concentric reducer 324759 hhd arra stilling basin inv | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
BEDROCK CONSTRUCTION GROUP, INC. | $7,789 | Contract | : As part of maintenance for Mud Mountain Dam, Enumclaw, WA, to improve access to gauging station; build wood trail steps, rework hilly segment of trail. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
DELTA EQUIPMENT RENTALS AND SALES, INC | $7,356 | Contract | : Portable light tower | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
TELEDESIGN SYSTEMS INC | $49,681 | Contract | : As part of the maintenance of the navigation channels, provide radio base stations and rover radios,(hydrographic survey unit, Seattle District USACE) | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
DARK HORSE CONSTRUCTION, LLC | $16,890 | Contract | : As part of maintenance for Mud Mountain Dam, Enumclaw, WA, tower staff gauge installation. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
MARINE CO., INC. | $7,725 | Contract | : As part of maintenance for Albeni Falls Dam, Oldtown, ID, provide concrete boat ramp planks 6 x 16 x 12' | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
LIME ENERGY SERVICES CO. | $1,104,273 | Contract | : Delivery Order / Task Order 0001 - Provide Work Plan / Design to execute the repair / renewal / construction effort for the Reserve Training Center Repairs, MCRC, Fort Lewis, WA. (2) Minor Construction Work at Fort Lewis to include heating, ventilation, | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
WILLIAMS ELECTRIC CO INC | $1,761,099 | Contract | : Engineering survey, cost estimates, design development and installation of an Electronic Security System at Niagra Falls Storage Facility in Lewiston, NY. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/29/2009 |
TERRACON CONSULTANTS, INC. | $134,474 | Contract | : Services to provide Geotechnical Exploration and Testing for the Cedar Rapids Flood Damage Reduction Project, Cedar River at Cedar Rapids, Iowa, Linn County, Iowa. The intent of the work specified is to determine the type, nature and characteristics of th | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
TERRACON CONSULTANTS, INC. | $26,774 | Contract | : Services to provide Geotechnical Exploration and Testing for the Cedar Rapids Flood Damage Reduction Project, Cedar River at Cedar Rapids, Iowa, Linn County, Iowa. The intent of the work specified is to determine the type, nature and characteristics of th | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
RE-ENGINEERED BUSINESS SOLUTIONS, INC. | $5,518 | Contract | : Grout and Close Piezometers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/07/2009 |
APRO TECHNOLOGY, LLC | $264,414 | Contract | : Front End Loader for U.S. Army Corps of Engineers Vicksburg District Sardis Lake Field Office | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
APRO TECHNOLOGY, LLC | $264,414 | Contract | : Front End Loader for U.S. Army Corps of Engineers Vicksburg District Lake Chicot Pumping Plant | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
APRO TECHNOLOGY, LLC | $154,719 | Contract | : AS PART OF THE MISSISSIPPI LAKES PROGRAM, SARDIS LAKE FIELD OFFICE, (1) MACK DIESEL FIRE FIGHTING EQUIPMENT TRANSPORT TRUCK | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
RCG ENTERPRISES INCORPORATED | $19,740 | Contract | : Trailer | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
RCG ENTERPRISES INCORPORATED | $58,733 | Contract | : Trailer for Corps of Engineer | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
SOL ENGINEERING SERVICE LLC | $139,889 | Contract | : Quality Assurance W912EE-08-D-0001, T.O. 0015 $172,928.54 W912EE-08-D-0001, T.O. 0015 01 $-365.58 W912EE-08-D-0001, T.O. 0015 02 $-15,176.15 W912EE-08-D-0001, T.O. 0015 03 $-17,498.13 TOTAL $139,888.68 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/14/2009 |
SOL ENGINEERING SERVICE LLC | $262,648 | Contract | : W912EE-08-D-0001-0017 Perform Quality Assurance to insure the contractor meets the specifications for the construction of Arkubutla Lake Field Office. Perform Quality Assurance to insure the contractor meets the specifications for the construction of Sard | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/30/2009 |
DCD CONSTRUCTION, INC. | $570,268 | Contract | : Flood Control, Mississippi River and Tributaries Steele Bayou Basin, Big Sunflower River, Issaquena County, Mississippi, Steele Bayou Sediment Reduction Structures, Phase III. The work consists of furnishing all plant, labor, materials, and equipment, an | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
LEHMAN-ROBERTS COMPANY | $4,053,846 | Contract | : Maintenance and repair of project roads at Enid Lake. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/15/2009 |
LEHMAN-ROBERTS COMPANY | $2,021,406 | Contract | : Asphalt paving at Grenada Lake roads and campgrounds. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
DON STEPHENS TRUCKING & CONSTRUCTION COMPANY | $2,079,430 | Contract | : Road Pavement Repair | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
DON STEPHENS TRUCKING & CONSTRUCTION COMPANY | $1,023,996 | Contract | : Lake Chicot Pumping Plant Maintenance and Road Repair Located in Tensas Basin, Chicot County, AR, inclusive of mobilization and demobilization, aggregate course material, asphalt concrete hot mix, paint and thermoplastic pavement marking | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/15/2009 |
SQUARE D COMPANY (INC) | $97,145 | Contract | : SUPPLY VARIOUS AUTOMATION CONTROL PRODUCTS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
U.S. MINERALS, LLC | $10,995 | Contract | : FURNISH AND DELIVER A BLACK BEAUTY MEDIA BLAST | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/25/2009 |
SIMCO COATINGS INC | $12,795 | Contract | : Furnish and Deliver Vinyl Paint, all paint shall be equal or equivalent to Sherwin Williams V776E Paint System. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/25/2009 |
MCGREW WASTE WATER PRODUCTS, LLC | $558,797 | Contract | : Installed a Wastewater Treatment System | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/28/2009 |
MCDANIEL'S A.C. PLUMBING & ELECTRICAL, INC | $6,600 | Contract | : INSTALLED 2 TREATMENT PLANTS FOR 2 NEW RESTROOMS AT GRENADA LAKE. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/22/2009 |
COLOM CONSTRUCTION COMPANY, INC. | $132,008 | Contract | : Flood Control/ Mississippi River & Tributaries, Yazoo Basin, Desoto County, Mississippi, Arkabutla Lake, Hernando Point, Shoreline Protection | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/03/2009 |
4 H CONSTRUCTION CORPORATION | $3,315,828 | Contract | : The work consists of furnishing all plant, labor materials and equipment and constructring 61 relief wells in E Carroll Parish, LA, 25 relief wells in Madison Parish, LA and 63 relief wells in Issaquena County, MS. Principal features include mobilization | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/24/2009 |
QDCC, LLC | $1,082,748 | Contract | : Realignment of Boat Launching Facilities, Wyatt Crossing Modification A0001 awarded in the amount of $13,623.00. Several more modifications have been approved since award. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/20/2009 |
EXTREME COATINGS, INC. | $1,005,511 | Contract | : Charbonneau Park Water Treatment Facility - Construction Project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
FOWLER GENERAL CONSTRUCTION, INC. | $1,072,938 | Contract | : Ice Harbor Charbonneau and Fishhook Parks Electrical Upgrade | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
KONNOWAC, LLC | $815,491 | Contract | : Lower Granite Dam North Yard Storage Building- provide concrete foundation and pre-engineered 3,000 sq ft pre-fabricated building for equipment storage. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
TETRA TECH EC, INC. | $83,413 | Contract | : As part of maintenance for the Hiram M. Chittenden Locks and Lake Washington Ship Canal, perform modeling of fish behavior and water quality in the Lake Washington Ship Canal. 324464 LWSC ARRA FISH PASSAGE IMPROVEMENT. The task order incorporates the th | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/02/2009 |
PROJECT TIME & COST, INC. | $72,336 | Contract | : Cost Engineering Services to perform an IGCE at Portsmouth, OH | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/19/2009 |
PROJECT TIME & COST, INC. | $44,378 | Contract | : Cost Engineering Services to perform an IGCE for the Paducah plant at Paducah, KY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/19/2009 |
PROJECT TIME & COST, INC. | $99,758 | Contract | : Cost Engineering Services to perform an IGCE for the Liquid Waste portion of the SRS plant at SCRA, South Carolina | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/27/2009 |
PROJECT TIME & COST, INC. | $161,348 | Contract | : Cost Engineering Services to perform additional IGCE work for the Liquid Waste portion of the SRS plant at CSRA, South Carolina. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/31/2009 |
MOCA SYSTEMS, INC | $140,675 | Contract | : As part of construction on Lock & Dam 3, Red Wing, MN project, prime contractor provided independent, detailed construction cost estimates for the work required. These detailed estimates are to be used to negotiate and evaluate design-build construction | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/20/2009 |
JOHNSON, HARRY PLUMBING & EXCAVATION INC | $32,250 | Contract | : Demolition of existing restrooms at Swallows boatramp. greenbelt ramp and chestnut beach rec. area | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
WALLA WALLA FENCE | $8,788 | Contract | : Baseball Field Fence and Installation | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
OJEDA BUSINESS VENTURES, LLC | $27,928 | Contract | : Irrigation Components ARRA Project #324507 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/01/2009 |
