Contract: COLEMAN CONSTRUCTION, INC.
Primary Recipient
COLEMAN CONSTRUCTION, INC.
Amount
$170,920.30
Award Date
5/14/2009
Administering Agency
CDFA Number
CDFA Program Title
Description
Install temporary fencing around water tank as detailed on aerial drawing. Installation of temporary fencing shall be initially installed on the weekend and taken down at the direction of the CES SABER PM. Repaint exterior 500,000 Gallon Elevated Water St