MCMILLEN, LLC | $3,688,370 | Contract | : ARRA Project #: 17355. Design build project for restoration of Paradise Creek Ecosystem in Moscow, ID. Purpose is to restore a highly degraded section of Paradise Creek to create a healthy, sustainable stream, and rebuild the habitat for wildlife. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/09/2009 |
DIX CORPORATION | $13,878,358 | Contract | : Construction Project: Lower Monumental Navigation Lock Lift Gate Replacement ARRA Project Number 10210 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/09/2009 |
COLUMBIA RURAL ELECTRIC ASSOCIATION INC. | $103,702 | Contract | : ELECTRIC UTILITY CONNECTION CHARGES. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
CREATIVE OUTDOOR DESIGNS, INC. | $15,950 | Contract | : Small Shelters 10x10 and drawings | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/04/2009 |
MATERIALS TESTING & INSPECTION, INC. | $3,975 | Contract | : Geotechnical and pump testing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/13/2009 |
UNIVERSITY OF IDAHO | $11,825 | Contract | : Literature review of potential impacts of overwater structures on Bull Trout in Lake Pend Oreille General Background and Primary Goals Bull Trout in Lake Pend Oreille have been listed as threatened under the Endangered Species Act since 1998. The U.S. Arm | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/04/2009 |
ASM AFFILIATES INC | $24,646 | Contract | : Archaeology Monitoring of ground disturbance for Charbonneau and Fishhook Park during scheduled electrical systems upgrad work, Ice Harbor Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/16/2009 |
WESTERN AIR MAPS, INC. | $59,700 | Contract | : AE Task Order Lake Red Rock Boundary Recovery & Resurvey Project, 10 Mile Pilot Project, Des Moines River, Iowa. The work includes the recovery and resurvey of about 10 miles of Government boundary lines. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/10/2009 |
WESTERN AIR MAPS, INC. | $229,600 | Contract | : Services to perform Bathymetric Surveys for Portions of Mississippi River Pools 22, 20, 18, and Peoria Pool on the ILWW. The Contractor shall produce hydrographic surveys in select area of the four pools to fulfill the mission of complete topographic cove | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
TERRACON CONSULTANTS, INC. | $18,511 | Contract | : Services to Investigate Existing Geotechnical Data and Prepare Report for Cedar Rapids Flood Damage Reduction Project, Cedar Rapids, IA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/17/2009 |
GRIMES ASPHALT AND PAVING CORPORATION | $1,000,000 | Contract | : Neal Smith Trail Repairs and Improvements, Saylorville Lake, Johnston, IA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/14/2009 |
SUNFLOWER ENTERPRISES, L.L.C. | $404,560 | Contract | : Grant River Recreation Area Paving Project, Mississippi River, Pool 11, RM 591, Grant County, Potosi, Wisconsin. The work includes milling existing asphalt cement concrete (ACC)/portland cement concrete (PCC) paving, installing surface and base course ho | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
HNTB-GERWICK RIVER SOLUTIONS JV | $1,324,698 | Contract | : Project No. 324170. As part of Periodic Inspections for Federally constructed levee systems in the St. Paul District, this project is to perform levee safety inspections on 15 separable levee systems located in the State of Minnesota in the St. Paul Dist | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/02/2009 |
HNTB-GERWICK RIVER SOLUTIONS JV | $302,982 | Contract | : Project No. 324170. As part of Operations and Maintenance on Periodic Inspections on 5 Federally constructed levee systems in the St. Paul District, this project is to perform levee safety inspections on 5 separable levee systems located within the State | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/04/2009 |
GRIMES ASPHALT & PAVING CORP. | $251,976 | Contract | : Road Repairs- Saylorville IDIQ W912EK-09-D-0011 Delivery Order #1, Prairie Flower Campground, Saylorville Lake, Johnston, IA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/30/2009 |
GRIMES ASPHALT & PAVING CORP. | $459,435 | Contract | : Road Repairs Saylorville IDIQ W912EK-09-D-0011 Delivery Order #4 Cherry Glen Campground Saylorville Lake, Johnston, IA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
FEDERAL CONTRACTS CORP | $120,966 | Contract | : Equipment Replacement, Wheel Loader, Caterpillar 924HZ, Lake Red Rock Recreation Area, Knoxville, Iowa | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/28/2009 |
RM HOEFS AND ASSOCIATES INC | $18,354 | Contract | : U.S. Army Corps of Engineers, Rock Island District Homeland Security Customs and Boarder Patrol Canadian Sites North Dakota and Canadian Boarder. The U.S. Army Coprs of Engineers, Rock Island District is authorized to perform Tract Appraisals for the acqu | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/03/2009 |
J. F. BRENNAN COMPANY, INC. | $2,463,040 | Contract | : As a part of Construction on MAJOR REHABILITATION, STAGE III-B, LOCK AND DAM 11, MISSISSIPPI RIVER, DUBUQUE, IOWA, the work includes concrete removal and replacement, installation of concrete anchors and reinforcing; fabrication and installation of steel | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
EISENBRAUN AND ASSOCIATES, INC. | $735,199 | Contract | : As part of Construction for project for Services to provide Bathymetric Surveys for Portions of Mississippi River Pools 2, 5, 6, 10, 11, and 12. The Contractor shall produce hydrographic surveys in select areas of these pools to fulfill the mission of com | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
EISENBRAUN AND ASSOCIATES, INC. | $701,945 | Contract | : As part of Construction for project for Services to perform Bathymetric Surveys for Portions of Mississippi River Pools 3, 5a, 14, 15, 16, 17, and 19 and the Starved Rock and Marseilles Pools on the Illinois Waterway. The Contractor shall produce hydrogr | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/24/2009 |
MURPHY TRACTOR & EQUIPMENT CO | $77,195 | Contract | : WHEEL LOADER | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/16/2009 |
NORTH DAKOTA GUARANTY AND TITLE CO., THE | $41,600 | Contract | : As part of Construction on Project Preliminary, Intermediate and Final Title evidence for thirteen owners in but not limited to Renville Bottineau Towner Divide Pembina Cavalier Counties in North Dakota and Roseau County in Minnesota. P2#: 322746. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/21/2009 |
SHORELINE FOUNDATION, INC. | $1,037,158 | Contract | : 1. Linita Design and Mfg, Inc. - Fabrication of (7) Tainter Gates - original contract for $484,501, increased for the gates to be shipped fully assembled and for field measurements to $591,185, and finalized at $557,218.94. 2. Advanced Stair and Rail have | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
G.E.C., INC. | $104,000 | Contract | : TAS::96 3133::TAS RECOVERY PROJECT #::010626::RP # MILE POINT, FL, ECONOMIC ANALYSIS NAVIGATION FEASIBILITY STUDY. The objective is to provide documentation of the domestic origins and destinations of marine containers currently shipped through marine | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/06/2009 |
CCI GROUP, LLC | $524,114 | Contract | : PROVIDE (2) CONSTRUCTION ENGINEER POSITIONS FOR INSPECTION SERVICES IN THE JACKSONVILLE FLORIDA DISTRICT | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/01/2009 |
CCI GROUP, LLC | $371,026 | Contract | : PROVIDE (3) JUNIOR QUALTIY ASSURANCE REPRESENTATIVES FOR INSPECTION SERVICES IN THE JACKSONVILLE FLORIDA DISTRICT | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
HNTB CORPORATION | $668,300 | Contract | : This project involves engineering and design efforts to improve flood control of the basin. A-E design services for Rio Puerto Nuevo, PR (113454), Margarita Channel to improve flood control of the basin. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/25/2009 |
TEC PRO, LTD. | $99,996 | Contract | : Supply of Mobotix cameras & related equipment | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/26/2009 |
COAST TO COAST COMPUTER PRODUCTS, INC | $11,062 | Contract | : sale and delivery of 14 SonicWall TZ 210 Wireless-N G routers for the purpose of fast and more convenient internet access. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/15/2009 |
HOME DEPOT U.S.A., INC. | $3,064 | Contract | : Army Procurement of 400 packages of Aluminum Conduit (Home Depot SKU 425-298) Transaction on 10/28/09 was for $3400 when transaction was completed. Resolution in process | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
SEALS UNLIMITED, INC. | $5,510 | Contract | : MOOREHAVEN LOCK & DAM LOWER SECTOR GATE SEAL SETS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |
HARRY PEPPER & ASSOCIATES, INC. | $39,752,000 | Contract | : The Picayune Strand Restoration Project, Merritt Pump Station and Levees, Canals and Roads is part of the Comprehensive Everglades Restoration Plan (CERP). The project will help to restore the area known formerly as the Southern Golden Gate Estates to its | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/30/2009 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $7,920,165 | Contract | : This contract involves the hydraulic dredging of approximately 647,000 cubic yards of material. The material is taken from the designated sand bypass area on the north side of the entrance channel. Placement of the material is on Canaveral Beach on the | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/09/2009 |
MEASUTRONICS CORPORATION | $309,643 | Contract | : R2Sonic Multibeam Echosounders (QTY:2) with 3 year warranty | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/02/2009 |
BAINE CLARK CO., INC. | $13,500 | Contract | : Lease 1 Each 2010 Jeep Rubicon for 12 months. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/04/2009 |
B & P CONSORT, INC | $4,693 | Contract | : 1 EACH BAND SAW | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/14/2009 |
ALL AMERICAN TRAILER CONNECTION, INC. | $15,744 | Contract | : Manufacturing two enclosed cargo trailers and one open equipment trailer. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 |
DIMCO, INC. | $61,678 | Contract | : The AE shall develop topographic data (DTM, cross sections and locate utilities) along St Francis Levee, borrow site areas and access roads in the vicinity of Greene County, AR. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/18/2009 |
ARCADIS-GARVER JOINT VENTURE | $577,054 | Contract | : Periodic Inspection of Levees per list in the Statement of Work | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
QUINN CONTRACTING INC | $528,388 | Contract | : ST.JOHNS BAYOU FLOODGATE CHANNEL SCOUR-PROJECT CONSISTS OF PLACING RIPRAP IN ST. JOHN BAYOUS BETWEEN STA 1+40 AND STA 2+15 AND RIPRAP ALONG THE LEFT DESCENDING BANK BETWEEN STA 2+15 AND 7+75 IN NEW MADRID COUNTY, MISSOURI | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/01/2009 |
QUINN CONTRACTING INC | $291,070 | Contract | : Harbour Scour Repair, New Madrid Port Authority, New Madrid County Harbor Maintenance, New Madrid County, Missouri Anticipated completion date May 4, 2010. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/26/2009 |
PRUS CONTRACTING, LLC | $1,244,500 | Contract | : Subcontractor: APAC - A paving company. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/12/2009 |
ROLAND MACHINERY COMPANY | $4,900 | Contract | : RENTAL OF EXCAVATOR FOR MAINTENANCE & REPAIR OF FOUNTAIN CITY, WI LOCK & DAM. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
AMBASSADOR MOVING SYSTEM INC | $16,900 | Contract | : The scope of work consisted of moving the majority of the contents of the cold storage building in Fountain Lake, WI to another warehouse. Fork lifts were necessary at origin and destination to move heavy equipment. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
ASPEN CONSTRUCTION COMPANY | $91,025 | Contract | : Demolition of a 120' x 64' one story building and dispose of all debris. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
R P & H INC | $98,571 | Contract | : Bituminous Resurfacing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
ASPEN CONSTRUCTION COMPANY | $89,655 | Contract | : Construct a single boat ramp access on Leech River down stream of the Leech Lake Dam located at Federal Dam, Minnesota. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
SINGLETON ENTERPRISES | $243,083 | Contract | : As part of the operation and maintenance on Lake Ashtabula Asphalt Road. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/05/2009 |
EDWARD KRAEMER & SONS, INC. | $27,578,216 | Contract | : This project is part of the lock and dam 3, Mississippi River MN project number 76200. As a part of construction on Lock and Dam # 3 Navigational Improvements project the work consists of extending the existing guidewall and placing rip rap in the channe | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 |
LAKE STATE REALTY SERVICES INC | $13,750 | Contract | : As a part of construction, land appraisal services project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/12/2009 |
AUGESON, DARRELL | $2,785 | Contract | : As part of (Operation and Maintenance) on (Lac Qui Parle Dam Recreation Area) project, (East Side)I installed a 100 Amp service on the main power pole, trenched 70 feet installed 3/4 pvc conduit and installed a photo cell and light for the restroom. (West | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/20/2009 |
GREAT LAKES ARCHAEOLOGICAL RESEARCH CENTER, INC. | $189,250 | Contract | : Project#110318 As part of the construction for Roseau Flood Control, and prior to ground disturbing activities, the National Register of Historic Places (NRHP) eligible Strandlund site will be scienticially excavated to mitigate the effects of the constru | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/26/2009 |
GRACE HILL CORPORATION | $61,383 | Contract | : Regulatory document imaging and digital conversion to search able format. Approximately 800,000 documents. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/05/2009 |
SCIPAR, INC. | $188,881 | Contract | : New Protective Relays for the Fort Randall Project Office Powerplant | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
DIAL CORDY & ASSOCIATES INC | $41,988 | Contract | : Evaluation of Benthic Resources in Upper Savannah Harbor Estuary | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/08/2009 |
DIAL CORDY & ASSOCIATES INC | $199,774 | Contract | : Evaluation of Shortnose Sturgeon Spawning Habitat in Upper Savannah Harbor Estuary. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/05/2009 |
GREENHORNE & O'MARA, INC. | $3,645 | Contract | : Shoreline protection survey, Falls Lake, Sandling Beach Recreation Area, Wake County, NC | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
NATIVE AMERICAN SERVICES CORP. | $2,035,219 | Contract | : ASBESOS CABLE TRAY REPLACEMENT | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
NATIVE AMERICAN SERVICES CORP. | $1,628,674 | Contract | : AS A PART OF TAS 96-3134 TAS RECOVERY PROJECT ON CO2 FIRE SUPPRESSION REPLACEMENT LOCATED AT POWER HOUSE THRUMAN DAM | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
NATIVE AMERICAN SERVICES CORP. | $3,422,147 | Contract | : AS A PART OF TAS 96.3134 TAS RECOVERY PROJECT ON HIGH VOLTAGE CABLE REPLACEMENT J. STROM LOCATED AT THURMOND DAM, GA. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/27/2009 |
DIAMONDWATER, LLP | $58,919 | Contract | : W. Kerr Scott Dam and Reservoir Erosion Control adjacent to the Boat Ramp Parking Lot, at Wilkes County, NC | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
DIAMONDWATER CONSTRUCTION, LLC | $58,919 | Contract | : W. Kerr Scott Dam and Reservoir Erosion Control adjacent to the Boat Ramp Parking Lot, at WilkesCounty, NC. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
RAM UTILITIES | $18,873 | Contract | : Water Line Extension | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
PINTECH CORP | $29,250 | Contract | : Repair of Restroom Buildings Cape Fear Locks and Dams #1, #2, #3 Riegelwood, Elizabethtown, Tolar Landing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
MARINEX CONSTRUCTION, INC. | $4,312,996 | Contract | : Task Order 8 of Contract W912HN-09-D-0001, Maintenance Dredging Savannah Harbor, GA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/09/2009 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $1,296,860 | Contract | : This award is part of an Indefinite Delivery/Indefinite Quantity contract for maintenance dredging of material from the Entrance Channel of Brunswick Harbor. 193,001 cubic yards of dredge spoils were placed offshore. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/02/2009 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $343,039 | Contract | : This award is part of an Indefinite Delivery/Indefinite Quantity contract for maintenance dredging of material from the Entrance Channel of Savannah Harbor. 85,063 cubic yards of dredge spoils were placed offshore. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/02/2009 |
ASHRIDGE INC | $570,100 | Contract | : Build a 4 Acre Bird Island in the NOrthwest corner of DMCA 13A in Savannah Harbor, Jasper County, SC. The work consists of placing approximately 163,000 cubic yards of suitable material borrowed from DMCA 13A | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/26/2009 |
ASHRIDGE INC | $674,300 | Contract | : Build 11,600 LF haul road approximately 30ft wide from station 55+00 to 171+00 adjacent to and abutting the counterweight on the outside of DMCA 13B. The estimated volume of material is 60,000cys. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/01/2009 |
WHITE CAP CONSTRUCTION SUPPLY, INC. | $6,563 | Contract | : ONE TIME AWARD FOR DELIVERY OF CONSTRUCTION MATERIAL. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/08/2009 |
EATON CORPORATION | $1,061,090 | Contract | : As a part of the Hartwell Lake project #007380 at Hartwell, GA, design and install motor control; perform turnkey replacement of the motor control equipment | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
EATON CORPORATION | $1,743,815 | Contract | : As a part of the Hartwell Lake project #007380 at Hartwell, GA, design and install station svc switchgear and perform turnkey replacement of the switchgear | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
SMITH-PHILLIPS LUMBER COMPANY | $38,935 | Contract | : ARRA- Yellow Pine- Timbers, Provide, deliver, and unload 3,168 ea Pressure treated S4S #2(.40 ACQ) 6x6x8' for outlying campsite, trails, walkways | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
HARRISON INDUSTRIES INC | $59,634 | Contract | : As a part of operation and maintenance on W Kerr Scott Dam and Reservoir, NC, award was made for W Kerr Scott picnic shelters. The project number for this award is 019220 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/31/2009 |
HARRISON INDUSTRIES INC | $37,380 | Contract | : The project was awarded on 8-14-2009 for the amount of $ 37,380.00. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/14/2009 |
BOART LONGYEAR COMPANY | $24,450 | Contract | : Shep monitoring well installation | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
NEW SOUTH ASSOCIATES, INC. | $25,067 | Contract | : As a part of operation and maintenance on W Kerr Scott Dam and Reservoir, NC, award was made for the Update of Historic Properties. The project number for this award is 019220. Deliverables include monthly progress reports, an updated HPMP, Draft Plan s | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
RAM UTILITIES | $54,960 | Contract | : DELIVERY OF TREATED TIMBERS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/14/2009 |
UNIVERSITY OF GEORGIA RESEARCH FOUNDATION, INC. | $49,372 | Contract | : This investigation assesses the dynamics of sedimentation at gravel bars used for benthic spawners located downstream of the New Savannah Bluff Lock and Dam on the Savannah River. This study wil identify changes in gravel bar composition that occur in re | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
H W MARROW CONSTRUCTION CO | $27,610 | Contract | : To provide stone to renovate campsites in North Bend Park, John H. Kerr Reservoir, Boydton, VA 23917. Fifteen hundred (1,500) tons of stone will be required. To be delivered on an as needed basis with a minimum of 100 tons. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
F.W. JONES SURVEYING | $20,529 | Contract | : BOUNDARY LINE REMARKING, W. KERR SCOTT RESERVOIR, NORTH CAROLINA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/22/2009 |
WORTHINGTON PRODUCTS LLC | $10,940 | Contract | : O&M - PROVIDE PRE-MANUFACTUERD HIGH VISIBILITY ORANGE BOOM LINE FOR THE W. KERR SCOTT RESERVOIR. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
EEE CONSULTING, INC. | $806,213 | Contract | : DUNS: 030582170 Calendar Year: 2012 Calendar Quarter: 1 Award Id: W912HN-09-P-0479 Award Type: Federally Awarded Contract TAS::96 3135::TAS RECOVERYPROJECT#::005800::RP# RECOVERYPROJECT#::008350::RP# RECOVERYPROJECT#::019220::RP#RECOVERY PROJECT 005800, | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/29/2009 |
WHITLEY & BROWN INC | $14,766 | Contract | : Demolition of five (5) buildings. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/05/2009 |
COREY ENTERPRISES, INC | $1,939,094 | Contract | : Disposal Area 14A Dike and Weir Improvements, Savannah Harbor, Jasper County, SC | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/16/2009 |
HOWARD, PAUL CONSTRUCTION COMPANY, INC. | $714,616 | Contract | : North Jetty Rehab, Silver Lake Harbor, Hyde County, Ocracoke, North Carolina and Breakwater Rehab, Smith's Creek, Pamlico County, Oriental, North Carolina | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/18/2009 |
GULF GROUP, INC | $188,700 | Contract | : Rip Rap Repair at the B. Everett Jordan Dam | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
CARL ROSE & SONS, INC. | $254,906 | Contract | : ARRA funded W. Kerr Scott Dam & Reservoir located in Wilkes County North Carolina. Asphalt Paving | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
CARL ROSE & SONS, INC. | $225,707 | Contract | : ARRA funded W. Kerr Scott Dam & Reservoir located in Wilkes County, North Carolina. Asphalt paving | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/23/2009 |
J GREY WALKER CONTRACTOR | $658,503 | Contract | : TAS::96 3135::TAS RECOVERYPROJECT#::008350::RP#, PAVEMENT REPAIRS, SHOULDER REPAIR, REPAVING AND NEW PAVING VARIOUS AREAS AT JOHN H. KERR. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
MANSON CONSTRUCTION CO. | $4,629,540 | Contract | : Maintenance dredging in Savannah & Brunswick Harbors. As part of TAS 96-3135, this contract is for performance of maintenance dredgin in Savannah & Brunswick harbors. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/16/2009 |
STANDARD INDUSTRIAL CORP. | $74,900 | Contract | : MACHINING, FABRICATION,PAINTING, AND DELIVERY OF ONE STOPLOG | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/14/2009 |
CLIMATE CENTRAL, INC. | $325,500 | Contract | : We are developing a large library of downscaled projections of historical and future climate for use by researchers, decision-makers, and the public who need fine-scale information about future climate. The basis of our downscaled projections will be glob | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/04/2009 |
WEEKS MARINE, INC. | $41,889,000 | Contract | : As a part of USACE ARRA program, this is the Design/Build Project for Deepening of the Texas City Channel from 40' to 45' with construction of dredged materials disposal areas in Galveston County, TX. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/26/2009 |
EVANS-HAMILTON | $46,927 | Contract | : As part of project: White River, AR/Project Number::19830::contract W912HZ-05-D-0008 Delivery Order 0041 is for a Sediment Transport Study to Assess Erosion from Dredge Material Disposal Sites and Possible Impact on Mussel Beds, White River near Des Arc, | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/09/2009 |
SBSA GROUP, LTD THE | $1,020,149 | Contract | : As a part of the Periodic Levee Inspection on the St. Jude to Venice project, we will identify deficiencies in the existing levees. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/24/2009 |
AG WORKS LLC | $1,863,680 | Contract | : Deliver Crushed Stone to Atchafalaya, Red River, and Bayou Boeuf Levee Districts | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
STAN KIRKLAN | $1,697,231 | Contract | : DELIVER PLASTIC LUMBER TO FIVE LOCKS. LOCKS INCLUDED; IHNC LOCK 4635 URQUHART ST., NEW ORLEANS, LA., PORT ALLEN LOCK 2101 ERNEST WILSON DR., PORT ALLEN, LA., ALIGERS LOCK 3500 BLYTHE ST., NEW ORLEANS, LA., HARVEY LOCK 1 ALEX LANE HARVEY, LA., AND CALCASIE | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/23/2009 |
HERRERA CONSTRUCTION COMPANY, THE | $278,939 | Contract | : Construction Services for the replacemnt of highway brige expansion joints an concrete eck repair at the Wolf Creek Project, Jamestown, KY on the Nashville District US Army Corps of Engineers. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/22/2009 |
MANAGEMENT CONSULTING, INC. | $1,314,160 | Contract | : PROVIDED TEMPORARY LABORERS AND GENERAL MAINTENANCE WORKERS TO PROVIDE SUPPORT SERVICES FOR THE REPAIR AND MAINTENANCE ON THE TENNESEE RIVER LOCKS AND RELATED FACILITIES THAT ARE PROJECTS OF THE NASHVILLE DISTRICT U.S. ARMY CORPS OF ENGINEERS. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/07/2009 |
CONCORD PROFESSIONAL SERVICES, INC. | $1,479,182 | Contract | : Personnel services (Maintenance Workers) Approximately 13 FTE GS-7/9 equivalent General Maintenance Workers to support multiple lock locations in TN and KY, in the area of maintenance and repair of machinery, structure, utilities for the U.S. Army Corps o | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/10/2009 |
CNH AMERICA LLC | $47,195 | Contract | : (1) CASE COMPACT TRACK LOADER MODEL - # 445CTL | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/02/2009 |
PLAZA PERSONNEL LTD | $14,200 | Contract | : Work for Senior Project Scheduler on this project. Increased CLIN 7002 by $9,200 and added CLIN 7003 for $5,000. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/21/2009 |
CONTINENTAL FABRICATORS INCORPORATED | $7,990 | Contract | : split Ibeams | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/24/2009 |
RE-ENGINEERED BUSINESS SOLUTIONS, INC. | $214,438 | Contract | : P00040-Renovate 60 campgrounds at North Bend Park at John H. Kerr Reservoir | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/15/2009 |
FRANKFURT-SHORT-BRUZA ASSOCIATES, P.C. | $296,782 | Contract | : Electrical and Communications Upgrade, Abiquiu Dam, NM; Recovery Project Number 70. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/12/2009 |
AMERICAN CONSTRUCTION CO., INC. | $530,038 | Contract | : North Coast Mechanical Maintenance Dredging of the Westport Slough River Mile 0+28 to 0+36 approximately 30,000 cubic yards | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
AMERICAN CONSTRUCTION CO., INC. | $5,147,300 | Contract | : Coos Bay Maintenance Dredging of approximately 800,000 cubic yards of material from river mile 12-15, Culp Creek, Oregon | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/16/2009 |
K D L INVESTMENT CO. | $6,680 | Contract | : Moved furniture out of offices; removed old Carpet and disposed of. Installed 911.43 square feet of Groundworks III/Style #79710 Carpet Tile and moved furniture back to the offices. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
BOWEN ENGINEERING & SURVEY INC | $7,947 | Contract | : Hydrographic Surveys, Mile 28.0 to 35.5, Kaskaskia River, Illinois | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
BOWEN ENGINEERING & SURVEY INC | $9,625 | Contract | : Hydrographic Survey at Dogtooth Bend, Mile 31.0 to Mile 42.0, Lower Mississippi River | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/16/2009 |
BOWEN ENGINEERING & SURVEY INC | $24,200 | Contract | : Hydrographic Surveys at Devils Island and Red Rock Island, Lower Mississippi River | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/09/2009 |
PLAZA PERSONNEL LTD | $32,183 | Contract | : Recovery Project Numbers 110976, 111147, 129494, 111051, and 129494, Customer Hire MVS 09-30/Tim Conder/Senior Project Scheduler, Project Management, St. Louis District. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/08/2009 |
DIGITAL ENGINEERING & IMAGING | $2,108,860 | Contract | : Larose to Golden Meadow Hurricane Protection Project-Preparation of Preliminary Design Larose Floodgate and Golden Meadow Floodgates, Lafourche Parish, LA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/15/2009 |
FTN ASSOCIATES, LTD. | $707,442 | Contract | : Perform all required surveys as outlined in the UNET Model Review report completed by FTN Associates, Ltd. For the USACE New Orleans Distrct (MVN), July 2009. The contractor shall perform natural ground surveys for 467 overband and 467 hydrographic cross | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
FTN ASSOCIATES, LTD. | $32,729 | Contract | : Perform quality assurance and quality control review of a TABS-MD model (hydrodynamic and salinity analyses) for the Morganza to the Gulf Hurricane Protection Projects completed by Engineer Research and Development Center. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/02/2009 |
ECM-CDD JOINT VENTURE | $32,041 | Contract | : Contractor shall perform Construction Management Services to include Quality Assurance Activities, Engineering, and other related services for 2009 Stone Bank Paving in accordance with the attached Specifications and Contract clauses and Provisions | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/01/2009 |
ECM-CDD JOINT VENTURE | $1,046,768 | Contract | : Provide Construction Management Services to include Quality Assurance Activities, Engineering, and other related services for Pile Dike Repair 09-C-0112 in accordance with the attached Specifications and Contract clauses and Provisions | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
EVANS-GRAVES ENGINEERS, INC. | $159,095 | Contract | : Program and Project Management Support for Hurricane Protection Projects and Related Activities for USACE. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/29/2009 |
CHESTER BROSS CONSTRUCTION COMPANY | $92,117 | Contract | : Perform Road Maintenance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
CHESTER BROSS CONSTRUCTION COMPANY | $11,343 | Contract | : Perform Road Maintenance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/05/2009 |
KEITH CONTRACTING, L.L.C. | $2,193,675 | Contract | : Culvert valve machinery installation | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
TREVIICOS SOLETANCHE JV | $18,000,000 | Contract | : The award is for partially fund a Firm Fixed Price Construction Contract for the US Army Corps of Engineers, Nashville District to provide a Cut Off Wall at the Wolf Creek Dam, near Jamestown, Kentucky. Wolf Creek Dam is on the Cumberland River system. Th | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/08/2009 |
ARCADIS U.S., INC. | $11,058 | Contract | : Topographic survey of resource manager's office site at Cordell Hull Lake | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/15/2009 |
INCA ENGINEERS INC | $80,273 | Contract | : Specific work for heating, ventilation, air conditioning at the Old Hickory Power Plant | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
INCA ENGINEERS INC | $3,377 | Contract | : Update Anchorage Drawings for Chickamauga Loack Dam. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/10/2009 |
INCA ENGINEERS INC | $464,597 | Contract | : Engineering services for line relay design at the Barkley Power Plant, Grand Rivers, KY of the Nashville District US Army Corps of Engineers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
INCA ENGINEERS INC | $539,530 | Contract | : Engineering services for plans and specifications for the new lock upstream and downstream miter gates for the Kentrucky Lock project, Grand Rivers, KY of the Nashville District US Army Corps of Engineers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
INCA ENGINEERS INC | $4,186 | Contract | : Engineering services for the gate anchorage replacement technical assistance at the Chickamauga Lock project, Chattanooga, TN of the Nashville District USACE | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/09/2009 |
AVPOL INTERNATIONAL LLC | $234,704 | Contract | : Labor services (Quality Assurance Representative III) to support the Kentucky Lock construction mission of the Nashville DIstrict U.S. Army Corps of Engineers. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
STANTEC CONSULTING SERVICES INC. | $1,158,387 | Contract | : Provide all labor, materials, and services to perform drilling, instrumentation, and geotechnical analyses of J. Percy Priest Dam. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
STANTEC CONSULTING SERVICES INC. | $246,853 | Contract | : Provide all labor, materials, and services to perform design for waterstop repairs for Barkley Powerhouse | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
ENVIRONMENTAL, SAFETY & HEALTH, INC. | $475,553 | Contract | : Bennett's Fork Channel Improvements Phase 2, Middlesboro, KY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/07/2009 |
ENVIRONMENTAL, SAFETY & HEALTH, INC. | $274,529 | Contract | : Defeated Creek Campground Renovations, Carthage Tennessee | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
HERRERA CONSTRUCTION COMPANY, THE | $221,772 | Contract | : Construction Services for Piping Rehabilitation at Chickamauga Lock, Chattanooga, TN of the Nashville istrict US Army Corps of Engineers. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/02/2009 |
NORRIS DESIGN LLC | $184,773 | Contract | : 'Supply new furniture for the Cordell Hull Resource Manager's Office, Carthage, TN, of the Nashville District U.S. Army Corps of Engineers.' | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/10/2009 |
ROMTEC, INC. | $734,246 | Contract | : THREE RESTROOM FACILITIES (BUILDING AND INSTALLATION) FOR THE CORDELL HULL PROJECTS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/25/2009 |
MANAGEMENT CONSULTING, INC. | $672,007 | Contract | : Recovery Project # 111257, Cheatham Lock and Dam, TN. Temporary laborers to provide repair and maintenance services at the Wolf Creek, Dale Hollow, Center Hill, and Cheatham power plants of the Nashville District U.S. Army Corps of Engineers. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
LOUDON COUNTY RENTALS AND MINI-STORAGE, INC. | $3,900 | Contract | : RENTAL EQUIPMENT | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/21/2009 |
PERFORMANCE OIL STORE | $19,075 | Contract | : 100 barrels Velox3 Grease | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/26/2009 |
PPG INDUSTRIES, INC. | $24,795 | Contract | : paint | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
MSE TECHNOLOGY APPLICATIONS, INC. | $152,970 | Contract | : Scope of Work consists of upgrading the Dual MC3000 SCADA Master at Old Hickory and Remote Terminal Units (RTU's) at J. Percy Priest and Cheatham power houses. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/14/2009 |
WALTER A. WOOD SUPPLY CO., INC. | $19,153 | Contract | : Misc materials...pipe valves and fittings | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
WALTER A. WOOD SUPPLY CO., INC. | $5,265 | Contract | : various materials----pipe valves fittings | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
SHERRICK CONSTRUCTION, INC. | $190,291 | Contract | : Cheatham Dam Bulkheads | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/22/2009 |
INTERNATIONAL SYSTEMS INC. | $38,790 | Contract | : Supply two dewatering pumps | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
JERRY B. YOUNG CONSTRUCTION, INC. | $51,176 | Contract | : The J. Percy Priest Dam rip rap reinforcing project consist of placing a sanded concrete mix into the riprap on the upstream face of the dam. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/29/2009 |
ELITE ROOFING CO. - GENERAL CONTRACTOR | $346,630 | Contract | : Award to install shoreline power along six lock sites on the Tennessee river in three states including Tennessee, Kentucky, and Alabama. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/11/2009 |
KILLEN TRUE VALUE | $23,260 | Contract | : PAINT AND PAINT SUNDRIES | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
COONEY BROTHERS INC | $17,852 | Contract | : Recover-To provide labor, supplies and materials to furnish 76 pieces Hollaender 2 HD base flange mill finish fittings, 48 pieces 2 Hollaender #5-9 tees, 36 pieces 2 Hollaender #7-9 cross, 24 pieces #11-9 Hollaender side outlet tees, 20 pieces Hollaender | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/27/2009 |
HUNTSVILLE DECORATING HAMPTON COVE, L.L.C. | $22,045 | Contract | : Huntsville Decorating provided paint to the TVA Guntersville Dam. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/31/2009 |
HUNTSVILLE HARDWARE & BUILDING SUPPLY, INC. | $8,822 | Contract | : Paint Supplies sold to Corps of Engineers for TVA Dam in Guntersville | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/01/2009 |
OLDE TYME HARDWARE LLC | $24,946 | Contract | : Supply paint and painting supplies (paint brushes, roller frames and covers, PPE) for Pickwick Lock paint maintenance project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/02/2009 |
NZILANI GLASS CONSERVATION LLC | $24,385 | Contract | : Survey approximately 192 objects and their cases in the Marinship 1942*1945 Exhibit. The objects are made of, but are not limited to, paper, textiles, leather, clothing, watercolors, metals, plastic, wood, painted surfaces, and photographs. Provide an est | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/19/2009 |
MANSON-DUTRA JV | $2,420,000 | Contract | : Maintenance dredging in the Port of Oakland | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/27/2009 |
AHTNA ENGINEERING SERVICES, LLC | $999,974 | Contract | : As part of dredging on the San Leandro Dredging project, the work to be performed consisted of the operation and maintenance dredging of the Federal channel located at San Leandro Marina (Jack Maltester), southeast shore of San Francisco Bay in Alameda Co | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/20/2009 |
AGS, INC. | $185,817 | Contract | : The initial Coyote and Berryessa Creeks, and Uvas Creek O&M Manuals were prepared in 1996 and 1989, respectively. AGS has been tasked by the USACE to prepare updated OMRR&R Manuals. Objectives of the manuals include: to maintain the components/reaches o | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
ENTRIX, INC. | $70,370 | Contract | : ENTRIX will conduct a Joint Environmental Impact for the U.S. Army Corps of Engineers. This includes furnishing labor, material, and equipment necessary to provide a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR), Final EIS/EI | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/17/2009 |
MIRACLE PLAYSYSTEMS INCORPORATED | $34,970 | Contract | : FURNISH AND INSTALL RECREATIONAL PLAY EQUIPMENT | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/10/2009 |
ROMTEC, INC. | $48,628 | Contract | : ASPEN CONCRETE BUILDING KIT PACKAGE AND INSTALLATION SERVICES | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
STANLEY SECURITY SOLUTIONS, INC. | $53,166 | Contract | : Recovery: Upgrade of Locks System at Dry Creek (Warm Springs) Lake & Channel, Ca | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/05/2009 |
KIPPER TOOL COMPANY | $53,098 | Contract | : Skid Steer Track Loader | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
MILLER, BRIAN | $16,675 | Contract | : Interior carpeting of Headquarters Building and Maintenance Shop Office, Lake Sonoma, Warm Springs Dam Project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/07/2009 |
LOHR, JAMES P | $77,128 | Contract | : Install emergency generator at Coyote Valley Dam. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/01/2009 |
ATLANTIS AQUATIC MAINTENANCE | $14,459 | Contract | : replace and install new display aquariums at the san francisc corps of engineers sausalito bay model | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
PEORIA FIBERGLASS, INC. | $130,000 | Contract | : 20 Dry Creek ARRA - Restrooms, Furnish all appropriate labor, materials, equipment, supplies and transportation necessary to perform the work as outlined in the scope of work, entitled Lake Sonoma Restroom Building Replacements. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/24/2009 |
HALLSTEN CORPORATION | $38,360 | Contract | : One (1) 4'W x 20'L ALUMINUM BOAT DOCKS; SIX (6) 8'W X 20'L ALUMINUM BOAT DOCKS; FOUR (4) CHAIN CONNECTING BOXES BUILT INTO END MEMBERS OF FOUR (4) DOCKS. DELIVERED TO JOBSITE AT SONOMA LAKE. SHOP DRAWINGS AND INSTALLATION INSTRUCTIONS INCLUDED. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
NORTHERN AGGREGATES, INC | $64,875 | Contract | : Production and delivery of stone revetment (riprap) for outlet channel erosion repair site B Warm Springs Dam/lake Sonoma Project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
WOIDA ENTERPRISES INC. | $44,000 | Contract | : RECOVERY: INSTALLATION OF FENCING AT DRY CREEK(WARM SPRINGS) LAKE & CHANNEL, CA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
NEWLAND ENTITIES, INC. | $379,791 | Contract | : Repair asphalt and aggregate-base surfced road on crest of dam | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/30/2009 |
NEWLAND ENTITIES, INC. | $625,958 | Contract | : Replace Waste Water System in Pomo C Receration Area | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/08/2009 |
MENDOCINO CONSTRUCTION SERVICES, INC. | $133,610 | Contract | : PAVE GRAVEL LINED SERVICE ROADS AT GOVERNMENT COVE BOAT HOUSE AND DOCKS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/11/2009 |
B.C. SCHMIDT CONSTRUCTION, INC. | $430,481 | Contract | : Design Build construction services to replace the 20-gallon per minute surface water treatment plant for Liberty Glen Campground at Warm Springs Dam/Lake Sonoma. Design build constrction utilizing the membrane technology for filtration of raw lake water | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/28/2009 |
EMC, INCORPORATED | $142,367 | Contract | : Survey Request for Morganza to the Gulf Hurricane Protection System, Reach B, Terrebone Parish, LA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/26/2009 |
PROFESSIONAL SERVICE INDUSTRIES, INC. | $75,551 | Contract | : Soil Boring and Testing for River-Ben Estates Tracts A,B,C, St. Mary Parish | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |
COMPUTATIONAL HYDRAULICS & TRANSPORT LLC | $37,758 | Contract | : Conduct technical review of Morganza to the gulf Tabs-MD model | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/06/2009 |
CDM FEDERAL PROGRAMS CORPORATION | $115,000 | Contract | : DESCRIPTION: REVIEW AND ANALYSIS OF WATER QUALITY DATA FROM PREVIOUS OPENINGS AT THE BONNET CARRE SPILLWAY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/18/2009 |
DAVID MILLER & ASSOCIATES, INC. | $350,023 | Contract | : Project Management Services and feasibility Study Activities for the Donaldsonville to the Gulf Project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/22/2009 |
DAVID MILLER & ASSOCIATES, INC. | $76,298 | Contract | : Environmental Compliance Documentation for Iberia Parish Wastewater Treatment Wetland Assimilation Project | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
INTEGRATED MANAGEMENT SERVICES, INC. | $921,660 | Contract | : The Army Corps of Engineers (USACE), New Orleans District (MVN)'s delivery order supports development of Engineering Documentation Report (EDR), as the authorizing document for Access Roads throughout ABFS. The project duration is 22 months (from October | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/07/2009 |
FFEB JV, L.L.C. | $697,339 | Contract | : As part of U.S. Army Corps of Engineers - civil program financing only-Operation and Maintenance, Recovery Act on retrieval, classification and testing of soil samples retrieved for Calcasieu River Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/03/2009 |
FFEB JV, L.L.C. | $2,018,021 | Contract | : Undisturbed soil borings, CPTs and laboratory testing for the Larose to Golden Meadow Hurricane and Risk Reduction System, Lafourche Parish, LA. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/11/2009 |
FFEB JV, L.L.C. | $544,377 | Contract | : Project# 324170 PERIODIC INSPECTION OF LEVEES, SANTA BARBARA AND VENTURA COUNTIES, CA. The Prime Recipient shall perform a levee safety Periodic Inspection (PI) on the following levee(s) in Santa Babara County: Santa Maria River (4.856 mi). The Prime Reci | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/21/2009 |
JESCO ENVIRONMENTAL & GEOTECHNICAL SERVICES, INC. | $534,018 | Contract | : Atchafalaya Basin Floodway System, Louisiana Project Comprehensive Monitoring Program | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/30/2009 |
MBJV LLC | $125,186 | Contract | : As a part of U.S. Army Corps of Engineers - civil program financing only-Operation and Maintenance, Recovery Act on SW Pass Pile Dike Repairs project, Construction Management Services include Quality Assurance Activities, Engineering and other related ser | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/23/2009 |
DIGITAL ENGINEERING & IMAGING | $43,049 | Contract | : Piezometer grouting at Degray Lake Dam. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/10/2009 |
HURRICANE PROTECTION ALLIANCE JV | $193,035 | Contract | : As part of the National Levee Safety Program--Periodic Inspections at Three Project Sites: Old River Overbank Control Structures, Old River Auxilliary Control Structure, and Ole River Low Sill Control Structure. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/06/2009 |
HURRICANE PROTECTION ALLIANCE JV | $248,050 | Contract | : TAS::96 3113::TAS RECOVERY PROJECT#::323300::RP#PERIODIC INSPECTION OF M/R LEVEE FOR NATIONAL LEVEE SAFETY PROGRAM. LEVEE SAFETY PERIODIC INSPECTION (PI) ON THE LEVEE SYSTEMS (MULTIPLE SEGMENTS/MULTIPLE SPONSOR PER SYSTEM). VERIFY PROPER OPERATION AND MA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/06/2009 |
HURRICANE PROTECTION ALLIANCE JV | $387,816 | Contract | : TAS::96 3113::TAS RECOVERY PROJECT - NATIONAL LEVEE SAFETY PROGRAM - Periodic Levee Inspections for St. Charles Parish, Jefferson Parish and Orleans Parish | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/18/2009 |
PIKA-MALCOLM PIRNIE JV, LLC | $311,206 | Contract | : TAS::96 3135::TASRECOVERY PROJECT#::324170::RP#TASK ORDER NO. 10 - NATIONAL LEVEE SAFETY PROGRAM -- PERIODIC INSPECTION OF LEVEE SYSTEMS - MORGANZA FLOODWAY LOCATED WITHIN POINTE COUPEE PARISH AND ST. MARTIN PARISH. The Contractor shall perform a levee sa | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/20/2009 |
MERRICK CONSTRUCTION LLC | $1,291,765 | Contract | : RECOVERY Pointe Coupee Pump Station Exterior Painting and Roof Retrofit, Pointe Coupee, Parish, Louisiana | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
MERRICK CONSTRUCTION LLC | $540,000 | Contract | : Contract #W912P8-08-D-0038, Task Order #0004, Bayou Sorrel Lock Matting Repairs, Iberville Parish, LA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/29/2009 |
PROGRESSIVE CONSTRUCTION COMPANY, LLC | $7,242,000 | Contract | : Mississippi River and Tributaries Old River Low Sill Control Structure, Old River Lock and Morganza Control Structure and Minor Refurbishing | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/25/2009 |
DQSI, LLC | $1,998,541 | Contract | : Atchafalaya Basin Flood Control. The work will tek place at Bayou Courtableau Drainage Structure. The work consists of removal of five existing sluice gates, gate frames, gate machinery and controls; replacing with five new self-contained sluice gate a | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 2/01/2010 |
COURSEAULT COMMERCIAL, INC. | $154,053 | Contract | : As part of maintenance John Deere tractor with front end loader and John Deere tractor | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/18/2009 |
RPL OIL DISTRIBUTOR & SUPPLY, LLC | $499,830 | Contract | : As a part of maintenance for spare needles for Bonnet Carre Spillway. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/29/2009 |
RPL OIL DISTRIBUTOR & SUPPLY, LLC | $186,561 | Contract | : As part of maintenance for Strut Arm Assembly parts for Port Allen Lock | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/15/2009 |
EBE FENCE COMPANY, INC | $65,057 | Contract | : INSTALLATION OF A NEW HIGH SECURITY FE6-TWBR-72 FENCE AT BAYOU BOEUF LOCK | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/11/2009 |
ATKINS NORTH AMERICA, INC | $302,095 | Contract | : The Contractor shall perform a levee safety Periodic Inspection (PI) on the levee systems indicated on the summary sheets included as Enclosure 2 of this scope of work. The levee systems to be inspected may consist of multiple segments and have multiple s | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/06/2009 |
ATKINS NORTH AMERICA, INC | $279,107 | Contract | : TAS::96 3135::TAS NATIONAL LEVEE SAFETY PROGRAM - PERIODIC INSPECTION OF LEVEE SYSTEMS FOR THE AREA COVERING PHOENIX TO BOHEMIA LEVEE SYSTEM | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/10/2009 |
URS CORPORATION | $816,868 | Contract | : 'TAS::96 3135::TAS RECOVERYPROJECT#::324170::RP# LEVEE PERIODIC INSPECTION MISSISSIPPI RIVER WEST BANK BELOW MORGANZA' Perform Levee Periodic Inspection of approximately 200 miles of levee reach surrounding the lower Atchafalaya basin in south Louisiana t | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/19/2009 |
URS CORPORATION | $387,768 | Contract | : 'TAS::96 3113::TAS LEVEE PERIODIC INSPECTIONS EFFORTS ON THE MISSISSIPPI RIVER LEVEES IN WESTWEGO, HARVEY, ALGIERS AND BELLE CHASSE.' Perform Levee Periodic Inspection of the Westwego, Harvey, Algiers and Bell Chasse Levy Systems to verify proper operati | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/21/2009 |
BERTUCCI CONTRACTING COMPANY, L.L.C. | $6,310,386 | Contract | : 2009 Stone Placement | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/02/2009 |
BIS SERVICES, L.L.C. | $9,491,000 | Contract | : Calcasieu River and Pass - Foreshore Dike Construction | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
REGIONAL ECONOMIC MODELS, INC. | $23,000 | Contract | : updating and reconfiguring an economic software model developed for the purpose of analyzing the economic impact of Hurricane Katrina and civil works projects in the New Orleans region | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 3/27/2009 |
RPL OIL DISTRIBUTOR & SUPPLY, LLC | $58,137 | Contract | : As a part of maintenance for Hollander parts for handrail system at Bayou Beouf. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/17/2009 |
AUGUILLARD CONSTRUCTION COMPANY, INCORPORATED | $97,855 | Contract | : West End Canal side Boat ramp 25ft extension | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/23/2009 |
IPS OF LOUISIANA CORPORATION | $41,199 | Contract | : PURCHASE OF ALUMINUM HANDRAIL PIPE (INCLUDES HARDWARE KIT) AND HANDRAIL FITTINGS TO BE DELIVERED TO CALCASIEU SALTWATER BARRIER | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/24/2009 |
IPS OF LOUISIANA CORPORATION | $21,781 | Contract | : PURCHASE AND INSTALLATION OF 12 SHUTTERS FOR WINDOWS SIZE 47 X 31, 2 SHUTTERS FOR WINDOWS SIZE 61 X 51, AND 2 SHUTTERS FOR WINDOWS SIZE 34 X 31 AT CATFISH POINT CONTROL STRUCTURE | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/24/2009 |
HANKO'S METAL WORKS INC | $34,800 | Contract | : 20' ALUMINUM WORKBOAT-SALTWATER BARRIER FOR DELIVERY TO WESTLAKE, LA | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/06/2009 |
INFINITY CONSTRUCTION AND TRUCKING, LLC | $137,000 | Contract | : Contractor shall Provide Equipment and Operators to transport stone to Bayou Courtableau East and West in accordance with the scope of work. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
HARDWARE, INC | $1,138,104 | Contract | : PLASTIC TIMBER AND LUMBER ACQUISITION BAYOU SORREL LOCK AND BAYOU BOEUF LOCK. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/28/2009 |
XPERT'S GULF LLC | $4,087,848 | Contract | : The contract is for the fabrication and delivery of 1,103 Timber Hinges Needles to the Old River Overbank Structure located in Vidalia LA. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/02/2009 |
LAMPLIGHTER CONSTRUCTION, L.L.C. | $658,333 | Contract | : TAS::96 3113::TAS As part of the maintenance on the Mississippi river and Tributaries, Bonnet Carrie Spillway Paint Spillway Bays #2 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/28/2009 |
PROGRESSIVE CONSTRUCTION COMPANY, INC. | $311,285 | Contract | : Furnish and supply all labor, supervision, equipment, and materials to purchase and deliver 6500 tn of grade #57 Limestone levee surfacing stone to Morganza Forebay East/South Guide Levee | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/03/2009 |
BERTUCCI CONTRACTING COMPANY, L.L.C. | $1,760,000 | Contract | : 2010 Emergency Stone Placement on the Mississippi, Atchafalaya, Red Rivers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
ARDL, INC. | $89,230 | Contract | : Asbestos Abatement Kakaskia L & D | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/04/2009 |
GEORGEWITZ CONTRACTING CO | $214,575 | Contract | : Task Order #0045 - American Bottoms Project at Chouteau Island. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/27/2009 |
GEORGEWITZ CONTRACTING CO | $507,438 | Contract | : 0038 - Calumet Creek Silo Access, LD #25 Saddle Dam, Spur Dike. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/28/2009 |
GEORGEWITZ CONTRACTING CO | $1,016,029 | Contract | : 0039 - Lock and Dam #25 Walkway Repairs, Chip and Seal, Lock #27 Concrete Sealer. RECOVERY PROJECT NUMBER 322852, FURNISH ALL LABOR, EQUIPMENT, MATERIALS OPERATORS, FLOATING PLANT AND SUPPLIES NECESSARY TO REPAIR WALKWAYS AT LD25, LAND REPAIR, RIVERS PROJ | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/29/2009 |
GEORGEWITZ CONTRACTING CO | $199,997 | Contract | : 0040 - Cabin Removal. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/29/2009 |
GEORGEWITZ CONTRACTING CO | $228,000 | Contract | : 0042 - 400# Rip Rap at Chain of Rocks Canal. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/08/2009 |
HANSON PROFESSIONAL SERVICES INC. | $64,500 | Contract | : Dredge Surveys for Quantities, Kaskaskia River Miles 28 to 35.5 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/09/2009 |
HOWELL PAVING INC | $549,544 | Contract | : Parking Lot and Road Rehabilitation and Maintenance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/22/2009 |
HOWELL PAVING INC | $294,295 | Contract | : Parking Lot and Road Rehabilitation and Maintenance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
A & H CONTRACTORS, INC. | $1,878,402 | Contract | : The work consists of relief well modifications, dredging, compacted pervious dredged materials, excavation and topsoil placement, removal of existing reinforced concrete pipe, and installation of new reinforced concrete pipe with precast flared end sectio | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/12/2009 |
BROMLEY EXCAVATING | $43,436 | Contract | : Furnish all labor, equipment, and materials necessary for rental equipment with operators at the Carlyle Lake Project and the Kaskaskia River Nav Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/27/2009 |
BROMLEY EXCAVATING | $39,154 | Contract | : Rental of equipment to be used at the Carlyle Lake/Kaskaskia Nav Project IAW the contract specs, clauses,and provisions. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/16/2009 |
BROMLEY EXCAVATING | $7,828 | Contract | : Furnish all labor, equipment, and materials necessary for rental of equipment with operators at the Carlyle Lake/Kaskaskia Nav Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/20/2009 |
BROMLEY EXCAVATING | $22,940 | Contract | : Furnish all labor, equipment and materials necessary for rental of equipment with operators at the Carlyle Lake/Kaskaskia River Navigation Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/17/2009 |
CABRERA SERVICES INC. | $2,000,000 | Contract | : St. Louis FUSRAP North St. Louis County Vicinity Properties Remedial Action. Remedial action involves the excavation of accessible soils at or above remediation goals established by USACE for specified radiological contaminants of concern. Contaminated | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/06/2009 |
SURDEX CORPORATION | $225,000 | Contract | : Delivery Order 0013: ARRA-LiDAR Data & Orthophotography Project Phase 2, Fayetteville, AR IAW attached Scope of Work. Delivery date - 30 September 2009; Amendment 01: Increase required area of coverage by 1,500 square miles located immediately west and ad | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
SURDEX CORPORATION | $116,536 | Contract | : 323893 The Tulsa District US Army Corps of Engineers requires a high-resolution digital elevation model developed from LiDAR (Light Detection and Ranging) data for all below, as well as hydrographic survey data integration and GIS services for two of the | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
SURDEX CORPORATION | $334,015 | Contract | : 323983 The Kansas City District US Army Corps of Engineers requires a high-resolution digital elevation model developed from LiDAR (Light Detection and Ranging) data for all below, as well as hydrographic survey data integration and GIS services for two o | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/23/2009 |
GEOTECHNICAL CONSTRUCTION, INC | $185,459 | Contract | : Modification due to change in work at the Bo Wood Recreation Area, Lake Shelbyville, Shelbyville, IL. Item 7003AA: Change quantity from 30 to 27, change amount from $14,929.20 to $13,436.28; Item 7006AA: Delete in it's entirety; Item 7006AB: Change Quant | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/15/2009 |
ABNA ENGINEERING INC | $169,266 | Contract | : ENGINEER IS PROVIDING COMPLETE ENGINEERING SERVICES FOR THE DESIGN AND PREPARATION OF PLANS AND SPECIFICATIONS FOR A HIGH LIGHTING SYSTEM AT LOCK &DAM 25 IN WINFIELD, MO. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/31/2009 |
ABNA ENGINEERING INC | $69,424 | Contract | : Engineer is providing complete engineering services for the design and preparation of Plans and Specifications for high mast lighting | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/03/2009 |
MAJESTYC CONSTRUCTION, INC. | $1,314,722 | Contract | : As a part of construction of the removal of HVAC Rooftop units, provide and install a new high efficiency HVAC system consisting of new air handlers, fan coils, and air-cooled chillers with sufficient thermal energy storage for on-peak hours of BLDG 6459 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/22/2009 |
CABRERA SERVICES INC. | $935,000 | Contract | : Characterization and remediation of inaccessible soils beneath Black Oak Ridge Road in Wayne, NJ. Original award for $816,802. Contract modification 01 executed 12/12/2009, added $33,198 in funding. Contract modification 02 executed 8/18/2010 added an a | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/31/2009 |
SEVENSON ENVIRONMENTAL SERVICES, INC. | $13,081,664 | Contract | : TAS::68 8195 RECOVERY PROJECT 011355 Hatheway & Patterson Superfund Site-Remediation Environmental Cleanup, Mansfield and Foxboro, Massachusetts; Excavate approximately 31,000 cubic yards of soil and demolish buildings at the Hatheway Patterson Superfund | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/13/2009 |
CHESTER BROSS CONSTRUCTION COMPANY | $298,136 | Contract | : Perform Road Maintenance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/19/2009 |
CHESTER BROSS CONSTRUCTION COMPANY | $296,582 | Contract | : Perform Road Maintenance | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/12/2009 |
WORTHINGTON PRODUCTS LLC | $192,940 | Contract | : SUPPLY AND INSTALLATION OF UPSTREAM AND DOWNSTREAM SAFETY/SECURITY BARRIERS ARE CLARENCE CANNON DAM aka MARK TWAIN LAKE. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/23/2009 |
A & H CONTRACTORS, INC. | $14,790,880 | Contract | : Project Number 323006 - The work to be accomplished under this contract shall consist of furnishing all equipment, labor a nd materials, necessary for theexcavation and disposal of dredge materials. The dredge material will be excavated from the Kaskaski | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/20/2009 |
B. W. STRAYHORN COMPANY, INC. | $120,743 | Contract | : Remove silt from ditches, place rip rap and repair erosion at cooper dam/jim chapman | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 1/14/2010 |
ALBERICI CONSTRUCTORS, INC. | $1,358,000 | Contract | : Gate Replacement and Closure Modification, St. Louis Flood Protection. RECOVERY PROJECT NUMBER 112349, Contractor will replace 4 Swing Gates which includes demolition, including lead paint, concrete, swing gate fabrication and painting, Service Base, Foo | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/10/2009 |
NOBLE CONSULTANTS, INC | $80,000 | Contract | : Project Number 104592 As a part of U.S. Army Corps of Engineers - civil program financing only-Investigations, Recovery Act, on Engineering Preparation of the Coastal Engineering Appendix for the Carpinteria Storm Damage and Shoreline Protection Plan For | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/26/2009 |
NOBLE CONSULTANTS, INC | $470,376 | Contract | : Project Number 112403 Prepare a Comprehensive Condition Survey Report for the Dana Point Breakwaters. Collect and review available surveys and relevant deign memoranda and reports; conduct physical field surveys consisting of hydrographic multi-beam and s | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/19/2009 |
NOBLE CONSULTANTS, INC | $129,723 | Contract | : Project Number 104804 Environmental Assessment - City of Cambria. Development of a combined Environmental Assessment under the National Environmental Policy Act and Mitigated Negative Determination under the California Environmental Quality Act for the im | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/30/2009 |
SEMPER TEK - INTERSTEEL JOINT VENTURE, LLC | $6,032,157 | Contract | : In support of the U.S. Army Corps of Engineers civil works construction program effect modifications to the upstream bank of the JT Myers Locks and Dam, Mt. Vernon, IN. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/17/2009 |
FUTURENET GROUP, INC. | $545,290 | Contract | : Milling, resurfacing, replacing expansion joints, and striping of The Markland Highway Bridge. Warsaw, KY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/28/2009 |
FUTURENET GROUP, INC. | $370,165 | Contract | : Provide services for Buckhorn Lake Trace Branch Campground Access Road Improvements. Buckhorn Lake, KY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/30/2009 |
MASON & HANGER GROUP INC, THE | $76,581 | Contract | : Construction Management - Fort Campbell, KY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/13/2009 |
ULTRA PLAY SYSTEMS, INC. | $99,680 | Contract | : Picnic tables for recreation area renovation, Rough River Lake, KY | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/01/2009 |
ROBOTRONICS, INC. | $2,363 | Contract | : BOBBER WATER SAFETY COSTUME | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 5/22/2009 |
ROBOTRONICS, INC. | $5,659 | Contract | : BUDDY BEAVER SAFETY COSTUME AND BOBBER WATER DOG SAFETY COSTUME | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/16/2009 |
PLAYCORE WISCONSIN, INC. | $73,111 | Contract | : manufacture of playground equipment | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/18/2009 |
E-Z-DOCK, INC. | $11,791 | Contract | : Floating dock system for C.J. Brown Dam and Reservoir, Springfield, OH | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/26/2009 |
ROBOTRONICS, INC. | $10,823 | Contract | : SEAMOOR SAFETY ROBOT SUPER PKG | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/06/2009 |
R. J. THOMAS MANUFACTURING COMPANY, INC. | $4,002 | Contract | : REPLACEMENT GRILLS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/17/2009 |
MCCORMICK ASPHALT PAVING AND EXCAVATING, INC. | $1,418,950 | Contract | : RECOVERY PROJECT #111135,PHASE 3B, BATCHTOWN FLOATING PUMP STATION, HABITAT REHABILITATION AND ENHANCEMENT PROJECT LOCATED IN ILLINOIS | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/09/2009 |
PATTON-TULLY MARINE, LLC | $345,936 | Contract | : RECOVERY PROJECT NUMBER 118736, River Rock Removal, Upper Mississippi River, Miles 46-38 and 81-78 in Missouri and Illinois | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/16/2009 |
BAXMEYER CONSTRUCTION, INC. | $12,257,905 | Contract | : PROJECT NUMBER 323005; CONTRACT NO. W912P9-09-C-0431 FOR CONSTRUCTION OF MAIN DAM AND SADDLE DAM NO. 2, RIPRAP REPAIRS, CARLYLE LAKE | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/24/2009 |
GPM INC | $339,397 | Contract | : REMOVE ALL WOODY VEGETATION ALONG LOCK WALLS LD27 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 10/16/2009 |
LUHR BROS., INC. | $625,397 | Contract | : PLACEMENT OF STONE AND REPAIR SCOUR HOLES UPSTREAM OF LD 25 PROJECT NO. 146348, SCOUR REPAIR LOCK & DAM 25 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/29/2009 |
LUHR BROS., INC. | $2,876,249 | Contract | : PLACEMENT OF STONE UPSTREAM OF LD 25.RECOVERY PROJECT NO.146348, PLACING CRUSHED STONE BEDDING MATERIAL AND MOD STONE C FOR SCOUR REPAIR LOCATED AT LOCK & DAM 25 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/07/2009 |
LUHR BROS., INC. | $174,521 | Contract | : GATE SEALING FOR PIERS 6,8,10,14-17 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/21/2009 |
ELVIS PRESTON KOERNER | $22,870 | Contract | : Contractor to furnish all labor,Equipment and Material necessary to deliver Rip Rap and bedding stone to the spillway approach Channel #3 | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 8/12/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $239,059 | Contract | : ROAD MAINTENANCE-ENT ROAD, UPPER/LOWER BOAT RAMP, SPUR LEVEE, N/S LOOP ROADS, CAMPGROUND SITES 1-10 AT KASKASKIA LOCK AND DAM | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/03/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $611,945 | Contract | : ROAD MAINTENANCE AT CARLYLE LAKE | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/18/2009 |
KORTE & LUITJOHAN CONTRACTORS, INC. | $768,775 | Contract | : Furnish all labor, equipment, and materials necessary for road maintenance at Carlyle Lake. parking Lot & Road rehabilitation at the Kaskaskia Navigation Project. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/10/2009 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $1,112,001 | Contract | : This work consists of providing one cutterhead hydraulic dredge and attendant plant to perform channel maintenance dredging and environmental dredging in side channels and chutes on the upper Mississippi River Miles 583.0 to 0.0, the Illinois River Miles | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 6/19/2009 |
GREAT LAKES DREDGE & DOCK COMPANY, LLC | $421,999 | Contract | : This work consists of providing one cutterhead hydraulic dredge and attendant plant to perform channel maintenance dredging and environmental dredging in side channels and chutes on the upper Mississippi River Miles 583.0 to 0.0, the Illinois River Miles | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 12/22/2009 |
JOHN MILNER ASSOCIATES, INC. | $499,949 | Contract | : Project Number 324332. Cultural resources investigations including Phase I testing along both sides of the Dismal Swamp Canal for approx. 23 miles in Chesapeake City, Va., and Camden County, N.C., and building assessment of the toll house. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/10/2009 |
PANTHER AIR BOAT CORPORATION, THE | $99,000 | Contract | : manufacturc 3 ea. 14 x 7 airboat & trailers | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 7/23/2009 |
YERBA BUENA ENGINEERING & CONSTRUCTION, INC. | $1,155,000 | Contract | : Coho Salmon Facility Water Filtration and Sterilization System at Congressman Don Clausen Fish Hatchery. This contract is to analyze the Water Filtration and Sterilization report, make any necessary revisions, and submit a design proposal for Government | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 9/30/2009 |
JOHN MILNER ASSOCIATES, INC. | $499,963 | Contract | : Project Number 323733. Cultural resources investigations of 14 archeological sites, including background research, development of historic contexts, site evaluations, laboratory processing and analysis, and reports, with recommendations. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/10/2009 |
JOHN MILNER ASSOCIATES, INC. | $636,500 | Contract | : Project Number 324332. Cultgural resources investigations of National Register of Historic Places eligibility for sixteen dams, and Phase 1 archeological investigations at three reservoirs within the Corps of Engineers Pittsburgh District. | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/10/2009 |
STATISTICAL RESEARCH, INC. | $498,223 | Contract | : Project 324332: Section 110 cultural resources investigations of Fall River Lake, Toronto Lake, Big Hill Lake, Marion Lake and John Redmond Lake, all in Kansas and Waurika Lake, Hugo Lake and Copan Lake in Oklahoma for the U.S. Army Corps of Engineers, | U.S. Army Corps of Engineers / U.S. Army Corps of Engineers - civil program financing only | 11/10/2009 |